The Apollo Spacecraft Chronology, Takes up the Story Where the First Left Off, in November 1962
A CHRONOLOGY NASA SP-4009 THE APOLLO SPACECRAFT A CHRONOLOGY VOLUME II November 8, 1962--September 80, 1964 by Mary Louise Morse and Jean Kernahan Bays THE NASA HISTORICAL SERIES Scientific and Technical ln[ormation Office 1973 /LS.P,. / NATIONAL AERONAUTICS AND SPACE ADMINISTRATION Washington, D.C. For sale by the Superintendent of Documents U.S. Government Printing Office, Washington, D.C. 20402 Price $3.20 Stock Number 3300-0455 (Paper Cover) Library o] Congress Catalog Card Number 69-60008 FOREWORD This, tile second volume of the Apollo Spacecraft Chronology, takes up the story where the first left off, in November 1962. The first volume dealt with the birth of the Apollo Program and traced its early development. The second concerns its teenage period, up to September 30, 1964. By late 1962 the broad conceptual design of the Apollo spacecraft and the Apollo lunar landing mission was complete. The Administrator formally advised the President of the United States on December 10 that NASA had selected lunar orbit rendezw)us over direct ascent and earth orbit rendezvous as the mode for landing on the moon. All major spacecraft contractors had been selected; detailed system design and early developmental testing were under way. On October 20, 1962, soon after Wally Schirra's six-orbit mission in .Sigma 7, the first formal overall status review of the Apollo spacecraft and flight mission effort was given to Administrator James E. _Vebb. The writer of this foreword, who was then the Assistant Director for Apollo Spacecraft Development, recalls George Low, then Director of Manned Spacecraft and Flight Missions trader D.
[Show full text]