Federal PSDP 2019-20 Authorization As on 11-10-2019 (Million Rupees)

Total Page:16

File Type:pdf, Size:1020Kb

Federal PSDP 2019-20 Authorization As on 11-10-2019 (Million Rupees) Federal PSDP 2019-20 Authorization as on 11-10-2019 (Million Rupees) Name of Project Cost Expenditure Throw- Allocation 2019-20 Authorization Upto June forward (Rupee Rupees Foreign Total Total Foreign 2019 Component) Aid Aid AVIATION DIVISION 1Construction of Airport Security 2,586.9 0.0 2,286.6 300.2 100.000 0.000 100.000 100.000 Force Camp (ASF) at IIAP 2Construction of Rain Water 2,629.4 0.0 1,638.9 990.5 100.000 0.000 100.000 42.000 Harvesting Kasana Dam 3Establishment of Specialized 2,502.5 0.0 2,446.1 56.4 3.532 20.000 23.532 0.700 Medium Range Weather Forecasting Center (SMRFC) and Strengthening of Weather Forecasting system in the Islamic Republic of Pakistan 4Installation of Weather Surveillance 1,580.0 0.0 1,017.8 562.2 30.000 130.000 160.000 16.701 Radar at Karachi in the Islamic Republic of Pakistan 5Installation of Weather Surveillance 1,848.7 0.0 9.0 1,839.7 30.000 20.000 50.000 16.000 Radar at Multan in the Islamic Republic of Pakistan 6 New Gwadar International Airport 22,247.5 0.0 1,146.8 21,100.6 355.000 200.000 555.000 NGIA Project 7Reverse Linkage Project Between 101.0 0.0 20.0 81.0 20.500 19.500 40.000 0.000 Pakistan Meteorological Department and Marmara Research Centre (MRC), Turkey (IDB) 8 Construction of Double Storey 86.9 0.0 0.0 86.9 25.000 0.000 25.000 Ladies Hostel/ Barrack with Provision of Third Storey alongwith Mess, Recreation Hall and Allied Facilities at AIIAP Lahore (53xladies staff) 9 Construction of 2x Double Storey 167.6 0.0 0.0 167.6 30.000 0.000 30.000 Barrack with Provision of Third Storey for Corporal to Inspectors and Assistant Director alongwith Separate Mess, and allied facilities Recreation Hall at Quetta Airport 10 Construction of Barrack 99.8 0.0 0.0 99.8 30.000 0.000 30.000 accommodation for 64x ASF personnel alongwith Mess and allied facilities, Ladies Rest Room MT, Store, Kote Magazine, Quarter guard, and OC Accommodation / Room at Skardu Airport 11 Construction of Barrack 50.0 0.0 0.0 50.0 20.000 0.000 20.000 accommodation for 64x ASF personnel alongwith Mess and allied facilities, MT, Store, Visitors Room, Ladies Rest Room, Kote Magazine, Quarter guard, and OC Accommodation / Room at Chitral Airport 12 Construction of Double Storey 85.1 0.0 0.0 85.1 20.000 0.000 20.000 Barracks for ASF at Faisalabad Airport 13 Construction of Double Storey 31.3 0.0 0.0 31.3 10.000 0.000 10.000 Director South Secretariat offices ASF alongwith allied facilities adjacent to HQs ASF Karachi 14 Construction of Triple Storey Living 88.6 0.0 0.0 88.6 25.000 0.000 25.000 Accommodation for ASF Personnel at Lahore Airport (192 persons) 15 Construction of Triple Storey Living 127.3 0.0 0.0 127.3 27.973 0.000 27.973 Barrack for 192x ASF Personnel alongwith Mess, Recreation hallat Multan airport 16 Up gradation of ASF Academy, 1,960.0 0.0 0.0 1,960.0 50.000 0.000 50.000 Karachi Page 1 of 46 (Million Rupees) Name of Project Cost Expenditure Throw- Allocation 2019-20 Authorization Upto June forward (Rupee Rupees Foreign Total Total Foreign 2019 Component) Aid Aid Total: 36192.4 0.0 8565.2 27627.2 877.005 389.500 1266.505 175.401 BOARD OF INVESTMENT 17Establishment of Project 339.3 0.0 87.5 251.8 100.000 0.000 100.000 20.000 Management Unit (PMU) on China Pakistan Economic Corridor - Industrial Cooperation Development Project (CPEC-ICDP) Total: 339.3 0.0 87.5 251.8 100.000 0.000 100.000 20.000 CABINET DIVISION 18Establishment of 200 Bed Centre of 5,301.4 455.0 1,583.3 3,718.2 1,500.000 0.000 1500.000 227.100 Excellence for Gynecology & Obstetrics, Rawalpindi 19Greenline Bus Rapid Transit 24,604.1 0.0 21,166.3 3,437.7 2,000.000 0.000 2000.000 1838.996 System (BRTS), Karachi 20Construction of Fly-over at Sakhi 2,386.0 0.0 1,492.8 893.2 893.201 0.000 893.201 893.200 Hassan, Five Star, & KDA Roundabout along Sher Shah Suri Road, Karachi (SIDC) (Karachi Package) 21Re-construction of Mangho Pir Road 2,440.5 0.0 1,376.3 1,064.2 1,064.199 0.000 1064.199 1064.199 from Jam Chakro to Banaras, Karachi (SIDC) (Karachi Package) 22Re-construction of Nishtar Road & 1,900.0 0.0 781.2 1,118.8 1,118.800 0.000 1118.800 1118.800 Mangho Pir Road, Karachi (SIDC) (Karachi Package) 23Rehabilitation/ Upgradation of 1,876.0 0.0 1,021.0 855.0 855.000 0.000 855.000 855.000 Existing Fire Fighting System of KMC, Karachi (SIDC) (Karachi Package) 24 Up-Gradation/ Strengthening of 638.0 0.0 532.7 105.3 105.275 0.000 105.275 Cabinet Division's 6 Aviation Squadron for Relief Operations & Enhancement of Security Islamabad Heliport, Islamabad 25SDGs Achievement Program 0.0 24,000.000 0.000 24000.000 2000.000 26 Construction of Aiwan-e-Sayahat in 40.0 0.0 0.0 40.0 40.000 0.000 40.000 F-5/1, Islamabad (Feasibility) 27 Facilitation of Tourism in 160.0 0.0 0.0 160.0 160.000 0.000 160.000 Islamabad - Marketing, Promotion etc. 28 Construction of Flyover on Jinnah 1,400.0 0.0 0.0 1,400.0 500.000 0.000 500.000 Avenue M-9 (Karachi Package) 29 Construction of Road from Dumlotte 400.2 0.0 0.0 400.2 200.000 0.000 200.000 Wells upto Link Road Adjacent to Education City District Malir, Karachi (SIDC) (Karachi Package) 30 Construction of Road over Malir 98.9 0.0 0.0 98.9 50.000 0.000 50.000 Bund from Dada Bhoy Town / Expressway upto Limits of PNS Mehran, District East, Karachi (SIDC) (Karachi Package) 31 Green Line BRTS Operations 10,400.0 0.0 0.0 10,400.0 2,500.000 0.000 2500.000 (Karachi Package) 32 Development Schemes under Prime 12,750.0 0.0 0.0 12,750.0 5,000.000 0.000 5000.000 Minister's Programme in Sindh Total: 64395.0 455.0 27953.6 36441.4 39986.475 0.000 39986.475 7997.295 CLIMATE CHANGE DIVISION 33Climate Resilient Urban Human 56.8 0.0 5.0 51.8 20.000 0.000 20.000 4.000 Settlements Unit 34Establishment of Geomatic Centre 48.9 0.0 40.1 8.8 3.200 0.000 3.200 0.640 for Climate Change Page 2 of 46 (Million Rupees) Name of Project Cost Expenditure Throw- Allocation 2019-20 Authorization Upto June forward (Rupee Rupees Foreign Total Total Foreign 2019 Component) Aid Aid 35Establishment of Pakistan WASH 40.0 0.0 5.0 35.0 16.000 0.000 16.000 3.200 Strategic Planning & Coordination Cell (Facilitating Achievements of SDG 6.1 and 6.2) 36Sustainable Land Management 105.4 0.0 66.0 39.5 25.000 0.000 25.000 5.000 Project to Combat Desertification of Pakistan SLMP-II 37Establishment of Climate Change 47.5 0.0 0.0 47.5 15.000 0.000 15.000 3.000 Reporting Unit in MoCC 38Ten Billion Trees Tsunami 125,000.0 0.0 0.0 125,000.0 7,500.000 0.000 7500.000 3750.000 Programme - Phase-I Upscaling of Green Pakistan Programme (Revised) Total: 125298.7 0.0 116.1 125182.6 7579.200 0.000 7579.200 3765.840 COMMERCE DIVISION 39Remodeling and Expansion of 2,677.4 0.0 0.0 2,677.4 100.000 0.000 100.000 20.000 Karachi Expo Centre, Component-I Total: 2677.4 0.0 0.0 2677.4 100.000 0.000 100.000 20.000 COMMUNICATIONS DIVISION (OTHER THAN NHA) 40Construction of SSP Office, Lines 289.5 0.0 105.1 184.4 88.704 0.000 88.704 17.741 HQ & Beat for NH&MP at Gwadar 41NTRC Accident Data and Accident 57.8 0.0 37.8 20.0 20.000 0.000 20.000 4.000 Cost Study 42NTRC Axle Load Survey Program 44.4 0.0 26.7 17.7 17.678 0.000 17.678 3.535 43NTRC Operational Research 43.4 0.0 21.4 21.9 21.926 0.000 21.926 4.385 Program 44NTRC Origin-Destination Survey 57.0 0.0 9.4 47.6 47.621 0.000 47.621 9.524 and Transport Demand 45NTRC Permanent Traffic Count 57.7 0.0 12.8 44.9 23.379 0.000 23.379 4.675 Program 46Study of Freight Transport 58.0 0.0 0.0 58.0 29.000 0.000 29.000 5.800 (Trucking) in Pakistan Total: 607.8 0.0 213.2 394.6 248.308 0.000 248.308 49.660 COMMUNICATIONS DIVISION (NHA) 47CAREC Corridor Development 21,041.0 0.0 1,511.6 19,529.4 2,400.000 100.000 2500.000 250.000 Investment Programme Tranche-I Projects ADBi. Petaro -Sehwan Section (128 KM)ii.Peshawar- Dara.Adam.Khail (36 KM)iii. Shikarpur-Ratodero (44 km) 48Construction for Improvement and 4,600.0 0.0 50.0 4,550.0 500.000 0.000 500.000 100.000 Widening Chitral-Ayun-Bumborate Road (48 km) 49Construction of 02 Lane Highway 19,188.4 0.0 1,500.0 17,688.4 2,000.000 0.000 2000.000 100.000 from Basima to Khuzdar (Length 106 km) 50Construction of 4-lane bridge across 9,775.6 0.0 1,888.1 7,887.5 1,000.000 0.000 1000.000 200.000 river Indus linking Layyah with Taunsa including 2-lane approach road and river training works (24.272 km) 51Construction of 4-lane Bridge and 2- 2,985.1 0.0 570.7 2,414.5 1,000.000 0.000 1000.000 100.000 lane Approach Roads across river Indus connecting Kallurkot with D.I.Khan 52Construction of 6-Lane Highway 12,848.0 0.0 11,757.5 1,090.6 1,090.589 0.000 1090.589 218.118 from Kala Shah Kaku to Lahore Ring Road (18.3 km) Including over river Ravi (Lahore Eastern Bypass) Page 3 of 46 (Million Rupees) Name of Project Cost Expenditure Throw- Allocation 2019-20 Authorization Upto June forward (Rupee Rupees Foreign Total Total Foreign 2019 Component) Aid Aid 53Construction of Athmuqam - Sharda- 17,585.0 0.0 35.3 17,549.7 500.000 0.000 500.000 100.000 Kel - Taobat Road Section (109.2 km) including two tunnels at Kahori/ Kamser (3.7 km) and Challpani (0.6) Section of Neelum Valley Road, AJ&K 54Construction of Black Top Road 13,758.0 0.0 3,406.3 10,351.7 1,000.000 0.000 1000.000 100.000 Yakmach-Kharan Via Dostain Wadh Khurmagai 55Construction of Bridge on River Ravi 1,568.9 0.0 654.5 914.5 400.000 0.000 400.000 80.000 at Syed Wala (Nankana Sahib) 56Construction of Burhan-Havelian 34,165.0 25,920.0 29,765.8 4,399.2 1,150.000 781.980 1931.980 230.000 Expressway (E-35) 29.1 Km (Revised) 57Construction of Faisalabad- 60,823.7 22,100.0 39,113.1 21,710.5 1,000.000 4,000.000 5000.000 300.000 Khanewal (M-4), 184 km 58Construction of Infrastructure
Recommended publications
  • Scope for Reallocation of River Waters for Agriculture in the Indus Basin Z
    Scope for Reallocation of River Waters for Agriculture in the Indus Basin Z. Habib To cite this version: Z. Habib. Scope for Reallocation of River Waters for Agriculture in the Indus Basin. Environmental Sciences. Spécialité Sciences de l‘eau, ENGREF Paris, 2004. English. tel-02583835 HAL Id: tel-02583835 https://hal.inrae.fr/tel-02583835 Submitted on 14 May 2020 HAL is a multi-disciplinary open access L’archive ouverte pluridisciplinaire HAL, est archive for the deposit and dissemination of sci- destinée au dépôt et à la diffusion de documents entific research documents, whether they are pub- scientifiques de niveau recherche, publiés ou non, lished or not. The documents may come from émanant des établissements d’enseignement et de teaching and research institutions in France or recherche français ou étrangers, des laboratoires abroad, or from public or private research centers. publics ou privés. Cemagref / d'Irstea ouverte archive : CemOA Recherches Coordonnées sur les Systèmes Irrigués RReecchheerrcchheess CCoooorrddoonnnnééeess ssuurr lleess SSyyssttèèmmeess IIrrrriigguuééss ECOLE NATIONALE DU GENIE RURAL, DES EAUX ET DES FORÊTS N° attribué par la bibliothèque /__/__/__/__/__/__/__/__/__/__/ THESE présentée par Zaigham Habib pour obtenir le grade de Docteur de l'ENGREF en Spécialité: Sciences de l’eau Cemagref / Scope for Reallocation of River Waters for d'Irstea Agriculture in the Indus Basin ouverte archive à l'Ecole Nationale du Génie Rural, des Eaux et Forêts : Centre de Paris CemOA soutenue publiquement 23 septembre 2004 devant
    [Show full text]
  • Snowlake & Biafo Hispar La Trek
    Snowlake & Biafo Hispar La Trek Trip Highlights Traverse of the Biafo & Hispar Glaciers in the Karakoram Mountains Walking on world’s longest Glacier Crossing of Hispar la 5000m Pass Beautiful Hunza Valley TRIP AT GLANCE 5-6 NIGHTS HOTELS , 14 NIGHTS CAMPING, 13-14 DAYS STRENUOUS TREKKING MAX. ALTITUDE – 5150M / 16,400FT Key Destinations:Islamabad-Skardu-Shigar-Braldu-Baltoro Glacier-Biafo Glacier-K2-Hispar Glacier- Hunza -Karakoram Highway TREK BACKGROUND The interconnected Biafo and Hispar glaciers, with a combined length of 120 kilometres, provide an unlikely natural highway that cuts through the heart of the Karakoram Range. Starting out from Askole on the approach to the Baltoro and K2, this long and relatively committing glacial traverse is undertaken annually by just a handful of expeditions. This trekking holiday does just that in a 3 week experience for budding explorers. Walking either on the glaciers themselves, or through flower-carpeted ablation valleys, we encounter challenging as well as more straightforward trekking conditions. A highlight of the trip is the camp on the Hispar La (5151m), where we can watch the afternoon shadow creeping across Snow Lake to the mighty Ogre (7285m) and turn to see the sun setting over the mountains of Hunza and the distant Hindu Kush to the west. Stunning scenery and a genuine sense of adventure in a high mountain wilderness are key attractions of this magnificent trekking holiday inh the karakoram. TREK OVERVIEW BEST TIME : MID-JUNE - MID-SEPTEMBER 2018 Date Day Activity Mode Time Height
    [Show full text]
  • Waterborn Outbreak of Vibrio Cholerae O1 Ogawa; in Wadh Area of Balochistan
    WATERBORN OUTBREAK OF VIBRIO CHOLERAE 01 OGAWA 247 ORIGINAL PROF-883 WATERBORN OUTBREAK OF VIBRIO CHOLERAE O1 OGAWA; IN WADH AREA OF BALOCHISTAN DR GHULAM SARWAR PIRKANI Dr Mohammad Iqbal Associate Professor Microbiology Microbiology Section Department of Pathology, Department of Pathology, Bolan Medical College Quetta. Bolan Medical College, Quetta. DR AMIR MOHAMMAD BABAR Dr Essa Khan Jogezai Assistant Professor Microbiology Deputy Director Preventive Department of Pathology, Government of Balochistan. Bolan Medical College, Quetta. Mr Nizam ud Din DR GHULAM RASOOL Lab Technician Assistant Professor Psychiatry Bolan Medical College Hospital, Quetta. Bolan Medical College, Quetta. ABSTRACT ... [email protected] Objective: To isolate the etiological agent of severe diarrheal outbreak, identification, antibiogram of isolated agent and preventive measures to control the spread of infection. Design: Samples of stool and drinking water supply of affected area collected in Cary- Blair transport medium, inoculated on various media. The isolated strains were identified as responsible for diarrheal outbreak tested against antibiotics. The strain and antibiogram was further confirmed by Agha Khan University Hospital Laboratory in Karachi. Setting: Bolan Medical College Hospital, Quetta. Main outcome measures: Isolation of Vibrio cholerae O1, Ogawa, El Tor, antibiogram against isolated strain, and control of spread of infection. Results: The etiological agent responsible for severe diarrheal disease outbreak was Vibrio cholerae O1, Ogawa El Tor. in which 148 persons affected including all ages and both sexes. Four deaths (2.7%) reported out of these affected patients. The isolated strain was same in all patients and water source. Susceptibility to antimicrobial drugs was determined showing sensitivity to Ampicillin, Choloramphenicol, Ofloxacin, Tetracycline, Nalidixic Acid , Gentamycin and resistance to Polymaxin B, and Co- trimaxazole.
    [Show full text]
  • "Family Motacillidae" with Reference to Pakistan
    Journal of Bioresource Management Volume 2 Issue 3 Article 10 Short Report: Description and Distribution of Wagtails "Family Motacillidae" with Reference to Pakistan Nadia Yousuf Bioresource Research Centre, Isalamabad, Pakistan Kainaat William Bioresource Research Centre, Islamabad, Pakistan Madeeha Manzoor Bioresource Research Centre, Islamabad, Pakistan, [email protected] Balqees Khanum Bioresource Research Centre, Islamabad, Pakistan Follow this and additional works at: https://corescholar.libraries.wright.edu/jbm Part of the Biodiversity Commons, and the Biology Commons Recommended Citation Yousuf, N., William, K., Manzoor, M., & Khanum, B. (2015). Short Report: Description and Distribution of Wagtails "Family Motacillidae" with Reference to Pakistan, Journal of Bioresource Management, 2 (3). DOI: 10.35691/JBM.5102.0034 ISSN: 2309-3854 online This Article is brought to you for free and open access by CORE Scholar. It has been accepted for inclusion in Journal of Bioresource Management by an authorized editor of CORE Scholar. For more information, please contact [email protected]. Short Report: Description and Distribution of Wagtails "Family Motacillidae" with Reference to Pakistan © Copyrights of all the papers published in Journal of Bioresource Management are with its publisher, Center for Bioresource Research (CBR) Islamabad, Pakistan. This permits anyone to copy, redistribute, remix, transmit and adapt the work for non-commercial purposes provided the original work and source is appropriately cited. Journal
    [Show full text]
  • Important Pakistani Rivers, Dams, Lakes and Doaabas Mcqs
    Important Pakistani Rivers, Dams, Lakes and Doaabas MCQs Land between Beas and Ravi is called ____. (a) Doaaba Bari (b) Doaaba Rachna (c) Doaaba Chaj (d) None of these Answer: a Doaaba Rachna is located between the River Chenab and River ___. (a) Ravi (b) Jhelum (c) Indus (d) None of these Answer: a ____ lies between Indus and Jehlum rivers. (a) Doaaba Chaj (b) Sindh Sagar (c) Doaaba Bari (d) None of these Answer: b Doaaba Chaj is located between River Chenab and River ____. (a) Jhelum (b) Ravi (c) Indus (d) None of these Answer: a River ____ is the longest river in Pakistan. (a) Jhelum (b) Indus (c) Chenab (d) Ravi Answer: b The length of Indus River is ____. (a) 1,600 miles (b) 1,700 miles (c) 1,800 miles (d) None of these Downloaded from www.csstimes.pk | 1 Important Pakistani Rivers, Dams, Lakes and Doaabas MCQs Answer: c Indus River is also called, Nile of Pakistan, Attock and ____. (a) Abaseen (b) Mehran (c) Sapt Sindhu (d) All of these Answer: d Check Also: Important Solved Analogy MCQs for Competitive Exams (Set-I) Indus River rises from Kailash Mountain and enters into Pakistan near ____. (a) Gilgit (b) Chilas (c) Astore (d) None of these Answer: b Indus River falls into Arabian Sea near ____. (a) Thatta (b) Karachi (c) Badin (d) None of these Answer: b River Jhelum rises in the Himalayas and meets the River Chenab in southwest of Jhang. Its length is ____ kms. (a) 625 (b) 725 (c) 825 (d) 925 Answer: b Chenab River rises in Himalayas and flows into Pakistan.
    [Show full text]
  • Survey Report
    SAVE THE NATURE SURVEY REPORT BALOCHISTAN BLACK BEARIN PAB HILL, DISTRICT KHUZDARBALOCHISTAN [November2013] [ INTRODUCTION Balochistan, the largest province of Pakistan, has a rich floral and faunal diversity. Despite its global importance it has never been explored in detail nor been managed properly. The ecosystems are being degraded, depleted and deteriorated mainly due to the absence of appropriate management practices. As a result critical habitats continue to be degraded and many species of global importance have either become extinct or are critically endangered. The government has limited reach to the wilderness areas of the province, and little capacity or resources to undertake conservation activities. The extent of the issues is further augmented in these areas of the province due to inaccessibility and lack of human resources with the custodian department. Overgrazing; cutting of scanty vegetation by outsiders for sale as for fuel; indiscriminate hunting and trade in wild species are common practice especially in the bordering districts. Besides poverty and unawareness, the other most serious deficiency in environmental policy-making in the province lies in the lack of adequate and specifically trained human resources, able to generate new or to tap traditional knowledge needed for effective policy and proper implementation of the decisions. HABITAT AND LOCALITY OF BLOCHISTAN BLACK BEAR WADH Sub-Tehsil of district Khuzdar, Balohistan is very famous for its unique natural resources. It is predominantly inhabited by Mengal Tribe of Balochistan. The climate of the area is semi-arid with warm summers and mild winters. The target area, like rest of the Balochistan is also rich in mineral resources.
    [Show full text]
  • Willingness to Pay for Margalla Hills National Park: Evidence from the Travel Cost Method
    The Lahore Journal of Economics 11 : 2 (Winter 2006) pp. 43-70 Willingness to Pay for Margalla Hills National Park: Evidence from the Travel Cost Method Himayatullah Khan* Abstract This study, which is among the first in Pakistan to value recreational benefits, estimates the benefits of the Margalla Hills National Park near Islamabad. The study examines how much park visitors are willing to pay to visit the park. Annual benefits from the park are considerable—the total annual consumer surplus or economic benefit obtained from recreation in the park is approximately Rs. 23 million (US $ 0.4 million). Various factors influence the value visitors obtain from the park — these include travel cost, household income, and the quality of the park. Improvements in the quality of the park are estimated to increase recreational benefits by 39%. The study recommends that a park entrance fee of Rs. 20 per person be introduced, which could be utilized for park management. This would generate nearly Rs. 11 million in revenues annually, a sizable amount of money that represents about 4% of the annual budget allocated to the environment sector in Pakistan. JEL Classification: Keywords: Environmental valuation, willingness to pay, total recreational value, consumer surplus, environmental resources, national parks, Pakistan. * The author is Professor at the Institute of Development Studies, NWFP Agricultural University, Peshawar and currently on deputation to Department of Development Studies, COMSATS Institute of Information Technology, Abbottabad. This paper is based on Himayatullah (2003). The author gratefully acknowledges the financial support provided by the South Asian Network for Development and Environmental Economics (SANDEE).
    [Show full text]
  • Students' Perception of the Learning Environment in Private-Sector
    Pharmacy Education (2020) 20(1) 191 - 197 https://doi.org/10.46542/pe.2020.201.191197 RESEARCH ARTICLE Students’ perception of the learning environment in private-sector pharmacy institutes of Pakistan 1 iiii 2 2 1 3 4 Samra Bashir , Arif-ullah Khan , Maryam Mahmood , Mateen Abbas , Samar Akhtar , Abdul Waheed Khan , Muhammad Tahir Aqeel5, Muhammad Akhlaq6 & Hamaad Ahmad3 1Capital University of Science and Technology, Islamabad, Pakistan 2Riphah Institute of Pharmaceutical Sciences, Riphah International University, Islamabad, Pakistan 3Yusra Institute of Pharmaceutical Sciences, Islamabad, Pakistan 4Department of Pharmacy, University of Lahore, Islamabad, Pakistan 5Margalla College of Pharmacy, Margalla Institute of Health Sciences, Rawalpindi, Pakistan 6Department of Pharmacy, Abasyn Univeristy Islamabad Campus, Islamabad, Pakistan Keywords Abstract Pharmacy Institutes Student’s Perception Introduction: A conducive learning environment is crucial to the effective delivery of Learning Environment curriculum and professional and social development of the students. This cross-sectional DREEM study was conducted to investigate students’ perception of the learning environment in private-sector pharmacy institutes of Pakistan. Methods: The overall learning environment and its various aspects were compared between different pharmacy institutes, year of study Correspondence and gender. Questionnaires, based on the Dundee Ready Education Environment Measure Dr Samra Bashir (DREEM) and demographic information, were completed by 527 undergraduate pharmacy Department of Pharmacy students enrolled at six private-sector pharmacy institutes in Pakistan. Participants were Capital University of Science & selected by convenience sampling and the scores were compared across grouping variables Technology identified via demographic information. Results: The total DREEM score across the sample Islamabad EXpressway was 116.10±25.39 (mean ± S.D), indicating an overall positive perception of the learning Kahuta Road environment among students of the private-sector pharmacy institutes.
    [Show full text]
  • Assessment of Market Price for Pia Own Properties
    ASSESSMENT OF MARKET PRICE FOR PIA OWN PROPERTIES PIA intends to hire an approved valuator of State Bank and National Bank of Pakistan regarding the assessment of market value for PIA own properties within Pakistan. The premises are located at different cities of Four Provinces of Pakistan including Gilgit Biltistan and Azad Kashmir. Interested parties are requested to send their Offers / Proposals to undertake the job by sealed envelopes through registered courier service to the office of DGM General Services 1st Floor, Works Division, Flight Operation Building Karachi Airport giving all the details of the proposals, within 15 days from this advertisement. The details of properties are available at PIA website. For further details please contact Phone No. at Karachi 021-99043029, 021-99043299 or visit PIA website at www.piac.com.pk or PPRA website, (PIA reserves the right to accept any one offer or reject all the offers without assigning any reason). Page 1 of 5 HIRING OF VALUATOR FOR ASSESSMENT OF PIA OWN PROPERTIES THE TERMS & CONDITIONS FOR HIRING OF VALUATOR AND JOB ASSIGNMENT IS AS UNDER • The procedure of hiring of valuator will be carried out by floating advertisements through news papers. • The interested parties will be given the detail of PIA properties city wise and will be asked for assessment. • One of the parties will be given the task to undertake the job after healthy competition. • The lowest bidder will be asked to give estimated market values of the properties with pictures of the property. • The separate market values for each of the property will be obtained.
    [Show full text]
  • K2 Base Camp and Gondogoro La Trek
    K2 And Gondogoro La Trek, Pakistan This is a trekking holiday to K2 and Concordia in the Karakoram Mountains of Pakistan followed by crossing the Gondogoro La to Hushe Valley to complete a superb mountaineering journey. Group departures See trip’s date & cost section Holiday overview Style Trek Accommodation Hotels, Camping Grade Strenuous Duration 23 days from Islamabad to Islamabad Trekking / Walking days On Trek: 15 days Min/Max group size 1 / 8. Guaranteed to run Meeting point Joining in Islamabad, Pakistan Max altitude 5,600m, Gondogoro Pass Private Departures & Tailor Made itineraries available Departures Group departures 2021 Dates: 20 Jun - 12 Jul 27 Jun - 19 Jul 01 Jul - 23 Jul 04 Jul - 26 Jul 11 Jul - 02 Aug 18 Jul - 09 Aug 25 Jul - 16 Aug 01 Aug - 23 Aug 08 Aug - 30 Aug 15 Aug - 06 Sep 22 Aug - 13 Sep 29 Aug - 20 Sep Will these trips run? All our k2 and Gondogoro la treks are guaranteed to run as schedule. Unlike some other companies, our trips will take place with a minimum of 1 person and maximum of 8. Best time to do this Trek Pakistan is blessed with four season weather, spring, summer, autumn and winter. This tour itinerary is involved visiting places where winter is quite harsh yet spring, summer and autumns are very pleasant. We recommend to do this Trek between June and September. Group Prices & discounts We have great range of Couple, Family and Group discounts available, contact us before booking. K2 and Gondogoro trek prices are for the itinerary starting from Islamabad to Skardu K2 - Gondogoro Pass - Hushe Valley and back to Islamabad.
    [Show full text]
  • Annual Procurement Plan FY 2019-20
    ANNUAL PROCUREMENT PLAN FY 2019- 20: PAKISTAN CIVIL AVIATION AUTHORITY Procurement of Goods & Services Tentative Estimated Tentative Date of Tentative Cost Procurement Date of Remarks S# Name of Procurement (Description) Procurement Date of (PKR in Method Award of (If any) Notice Completion Mil) Contract Publication Procurement Agency: Logistics (APS) HQ CAA, Karachi Open Competitive 1 Revamping of LAN & WiFi Infrastructure of JIAP 35 Jan, 2020 Feb, 2020 Jul, 2020 Bidding Procurement of various softwares (i.e. NMS, MS- Open Competitive 2 Exchange, MS-Office, Operating System, Auto 14 Sep, 2019 Oct, 2019 Jan, 2020 Bidding CAD, 3D Max & etc) Procurement of computer equipment (i.e. Desktop / Open Competitive 3 35 Aug, 2019 Oct, 2019 Jan, 2020 VDI, Laptop, Printers, Scanners and Desktop UPS Bidding Electronics Document Management System for HR Open Competitive 4 30 Sep, 2019 Nov, 2019 Jun, 2020 & other section of CAA Bidding Open Competitive 5 Up-gradation / enhancement of Enterprise Storage 10 Urgent Sep, 2019 Dec, 2019 Bidding Open Competitive 6 Establishment of Primary Data Centre at HQCAA 150 Aug, 2019 Sep, 2019 Jan, 2020 Bidding Open Competitive 7 Procurement of Fire & Safety Equipment 8 Aug, 2019 Nov, 2019 Mar, 2020 Bidding Open Competitive 8 Procurement of Rescue Equipment 3 Sep, 2019 Dec, 2019 Apr, 2020 Bidding Procurement of Misc. facilitation and E/M Open Competitive 9 20 Aug, 2019 Oct, 2019 Jun, 2020 equipment Bidding Replacement of Split & Window type Air Open Competitive 10 2 Aug, 2019 Oct, 2019 Jun, 2020 Conditioners for CAA
    [Show full text]
  • National L{Ighway Authority
    TgnSerNg, 6(479) National l{ighway AuthoritY [nifi.rorvri$r.rAvs REQIJESTFOR PROPOSAL I CoxsuLTAI\cY SERvTcES FOR DNTEILED DUSTCI\Ai\D COTVSTRUCTIOI\ SUpnnvISIOt\FOR WTnENII\G' IvrpnOVEMExr & RNSEBILITATIOI\ OF REMAII\II\G PONTION OF I{rrroNAL HrcswAY N-25rx KeneRo- Wenn SncrroNFRoM Ku 222ro KM 3L8(L8'258 Ku) (Aage1to 188) JaNuanv,2At9 Tableof Contents Sr. # Description 1. Letter of Invitation (LOI) (iD I Instructionsto Consultants(Annex A) 01 3. Data Sheet(Annex B) 09 4. TechnicalProposal X'orms 20 f,. FinancialProposal Forms 36 6. AppendixA (Termsof Reference) 48 1 Appendix B (Person-Monthsand Activity Schedule) 134 8. AppendixC (Client'sRequirements from the Consultants) 135 9. AppendixD (Personnel,Equipment, Facilities, and 136 other servicesto be providedby the Client) 10. AppendixE (Copyof Model Agreement) t37 GOVERNMENT OF' PAKISTAN NATIONAL HIGHWAY AUTHORITY 28-MauveArea, G-gllrPostBox No. 1205' ISLAMABAD Datedthe Ref No. LETTER OF INVITATION To' All consultants Gentlemen! We extendwarm welcometo you and invite you to participatein this project. We hopethat you will live up to your reputationand provide us accurateinformation so that the evaluationis carriedout "just andtransparent". Please understand that the contentsof this RFP, whereapplicable, shall be deemedpart of the contractagreement. An exampleto this affectcan be the contentsof your work plan and methodologywhich you shall be submittingin your TechnicalProposal. Since that is the basisof the selection,therefore, it shall becomepart of the contractagreement subject to approval/revisionsof the sameby NHA during the negotiations. Similarly, all otherservices and the contentcontributing to servicesshall be deemedpart of the contractagreement unless it is specificallymentioned for any particularitem up-front in your TechnicalProposal which obviouslywill makeyour Proposala conditionalproposal whereby, authorizingNHA to may or may not considerto evaluateyour Proposal.Please understand that if no such mention appearsup-front (i.e.
    [Show full text]