Profile: West Coast
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
GTAC/CBPEP/ EU Project on Employment-Intensive Rural Land Reform in South Africa: Policies, Programmes and Capacities
GTAC/CBPEP/ EU project on employment-intensive rural land reform in South Africa: policies, programmes and capacities Municipal case study Matzikama Local Municipality, Western Cape David Mayson, Rick de Satgé and Ivor Manuel with Bruno Losch Phuhlisani NPC March 2020 Abbreviations and acronyms BEE Black Economic Empowerment CASP Comprehensive Agricultural Support Programme CAWH Community Animal Health Worker CEO Chief Executive Officer CPA Communal Property of Association CPAC Commodity Project Allocation Committee DAAC District Agri-Park Advisory Committee DAPOTT District Agri Park Operational Task Team DoA Department of Agriculture DRDLR Department of Rural Development and Land Reform DWS Department of Water and Sanitation ECPA Ebenhaeser CPA FALA Financial Assistance Land FAO Food and Agriculture Organisation FPSU Farmer Production Support Unit FTE Full-Time Equivalent GGP Gross Geographic Product GDP Gross Domestic Product GVA Gross Value Added HDI Historically Disadvantaged Individual IDP Integrated Development Plan ILO International Labour Organisation LED Local economic development LORWUA Lower Olifants Water Users Association LSU Large stock units NDP National Development Plan PDOA Provincial Department of Agriculture PGWC Provincial Government of the Western Cape PLAS Proactive Land Acquisition Strategy SDF Spatial Development Framework SLAG Settlement and Land Acquisition Grant SSU Small stock unit SPP Surplus People Project TRANCRAA Transformation of Certain Rural Areas Act WUA Water Users Association ii Table of Contents -
Swartland Municipality Integrated Development Plan for 2017-2022
Swartland Municipality Integrated Development Plan for 2017-2022 THIRD AMENDMENT 28 MAY 2020 INTEGRATED DEVELOPMENT PLAN FOR 2017-2022 Compiled in terms of the Local Government: Municipal Systems Act, 2000 (Act 32 of 2000) Amendments approved by the Municipal Council on 28 May 2020 The Integrated Development Plan is the Municipality’s principal five year strategic plan that deals with the most critical development needs of the municipal area (external focus) as well as the most critical governance needs of the organisation (internal focus). The Integrated Development Plan – is adopted by the council within one year after a municipal election and remains in force for the council’s elected term (a period of five years); is drafted and reviewed annually in consultation with the local community as well as interested organs of state and other role players; guides and informs all planning and development, and all decisions with regard to planning, management and development; forms the framework and basis for the municipality’s medium term expenditure framework, annual budgets and performance management system; and seeks to promote integration by balancing the economic, ecological and social pillars of sustainability without compromising the institutional capacity required in the implementation, and by coordinating actions across sectors and spheres of government. AREA PLANS FOR 2020/2021 The five area plans, i.e. Swartland North (Moorreesburg and Koringberg), Swartland East (Riebeek West and Riebeek Kasteel), Swartland West (Darling and Yzerfontein), Swartland South (Abbotsdale, Chatsworth, Riverlands and Kalbaskraal) and Swartland Central (Malmesbury) help to ensure that the IDP is more targeted and relevant to addressing the priorities of all groups, including the most vulnerable. -
Growth Potential of Towns in the Western Cape
Growth Potential of Towns in the Western Cape WESTERN CAPE SPATIAL INFORMATION FORUM 14 November 2013 Growth Potential Study (GPS) of Towns IN A NUTSHELL PURPOSE? Purpose of the GPS is not to identify where growth (e.g. economic, population and physical) should occur, but rather where it is likely to occur (in the absence of significant interventions). HOW? Use quantitative data (measurements) to model the growth preconditions and innovation potential. BACKGROUND • 2004: GPS1 • Van der Merwe, Zietsman, Ferreira, Davids • 2010: GPS2 • Van Niekerk, Donaldson, Du Plessis, Spocter • 2012/13: GPS3 • Van Niekerk, Donaldson, Du Plessis, Spocter, Ferreira, Loots GPS3: PROJECT PLAN 1. Functional region mapping 2. Qualitative analysis 3. Public participation 4. Public sector priorities alignment 5. Quantitative analysis 6. Draft Report 7. Public comment GPS3: PROJECT PLAN 1. Functional region mapping 2. Qualitative analysis 3. Public participation 4. Public sector priorities alignment 5. Quantitative analysis 6. Draft Report 7. Public comment QUANTITATIVE ANALYSIS QUANTITATIVE ANALYSIS PROCEDURE 1. Create conceptual framework for estimating growth potential 2. Identify indicators that address growth potential concepts 3. Collect and manipulate data 4. Carry out statistical analyses to reduce data duplication 5. Carry out spatial analyses 6. Perform sensitivity analysis 7. Present and interpret the results DATA COLLECTION & MANIPULATION • Needed to collect data for all local municipalities and 131 settlements (as defined in GPS1) • Thiessen (Voronoi) -
Freshwater Fishes
WESTERN CAPE PROVINCE state oF BIODIVERSITY 2007 TABLE OF CONTENTS Chapter 1 Introduction 2 Chapter 2 Methods 17 Chapter 3 Freshwater fishes 18 Chapter 4 Amphibians 36 Chapter 5 Reptiles 55 Chapter 6 Mammals 75 Chapter 7 Avifauna 89 Chapter 8 Flora & Vegetation 112 Chapter 9 Land and Protected Areas 139 Chapter 10 Status of River Health 159 Cover page photographs by Andrew Turner (CapeNature), Roger Bills (SAIAB) & Wicus Leeuwner. ISBN 978-0-620-39289-1 SCIENTIFIC SERVICES 2 Western Cape Province State of Biodiversity 2007 CHAPTER 1 INTRODUCTION Andrew Turner [email protected] 1 “We live at a historic moment, a time in which the world’s biological diversity is being rapidly destroyed. The present geological period has more species than any other, yet the current rate of extinction of species is greater now than at any time in the past. Ecosystems and communities are being degraded and destroyed, and species are being driven to extinction. The species that persist are losing genetic variation as the number of individuals in populations shrinks, unique populations and subspecies are destroyed, and remaining populations become increasingly isolated from one another. The cause of this loss of biological diversity at all levels is the range of human activity that alters and destroys natural habitats to suit human needs.” (Primack, 2002). CapeNature launched its State of Biodiversity Programme (SoBP) to assess and monitor the state of biodiversity in the Western Cape in 1999. This programme delivered its first report in 2002 and these reports are updated every five years. The current report (2007) reports on the changes to the state of vertebrate biodiversity and land under conservation usage. -
A SECOND ASSEMBLAGE of PLIOCENE INVERTEBRATE FOSSILS from LANGEBAANWEG, CAPE Are Issued in Parts at Irregular Intervals As Material Becomes Available
ANNALS OF THE SOUTH AFRICAN MUSEUM ANNALE VAN DIE SUID-AFRIKAANSE MUSEUM Volume 72 Band April 1977 April Part 10 Deel A SECOND ASSEMBLAGE OF PLIOCENE INVERTEBRATE FOSSILS FROM LANGEBAANWEG, CAPE are issued in parts at irregular intervals as material becomes available word uitgegee in dele op ongereelde tye na beskikbaarheid van stof OUT OF PRINT/UIT DRUK 1,2(1,3, 5-8), 3(1-2, 4-5,8, t.-p.i.), 5(1-3, 5, 7-9), 6(1, t.-p.i.), 7(1-4), 8, 9(1-2,7), 10(1), 11(1-2,5,7, t.-p.i.), 15(4-5),24(2),27,31(1-3),33 Price of this part/Prys van hierdie deel R2,50 Trustees of the South African Museum © Trustees van die Suid-Afrikaanse Museum 1977 Printed in South Africa by In Suid-Afrika gedruk deur The Rustica Press, Pty., Ltd., Die Rustica-pers, Edms., Bpk., Court Road, Wynberg, Cape Courtweg, Wynberg, Kaap A SECOND ASSEMBLAGE OF PLIOCENE INVERTEBRATE FOSSILS FROM LANGEBAANWEG, CAPE BRIAN KENSLEY South African Museum, Cape Town An assemblage of fossils from the Quartzose Sand Member of the Varswater Formation at Langebaanweg is described. The assemblage consists of 20 species of gasteropods, 2 species of bivalves, 1 amphineuran species, about 4 species of ostracodes, and the nucules of a species of the alga Chara (stonewort). Included amongst the molluscs is a new species of Bu/lia, to be described later by P. Nuttall of the British Museum, and a new species of the bivalve genus Cuna described here. -
Section 5 Industrial Market Analysis
Saldanha Development Zone Pre-Feasibility Analysis - Final Report _OCTOBER 2009 SECTION 5 INDUSTRIAL MARKET ANALYSIS 5.1 INTRODUCTION CHAPTER 7: INDUSTRIAL ANALYSI Saldanha has developed into the largest industrial centre along the West Coast and there is further growth potential in the downstream steel manufacturing sector, agricultural sector and the mining sector, which can lead to job creation. Further growth potential in the oil and gas industries along the coast could also alter the function of the area. As a cautionary note it may be added that the town operates within a particularly sensitive marine and atmospheric environment highly vulnerable to air and water pollution. Great care will have to be taken to ensure sustainable maintenance of a healthy environment. The town is fully dependent on the already heavily taxed Berg River for its water supply - a strategically vulnerable limitation in terms of possible development. Apart from creating a vibrant industrial sector and supportive services and infrastructure, development in the region should also focus on creating a quality of life that contributes to a productive labour force and a favourable working-playing-living environment. This includes initiatives for human resource development, community empowerment, local economic development and basic infrastructure provision. In order to determine the development opportunities that can be exploited for the purpose of industrial establishment in the IDZ, it is necessary to assess the potential provided by existing economic activities in the province, as well as to identify opportunities through planned development initiatives in the country. Linked to this, are the current international market trends in product trading, the potential of establishing industries in the value chain of existing production lines and the potential of products to be manufactured competitively in South Africa (refer to Annexure A : Industrial Market Overview / Indicators). -
Dissertation Masters in Development Studies Mds 794
RESILIENCE AND ADAPTABILITY OF RURAL COMMUNITIES A CASE STUDY OF EBENHAESER James Backhouse visit to Ebenezer, 1840 DISSERTATION MASTERS IN DEVELOPMENT STUDIES MDS 794 Ilma Brink Student number: 2005024092 Centre for Development Support University of the Free State Bloemfontein 2014 Resilience and Adaptability of Rural Communities. A Case Study of Ebenhaeser Ilma Brink Contents TABLE OF FIGURES, MAPS, TABLES AND TRAVEL DEPICTIONS ....................... 4 ABBREVIATIONS ...................................................................................................... 6 INTRODUCTION ........................................................................................................ 7 CHAPTER 1: PROBLEM STATEMENT .................................................................. 10 Introduction ........................................................................................................... 10 1.1 Critical Questions ........................................................................................ 11 1.2 Objectives of the Study ............................................................................... 12 1.3 Significance of the Study ............................................................................. 12 CHAPTER 2: RESEARCH DESIGN ........................................................................ 13 Introduction ........................................................................................................... 13 2.1 Focus area of research .............................................................................. -
Proposed Realignment of Gauging Weirs Downstream of the Bulshoek Dam and in the Doring River, Western Cape Province
PROPOSED REALIGNMENT OF GAUGING WEIRS DOWNSTREAM OF THE BULSHOEK DAM AND IN THE DORING RIVER, WESTERN CAPE PROVINCE Phase 1 – Heritage Impact Assessment Issue Date - 3 December 2015 Revision No. - 2 Project No. - 131HIA PGS Heritage (Pty) Ltd PO Box 32542 Totiusdal 0134, T +27 12 332 5305 F: +27 86 675 8077 Reg No 2003/008940/07 Declaration of Independence The report has been compiled by PGS Heritage, an appointed Heritage Specialist for Zitholele Consulting. The views stipulated in this report are purely objective and no other interests are displayed during the decision making processes discussed in the Heritage Impact Assessment Process. HERITAGE CONSULTANT - PGS Heritage CONTACT PERSON - W Fourie Tel - +27 (0) 12 332 5305 Email - [email protected] SIGNATURE - ______________________________ ACKNOWLEDGEMENT OF RECEIPT CLIENT - Zitholele Consulting CONTACT PERSON - Kariesha Tilakram T: +27 11 207 2060 E: [email protected] SIGNATURE - ______________________________ HIA – Realignment of Gauging Weirs Downstream of the Bulshoek Dam and in the Doring River ii Date - 11 November 2015 Proposed realignment of gauging weirs downstream of the Bulshoek Dam and in Document Title - the Doring River, Western Cape Province Control Name Signature Designation Author W. Fourie Heritage Specialists/ Principal Investigator Reviewed K. Tilakram Zitholele Consulting HIA – Realignment of Gauging Weirs Downstream of the Bulshoek Dam and in the Doring River iii EXECUTIVE SUMMARY PGS Heritage (PGS) was appointed by Zitholele Consulting to undertake a Heritage Impact Assessment (HIA) that forms part of the Basic Environmental Impact Report (BAR) for the proposed realignment of the gauging weirs downstream of the Bulshoek Dam and in the Doring river, Western Cape Province. -
TKAK 2A?Sbo436 - 2&S00647
TKAK 2A?Sbo436 - 2&S00647 PEn-sfi DISCUSSION FORUM FOR RESEARCHERS IN NUCLEAR GEOLOGY- PROGRAMME ABSTRACTS AND NEWSLETTER PELINDABA REPUBLIC OF SOUTH AFRICA 1 -2 NOVEMBER 1984 by H J Brynard (Editor) NUCLEAR DEVELOPMENT CORPORATION OF SOUTH AFRICA (PTY) LTD x N U C O R m PRIVATE BAG X266 PRETORIA 0001 a, oo JANUARY 1985 Jill iltiitl PER-88 NUCLEAR DEVELOPMENT CORPORATION OF SOUTH AFRICA (PTY) LTD DISCUSSION FORUM FOR RESEARCHERS IN NUCLEAR GEOLOGY- PROGRAMME ABSTRACTS AND NESLETTER PELINDABA REPUBLIC OF SOUTH AFRICA 1 -2 NOVEMBER 1984 by H J Brynard* (Editor) 'Geology Department POSTAL ADDRESS: Private Bag X256 PELINDABA PRETORIA January 1985 0001 ISBN 0-86960-768-5 DISCUSSION FORUM FOR RESEARCHERS IN NUCLEAR GEOLOGY MAIN AUDITORIUM, PELINDABA 21 - 22 NOVEMBER 1984 PROGRAMME WEDNESDAY 21 NOVEMBER P D Toens -Welcome and introductor- remarks (NUCOR) SESSION 1: URANIUM IN GRANITES CONVENOR: A E SCHOCH (OOFS) P R Simpson Plenary address: Uraniferous high (British Geological heat production granites and their Survey) mineralising systems L J Robb The distribution of uranium in (E G R U) Archaean basement granites from the provenance region of the Witwatersrand Basin R J Hart Petrological and geochemical MAG Andreoli studies of the Vredefort Structure: (NUCOR) new clues to the evolution of the pre-Witwatersrand basement MAG Andreoli Radioelement fertilisation in R J Hart granulites of the Mozambique and (NUCOR) Kibaran belts N Niemand Uranium and thorium distribution in (NUCOR) the Verena and Makhutso gran, tes of the Bushveld Complex D Twist -
Flower Route Map 2014 LR
K o n k i e p en w R31 Lö Narubis Vredeshoop Gawachub R360 Grünau Karasburg Rosh Pinah R360 Ariamsvlei R32 e N14 ng Ora N10 Upington N10 IAi-IAis/Richtersveld Transfrontier Park Augrabies N14 e g Keimoes Kuboes n a Oranjemund r Flower Hotlines O H a ib R359 Holgat Kakamas Alexander Bay Nababeep N14 Nature Reserve R358 Groblershoop N8 N8 Or a For up-to-date information on where to see the Vioolsdrif nge H R27 VIEWING TIPS best owers, please call: Eksteenfontein a r t e b e e Namakwa +27 (0)79 294 7260 N7 i s Pella t Lekkersing t Brak u West Coast +27 (0)72 938 8186 o N10 Pofadder S R383 R383 Aggeneys Flower Hour i R382 Kenhardt To view the owers at their best, choose the hottest Steinkopf R363 Port Nolloth N14 Marydale time of the day, which is from 11h00 to 15h00. It’s the s in extended ower power hour. Respect the ower Tu McDougall’s Bay paradise: Walk with care and don’t trample plants R358 unnecessarily. Please don’t pick any buds, bulbs or N10 specimens, nor disturb any sensitive dune areas. Concordia R361 R355 Nababeep Okiep DISTANCE TABLE Prieska Goegap Nature Reserve Sun Run fels Molyneux Buf R355 Springbok R27 The owers always face the sun. Try and drive towards Nature Reserve Grootmis R355 the sun to enjoy nature’s dazzling display. When viewing Kleinzee Naries i R357 i owers on foot, stand with the sun behind your back. R361 Copperton Certain owers don’t open when it’s overcast. -
Cederberg-IDP May 2020 – Review 2020-2021
THIRD REVIEW: 2020/2021 MAY 2020 SECTIONS REVISED THIRD REVISION TO THE FOURTH GENERATION IDP ................... 0 3.8. INTERGOVERNMENTAL RELATIONS ................................. 67 FOREWORD BY THE EXECUTIVE MAYOR.................................. 2 3.9. INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) ...... 68 ACKNOWLEDGEMENT FROM THE MUNICIPAL MANAGER AND IMPORTANT MESSAGE ABOUT COVID-19 ................................. 4 CHAPTER 4: STRATEGIC OBJECTIVES AND PROJECT ALIGNMENT .. 71 EXECUTIVE SUMMARY ....................................................... 5 4.1 IMPROVE AND SUSTAIN BASIC SERVICE DELIVERY AND CHAPTER I: STATEMENT OF INTENT ...................................... 9 INFRASTRUCTURE .................................................... 73 1.1. INTRODUCTION ......................................................... 9 A. Water B. Electricity 1.2. THE FOURTH (4TH) GENERATION IDP .............................. 10 C. Sanitation D. Refuse removal / waste management 1.3. THE IDP AND AREA PLANS ........................................... 11 E. Roads F. Comprehensive Integrated Municipal Infrastructure Plan 1.4. POLICY AND LEGISLATIVE CONTEXT ................................ 11 G. Stormwater H. Integrated Infrastructure Asset Management Plan 1.5. STRATEGIC FRAMEWORK OF THE IDP .............................. 13 I. Municipal Infrastructure Growth Plan 1.6. VISION, MISSION, VALUES ............................................ 14 4.2 FINANCIAL VIABILITY AND ECONOMICALLY SUSTAINABILITY .... 87 1.7. STRATEGIC OBJECTIVES ............................................ -
Badisa Matzi-Care, Vanrhynsdorp
BADISA MATZI-CARE Adres Missie Voortrekkerstraat, Vanrhynsdorp- Ons missie is: Badisa Matzi-Care strewe daarna om tot eer van God mense in nood in totale gemeenskap te help tot Bedieningsgebied die ontwikkeling van hulle volle potensiaal. Ons doen dit Vanrhynsdorp en omliggende deur middel van omvattende gemeenskapsgebaseerde plase, Klawer en omliggende programme en in samewerking met ander rolspelers. plase, Trawal en omliggende plase, Vredendal en plase wes Doelstellings van die Olifantsrivier, Lutzville en • Bewusmaking en voorkoming - Om maatskaplike Uitsig. wanfunksionering te voorkom deur bewusmakings- en voorkomingsprogramme te loods aan teikengroepe wat Beheerraad kwesbaar is. Programme word in vennootskap met die Voorsitter: Me Huibrecht F Wiese gemeenskap gedoen. Teikengroepe word van soveel moontlike inligting voorsien ten einde verantwoordelike Onder-voorsitter: Ds Elmo Evert besluitneming en sosiaal aanvaarbare gedrag te bevorder. Ds Angelique S Esau • Vroeë intervensie - Ontwikkelingsgerigte en terapeutiese Mnr Joseph J Claase programme word gerig op teikengroepe waar risiko’s Me Linda M Smit geïdentifieer is. Mnr Martin Smuts • Statutêre intervensie - Statutêre prosesse word gevolg om Mev Hannie Pool die kliënt te beskerm, te beveilig of in alternatiewe sorg te plaas. Werknemers • Herintegrasie - Dienste wat op hierdie vlak gelewer V V V V V V V word, het ten doel om die individu terug te plaas in sy/ haar gesin en gemeenskap van oorsprong. Nasorg en ondersteuningsdienste word aan die individu en die gesin 7 PERMANENTE