Bøker / Books Publikasjoner / Publications

Total Page:16

File Type:pdf, Size:1020Kb

Bøker / Books Publikasjoner / Publications the western Arctic. In Zubakov V.A. DEPARTMENT OF EARTH SCIENCE (ed). Palinologicheskiye, PUBLICATIONS, REPORTS & klimatostratigraficheskiye i PRESENTATIONS 2007 geoekologicheskiye rekonstruktsii. St. Petersburg, Nedra, 131–153 (in Russian). Astakhov V. I., Mangerud J. & Svendsen Bøker / Books J. I., 2007. Trans-Uralian correlation of Doyen P.M. Seismic reservoir the Upper Pleistocene of the North. characterization - an earth modelling Regional Geology and Metallogeny, St. perspective, 2007. European Association Petersburg (In Russian, Englisg abstract), of Geoscientists and Engineers 30-31, 190-206. Publications, 255pp. Banerjee N.R., Simonetti A., Furnes H., Filippov M.M. & Melezhik V.A. (eds), 2007. Muehlenbachs K., Staudigel H., Heaman Atlas of Textures and Structures of Sungite- L. & Van Kranendonk M.J., 2007. Direct Bearing Rocks from the Onega dating of Archean microbial ichnofossils. Synclinorium. Karelian Science Centre, Geology, 35, 487-490. Petrozavodsk, Russia (in Russian), 80 pp. Brevik I., Rojas M., Hatteland T. & Havskov J. & Alguacil G., 2007. Ahmadi G.R., 2007. Documentation and Instrumentation in Earthquake quantification of velocity anisotropy in Seismology. Chinese edition. Springer, shales using wireline log measurements. 277pp, + CD-rom. The Leading Edge. Boulaenko, M., Hesthammer, J., Vereshagin, A., Gelting, P., Davies, R. & Publikasjoner / Publications Wedberg, T., 2007. Marine CSEM Agersborg R., Jakobsen M., Ruud B.O. Technology - The Luva Case. Houston & Johansen T.A., 2007. Effects of pore Geological Society Bulletin, 23-43. fluid pressure on the seismic response of Chew D.M., Schaltegger U., Kosler J., a fractured carbonate reservoir. Stud. Whitehouse M.J., Gutjahr M., Spikings Geophys. Geod., 51 , 89-118. R.A. & Miškovic A., 2007. U- Pb Alaei B. & Petersen S.A., 2007. geochronologic evidence for the Geological modelling and finite evolution of the Gondwanan margin of difference forward realization of a the north-central Andes. Geol. Soc. regional section from the Zagros fold- America Bulletin, 119, 697-711. and-thrust belt. Petroleum Geoscience, Chumakov N.M., Pokrovsky B.G., 13, 241-251. Melezhik V.A., 2007. Geological history Alhassan A. A. I. & 6 others (Havskov J.), of the Patom Complex, Late Precambrian, 2007. The Sudanese seismic network. Central Siberia. Transactions of the Seismological Research Letters, 78, 498- Russian Academy of Sciences, 413, 379- 501. 383. Askeland B., Ruud B.O., Hobæk H. & Coffin M.F. & Eldholm O., 2007. Large Mjelde R., 2007. Marine seismics with a Igneous Provinces. In: Oceans: A pulsed combustion source and Pseudo Scientific American Reader, Chicago Noise codes. Marine Geophysical Univ. Press, 12-25. Researches, 28, 109-117. Cohen A.S. et al. (Talbot M.R.), 2007. Astakhov V. & Mangerud J., 2007. The Ecological consequences of early Late geochronometric age of Late Pleistocene Pleistocene megadroughts in tropical terraces on the Lower Yenisei. Doklady Africa. Proceedings of the National Earth Sciences, 416, 1022-1026. Academy of Sciences of the United Astakhov V.I., Mangerud J. & Svendsen States of America, 104, 16422-16427. J.I., 2007. News on the Late Cenozoic of Constantin S., Bojar A.V., Lauritzen S.E. of existing models and proposed & Lundberg J., 2007. Holocene and Late modifications. N.Jb. Miner. Abh., 183, Pleistocene climate in the sub- 317-341. doi:10.1127/0077- Mediterranean continental environment: 7757/2007/0078. A speleothem record from Poleva Cave Emmel B., Jacobs J., Crowhurst P. & (Southern Carapathians, Romania). Daszinnies M.C., 2007. Combined Palaeogeography, Palaeoclimatology, apatite fission-track and single grain Palaeoecology, 243, 322-338. apatite (U-Th)/He ages from basement Corfield R.M., Searle M.P., Pedersen R- rocks of central Dronning Maud Land B., 2007. Tectonic setting, origin and (East Antarctica) - Possible identification obduction history of the Spontang of thermally overprinted crustal ophiolite, Ladakh Himalaya, N.W. India. segments? Earth and Planetary Science Geological Society of America Bulletin. Letters., 264, 72-88. Currie C.A., Beaumont C. & Huismans Enge H.D., Buckley S.J., Rotevatn A. & R.S., 2007. The fate of subducted Howell J.A., 2007. From outcrop to sediments: A case for backarc intrusion reservoir simulation model: workflow and underplating. Geology, 35, 1111- and procedures. Geosphere, 3, 469-490. 1114. doi:10.1130/G24098A.1 doi: 10.1130/GES00099.1. Dawson A.G., Hickey K., Mayewski P.A. Faryad S.W., Kosler J., 2007. Incipient & Nesje A., 2007. Greenland (GISP2) eclogite facies metamorphism in a ice core and historical indicators of granulite recorded by inclusion pattern complex North Atlantic climate changes and compositional zoning in garnet. during the fourteenth century. The Geochimica et Cosmochimica Acta, Holocene, 17, 427-434. 71(15) Suppl 1:A269-A269 Dilek Y., Furnes H. & Shallo M., 2007. Farzadi P. & Hesthammer J., 2007. Suprasubduction zone ophiolite Diagnosis of the Upper Cretaceous formation along the periphery of palaeokarst and turbidite systems from Mesozoic Gondwana. Gondwana the Iranian Persian Gulf using volume- Research, 11, 453-475. based multiple seismic attribute analysis Ehlers J., Astakhov V. Gibbard P.L., and pattern recognition. Petroleum Ingolfsson O., Mangerud J. & Geoscience, 13, 227-240. Svendsen J.I., 2007. Early Quaternary. Fossen H. & Bale A., 2007. Deformation In S.A. Elias (ed.) Encyplopedia of bands and their influence on fluid flow. Quaternary Science, 2. Elsevier. American Association of Petroleum Amsterdam, 1031-1032. Geologists Bulletin, 91, 1685-1700. Ehlers J., Astakhov V. Gibbard P.L., Fredman N., Tveranger J., Semshaug S., Mangerud J. & Svendsen, J.I., 2007. Braathen A., & Sverdrup E., 2007. Late Quaternary in lowland Eurasia. In Sensitivity of fluid flow to fault core S.A. Elias (ed.) Encyplopedia of architecture in siliciclatic rerservoirs; a Quaternary Science, 2. Elsevier, synthtic fault model. Petroleum Amsterdam, 1085-1095. Geoscience, 13, 1-16. Ehlers J., Astakhov V. Gibbard P.L, Furnes H., Banerjee N.R., Staudigel H. & Mangerud J. & Svendsen J.I., 2007. Muehlenbachs K., 2007. Pillow lavas as Mid-Quaternary in Eurasia. In S.A. Elias a habitat for microbial life. Geology (ed.) Encyplopedia of Quaternary Today, 23, 143-146. Science, 2. Elsevier. Amsterdam, 1036- Furnes H., Banerjee N.R., Staudigel H., 1043. Muehlenbachs K., McLoughlin N., de El-Sayed M.M., Furnes H. & Shagar A., Wit M. & Kranendonk M.V., 2007. 2007. Growth of the Egyptian crust in the Comparing petrographic signatures of northern East African Orogen: A review bioalteration in recent to Mesoarchean pillow lavas: Tracing subsurface life in Hanyga A. & Seredynska M., 2007. A oceanic igneous rocks. Precambrian rigourous construction of maximum Research, 158, 156-176. recoverable work. Z. Angew. Math. Furnes H., De Wit M., Staudigel H., Phys, 58, 1-10. doi:10.1007/s00033-007- Rosing M. & Muehlenbachs K. 2007. A 7020-z Vestige of Earth´s Oldest Ophiolite. Hanyga A. & Seredynska M., 2007. Science, 315, 1704-1707. Hamiltonian and Lagrangian theory of Furnes H., De Wit M., Straudigel H., viscoelasticity. Continuum Mech Rosing M. & Muehlenbachs K., 2007. Thermodyn. xxx, doi 10.1007/s00161- Response to Comments on “A Vestige of 007-0065-6 Earth´s Oldest Ophiolite”. Science, 318, Hanyga A. & Seredynska M., 2007. 746. Multiple-integral viscoelastic constitutive Gibbons S.J., Sørensen M.B., Harris D.B. equations. Int. J. Non-Linear Mech, 42, & Ringdal F., 2007. The detection and 722-732. location of low magnitude earthquakes in doi:10.1016/j.ijnonlinmec.2007.02.003 northern Norway using multi-channel Hanyga A. & Seredynska M., 2007. waveform correlation at regional Relations Between Relaxation Modulus distances. Physics of the Earth and and Creep Compliance in Anisotropic Planetary Interiors, 160, 285-309. Linear Viscoelasticity. J Elasticity, 41- Haeuselmann P., Granger D.E., Jeannin 61. doi 10.1007/s10659-007-9112-6. P.Y., & Lauritzen S.E., 2007. Abrupt Helle S.K., Rye N., Stabell B., Prösch- glacial valley incision at 0.8 Ma dated Danielsen & Hoel C., 2007. Neotectonic from cave deposits in Switzerland. faulting and the Late Weichselian Geology, 35, 143-146. shoreline gradients in SW Norway. Haflidason H., de Alvario M. M., Nygård Journal of Geodynamics, 44, 96-128. A., Sejrup H. P. & Laberg J. S., 2007. Hellevang H. & Kvamme B., 2007. An Holocene sedimentary processes in the explicit and efficient algorithm to solve Andøya Canyon system, north Norway. kinetically constrained CO2-water-rock Marine Geology, 246, 86-104. interactions. WSEAS Transactions on Hald M. & 9 others (Andersson C., Mathematics, 6, 681-687. ISBN Jansen E. & Sejrup H.P), 2007. 9789608457584 Variations in temperature and extent of Hjelstuen B.O., Eldholm O. & Faleide Atlantic water in the northern North J.I., 2007. Recurrent Pleistocene mega- Atlantic during the Holocene, Quaternary failures on the SW Barents Sea Margin. Science Reviews, 26, 3423-3440. Earth and Planetary Science doi:10.1016/j.quascirev.2007.10.005. Letters, 258, 605-618. Hanyga A., 2007. Anomalous diffusion Huismans R.S. & Beaumont C., 2007. without scale invariance. J. Phys. A: Roles of lithospheric strain softening and Math. Theor. 40, 5551-5563. heterogeneity in determining the Hanyga A., 2007. Fractional-order geometry of rifts and continental relaxation laws in non-linear margins. In Karner G.D., Manatschal G., viscoelasticity. Continuum Mech. & Pinhiero, L.M. (eds.) Imaging, Thermodyn, 19, 25-36. doi Mapping and Modelling Continental 10.1007/s00161-007-0042-0
Recommended publications
  • Søknad Om Ny Utslippstillatelse for Etablering Av Renseanlegg Og
    Teknisk Fylkesmannen i Vestland 15 JULI 2020 Fylkesmannen i Vestland Saksnr. Njøsavegen 2 Arkivnr. 6863 LEIKANGER Sakshand. I Avd Vår ref: Saksbehandler / Direkte Telefon: Deres ref: Dato: 2020/4979-1 Sissel Aasebø/56 15 58 oo 10.07.2020 Søknad om utslipp av kommunalt avløpsvann og overvann i Søre Askøy tettbebyggelse På bakgrunn av endringene i avløpsstrukturen for Søre Askøy tettbebyggelse søker Askøy kommune om ny utslippstillatelse for etablering av renseanlegg og utslipp for avløpsområdet. Utslippssøknad er vedlagt i eget dokument. Søknaden er basert på gjeldende utslippstillatelse, supplert med opplysninger om endring i avløpsstrukturen. Krav til rensing er gitt i utslippstillatelser av 25.01.2011 og 12.10.2016. Det generelle kravet til rensing er sekundærrensing, men Askøy kommune har fått unntak fra sekundærrensekravet slik at primærrensing er gjeldende krav for dagens utslippstillatelse. Ut fra de signaler som i den senere tid et gitt av Miljødirektoratet fremgår det at overgangsfristen for å oppfylle primærrensekravene innen 31.12.2015 er endelig. Alternativt kan kommunene søke om ny utslippstillatelse basert på etablering av sekundærrensing, med mulighet for å få innvilget noe lengre frister. Askøy kommune ønsker på bakgrunn av signalene fra Miljødire1.'toratet å etablere sekundærrenseanlegg. Se vedlagte dokumenter. Med hilsen Anton Bøe leder Vann og avløp Sissel Aasebø leder VA forvaltning Brevet er godkjent elektronisk og har derfor ingen underskrift Postadresse: Besøksadresse: Telefon: Bank: Klampavikvegen 1, 5300 Kleppestø
    [Show full text]
  • Brass Bands of the World a Historical Directory
    Brass Bands of the World a historical directory Kurow Haka Brass Band, New Zealand, 1901 Gavin Holman January 2019 Introduction Contents Introduction ........................................................................................................................ 6 Angola................................................................................................................................ 12 Australia – Australian Capital Territory ......................................................................... 13 Australia – New South Wales .......................................................................................... 14 Australia – Northern Territory ....................................................................................... 42 Australia – Queensland ................................................................................................... 43 Australia – South Australia ............................................................................................. 58 Australia – Tasmania ....................................................................................................... 68 Australia – Victoria .......................................................................................................... 73 Australia – Western Australia ....................................................................................... 101 Australia – other ............................................................................................................. 105 Austria ............................................................................................................................
    [Show full text]
  • Rehabilitering Utenfor Institusjon Innsatsteam
    Hvordan ta kontakt: Du kan selv ta kontakt med oss, eller du kan be helsepersonell l (institusjon, fastlegen, ergo- f Tjenesten tilbys dagtid mandag til fysioterapitjenesten, hjemmesy- Rehabilitering t kepleien) å henvise til oss. Tje- fredag. Det er ingen egenandel på nesten er organisert under Ergo- utenfor tjenesten Rehabilitering utenfor in- og Fysioterapitjenestene i Ber- institusjon gen Kommune: stitusjon i henhold til lov om kom- munale helse og omsorgstjeneste. Arna / Åsane (base Åstveit): 53 03 51 50 / 40 90 64 57 Bergenhus /Årstad (base Engen): Den som søker helsehjelp kan på- 55 56 93 66 / 94 50 38 14 Innsatsteam - klage avgjørelsen dersom det gis av- Fana / Ytrebygda (base Nesttun): slag eller dersom det menes at rettig- 55 56 18 70 / 94 50 79 60 rehabilitering hetene ikke er oppfylt. Klage sendes Fyllingsdalen/ Laksevåg (base Fyllingsdalen): 53 03 30 09 / 94 50 38 15 til Helsetilsynet i fylket og klagen skal være skriftlig (jfr. Lov om pasi- E-post: entrettigheter § 7-2). innsatsteam-rehabilitering@ bergen.kommune.no Rehabilitering utenfor institusjon Oppfølgingsperioden er tverrfaglig og Et ønske om endring innen funksjon, Innsatsteam-rehabilitering gir tjenes- aktivitet og/ eller deltakelse kan være ter til deg som nylig eller innen siste individuelt tilpasset og kan inneholde: utgangspunkt for rehabilitering. år, har fått påvist et hjerneslag eller Kartlegging av funksjon en lett/moderat traumatisk hodeska- Dine mål står sentralt i rehabilite- de. Målrettet trening ringsforløpet. Innsatsteam-rehabilitering er et tverr- Veiledning til egentrening og aktivitet faglig team bestående av fysiotera- peut, ergoterapeut og sykepleier. Samtale, mestring og motivasjon Egentrening og egeninnsats er viktig Oppfølgingen fra Innsatsteam– reha- for å få en god rehabiliteringsprosess.
    [Show full text]
  • Maurolicus Muelleri) Larvae and Life-History Consequences1 Arild Folkvord, Geir Gundersen, Jon Albretsen, Lars Asplin, Stein Kaartvedt, and Jarl Giske
    163 ARTICLE Impact of hatch date on early life growth and survival of Mueller’s pearlside (Maurolicus muelleri) larvae and life-history consequences1 Arild Folkvord, Geir Gundersen, Jon Albretsen, Lars Asplin, Stein Kaartvedt, and Jarl Giske Abstract: Growth and survival of Maurolicus muelleri larvae in Herdlefjorden, Norway, were investigated by daily otolith incre- ment analysis. While high egg densities were generally observed throughout the spawning season, three cohorts each with a narrow window of hatching dates were identified. The first of these cohorts was characterized by low growth and poor morphometric condition and disappeared from the fjord during autumn. High-resolution drift modeling indicated that Herdlef- jorden had a net export of larvae and negligible import in the period cohort 1 disappeared. Yet, the advective loss rate of larvae was not considered high enough to explain the near complete disappearance of the first cohort. An otolith-based growth chronology indicated that growth conditions in Herdlefjorden improved noticeably around mid-September and remained favorable the following month. The analysis of daily otolith increments could thus be used to document within-season variability in larval growth and survival. The low and variable survival due to short-term fluctuations in environmental conditions indicate that multiple batch spawning is an adequately evolved life-history strategy for marine planktivorous fish such as M. muelleri. Résumé : La croissance et la survie des larves de Maurolicus muelleri dans le Herdlefjorden (Norvège) ont été étudiées par l'analyse des incréments quotidiens d'otolithes. Si de fortes densités d'œufs ont été généralement observées durant toute la saison de frai, trois cohortes ont néanmoins été identifiées, chacune présentant sa propre fourchette restreinte de dates d'éclosion.
    [Show full text]
  • 2015 Programme Bergen International Festival
    BERGEN 27 MAY — 10 JUNE 2015 2015 PROGRAMME BERGEN INTERNATIONAL MORE INFO: WWW.FIB.NO FESTIVAL PREFACE BERGEN INTERNATIONAL 003 FESTIVAL 2015 Love Enigmas Love is a perpetually fascinating theme in the Together with our collaborators we aim to world of art. The most enigmatic of our emotions, create a many-splendoured festival – in the it brings us joy when we experience it set to music, truest sense of the word – impacting the lives of AN OPEN INVITATION recounted in literature or staged in the theatre, in our audiences in unique and unmissable ways, dance and in film. We enjoy it because art presents both in venues in the city centre, the composers’ TO VISIT OUR 24-HOUR us with mirror images of ourselves and of the most homes and elsewhere in the region. important driving forces in our lives. OPEN BANK The Bergen International Festival is an event Like a whirling maelstrom love can embrace in which artists from all over the world want ON 5-6 JUNE 2015 us and suck us in and down into the undertow to participate, and they are attracted to the with unforeseeable consequences. Love unites playfulness, creativity and tantalizing energy high and low, selfishness and selflessness, self- of the festival. The Bergen International Festival Experience Bergen International Festival at affirmation and self-denial, and carries us with is synonymous with a high level of energy and our branch at Torgallmenningen 2. There will equal portions of blindness and ruthlessness a zest for life and art. Like an explorer, it is be activities and mini-concerts for children into the embrace of the waterfall, where its unafraid, yet approachable at the same time.
    [Show full text]
  • Kommunedelplan for Sambandet Vest Silingsrapport
    Kommunedelplan for Sambandet vest Silingsrapport Askøy kommune og kommunane Meland, Radøy og Lindås (Alver kommune i 2020): KOMMUNEDELPLAN FOR SAMBANDET VEST VEDLEGG I: SILINGSRAPPORT, juni 2019 1 Kommunedelplan for Sambandet vest Silingsrapport Oppdragsgjevar: Alver kommune Oppdragsgjevars kontaktperson: John Fredrik Wallace Rådgjevar Norconsult AS, Valkendorfsgate 6, NO-5012 Bergen Oppdragsleiar: Øystein Skofteland Fagansvarleg: Øystein Skofteland Andre nøkkelpersonar: Alv Terje Fotland, Lene Merete Rabben, Kristoffer Åsen Røys, Heidi Handeland, Arne Værnes. Kristina Ebbing Wensaas Oppdragsnummer NO: 5190526 001 2019-05-22 Silingsrapport Versjon 1 OYSKO ATFOT/KRIWEN OYSKO Versjon Dato Beskrivelse Utarbeidet Fagkontrollert Godkjent Dette dokumentet er utarbeidet av Norconsult AS som del av det oppdraget som dokumentet omhandler. Opphavsretten tilhører Norconsult AS. Dokumentet må bare benyttes til det formål som oppdragsavtalen beskriver, og må ikke kopieres eller gjøres tilgjengelig på annen måte eller i større utstrekning enn formålet tilsier. 2 Kommunedelplan for Sambandet vest Silingsrapport INNHALD 1 INNLEIING 5 4.3 FORKASTA LINJER 16 4.4 OPPSUMMERING 19 1.1 BAKGRUNN 5 5 ANALYSAR 21 2 MÅL MED PROSJEKTET 7 5.1 TRANSPORT, BUSETNAD OG ARBEIDSLIV 21 2.1 NASJONALE OG REGIONALE MÅL 7 5.2 TRAFIKK 27 2.2 SAMFUNNSMÅL 7 5.3 KOSTNAD 28 2.3 EFFEKTMÅL 8 5.4 KONFLIKTANALYSE 29 2.4 VEGSTANDARD 9 5.5 AREALPLANAR I OMRÅDET 33 3 METODE 11 6 SILING 35 3.1 SILINGSKRITERIUM OG SILING 11 6.1 KORRIDOR AA 35 3.2 VURDERING AV MÅLOPPNÅING 12 6.2 KORRIDOR
    [Show full text]
  • Zoning Plan for Parts of Bergen Airport, Flesland Proposer's Plan Description and Impact Assessment
    ZONING PLAN FOR PARTS OF BERGEN AIRPORT, FLESLAND PROPOSER’S PLAN DESCRIPTION AND IMPACT ASSESSMENT REVISED FOR 2ND READING DATED 30 MARCH 2012 ZONING PLAN (DETAIL PLAN) W/ IMPACT ASSESSMENT FOR BERGEN AIRPORT, FLESLAND, LAND NO. 109, TITLE NO. 14 ET AL. AVINOR AS P.O. BOX 150 2061 Gardermoen Switchboard: +47 815 30 550 Fax: +47 64 81 20 01 E-mail: [email protected] www.avinor.no Org.no: 985198292 Contact person: Project director Alf Sognefest REPORT TITLE Zoning plan (detail plan) w/ Impact assessment for Bergen Airport, Norconsult AS, Main office Flesland, land no. 109, title no. 14 et al. P.O. Box 626, 1303 SANDVIKA Vestfjordgaten 4, 1338 SANDVIKA Phone: +47 67 57 10 00 CLIENT Fax: 67 54 45 76 Avinor AS E-mail: [email protected] www.norconsult.no CLIENT’S CONTACT PERSON Bus. reg. no.: NO 962392687 VAT Project director Alf Sognefest ASSIGNMENT NO. DOCUMENT NUMBER PREPARED 5008543 01 Mona Hermansen DATE REVISION TECHNICAL QUALITY CONTROL 12 May 2011 01 Ragne Rommetveit 11 July 2011 02 30 March 2012 03 NUMBER OF PAGES APPROVED 140 Ragne Rommetveit 2 1 BACKGROUND AND REASON FOR DRAFT PLAN - SUMMARY Avinor hereby submits a proposal for a zoning plan for parts of the landside at Bergen Airport Flesland. Implementation of this plan ensures that Bergen Airport, Flesland will not be a limiting factor in the positive development for citizens, public activities as well as business and tourism in Bergen and the Western Region. The plan furthermore facilitates increasing the public transport share of traffic to the airport by the construction of a light rail transit (LRT) station at the airport, integrated in the air terminal.
    [Show full text]
  • Norway High Speed Rail Assessment Study: Phase III Model
    Norway High Speed Rail Assessment Study: Phase III Model Development Report Final Report 25 January 2012 Norway HSR Assessment Study – Phase III Model Development Report Notice This document and its contents have been prepared and are intended solely for Jernbaneverket‟s information and use in relation to the Norway High Speed Rail Study – Phase III. Atkins assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 83 pages including the cover. Document history Job number: 5101627 Document ref: Final Report Revision Purpose description Originated Checked Reviewed Authorised Date Rev 1.0 Phase III Final Report, JA TH / JA MH AJC / WL 19/01/12 Draft for Review Rev 1.1 Phase III Final Report JA TH / JA MH AJC / WL 25/01/12 Client signoff Client Jernbaneverket Project Norway HSR Assessment Study - Phase III Document title Norway HSR Assessment Study - Phase III Model Development, Final Report Job no. 5101627 Copy no. Document reference Norway HSR Assessment Study - Phase III: Final Report, 25 January 2012 Atkins Norway HSR Assessment Study - Phase III: Model Development Report 2 Norway HSR Assessment Study – Phase III Model Development Report Table of contents Section Pages 1. Introduction 5 1.1. Background 5 1.2. Purpose of the report 5 1.3. Structure of the report 5 2. Overview 7 2.1. Corridors 7 2.2. Key model outputs 8 2.3. Modelling and forecasting challenges 8 2.4. Requirements for Phase III model development 9 3. Modelling Overview 10 3.1.
    [Show full text]
  • Land Use Development Potential and E-Bike Analysis
    Summary Land use development potential and E- bike analysis TØI Report 1699/2019 Tanu Priya Uteng, Andre Uteng, Ole Johan Kittilsen Oslo 2019 43 pages English Increasing cycling shares is a part of the urban and transport planning mandate for the Norwegian urban regions. The pathways to increase bicycling shares can be plotted at both macro and micro levels. At micro levels, road designs and measures to both improve the conditions for cyclists and make cycling paths safer can lead to potential increase in bicycling. At the macro level, land use planning can assist in increasing bicycling usage. In this report, we analyse the issue at a macro level for the four largest cities in Norway – Oslo, Bergen, Trondheim and Stavanger. Analysis is based on INMAP model, which has previously been employed to estimate the mutual effects of land use plans, infrastructure provision and transportation in Norway. The White Paper 26, 2012-2013 (NTP) states that any future growth in person transport in the larger cities should be absorbed by public transport, cycling and walking. In order to realize this ambitious goal, government wants to implement measures to stimulate ‘green’ person transport, and one of the popular measures towards this end is through extending financial support for policy packages in the city-networks. This report provides knowledge on how current and proposed land use and transport policies can be effectively interlinked to promote bicycling in the four cities. The results can assist in designing specific measures and paths of adoption for such measures, which can form a vital input for making decisions on policy packaging by the cities.
    [Show full text]
  • Project Description and Program Download
    REKINDLING SØREIDE’S SEASCAPES A contextualized restructure of the bay and new public “forsamlingshus” at the forgotten coastline of Søreide. Solveig Sanden Døskeland Diploma program 2020 André Fontes, APP Hedvig Skjerdingstad, DAV CONTENTS Page Introduction 4 The place 6 Location 8 Timeline 10 Future of Søreide 12 What 14 How 16 Why 18 Text 21 Model 23 Framework 25 CV 26 Couses 27 Position of Bergen in Europa 4 INTRODUCTION Bergen and areas around are becoming How can desification take use of the existing steadily more dense in population, reflect- local values? Can this as a way of thinking ing growth in number of resident housings. help to develop with more care within social This trend is making some suburbs growing and environmental sustainability. and stretching in to “minicenters” in be- tween the mountains, already built up are- as and the seafront. This dramatic change, form and adapt the landscape relatively fast. “Suburb are an area outside a The former rural areas that are often associ- city but near it and consisting ated with “peace and quiet” are in growth. mainly of homes, sometimes also having stores and small The content of this diploma will focus on businesses.” - Cambridge ways of exploring with growth of suburb ar- University Press. eas around Bergen, zooming in to Søreide, a local center along the seafront in Ytrebygda district. Among other places around Ber- gen, this is a location where the municipali- ty have regulated for densification. collage of typical development in the suburbs of Bergen within the last decade. 5 1 3 km.
    [Show full text]
  • Handlingsplan for Avløp Og Vannmiljø Strategisk Del 2022-2032
    Handlingsplan for avløp og vannmiljø Strategisk del 2022-2032 1 Forord Handlingsplan for avløp og vannmiljø skal legge til rette for gode og fremtidsrettede løsninger for oppsamling, transport og rensing av avløpsvann. Planen skal ivareta bærekraftig og langsiktig forvaltning av infrastrukturen for å oppnå og opprettholde god økologisk og kjemisk tilstand i alle vannforekomster i kommunen. På bakgrunn av store utfordringer både når det gjelder teknisk gjennomføring og økonomi, har enhet Vann og avløp utført flere utredningsarbeid for å sikre den eksisterende og fremtidige avløpshåndteringen i kommunen. Etter konseptvalgutredning utført i 2017 ble det vedtatt at det skal foretas endring av avløpsstrukturen for Søre Askøy tettstedsbebyggelse ved at det velges en desentralisert løsning med bygging av fire renseanlegg i stedet for ett felles sentralt anlegg. Med bakgrunn i ny utslippssøknad har Statsforvalteren i Vestland gitt ny utslippstillatelse for Søre Askøy. Formålet med denne planen er å vedta målsettinger, strategier og investeringsplan for nødvendige tiltak med utbygging avløpsanleggene, og på den måten sikre at alle utslipp oppfyller krav til rensing. Planen er delt inn i to deler, en strategisk del og en operativ del. Den strategiske delen skildrer rammeverk for forvaltningen, utfordringer og behov for tiltak med dagens avløpsanlegg, samt overordnede målsettinger og strategier for måloppnåelse. Den operative delen skal være styringsdokumentet for å få gjennomført målsettinger i den strategiske delen, og inneholder investeringsplan og gebyrprognoser. Hovedtiltakene i handlingsplanen er bygging av følgende sekundærrenseanlegg i Søre Askøy: Horsøy, Skarholmen, Erdal og Ask, innenfor frister gitt i utslippstillatelsen. I tillegg skal det etableres ledningsnett og pumpestasjoner for å overføre avløp til renseanleggene, samt etablering av avløpsanlegg innenfor øvrige deler av kommunen.
    [Show full text]
  • Byrådssak /18 Saksframstilling
    BYRÅDET Byrådssak /18 Saksframstilling Vår referanse: 2018/04034-3 Nye bibliotekfilialer på Indre Laksevåg, Sletten, Ytrebygda og Indre Arna Hva saken gjelder: Det vises til merknad 34 fra protokollen til bystyrets behandling av B.sak 306-17 «Byrådets forslag til Handlings- og økonomiplan 2018-2021/Budsjett 2018»: «Bibliotek Indre Laksevåg Bystyret ber byrådet vurdere opprettelsen av en bibliotekfilial sentralt på Indre Laksevåg i forbindelse med utarbeidelsen av sak om fremtidig bibliotekstruktur. Bystyret ber byrådet legge frem sak i løpet av første halvår 2018.» I byrådets plattform 2015 – 2019 står det: Bibliotekene er ikke bare steder der byens innbyggere kan låne bøker, men også viktige møteplasser for nærmiljøene. Byrådet vil sikre at bibliotekene fortsatt skal være gode arenaer i alle deler av byen. I byrådsavdeling for klima, kultur og næring er det er et pågående arbeid med utarbeidelse av en kulturarenaplan for de neste 10 år, og byrådets prioritering i denne sak vil være tilsvarende i planen. Dette er en orienteringssak til bystyret om vurdering av fremtidig bibliotekstruktur. Byrådets vurdering og anbefaling/konklusjon: Bibliotek er både viktige møteplasser og kulturinstitusjoner, og byrådet vil legge til rette for gode bibliotek i alle deler av byen. På denne bakgrunn vil byrådet flytte og relokalisere Landås bibliotek til Slettenområdet med oppgradering til større bydelsbibliotek, som også vil være tilpasset den økte befolkningsveksten som kommer i Årstad bydel. Årstad bydel har levekårsutfordringer og en bibliotekfilial vil kunne spille en viktig rolle som sosial møteplass og læringsarena. Det må påregnes samme etableringskostnader som ved nye filialer, mens årlige driftsutgifter er mindre enn ved nyetableringer. Byrådet vil foreslå følgende prioritering av nye bydelsbibliotek: 1.
    [Show full text]