Bhavanipuram EC No: F.No : J
Total Page:16
File Type:pdf, Size:1020Kb
Deccan Cements Limited :: Bhavanipuram EC No: F.No : J-11011/572/2007-IA II(I) Deccan Cements Limited :: Bhavanipuram EC No: F.No : J-11011/572/2007-IA II(I) Status of Environmental Clearances received from MOEF vide MoEF No.J-1101/572/2007- IA II(I) dated 11.05.2017- Cement Plant and CPP, March - 2018. i) Compliance report is enclosed herewith for all the conditions stipulated by MoEF &CC. ii) Next report will be submitted in the Month of December -2018 SPECIFIC CONDITION: Sl No Conditions Compliance i. All the conditions stipulated vide All the condition stipulated in the EC is environmental clearance letter No J- complied 11011/572/2007 –IA II(I) dated 27th December ,2007 should be complied with ii. The project proponent shall install 24x7 air 3Nos of Continuous ambient air quality monitoring devices to monitor air emissions as monitoring stations are in operation. provided by the CPCB and submit report to Data is uploaded to CPCB and SPCB 24 x 7 Ministry and its regional Office All stack emission are monitored (24x7) and uploaded the data to CPCB and SPCB and six months reports are submitted regularly to Regional Office. iii. The Standards issued by the Ministry vide As per the G.S.R. No.612 (E) dated 25th G.S.R. No.612 (E) dated 25th August 2014 August 2014 standards we are upgrading our plants with respect to particulate matter, SO2 plant meet requirements. and NOx shall be followed. Details enclosed –Annexure -A iv. Efforts shall be made to made achieved power We taken up the modification to achieve the consumption of 70 Units /Tones for Portland power and thermal energy as per the Cement (OPC) production and thermal energy recommendation of CII during mandatory consumption of 670 Kcal/ Kg of clinker. energy audit on October 2016 , Implementation of recommendation are under progress v. Efforts shall be made to reduce impact of the We have commissioned the rail way wagon transport of raw materials and end products on siding with in the plant and trying to improve the surrounding environment including the wagon loading and raw material through agricultural land by use of conveyors /rail the rail. mode of transportation wherever feasible. The company shall have separate truck parking area. Vehicular emissions shall be regularly monitored. vi. Efforts shall be made to further reduce water We are meeting our part of water consumption by using air cooled condensers. requirement from the rain harvested water All the treated wastewater shall be recycled from the mined out pits from ML-2 and also and reused in the process and /or for dust green belt water requirement is meet from Deccan Cements Limited :: Bhavanipuram EC No: F.No : J-11011/572/2007-IA II(I) suppression and green belt development and STP other plant related activities etc No process We have Zero discharge from our plant wastewater shall be discharge outside the premises. factory premises and ‘zero’ discharge shall be adopted. vii. Efforts shall be made to make use of rain water We are in the practice and balance water is harvested. If needed, capacity of the reservoir drawn from the Krishna River shall be made enhanced to meet the maximum water requirement. Only balance water requirement shall be met from other sources. viii. Greenbelt shall be developed in 33% of the We have well developed green belt in and project area within the plant premises with at around the plant as per the MoEF & CC least 10 meter wide green belt on all sides Part of the Telangana State Haritha Haram along the periphery of the project area, along program we are planning to plant 10,000 road sides etc. By planting native and board Sapling with the plant area Pics enclosed leaved species in consultation with local DFO and local communities as per the CPCB guidelines. ix. All the recommendations made in the charter Noted and under implementation on corporate responsibility for Environmental Protection (CREP) for the Cement plants shall be implemented. x. At least 2.5% of the total cost of project shall Details enclosed in Annexure-1 be earmarked towards the Enterprise Social commitment (ESC) based on local needs and actions plan with financial and physical breakup/details shall be prepared and submitted to the Ministry’s Regional Office. xi. The proponent shall prepare a detailed CSR Details enclosed in Annexure-2 plan for next 5 years for the existing –cum- expansion project , which includes village- wise , sector-wise (Health, Education, Sanitation, Health, Skill Development and infrastructure requirements such as strengthening of village roads , avenue plantation, etc) activities in consultation with local communities and administration. The CSR Plan will include the amount of 2% retain annual profit as provided for in clause 135 of the companies Act,2013 which provides for 2% of average net profit of previous 3 years towards CSR activities for life of the project . A separate budget head shall be created and the annual capital and revenue expenditure on various activities of the Plan shall be submitted as part of the compliance Report to RO. The details of the CSR plan shall also be uploaded on the company website and shall also be provided in the Annual report of the company. xii. The project proponent shall provide for solar Proposals and possibilities will be explored Deccan Cements Limited :: Bhavanipuram EC No: F.No : J-11011/572/2007-IA II(I) light system for all common area, street lights, and finalized as per the priority village, and parks around project area and maintain the same regularly. xiii. The project proponent shall provide for LED Phase wise change over is under process lights in their office and residential areas. (failure replacement is under implementation) xiv Provision shall be made for the housing of Noted (this is up gradation of existing plant construction labour within the site with all adopting latest development with minor necessary infrastructure and facilities such as rectification in the existing system there will fuel for cooking, mobile toilets, Safe drinking be no extra labour required and no labour water, medical health care crèche etc. The intensified job involved ). housing may be in the form of temporary structures to be removed after the completion of the project. B. GENERAL CONDITIONS: i. The project authorities must strictly adhere to Noted and will be complied the directions of the stipulations made by the Telangana the Telangana Pollution Control Board and Pollution Control Board and the State the State Government. in all respects Government. ii No further expansion or modifications in the Noted will be complied. plant shall be carried out without prior approval of the approval of the Ministry of Environment, Forest and Climate Change (MoEF & CC) iii At least four ambient air quality monitoring 3nos of Continuous ambient air quality stations should be established in the downward monitoring stations are in operation. direction as well as where maximum ground Data is uploaded to CPCB and SPCB 24 x 7 level concentration of PM10, PM2.5, SO2 and All stack emission are monitored (24x7) and NOx are anticipated in consultation with the uploaded the data to CPCB and SPCB and SPCB. Data on ambient air quality and stack six months reports are submitted regularly to emission shall be regularly submitted to this Regional Office. Third party monitoring is Ministry including its Regional Office at conducted quarterly and the reports are Chennai and the SPCB/CPCB once in six enclosed which are submitted regularly RO months. and SPCB. iv Industrial wastewater shall be properly Not applicable as Zero discharge from the collected, treated so as to conform to the plant. standards prescribed under GSR 422 (E) dated Domestic water is treated in the STP and 19th May, 1993 and 31st December 1993 or as used for the green belt development. amended form time to time. The treated wastewater shall be utilized for plantation purpose. v The overall noise levels in and around the plant Noted will be complied. area shall be kept well within the standards (85 Third party reports enclosed. dBA) by providing noise control measures including acoustic hoods, silencers enclosures etc. on all sources of noise generation. The Deccan Cements Limited :: Bhavanipuram EC No: F.No : J-11011/572/2007-IA II(I) ambient noise levels should conform to the standards prescribed under EPA Rules, 1989 VIZ. 75 dBA(day time) and 70 dBA(night time). vi Occupational health surveillance of the workers Noted and periodical medical checkup are shall be done on a regular basis and records carried out as per the factory act and record maintained as per the Factories Act. are available in Occupational health center vii The company shall develop rain water We have developed the rain harvesting harvesting structures to harvest the rainwater for structure with in the plant and same is utilization in the lean season besides recharging maintained and desilted periodically and the ground water table. Mine pit water is used for the plant operations viii The project proponent shall also comply with all Noted and under implementation. the environmental protection measures and Primary education is provided to surrounding safeguards recommended in the EIA/EMP villagers up to 10th class report. Further , the company must undertake Drinking water is provided nearby villages socio-economic development activities in the During summer water is catered to surrounding villages like community surrounding villages by tankers. development programmes, educational . programmes, drinking water supply and health care etc. ix Requisite funds shall be earmarked towards Noted and details enclosed in Annexure- 3 capital cost and recurring cost/annum for environment pollution measures to implement the conditions stipulated by the Ministry of Environment, Forest and Climate Change (MoEF& CC) as well as the State Government.