Khammouane Natural Cultural and Historic Heritage Tourism

Total Page:16

File Type:pdf, Size:1020Kb

Khammouane Natural Cultural and Historic Heritage Tourism Natural, Cultural and Historic Heritage Tourism Preservation and Management Plan Khammouane Province 2016-2025 Mekong Subregion Tourism Infrastructure for Inclusive Growth Project Acknowledgements The Department of Information, Culture and Tourism of Khammouane Province would like to sincerely thank the Department of Tourism Devlopment, Ministry of Informaiton, Culture and Tourism (MICT) and the Khammouane Government that has provided funding support through the Mekong Sub region Tourism Infrastructure for Inclusive Growth Project to develop the Natural, Cultural and Historical Heritage Protection and Management Plan for Khammouane Province. Sincere gratitudes are extended to Mr. Thaviphet Oula, Deputy Director General of the Tourism Development Department and Project Director, Mrs. Phongsith Davading, Project Consultant for their technical support and guidance. High appreciation goes out to the related sectors for their consultation and comments on the draft heritage tourism protection and management plan for Khammouane Province. The team responsible for drafting this Natural, Cultural and Historical Heritage Protection and Management Plan, Khammouan Province 2016 – 2025 strived to include and provide as much information as possible, however at the time of writing certain details may have been omitted and incomplete. We envisioned that there will be more stakeholder consultations in order to gain feedback and comments to improve and make this plan more comprehensive and appropriate to the context of the economic and social development of Khammouane Province. Table Of Contents Part I Introduction....................................................................................................................................1 1. Summary of tourism development related to natural, cultural and historic heritage conservation 2005 - 2015..............................................................................................................................................1 2. 2. Rationale and Principles..............................................................................................................2 2.1 Rationale ...........................................................................................................................2 2.2 Priciples ............................................................................................................................2 3. Scope of the heritage tourism protection and management plan 2016-2025................................3 Part II The Natural, Cultural and Historic Heritage Tourism Protection and Management Plan...............4 1. References and methodology used for developing the Heritage Tourism Protection and Management Plan 2016 -2025 ...................................................................................................................4 2. SWOT Anylasis............................................................................................................................4 2.1 Strength:............................................................................................................................4 2.2 Weaknesses.......................................................................................................................5 2.3 Opportunities......................................................................................................................5 2.4 Challenges...........................................................................................................................6 3. Vision, Objectives and Targets of the Natural, Cultural and Historic Heritage Tourism Protection and Management Plan 2016 – 2025..........................................................................................................6 3.1 Vision................................................................................................................................6 3.2 Objectives...........................................................................................................................7 3.3 Targets.................................................................................................................................7 3.4 Strategy..............................................................................................................................8 4. Policies..........................................................................................................................................9 5. Programs and Projects for 2016-2025 ........................................................................................11 5.1 To achieve the strategic objective to develop the natural, cultural and historic heritage tourism conservation and management plans the programs and projects are:...........................11 5.2 To achieve the strategic objective to revive and promote the outstanding natural environment and cultural traditions and customs of local people the programs and projects include:...........14 5.3 To achieve the strategic objective to conserve and manage natural, cultural and historical heritage tourism sites involve the following programs and projects:..........................................15 5.4 To achieve the strategic objective to improve of services linked to the protection and management of heritage tourism to the international quality standards the programs and projects includes:......................................................................................................................................17 5.5 To achieve strategic objective to develop the Khammouane destination development, management and promotional plan (DMP).................................................................................17 5.6 To achieve the strategic objective to improve facilities and urban infrastructure systematically and comprehensively, the programs and projects are:.....................................17 5.7 To achieve the strategic objective to improve tourism sites that meet standards for sustainable use.....................................................................................................................18 5.8 To achieve the strategic objective to formulate marketing activities to advertise and promote heritage tourism, the programs and projects are as below:..........................................19 5.9 To achieve the strategic objective to develop of human resources in the tourism sector related to the protection and management Heritage tourism attractions, the programs and projects are: .......................................................................................................................19 5.10 To achieve the strategic objective to promote of activities related to the protection and management of heritage tourism recources and generate income for the community, the following programs and projects are:................................................................................20 5.11 To achieve the strategic objective to upgrading the capacity and skills of local people, the programs and projects include:..........................................................................................21 5.12 To achieve the strategic objective to establish favorable conditions and facilitate access for local people to maximize revenue from tourism and employment, the programs and projects are:........................................................................................................................21 5.13 To achieve the strategic objective to formulate legislation to improve services linked to the protection and management of heritage tourism resources, the program and projects are:.......................................................................................................................21 5.14 To achieve the strategic objective to strengthen capacity of the tourism operators and service providers that is linked to the protection and management of heritage tourism attractions, the programs and projects are:...............................................................................22 5.15 To achieve the strategic objective to promote monitoring and management of services related to the protection of heritage tourism attractions, the program and projects are as below:...............................................................................................................................22 5.16 To achieve the strategic objective to support the cooperations between public - private in protecting heritage tourism attractions, the programs and projects are as follow:...............22 5.17 To achieve the strategic objective to identify of appropriate form of cooperation between the public and private participation and local communities for the protection and management of heritage tourism, the programs and projects are as below:.........................................................22 5.18 To achieve the strategic objective to monitor and evaluate heritage tourism attractions protection and management, the program and projects are as below:........................................23 Part III Implementation guidelines for Heritage Protection and Management Plan 2016 – 2025....24 Part IV Implementation Plan 2016-2025..............................................................................................25 Forward The Department of Information, Culture and Tourism, Khammouane Province together with the Department of Tourism Development, Ministry of Information, Culture and Tourism and the Tourism
Recommended publications
  • The Mineral Industry of Laos in 2015
    2015 Minerals Yearbook LAOS [ADVANCE RELEASE] U.S. Department of the Interior October 2018 U.S. Geological Survey The Mineral Industry of Laos By Yolanda Fong-Sam In 2015, Laos produced a variety of mineral commodities, oversees and implements the mineral law, mine safety, and including barite, copper, gold, iron ore, lead, and silver. mine closure regulations; creates the necessary regulations and Laos had a variety of undeveloped mineral resources. The guidelines for the promotion of the mining and metallurgical Government recognized mining as a critical sector of the sector; and issues, rejects, extends, and withdraws mining economy, and it continued to support it while at the same time licenses (Department of Mineral Resources of Thailand, 2013; promoting other domestic and foreign investments. As of 2014, REDD Desk, The, 2015; Ministry of Natural Resources and employment in the mining sector was about 15,381 people, Environment, 2016). which represented about 0.3% of the total population of Laos. In 2015, the main producers of copper and gold in Laos were Lane Xang Minerals Ltd. (MMG LXML), which was Minerals in the National Economy a subsidiary of MMG Ltd. of Hong Kong (90% interest) and the Government (10% interest), and Phu Bia Mining Ltd. In 2015, Lao’s industrial sector, which included the (PBM), which was a subsidiary of PanAust Ltd. of Australia construction, electricity generation, manufacturing, and mining (90% interest) and the Government (10% interest). The and quarrying sectors, grew by 9.7% and contributed 29.3% to country’s major mineral industry facilities and their capacities Lao’s real gross domestic product (GDP) (at constant 2002 are listed in table 2.
    [Show full text]
  • Malaria Transmission by Anopheles Dirus in Attapeu Province, Lao Pdr
    MALARIA TRANSMISSION BY AN. DIRUS IN LAO PDR MALARIA TRANSMISSION BY ANOPHELES DIRUS IN ATTAPEU PROVINCE, LAO PDR B Sidavong1, I Vythilingam2, R Phetsouvanh1, ST Chan2, T Phonemixay1, S Lokman Hakim2 and S Phompida1 1Center for Malaria, Parasitology and Entomology, Vientiane, Lao PDR; 2Institute for Medical Research, Kuala Lumpur, Malaysia Abstract. A study was carried out in four malaria-endemic villages in Attapeu Province, in the southern region of Lao PDR. All-night human landing collections were carried out in May, August, and October 2002, to determine malaria vectors. At the same time, mass blood surveys were also carried out in the same villages. Anopheles dirus was the predominant species in three of the study villages. Sporozoites were found only in An. drius from Phou Hom. However, in Beng Phoukham, An. dirus was positive for oocysts. The distribution of malaria cases was highest in Phou Hom and this correlated well with the vectorial capacity of An. dirus. The risk for infection from An. dirus was also high, at 0.99. INTRODUCTION Mekong Region. Since An. dirus has been found in Sekong, which is a province in the south, we Malaria is a serious public health problem wanted to determine how far south An. dirus was in Lao PDR, which is a landlocked country. Most present. malaria cases are reported from the provinces south of Vientiane, the capital of Lao PDR. Very Attapeu Province is the southern-most prov- little is known about the malaria vectors in Lao ince of Lao PDR, and it has common borders with PDR, as mosquito dissections have not been car- Vietnam and Cambodia.
    [Show full text]
  • 50099-003: Fourth Greater Mekong Subregion Corridor Towns
    Environmental Monitoring Report 1st Semestral Report May 2020 Lao PDR: Fourth Greater Mekong Subregion Corridor Towns Development Project Prepared by the Project Coordination Unit of Department of Housing and Urban Planning for the Ministry of Public Works and Transport, Lao PDR and the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Lao People’s Democratic Republic Peace Independence Democracy Unity Prosperity Ministry of Public Works and Transport Department of Housing and Urban Planning Fourth Greater Mekong Sub-Region Corridor Towns Development Project (ADB Grant No. 0606) Semi-Annual Environmental Safeguard Monitoring Report March – December 2019 Prepared by the Project Coordination Unit of Department of Housing and Urban Planning for the Ministry of Public Works and Transports and the Asian Development Bank. NOTE: In this report, "$" refers to US Dollars This environmental safeguard monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • 1 Lao People's Democratic Republic Peace Independence Democracy Unity Prosperity Ministry of Health Department of Planning
    Lao People’s Democratic Republic Peace Independence Democracy Unity Prosperity Ministry of Health Department of Planning and Cooperation GMS Health Security Project Cross border checkpoint (Points of entry) survey report The department of communicable disease control of the ministry of health conducted the survey of the border checkpoints during the period of June to September 2019. The survey was to implement one of the activities of the annual operation plan 2019 supported by the health security project and funded by the Asian Development Bank (ADB). The overall objectives of the survey were to have the information about the operation and the capacity of the border checkpoints in meeting the core capacity of the International Health Regulation for the public health emergency operation. Specific objectives were to: Map out the location/site of each checkpoint Assess the availability of health facilities, equipment, numbers of health staff and location of health checking counter and SOP Collect the information of traffic volume crossing the border checkpoints Assess the preparedness and response capacity at the PoE See the gaps, constraints and make the recommendation for an improved capacity in disease outbreak control at the border checkpoint I. Border checkpoints in the survey: A totally 27 selected points of entry surveyed which included 4 international airports, 23 ground crossing points and 3 local traditional checkpoints shown in the table below: No. Province District Check point name Shared border Sikhottabong Wattai International
    [Show full text]
  • Baseline Report Xe Champhone Wetland, Champhone and Xonbuly Districts, Savannakhet Province, Lao PDR
    Baseline Report Xe Champhone Wetland, Champhone and Xonbuly Districts, Savannakhet Province, Lao PDR MEKONG WATER DIALOGUES 0 June 2011 The designation of geographical Published by: IUCN, Gland, Cover Photo: Turtle Pond at ban entities in this publication, and Switzerland, and Vientiane, Lao Donedeng, Xe Champhone the presentation of the material, PDR. Wetland, IUCN Lao PDR do not imply the expression of any opinion whatsoever on the Copyright: © 2011 International Layout by: Charlotte Hicks part of IUCN or The Ministry for Union for Conservation of Nature Foreign Affairs of Finland and Natural Resources Produced by: IUCN Lao PDR concerning the legal status of any Country Office country, territory, or area, or of its Reproduction of this publication authorities, or concerning the for educational or other non- Funded by: The Ministry for delimitation of its frontiers or commercial purposes is Foreign Affairs of Finland and boundaries. authorized without written IUCN permission from the copyright The views expressed in this holder provided the source is fully Available from: publication do not necessarily acknowledged. IUCN reflect those of IUCN or The Lao PDR Country Office Ministry for Foreign Affairs of Reproduction of this publication PO Box 4340 Finland. for resale or other commercial 082/01 Fa Ngum Rd purposes is prohibited without Ban Wat Chan, This report is a summary of prior written permission of the Vientiane, Lao PDR research implemented in 2011 copyright holder. Tel: +856-21-216401 under the Mekong Water Fax: +856-21-216127 Dialogues, facilitated by IUCN. Citation: IUCN (2011). Baseline Web: www.iucn.org/lao No warranty as to the accuracy or Report: Xe Cha,phone Wetland, completeness of this information Champhone and Xonbuly is given and no responsibility is Districts, Savannakhet Province, accepted by IUCN or its Lao PDR, Mekong Water employees for any loss or Dialogues Project.
    [Show full text]
  • V-4 Tourism Industry Development Plan
    PLANET CPC – JICA V-4 TOURISM INDUSTRY DEVELOPMENT PLAN V-4.1 Present Condition of Tourism in SKR 1) Tourism Resources and Products The major interest for tourists visiting Lao PDR are (i) nature, (ii) local life observation, and (iii) culture, which differ from tourism observed in ordinal tourism destinations. 1 It means that Lao PDR is an eco-tourism destination for international tourists, in lieu of ordinal sightseeing tourism. The major tourism resources in Lao PDR are (i) Vientiane, (ii) City of Louang Prabang which is a World Heritage site with old Lao style buildings and temples, (iii) Jar highland with Jar pots, (iv) Wat Phu Kmer heritage which is a candidate for the World Heritage, and (v) Boloben plateau in Champassak province. More than 50 % of the tourists visited Louang Prabang, and 15 % visited Jar highland and Champassak Province. Savannakhet and Khammouan provinces, receiving approximately 3-4 % of the tourists as shown in Figure V4-1, are not the major destinations for international tourists. Popular Destination for International Tourist in Laos (%) (duplicated answer) 100 90 80 70 60 50 40 30 20 10 0 Jar Bakeo Huapanh Vientiane Xayabouli Champassak KhammouanBolikhamxay Luang Namtha Savannakkhet Louang Prabang Source: Statistical Report on Tourism in Laos, 1998 Figure V4-1 Tourist Arrival by Destination in Lao PDR The major tourism destinations in SKR are listed below, and their distribution is illustrated in Figure V4-2. 1 Statistical report on Tourism in Laos, 1998 reported that international tourists show main interest in 1) Nature (72%), 2) People (54%), 3) Culture (35%), etc.
    [Show full text]
  • New Country Records of Reptiles from Laos
    Biodiversity Data Journal 1: e1015 doi: 10.3897/BDJ.1.e1015 Taxonomic paper New country records of reptiles from Laos Vinh Quang Luu†,‡, Truong Quang Nguyen§,|, Thomas Calame¶, Tuoi Thi Hoang#, Sisomphone Southichack††, Michael Bonkowski|, Thomas Ziegler‡,| † Department of Wildlife, Faculty of Natural Resource and Environmental Management, Vietnam Forestry University, Xuan Mai, Chuong My, Hanoi, Vietnam ‡ AG Zoologischer Garten Köln, Riehler Strasse 173, D-50735 Cologne, Germany § Institute of Ecology and Biological Resources, Vietnam Academy of Science and Technology, 18 Hoang Quoc Viet, Hanoi, Vietnam | Zoological Institute, University of Cologne, Zülpicher Strasse 47b, D-50674 Cologne, Germany ¶ WWF Greater Mekong, House No. 39, Unit 05, Ban Saylom, Vientiane, Lao People's Democratic Republic # Biodiversity Center, Faculty of Natural Resource and Environmental Management, Vietnam Forestry University, Xuan Mai, Chuong My, Hanoi, Vietnam †† Hin Nam No National Protected Area, Boualapha District, Khammouane Province, Lao People's Democratic Republic Corresponding author: Vinh Quang Luu ([email protected]) Academic editor: Johannes Penner Received: 27 Oct 2013 | Accepted: 04 Dec 2013 | Published: 10 Dec 2013 Citation: Luu V, Nguyen T, Calame T, Hoang T, Southichack S, Bonkowski M, Ziegler T (2013) New country records of reptiles from Laos. Biodiversity Data Journal 1: e1015. doi: 10.3897/BDJ.1.e1015 Abstract Four species of reptiles, of which one is represented by one of its subspecies, are recorded for the first time from Laos: Cyrtodactylus phongnhakebangensis, Lycodon futsingensis, and L. ruhstrati, as L. ruhstrati abditus, from limestone forests in Khammouane Province and Cyrtodactylus pseudoquadrivirgatus from hill evergreen forest in Salavan Province. These discoveries of lizards and snakes bring the total species number of reptiles to 189 in Laos.
    [Show full text]
  • PRECEDING PAGE BLANK NOT FILUB) ;?Ji , Itj Basic Data Necessary for Completion of Development Plans for the Mekong Basin
    Paper W 3 APPLlCATlONS OF MULTISPECTRAL IMAGERY TO WATER RESOURCES DEVELOPMENT PLANNING IN THE LOWER MEKONG BASIN (KHMER REPUBLIC, LAOS. THAI LAND AND VI ET-NAM) Willem J. van Liere, Mekong Committee Secretariat, Bangkok, Thailand 1. ABSTRACT The use of ERTS imagery for water resources planning in the lower Mekong basin relates to three major issues: it camplements data from areas, which have been inaccessible in the past because d security; this concerns mainly forest cover of the water- sheds, and geological features. it refines ground surveys; this cmcerns maialy land forms, md soils of existing and planned irrigation peri~eters. it provides new information, which would be almost or entirely impos- sible to detect with ground surveys or conventional photography; this concerns the mechanism of flooding and drainage of the delta; siltation of the Great Lake and mapping of acidity, possioly also of salinity, in the lowsr delta: sedimentation and fisheries in the Mekong Delta estua- rine areas. Exbmples are given of all these major issues (see Fig. 1. Fig. 2, Fig. 3-3 III, Fig. 1 and Fig. 5). There are also other uses, not directly related to waer resources planning, but still of prime importance to the holistic concept of river basin planning. These relate to the delimination of national reserves and to the identification of antiquities. Examples of these are given too (see Fig. 3 and Fig. 6). Complementary explandory notes on ERTS images are given also directly on the different figures and images attached herewith, in conjunction wlth the correapording ERTS frames. The satellite data are particularly valuable also because their repetitive coverage gives an insight in the gradual tranaformatioa of changing features such as the extent of flooding and moisture redention in various mil types.
    [Show full text]
  • View of the Main Stupa and Temple at Vat Sikhot- Tabong at Sunset
    RESEARCH NOTES An Abandoned City in Laos BY ELIZABETH G. HAMILTON AND JOYCE C. WHITE Laos is one of the least archaeologically explored countries in the world, largely because geopolitics of Southeast Asia through much of the 20th century made ABOVE: Research areas of the Middle Mekong Archaeological Project: Thakhek, Luang Prabang, and Ban Chiang. Map by the country too dangerous for research. Ardeth Anderson. Te Middle Mekong Archaeological Project (MMAP), at the Smithsonian Institution’s Asian Cultural Heritage directed by Joyce White, Penn Museum Consulting Program, on a project in Laos. Te aim was to conduct Scholar and head of the Institute for Southeast Asian survey in a new area at a location that had never been Archaeology, has been conducting surveys and test recorded by archaeologists: an old abandoned city along excavations since 2001 in northern Laos, mainly in the the Mekong to the south of Takhek, Laos. Tere were area around Luang Prabang, the former royal capital. two goals: frst, to produce a digital map of the historic (See Expedition 52.2: 6–7.) Her work has built upon the temple complex at Vat Sikhottabong, and second, to map Museum’s long research in northeast Tailand, especially the extent of the abandoned city surrounding the temple. at the site of Ban Chiang. Te project was funded through an Asian Development In the winter of 2018, we worked with Dr. Peter Bank-fnanced program to enhance tourism facilities Cobb, then Kowalski Family Teaching Specialist in the at the renowned site. Museum’s Center for the Analysis of Archaeological Materials (CAAM), and Jared Koller, a researcher Rapid Assessment Survey Te rapid ground survey along the Mekong River included local cultural heritage managers who were familiar with collapsed stupas, sculptures, brick mounds, walls, and platforms in the Takhek area.
    [Show full text]
  • Information-Bulletin-No.-4 Lao-PDR
    Lao PDR: Floods Humanitarian Country Team Information Bulletin No.4 (as of 19 October 2018) This bulletin covers the entire country, with significant focus on Attapeu province. It is produced by the Office of the UN Resident Coordinator in Lao PDR in collaboration with humanitarian partners. Summary • According to Government figures as of 15 October, which are similar to the ones reported in the last Information Bulletin of 5 October, 2,382 villages, 126,736 families and 616,145 people are reported to be affected by the floods. A total of 16,739 people remains evacuated from their villages. 1,779 Houses are reported as destroyed and 514 as damaged. 90,000 ha of paddy fields and 11,000 ha of other plantations have been destroyed, and 630 km of roads and 47 bridges have been damaged. • The Ministry of Labour and Social Welfare will present the findings of the ongoing Post-Disaster Needs Assessment (PDNA) on damages, losses and recovery needs to the National Disaster Prevention and Control Committee on 23 October. The PDNA, which is facilitated by United Nations, World Bank and European Union covers the entire country, will develop a sustainable recovery strategy and sector plans of the Government and guide discussions on funding with development partners. The final report is expected to be available by end November. The PDNA will feed into discussions at the National Assembly, the Round Table Meeting and the Mid-Term Review of 8th National Socio-Economic Development Plan. • Influenza-like illness, severe acute respiratory illnesses, diarrhea, and dengue fever remain priority public health concerns in Attapeu province.
    [Show full text]
  • Nam Theun 2 Hydroelectric and Social and Environment Projects
    LAO PEOPLE’S DEMOCRATIC REPUBLIC Nam Theun 2 Hydroelectric and Social and Environment Projects Report No. 153963 DECEMBER 16, 2020 © 2021 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW Washington DC 20433 Telephone: 202-473-1000 Internet: www.worldbank.org Attribution—Please cite the work as follows: World Bank. 2021. Lao People’s Democratic Republic—Nam Theun 2 Hydroelectric and Social and Environment Projects. Independent Evaluation Group, Project Performance Assessment Report 153963. Washington, DC: World Bank. This work is a product of the staff of The World Bank with external contributions. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. RIGHTS AND PERMISSIONS The material in this work is subject to copyright. Because The World Bank encourages dissemination of its knowledge, this work may be reproduced, in whole or in part, for noncommercial purposes as long as full attribution to this work is given. Any queries on rights and licenses, including subsidiary rights, should be addressed to World Bank Publications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; fax: 202-522-2625; e-mail: [email protected].
    [Show full text]
  • Hin Namno National Protected Area Co-Management Plan
    Hin Namno National Protected Area Co-Management Plan Prepared by Hin Namno National Protected Area In association with Department of Forestry, Division of Forest Resources Conservation and With Technical Assistance from IUCN Lao PDR March 2010 Lao People’s Democratic Republic Peace Independence Democracy Unity Prosperity ===000=== Ministry of Agriculture and Forestry No........... Dated............. Department of Forestry Resolutions Department of Forestry, Ministry of Agriculture and Forestry On the implementation of Co- Management Plan for Hin Namno National Protected Area - Pursuance of the Forest Strategy for the Year 2020 - Pursuance of the Forestry Law No. 04/NA, dated 24/12/2007 - Pursuance of the Law on Wild Animals and Aquatic Resources No. 07/NA, dated 24/12/2007. The Technical Team of Hin Namno National Protected Area (NPA), with technical assistance from the International Union for Conservation of Nature (IUCN), has prepared the Co-Management Plan for Hin Namno NPA through working in cooperation with the relevant sectors in Bualapha District, Khammoune Province, village cluster heads and villagers living adjacent to the Hin Namno NPA. This Co-Management Plan has been reviewed and finally agreed upon in the consultation workshop held in Bualapha District on September 15-16, 2009, and adopted in the Provincial meeting on October 26-27, 2009. The Management Plan is reference material for the effective management of Hin Namno NPA. However, it is also necessary that it is formulated and implemented in a manner compatible with the local situation. Thus, the Department of Forestry, Ministry of Agriculture and Forestry, has adopted the management plan and it is effective from the signature date.
    [Show full text]