Plant and CPP, March’2021

Total Page:16

File Type:pdf, Size:1020Kb

Plant and CPP, March’2021 Deccan Cements Limited :: Bhavanipuram EC No: F.No : J-11011/572/2007-IA II(I) Deccan Cements Limited :: Bhavanipuram EC No: F.No : J-11011/572/2007-IA II(I) Status of Environmental Clearances received from MOEF vide MoEF No.J-1101/572/2007-IA II(I) dated 11.05.2017- Cement Plant and CPP, March’2021. i) Compliance report is enclosed herewith for all the conditions stipulated by MoEF & CC. ii) Next report will be submitted in the Month of December - 2021 SPECIFIC CONDITION: S. Conditions Compliance No i. All the conditions stipulated vide environmental All the condition stipulated in the EC is complied clearance letter No J-11011/572/2007 –IA II(I) dated 27th December, 2007 should be complied with ii. The project proponent shall install 24x7 air 3No’s of Continuous ambient air quality monitoring devices to monitor air emissions as monitoring stations are in operation. provided by the CPCB and submit report to Ministry Real time Data is uploaded to CPCB and SPCB 24 and its regional Office x 7.All stack emissions are also being monitored (24x7) and the real time data uploaded to CPCB and SPCB servers, Annexure-A Third party reports are also enclosing in Six months EC Compliance reports are submitted regularly to Regional Office. Annexure-I,II, III & IV iii. The Standards issued by the Ministry vide G.S.R. As per the G.S.R. No.612 (E) dated 25th August No.612 (E) dated 25th August 2014 and subsequent 2014 standards we have upgraded APCE to meet amendments dated 9th may2016 and 10th May’2016 the emission norms by changing latest bag filter regarding cement plants with respect to particulate bags and up gradation of transformers in the matter, SO2 and NOx shall be followed. ESP’S etc., The details are enclosed in annexure– A1 iv. Efforts shall be made to achieve power consumption Mandatory energy audit is carried out on regular of 70 Units /Tones for Portland Pozzolona Cement bases and based on recommendations & (PPC) and 95 units /tone for Ordinary Portland modifications are carried out. We have achieved Cement (OPC) production and thermal energy power consumption targets and planning for consumption of 670 Kcal/ Kg of clinker. thermal energy consumption. Based on the recommendations by principals equipment suppliers and sectorial specifications. The details are enclosed in Annexure – A2 v. Efforts shall be made to reduce impact of the Complied. transport of raw materials and end products on the 1. Installed Railway wagon siding with surrounding environment including agricultural land mechanized unloading facility for Coal by use of conveyors /rail mode of transporn wherever within the plant. feasible. The company shall have separate truck 2. New packing system with wagon loading to parking area. Vehicular emissions shall be regularly enhance the capacity is completed. monitored. 3. We are regularly monitoring the vehicular emissions engaged for our raw material handling vehicles other vehicles.. vi. Efforts shall be made to further reduce water We are meeting part of water requirement from consumption by using air cooled condensers. All the the rain water harvesting through the mined out treated wastewater shall be recycled and reused in pits from ML-2 Mine and for green belt the process and /or for dust suppression and green development requirement water is meeting with belt development and other plant related activities treated STP water and river water. No Process etc No process wastewater shall be discharge outside waste water is discharging to outside factory the factory premises and ‘zero’ discharge shall be premises. Deccan Cements Limited :: Bhavanipuram EC No: F.No : J-11011/572/2007-IA II(I) adopted. We have Zero discharge from our plant premises. vii. Efforts shall be made to make use of rainwater New water storage has developed in New mine pit harvested. If needed, capacity of the reservoir shall area for rain water harvesting to meet our process be made enhanced to meet the maximum water requirements at plant and balance required water requirement. Only balance water requirement shall be will be drawn from the Krishna River. met from other sources. viii. Greenbelt shall be developed in 33% of the project We have well developed green belt and fulfilled as area within the plant premises with at least 10-meter stipulated with an area of 18.50 Ha all around the wide green belt on all sides along the periphery of the plant and also as Part of the Telangana State project area, along road sides etc. By planting native Haritha Haram. and board leaved species in consultation with local Annexure-VII . DFO and local communities as per the CPCB Enclosed plantation Photos. guidelines. ix. All the recommendations made in the charter on Noted and under implementation corporate responsibility for Environmental Protection (CREP) for the Cement plants shall be implemented. x. At least 2.5% of the total cost of project shall be We have optimized our process equipments to earmarked towards the Enterprise Social increase the production levels and there is no commitment (ESC) based on local needs and actions direct cost involved for this project. plan with financial and physical breakup/details shall be prepared and submitted to the Ministry’s Regional Office. Implementation of such program shall be ensured accordingly in a time bond manner. xi. The proponent shall prepare a detailed CSR plan for Details enclosed in Annexure-V next 5 years for the existing–cum-expansion project, which includes village-wise, sector-wise (Health, Education, Sanitation, Health, Skill Development and infrastructure requirements such as strengthening of village roads, avenue plantation, etc) activities in consultation with local communities and administration. The CSR Plan will include the amount of 2% retain annual profit as provided for in clause 135 of the companies Act,2013 which provides for 2% of average net profit of previous 3 years towards CSR activities for life of the project. A separate budget head shall be created and the annual capital and revenue expenditure on various activities of the Plan shall be submitted as part of the compliance Report to RO. The details of the CSR plan shall also be uploaded on the company website and shall be provided in the Annual report of the company. xii. The project proponent shall provide for solar light Proposals and possibilities will be explored and system for all common area, streetlights, village, and finalized as per the priority parks around project area and maintain the same regularly. xiii. The project proponent shall provide for LED lights in Noted. New Installations of lighting completely their office and residential areas. with LED and old lighting is replacing Phase wise change over with LED lights is under process (Failure replacement of Lights is under implementation) xiv Provision shall be made for the housing of Noted (this is up-gradation of existing plant construction labour within the site with all necessary adopting latest development with minor infrastructure and facilities such as fuel for cooking, rectification in the existing system there will be no mobile toilets, Safe drinking water, medical health extra labour required and no labour intensified Deccan Cements Limited :: Bhavanipuram EC No: F.No : J-11011/572/2007-IA II(I) care crèche etc. The housing may be in the form of job involved ). temporary structures to be removed after the Presently Not applicable completion of the project. B. GENERAL CONDITIONS: S. Conditions Compliance No i. The project authorities must strictly adhere to the Noted and will be complied the directions of the stipulations made by the Telangana Pollution Control Telangana Pollution Control Board and the Board and the State Government. State Government. in all respects ii No further expansion or modifications in the plant Noted will be complied. shall be carried out without prior approval of the approval of the Ministry of Environment, Forest and Climate Change (MoEF & CC) iii At least four ambient air quality monitoring stations Complied and also we have established 3 No’s should be established in the downward direction as of Continuous ambient air quality monitoring well as where maximum ground level concentration of stations are in operation. PM10, PM2.5, SO2 and NOx are anticipated in Data is uploaded to CPCB and SPCB 24 x 7 consultation with the SPCB. Data on ambient air All stack emissions are being monitored (24x7) quality and stack emission shall be regularly and connected to CPCB and SPCB servers. submitted to this Ministry including its Regional Office Six months reports are submitted regularly to at Chennai and the SPCB/CPCB once in six months. Regional Office. iv Industrial waste water shall be properly collected, Not applicable as Zero discharge from the plant. treated so as to conform to the standards prescribed Domestic water is treated in the STP and used under GSR 422 (E) dated 19th May, 1993 and 31st for the green belt development. We are December 1993 or as amended form time to time. regularly checking the outlet water and taking The treated wastewater shall be utilized for plantation necessary action to maintain the treated water purpose. adherence to the PCB Norms. We have also engaged third party for checking of STP outlet water and quarterly reports are sending RO, TSPCB. Annexure - I v The overall noise levels in and around the plant area Complied. shall be kept well within the standards (85 dBA) by Third party reports enclosed. Annexure-III providing noise control measures including acoustic hoods, silencers enclosures etc. on all sources of noise generation. The ambient noise levels should conform to the standards prescribed under EPA Rules, 1989 VIZ. 75 dBA (day time) and 70 dBA(night time). vi Occupational health surveillance of the workers shall Noted and periodical medical checkup are be done on a regular basis and records maintained carried out as per the factory act and record as per the Factories Act.
Recommended publications
  • DECCAN CEMENT LIMITED (UNIT – II) Mahankaligudem Village, Nereducherla Mandal, Nalgonda District, Telangana Table of Contents
    PRE-FEASIBILITY REPORT For INCREASE OF PRODUCTION CLINKER: 1.0 MTPA TO 1.20 MTPA & CAPTIVE POWER: 15 MW TO 18 MW. At DECCAN CEMENT LIMITED (UNIT – II) Mahankaligudem Village, Nereducherla Mandal, Nalgonda District, Telangana Table of Contents 1. Executive Summary 2. Introduction 3. Project Description 4. Site Analysis 5. Planning Brief 6. Proposed infrastructure 7. Rehabilitation and resettlement (R & R) Plan 8. Project schedule & Cost Estimates 9. Analysis of proposal (Final Recommendations) Annexure Annexure-1 (a) - MoEF EC Letter No. J-11011/572/2007- IA II (I) dated 27th December, 2007 Figure Figure-1 Location Map Figure-2 Key Map Figure-3 Topographical Map Figure-4 Layout 1. Executive Summary DECCAN CEMENT LIMITED., DCL is operating 1.5 MTPA Cement Plant (1.0 MTPA Clinker) along with 15 MW Coal based Captive power plant [UNIT –II] at Mahankaligudem Village, Neredcherla Mandal, Nalgonda District, Andhra Pradesh. DCL proposes to increase the clinker production of the cement plant from 1.0 to 1.2 MTPA and power generation from 15 to 18 MW by upgradation and optimizing process operations Limestone requirement of the plant is met from captive limestone mines located adjacent to the cement plant. Limestone requirement of Cement Plant Unit-II increases from 1.5 to 1.8 MTPA. This requirement is met from captive limestone mines. No additional land is required as no additional machinery is proposed Water requirement increases from 1900 to 2168 m3/day which will be met from same sources i.e Krishna River Coal requirement increases from 0.15 to 0.18 MTPA at cement plant and 360 to 432 TPD at power plant.
    [Show full text]
  • Acknowledgement
    Deccan Cements Ltd. ACKNOWLEDGEMENT M/s. LAWN ENVIRO ASSOCIATES express sincere debt of gratitude to M/s. DECCAN CEMENTS LTD. for the opportunity given by assigning the preparation of Environmental Statement (Audit) Report for the financial year 2019-2020, for their Cement plant at Bhavanipuram, Janpahad, Suryapet District of Telanga. The Environmental statement (Audit) Report is prepared for the financial year 2019-2020 Special mention needs to be made of Executives of M/s. DECCAN CEMENTS LIMITED. Especially Mr. S. Venkateswarlu Director (Works) & Mr. KVL Narasimha Rao (PQC) & Team for their co-operation and assistance during the preparation of this statement. We also wish to acknowledge our gratitude to all of them who helped during the data collection and report preparation. LAWN Enviro Associates 2 Deccan Cements Ltd. CONTENTS Acknowledgement 2 Contents 3 List of Tables 4 List of Figures 4 Form – V 5 1. INTRODUCTION 13 2. OBJECTIVE OF THE STUDY 13 3. BENEFITS OF ENVIRONMENTAL AUDIT 14 4. LOCATION 15 5. RAW MATERIALS AND PRODUCTS 17 5.1. Raw materials 17 5.2. Moisture losses 17 5.3. Products 17 6. PROCESS DESCRIPTION 17 6.1 Lime Stone Mining and Crushing 19 6.2 Raw Material grinding and preparation 20 6.3 Clinker formation 20 6.4 Clinker grinding 21 6.5 Cement Packing 21 6.6 Process Description of Power Plant 21 7. WATER REQUIREMENT 25 8. POLLUTION CONTROL IN THE PLANT 26 8.1 Waste Water Sources and Monitoring 26 8.2 Air Pollution Control 27 8.2.1 Stack Emission 27 8.2.2 Ambient Air Quality 28 8.2.3 Ambient Noise levels 29 9.
    [Show full text]
  • Bhavanipuram EC No: F.No : J
    Deccan Cements Limited :: Bhavanipuram EC No: F.No : J-11011/572/2007-IA II(I) Deccan Cements Limited :: Bhavanipuram EC No: F.No : J-11011/572/2007-IA II(I) Status of Environmental Clearances received from MOEF vide MoEF No.J-1101/572/2007- IA II(I) dated 11.05.2017- Cement Plant and CPP, March - 2018. i) Compliance report is enclosed herewith for all the conditions stipulated by MoEF &CC. ii) Next report will be submitted in the Month of December -2018 SPECIFIC CONDITION: Sl No Conditions Compliance i. All the conditions stipulated vide All the condition stipulated in the EC is environmental clearance letter No J- complied 11011/572/2007 –IA II(I) dated 27th December ,2007 should be complied with ii. The project proponent shall install 24x7 air 3Nos of Continuous ambient air quality monitoring devices to monitor air emissions as monitoring stations are in operation. provided by the CPCB and submit report to Data is uploaded to CPCB and SPCB 24 x 7 Ministry and its regional Office All stack emission are monitored (24x7) and uploaded the data to CPCB and SPCB and six months reports are submitted regularly to Regional Office. iii. The Standards issued by the Ministry vide As per the G.S.R. No.612 (E) dated 25th G.S.R. No.612 (E) dated 25th August 2014 August 2014 standards we are upgrading our plants with respect to particulate matter, SO2 plant meet requirements. and NOx shall be followed. Details enclosed –Annexure -A iv. Efforts shall be made to made achieved power We taken up the modification to achieve the consumption of 70 Units /Tones for Portland power and thermal energy as per the Cement (OPC) production and thermal energy recommendation of CII during mandatory consumption of 670 Kcal/ Kg of clinker.
    [Show full text]
  • Telangana Government Notification Rabi 2017-18
    GOVERNMENT OF TELANGANA ABSTRACT Agriculture and Cooperation Department – Pradhan Manthri Fasal Bhima Yojana (PMFBY)– Rabi 2017 -18 - Implementation of “Village as Insurance Unit Scheme” and “Mandal as Insurance Unit Scheme under PMFBY -Notification - Orders – Issued. AGRICULTURE & CO-OPERATION (Agri.II.) DEPARTMENT G.O.Rt.No. 1182 Dated: 01-11-2017 Read the following: 1. From the Joint Secretary to Govt. of India, Ministry of Agriculture, DAC, New Delhi Lr.No. 13015/03/2016-Credit-II, Dated.23.02.2016. 2. From the Commissioner of Agriculture, Telangana, Hyderabad Lr.No.Crop.Ins.(2)/175/2017,Dated:12-10-2017. -oOo- O R D E R: The following Notification shall be published in the Telangana State Gazette: N O T I F I C A T I O N The Government of Telangana hereby notify the Crops and Areas (District wise) to implement the “Village as Insurance Unit Scheme” with one predominant crop of each District and other crops under Mandal Insurance Unit scheme under Pradhan Mantri Fasal Bhima Yojana (PMFBY) during Rabi 2017 -18 season vide Annexure I to VIII and Annexure I and II and Statements 1-30 and Proforma A&B of 30 Districts for Village as Insurance Unit Statements 1 to 30 for Mandal Insurance Unit and Appended to this order. 2. Further, settlement of the claims “As per the Pradhan Mantri Fasal Bhima Yojana (PMFBY) Guidelines and administrative approval of Government of India for Kharif 2016 season issued vide letter 13015/03/2016-Credit-II, Dated.23.02.2016 the condition that, the indemnity claims will be settled on the basis of yield data furnished by the State Government based on requisite number of Crop Cutting Experiments (CCEs) under General Crop Estimation Survey (GCES) conducted and not any other basis like Annavari / Paisawari Certificate / Declaration of drought / flood, Gazette Notification etc., by any other Department / Authority.
    [Show full text]
  • DCL:SECY:2020 17.07.2020 BSE Limited Corporate Relationship Department Phiroze Jeejeebhoy Towers Dalal Street Mumbai
    CIN: L26942TG1979PLC002500 Regd. Office: Deccan Chambers, 6-3-666/B, Somajiguda, Hyderabad, Telangana, India - 500082 Tel: 040 – 2331 0168/ 0552/ 0555, Fax: 040 – 2331 8366, e -mail: [email protected] Cement Plant: Bhavanipuram, Janpahad P.O., Suryapet District, Telangana, India - 508218 DCL:SECY:2020 17.07.2020 BSE Limited National Stock Exchange of India Limited Corporate Relationship Department Listing Department Phiroze Jeejeebhoy Towers Exchange Plaza, Plot No. C/1, G Block Dalal Street Bandra-Kurla Complex, Bandra (East) Mumbai - 400 001 Mumbai - 400 051 Scrip Code: 502137 Trading Symbol: DECCANCE Dear Sir/Madam, Sub: Submission of Disclosure on Related Party Transactions. Ref: Publication of Quarterly/Year ended 31st March 2020 Financial Result on 25thJune, 2020. Pursuant to Regulation 23(9) of the (Listing Obligations and Disclosure Requirements) Regulations, 2015 please find enclosed disclosure of Related Party Transactions during the half year ended 31st March 2020, drawn in accordance with applicable accounting standards. Thank you, With regards, For Deccan Cements Limited Sd/- Bikram Keshari Prusty Company Secretary Compliance Officer Encl: As above CIN: L26942TG1979PLC002500 Regd. Office: Deccan Chambers, 6-3-666/B, Somajiguda, Hyderabad, Telangana, India - 500082 Tel: 040 – 2331 0168/ 0552/ 0555, Fax: 040 – 2331 8366, e -mail: [email protected] Cement Plant: Bhavanipuram, Janpahad P.O., Suryapet District, Telangana, India - 508218 DISCLOSURES OF RELATED PARTY TRANSACTIONS In compliance with Ind AS-24 "Related Party Disclosures", as notified under Rule 3 of the Companies (Indian Accounting Standards) Rules, 2016 and Companies (Indian Accounting Standards) Amendment rules, 2017 the required disclosures are given in the table below: Names of the related parties Nature of relationship i) Key Management Personnel (KMP): Mr.
    [Show full text]
  • STATEMENT SHOWING the LIST of WORKS SANCTIONED UNDER MPLADS FUNDS Name of the Sl
    STATEMENT SHOWING THE LIST OF WORKS SANCTIONED UNDER MPLADS FUNDS Name of the Sl. Estd. Cost Total Amount Hon'ble Year Mandal Village Description of work Executive Agency No. (In Rs.) Released MP/Constituency 1 2 3 4 5 6 7 8 9 1 Nalgonda 2009-2010 ANUMULA PULIMAMIDI Construction of Bus shelter at Pulimamidi Bus stage Anumula, MPDO 150000 149975 (Nalgonda to Nagarjuna Sagar RandB road) 2 Nalgonda 2009-2010 ANUMULA Srinadhapuram Construction of Bus shelter at Srinadhapuram Bus Anumula, MPDO 150000 150000 stage (Nalgonda to Nagarjuna Sagar RandB road) 3 Nalgonda 2009-2010 CHINTHAPALLE Vinjamoor Construction of SC Community Hall at Vinjamoor gate Chinthapally, MPDO 150000 150000 4 Nalgonda 2009-2010 CHINTHAPALLE Varkala B/W of SC Community Hall at Varkala Chinthapally, MPDO 150000 150000 5 Nalgonda 2009-2010 CHINTHAPALLE Gadiagouraram Laying of CC road from Primary School to Gram Chinthapally, MPDO 200000 200000 Panchayat Chavadi at Gadiagouraram 6 Nalgonda 2009-2010 KODAD Kodad Laying of CC road from Thummati Subba Reddy house E.E., 300000 300000 to Bodrai PR.,Miryalaguda 7 Nalgonda 2009-2010 KODAD Kodad town CC road in Mallapalli in 12th ward in Kodad E.E., 200000 200000 PR.,Miryalaguda 8 Nalgonda 2009-2010 KODAD Kodad town CC road from Habeeb house to Apartment in 5th ward E.E., 200000 188952 in Kodad town PR.,Miryalaguda 9 Nalgonda 2009-2010 KODAD Kodad town CC road from Samdani Babu house to Wahid house in E.E., 200000 200000 10th ward in Kodad PR.,Miryalaguda 10 Nalgonda 2009-2010 KODAD Kodad town CC road from Huzurnagar road to JE
    [Show full text]
  • APPENDEX (See Rule 6) FORM-'A' Form for Seeking Prior Approval Under Section 2 of the Proposals by the State Government
    APPENDEX (See Rule 6) FORM-‘A’ Form for seeking prior approval under section 2 of the proposals by the state Government and other authorities PART-1 (TO BE FILLED BY USER AGENCY) 1. Project details: (i) Short narrative of the Proposal: Construction of railway siding and associated proposal and project/ activities for cement plant of M/s Deccan Cements Limited. scheme for which the forest land is Narrative: M/s Deccan Cements Limited had approached required. South Central Railway for provision of siding facility for its cement plant located at Bhavanipuram (Village), Palakeedu (Mandal), Suryapet (Dist.) Telangana. South Central Railway had approved the proposal in the year 2007. DCL had obtained diversion of 1.93 Ha. of forest land for the above said project in the year 2011. South Central Railway has also taken a diversion of forest land to an extent of 0.66 Ha at the take off point from the main line Vishnupuram - Janpahad for the above siding purpose in the year 2016. In February, 2021, a joint survey conducted by Revenue and forest officials declared that an extent of 8.02 Ha. of land within the proposed siding as forest. Hence DCL is making this proposal to get the said 8.02 Ha forest land diverted for this railway siding purpose. Thus, the extent of forest land for which permission is sought is as follows: Division Name RF Name Area in ha Suryapet Saidulnama 8.02 (ii) Map showing the Map showing the reserve forest area is enclosed. required forest land, boundary of adjoining The ETS & DGPS/GNSS Survey data map authenticated by forest on a 1:50,000 the Forest Department enclosed.
    [Show full text]
  • TELANGANA STATE PUBLIC SERVICE COMMISSION :: HYDERABAD Notification No
    TELANGANA STATE PUBLIC SERVICE COMMISSION :: HYDERABAD Notification No. 03/2015 , Departmental Tests November 2014 LIST OF SUCCESSFUL CANDIDATES . Test Name : The Revenue Test (18,27,43,62) Paper Code 18 : The Revenue Test : Part - I : Paper - I - ( WITH BOOKS ) - Held On : 27-05-2015 - FN Paper Code 27 : The Revenue Test : Part - I : Paper - II - ( WITH BOOKS ) - Held On : 27-05-2015 - AN Paper Code 43 : The Revenue Test : Part - II - ( WITH BOOKS ) - Held On : 28-05- 2015 - FN Paper Code 62 : The Revenue Test : Part - III - ( WITH BOOKS ) - Held On : 28-05 -2015 - AN The candidates whose Register No.s, Names, Designations and Addresses given below are provisionally 'PASSED' the TEST mentioned above. If the above test contains more than one paper or part, the details of each paper or part Passed by the candidate is indicated. CENTRE::ADILABAD 1.22401163 - GANGAKISHAN, HOSTEL WELFARE OFFICER, GOVT BC BOYS HOSTEL, LOKESWARAM, ADILABAD [018 ] 2.22401164 - V NAGARAO, HOSTEL WELFARE OFFICER, GOVT BC HOSTEL, BHAINSA, ADILABAD [018 ] 3.22401165 - ALLADI LAXMINARSAIAH, VILLAGE REVENUE OFFICER, TAHSILDAR OFFICE, MAMADA, MAMADA, ADILABAD [027 ] 4.22401166 - NASREEN ROOHI, JUNIOR ASSISTANT, REVENUE DIVISIONAL OFFICER, ADILABAD, ADILABAD, ADILABAD [043 ] 5.22401167 - RACHAMALLA NARSAIAH, VILLAGE REVENUE OFFICER, TAHSILDAR OFFICE KHANAPUR, KHANAPUR, ADILABAD [018,027 ] 6.22401171 - RANGULA RAJAMANI, VILLAGE REVENUE OFFICER, TAHSILDAR OFFICE, KAGAZNAGAR, ADILABAD [027 ] 7.22401174 - SHETTY SRINIVAS RAO, VILLAGE REVENUE OFFICER, TAHSIL OFFICE, MAMDA,
    [Show full text]
  • Government of Andhra Pradesh
    TELANGANA STATE INFORMATION COMMISSION (Under Right to Information Act, 2005) Samachara Hakku Bhavan, D.No.5-4-399, ‘4’ Storied Commercial Complex, Housing Board Building, Mojam Jahi Market, Hyderabad – 500 001. Phone Nos: 040-24740107 (o); 040-24740592(f) Appeal No. 35256/CIC/2016 Dated: 22-02-2018 Appellant : Sri V.: Praveen Kumar, Suryapet District. Respondents : The Public: Information Officer (U/RTI Act, 2005) / O/o The Tahsildar, Neredcherla Mandal, Suryapet District. The Appellate Authority (U/RTI Act, 2005) / O/o The Revenue Divisional Officer, Suryapet, Suryapet District. O R D E R 1. Sri V. Praveen Kumar, Suryapet District has filed 2nd appeal dated Nil-10-2016 which was received by this Commission on 31-10-2016 for not getting the information sought by him from the PIO / O/o The Tahsildar, Neredcherla Mandal, Suryapet District and 1st Appellate Authority / O/o The Revenue Divisional Officer, Suryapet, Suryapet District. 2. The brief facts of the case as per the appeal and other records received along with it are that the appellant herein filed an application dated 03-09-2016 before the PIO requesting to furnish the information under Sec.6(1) of the RTI Act, 2005, on the following points mentioned in his application: 3. The Public Information Officer has given reply to the appellant vide letter no. E/__/2016, dated 12-10-2016. 4. Since the appellant did not receive the information from the Public Information Officer, he filed 1st appeal dated 24-10-2016 before the 1st Appellate Authority requesting him to furnish the information sought by him u/s 19(1) of the RTI Act, 2005.
    [Show full text]
  • State District Branch Address Centre Ifsc
    STATE DISTRICT BRANCH ADDRESS CENTRE IFSC CONTACT1 CONTACT2 CONTACT3 MICR_CODE A.N.REDDY NAGAR ANDHRA A N REDDY BR,NIRMAL,ANDHRA PRADESH ADILABAD NAGAR PRADESH NIRMAL ANDB0001972 8734243159 NONMICR 3-2-29/18D, 1ST CH.NAGAB FLOOR, AMBEDKAR HUSHANA ANDHRA CHOWK ADILABAD - M 08732- PRADESH ADILABAD ADILABAD 504 001 ADILABAD ANDB0000022 230766 TARA COMPLEX,MAIN ANDHRA ROAD,ASIFABAD,ADI 08733 PRADESH ADILABAD ASIFABAD LABAD DT - 504293 ASIFABAD ANDB0002010 279211 504011293 TEMPLE STREET, BASARA ADILABAD, ANDHRA ADILABAD, ANDHRA 986613998 PRADESH ADILABAD BASARA PRADESH-504104 BASAR ANDB0001485 1 Bazar Area, Bellampally , Adilabad G.Jeevan Reddy ANDHRA Dist - - 08735- PRADESH ADILABAD Bellampalli Bellampalli ADILABAD ANDB0000068 504251 2222115 ANDHRA BANK, BHAINSA BASAR P.SATYAN ROAD BHAINSA- ARAYANA - ANDHRA 504103 ADILABAD 08752- PRADESH ADILABAD BHAINSA DIST BHAINSA ANDB0000067 231108 D.NO 4-113/3/2,GOVT JUNIOR COLLEGE ROAD,NEAR BUS ANDHRA STAND,BOATH - 949452190 PRADESH ADILABAD BOATH 504305 BOATH ANDB0002091 1 MAIN ROAD,CHENNUR, ADILABAD DIST, ANDHRA CHENNUR, ANDHRA 087372412 PRADESH ADILABAD CHENNUR PRADESH-504201 CHINNOR ANDB0000098 36 9-25/1 BESIDE TANISHA GARDENS, ANDHRA DASNAPUR, PRADESH ADILABAD DASNAPUR ADILABAD - 504001 ADILABAD ANDB0001971 NO NONMICR ORIENT CEMENT WORKS CO, DEVAPUR,ADILABAD DIST, DEVAPUR, ANDHRA ANDHRA PRADESH- 08736 PRADESH ADILABAD DEVAPUR 504218 DEVAPUR ANDB0000135 240531 DOWEDPALLI, LXXETTIPET 08739- ANDHRA VILLAGE, GANDHI DOWDEPAL 233666/238 PRADESH ADILABAD DOWDEPALLI CHOWK LI ANDB0000767 222 H NO 1-171 VILL
    [Show full text]
  • Name of the District: Nalgonda S.NO Bank Mandal Village 1 State Bank
    SLBC OF AP CONVENOR:ANDHRA BANK FIP- ABOVE 2000 POPULATION VILLAGES Name of the District: Nalgonda S.NO Bank Mandal Village 1 State Bank of India Narayanpur Sarvail Choutuppal 7093 2 Gudipalle Vaddipatla Gudipalli 2687 3 Eduluru Kurumathy Aitipamula 4959 4 Aitipamula Cheruvannaram Aitipamula 3079 5 Bolle Palle Dugnevally Aitipamula 4386 6 Akupamula Kokkireni Aitipamula 2265 7 Nemmikal Thummalapen Pahad Atmakur(S) 8 Cheedella Gajulamalkapuram Cheedella 2903 9 Cheruku Palle Towklapur Cherukupally 3454 10 Cheruku Palle Bollana Palle Cherukupally 2560 11 Choutuppal Peepal pahad Choutuppal 2557 12 Jai Kesaram Tangad Palle Choutuppal 6139 13 Jai Kesaram Panthangi Choutuppal 5642 14 Jai Kesaram Lakkaram Choutuppal 3250 15 Pedda Adiserla Palle Ghanpur Gudipalli 2004 16 Nagaram Kasarla pahad Jajireddygudem 2463 17 Nagaram Kommala Jajireddygudem 38285 18 Nagaram Kodur Jajireddygudem 3155 19 Koppole Palwai Koppole 2985 20 Koppole Chepur Koppole 3633 21 Mamidala Rajupeta Nalgonda 3362 22 Mamidala Indugula Nalgonda 2294 23 Nalgonda Narsing Batla Nalgonda 3837 24 Valigonda Pulgilla Nalgonda 3359 25 Arrur Poddatur Redlarepaka 5095 26 Nadigudem Kagitha RamachandrapuramRedlarepaka 2152 27 Siripuram Karivirala Siripuram 3083 28 Tripuravaram Yallapuram Siripuram 3083 29 Tadakamalla Takkellapahad Siripuram 2653 30 Tripuravaram Palaram Tadakamalla 2649 31 Tripuravaram Singavaram ,Triupuravaram 2607 32 M Turkapalle Veerareddi Palle ,Triupuravaram 2093 33 M Turkapalle Gandamsalla Turkapalle 3241 34 M Turkapalle Palle Pahad Turkapalle 2360 35 M Turkapalle Rusta
    [Show full text]
  • Nalgonda District (Phase-II), Telangana
    क� द्र�यू�म भ जल बोड셍 जल संसाधन, नद� �वकास और गंगा संर�ण मंत्रालय भारत सरकार Central Ground Water Board Ministry of Water Resources, River Development and Ganga Rejuvenation Government of India Report on AQUIFER MAPPING AND GROUND WATER MANAGEMENT Parts of Nalgonda District (Phase-II), Telangana द��णी �ेत्र, हैदराबाद Southern Region, Hyderabad भारत सरकार जल संसाधन नदी विकास एिम् गंगा संरक्षण मंत्रालय कᴂद्रीय भूवमजलबो셍ड GOVERNMENT OF INDIA MINISTRY OF WATER RESOURCES, RIVER DEVELOPMENT AND GANGA REJUVENATION REPORT ON AQUIFER MAPPING FOR SUSTAINABLE MANAGEMENT OF GROUNDWATER RESOURCES IN PARTS OF NALGONDA DISTRICT TELANGANA STATE (Phase-II) CENTRAL GROUND WATER BOARD SOUTHERN REGION HYDERABAD JUNE-2016 REPORT ON AQUIFER MAPPING FOR SUSTAINABLE MANAGEMENT OF GROUNDWATER RESOURCES IN PARTS OF NALGONDA DISTRICT TELANGANA STATE CONTRIBUTORS’ PAGE Name Designation Principal Authors Dr.PandithMadhnure : Scientist-D (Sr. Hydrogeologist) Shri G. Praveen Kumar : Scientist-C Shri G. Ravi Kumar : Scientist-C Hydrogeology Dr.PandithMadhnure : Scientist-D Shri G.Praveen Kumar : Scientist-C Shri Ravi Kumar : Scientist-C Shri Vinay Vidyadhar : Scientist-D Shri K. Dwarkanath : Scientist-D Dr.V.S.R. Krishna : Scientist-D Dr.M.Sudheer Kumar : Scientist-D Groundwater Exploration Shri M.K.Rafiuddin : Scientist-D Shri BharathBhushan : Scientist-D Shri M.R.K. Reddy : Scientist-D Shri D.Mohantha : AHG Geophysics Dr.Murali Krishna : Scientist-C Shri P.H.P.Reddy : Scientist-D Shri T.RajaBabu : Scientist-D Hydrometeorology Shri P.Sudhakar : Scientist-D Chemical Analysis Shri M. Bhaskar Reddy : Scientist-B Shri K.
    [Show full text]