Package name Owner Status** $ million* Consultant Contractor Start date End date

Abu Dhabi 2030 – Surface Transport Abu Dhabi Department of Transport (DOT) Feasibility study 7,000 Arup Group Not yet appointed 2009-Q3 2020-Q1 Abu Dhabi International Airport – Midfield erminalT Complex Abu Dhabi Airports Company (Adac) Construction 3,200 Hill International – Aecom – Consolidated Contracting Company (CCC) – TAV Construction – Arabtec Construction 2008-Q1 2017-Q4 Kellogg Brown & Root Abu Dhabi International Airport Expansion – Overview Adac Construction 7,080 Parsons Al Habtoor Engineering Enterprises – Al Jaber & Partners Construction & Energy – 2005-Q1 2017-Q3 Murray & Roberts – Oderbrecht – Fibrex Company – Taylor Woodrow Construction Dynamics – CCC – Arabtec Construction – TAV Construction Abu Dhabi to Abu Dhabi Municipality Feasibility study 7,200 Not yet appointed Not yet appointed 2017-Q1 2025-Q1 Abu Dhabi to – New Main Road E311 – Package A DOT – Abu Dhabi General Services (Musanada) Construction 400 Aurecon Ghantoot Transport & General Contracting 2012-Q1 2017-Q1 Abu Dhabi to Dubai – New Main Road E311 – Overview DOT – Musanada Construction 600 Aurecon Bin Hafeez General Contracting & Transport – Tristar Transport & Contracting – 2012-Q1 2017-Q1 Ghantoot Transport & General Contracting Al Falah Community Development Construction 2,500 Fluor Corporation El Seif Engineering Contracting – Al Jaber Engineering Services – Ghantoot Transport 2008-Q1 2019-Q4 – Bin Hafeez General Contracting – Bilbadi Contracting – Pembinaan SPK Al Hadeel Development Aldar Properties EPC ITB 500 Not yet appointed Drake & Scull 2014-Q1 2017-Q3 Al Maryah Central Gulf Related Construction 1,000 Aecom Brookfield Multiplex 2014-Q1 2018-Q1 – Maryah Plaza Mubadala Development Company Construction 800 Mubadala Development Company State Construction Engineering (CSCEC) – Al Faraa General Contracting 2010-Q1 2018-Q4 Al Maryah Island – Overview Mubadala Development Company Construction 3,000 Not yet appointed Al Naboodah Contracting 2008-Q1 2016-Q1 Al Taweelah Refinery Dubal – Mubadala Development Company – Emal – EGA Construction 3,000 Not yet appointed Bechtel Corporation – Petrofac – Larsen & Toubro (L&T) 2013-Q4 2018-Q1 Al Wathba Desert Retreat Mansour bin Zayed Al Nahyan Engineering Office Construction 500 Godwin Austen Johnson (GAJ) Tasameem STX Construction 2013-Q1 2017-Q2 Capital District – Overview Abu Dhabi Urban Planning Council Design 37,430 Not yet appointed Not yet appointed 2010-Q1 2020-Q1 Circulating Water Intake Structures (CWIS) Enec Construction 610 CH2M Hill – Thorium Power Hilalco 2008-Q1 2017-Q2 Combined Cycle Power Plant – Phase 3 Emal – EGA Construction 215 Not yet appointed Abengoa 2014-Q2 2018-Q4 – Trans-Emirates Rail Network – Overview Etihad Rail – Abu Dhabi National Oil Company (Adnoc) EPC ITB 11,000 Aecom – Parsons – Atkins Tecnimont – Saipem – Dodsal 2011-Q4 2020-Q4 Etihad Rail – Trans-Emirates Network – Phase 2 – Contract 1 Etihad Rail EPC ITB 533 Parsons – Aecom Not yet appointed 2012-Q3 2020-Q4 Etihad Rail - Trans-Emirates Network – Phase 2 – Contract 2 Etihad Rail EPC ITB 740 Not yet appointed Not yet appointed 2012-Q2 2020-Q4 Etihad Rail- Trans-Emirates Network – Phase 2 – Contract 3 Etihad Rail EPC ITB 724 Parsons – Aecom Not yet appointed 2013-Q1 2020-Q4 Emirati Housing Project Abu Dhabi Urban Planning Council Construction 700 Tamouh Trojan General Contracting 2013-Q1 2019-Q1 and Industrial Zone (KPIZ) Company (ADPC) Construction 7,200 Bechtel Corporation Hyundai Engineering – Al Habtoor – Archirodon – Ghantoot Transport – SMS Concast 2006-Q1 2030-Q4 Leighton – Boskalis – Al Jaber & Partners – CCC – Ed Zueblin – System Construct – L&T Mafraq- Highway – Section 3B DOT – Musanada Construction 550 Mott MacDonald Al Jaber Group 2012-Q4 2017-Q2 Mafraq-Ghuwaifat Highway – Section 4B DOT Construction 510 Mott MacDonald Ghantoot Transport & General Contracting 2012-Q1 2016-Q1 Mafraq-Ghweifat Highway – Section 1 (A & B) DOT – Musanada Construction 571 Mott MacDonald Bin Hafeez General Contracting & Transport 2012-Q1 2018-Q4 Mafraq-Ghweifat Highway – Section 3A DOT – Musanada Construction 571 Mott MacDonald Aljaber Engineering 2012-Q1 2017-Q1 Mafraq-Ghweifat Highway Project – (Overview) DOT – Musanada Construction 3,000 Mott MacDonald Al Jaber Group – Bin Hafeez – Ghantoot Transport 2008-Q1 2018-Q3 Institute Neighbourhood Masdar Construction 1,150 Hill International Besix 2015-Q1 2022-Q1 Mirfa IWPP Adwea – GDF Suez Construction 15,000 Fichtner Consulting Engineers Hyundai Engineering & Construction – Ansaldo Energia 2011-Q4 2017-Q3 North Wathba Musanada – Abu Dhabi Urban Planning Council EPC ITB 2,000 Atkins – Otak International Not yet appointed 2012-Q1 2018-Q3 Nuclear Power Plant Emirates Nuclear Energy Corporation (Enec) Construction 40,000 CH2M Hill – Thorium Power – Korea Electric Power Corporation (Kepco)- Doosan Heavy Industries & Construction 2008-Q3 2020-Q2 Lightbridge Corporation – Lloyds – Hyundai Engineering & Construction – Samsung C&T Engineering and Register Energy Construction Group Park View Bloom Properties Construction 3,500 Not yet appointed Tharwaa/Al Mansouri 3B 2015-Q2 2018-Q4 Reem Mall Al-Farwaniya Property Developments EPC ITB 1,000 Mace Group Not yet appointed 2012-Q1 2020-Q4 – Guggenheim Museum Tourism Development & Investment Company (TDIC) EPC ITB 400 Not yet appointed Not yet appointed 2006-Q3 2017-Q2 Saadiyat Island- Museum TDIC Construction 700 Parsons – Aecom Bauer – Arabtec Construction – Constructora San Jose 2010-Q1 2016-Q3 Saadiyat Island Shopping Mall – Package 1 TDIC – L Real Estate Design 5,000 Turner Construction International Not yet appointed 2012-Q2 2019-Q3 Saadiyat Island- Abu Dhabi Tourism Authority (ADTA) EPC ITB 1,000 Aecom Not yet appointed 2013-Q1 2023-Q1 Saadiyat Lagoons District TDIC Feasibility study 1,000 Not yet appointed Not yet appointed 2016-Q2 2023-Q1 Yas Bay – Phase 1 (Yas Arena) Miral EPC ITB 1,100 Faithful + Gould Not yet appointed 2017-Q2 2019-Q4 - Warner Bros Theme Park Miral Asset Management Construction 1,000 Louis Berger Group Besix 2012-Q1 2018-Q1

**ITB = invitation to bid; EPC = engineering, procurement and construction; FEED = front-end engineering design; EP = engineering & procurement *List includes projects worth over $215 million only. Source: DMS Projects

50 Gulf Construction, September 2017 Gulf Construction, September 2017 51