2010 by ANDREW SEEDHOUSE a Thesis

Total Page:16

File Type:pdf, Size:1020Kb

2010 by ANDREW SEEDHOUSE a Thesis A CRITICAL EVALUATION OF COMMUNITY RAIL POLICY AND PRACTICE DURING THE NEW LABOUR YEARS 2003 - 2010 by ANDREW SEEDHOUSE A thesis submitted to the University of Plymouth In partial fulfilment for the degree of DOCTOR OF PHILOSOPHY School of Geography, Earth and Environmental Science Faculty of Science and Technology In collaboration with the Department for Transport NOVEMBER 2012 Copyright Statement This copy of the thesis has been supplied on condition that anyone who consults it is understood to recognise that its copyright rests with its author and that no quotation from the thesis and no information derived from it may be published without the author's prior consent. 2 ABSTRACT This thesis examines the separate but interlinked issues of changing governance processes and the delivery of Community Rail policy and outcomes in addressing the primary research aim ‘To consider how changing governance environments introduced under New Labour, compromised or assisted the successful delivery of the Community Rail Development Strategy’. The history of Community Rail policy development and application is explored, leading to the publication in 2004 of the Community Rail Development Strategy (the 2004 Strategy). The process of governance and the academic literature detailing its changing application and form across the scalar range is considered, as is the rise of the neoliberal approach to governance favoured by recent administrations. The thesis then explores New Labour’s introduction of the Third Way and the revised approach to the renamed third sector, a space where a high number of Community Rail Partnerships (CRPs) engage. To test the primary research aim and four core research objectives, a multi-methodological approach is applied combining desk-based quantitative analysis to determine a sample set of CRPs for the fieldwork, with qualitative semi-structured interviews of actors engaged in the case study areas. The processes behind these decisions are examined in Chapter 4. Having selected the case study areas, an empirical overview of the transport planning policies of actor members of the CRPs is undertaken, as well as a visual and audio station audit. The research then considers the place of the 2004 Strategy within this wider transport planning policy landscape at all tiers of regional and sub-regional government, and concludes that not all tiers of local government appear as engaged as others. The resurgent approach to localism is then examined, and the role of Local 3 Strategic Partnerships is considered to determine the level of current CRP engagement and opportunity for enhanced integration to deliver the 2004 Strategy and wider outcomes. The research demonstrates a high level of correlation between CRP activities and alignment to core designated national indicators which make up the current performance management processes for Local Strategic Partnership members including the local authorities. The research then examines the importance of a CRPs own approach to governance, the role of core individuals and the importance of core actor engagement to support a stable platform for delivering successful Strategy outputs and outcomes. It concludes by identifying where CRPs currently engage in the wider policy environment and recommends national policy options to improve on outcome delivery for individual CRPs and their actor members. 4 CONTENTS Page No LIST OF FIGURES ................................................................................................................ 12 LIST OF TABLES .................................................................................................................. 13 LIST OF APPENDICES ......................................................................................................... 13 ABBREVIATIONS ............................................................................................................... 14 DECLARATION ................................................................................................................... 16 ACKNOWLEDGEMENTS .................................................................................................... 18 CHAPTER 1: Introduction ............................................................................................... 19 CHAPTER 2: Partnerships, Governance and a New Approach to Localism ................... 28 2.1 Introduction ........................................................................................................... 28 2.2 Governance and Scale .......................................................................................... 29 2.2.1 Defining Governance ................................................................................. 29 2.2.2 Metagovernance ....................................................................................... 31 2.2.3 Scale, Spatiality, and Territorisation.......................................................... 32 2.2.4 New State Spaces and Geographies of Governance ................................. 34 2.2.5 Hollowing Out and Filling In ...................................................................... 36 2.3 The Changing Approach to Governance within the UK ....................................... 38 2.3.1 The English Question ................................................................................. 38 2.3.2 The Rise of Neoliberal Resource Led Governance .................................... 39 2.3.3 Shifting the Balance from Government to Governance ............................ 42 2.4 New Labour and the Third Way of Governance .................................................. 43 2.4.1 The Third Way ........................................................................................... 44 2.4.2 The Quiet Revolution of the Third Sector ................................................. 45 2.5 Summary ............................................................................................................... 47 CHAPTER 3: Policy Development and Influences on the Community Rail Development Strategy ................................................................................ 50 3.1 Introduction ........................................................................................................... 50 3.2 British Railways and the Governance of Post War Branch Lines ........................ 51 3.2.1 Post War Neostatism and the 1947 Transport Act ................................... 51 3.2.2 Reducing Social Obligations and Changing Perceptions of Social Value ... 53 3.2.3 The Reshaping of British Railways ............................................................. 55 5 3.3 New-Welfarism Supporting a Socially Necessary Railway .................................. 57 3.3.1 The 1968 Transport Act - A Wolf in Sheeps Clothing ................................ 57 3.3.2 The 1974 Railway Act, Unified PSO Block and EEC Obligations ............... 58 3.3.3 Quantifying the Social Consequences of Rail Closures ............................. 59 3.4 Internal Hollowing Out of British Railways at a Regional Scale ......................... 60 3.4.1 A Neoliberal Approach to Railway Finance and Sectorisation ................. 60 3.4.2 The Serpell Report ..................................................................................... 62 3.4.3 Closures and Bustitution or Investment and Operational Efficiencies ..... 64 3.4.4 A More Commercially Responsive Railway – the Omega Report ............. 66 3.4.5 Challenging Assumptions and the Value of Partnership Working ............ 67 3.5 Privatisation and Partnerships ............................................................................. 68 3.5.1 Organising for Quality and Support from the Supranational Scale ........... 68 3.5.2 New Opportunities for the Railways ......................................................... 70 3.5.3 New Futures for Rural Rail ........................................................................ 72 3.5.4 What use are Rural Railways? ................................................................... 74 3.6 A New Age, A New Opportunity ......................................................................... 76 3.6.1 The Growth of Community Rail Partnerships and Governance ................ 77 3.6.2 The Association of Community Rail Partnerships (ACoRP) ....................... 78 3.6.3 The 2004 Community Rail Development Strategy Consultation .............. 79 3.6.4 The 2004 Community Rail Development Strategy and the Future of Rail 80 3.7 Summary ............................................................................................................... 83 CHAPTER 4: Methodology ............................................................................................... 88 4.1 Introduction........................................................................................................... 88 4.2 Methodological Considerations ........................................................................... 90 4.2.1 The Primary Research Aim and Core Research Objectives ...................... 90 4.2.2 Data Requirements to Determine Primary Methodology ......................... 91 4.3 Determining the Sample Selection ...................................................................... 92 4.3.1 A Pilot Survey to Optimise Data Value ...................................................... 95 4.3.2 Questionnaire Survey for Sample Selection .............................................. 97 4.3.3 Patronage Performance of Designated Community Rail Partnerships ....
Recommended publications
  • Railfuture Response to National Infrastructure
    RAILFUTURE RESPONSE TO NATIONAL INFRASTRUCTURE COMMISSION RAIL NEEDS ASSESSMENT FOR THE MIDLANDS AND THE NORTH – CALL FOR EVIDENCE FOLLOWING INTERIM REPORT Contribution from Railfuture East Midlands Branch – August 2020 National Infrastructure Commission | Rail Needs Assessment for the Midlands and the North - Interim report https://www.nic.org.uk/wp-content/uploads/RNA-Interim-Report-Final.pdf Introduction: The Railfuture response dated 29th May 2020 to the first round of this consultation https://www.railfuture.org.uk/display2324 placed considerable emphasis on freight. In contributing to the August call for evidence, we in East Midlands Branch: Re-submit our May 2020 Rf EM Branch submission for previous NIC RNA call for evidence. This is on pp6-15 below in red text with a few subsequent additions in blue. Attempt to answer the NIC’s broad questions Q1 to Q4 below. References are to the pages and tables in the NIC’s Interim Report (see header.) Prepared by: Steve Jones, Branch Secretary, Railfuture East Midlands Branch [email protected] including contributions from members of EM Branch. Question 1: Please provide specific sources for evidence that the Commission could use in estimating costs and the impact of proposals on journey time and capacity. For schemes already proposed other than by Railfuture, such as those listed on p36, much information is already available from Network Rail, SNTBs (TfN, Midlands Connect), local and combined authorities, TOCs, DfT. Campaign organisations. For additional schemes put forward by Railfuture, further work would need to be done, though campaign groups such as SENRUG, SELRAP, MEMRAP and CRIL may have initial estimates for specific lines or areas.
    [Show full text]
  • Weekend Timetables
    Welcome to our guide to services showing St Ives Bay Line trains between Penzance, St Erth and St Ives. All services in this timetable are operated by Great Western Railway. GWR Customer Panel The Devon & Cornwall Rail Partnership Amendments to published times We have a Customer Panel to give us works to promote rail travel in the region and Public Holidays and rail improvement feedback on our services and to contribute to improve services and facilities at our stations. works may affect services in this good ideas. If you would like to join the For more details, please visit dcrp.org.uk timetable, especially at weekends. Panel, please sign up at GWR.com For the latest timetable information, Notes and symbols please visit our website or download National Rail Bold Through service our smartphone app. For further information on train times Light Connecting service and fares, visit nationalrail.co.uk or call Green Runs on certain days only. Please check 03457 48 49 50* (24 hours, call may be the note at the top of the column recorded). You can also download a copy ) PlusBus available Want to bring your bike? of the National Rail Conditions of Travel a Arrival time Bike reservations are compulsory on many from this website. d Departure time of our services. Space is limited on board, f Arrives at 0752 on Mondays and so we operate a strict first-come, first- Transport Focus x Stops on request. Please tell the Conductor served policy. Book a space at your nearest Transport Focus is the independent if you wish to leave.
    [Show full text]
  • Derwent Valley Line
    Prices correct at November 2018 November at correct Prices (Newark) – Nottingham – Derby – Matlock – Derby – Nottingham – (Newark) derbyshire.gov.uk/bline long as one end of your journey is in Derbyshire. in is journey your of end one as long © Matt Jones Matt © . Receive 25% off local train fares as as fares train local off 25% Receive 01629 533190 01629 Derbyshire Call Derbyshire b_line Card Holders Holders Card b_line Derbyshire This publication is available in other formats from from formats other in available is publication This most local bus services (Wayfarer cannot be purchased on the train). the on purchased be cannot (Wayfarer services bus local most eastmidlandstrains.co.uk/derwentvalleyline and other staffed stations, from Tourist Information Centres and on on and Centres Information Tourist from stations, staffed other and 01629 538062 538062 01629 for seniors or child. Tickets can be purchased at Derby, Long Eaton Eaton Long Derby, at purchased be can Tickets child. or seniors for Hall Matlock DE4 3AG. 3AG. DE4 Matlock Hall except on Sundays. Adult tickets £13.00 including one child, £6.50 £6.50 child, one including £13.00 tickets Adult Sundays. on except Council, Economy, Transport and Communities Department, County County Department, Communities and Transport Economy, Council, travel before 0900 Monday to Saturday or on the Transpeak bus bus Transpeak the on or Saturday to Monday 0900 before travel Derwent Valley Line Community Rail Partnership, Derbyshire County County Derbyshire Partnership, Rail Community Line Valley Derwent train services in Derbyshire and the Peak District. Not valid for rail rail for valid Not District. Peak the and Derbyshire in services train day rover tickets are valid on most bus and and bus most on valid are tickets rover day Derbyshire Wayfarer Derbyshire tourism and railway organisations.
    [Show full text]
  • Copyrighted Material
    176 Exchange (Penzance), Rail Ale Trail, 114 43, 49 Seven Stones pub (St Index Falmouth Art Gallery, Martin’s), 168 Index 101–102 Skinner’s Brewery A Foundry Gallery (Truro), 138 Abbey Gardens (Tresco), 167 (St Ives), 48 Barton Farm Museum Accommodations, 7, 167 Gallery Tresco (New (Lostwithiel), 149 in Bodmin, 95 Gimsby), 167 Beaches, 66–71, 159, 160, on Bryher, 168 Goldfish (Penzance), 49 164, 166, 167 in Bude, 98–99 Great Atlantic Gallery Beacon Farm, 81 in Falmouth, 102, 103 (St Just), 45 Beady Pool (St Agnes), 168 in Fowey, 106, 107 Hayle Gallery, 48 Bedruthan Steps, 15, 122 helpful websites, 25 Leach Pottery, 47, 49 Betjeman, Sir John, 77, 109, in Launceston, 110–111 Little Picture Gallery 118, 147 in Looe, 115 (Mousehole), 43 Bicycling, 74–75 in Lostwithiel, 119 Market House Gallery Camel Trail, 3, 15, 74, in Newquay, 122–123 (Marazion), 48 84–85, 93, 94, 126 in Padstow, 126 Newlyn Art Gallery, Cardinham Woods in Penzance, 130–131 43, 49 (Bodmin), 94 in St Ives, 135–136 Out of the Blue (Maraz- Clay Trails, 75 self-catering, 25 ion), 48 Coast-to-Coast Trail, in Truro, 139–140 Over the Moon Gallery 86–87, 138 Active-8 (Liskeard), 90 (St Just), 45 Cornish Way, 75 Airports, 165, 173 Pendeen Pottery & Gal- Mineral Tramways Amusement parks, 36–37 lery (Pendeen), 46 Coast-to-Coast, 74 Ancient Cornwall, 50–55 Penlee House Gallery & National Cycle Route, 75 Animal parks and Museum (Penzance), rentals, 75, 85, 87, sanctuaries 11, 43, 49, 129 165, 173 Cornwall Wildlife Trust, Round House & Capstan tours, 84–87 113 Gallery (Sennen Cove, Birding,
    [Show full text]
  • Rail Strategy 2006-2011 and Beyond Now We’Removing Informing, Engaging and Inspiring Foreword Essex Rail Strategy – 2006-2011 and Beyond
    Essex Rail Strategy 2006-2011 and Beyond now we’removing informing, engaging and inspiring Foreword Essex Rail Strategy – 2006-2011 and Beyond ‘I cannot think of a higher priority for the County Council than for it to strive to achieve a first class highways and transportation system for all who live in, work in or visit the county of Essex. The challenges in front of us are enormous. Over 130,000 new homes are being proposed for Essex and its borders with surrounding authorities, the travel needs of which will have a direct impact on the transport network in Essex. All aspects of passenger transport will play a key role in delivering this vision. The County Council has therefore produced three daughter strategies to support the Local Transport Plan, focusing on how passenger transport will contribute towards a fully integrated transport network. The Road Passenger Transport, Bus Information and Rail Strategies outline the ways in which we intend to improve the lives of Essex people by addressing traffic growth, road congestion and improving public transport. They contain measures aimed at improving options for travel and access to services to develop a more effective transport network. To produce the strategies the County Council has consulted widely at regional, district and parish level, with key service providers, a wide range of user groups and the general public so that collectively they represent a tangible commitment by Essex County Council to make our County a better place to live and work and to support a decent public transport network. I am committed to delivering a transport system that meets the challenges we face in Essex and look forward to working in partnership with stakeholders to bring about the transformation we now need.’ Councillor Rodney L.
    [Show full text]
  • Derwent Valley Line Line Valley Derwent
    Prices correct at April 2019 April at correct Prices derbyshire.gov.uk/bline long as one end of your journey is in Derbyshire. in is journey your of end one as long (Newark) – Nottingham – Derby – Matlock – Derby – Nottingham – (Newark) Receive 25% off local train fares as as fares train local off 25% Receive Derbyshire b_line Card Holders Holders Card b_line Derbyshire purchased on the train). the on purchased © Matt Jones Matt © . Centres and on most local bus services (Wayfarer cannot be be cannot (Wayfarer services bus local most on and Centres 01629 533190 01629 Derbyshire Call This publication is available in other formats from from formats other in available is publication This Derby, Long Eaton and other staffed stations, from Tourist Information Information Tourist from stations, staffed other and Eaton Long Derby, one child, £6.70 for seniors or child. Tickets can be purchased at at purchased be can Tickets child. or seniors for £6.70 child, one eastmidlandstrains.co.uk/derwentvalleyline travel before 0900 Monday to Friday. Adult tickets £13.40 including including £13.40 tickets Adult Friday. to Monday 0900 before travel 01629 538062 538062 01629 train services in Derbyshire and the Peak District. Not valid for rail rail for valid Not District. Peak the and Derbyshire in services train Hall Matlock DE4 3AG. 3AG. DE4 Matlock Hall day rover tickets are valid on most bus and and bus most on valid are tickets rover day Derbyshire Wayfarer Derbyshire Council, Economy, Transport and Communities Department, County County Department, Communities and Transport Economy, Council, Derwent Valley Line Community Rail Partnership, Derbyshire County County Derbyshire Partnership, Rail Community Line Valley Derwent fares (when booked in advance).
    [Show full text]
  • THE RURAL ECONOMY of NORTH EAST of ENGLAND M Whitby Et Al
    THE RURAL ECONOMY OF NORTH EAST OF ENGLAND M Whitby et al Centre for Rural Economy Research Report THE RURAL ECONOMY OF NORTH EAST ENGLAND Martin Whitby, Alan Townsend1 Matthew Gorton and David Parsisson With additional contributions by Mike Coombes2, David Charles2 and Paul Benneworth2 Edited by Philip Lowe December 1999 1 Department of Geography, University of Durham 2 Centre for Urban and Regional Development Studies, University of Newcastle upon Tyne Contents 1. INTRODUCTION 1.1 Scope of the Study 1 1.2 The Regional Context 3 1.3 The Shape of the Report 8 2. THE NATURAL RESOURCES OF THE REGION 2.1 Land 9 2.2 Water Resources 11 2.3 Environment and Heritage 11 3. THE RURAL WORKFORCE 3.1 Long Term Trends in Employment 13 3.2 Recent Employment Trends 15 3.3 The Pattern of Labour Supply 18 3.4 Aggregate Output per Head 23 4 SOCIAL AND GEOGRAPHICAL DYNAMICS 4.1 Distribution of Employment by Gender and Employment Status 25 4.2 Differential Trends in the Remoter Areas and the Coalfield Districts 28 4.3 Commuting Patterns in the North East 29 5 BUSINESS PERFORMANCE AND INFRASTRUCTURE 5.1 Formation and Turnover of Firms 39 5.2 Inward investment 44 5.3 Business Development and Support 46 5.4 Developing infrastructure 49 5.5 Skills Gaps 53 6. SUMMARY AND CONCLUSIONS 55 References Appendices 1. INTRODUCTION 1.1 The scope of the study This report is on the rural economy of the North East of England1. It seeks to establish the major trends in rural employment and the pattern of labour supply.
    [Show full text]
  • Colchester Borough Local Plan 2017 – 2033
    Publication Draft The Publication Draft stage of the Colchester Borough Local Plan 2017 – 2033 June 2017 CONTENTS Introduction ................................................................................................................ 1 Local Plan: The Process ......................................................................................... 1 National planning guidance ................................................................................. 1 County Level Plans ............................................................................................. 2 Borough Strategies ............................................................................................. 3 Duty to Co-operate .............................................................................................. 3 Evidence Base .................................................................................................... 4 Sustainability Appraisal ....................................................................................... 4 Habitat Regulations Assessment ........................................................................ 5 Local Plan: Structure of the Plan and other related documents .............................. 5 Other Colchester Planning Documents ................................................................... 6 How to respond....................................................................................................... 7 What Happens Next? .............................................................................................
    [Show full text]
  • 2001 Census Report for Parliamentary Constituencies
    Reference maps Page England and Wales North East: Counties, Unitary Authorities & Parliamentary Constituencies 42 North West: Counties, Unitary Authorities & Parliamentary Constituencies 43 Yorkshire & The Humber: Counties, Unitary Authorities & Parliamentary Constituencies 44 East Midlands: Counties, Unitary Authorities & Parliamentary Constituencies 45 West Midlands: Counties, Unitary Authorities & Parliamentary Constituencies 46 East of England: Counties, Unitary Authorities & Parliamentary Constituencies 47 London: County & Parliamentary Constituencies 48 South East: Counties, Unitary Authorities & Parliamentary Constituencies 49 South West: Counties, Unitary Authorities & Parliamentary Constituencies 50 Wales: Unitary Authorities & Parliamentary Constituencies 51 Scotland Scotland: Scottish Parliamentary Regions 52 Central Scotland Region: Parliamentary Constituencies 53 Glasgow Region: Parliamentary Constituencies 54 Highlands and Islands Region: Parliamentary Constituencies 55 Lothians Region: Parliamentary Constituencies 56 Mid Scotland and Fife Region: Parliamentary Constituencies 57 North East Scotland Region: Parliamentary Constituencies 58 South of Scotland Region: Parliamentary Constituencies 59 West of Scotland Region: Parliamentary Constituencies 60 Northern Ireland Northern Ireland: Parliamentary Constituencies 61 41 Reference maps Census 2001: Report for Parliamentary Constituencies North East: Counties, Unitary Authorities & Parliamentary Constituencies Key government office region parliamentary constituencies counties
    [Show full text]
  • Derwent Valley Walks 1
    station walks station 4 scenic station to station scenic 4 by using the town map in the inset. inset. the in map town the using by orld Heritage Site Heritage orld W Mills alley V Derwent station is easily followed through some of Old Belper Belper Old of some through followed easily is station River Derwent River This leaflet was produced by Derbyshire County Council for the the for Council County Derbyshire by produced was leaflet This urn left here and the route to the the to route the and here left urn T Lane. Swinney el: (01629) 823204 (01629) el: T TION A ST urn left at the entrance and cross fields to reach reach to fields cross and entrance the at left urn T op Visitor Centre, Visitor op T Middleton DUFFIELD . Cemetery Belper to path a down left soon then right TION INFORMA MORE FOR urn urn T road. main the to on continue and these Ascend footpath which leads eventually to steps on the right. right. the on steps to eventually leads which footpath ALKING! W HAPPY urn left at the first road and soon right onto a a onto right soon and road first the at left urn T left and then on into the housing estate in the distance. the in estate housing the into on then and left MILFORD leaflets’ more two several fields for nearly half a mile to pass a wood on the the on wood a pass to mile a half nearly for fields several in in detailed are walks eight other The .
    [Show full text]
  • Public Notices
    facebook.com/TeessideGazette FRIDAY, MAY 15, 2020 The Gazette 45 Public Notices SECTION 153 OF THE PLANNING ACT 2008 SECTION 153 OF THE PLANNING ACT 2008 REGULATION 6 OF THE INFRASTRUCTURE PLANNING REGULATION 6 OF THE INFRASTRUCTURE PLANNING (CHANGES TO, AND REVOCATION OF, DEVELOPMENT CONSENT (CHANGES TO, AND REVOCATION OF, ORDERS) REGULATIONS 2011 DEVELOPMENT CONSENT ORDERS) REGULATIONS 2011 NOTICE OF APPLICATION TO MAKE A NON-MATERIAL CHANGE NOTICE OF APPLICATION TO MAKE A NON-MATERIAL CHANGE TO THE FOLLOWING DEVELOPMENT CONSENT ORDER: TO THE FOLLOWING DEVELOPMENT CONSENT ORDER: THE DOGGER BANK TEESSIDE A AND B OFFSHORE WIND THE DOGGER BANK TEESSIDE A AND B OFFSHORE WIND FARM FARM ORDER 2015 (SI 2015/1592) AS AMENDED BY ORDER 2015 (SI 2015/1592) AS AMENDED BY THE DOGGER THE DOGGER BANK TEESSIDE A AND B OFFSHORE WIND BANK TEESSIDE A AND B OFFSHORE WIND FARM AMENDMENT FARM AMENDMENT ORDER 2019 (SI 2019/699) ORDER 2019 (SI 2019/699) 1. An application has been made by Sofia Offshore Wind Farm 1 An application has been made by Sofia Offshore Wind Farm Limited and Doggerbank Offshore Wind Farm Project 3 Projco Limited to the Secretary of State for Business, Energy and Limited to the Secretary of State for Business, Energy and Industrial Strategy to make a non-material change to the above Industrial Strategy to make a non-material change to the above mentioned Development Consent Order (the DCO). mentioned Development Consent Order (the DCO). 2 The DCO granted development consent to Doggerbank Project 2. The DCO granted development consent to Doggerbank 2 Bizco Limited for ‘Project A’ and Doggerbank Project 3 Bizco Project 2 Bizco Limited for ‘Project A’ and Doggerbank Project Limited for ‘Project B’ - two offshore wind turbine generating 3 Bizco Limited for ‘Project B’ – two offshore wind turbine stations each comprising up to 200 wind turbine generators generating stations each comprising up to 200 wind turbine (WTGs) and associated development in the Dogger Bank Zone generators (WTGs) and associated development in the and the Borough of Redcar and Cleveland.
    [Show full text]
  • Legal & Committee Services
    Appendix Anglia Level Crossing Reduction Strategy - Preferred Options Colchester Borough Council - detailed comments on Network Rail’s proposals The Main Line – London to Norwich • E25 Church 2 Copford/Marks Tey –no objection to closure The crossing is currently closed. The footpath which serves it has already been severed by the construction of the A12. An alternative route is already in place, and an additional route linking the footpath via Turkey Cock Lane is proposed. • E23 Long Green Marks Tey – no objection to closure The crossing has been replaced recently with a bridge. However we note that the design of the bridge used here is very functional and its form is very intrusive on the local environment. It is suggested that Network Rail seek an improved design for future structures used elsewhere. • E24 Church 1 Marks Tey – no objection to closure The crossing closed in 1989. The alternative route is via the new bridge 300m to the west. Sunshine Coast Line – Colchester to Clacton branch line • E 41 Paget Road – CBC does not object but seeks improvements to the alternative pedestrian routes. This crossing is used by a large number of local residents of Wivenhoe (approximately 220 a day). The alternative to the Paget Road crossing is Anglesea Road and High Street bridges approximately 90m and 180m east and west of the current crossing point. Anglesea Road is an unmade and unadopted road and Queens Road has an incline leading to Anglesea Road, making it difficult for less able people to negotiate. The alternative crossing point is the High Street bridge.
    [Show full text]