MINUTES OF THE DEPARTMENTAL SUB COMMITTEE MEETING REGARDING PSDP 2015-2016 SCHEMES (Education Sector) HELD ON 8TH APRIL, 2016 AT 10:30 AM UNDER THE CHAIRMANSHIP OF SECRETARY, SECONDARY EDUCATION DEPARTMENT. The following attended:- Mr. Abdul Saboor Kakar, In chair. Secretary, Secondary Education. Secondary Education Department Mr. Aziz Ahmed Jamali, Additional Secretary(Dev). Mr. Aziz Ullah Gharshin Deputy Secretray (Dev) Finance Department Syed Akram Shah, Under Secretary (Dev). C&W Department Mr. Muhammad Akram, XEN. Directorate of Education (Schools) Mr. Khalil Ahmed, Assistant Director (Planning). The Departmental Sub Committee meeting was held on 8th April, 2016 to consider the PC-Is of development schemes (PSDP 2015-2016) of Secondary Education Sector. The meeting started with welcome remarks from the chair to all the participants. The following schemes were discussed and decisions taken therein; 1 Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Construction of Multi Rs.7,200,000/- The Scheme was Multi Purpose Hall Purpose Hall for Govt: Boys discussed in detail and for Govt: Boys High High School Toba Gidder approved at Rs.7.200 School Toba Gidder, (EMIS-3239). million. District Kalat (EMIS-3239) PSDP.No-1432 (2015-16) Total: Rs.7,200,000/- 2. Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Construction of Multi Rs.7,200,000/- The Scheme was Multi Purpose Hall Purpose Hall for Govt: Boys discussed in detail and for Govt: Boys High High School Dumb (EMIS- approved at Rs.7.200 School Dumb, 3104). million. District Kalat (EMIS-3104) PSDP.No-1432 (2015-16) Total: Rs.7,200,000/- 3. Name of Scheme. Scope of Work. Cost. Decision. Up-Gradation of 1. Cost for Up-Gradation of Rs.7,600,000/- The Scheme was GGMS into High GGMS into High School at discussed in detail and School at Risani Risani Nighar (EMIS- approved at Rs.7.600 Nighar, District Kalat 12558). million. (EMIS-12558) PSDP.No-1429 (2015-16) Total: Rs.7,600,000/-

1

4. Name of Scheme. Scope of Work. Cost. Decision. Construction of 2- 1. Cost for Construction of Rs.2,200,000/- The Scheme was Nos Additional 2-Nos Additional C/Rooms discussed in detail and C/Rooms for GBMS for GBMS Zarai Farm approved at Rs.2.200 Zarai Farm Giddar Giddar (EMIS-3128) million. (EMIS-3128), District Kalat. PSDP.No-1431 (2015-16) Total: Rs.2,200,000/- 5. Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Constt: of B/Wall Rs.2,350,000/- The Scheme was Boundary Wall for 800rft for GGHS discussed in detail and Existing Government Surab (EMIS-3114). approved at Rs.5.710 Primary, Middle and 2. Constt: of B/Wall million. High Schools at 400RFT for GBPS Rs. 840,000/-

Tehsil Surab, District Dasht Khatai (EMIS-

Kalat. 14766). PSDP.No-1430 3. Constt: of B/Wall (2015-16) 400rft for GBPS Rs.840,000/- Killi Notuk Marap (EMIS-15263). 4. Constt: of B/Wall 400rft for GBPS Tarasani (EMIS- Rs.840,000/- 3205). 5. Constt: of B/Wall

400rft for GBPS

Chad Budla Giddar Rs.840,000/- (EMIS-3234).

Total: Rs.5,710,000/-

5. Name of Scheme. Scope of Work. Cost. Decision. Up-Gradation of 1. Cost for Up-Gradation of Rs.5,700,000/- The Scheme was GBPS into Middle GBPS into Middle School at discussed in detail and School at Mut Gaji Mut Gaji Khanzai (EMIS- approved at Rs.5.700 Khanzai (EMIS- 3243). million. 3243), District Kalat. PSDP.No-1363 (2015-16) Total: Rs.5,700,000/- 6. Name of Scheme. Scope of Work. Cost. Decision. Up-Gradation of 1. Cost for Up-Gradation of Rs.5,700,000/- The Scheme was GBPS into Middle GBPS into Middle School at discussed in detail and School at Rodeni Rodeni Giddar (EMIS- approved at Rs.5.700 Giddar (EMIS-8456), 8456). million. District Kalat. PSDP.No-1363 (2015-16) Total: Rs.5,700,000/-

2

7. Name of Scheme. Scope of Work. Cost. Decision. Up-Gradation of 1. Cost for Up-Gradation of Rs.5,700,000/- The Scheme was GBPS into Middle GBPS into Middle School at discussed in detail and School at Jori Raiki Jori Raiki Zai (EMIS-8481). approved at Rs.5.700 Zai (EMIS-8481), million. District Kalat. PSDP.No-1363 (2015-16) Total: Rs.5,700,000/- 8. Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Constt: of Building for Rs.3,300,000/- The Scheme was Shelter Less Primary Shelter Less GBPS Killi discussed in detail and School at Tehsil Mirwani (EMIS-11592). approved at Rs.3.300 Surab, District Kalat million. , District Kalat. PSDP.No-1363 (2015-16) Total: Rs.3,300,000/- 9. Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Constt: of 2-Nos Rs.1,800,000/- The Scheme was Additional C/Rooms Add: C/Rooms for discussed in detail and for Existing GGHS Surab (EMIS- approved at Rs.9.000 Government Schools 3114). million. at Tehsil Surab, 2. Constt: of 2-Nos Rs.1,800,000/-

District Kalat. Add: C/Rooms for

PSDP.No-1431 GBHS Umerabad (2015-16) Giddar (EMIS- 3240). 3. Constt: of 2-Nos Rs.1,800,000/- Add: C/Rooms for GBPS Killi Bashir Nighar (EMIS- 3107). 4. Constt: of 2-Nos Rs.1,800,000/- Add: C/Rooms for

GBPS Dasht Khatai

(EMIS-14766). 5. Constt: of 2-Nos Rs.1,800,000/- Add: C/Rooms for GBPS Tarasani (EMIS-3205). Total: Rs.9,000,000/- 10. Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Constt: of 1-No Add: Rs.900,000/- The Scheme was Additional C/Rooms C/Rooms for discussed in detail and for GBPS GBPSMuhammad approved at Rs.0.900 Muhammad Musa Musa Khan (EMIS- million.

Khan (EMIS-8774), 8774).

District Jaffarabad.

PSDP.No-1431

(2015-16) Total: Rs.900,000/-

3

11. Name of Scheme. Scope of Work. Cost. Decision. Up-Gradation of 1. Up-Gradation of Rs.7,600,000/- The Scheme was GGMS Zarghoon GGMS Zarghoon discussed in detail and into High School at into High School approved at Rs.7.600 District Pishin (EMIS-1350). million. (EMIS-1350).

PSDP.No-1429

(2015-16)

Total: Rs.7,600,000/- 12. Name of Scheme. Scope of Work. Cost. Decision. Up-Gradation of 1. Up-Gradation of Rs.7,600,000/- The Scheme was GBMS Panwan into GBMS Panwan into discussed in detail and High School at High School (EMIS- approved at Rs.7.600 District Gwadar 5755). million. (EMIS-5755).

PSDP.No-1429

(2015-16)

Total: Rs.7,600,000/- 13. Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Construction of Rs.7,200,000/- The Scheme was Multi Purpose Hall Multi Purpose Hall discussed in detail and for GGHS Gwadar, for GGHS Gwadar approved at Rs.7.200 District Gwadar. (EMIS-5706). million. PSDP.No-1432 (2015-16)

Total: Rs.7,200,000/- 14. Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Construction of Rs.7,200,000/- The Scheme was Multi Purpose Hall Multi Purpose Hall discussed in detail and for GBHS Pasni, for GBHS Pasni approved at Rs.7.200 District Gwadar. (EMIS-5780). million. PSDP.No-1432 (2015-16)

Total: Rs.7,200,000/- 15. Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Construction of Rs.840,000/- The Scheme was Boundary Wall Boundary Wall discussed in detail and 400rft for GGPS Pir 400rft for GGPS Pir approved at Rs.0.840 Muhammad Mengal, Muhammad Mengal million. District Naseerabad (EMIS-10814).

(EMIS-10814).

PSDP.No-1430

(2015-16) Total: Rs.840,000/-

4

16. Name of Scheme. Scope of Work. Cost. Decision. Construction of 2- 1. Constt: of Add: Rs.1,800,000/- The Scheme was Nos Additional C/Rooms for GBPS discussed in detail and C/Rooms for Rehmatullah Lehri approved at Rs.3.600 Existing Primary (EMIS-7626). million. Schools at District 2. Constt: of Add: Rs.1,800,000/-

Naseerabad. C/Rooms for GGPS

PSDP.No-1431 Izat Khan Rind (2015-16) (EMIS-14200).

Total: Rs.3,600,000/- 17. Name of Scheme. Scope of Work. Cost. Decision. Construction of 2- 1. Construction of 2- Rs.1,800,000/- The Scheme was Nos Additional Nos Additional discussed in detail and C/Rooms for GBPS C/Rooms for GBPS approved at Rs.1.800 Kazha Baaik, District Kazha Baaik (EMIS- million. Sheerani. 4496)

PSDP.No-1431

(2015-16) Total: Rs.1,800,000/- 18. Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Construction of Rs.7,200,000/- The Scheme was Multi Purpose Hall Multi Purpose Hall discussed in detail and for GBMODHS Pilot for GBMODHS Pilot approved at Rs.7.200 Sibi, District Sibi. Sibi (EMIS-8022) million. PSDP.No-1432 (2015-16) Total: Rs.7,200,000/- 19. Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Construction of Rs.2,350,000/- The Scheme was Boundary Wall Boundary Wall discussed in detail and 1000rft for 1000rft GBMODHS approved at Rs.2.350 GBMODHS Pilot Pilot Sibi (EMIS- million. Sibi, District Sibi. 8022)

PSDP.No-1430

(2015-16)

Total: Rs.2,350,000/- 20. Name of Scheme. Scope of Work. Cost. Decision. Construction of 3- 1. Construction of 3- Rs.2,700,000/- The Scheme was Nos Add: C/Rooms Nos Add: C/Rooms discussed in detail and for GBPS Ghulam for GBPS Ghulam approved at Rs.2.700 Muhammad, District Muhammad (EMIS- million. Jaffarabad. 5551)

PSDP.No-1431

(2015-16)

Total: Rs.2,700,000/-

5

21. Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Constt: 2-Nos Add: Rs.1,800,000/- The Scheme was additional C/Rooms C/Rooms for GBHS discussed in detail and for Existing Sur Bander (EMIS- approved at Rs.9.000 Government Schools 5721). million. at District Gwadar. 2. Constt: 2-Nos Add: Rs.1,800,000/- PSDP.No-1431 C/Rooms for GBHS

(2015-16) Nalaint (EMIS- 5794). 3. Constt: 2-Nos Add: Rs.1,800,000/- C/Rooms for GGHS Sur Bander (EMIS- 5721). 4. Constt: 2-Nos Add: Rs.1,800,000/- C/Rooms for GBMS Ghati Door (EMIS- 5734).

5. Constt: 2-Nos Add: Rs.1,800,000/- C/Rooms for GBPS Washdil Mohalla (EMIS-5712). Total: Rs.9,000,000/- 22. Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Constt: 2-Nos Add: Rs.1,800,000/- The Scheme was additional C/Rooms C/Rooms for GBPS discussed in detail and for Existing Mulla Band approved at Rs.5.400 Government Schools (Nayabad) (EMIS- million. at District Gwadar. 5715). Rs.1,800,000/- PSDP.No-1431 2. Constt: 2-Nos Add:

(2015-16) C/Rooms for GBPS Sohrabi Ward (EMIS-5709). 3. Constt: 2-Nos Add: Rs.1,800,000/- C/Rooms for GBPS Chib Kalmati (EMIS-5730). Total: Rs.5,400,000/- 23. Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Construction of 2- Rs.1,800,000/- The Scheme was additional C/Rooms Nos additional discussed in detail and for GGMS Zahoor C/Rooms for GGMS approved at Rs.1.800 Colony (EMIS- Zahoor Colony million. 11064), District (EMIS-11064).

Chagai. PSDP.No-1431 (2015-16) Total: Rs.1,800,000/-

6

24. Name of Scheme. Scope of Work. Cost. Decision. Construction of 1. Construction of Rs.3,500,000/- The Scheme was Building for District Building for District discussed in detail and Education Officer Education Officer approved at Rs.3.500 Office at District Office. million. Washuk.

PSDP.No-1431 (2015-16) Total: Rs.3,500,000/- 25. Name of Scheme. Scope of Work. Cost. Decision. Construction of Add: 1. Construction of 2- Rs.1,800,000/- The Scheme was C/Rooms for Nos Add: C/Rooms discussed in detail and Existing Schools at for GGPS at Basti approved at Rs.2.700 District Brakhan. Wadera Ahmed million. PSDP.No-1431 Khan Karamdani

(2015-16) (EMIS-12619).

2. Construction of 1-No Rs.900,000/- Add: C/Room for GGPS at Basti Lai Mohammad (Lala) Lohma Zareen (EMIS-12606). Total: Rs.2,700,000/- 26. Name of Scheme. Scope of Work. Cost. Decision. Up-Gradation of 1. Up-Gradation of Rs.7,600,000/- The Scheme was GGMS into High GGMS into High discussed in detail and School Jangi Khan School Jangi Khan approved at Rs.7.600 Goth, District Goth (EMIS-10240). million. Lasbella.

PSDP.No-1429

(2015-16) Total: Rs.7,600,000/- 27. Name of Scheme. Scope of Work. Cost. Decision. Construction of 3- 1. Construction of 3- Rs.2,700,000/- The Scheme was Nos Add: C/Rooms Nos Add: C/Rooms discussed in detail and for GBHS Nighand, for GBHS Nighand approved at Rs.2.700 District Pishin. (EMIS-1299). million. PSDP.No-1431 (2015-16) Total: Rs.2,700,000/- 28. Name of Scheme. Scope of Work. Cost. Decision. Raising 0f Boundary 1. Raising 0f Boundary Rs.840,000/- The Scheme was Wall for GBHS Wall GBHS Nighand discussed in detail and Nighand, District (EMIS-1299). approved at Rs.0.840 Pishin. million. PSDP.No-1430 (2015-16)

Total: Rs.840,000/-

7

29. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Additional 1. Constt: of Additional Rs.1,800,000/- The Scheme was C/Rooms 2-Nos for C/Rooms 2-Nos for discussed in detail and GGPS Marah Khurd, GGPS Marah Khurd approved at Rs.1.800 District Loralai. (EMIS-14515). million. PSDP.No-1431 (2015-16)

Total: Rs.1,800,000/- 30. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Additional 1. Constt: of Additional Rs.2,700,000/- The Scheme was C/Rooms 3-Nos for C/Rooms 3-Nos for discussed in detail and GGMS Goth Ghulam GGMS Goth Ghulam approved at Rs.2.700 Muhammad, District Muhammad(EMIS- million. Jaffarabad ).

PSDP.No-1431

(2015-16)

Total: Rs.2,700,000/- 31. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Boundary 1. Constt: of 600rft Rs.1,260,000/- The Scheme was Wall for GGMS B/Wall for GGMS discussed in detail and Goth Ghulam Goth Ghulam approved at Rs.1.260 Muhammad, District Muhammad(EMIS- million.

Jaffarabad ).

PSDP.No-1430

(2015-16)

Total: Rs.1,260,000/- 32. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Boundary 1. Constt: of 600rft Rs.1,260,000/- The Scheme was Wall for GBMS B/Wall for GBMS discussed in detail and Fateh Pur District Fateh Pur (EMIS- approved at Rs.1.260 JHal Magsi ). million. PSDP.No-1430 (2015-16)

Total: Rs.1,260,000/- 33. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Boundary 1. Constt: of Boundary Rs.5,000,000/- The Scheme was Wall (960rft), 3-Nos Wall (960rft), 3-Nos discussed in detail and Additional C/Rooms Additional C/Rooms approved at Rs.5.000 with Toilet Block for with Toilet Block for million. GBPS Wadh, District GBPS Wadh.

Khuzdar.

PSDP.No-1430

(2015-16) Total: Rs.5,000,000/-

8

34. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos 1. Constt: of 2-Nos Rs.2,200,000/- The Scheme was Add: C/Rooms for Add: C/Rooms for discussed in detail and GBPS Razai Kalaag, GBPS Razai Kalaag, approved at Rs.2.200 District Kharan million. (EMIS-02502). (EMIS-02502).

PSDP.No-1431

(2015-16) Total: Rs.2,200,000/- 35. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Boundary 1. Constt: of Boundary Rs.900,000/- The Scheme was Wall (360rft) Wall (360rft) discussed in detail and alongwith Main Gate alongwith Main Gate approved at Rs.0.900 for District for District million. Education Office, Education Office,

Kharan, District Kharan.

Kharan PSDP.No-1431 (2015-16) Total: Rs.900,000/- 36. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos 1. Constt: of 2-Nos Rs.2,000,000/- The Scheme was Additional C/Rooms Additional C/Rooms discussed in detail and for GBPS Killi for GBPS Killi approved at Rs.2.000 Jadeed Zarghoon Jadeed Zarghoon million. Tehsil Tehsil Duki (EMIS-

Loralai (EMIS- 04407).

04407) PSDP.No-1431 (2015-16) Total: Rs.2,000,000/- 36. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 1. Constt: of Rs.3,300,000/- The Scheme was Government Girls Government Girls discussed in detail and Primary School at Primary School at approved at Rs.3.300 Killi Aghbarg Killi Aghbarg million. Kanoobi Tehsil Kanoobi Tehsil

Sanjavi, District Sanjavi.

Ziarat. Honorable Governor’s Special Funds (2015-16) Total: Rs.3,300,000/- 37. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Boundary 1. Constt: of Boundary Rs.1,680,000/- The Scheme was Wall (800rft) for Wall (800rft) for discussed in detail and GGHS, Balozai GGHS, Balozai. approved at Rs.1.680 District Pishin. million. PSDP-No-1430 (2015-16)

Total: Rs.1,680,000/-

9

38. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Boundary 1. Constt: of Boundary Rs.2,616,600/- The Scheme was Wall (1246rft) for Wall (1246rft) for discussed in detail and Board of Balochistan Board of approved at Rs.2.616 Intermediate Office, Intermediate Office, million. . Quetta.

PSDP-No-1430

(2015-16)

Total: Rs.2,616,600/- 39. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Boundary 1. Constt: of Boundary Rs.630,000 /- The Scheme was Wall (300rft) for Wall (300rft) for discussed in detail and GGHS Harani GGHS Harani approved at Rs.0.630 District Harani District million. PSDP-No-1430 Harani(EMIS 8180)

(2015-16)

Total: Rs. 40. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Boundary Constt: of Boundary Wall Rs.630,000 /- The Scheme was Wall (300rft) for (300rft) for GGMIDS Killi discussed in detail and GGMIDS Killi Shekan Sharagh District approved at Rs.0.630 Shekan Sharagh Harani (EMIS 9780) million. District Harani

PSDP-No-1430

(2015-16)

Total: Rs.630,000/-. 41. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,000,000/- The Scheme was Additional C/Rooms C/Rooms for GGMS Gharib discussed in detail and for GGMS Gharib abad District Harnai (EMIS- approved at Rs.2.000 abad District Harnai 08184) million. (EMIS-08184)

PSDP.No-1431

(2015-16)

Total: Rs.2,000,000/- 42. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,000,000/- The Scheme was Additional C/Rooms C/Rooms for GBMS discussed in detail and for GBMS Woolan Woolan Mill harani District approved at Rs.2.000 Mill Harani District Harnai (EMIS-08148) million. Harnai (EMIS-

08148)

PSDP.No-1431

(2015-16)

Total: Rs.2,000,000/-

10

43. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,000,000/- The Scheme was Additional C/Rooms C/Rooms for GBHS Harani discussed in detail and for GBHS Harani District Harnai (EMIS- approved at Rs.2.000 District Harnai 08181) million. (EMIS-08181)

PSDP.No-1431

(2015-16)

Total: Rs.2,000,000/- 43. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,000,000/- The Scheme was Additional C/Rooms C/Rooms for GGHS Harani discussed in detail and for GGHS Harani District Harnai (EMIS- approved at Rs.2.000 District Harnai 08180) million. (EMIS-08180)

PSDP.No-1431

(2015-16)

Total: Rs.2,000,000/- 44. Name of Scheme. Scope of Work. Cost. Decision. Construction of ECE Construction of ECE Centre Rs.1,862,896 /- The Scheme was Centre in GBPS babo in GBPS Babo Muhallah discussed in detail and Muhallah Landi No 2 Landi No 2 at District approved at Rs.1.862 at District Harnai. Harnai. (EMIS 8529) million. (EMIS 8529) PSDP.No-1314 (2015-16) Total: Rs. 1,862,896 /- 44. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,000,000/- The Scheme was Additional C/Rooms C/Rooms for GGPS Abdul discussed in detail and for GGPS Abdul Malik Nasar District Loralai approved at Rs.2.000 Malik Nasar District (EMIS-09181) million. Loralai (EMIS-

09181)

PSDP.No-1431 (2015-16)

Total: Rs.2,000,000/- 45. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Boundary Constt: of Boundary Wall Rs.630,000/- The Scheme was Wall (300rft) for (300rft) for GBMIDS yaroo discussed in detail and GBMIDS yaroo Sheher District Loralai approved at Rs.0.630 Sheher District (EMIS 4365) million. Loralai (EMIS 4365)

PSDP-No-1430

(2015-16)

Total: Rs.630,000/-

11

46. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,000,000/- The Scheme was Additional C/Rooms C/Rooms for GBHS Nana discussed in detail and for GBHS Nana Sahib Loralai approved at Rs.2.000 Sahib Ziarat District (EMIS-04066). million. Loralai (EMIS-

04066)

PSDP.No-1431

(2015-16)

Total: Rs.2,000,000/- 47. Name of Scheme. Scope of Work. Cost. Decision. Construction of Construction of Multi Rs.7,200,000/- The Scheme was Multi Purpose Hall Purpose Hall for GGHSS discussed in detail and for GGHSS Duki Duki Bazar Town, District approved at Rs.7.200 Bazar Town, District Loralai (EMIS 4022) million. Loralai (EMIS 4022)

PSDP.No-1432

(2015-16)

Total: Rs.7,200,000/- 48. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,000,000/- The Scheme was Additional C/Rooms C/Rooms for GGMS Wazir discussed in detail and for GGMS Wazir Abad District Kohlu (EMIS- approved at Rs.2.000 Abad District Kohlu 012118) million. (EMIS-012118)

PSDP.No-1431

(2015-16)

Total: Rs.2,000,000/- 49. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,000,000/- The Scheme was Additional C/Rooms C/Rooms for GBPS Killi discussed in detail and for GBPS Killi Abdul Ahad District Loralai approved at Rs.2.000 Abdul Ahad District (EMIS-04003) million. Loralai (EMIS-

04003)

PSDP.No-1431

(2015-16)

Total: Rs.2,000,000/- 50. Name of Scheme. Scope of Work. Cost. Decision. Up-Gradation of Up-Gradation of GGMS into Rs.7,600,000/- The Scheme was GGMS into High High School at GBMS discussed in detail and School at GBMS Chasma Achozai District approved at Rs.7.600 Chasma Achozai Quetta (EMIS-5057) million. District Quetta (EMIS-5057) PSDP.No-1429 (2015-16) Total: Rs.7,600,000/-

12

51 Name of Scheme. Scope of Work. Cost. Decision. Construction of 2- Construction of 2-Nos Add: Rs.1,862,896 /- The Scheme was Nos Add: Rooms for Rooms for GGPS Killi Haji discussed in detail and GGPS Killi Haji hamza Zaik. (EMIS 9934) approved at Rs.1.862 hamza Zaik at million. District Washuk. (EMIS 9934) PSDP.No-1314 (2015-16) Total: Rs. 1,862,896 /- 52. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Boundary Constt: of Boundary Wall Rs.1,680,000 /- The Scheme was Wall for GBHS for 800rft GBHS Shimshi discussed in detail and Shimshi District District Washuk (EMIS approved at Rs.1.680 Washuk (EMIS 2391) million. 2391)

PSDP-No-1430

(2015-16)

Total: Rs.1,680,000/- 53. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,000,000/- The Scheme was Additional C/Rooms C/Rooms for GGHS Kawas discussed in detail and for GGHS Kawas Gharbi District Ziarat approved at Rs.2.000 Gharbi District Ziarat (EMIS-01038) million. (EMIS-01038)

PSDP.No-1431

(2015-16)

Total: Rs.2,000,000/- 54. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,000,000/- The Scheme was Additional C/Rooms C/Rooms for GBPS discussed in detail and for GBPS Zarmana Zarmana (EMIS-08120) approved at Rs.2.000 District Harnai million. (EMIS-08120)

PSDP.No-1431

(2015-16)

Total: Rs.2,000,000/- 54. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,000,000/- The Scheme was Additional C/Rooms C/Rooms for GGPS Killi discussed in detail and for GGPS Killi Jamil Jamil Ahmed Gogi District approved at Rs.2.000 Ahmed Gogi District Ziarat (EMIS-15575) million. Ziarat (EMIS-15575)

PSDP.No-1431

(2015-16)

Total: Rs.2,000,000/-

13

55. Name of Scheme. Scope of Work. Cost. Decision. Up-Gradation of Up-Gradation of GGPS into Rs.5,700,000 /- The Scheme was GGPS into Middle Middle Level GBPS Haddo discussed in detail and Level GBPS Haddo at Distirct Washuk.(EMIS approved at Rs.5.700 at Distirct 2429) million. Washuk.(EMIS

2429) PSDP.No-1363 (2015-16) Total: Rs.5,700,000/- 56. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,000,000/- The Scheme was Additional C/Rooms C/Rooms for GBPS Golak discussed in detail and for GBPS Golak Umarani District Kalat approved at Rs.2.000 Umarani District (EMIS-9754) million. Kalat (EMIS-9754)

PSDP.No-1431

(2015-16)

Total: Rs.2,000,000/- 57. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,000,000/- The Scheme was Additional C/Rooms C/Rooms for GBPS Khaliq discussed in detail and for GBPS Khaliq Abad Surab District Kalat approved at Rs.2.000 Abad Surab District (EMIS-3103) million. Kalat (EMIS-3103)

PSDP.No-1431

(2015-16)

Total: Rs.2,000,000/- 58. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,000,000/- The Scheme was Additional C/Rooms C/Rooms for GGPS Took discussed in detail and for GGPS Took District Kalat (EMIS-12567) approved at Rs.2.000 District Kalat million. (EMIS-12567)

PSDP.No-1431

(2015-16)

Total: Rs.2,000,000/- 59. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 3-Nos Constt: of 3-Nos Additional Rs.3,000,000/- The Scheme was Additional C/Rooms C/Rooms for GBPS Juria discussed in detail and for GBPS Juria Khan Khan Jamali (EMIS-14188) approved at Rs.3.000 Jamali (EMIS- million. 14188), District

Naseerabad.

PSDP.No-1431

(2015-16)

Total: Rs.3,000,000/-

14

60. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,200,000/- The Scheme was Additional C/Rooms C/Rooms for GBPS Mirza discussed in detail and for GBPS Mirza Khan (EMIS-15310), approved at Rs.2.200 Khan (EMIS-15310), million. District Pishin.

PSDP.No-1431

(2015-16) Total: Rs.2,200,000/- 61. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 1-Nos Constt: of 1-Nos Additional Rs.1,100,000/- The Scheme was Additional C/Rooms C/Rooms for GGPS Wacha discussed in detail and for GGPS Wacha Ghoskai (EMIS-12911) approved at Rs.1.100 Ghoskai (EMIS- million. 12911), District

Ziarat.

PSDP.No-1431

(2015-16) Total: Rs.1,100,000/- 62. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Multi Constt: of Multi Purpose Rs.8,911,000/- The Scheme was Purpose hall for hall for GBHS Sharaag discussed in detail and GBHS Sharaag, (Revised) approved with revised District Harnai Cost of Rs.8.911 PSDP.No-1432 million. (2015-16) Total: Rs.8,911,000/- 63. Name of Scheme. Scope of Work. Cost. Decision. Up-Gradation of Up-Gradation of GBMS into Rs.7,680,000/- The Scheme was GBMS into High High School at Gharibabad discussed in detail and School at (Revised) approved with revised Gharibabad, District Cost of Rs.7.680 Harnai. million.

PSDP.No-1429

(2015-16) Total: Rs.7,680,000/- 64. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Add: 1. Constt: of 2-Nos Rs.2,000,000/- The Scheme was C/rooms for Existing Add: C/Rooms for discussed in detail and Schools at District GBMS Noor Khan. approved with revised Noushki. 2. Constt: of 3-Nos Rs.3,000,000/- Cost of Rs.7.000 PSDP.No-1431 Add: C/rooms for million.

(2015-16) GBMS Killi Murad

Ali. 3. Constt: of 2-Nos Rs.2,000,000/- Add: C/Rooms for GBPS Atta Mohammad. Total: Rs.7,000,000/-

15

65. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 800rft 1. Constt: of 800rft Rs.1,680,000/- The Scheme was Boundary Wall for Boundary Wall for discussed in detail and GBHS Darzi Chah at GBHS Darzi Chah. approved at Rs.1.680 District Noushki. million. PSDP.No-1431 (2015-16) Total: Rs.1,680,000/- 66. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Additional Rs.2,200,000/- The Scheme was Additional C/Rooms C/Rooms for GBHS discussed in detail and for GBHS Aghbargh Aghbargh Dumar (EMIS- approved at Rs.2.200 Dumar, District Ziarat 04157). million. (EMIS-04157). PSDP.No-1431 (2015-16) Total: Rs.2,200,000/- 67. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos Add: Rs.2,200,000/- The Scheme was Add: Rooms for Rooms for GBMS Manzarai discussed in detail and GBMS Manzarai . approved at Rs.2.200 District Pishin. million. PSDP.No-1431 (2015-16) Total: Rs.2,200,000/- 68. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 3-Nos 1. Constt: of 3-Nos Rs.2,400,000/- The Scheme was Add: Rooms for GPS Add: Rooms for GPS discussed in detail and Zadaa Kaish Murgha Zadaa Kaish Murgha approved at Rs.2.400 Kibzai, District Killa Kibzai. million. Saifullah. PSDP.No-1431 (2015-16) Total: Rs.2,400,000/- 69. Name of Scheme. Scope of Work. Cost. Decision. Up-Gradation of 1. Up-Gradation of Rs.7,600,000/- The Scheme was GBMS into High GBMS into High discussed in detail and School at Nokjo, School at Nokjo approved at Rs.7.600 District Nushki. (Emis-6679). million. PSDP.No-1429 (2015-16) Total: Rs.7,600,000/- 70. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 6-Nos Constt: of 6-Nos Rooms Rs.8,100,000/- The Scheme was Rooms for Deputy for Deputy District discussed in detail and District Officer Male Officer Male & Female approved at Rs.8.100 & Female Karezat Karezat with Boundary million. with Boundary Wall Wall. at District Pishin. PSDP.No-1431 (2015-16) Total: Rs.8,100,000/-

16

70. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 2-Nos Constt: of 2-Nos C/Rooms Rs.2,200,000/- The Scheme was C/Rooms for GBPS for GBPS Chari, District discussed in detail and Chari, District Ziarat Ziarat (EMIS-1088). approved at Rs.2.200 (EMIS-1088). million. PSDP.No-1431 (2015-16) Total: Rs.2,200,000/- 71. Name of Scheme. Scope of Work. Cost. Decision. Imp: of GPS Imp: of GPS Ghimkhana Rs.3,000,000/- The Scheme was Ghimkhana Minority Minority & Supply of discussed in detail and & Supply of Computers Alongwith approved at Rs.2.200 Computers Computer Chairs to million. It was decided Alongwith Computer GBHS Staff College that the Director of Education (Schools), Chairs to GBHS Cantt Quetta. Balochistan fulfill the Staff College Cantt: all codal formalities. District Quetta. PSDP.No-1398 (2015-16) Total: Rs.3,000,000/- 72. Name of Scheme. Scope of Work. Cost. Decision. Provision of Provision of Furniture Rs.3,000,000/- The Scheme was Furniture GGHS GGHS Inyatullah Karez discussed in detail and Inyatullah Karez Gulistan District Killa approved at Rs.3.000 Gulistan District Abdullah (Through million. Killa Abdullah BDA). (Through BDA). PSDP.No-1435 (2015-16) Total: Rs.3,000,000/- 73. Name of Scheme. Scope of Work. Cost. Decision. Provision of Van for Provision of Van for Rs.3,000,000/- The Scheme was Girls High School, Girls High School, discussed in detail and Chtkan, District Chtkan approved at Rs.3.000 Panjgoor. million. It was decided PSDP.No-1434 that the Director of (2015-16) Education (Schools), Balochistan fulfill the all codal formalities. Total: Rs.3,000,000/- 74. Name of Scheme. Scope of Work. Cost. Decision. Up-Gradation of 02 Up-Gradation of GBPS Rs.3,800,000/- The Scheme was Nos Primary Schools into Middle level Haji discussed in detail and to Middle Level, Khamis Jankyani approved at Rs.3.800 District Barkhan. (EMIS-7669). million. PSDP.No-1354 (2015-16) Total: Rs.3,800,000/-

17

75. Name of Scheme. Scope of Work. Cost. Decision. Constt: of 4 Primary 1. Constt: of Building Rs.2,500,000/- The Scheme was (Shelter less) Schools for Shelter Less discussed in detail and Boys & Girls, GGPS Dadwani approved at Rs.7.500 District Barkhan. (EMIS-12339). million. PSDP.No-1286 2. Constt: of Building Rs. 2,500,000/- (2015-16) for Shelter Less

GBPS Haji Mian Khan Buzdar (EMIS- 7134). 3. Constt: of Building Rs.2,500,000/- for Shelter Less GBPS Sakar Noor Khan (EMIS-7059). Total: Rs.7,500,000/- 76. Name of Scheme. Scope of Work. Cost. Decision. Constt: of Bungalow 1. Constt: of Bungalow Rs.3,800,000/- The Scheme was (Residential Quarter) (Residential Quarter) discussed in detail and for Headmistress for Headmistress approved at Rs.3.800 Govt: High School Govt: High School million. Wadera Karam Khan Wadera Karam Khan

Eshani (EMIS- Eshani (EMIS-

13155), District 13155). Barkhan. PSDP.No-1404 (2015-16) Total: Rs.3,800,000/- 77. Name of Scheme. Scope of Work. Cost. Decision. Missing 1. Constt: one Add: Rs.700,000/- The Scheme was Infrastructure and C/Room for GBPS discussed in detail and Additional Class Haji Mian Khan approved at Rs.2.100 Rooms in Schools of Gajwani (EMIS- million. , District Barkhan. 7076). Rs.700,000/- PSDP.No-1286 2. Constt: of One Add:

(2015-16) C/Room for GBPS Jewan Wahala Rakhni(EMIS- 12209). 3. Constt: of One Add: Rs.700,000/- C/Room for GBPS Wadera Sahiban Salorani (EMIS-7142). Total: Rs.2,100,000/- 78 Name of Scheme. Scope of Work. Cost. Decision. Constt: of 3-Nos Constt: of 3-Nos Add: Rs.2,400,000/- The Scheme was Add: Rooms for Rooms for GBHS Jumal discussed in detail and GBHS Jumal Khan Khan Bugti, District Sohbat approved at Rs.2.400 Bugti, District Pur (EMIS 5565) million. Sohbat Pur (EMIS 5565) PSDP.No-1431 (2015-16) Total: Rs.2,400,000/-

18

Sd/- Sd/- Secretary Education Department Additional Secretary (Dev) Education Department

Sd/- Sd/- Chief of Section (Edn) Under Secretary P&D Department Finance Department

Sd/- Sd/- XEN, C&W Department Deputy Director (Planning Cell) Directorate of Education

No. SO(Dev)11-1/2015-16/969-74 Dated Quetta, the 22nd April, 2016. A copy to :- 1. The Additional Chief Secretary (Dev), P&D, Govt: of Balochistan, Quetta. 2. The Secretary, Govt: of Balochistan, Finance Department, Quetta. 3. The Secretary, Government of Balochistan, C&W Department, Quetta. 4. The Director of Education (Schools ), Balochistan, Quetta. 5. PS to Secretary Secondary Education Department.

Sd/- Deputy Secretary (Dev)

19