Ghoulish delights THE at WXHS musical revue, page 9 Davis Region XC wins help Davis, WX on to state, page 21 Davis County Election Guide Clipper75 CENTS VOL. 124 NO. 35 find out more about local races, page B1 THURSDAY, OCTOBER 16, 2014 Shared solution considered for corridor BY MELINDA WILLIAMS are “very optimistic” their no- ing in Bountiful on Friday and UDOT should know within “I’m very optimistic that
[email protected] build plan will come through the took a break during the proceed- the next couple of months if the evaluation process a winner. ings to speak with the Clipper. no-build alternative meets the going forward, we’re BOUNTIFUL — Utah “We’re looking at that alterna- “We’re giving it a detailed look purpose and if it needs to advance Department of Transportation tive (the shared solution) the same and evaluating it with the other al- it to a place where an Environ- going to get a fair officials are taking a detailed look as we would look at any alterna- ternatives,” he said, adding that the mental Impact Statement would at the “shared solution” alterna- tive,” said Randy Jefferies, UDOT’s agency has made no decision on be conducted. shake.” tive to the proposed West Davis project manager for the corridor. which alternative may be chosen. That thrills Roger Borgenicht, – Roger Borgenicht, co-chair of Corridor. Jefferies was attending a Utah “The no-build alternative is Utahns for Better And opponents of the corridor Transportation Commission meet- always a possibility,” Jefferies said. n See “CORRIDOR” p.