AUTOMATION OF THE CASTLE BUILDING COMPLEX Along with technical development, the technical integration and modernisation of existing systems Case Study takes on an increasingly significant role in the everyday life of institutions and economic organisations. Integration of the technical systems of the Castle Theatre, the National Széchenyi Library, the Hungarian National Gallery, the Historical Museum and the Cooling House

The is part of the Buda old town area and is one of the most important cultural and touristic centres of Budapest.

Since 1987, it has been a UNESCO World Heritage site. The first stones of the gothic-style royal were laid in the spring of 1247, following the Tatar invasion, on orders by King Bela IV. Thanks to the expansions and renovations over the subsequent centuries, today you can find the signs of , and secession styles. The three main parts of the Buda old town area are the Buda Castle, Szent György tér (St. George’s place) and the historic residential area. The buildings are home to museums, theatres, libraries, hotels and churches. Among cultural institutions, the National Szécsenyi Library, Hungarian National Gallery and Budapest Historic Museum are the most significant. The task of Várgondnokság Non-profit Kft. is to maintain and develop the historical status of estates in the area of Buda Castle.

THE CHALLENGE The previously installed IT systems were unable to handle the central processing and control functions of the machines and installations operating in the buildings and the required level of information. The data of the isolated systems and registers are saved in different databases and it took great effort to retrieve the information required to maintain these systems from these separate databases.

THE TASK The objective involves the simple and central Due to the monument status of the building operability of the machine installations in the complex, the assembly work could only be The technical special exhibition areas of these buildings. performed under strict rules. In the larger systems were Precious cultural values that require special area, an IT-network had to be created to storage have high requirements for the maintain proper communication. The technical integrated into engineering systems: a consistent temperature systems of the Castle Theatre, the National the EBI controlling and humidity must be continuously provided, Széchenyi Library, the Hungarian National system installed special lighting is required, etc. Some buildings Gallery, the Budapest Historical Museum and have their own engineering plants (cooling, the Cooling House were integrated into the by Honeywell. heating, air technology, etc.), which also must EBI controlling system installed by Honeywell be integrated and centralised as part of the Szabályozástechnikai Kft. task. Given the total lack of a CCTV system in the area, this system also had to be installed from scratch.

Várgondnokság Non-profit Kft. assigned Honeywell Szabályozástechnikai Kft. the task of planning, installing and maintaining a modern building automation system.

© Honeywell Building Solutions 2019 | Buda Castle, Budapest, THE SOLUTION Today, a modern building automation system The IT background was provided by high operates behind the walls that feature the performance Dell servers and workstations. Stationary and footprints of many different styles. Using the investments, which ended in 2000, mobile cameras The first investments were made in 2000. an optic main network was installed to provide In 2011, the IT systems were modernised. communication between the systems. were installed The active network components in the at strategically The building systems (electric control, buildings (switch, router, etc.), which also have building automation, access system, intrusion important points a data entry system with UPS, are connected alarm, video surveillance, fire alarm, etc.) to this network. of the area. are implemented using the Honeywell EBI software. Automation control boxes have been In order to provide general surveillance placed in the buildings. Different plants are of the areas, it was necessary to create a CCTV connected to them with their signals forwarded system that helps the work of the security on to the existing IT network. Modules were service. Stationary and mobile cameras were integrated to ensure the control and handling installed at strategically important points of the different systems: of the area. The digitalised pictures are processed via the IT network. In 2011, the • Enterprise Building Integrator, version entire IT assets park was changed. Honeywell R410.2 (software) installed the newest version of its software • Digital Video Manager R400.2 (software) as well. In addition, the cameras of the CCTV • CCTV systems (fixed and mobile cameras, system were modernised and some facilities optics and camera facilities) were also expanded and modernised in • Engineering control plants (cooling, heating, compliance with the partner’s changing needs. air technology) Due to the limited financial resources of the • IT communication network (optic and copper Buda Castle, the entire system renewal was cables, routers, switches) implemented with Honeywell’s support in • IT plants (servers, workstations, monitors) sections of five-year ELM construction, which includes a system update at the half of the The system was ready in 2000 with the operation time, and the installation of the latest first version of the EBI and DVM Honeywell software versions at the end of the cycle. software. The version was redundant both at the software and the hardware level.

© Honeywell Building Solutions 2019 | Buda Castle, Budapest, Hungary THE RESULT The solution installed by Honeywell integrates the earlier separate systems and registers of the Buda Castle into a single system. The integrated building surveillance system ensures the monitoring of the entire building, the energy efficient operation of the system as well as rapid and efficient response.

As for cultural values, the installed security systems meet the demands of the highest safety requirements.

For more information www.buildingsolutions.honeywell.com