Catalogue of investment projects of the Republic of (Yakutia) Contents

Innovative projects Transportation industry

Mining industry Oil and gas industry

Agro-industrial Electrical energy industry and complex housing and utility complex

Tourism and recreation Construction complex complex

Public-Private Partnership

Territories of priority social and economic development

Contacts «…The Republic of Sakha (Yakutia) is the largest region of and one of its richest “natural treasuries”. It’s needless to say that stable and dynamic development of Yakutia is a key significance for both the Far Eastern District and the entire Russia...»

President of the Russian Federation Vladimir Putin

«…One of the main goals of the Government of the Republic of Sakha (Yakutia) is dynamic economic development by the means of creating comfortable conditions for investment and business activity...»

Head of the Sakha Republic (Yakutia) Egor Borisov Administrative and territorial division

Republic of Sakha (Yakutia) is the biggest region of the Russian Federation . The capital of the republic is . Yakutia is a region with a high level of resource and economic potential.

31

32 30

33 29 28

16

26 27

15 8 35

7 25 14

6 2 34 5 3 9 13 1 4 10 22 12 11 20

24 21 17 19

23 18 Administrative and territorial division

No. Name П/п Name 1 Yakutsk 18 2 Ust- 19 Olekminsky District 3 20 Verkhnevilyuysky District 4 Megino-Kangalassky District 21 5 Namsky District 22 6 Kobyaysky District 23 Lensky District 7 Tomponsky District 24 Mirninksy District 8 Oymyakonsky District 25 Oleneksky District 9 Ust-Maysky District 26 Anabarsky District 10 27 11 28 Ust-Yansky District 12 29 Abyisky District 13 Vilyuysky District 30 Allaikhovsky District 14 Zhigansky District 31 15 32 Srednekolymsky District 16 Momsky District 33 17 Aldansky District 34 Tattinsky District

No. Name 35 Eveno-Bytantaysky national District

Capital Yakutsk Head of the Republic of Sakha (Yakutia) Egor Borisov Population of the Republic of Sakha (Yakutia) 949 280 Official languages Russian and Sakha Ethnic composition Sakha, Russians and others Innovative projects Innovative projects

Creation of basalt high-technology complex on production of basalt and plastic composites in Yakutsk

2 474 M rubles 6.4 years

IRR 18.2% 2014 Project start date NPV 523.9 M rubles 1 100 M rubles Committed investment

Discount Разработана1 187 M проектная rubles rate 17.2% Required investment документация

Creation of the network of basalt plastic composites manufactures of basalt continuous fiber (BCF) – up to 2 200 tons per year and following nano-structured basalt plastic composites on its basis – up to 2 600 tons per year, concrete constructions and goods – 29 200 cubic meters, basalt foam-concrete blocks – up to 24 000 cubic meters, basalt plastic pipes – 55 000 basalt running meters per year, Project resume geonets (BCP) – up to 1400 square meters for the North of Russia. Project is based on Russian know-how and it is aimed on creation of the new generation of high technological goods for industrial, house and road construction.

Direct or debt investment Investor’s involvement level The Project is aimed to modernize construction sphere; it is aimed to the creation of new, innovative building materials types, to its massive integration and resolution of goals in 2 directions: ЦельThe Проекта Project’s – создание realization на принципах will allow государственно to create -частногоa new generationпартнерства ofнового more крупного qualitative, промышленногоmore durable, района price на-competitive, Дальнем Востоке innovative России на building базе имеющихся materials в .регионе гидроэнергетическихImplementation иof минерально Yakut Project-сырьевых and ресурсов: its scaling природного-up to газа,the Farапатитов, East угля,of Russia will Project relevance железных и урановых руд и других. contribute to the development of basalt composite materials, constructions and goods technologies and manufacturing.

Отведены земельные участки под промышленные объекты The necessary infrastructure is available. Required infrastructure development level

7 Innovative projects

Production of heat insulating materials on a basis of basalt fibers

870 M rubles 5 years

IRR 26.5% 2014 Project start date NPV 172 M rubles 522 M rubles Committed investment

Discount Разработана проектная rate 16.8% Required investment документация100 M rubles/year

Technologies of Basalt Materials LLC produces effective heat insulating materials on a basis of basalt fibers under the trademark “SAKHABASALT”. The company uses advanced technologies and state-of-the-art equipment. The project provides for creation of complex production of effective heat insulating and Project resume sound proofing materials on a basis of basalt fibers for construction industry and housing and utility sector of the Republic of Sakha (Yakutia).

Direct or debt investment Investor’s involvement level Modern production of heat insulating tiles makes it possible to resolve the following social and economic issues:  Heat insulating tiles can be used not only in winterization of walls and floors, but also as an effective option of timber strip. It helps to reduce cost of construction. ЦельIt Проектаmakes –possible создание toна iпринципахncrease государственноin the volume-частного of construction, партнерства новогоin particular крупного by the промышленного района на Дальнем Востоке России на базе имеющихся в регионе Project relevance гидроэнергетическихmeans of stimulating и минерально private- сырьевыхhousing ресурсов:construction природного. газа, апатитов, угля, железныхIt makes и урановых possible руд to и realize других. quality and available heat insulating and sound proofing materials with further access to the markets of neighboring regions and countries.

The Отведеныnecessary земельные infrastructure участки is под available. промышленные объекты

Required infrastructure development level ОАО «Корпорация развития Южной Якутии», 127473, Россия, г. Москва, ул. Селезневская, 11б тел. +7 (495) 232-42-44, факс +7 (495) 232-95-13 e-mail: [email protected] http://www.sy-corp.ru 8 Innovative projects

Production of alternative fuels on a basis of brown coal processing with application of rapid pyrolysis technology

275.4 M rubles 3.8 years

IRR 23.17% 2015 Project start date NPV 94 M rubles ̶ Committed investment

Discount rate 18 % Required investment 275.4 M rubles

Introduction of technology of unclaimed local hydrocarbon feed (brown coal, peat, etc.) processing on the territory of the Republic of Sakha (Yakutia) with the aim to produce local fuel and energy products (solid, gas, burning oil motor fuels) instead of Project resume expensive fuel and energy resources transporting to remote regions of Yakutia with the use of complicated logistic scheme.

Investment credit Project financing Investor’s Venture financing involvement level

The project relevance is related to necessity to resolve issues on seasonal delivery of fuel and energy resources to remote regions of Yakutia – Northern and Arctic regions of the republic by the means of application . Successful realization of the pilot project will allow to overcome this problem cardinally by the means of replication of the technology Project relevance in the Northern and Arctic regions which have coal deposits. Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, железных и урановых руд и других. The necessary infrastructure is available. Required infrastructure development level Отведены земельные участки под промышленные объекты

9 Transportation industry Transportation industry

Transport and logistic center in

3 B rubles 10 years

IRR 25.2% 2013 Project start date NPV 0.5 B rubles 0.3 B rubles Committed investment

Discount Разработана проектная 20% Required investment 1.4 B rubles rate документация

Construction of the transport and logistic center in Nizhny Bestyakh for maintenance of the republican freight traffic and interregional cargo traffic with possibility of additional Project resume placement of manufacturing sites with a total area of 50-60 ha.

Government investments– 1.3 billion rubles (construction of the project’s infrastructure)

Investor’s Private investments– involvement level 1.7 billion rubles

Realization of the project will contribute to implementation of projects on exploration of mineral potential of Yakutia which are of federal and international importance. It will assure year-round delivery of cargo on the whole territory of the Republic of Sakha Project relevance (Yakutia).

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного Theпромышленного necessary района infrastructure на Дальнем is Востокеavailable России partially на базе. There имеющихся is a land в регионе plot with area of 80 haгидроэнергетических next to railway stationи минерально “Nizhny-сырьевых Bestyakh ресурсов:” and природногоwith an access газа, апатитов, to federal угля, roads “” andжелезных “”, и урановых republican руд и других. road “” and riverbank of the Lena river. Phase 1 construction of railway of the transport and logistic center with length of 1 611.5 meters Required infrastructure is at the final stage. There are 2 sites for storage of oversize cargo with a total area of development level 3.15 ha. There are utility lines (electricity, gas). Отведены земельные участки под промышленные объекты

11 Mining industry Mining industry

Organization of gold mining in the Republic of Sakha (Yakutia)

1 037.9 M rubles 6 years

IRR 14.47% 2015 Project start date NPV 187.6 M rubles 93.6 M rubles Committed investment Разработана проектная Discount документация rate 10% Required investment 1 037.9 M rubles

It is planned to attract an investor to acting company with a 400-kg gold mining license for increase of gold mining. In 2014 the shareowner financed acquisition of exploration and mining license at the Acchygyi-Kumakh-Yuryui deposit. According to the plans, in 2015-2016 the company will attain exploration and mining Project resume license of 2 other deposits. In 2016-2017 the company plans to use its free cash flow and acquire license to mine gold in 1 medium-size and 1 big-size deposits. The company will get loan funds for deposits’ development. In 2019 the company will acquire 1 medium-size deposit of gold using its internal funds.

49% Investor’s involvement level

Huge resource potential and positive experience of gold mining in Ust-Yansky region of Yakutia will allow Yanolovo OJSC to realize the project successfully. Project relevance Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, железных и урановых руд и других.

The necessary infrastructure is available partially. Required infrastructure Отведены земельные участки под промышленные объекты development level

13 Mining industry

Construction of Phase 1 of the Tayozhnoe mining and processing plant on a base of the Tayozhnoe deposit

$343 M 28 years

IRR 14% 2014 Project start date NPV $20 M $148 M Committed investment

Разработана проектная Discount документация rate 12,2% Required investment $158 M

At the 1st stage of Tayozhnoe deposit development it is planned to build a mining and processing plant, transport, energy and basic infrastructure for further iron ore cleaning and iron-ore concentrate with a 3 million tones a year output. Project resume The 2nd stage considers enlargement of ore output to 16 million tones a year.

46% Investor’s involvement level

Currently a basic supplier of the iron-ore concentrate to the ZMSK (EVRAZ branch) is the Evrazruda (EVRAZ branch as well). In 2013 the Evrazruda shared 50% (3.8 million tones) out of total EVRAZ group iron-ore output. Project relevance Realization of the project is aimed at stable delivery of iron ore raw materials to the ZMSK – a plant of construction metal structure.

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, железных и урановых Theруд и necessary других. infrastructure is available partially. Required infrastructure development level

14 Mining industry

Development of the Inaglinsky coal complex

$1.488 M 9.1 years

IRR 21,3% 2013

Project start date NPV $884 M ̶ Committed investment

Discount rate 12% Required investment 18 B rubles

Construction of industrial sites within a in-mine coal pit “Inaglinskaya” with a 3 million tones a year output, ore-dressing plant on production of coal concentrate and sites of Project resume internal infrastructure.

As agreed Investor’s involvement level

Inaglinsky coal complex will create new work places, ensure increase of employment level of the region and raise of tax proceeding. Project relevance

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, железных и урановых Theруд и necessary других. infrastructure is available partially. Required infrastructure development level

Отведены земельные участки под промышленные объекты

15 Mining industry Construction of Elginsky coal complex

354.9 B rubles 15 years

IRR 17.7% 2008 Project start date NPV 190.6 B rubles 75.2 B rubles Committed investment

Discount 9.8% Разработана279.7 проектнаяB rubles rate Required investment документация

Project on development of the Elginsky coal deposit situated in the Southern-East part of the Republic of Sakha (Yakutia), considers a stage-by-stage creation of facilities on extraction and enrichment of soldering and steaming coals and their delivery to consumers in the Russian Federation and export to the countries of the Asia-Pacific Project resume region. Project is realized in the frames of adopted Long-term Program of the Russian Coal Industry Development up to 2030. It has nationwide value. As result of the project realization Russia will create a new world center of coal mining in the .

As agreed Investor’s involvement level

Realization of the project will ensure: • acceleration of socioeconomic development of and the Russian Far East; • creation of a new world center of coal mining in the Russian Far East aimed at extraction, enrichment and transportation of coal; • increase of export of soldering and steaming coal to the countries of the Asia-Pacific regionЦель Проекта; – создание на принципах государственно-частного партнерства нового крупного •промышленного construction ofрайона infrastructure на Дальнем for Востоке further России development на базе имеющихся of mineral в регионе resources in the Far Project relevance Eastгидроэнергетических of the Russian и Federationминерально-;сырьевых ресурсов: природного газа, апатитов, угля, •железных meeting и perspectiveурановых руд requirementsи других. of the Russian metallurgy industry in high quality coking coal; • creation of more than 10 000 new work places in 4 regions of the Russian Far East; • use of open-cut method to ensure avoiding risks related with underground mining method and minimization ofОтведены expenditures земельные; участки под промышленные объекты • attraction of mainly Russian contractors and equipment suppliers.

The necessary infrastructure is available partially. The projects includes: • Construction of permanent rotation camp – 3 billion rubles Required infrastructure• Construction of HV line and 2 electrical substations: substation “Promploschadka” and substation “Gornaya” – 2.8 billion rubles development level

16 Oil and gas industry Oil and gas industry

Exploration and commercial development of the Zapadno- Anbarsky licensed area of the Republic of Sakha (Yakutia)

11 years (oil) 4 565.5 M rubles 6.8 years (gas) 29.8% (oil) IRR ̶ 47.5% (gas) Project start date

192 013 M rubles (oil) NPV 250 M rubles 102 602 M rubles (gas) Committed investment

Discount ̶ Required investment Разработана проектная rate документация4 315.5 M rubles

Project is aimed at economically effective commercial development and realization of large-scale oil and gas production at the Zapadno-Anabarsky licensed area of the Republic of Sakha (Yakutia). Project resume The licensed area is situated in 8 km from the Nordvik bay in the . Logistics of the project is related with development of the Northern sea route and connection to the pipeline system “Eastern Siberia – Pacific Ocean”.

80% Investor’s involvement level

The Republic of Sakha (Yakutia) is one of the most perspective regions of the Russian Federation on realization of large-scale oil and gas projects related to development of Arctic territories of Russia. Project relevance Unique oil and gas resources create favorable forecast for oil processing industry.

The necessary infrastructure is available partially. There is an opportunity to deliver cargo to the licensed area by the means of sea, river and automobile transport (in winterЦель Проекта time). –Automobile создание на transportпринципах toгосударственно Olenek airport-частного and партнерстваhelicopter transportation нового крупного to the промышленного района на Дальнем Востоке России на базе имеющихся в регионе licensed area are available. Required infrastructure гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, It is required to construct sea and river moorings and to build a road “Olenek – development level железных и урановых руд и других. Yuryung-Khaya – Lincensed area”.

18 Oil and gas industry

Reconstruction of petroleum storage complex in Nizhny Bestyakh of the Republic of Sakha (Yakutia)

439.2 M rubles 7 years

IRR 37.3% 2014 Project start date NPV 264 M rubles 26.5 M rubles Committed investment

Discount Разработана проектная документация rate 10% Required investment 329.4 M rubles

Creation of strategic logistic hub in Nizhny Bestyakh is aimed at year-round delivery of petroleum items to the Republic of Sakha (Yakutia) in addition to current input terminal of fuel delivery to the Republic of Sakha (Yakutia) at Ust-Kut (Irkutsky oblast). The project includes the following subprojects: Project resume 1. Construction of railside petroleum storage. 2. Technical upgrade of the current petroleum storage complex. 3. Modernization of mooring of the petroleum storage: at the stage of development. Initiator of the project looks for long-term loan funds for realization of the project.

25% - equity capital 75% - loan funds Investor’s involvement level

Reconstruction and modernization of the petroleum storage complex of the Tuymaada- neft oil company OJSC will lead to increase throughput of petroleum items from 23 tones to 73 tones and will ensure reception of 4 petroleum tankers. Modernization of mooring will ensure full-time work of the petroleum storage, and it will Project relevance Цель Проекта – создание на принципах государственно-частного партнерства нового крупного becomeпромышленного an alternative района на to Дальнем the Ust Востоке-Kut petroleum России на storageбазе имеющихся complex в .регионе гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, железных и урановых руд и других. Tuymaada-neft oil company OJSC owns the petroleum storage complex with capacity of 50 000 tones. There is a land with a total area of 22 848 thousand square meters. It is situated on the railside. Next to Nizhny Bestyakh there are 2 federal roads M56 “Lena” and “Kolyma”, 1 republicanОтведены road земельные “Amga” участки. под промышленные объекты Required infrastructure The site is included in the republican goal-oriented program “Transport strategy of the development level Republic of Sakha (Yakutia)”.

19 Oil and gas industry

Construction of Yakutsky oil refinery ( city)

$1 952 M 5 years

IRR 106.7% 2015 Project start date NPV 125 279 M rubles 10.2 M rubles Committed investment volume

Discount 10% ̶ rate Required investment volume

Construction of oil refinery with the use of licenses of leading world engineering contractors meeting all up-to-date requirements and standards. Conversion rate of raw petroleum – 96 Project resume Nelson complexity index – 9.4 Capacity – 2 million tones of oil a year.

Direct and debt investment Investor’s involvement level

Construction of oil refinery will allow to reduce fuel price and transport expenses on delivery of petroleum items to central and northern regions of the Republic of Sakha (Yakutia). Project relevance

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе Oilгидроэнергетических refinery placement и минерально (Aldan -сырьевыхcity) was ресурсов: chosen природного because газа,of availability апатитов, угля, of necessary infrastructureжелезных и урановых – oil and руд иgas других. pipelines, railway and automobile roads Required infrastructure development level

20 Agro-industrial complex Agro-industrial complex

Construction of a year-round greenhouse complex of Yakutsk city

109.3 M rubles 4 years

IRR 22.8% 2016 Project start date NPV 29 M rubles 9 M rubles Committed investment volume

Discount Разработана98 M rubles проектная rate 12% Required investment volume документация

Technical upgrade of the greenhouse complex on cultivation of vegetables, lettuce, flowers, seedlings of flowers (settlement gardening of Yakutsk), trees and bushes, soft wood growing with the use of hydroponic solutions (for process acceleration). Project resume The greenhouse complex including office, storage and service buildings occupy 3000 square meters area in district of Yakutsk.

80% of infrastructure sites construction Investor’s involvement level

A year-round provision of vegetables and flowers to consumers from Yakutsk and nearest regions. Development of settlement gardening in Yakutsk. Project relevance

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, железных и урановыхConstruction руд и других. of engineering infrastructure is required. Required infrastructure development level

22 Агропромышленный комплекс

Expansion of existing small series production of year-round cultivation of herbs, fruits and vegetables in the Far North

32.8 M rubles 3 years

IRR 63.7% 2015 Project start date

NPV 38 M rubles 12.8 M rubles Committed investment

Discount 18% Разработана20 M rubles проектная rate Required investment документация

The project's aims are expansion of existing small series production of hydroponic cultivation of herbs, fruit and vegetables in a small enclosed space and reduction of the cost of farmed products. Implementation of the project will provide year-round access to the cheap and high-quality herbs and fruits, that have limited shelf life, to the residents Project resume of the Republic of Sakha (Yakutia) . It is different types of greens (lettuce, dill, parsley, chives, mint, basil, etc.), berries (strawberries, raspberries) and vegetables (cherry tomatoes, gherkins).

61% Investor’s involvement level

Currently, it is a classic innovative start-up project, which has: - a demand for the products of the project which significantly exceeds the available supply; - Great potential for development of production is based on current needs of the regional market in the product and on the possibility of expansion of the product line Project relevance (new types of greens and berries, growing of certain varieties of cucumbers, tomatoes and other vegetables).

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минеральноRequired-сырьевых infrastructure ресурсов: природного is available газа, апатитов, угля, железных и урановых руд и других. Required infrastructure (existing production facility with a small volume of sales of finished products, development level about 60-70 thousand rubles per month).

23 Agro-industrial complex

Factory extension and reconstruction of the Neryungrinskaya poultry factory OJSC: broiler farming up to 6300 tones of dressed weight a year

959.3 M rubles. 3.8 years

IRR 39% 2014 Project start date NPV 571 M rubles 408.7 M rubles Committed investment

Discount 10% 550Разработана.6 M проектная rubles rate Required investment документация

Project includes construction of 14 sites and reconstruction of 3 sites at 2 areas: - 1st area for feeding chickens and dressing section *construction of 4 feeding sections, sanitary inspection section; *reconstruction of incubatory section, killing room and utilization section; Project resume - 2nd area for housing of rearing flocks and parents flocks * Construction of 2 sections for housing of rearing flocks, disinfection section, 4 sections for housing of parent flocks, 2 sanitary inspections sections.

57% Investor’s involvement level

Realization of the project will meet growing demand of the Republic of Sakha (Yakutia).

Project relevance

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района наThe Дальнем necessary Востоке infrastructure России на базе isимеющихся available в. регионе Required infrastructureгидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, development level железных и урановых руд и других. Отведены земельные участки под промышленные объекты

24 Agro-industrial complex

Modernization of leather and footwear, fur production facilities

186.84 M rubles 2.9 years

IRR 31.19% 2015 Project start date

NPV 81.6 M rubles 36.84 M rubles Committed investment

Discount Разработана проектная rate 15% Required investment документация150 M rubles

Reconstruction of leather and footwear production facilities, purchase and modernization of equipment for increase of production volume of high quality fur products on the basis of industrial technology and also leather goods of Sakhabult Project resume OJSC for domestic and foreign markets.

50% Investor’s involvement level

Modern tendencies of the leather and footwear and fur production development have wide prospects of exploitation with orientation on the commercial success. Sakhabult OJSC makes provision for modernization of production process and produced products providing at the same time modernization of functional Project relevance characteristics of the product for satisfaction of the citizens needs in high quality goods made of leather and fur. Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, железных и урановых руд и других.

The necessary infrastructure is available. Required infrastructure development level Отведены земельные участки под промышленные объекты

25 Agro-industrial complex

Organization of agricultural products freeze-drying in the Republic of Sakha (Yakutia)

83.9 M rubles 5 years

IRR 17.73% 2015 Project start date NPV 0.74 M rubles 19.9 M rubles Committed investment

Discount 17% Required investment 64 M rubles rate

Overhaul of industrial premises of Taba CJSC, purchase, installation and adjusting of production and processing equipment, production and sale of freeze-dried products Project resume made of local raw materials.

76,2% Investor’s involvement level

The main advantages and benefits of this project are contingent on the correct geographic location based on the natural resource base, ecological purity, richness and diversity of flora and fauna of the Republic of Sakha (Yakutia), which leads to the high level of biologically active substances in the sublimated finished product, which allows Project relevance to enter the market with competitive products.

InfrastructureЦель Проекта – isсоздание available на :принципах государственно-частного партнерства нового крупного -промышленногоproduction районаbase inна ДальнемYakutsk Востоке with wellРоссии-developed на базе имеющихся infrastructure в регионе and autonomous гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, heating system. Required infrastructure железных и урановых руд и других. Repair works of existing infrastructure are required. development level

26 Agro-industrial complex

Expansion and reconstruction of Khatasskiy pig-breeding complex up to 1512 productive sows

2 150.6 M rubles 7.3 years

IRR 22.11% 2015 Project start date NPV 366.5M rubles ̶ Committed investment

Discount 11.46% Required investment 2 150.6 M rubles rate

Complete reconstruction and modernization of production buildings of the Pig-breeding complex and integrated development of biological waste disposal issues, construction Project resume of feed mill, grain storage, slaughtering and meat processing.

100% Direct and debt investment Investor’s involvement level

Cost-effectiveness of the project is conditioned by: • organization of modern high-tech and economically viable production; • introduction of modern intensive technological and technical solutions of breeding, Project relevance slaughter and processing of raw meat of pigs; • improving product quality while reducing its cost.

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного Requiredпромышленного infrastructure района на Дальнемis available Востоке: России на базе имеющихся в регионе -гидроэнергетических2 high-voltage lines и минерально with installed-сырьевых capacity ресурсов: – 1493 природного kw; газа, апатитов, угля, железных и урановых руд и других. - gas supply with the gas flow rate – 1226.18 cbm per hour; Required infrastructure - Sanitary protection zone – 1000 m; development level - etc.

27 Agro-industrial complex

“Pokrovskiy” Greenhouse Complex

503 M rubles 7.4 years

IRR 25.6% 2015 Project start date NPV 120 M rubles 17 M rubles Committed investment

Discount 16.18% Required investment Разработана352.2 M проектная rubles rate документация

The aim of the project is creation of the first in Yakutsk and the Republic of Sakha (Yakutia) high-tech greenhouse complex designed for year-round operation with effective area of 1.5 hectares and an annual production capacity up to 1,162 tons of vegetables and herbs. Project resume Construction of the greenhouse complex is expected to be performed in the area located near Ulah-An village of Khangalasskiy District which is situated 64 km from Yakutsk.

70% Investor’s involvement level

During the project implementation it will become possible to provide quality fresh vegetables (tomatoes, cucumbers and greens (lettuce, dill, parsley, basil, and others)) to the population of Yakutsk and the surrounding areas, as well as to catering facilities, Project relevance preschools and schools.

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, железных и урановых руд и других. Engineering infrastructure construction is required. Required infrastructure development level

28 Electrical energy industry and housing and utility complex Electrical energy industry and housing and utility complex

Project of change-over of boiler-houses to gas fuel in 6 districts of the Republic of Sakha (Yakutia) in 2015-2017

925.6 M rubles 5 years

IRR 28% 2015 Project start date NPV 938.3 M rubles ̶ Committed investment

Discount 10% Required investment Разработана925.6 M проектная rubles rate документация

Optimization of the fuel balance shall be provided by the change-over of boiler-houses to gas fuel in areas of centralized gas supply according to the State program "Gasification of settlements and ensuring the reliability of gas facilities of Sakha (Yakutia) for 2012-2016". Project resume In the period of 2015-2017 will be gasified settlements of the Verkhnevilyuiskiy, Gorniy, Megino-Kangalasskiy, Churapchinskiy and Ust-Aldanskiy districts.

100% Investor’s involvement level

According to the Decree of the Government of the Republic of Sakha (Yakutia) of 22.05.2014 № 504-р "On gasification financing of settlements and ensuring of reliability of gas facilities in 2014-2016", the gasification will be held in 18 localities. Project relevance

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических иThe минерально necessary-сырьевых infrastructure ресурсов: isприродного available газа, partially. апатитов, угля, Required infrastructure железных и урановых руд и других. development level

30 Electrical energy industry and housing and utility complex

Creating of a pilot prototype of an arctic power-engineering complex for production of energy and carbon materials from local coal in the Republic of Sakha (Yakutia)

202 M rubles 5.41 years

IRR 25% 2015 Project start date NPV 254.55 M rubles 1 M rubles Committed investment

Discount 10% Required investment Разработана201 M проектнаяrubles rate документация

This project aims to create a production of coal briquettes made of coal from the Sangar coal deposit located in Kobyayskiy district of the Republic of Sakha (Yakutia). The plant capacity is 70 t/h (150 000 t/year). Project resume

100% Investor’s involvement level

In connection with the problem of exhaustion of Dzhebariki-Haya coal field and the need of developing of new fields in the coal-bearing area, that will undoubtedly lead to higher prices for the cost of coal and, as a consequence, increase of the cost of public utility services provided to the population, who uses coal of Dzhebariki-Haya coal field Project relevance as a boiler fuel, the need of searching of alternative fuel became necessary.

Цель Проекта – создание на принципахRequired государственно infrastructure-частного is available. партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе Required infrastructure гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, development level железных и урановых руд и других.

31 Electrical energy industry and housing and utility complex

Creation of a production of a new type of fuel (peat) in conditions of the Far North including approbation and adaptation of the specialized equipment

279.582 M rubles 6 years IRR 26.4% 2015 Project start date NPV 457.844 M rubles Committed investment 7.010 M rubles

Discount Required investment rate 15% Разработана272.572 проектная M rubles документация Reducing the cost of fuel for boilers by reducing transportation leg and increasing reliability of ensuring with fuel and energy resources for boiler-houses of branch of State Unitary Enterprise "Housing and Utility Services of the Republic of Project resume Sakha (Yakutia)”. Creation of a production of a new type of fuel (peat) in conditions of the Far North including approbation and adaptation of the specialized equipment.

100% Investor’s involvement level

The main reason for the start of the project is the complicated transportation and logistic scheme of delivery of coal for boiler-houses of Verkhoyanskiy district. Common path from the quarry to the boiler-houses takes 2 years. Also, this logistics scheme causes a considerable percentage of loss during transportation of coal (approx. 22%). And, as a consequence, transportation component of the final cost of coal is several Project relevance times higher than the purchase price. Also, in recent years, the population faced with the problem of depletion of Dzhebariki- Haya coal field which currently fueled the boiler-houses of Verkhoyanskiy district.

Цель Проекта – создание на принципахRequired государственно infrastructure-частного is available. партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе Required infrastructure гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, development level железных и урановых руд и других.

32 Electrical energy industry and housing and utility complex

Construction of 220 kV Mirniy-- HV line (3rd and 4th starting complexes)

5145.55 M rubles 11.3 years

IRR 11.5% 2015 Project start date NPV 289 M rubles 150 M rubles Committed investment

Разработана проектная Discount 10% документация4995.55 M rubles rate Required investment

Along with the implementation in the Republic of Sakha (Yakutia) of large investment projects of the ore mining and diamond industries it has been revealed a significant lag in the development of energy infrastructure. The need of construction of the high- voltage power lines has appeared. Construction of 220 kV Mirniy-Suntar-Nyurba HV line (3rd and 4th starting complexes) Project resume includes following parts: - 220kV Suntar-Nyurba line segment with total length 151 km; - “Nyurba” 220/110/35/6 kV electrical substation, 110 kV additional lines entry and reconstruction of “Suntar” 220/110/35/6 kV electrical substation.

100% loan funds Investor’s involvement level

Construction of 220 kV Mirniy-Suntar-Nyurba HV line will ensure qualitative and uninterrupted power supply of the citizens and industrial consumers of the ore mining and diamond cluster. Also, the project implementation will allow to load surplus energy capacities of Project relevance hydroelectric power plants and will allow to remove the existing network limitations and ensure the use of electricity for heating. Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, железных и урановых руд и других. In 2002 and 2010 the construction of 1st and 2nd starting complexes was finished: - Construction of 220 kV HV line from 220 kV “Rayonnaya” electrical substation in Mirniy to Krestyakh village – 131 km and construction of 220 kV HV line from Required infrastructure 20/110/235/6 kV “Suntar” in Krestyakh village to Suntar village – 81 km. development level Отведены земельные участки под промышленные объекты

33 Electrical energy industry and housing and utility complex

Reconstruction of diesel power plant in Batagai village of Verkhoyanskiy District of the Republic of Sakha (Yakutia)

1530 M rubles 7,65 years

IRR 13% 2016 Project start date NPV 1234.6 M rubles 17.3 M rubles Committed investment

Разработана проектная Discount 10% документация711.7 M rubles rate Required investment

Reconstruction of the existing diesel power plant is needed to ensure synchronous operation with solar power plant. To reduce operating costs in the development of electric power it is planned to use heavy fuel (petroleum). Also there is the possibility of Project resume using recovered heat for heat supply of consumers from Batagai. Operation of this kind of automated power plants are well established under conditions of arctic winter.

100 % loan funds Investor’s involvement level Reconstruction and modernization of diesel power plant will provide increase of reliability and quality of electricity supply to consumers from Batagai of Verkhoyansky District and will allow to reduce significantly operating costs by reducing the cost of diesel fuel to generate electricity. Also it will allow to provide parallel operation with the planned construction of a solar Project relevance power plant. Moreover there is a possibility of using waste energy. Using of the heat energy after working in installations for the production of electricity also will reduce operating costs by closing existing boiler. Цель Проекта – создание на принципах государственно-частного партнерства нового крупного Currently,промышленного there района are на12 Дальнем units of Востоке diesel России generators на базе ofимеющихся 1973, 1982 в регионе, 1990 , 1994, 2006 releaseгидроэнергетических in Batagai и .минерально Diesel generators-сырьевых ресурсов: have becomeприродного obsolete, газа, апатитов, both угля, morally and physicallyжелезных и. урановыхSynchronous руд и других.operation of such kind of diesel generators with solar power is Required infrastructure impossible without changing the automation systems of diesel engines, which in turn development level will require reconstruction and modernization of the diesel generators.

34 Electrical energy industry and housing and utility complex

Reconstructon of heating network in village of Ust-Yansky District of the Republic of Sakha (Yakutia)

378.90 M rubles 7.37 years

IRR 16.1% 2016 Project start date NPV 200.9 M rubles ̶ Committed investment

Discount 13% 378.90 M rubles rate Required investment

As part of the reconstruction of heating networks in Deputatsky village it is planned holding of the following activities: - Reconstruction of heat supply networks and cold water supply networks using steel (for water pipe - galvanized steel) pipes covered with polyurethane foam insulation with a low coefficient of thermal conductivity with galvanized metallic covering. To prevent Project resume freezing, water supply pipeline should be combined with the heating system return line with common thermal insulation, using the technology of twin pipes with digital operational remote monitoring of pre-insulated pipeline; - Installation of block individual heat points (BITP) with the exception of hot water pipelines for consumers.

100% Investor’s involvement level

Reconstruction of heating networks in Deputatsky village will provide reliable and quality thermal and water supply to consumers. It will significantly reduce the operating costs by reducing heat energy losses, will allow to make lower fuel consumption and to solve problems of hot water supply networks thanks to installation of individual heating Project relevance stations. Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе Currentlyгидроэнергетических electric, heatingи минерально and -сырьевыхwater supply ресурсов: in Deputatsky природного газа,village апатитов, is provided угля, by mini- TPPжелезных (thermal и урановых power руд plant) и других. with installed power capacity 7.5 MW and thermal capacity 76.4 Gcal / h. Required infrastructure Heating networks and the hot and cold water networks were built in 1986. At the development level moment, the heat loss is about 40%. Отведены земельные участки под промышленные объекты

35 Electrical energy industry and housing and utility complex

Reconstruction of diesel power plant in Khonu village of Momsky District of the Republic of Sakha (Yakutia)

917.5 M rubles 9.83 years

IRR 11% 2016 Project start date NPV 205.8 M rubles 12.7 M rubles Committed investment

Discount Разработана проектная документация rate 10% Required investment 326.5 M rubles

As part of the reconstruction of the diesel power plant with an installed capacity 5 MW it is planned to install an automated power station on heavy fuel (petroleum). Also there is a possibility of using recovered heat for heat supply of consumers from Khonu. Project resume Operation of this kind of automated power plants are well established under conditions of arctic winter.

100 % loan funds Investor’s involvement level Reconstruction and modernization of diesel power plant will provide increase of reliability and quality of electricity supply to consumers from Khonu of Momsky District and will allow to reduce significantly operating costs by reducing the cost of diesel fuel to generate electricity. Also it will allow to provide parallel operation with the planned construction of a solar power plant. Project relevance Moreover there is a possibility of using waste energy. Using of the heat energy after working in installations for the production of electricity also will reduce operating costs by closing existing boiler. Цель Проекта – создание на принципах государственно-частного партнерства нового крупного Requiredпромышленного infrastructure района на Дальнемis available Востоке (5 России units наof базе diesel имеющихся generators в регионе released in 1977, гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, 1981железных, 1983 и урановых, 1985, 1986руд и других.are currently being used at diesel power plant of Khonu village, the main production building consists of 2 machinery rooms. There is an unfinished Required infrastructure building for the new diesel power plant near the old, but the works were cancelled in development level the early 90s).

Отведены земельные участки под промышленные объекты

36 Tourism and recreation complex Tourism and recreation complex

“North World” Special Economic Zone for tourism and recreation

4 409 M rubles 6 years

IRR 15,81% 2013 Project start date

NPV 914 586 M rubles 636,6 M rubles Committed investment

Discount rate 19% Required investment 3 772,4 M rubles

Formation of interbranch complex causing fold increase of inbound and outbound tourism in the Republic of Sakha (Yakutia). Creation and development of highly effective and competitive tourist complex that meets the requirements of the tourism Project resume industry world market and corresponds provisions of the ideology of sustainable development.

53,4% Investor’s involvement level

Extremely low temperatures, permafrost and mineral springs are unique tourism and recreation service resources and all available in one place – in the Republic of Sakha (Yakutia). Project relevance

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, железных и урановых руд иRequired других. infrastructure partially available Required infrastructure development level

38 Tourism and recreation complex

“Orto Doydu” tourism and recreation cluster

1313 M rubles 5 years

IRR 24% 2016 Project start date NPV 200 M rubles ̶ Committed investment

Разработана проектная Discount документация 18% Required investment 328,2 M rubles rate

The project aims construction of following ethno-themed objects: Yakutian Longevity Centre, “13 months” Children Ethnographic Complex, Four Seasons Pavilion, “Kut-Syur” Spiritual Renovation Centre, “Aal Luuk Mas” Building with Panoramic View and café, “Ayikhyt”, “Yeyekhsit”, “Jayogyoi” Family Ritual Complex, “Khotoy Ayii”, “Aan Jyahyn”, “Kharyga Suorun” Fortitude Education Centre, “Bilgye, Project resume Tankha, Gylgkha”, “Odun Khan, Genghis Khan” Astrological Forecast Centre, Ethnic Ritual Centre for Special Events, “Gyohyogyoyi” Equestrian Tourism School and “Orto Doydu” Hotel for 50 guests at one time.

75% Investor’s involvement level

Use of traditional beliefs of the Sakha people and also unique ethno cultural peculiarity and legacy of the indigenous population of Yakutia for organization and providing of Project relevance tourism and recreation service to citizens and tourists.

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе Requiredгидроэнергетических infrastructure и минерально ispartially-сырьевых available ресурсов: (“Orto природного Doydy” газа,Zoo, апатитов, “Orto Doydy угля, ” Cultural andжелезных Ethnographic и урановых Complex, руд и других. “Tekhtur ” Sports and Entertainment Complex). Required infrastructure development level

Отведены земельные участки под промышленные объекты 39 Construction complex Construction complex

Residential development of 84th block of Yakutsk city

7 846,3 M rubles 4,4 years

IRR 28% 2014 Project start date NPV 708,6 M rubles ̶ Committed investment

Discount rate 12% Required investment 7 846,3 M rubles

Integrated solution of problems of the 84th block of Saysarskiy district of Yakutsk city concerning resettlement of citizens from dilapidated wooden housing into the new Project resume stone houses with modern engineering life-support system and public amenities.

100% Investor’s involvement level

Formation of the modern housing and improvement of living conditions of more than eight thousand inhabitants of Yakutsk; Infrastructure development of the part of the Stroitelniy Okrug (district) of Yakutsk city; Improvement of areas surrounding to the construction sites; Project relevance Improvement of the crime situation in the Stroitelniy Okrug (district) of the Yakutsk city; development of the construction complex of Yakutsk city

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, железных и урановых рудRequired и других. infrastructure partially is available. Measures on the construction site preparation are required. Required infrastructure development level

41 PPP projects Public-private partnership projects

Construction of the 150-bed Cardiovascular Centre in Yakutsk

3 752 M rubles 11 years

IRR 15% 2016 Project start date

3752 M rubles Required investment

The project aims construction of modern 150-bed Cardiovascular Centre with specialized departments. Total area is 18 000 square meters. Project resume

100% Investor’s involvement level

Diseases of the cardiovascular system occupy a leading place in the structure of morbidity of the population of the Republic of Sakha (Yakutia), and to a large extent determine the level of temporary and permanent disability and mortality. In case of realization of the construction project of modern Cardiovascular Centre, the Project relevance favorable conditions for the reduction of the incidence of the region through the implementation of best practices for the prevention and treatment of cardiovascular diseases will be created.

Design-estimate documentation is available. LandЦель Проектаplot for –the создание project на implementation принципах государственно is available-частного at the партнерства Republic новогоof Sakha крупного (Yakutia), Yakutsk,промышленного 4th km района of the на Sergelyakhskoye Дальнем Востоке России Highway на базе имеющихся в регионе Required infrastructure гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, development level железных и урановых руд и других.

Отведены земельные участки под промышленные объекты

43 Public-private partnership projects

Construction of 210-bed Abalakh Multi-Functional Rehabilitation Centre in the Republic of Sakha (Yakutia)

1 845 M rubles 11 years

IRR 15% 2016 Project start date

1875 M rubles Required investment

The project envisages the creation of a modern Multi-Functional Rehabilitation Centre in the Republic of Sakha (Yakutia) for the treatment and rehabilitation of patients using Project resume latest advances in medical science and practice.

100% Investor’s involvement level

The current situation in the Republic of Sakha (Yakutia) is characterized by the unavailability of rehabilitative care for patients with the most common and, at the same time, disabling diseases of the nervous, cardiovascular, musculoskeletal system and cancer. The lack of a systematic approach to the organization of the provision of rehabilitation assistance to the population, the shortage of hospital beds to assist with Project relevance medical rehabilitation for both adults and children, the extreme shortage of outpatient forms of rehabilitation assistance became the reason of high level of mortality in the Republic of Sakha (Yakutia).

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного Landпромышленного plot for the района project на Дальнемimplementation Востоке России is available на базе atимеющихся the Republic в регионе of Sakha (Yakutia), Meginoгидроэнергетических-Kangalasskiy и минерально District, Nizhniy-сырьевых Bestyakh ресурсов: village природного. газа, апатитов, угля, железных и урановых руд и других. Required infrastructure Curative mud deposits and mineral water wells are available. development level Отведены земельные участки под промышленные объекты

44 Public-private partnership projects

Construction of school educational institutions in the Republic of Sakha (Yakutia)

8 043 M rubles 10 years

IRR 15% 2015 Project start date

8043 M rubles Required investment

The project involves the design, construction and full provision of necessary equipment for 44 objects of general educational institutions in the Republic of Sakha (Yakutia), as Project resume well as the technical exploitation of the facilities.

100% Investor’s involvement level

According to the Article 43 of the Constitution of the Russian Federation, general access and free pre-school, secondary and secondary vocational education in State and municipal educational institutions and at enterprises shall be guaranteed to all Russian citizens. According to the Article 5 of the Russian Federation Law “On Education” of 10.07.1992 Project relevance №3266-1, the Government should provide to the citizens their right of education through creation of educational system and proper socio-economical conditions for the education.

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минерально-сырьевыхLand plots ресурсов: are available. природного газа, апатитов, угля, Required infrastructure железных и урановых руд и других. development level

45 Public-private partnership projects

Construction of the “IT-Park” High-Tech Park in Yakutsk

1200 M rubles 11 years

IRR 15% 2016 Project start date

1200 M rubles Required investment

The project involves a construction of the IT-Park building with a total area of 21,000 sq.m with 12 to 15 floors and its equipping with the necessary equipment to ensure interaction between the participants of the market of high technology involved in Project resume production, consumption and redistribution of the ICT-products.

100% Investor’s involvement level

The project of IT-Park construction is the only one in this sphere in the Far East and could provide perspective access to the intellectual market of the region with minimal competitive risk. Project relevance Construction of IT-Park is designed to ensure the most favorable conditions for start-up projects and emerging IT-companies in the Republic of Sakha (Yakutia).

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетическихLand plot for the project и минерально implementation-сырьевых ресурсов:is available природного at the Republic газа, апатитов, of Sakha угля, (Yakutia), железныхYakutsk, иBlock урановых 68 ofруд Avtodorozhnaya и других. st. Required infrastructure Total area is 12 111 square meters. development level

46 Public-private partnership projects

Construction, reconstruction and exploitation of the heat supply objects in , Municipal District "Lenskiy rayon" of the Republic of Sakha (Yakutia)

238 M rubles 10 years

IRR 15% 2015 Project start date

238 M rubles Required investment

Construction of 2 water supply wells, 6 local wastewater treatment plants, 3 makeup tanks, boiler heating networks with a total length of 42.1 km. Reconstruction of 8 boilers and exploitation of heat supply facilities in Lenskiy District Project resume "Lenskiy Rayon" of the Republic of Sakha (Yakutia).

100% Investor’s involvement level

The need for reconstruction is due to results of a technical survey, which revealed a number of shortcomings of boiler-houses located in Lensk. Identified deficiencies do not conform the requirements for the boiler-houses to ensure quality housing and communal services. Project relevance Construction of new heating networks will provide superior market coverage and also will have a positive impact on the expansion of the settlement.

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минерально-сырьевыхLand plots ресурсов: are available. природного газа, апатитов, угля, железных и урановых руд и других. Required infrastructure development level

47 Territories of priority social and economic development TPSED

Creation of the Territory of Priority Social and Economic Development in Nizhniy Bestyakh of the Republic of Sakha (Yakutia) – “Zarechye” TPSED

157.986 B rubles 101.8 B rubles Required investment

The aim of the "Zarechye" TPSED is realization of a new type of urban policy - the creation of a full-fledged industrial center in the Far East aimed at attracting of the direct investment for the development of gas processing and gas chemical complex of the Republic of Sakha (Yakutia). Implementation of the project pursues the development of the priorities of TPSED in the Project resume field of gas chemistry and gas processing by implementing projects for the construction of plant for production of methanol and LNG and plant for production of urea, as well as the creation of social infrastructure in TPSED.

62% (in case of the project realization without support of the republican budget) 61% (in case of construction of social infrastructure outside of TPSED, Investor’s causing financial allocations from the budget of the Republic of Sakha (Yakutia)) involvement level

The creation of the territory of priority social and economic development is primarily aimed at creating conditions for accelerated development of new export-oriented productions for gas processing and gas chemical industry, which will create an efficient platform for long-term development of industrial potential of the Republic of Sakha Project relevance (Yakutia) and will create conditions for increasing of ratio of the added value in the price of products, which left in the region, that shall provide the growing needs of Russia in the polymer products and liquefied natural gas and the enter of the large deliveries for the growing markets of the Asia-Pacific region.

Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, железных и урановых руд и других. Required infrastructure is partially available. Required infrastructure development level Отведены земельные участки под промышленные объекты

49 TPSED

Creation of “Basalt – New Technologies” the Territory of Priority Social and Economic Development

18,384 B rubles 7,8 B rubles Required investment

The aim of the project "Basalt - New Technologies" TPSED is to create in the Russian Far East a new high-tech export-oriented industry of basalt fiber and basalt composite, constructions and products made of them. Implementation of the project involves the introduction of unique technologies based on Project resume domestic "know-how" and broad use of the final products in different spheres (including housing and utilities, construction and road facilities), as well as the creation of a complete industrial chain.

42% Investor’s involvement level

The creation of "Basalt - New Technologies" the Territory of Priority Social and Economic Development will implement pilot projects to develop and transfer technologies of domestic industrial large-scale production of composite materials and will allow to make a breakthrough in the industrial production of new types and generations of composite materials, constructions and products made of them. Realization of this TPSED project aims to solve the problem of durability of buildings and structures through the introduction and application of high-performance basalt Project relevance composite construction materials, constructions and products made of them, as well as to consolidate the leading role of Russia in the market of high-tech products as the exclusive exporter of basalt composite materials, constructions and products made of them in Asia-Pacific and the Middle East. Цель Проекта – создание на принципах государственно-частного партнерства нового крупного промышленного района на Дальнем Востоке России на базе имеющихся в регионе гидроэнергетических и минерально-сырьевых ресурсов: природного газа, апатитов, угля, железных и урановых руд и других. Required infrastructure is partially available. Required infrastructure development level Отведены земельные участки под промышленные объекты

50 Contacts

Ministry of Economy of the Republic of Sakha (Yakutia)

Russian Federation, Republic of Sakha (Yakutia), 677000, Yakutsk, 28 Lenina Avenue

Telephone: +7 (4112) 42-03-10 Fax: +7 (4112) 42-10-89

[email protected] http://www.sakha.gov.ru/minecon

Russian Federation, Republic of Sakha (Yakutia), 677000, Yakutsk, 36/1 Ordzhonikidze St., Office 603, 605

Investment Projects Promotion Group: +7 (4112) 39-83-00 (ext. 67903, 67906, 67914)

[email protected] http://www.investyakutia.com