INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION Mining Plan inspection REPORT Hyderabad regional office

Mine file No : TS/LST-86/HYD Mine code : 38TNG08001 (i) Name of the Inspecting : M001( ) S K MUDULI Officer and ID No. (ii) Designation : Junior Mining Geologist (iii) Accompaning mine : Official with Designation (iv) Date of Inspection : 28/09/2019 (v) Prev.inspection date :

PART-I : GENERAL INFORMATION 1. (a) Mine Name : BHAVANIPURAM-III (b) Registration NO. : IBM/1029/2011 (c) Category : A Fully Mechanised (d) Type of Working : Opencast (e) Postal address State : District : NALGONDA Village : RAVIPAHAD Taluka : NEREDUCHERLA Post office : Pin Code : 508218 FAX No. : 08686-229502 E-mail : [email protected] Phone : 08686-229502 (f) Police Station : (g) First opening date : 23/03/2015 (h) Weekly day of rest : SUN 2. Address for : M/s Deccan Cements,Ravipahad Village, correspondance Mandal: Palakeedu, District Telangana State

3. (a) Lease Number : TNG0017 (b) Lease area : 183.11 (c) Period of lease : 50 (d) Date of Expiry : 27/12/2063

4. Mineral worked : LIMESTONE Main PAGE : 2

5. Name and Address of the Lessee : M/S DECCAN CEMENT LIMITED DECCAN CHAMBERS 6-3-666/B, SOMAJGUDA HYDERABAD HYDERABAD TELANGANA Phone:3310168, 3310552, 3310561, 3310599 FAX :(91) 040-3318366

Owner : DECCAN CEMENTS LIMITED Ravipahad Village,Huzurnagar Mandal Telangana State NALGONDA TELANGANA Phone: 08686-229502 FAX : 08686-229502

Agent : S.VENKATESWARULU SAGAR CEMENTS LTD MATTAMPALLY VILLAGE AND MANDAL NALGONDA DISTRICT NALGONDA TELANGANA Phone: 08683247029 FAX : 08683247041 Mining Engineer Name : CH.NARESH KUMAR,Full Time Qualification : B.Tech(MINING ENGINEERING) Appointment/ : 08/02/2012 Termination date

Geologist Name : L.Srimannarayana,Full Time Qualification : M.Sc(geologist) Appointment/ : 28/04/2017 Termination date

6. Date of approval of Mining : Fresh under rule 22 MCR1960 10/10/2013 Plan/Scheme of Mining MP modif under 17(3) MCR 2016 16/04/2018 PAGE : 3

PART - II : OBSERVATION/COMMENTS OF INSPECTING OFFICERS

Exploration :

Sl.No. Item Proposals Actual work Remarks

1b Exploration over Nil Nil lease area for geological axis 1 or 2 1c Exploration Nil Nil Agencies and Expenditure in lakh rupees during the year 1d Balance area to 82.7920 mt 82.7920 mt be explored to bring Geological axis in 1 or 2 1e Balance reserve as on 01/04/20 1f General remarks The deposit is of inspecting very uniform and officers on sufficient geology, exploration done. exploration etc

Development :

Sl.No. Item Propasals Actual work Remarks

2a Location of E362420 E362420 Deviated on east development E362720 E362720 200m more adva w.r.t.lease area and and need. Co- N1848380 N1848380 ordinates of N1848700 N1848700 actual as on 31.3.2019 2b Separate benches 2 benche in 2 bench in the mineral in topsoil, the mineral and there is no OB overburden and and there is bench. minerals (Rule no OB bench 15) 2c Stripping ratio 1:0 1:0 or ore to OB ratio 2d Quantity of Nil Nil topsoil generation in m3 2e Quantity of Nil Nil overburden generation in m3

PAGE : 4

2f General remarks of inspecting officers on development of pit w.r.t. type of deposit etc

Exploitation:

Sl.No. Item Propasals Actual work Remarks

3a Number of pit 1 1 proposed for production 3b Quantity of ROM 2018-19 2018-19 21.9% less due to mineral 11,01,600 tons 8,60,000 tons less demand for production cement production. proposed 3c Recovery of 2018-19 2018-19 sailable/usable 11,01,600 tons 8,60,000 tons mineral from ROM production 3d Quantity of Nil Nil mineral reject generation 3e Grade of mineral NA NA rejects generation and threshold value declared. 3f Quantity of sub NA NA grade mineral generation. 3g Grade of sub grade mineral generation 3h Manual / Nil Nil Mechanised method adopted for segregating from ROM 3i Any analysis or Nil Nil beneficiation study proposed and carried out for sub grade mineral and rejects. 3j Provision of Proposed Proposed drilling and blasting in mineral benches PAGE : 5

3k Provision of Proposed Proposed mining machineries in mineral benches 3l Whether height of benches in overburden and mineral suitable for method of mining proposed in MP/SOM 3m Total area covered under excavation/pits 3n Ore to OB ratio for the pit/mine during the year. 3o Total area put in use under different heads at the end of year 3p Production of ROM mineral during the last five year period as applicable 3q General remarks of inspecting officers on method of mining etc.

Solid Waste Management - Dumping:

Sl.No. Item Propasals Actual work Remarks

4a Separate dumping Nil Nil of topsoil, OB and mineral rejects (Rule 32,33) 4b Location of NA NA topsoil, OB and mineral reject dumps 4c Number of dumps NA NA within lease area and outside of lease area 4d Location of Nil Nil dumps w.r.t. ultimate pit limit (Rule 16) PAGE : 6

4e Number of active Nil Nil and alive dumps. 4f Number of dead Nil Nil dumps. 4g Number of dumps Nil Nil established. 4h Whether Nil Nil Retaining wall or garland drain all along dumps are there. 4i Length of NA NA Retaining wall or garland drain all along dumps 4j Number of Nil Nil settling ponds 4k Specific comments of inspecting officer on waste dump management

Solid Waste Management - Backfilling:

Sl.No. Item Propasals Actual work Remarks

5a Status of part Nil Nil or full extraction of mineral from mined out area before starting backfilling. 5b Area under Nil Nil backfilling of mined out area 5c Concurrent use Nil Nil of topsoil for restoration or rehabilitation of mineral out area (Rule 32) 5d Total area Nil Nil fully reclaimed and rehabilitated 5e General remarks There is no of inspecting reclaimed and officers on backfilled area. backfilling and reclamation etc. PAGE : 7

Progressive Mine Clousre Plan:

Sl.No. Item Propasals Actual work Remarks

6a Whether Annual Yes Yes report on PMCP submitted on time and correctly. Rule 23 E(2). 6b Area available 2018-19 2018-19 for 2500 no 2885 nos rehabilitation 2019-20\1900 2019-20 (ha) . no 1.15 ha 6c afforestation done (ha). 6d No. of saplings planted during the year

Mineral Conservation:

Sl.No. Item Propasals Actual work Remarks

7a ROM Mineral 2018-19 2018-19 dispatch or 11,01,600 tons 8,60,000 tons grade-wise sorting within lease area 7b Method of grade- Nil Nil wise mineral sorting i.e. manual or mechanical. 7c Different grade Nil Nil of mineral sorted out at mines. 7d Any Nil Nil beneficiation process at mines . 7e General remarks No mineral of inspecting beneficiation officer on requqired Mineral conservation and beneficiation issues

Environment:

Sl.No. Item Propasals Actual work Remarks PAGE : 8

8a Separate removal Very little Complied and utilization top soil which of topsoil (Rule shall be used 32) for plantation purpose 8b Concurrent use Used for plantation and or storage of no stock as on date. topsoil 8c Separate dumps Mp PB and No OB and waste rocks. for overburden, waste rocks. waste rock, rejects and fines (Rule 33) 8d Use of Not applicable Nil overburden, as there is no waste rock, OB and waste rejects and rocks fines dumps for restoring the land to its original use 8e Phased Nil Nil restoration, reclamation and rehabilitation of lands affected by mining operations (Pits, dumps etc) 8f Baseline 2500 within ML 2885 within ML information on cumulative plantation - existence of within ML - 11235 in4.49 plantation and ha additional plantation done (Rule 41) 8g Survival rate 90% 8h Water sprinkling Dedicated Water tanker with 12 KL on roads to water tanker capacity deployed for control airborne of 12 KL water sprinkling. dust capacity shall be provided 8i General remarks The area in and of inspecting around the mine is officer on with aesthetic aesthetic beauty beauty. in and around mines area

Compliance of Rule 45:

Sl.No. Item Propasals Actual work Remarks PAGE : 9

9a Status of MR submitted submission of uip to July Monthly and 2019 Annual returns AR submitted upto to 20119 9b Scrutiny of Manager D.K. Annual return Chakravarthy for information Mining on Mining Engineer Engineer, Cg. Geologist and Nareshkumar Manager Geologist L Srimannarayann a 9c Scrutiny of 8.863 ha Annual return on 8.808 ha land use pattern for area under pits, reclaimed area, dumps etc. 9d Scrutiny of Annual return on afforestation 9e Scrutiny of Annual return on mineral reject generation (Grade and quantity) 9f Scrutiny of Annual return on ROM stock and/or graded ore 9g Scrutiny of 158.37 Exploration cost not 158.37 Annual return on taken into account sale value, Ex. Mine price and production cost PAGE : 10

Details of violations observed during current inspection and compliance position of violation pointed out

Violation observed Show couse position Rule NO. Issued on Compliance on Rule NO. Issued on Compliance on

Date : (S K MUDULI)

Indian Bureau of Mines