Procurement Plan
I. General Public Disclosure Authorized 2. Bank’s approval Date of the procurement Plan :- Feb 17, 2014 3. Date of General Procurement Notice: - 4. Period covered by this procurement plan: May 31, 2014 to May 30, 2019
II. Goods and Works and non-consulting services.
1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Table A3.3 of PAD.
Expenditure Contract Value Procurement Contracts/Processes Subject
Public Disclosure Authorized Category (Threshold) Method to Prior Review Works >= US$7.500,000 ICB All contracts over US$ 10 m equivalent Public Disclosure Authorized review. <=US$50,000 Shopping All contracts subject to post review DC All contracts costing more than US$ 100,000 equivalent 2. Prequalification. : Not Applicable 3. Proposed Procedures for CDD Components: According to the PAD: A limited number of small works may be procured following and Community Based Public Disclosure Authorized Procurement with clearance from World Bank in accordance with the Procurement Administration Manual of the Project. 4. Reference to (if any) Project Operational/Procurement Manual: Project Procurement Administration Manual – January 2014 5. Any Other Special Procurement Arrangements: Not Applicable 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) Domestic Review by Reference Estimated Cost Description Packages Preference Bank (Prior / Comments No. US$ Million (Yes/No) Post) Summary of ICB - - - - - (Works) Summary of ICB (Goods) 384 1 Post Summary of NCB (Works) 65.071 230 Post Irrigation Department 26.726 172 Post Mahaweli Authority of Sri Lanka 9.743 30 Post Road Development Authority 21.453 10 Post National Building Research Organization 6.349 15 Post PMU 0.9 3 Post Summary of NCB (Goods) 6.281 28 Post Summary of ICB (Non ------Consultancy Works) III. Selection of Consultants 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Table A3.3 of PAD. Expenditure Contract Value Procurement Contracts/Processes Subject Category (Threshold) Method to Prior Review Consultant >=US$300,000 All competitive All contracts over US$1 m Services methods; advertise equivalent (firms) internationally SSS All contracts costing more than US$ 100,000 equivalent Individual IC ( (Section V of All contracts over US$300,000 Consultants Consultant equivalent Guidelines) IC- Sole source All contracts costing more than US$ 50,000 equivalent 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not Applicable 4. Consultancy Assignments with Selection Methods and Time Schedule (during the first 18 months after project effectiveness) Estimated Review by Description of Reference No. Cost US$ Packages Bank (Prior / Comments Assignment Million Post) Summary of number of contracts that will be let under QCBS 8.5 2 Post Summary of number of contracts that will be let other methods 3.17 7 Post SSS PROCUREMENT Sri Lanka : Climate Resilience Improvement Project (CRIP) PLAN General Information Country: Sri Lanka Bank s Approval Date of the Original Procurement Plan: 2016-08-24 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-03-13 Project ID: P146314 GPN Date: Project Name: Climate Resilience Improvement Project (CRIP) Loan / Credit No: IDA / 54170 Executing Agency(ies): Ministry of Irrigation and Water Resource Management WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LK-MOIWRM-4975-CW-RFB / CRIPAF/WORKS/MASL/NCB/ 101 Protection of Canal Bunds of LB Main Canal of Ulhitiya Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 253,846.20 0.00 2017-01-16 2017-01-23 2017-02-13 2017-02-27 2017-03-27 2018-03-27 Reservoir & Miscellaneous infrastructure Envelope Implementation rehabilitation works in Girandurukotte, Sandunpura and Madagama Blocks. LK-MOIWRM-4977-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/03 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 216,000.00 0.00 2017-02-27 2017-03-06 2017-03-27 2017-04-10 2017-05-08 2018-05-08 Flood damage repairs and infrastructure Envelope Implementation Improvements to LB 23, G4, G21.1,G22,G22.1 & LB22 canal in Gonagolla Unit LK-MOIWRM-4981-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/04 Increasing climate resilience of Single Stage - One Pending Flood damage repairs and IDA / 54170 Post Request for Bids Open - National 124,000.00 0.00 2017-03-07 2017-03-14 2017-04-04 2017-04-18 2017-05-16 2018-05-16 infrastructure Envelope Implementation Improvements to M 31, M 31.5, M 31.5.1, M 31.5.2, M22 & M23 canal in Annamalai Unit LK-MOIWRM-4982-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/05 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 161,000.00 0.00 2017-02-22 2017-03-01 2017-03-22 2017-04-05 2017-05-03 2018-05-03 Flood damage repairs and infrastructure Envelope Implementation Improvements to RB-04, RB-15, RB-19 & RB-17 channel in Damana Unit LK-MOIWRM-4979-CW-RFB / CRIPAF/WORKS/MASL/NCB/ 102 Construction of Tough Structure Increasing climate resilience of Single Stage - One Pending IDA / 54170 Prior Request for Bids Open - National 121,286.50 0.00 2017-01-19 2017-01-26 2017-02-16 2017-03-02 2017-03-30 2018-03-30 at 206/D6/TC 47 as Ulhitiya Unit infrastructure Envelope Implementation and at 2014/D4/FC28 at Hobiriyawa Unit in Girandurukotte Block LK-MOIWRM-4983-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/06 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 173,076.92 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 Flood damage repairs and infrastructure Envelope Implementation Improvements to RB-07, RB-11, RB-12, RB-05 & RB-18 channels in Damana Unit LK-MOIWRM-4970-CW-RFB / Flood damage repairs and Improvements to L.B. Main canal from stn 0+000 km to 10+000 km, Construction of Nethravil Increasing climate resilience of Single Stage - One Pending Anicut & Flood damage repairs IDA / 54170 Post Request for Bids Open - National 230,769.23 0.00 2017-02-13 2017-02-20 2017-03-13 2017-03-27 2017-05-10 2018-05-05 infrastructure Envelope Implementation and Improvements to LB 1A & LB 1 canals in Ampara Unit CRIPAF/WORKS/ID- AMP/NCB/01 LK-MOIWRM-3486-CW-RFB / Rectification of unstable slopes Increasing climate resilience of Single Stage - One Under at Haggala along Peradeniya- IDA / 54170 Prior Request for Bids Open - International 2,950,000.00 0.00 2016-11-17 2016-12-01 2016-11-22 2016-12-07 2017-01-03 2017-01-23 2017-02-02 2017-03-09 2018-03-08 infrastructure Envelope Implementation Badulla-Chenkaladi Road (A05) (CRIP/WORKS/RDA/ICB/308) LK-MOIWRM-3479-CW-RFB / Construction and rehabilitation of flood control structures and flood protection structures of Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 284,615.38 0.00 2017-01-02 2017-01-09 2017-01-30 2017-02-13 2017-03-13 2018-03-12 Kalawewa Right Bank Main infrastructure Envelope Implementation Canal and left bank canal. CRIP/WORKS/MASL/NCB/ 227 LK-MOIWRM-3478-CW-RFB / Rectification of unstable slopes in the premises of Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 310,000.00 0.00 2016-12-01 2016-12-08 2016-12-10 2016-12-24 2017-01-21 2017-03-07 Maha/Sirimalwatta Maha infrastructure Envelope Implementation Vidyalaya Gunnapana (CRIP/WORKS/NBRO/NCB/355) LK-MOIWRM-4972-CW-RFB / Rehabilitation Of UB 12 D-Canal with Field canal &Rehabilitation of D-Canal with Field canal IN Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 192,307.69 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 Uhana Unit infrastructure Envelope Implementation CRIPAF/WORKS/ID- AMP/NCB/02 LK-MOIWRM-4985-CW-RFB / CRIPAF/WORKS/MASL/NCB/ 103 Construction of Concrete Retaining Walls for the Increasing climate resilience of Single Stage - One Pending Rathkinnda Right Bank Branch IDA / 54170 Post Request for Bids Open - National 247,328.60 0.00 2017-02-01 2017-02-08 2017-03-01 2017-03-15 2017-04-12 2018-04-12 infrastructure Envelope Implementation Canal No.02 & Construction of Tough Structures 402/D5/FC50 at Webadagama in Sadamadulla Unit in Sadunpura Block LK-MOIWRM-4987-CW-RFB / CRIPAF/WORKS/MASL/NCB/ 104 Construction of 700 m long Increasing climate resilience of Single Stage - One Pending reinforced concrete retaining wall IDA / 54170 Post Request for Bids Open - National 230,769.23 0.00 2017-02-10 2017-02-17 2017-03-10 2017-03-24 2017-04-21 2018-04-21 infrastructure Envelope Implementation at 27+610 km to 27+310 km of side canal bank of Right bank main canal Page 1 LK-MOIWRM-4989-CW-RFB / CRIPAF/WORKS/MASL/S/105 Construction of flood protection bund at Kuda oya (940m d/s of 503 anicut) and flood protection Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 30,769.20 0.00 2017-02-13 2017-02-20 2017-03-13 2017-03-27 2017-04-24 2018-04-24 bund to spill drainage of infrastructure Envelope Implementation Bamunakotuwa tand (Near FC08, 09/D01) of Track 04 of Aralaganwila unit, of Wijayabapura block LK-MOIWRM-4992-CW-RFB / Increasing climate resilience of Single Stage - One Pending Construction of Gabion wall U/S IDA / 54170 Post Request for Bids Open - National 153,846.15 0.00 2017-02-15 2017-02-22 2017-03-15 2017-03-29 2017-04-26 2018-04-26 infrastructure Envelope Implementation and D/S of 503 Anicut LK-MOIWRM-4993-CW-RFB / CRIPAF/WORKS/MASL/NCB/ 108 Construction of flood protection bund near the FC 03 Increasing climate resilience of Single Stage - One Pending and rehabilitation & improvement IDA / 54170 Post Request for Bids Open - National 45,384.62 0.00 2017-01-19 2017-01-26 2017-02-16 2017-03-02 2017-03-30 2018-03-30 infrastructure Envelope Implementation of FC03/D1/302 (0+00km to 0+450 km and 0+739 km) in Sooriyawewa Unit in Singhapura Block LK-MOIWRM-4994-CW-RFB / CRIPAF/WORKS/MASL/S/ 109 Increasing climate resilience of Single Stage - One Pending Construction of Gabion Wall for IDA / 54170 Post Request for Bids Open - National 46,161.20 0.00 2017-01-23 2017-01-30 2017-02-20 2017-03-06 2017-04-03 2018-04-03 infrastructure Envelope Implementation D/S eroded section of Bowatenna Spillway Tail Canal LK-MOIWRM-4995-CW-RFB / CRIPAF/WORKS/MASL/S/ 110 Construction of Gabion Wall for Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 49,901.80 0.00 2017-02-27 2017-03-06 2017-03-27 2017-04-10 2017-05-08 2018-05-08 structures at 6+250 km and infrastructure Envelope Implementation 7+500 km of Huruluwewa Feeder Canal LK-MOIWRM-5013-CW-RFB / CRIPAF/WORKS/MASL/NCB/ 111 Removing of Existing Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 153,846.15 0.00 2017-03-01 2017-03-08 2017-03-29 2017-04-12 2017-05-10 2018-05-10 Concrete lining and infrastructure Envelope Implementation Reconstruction at Tunnel out-let Bowatenna LK-MOIWRM-5014-CW-RFB / CRIPAF/WORKS/MASL/NCB/ Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 100,000.00 0.00 2017-03-06 2017-03-13 2017-04-03 2017-04-17 2017-05-15 2018-05-15 112 Improvement of Kandalama infrastructure Envelope Implementation RB Canal LK-MOIWRM-4971-CW-RFB / CRIP/WORKS/NBRO/NCB/350-1 Increasing climate resilience of Single Stage - One Pending Rectification of unstable slopes IDA / 54170 Post Request for Bids Open - National 230,769.23 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 infrastructure Envelope Implementation in the premises of Molagoda Sri Piyadassi Vidyalaya LK-MOIWRM-4974-CW-RFB / CRIP/WORKS/NBRO/NCB/353 Rectification of unstable slopes in the premises of Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 346,153.85 0.00 2017-02-13 2017-02-20 2017-03-13 2017-03-27 2017-04-24 2018-04-24 Maha/Kasawaththa Muslim infrastructure Envelope Implementation Kanishta Vidyalaya & Maha/Rambuke-Ela Muslim Maha Vidyalaya LK-MOIWRM-4980-CW-RFB / CRIP/WORKS/NBRO/NCB/359 Increasing climate resilience of Single Stage - One Pending Rectification of unstable slopes IDA / 54170 Post Request for Bids Open - National 461,538.47 0.00 2017-01-30 2017-02-06 2017-02-27 2017-03-13 2017-04-10 2017-10-07 infrastructure Envelope Implementation in the premises of Gampola St. Joseph Girls' College LK-MOIWRM-4986-CW-RFB / CRIP/WORKS/NBRO/NCB/360 Increasing climate resilience of Single Stage - One Pending Rectification of unstable slopes IDA / 54170 Post Request for Bids Open - National 538,461.54 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2017-10-14 infrastructure Envelope Implementation in the premises of Vidyartha Vidyalaya LK-MOIWRM-5041-CW-RFB / CRIP/WORKS/RDA/NCB/310 Rectification of 02 unstable Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 326,923.08 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 slopes along Kegalle- infrastructure Envelope Implementation Bulathkohupitiya-Karawanella Road (A21) LK-MOIWRM-5045-CW-RFB / CRIP/WORKS/RDA/NCB/312 Increasing climate resilience of Single Stage - One Pending Rectification of unstable slope at IDA / 54170 Post Request for Bids Open - National 115,384.62 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 infrastructure Envelope Implementation Bridge no. 48/2 on Avvissawella - Hatton Road (A07) LK-MOIWRM-5048-CW-RFB / CRIP/WORKS/RDA/NCB/316 Increasing climate resilience of Single Stage - One Pending Reconstruction of Bridge No. IDA / 54170 Post Request for Bids Open - National 769,230.77 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-08 2018-05-08 infrastructure Envelope Implementation 23/3 on Ella-Kanthale Road (B010) LK-MOIWRM-5052-CW-RFB / CRIP/WORKS/RDA/NCB/317 Increasing climate resilience of Single Stage - One Pending Rehabilitation of Bridge No. 3/3 IDA / 54170 Post Request for Bids Open - National 961,538.46 0.00 2017-03-06 2017-03-13 2017-04-03 2017-04-17 2017-05-15 2018-05-15 infrastructure Envelope Implementation on Makandura- Badalgama Road (B503) Across Maha Oya LK-MOIWRM-5063-CW-RFB / CRIP/WORKS/RDA/NCB/318 Increasing climate resilience of Single Stage - One Pending Reconstruction Bridge No. 23/1 IDA / 54170 Post Request for Bids Open - National 2,222,222.22 0.00 2017-03-06 2017-03-13 2017-04-03 2017-04-17 2017-05-15 2018-05-15 infrastructure Envelope Implementation on Warakapola- Ruwanwella Road LK-MOIWRM-5088-CW-RFB / CRIPAF/WORKS/ID- KAN/NCB/71 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 153,846.15 0.00 2017-01-23 2017-01-30 2017-03-13 2017-03-27 2017-04-24 2018-04-24 Rehabilitation of D1A, D1B, D3B, infrastructure Envelope Implementation D6B,D8A, D8B, & D10A canals in D1 FO Area LK-MOIWRM-5093-CW-RFB / CRIPAF/WORKS/ID- Increasing climate resilience of Single Stage - One Pending KAN/NCB/72 IDA / 54170 Post Request for Bids Open - National 100,000.00 0.00 2017-01-23 2017-01-30 2017-02-20 2017-03-06 2017-04-03 2018-04-03 infrastructure Envelope Implementation Rehabilitation of D 12 canal in D12 FO Area LK-MOIWRM-5095-CW-RFB / CRIPAF/WORKS/ID- Increasing climate resilience of Single Stage - One Pending KAN/NCB/73 IDA / 54170 Post Request for Bids Open - National 138,461.54 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 infrastructure Envelope Implementation Rehabilitation of D16, D17, canals D16 FO Area LK-MOIWRM-5105-CW-RFB / CRIPAF/WORKS/ID- KAN/NCB/74 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 230,769.23 0.00 2017-01-09 2017-01-16 2017-02-06 2017-02-20 2017-03-20 2018-03-20 Rehabilitation of D20 canal in infrastructure Envelope Implementation D19 FO Area & Rehabilitation of D21 canal in D21 FO Area Page 2 LK-MOIWRM-5115-CW-RFB / CRIPAF/WORKS/ID- Increasing climate resilience of Single Stage - One Pending KAN/NCB/75 IDA / 54170 Post Request for Bids Open - National 176,923.08 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 infrastructure Envelope Implementation Rehabilitation of D25 canal in D25 FO Area LK-MOIWRM-5018-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/09 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 100,000.00 0.00 2017-02-14 2017-02-21 2017-03-14 2017-03-28 2017-04-25 2018-04-25 infrastructure Envelope Implementation Improvements to Karadikkulam and Padarakkal Kulam in Deegawapi Unit LK-MOIWRM-5016-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/08 Improvements to tank and LB & RB drainage canal & Flood Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 106,153.85 0.00 2017-03-15 2017-03-22 2017-04-12 2017-04-26 2017-05-24 2018-05-24 damage repairs infrastructure Envelope Implementation andReconstruction of 10.0m span 4.88 m width bridge in neethai tank spill tail chl At stn.0+600 km in Illukuchenai unit LK-MOIWRM-5019-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/10 Increasing climate resilience of Single Stage - One Pending Flood damage repairs IDA / 54170 Post Request for Bids Open - National 130,769.23 0.00 2017-02-22 2017-03-01 2017-03-22 2017-04-05 2017-05-03 2018-05-03 infrastructure Envelope Implementation andImprovements to Pallakkadu Anicut, Malayadi Anicut & Kaliodai anicut with addional spillway in Veerayadi unit LK-MOIWRM-5021-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/11 Increasing climate resilience of Single Stage - One Pending Construction of box culverts and IDA / 54170 Post Request for Bids Open - National 69,230.77 0.00 2017-03-20 2017-03-27 2017-04-17 2017-05-01 2017-05-29 2018-05-29 infrastructure Envelope Implementation Providing steel gates to Muthalaikkal anicut and D/S flood damage repairs in Akkarapathu Unit LK-MOIWRM-5023-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/12 Flood damage repairs and Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 84,615.38 0.00 2017-02-15 2017-02-22 2017-03-15 2017-03-29 2017-04-26 2018-04-26 Improvements to D'chls of VRBC, infrastructure Envelope Implementation KLBC, KL-20A & exiting causeway at 234 road including necessary structures in Deegawapi Unit LK-MOIWRM-5025-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/13 Improvements to Veddukadu Anicut, visarai vaikal drainage, Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 296,153.85 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 Thiraiodai drainage, infrastructure Envelope Implementation Narrakkanodai drainage and desilting and widening of Udanga river including bund strengthing from 0+000 to 7+000 km in Moravil, Paddampitty Unit LK-MOIWRM-5027-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/14 Increasing climate resilience of Single Stage - One Pending Improvements to Kollaveliodai IDA / 54170 Post Request for Bids Open - National 61,538.46 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 infrastructure Envelope Implementation drainage channel including Reconstruction of drainage out let to weerayadi river in Moravil Unit LK-MOIWRM-5030-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/15 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 53,846.15 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 infrastructure Envelope Implementation Widening of Aarapaththai bridge across Nellikadu river in Block J Unit LK-MOIWRM-5031-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/16 Improvement to LB channal of Kaliodai anicut to cater additional Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 123,076.92 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 flood, Straightning of Kaliodai infrastructure Envelope Implementation anicut LB flank bund to cater addition flood & Flood damage repairs and Strengthening of U/S bund of Kothayanmadu anicut in Sengap LK-MOIWRM-5032-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/17 Improvement to Chettiyawattai main chl.at stn from 5 + 000 to Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 261,538.46 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 9+000 km to cater additional infrastructure Envelope Implementation flood, Koduvapini Branch chl. to cater additional flood, Manamvaddai br. Chl. to cater additional flood & Panneerkattu anicut and Panne LK-MOIWRM-5033-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/18 Scoure filling & construction of gabion wall proction Kurunal kanji Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 307,692.31 0.00 2017-02-27 2017-03-06 2017-03-27 2017-04-10 2017-05-08 2018-05-08 river bund road, RB site and infrastructure Envelope Implementation Pooran puri bund road, Flood damage repairs and Improvement to D/S basic gabian wall to palla vkl regulator in Upper Kurunal kanji LK-MOIWRM-5035-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/19 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 385,714.23 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 infrastructure Envelope Implementation Improvements to D 04 LB 02 canal & D 04 (from 1 +500km to 4+600 Km) in L.M.C. Padaviya Page 3 LK-MOIWRM-5043-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/21 Improvements to RB 12 in D 15 canal from 0+000Km to Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 382,153.85 0.00 2017-02-13 2017-02-20 2017-03-13 2017-03-27 2017-04-24 2018-04-24 0+600Km, . RB 14 in D 15 canal infrastructure Envelope Implementation from 0+000Km 0+432Km ,D 15 canal from 3+500km to 4+625Km & Reconstruction of D15 Canal from 1+000Km to 1+105Km in L.M.C. IN Padaviya. LK-MOIWRM-5044-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/22 Construction to D 16 canal from 0+000Km to 0+149km & Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 250,846.15 0.00 2017-02-13 2017-02-20 2017-03-13 2017-03-27 2017-04-24 2018-04-24 Improvements to LB 03 in D 18 , infrastructure Envelope Implementation RB 03 in D 18 ,RB 05 in D 18 , D 26 canal from 0+700m to 1+050m and Cascade Drop 01 at 25.5 Km , Cascade Drop 03 at 26 Km & Cascade LK-MOIWRM-5046-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/23 Increasing climate resilience of Single Stage - One Pending Improvements to D 02 IDA / 54170 Post Request for Bids Open - National 285,000.00 0.00 2017-03-06 2017-03-13 2017-04-03 2017-04-17 2017-05-15 2018-05-15 infrastructure Envelope Implementation 0+000Km - 2+462 km canal , D 04 canal D 05 FC 02 0+000Km 0+128Km canal in U.M.C. Padaviya. LK-MOIWRM-5047-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/24 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 342,307.69 0.00 2017-03-06 2017-03-13 2017-04-03 2017-04-17 2017-05-15 2018-05-15 Improvements to D 07 canal ,LB infrastructure Envelope Implementation 08 / D 07 canal , RB 02 / D 08 canal & RB 01 / D 09 canal in U.M.C. Padaviya. LK-MOIWRM-5050-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/26 Construction of Bridge at 1+500 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 515,923.08 0.00 2017-02-27 2017-03-06 2017-03-27 2017-04-10 2017-05-08 2018-05-08 LB 01 of D 13 & Improvements to infrastructure Envelope Implementation LB 08 of D 13 canal , D 14 canal , RB 03 of D 21 canal , D 21 LB 01 canal & D 21 LB 02 canal in U.M.C .Padaviya LK-MOIWRM-5051-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/27 Flood damage Repairs Hurulu Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 153,846.15 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 wewa Right bank main canal D5 infrastructure Envelope Implementation 1+200 DROP, B2 1+850 culvert, D5 FC 39 Truff, D4 FC28 Road, D5 FC 34 0+000 Drop, D5 FC 40 0+500 LK-MOIWRM-5053-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/28 Flood damage Repairs Hurulu Increasing climate resilience of Single Stage - One Pending wewa Right bank main canal IDA / 54170 Post Request for Bids Open - National 192,307.69 0.00 2017-02-13 2017-02-20 2017-03-13 2017-03-27 2017-04-24 2018-04-24 infrastructure Envelope Implementation FC31 road, DC6 FC45 ROAD, B2/FC3/0+035 km DROP,D7 DROP, B2/FC6/0+100 km DROP, D7 DROP, B2/FC16/0+250 km DROP LK-MOIWRM-5054-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/29 Construction of drop structure 0+200m & 0+300 RB Increasing climate resilience of Single Stage - One Pending D2,1+410Km RB D12,D8 FC18 IDA / 54170 Post Request for Bids Open - National 153,846.15 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 infrastructure Envelope Implementation in RB MC( 02 drop structures),D8 FC9,(2 no. of Drops),RB D8 FC22,RB D6 0+250Km,RB D6 FC48,RB D3 FC24 0+150Km, Construction of Retaining wall at 1+650Km LK-MOIWRM-5055-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/30 Demolishing and re-construction of 02 Nio. Of drops and trough Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 153,846.15 0.00 2017-02-27 2017-03-06 2017-03-27 2017-04-10 2017-05-08 2018-05-08 structure in RB D6 infrastructure Envelope Implementation canal,Improvements to FC3 agriculture road in LB D9,Re- construction of inlet structure and drop structure at 0+00m in FC13,Construction of drop s LK-MOIWRM-5056-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/31 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 269,230.77 0.00 2017-03-06 2017-03-13 2017-04-03 2017-04-17 2017-05-15 2018-05-15 infrastructure Envelope Implementation Flood damage Repairs Illuk wewa anicut LK-MOIWRM-5058-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/33 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 153,846.15 0.00 2017-02-27 2017-03-06 2017-03-27 2017-04-10 2017-05-08 2018-05-08 infrastructure Envelope Implementation Provinding lifting Gates to Manankattiya Scheme spill LK-MOIWRM-5059-CW-RFB / CRIPAF/WORKS/ID- BAT/NCB/34 Increasing climate resilience of Single Stage - One Pending Construction of Mookarayankattu IDA / 54170 Post Request for Bids Open - National 230,769.23 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 infrastructure Envelope Implementation anicut and Widening, Straightening the Tributary of Mundenai aru, Thevu aru and Karachchaveli aru LK-MOIWRM-5060-CW-RFB / CRIPAF/WORKS/ID- BAT/NCB/35 Improvements to Pallathuvelli Increasing climate resilience of Single Stage - One Pending Road and construction of IDA / 54170 Post Request for Bids Open - National 230,769.23 0.00 2017-03-27 2017-04-03 2017-04-24 2017-05-08 2017-06-05 2018-06-05 infrastructure Envelope Implementation Pammathurai & Koddadikattu anicuts, Improvements to Uppodai Road, Road from Uppodai road to Kidawadipallam Anicut and Thevu Road Page 4 LK-MOIWRM-5065-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/39 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 269,230.77 0.00 2017-03-06 2017-03-13 2017-04-03 2017-04-17 2017-05-15 2018-05-15 infrastructure Envelope Implementation Drought Mitigation of D1 canal Tract II LK-MOIWRM-5061-CW-RFB / CRIPAF/WORKS/ID- BAT/NCB/36 Widening, Straightening Mundenai aru, Kaliyamadu anicut Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 269,230.77 0.00 2017-02-27 2017-03-06 2017-03-27 2017-04-10 2017-05-08 2018-05-08 and providing bridge at anicut, infrastructure Envelope Implementation Improvements to Thoduvilcholai road, road from Thalaiyadi to Kidavadipallam, Vavichchenai channel and road from Sinnalamvelikkaddu to Kuru LK-MOIWRM-5062-CW-RFB / CRIPAF/WORKS/ID- BAT/NCB/37 Construction of Murukanthivu Regulator, Reconstruction of Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 507,692.31 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 Erukalampathu Bridge and infrastructure Envelope Implementation Widening, Straightening the Odduvelli River and Wahulawalai Drainage and Widening, Straightening the Paddiyadiveli Drainage and Maduru Oya upstr LK-MOIWRM-5064-CW-RFB / CRIPAF/WORKS/ID- HAM/NCB/38 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 215,384.62 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 infrastructure Envelope Implementation Drought Mitigation of D1 , D2 , D3/D4 canals Tract I LK-MOIWRM-5066-CW-RFB / CRIPAF/WORKS/ID- HAM/NCB/40 Drought Mitigation of FC-1, FC-2, Increasing climate resilience of Single Stage - One Pending FC-4, FC-5 ,FC-12, FC-13, FC-14 IDA / 54170 Post Request for Bids Open - National 196,153.85 0.00 2017-02-13 2017-02-20 2017-03-13 2017-03-27 2017-04-24 2018-04-24 infrastructure Envelope Implementation ,FC-15, FC-17 of D1 Tract II, Drought Mitigation of FC-22, FC- 25, of D2 Tract II, Drought Mitigation of FC-64, FC-65 of D5 Tract II LK-MOIWRM-5067-CW-RFB / CRIPAF/WORKS/ID- HAM/NCB/41 Drought Mitigation of FC-66 ,FC- Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 176,923.08 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 70 ,FC-74 of D6 Tract II, Drought infrastructure Envelope Implementation Mitigation of FC-87, FC-88, FC- 92 of D7 Tract II, Drought Mitigation of FC-115, FC-116 of D8 Tract II LK-MOIWRM-5068-CW-RFB / CRIPAF/WORKS/ID- HAM/NCB/42 Drought Mitigation of FC-125, Increasing climate resilience of Single Stage - One Pending FC-128, FC-142 of D9 Tract II, IDA / 54170 Post Request for Bids Open - National 215,384.62 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 infrastructure Envelope Implementation Drought Mitigation of FC-1, FC-4, FC-5, FC-6, FC-9, FC-10, FC-12 of D1 Tract III, Drought Mitigation of FC-17, FC-28, FC-29, FC-32 of D2 Tract III LK-MOIWRM-5069-CW-RFB / CRIPAF/WORKS/ID- HAM/NCB/43 Drought Mitigation of FC-52, FC- 53, FC-57, FC 143 of D3 Tract Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 257,692.31 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 III, Drought Mitigation of FC- infrastructure Envelope Implementation 63,FC-64 of D4, FC-68, FC-70 of D5 Tract III, Drought Mitigation of FC-148, FC-149 of D6, Supply channel from Mahaweli pickup regul LK-MOIWRM-5070-CW-RFB / CRIPAF/WORKS/ID- HAM/NCB/44 Drought Mitigation of FC-78, FC- Increasing climate resilience of Single Stage - One Pending 85, FC-86, FC-90, FC 95, FC 97 IDA / 54170 Post Request for Bids Open - National 207,692.31 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 infrastructure Envelope Implementation of D7 Tract III, Drought Mitigation of FC-102, FC-103, FC-105, FC- 107 of D8 Tract III, Drought Mitigation of FC-121, FC-131 of D9, D9 Track III LK-MOIWRM-5071-CW-RFB / CRIPAF/WORKS/ID- HAM/NCB/45 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 161,538.46 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 infrastructure Envelope Implementation Widening of WLB Main canal 6.95 km - 11.00 km LK-MOIWRM-5073-CW-RFB / CRIPAF/WORKS/ID- HAM/NCB/47 Widening of box culvert Nugelanga yaya Koggalla ara Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 123,076.92 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 Drainage canal, Widening of box infrastructure Envelope Implementation culvert Koggalla ara Drainage canal and avoid bend along Koggalla ara & Bank protection along Koggalla ara Drainage canal LK-MOIWRM-5074-CW-RFB / CRIPAF/WORKS/ID- Increasing climate resilience of Single Stage - One Pending HAM/NCB/48 IDA / 54170 Post Request for Bids Open - National 192,307.69 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 infrastructure Envelope Implementation Improvements to Kadawara wewa LK-MOIWRM-5075-CW-RFB / CRIPAF/WORKS/ID- HAM/NCB/49 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 46,153.85 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-24 2018-04-24 infrastructure Envelope Implementation Introduce new spill tail canal and land acquition LK-MOIWRM-5076-CW-RFB / CRIPAF/WORKS/ID- MAN/NCB/50 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 423,076.92 0.00 2017-02-13 2017-02-20 2017-03-13 2017-03-27 2017-04-24 2018-04-24 infrastructure Envelope Implementation FDR Tekkam Anicut to GT Head Sluice(0+000 to 4+000) in Gaints tank Inlet canal Page 5 LK-MOIWRM-5077-CW-RFB / CRIPAF/WORKS/ID- MAN/NCB/51 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 153,846.15 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 infrastructure Envelope Implementation FDR GT Head Sluice to Canal Spill No-02 ( 3+000 to 4+000) in Gaints tank Inlet canal LK-MOIWRM-5078-CW-RFB / CRIPAF/WORKS/ID- MAN/NCB/52 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 346,153.85 0.00 2017-03-06 2017-03-13 2017-04-03 2017-04-17 2017-05-15 2018-05-15 FDR Canal Spill No-02 to infrastructure Envelope Implementation Kaddaiyadampan Bridge (4+000 to 11+000) in Gaints tank Inlet canal LK-MOIWRM-5080-CW-RFB / CRIPAF/WORKS/ID- MAN/NCB/53 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 115,384.62 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 infrastructure Envelope Implementation Improvements Giants Tank Spill Tail Canal to cater future floods LK-MOIWRM-5081-CW-RFB / CRIPAF/WORKS/ID- MAN/NCB/54 Flood damge repairs in Increasing climate resilience of Single Stage - One Pending Neelamadu Feeder Tank in 14th IDA / 54170 Post Request for Bids Open - National 115,384.62 0.00 2017-02-27 2017-03-06 2017-03-27 2017-04-10 2017-05-08 2018-05-08 infrastructure Envelope Implementation mile canal of Gaints tank, Flood damge repairs in Chalampan Feeder Tank and Vellalakaddu Feeder Tank 13th mile canal of Gaints tank LK-MOIWRM-5082-CW-RFB / CRIPAF/WORKS/ID- MAN/NCB/55 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 230,769.23 0.00 2017-02-27 2017-03-06 2017-03-27 2017-04-10 2017-05-08 2018-05-08 infrastructure Envelope Implementation FDR Akathymurippu Inlet Canal from Tekkam Anicut LK-MOIWRM-5083-CW-RFB / CRIPAF/WORKS/ID- Increasing climate resilience of Single Stage - One Pending MAN/NCB/56 IDA / 54170 Post Request for Bids Open - National 192,307.69 0.00 2017-03-06 2017-03-13 2017-04-03 2017-04-17 2017-05-15 2018-05-15 infrastructure Envelope Implementation Viyadikulam Spill Tail Canal LK-MOIWRM-5085-CW-RFB / CRIPAF/WORKS/ID-TRI/NCB/57 Flood damage repairs and Increasing climate resilience of Single Stage - One Pending Impts. to D9 chl. & chl. bund IDA / 54170 Post Request for Bids Open - National 100,000.00 0.00 2017-02-27 2017-03-06 2017-03-27 2017-04-10 2017-05-08 2018-05-08 infrastructure Envelope Implementation road from 1000m to 5500m , D5 chl. bund road from 3500m to 4500m and FC 2,3,4,6,8,11,13 canal bund road in Peraru Tract, LK-MOIWRM-5086-CW-RFB / CRIPAF/WORKS/ID-TRI/NCB/58 Flood damage repairs and Impts. to D7 canal in RB M/chl. Kantale Increasing climate resilience of Single Stage - One Pending ,Flood damage repairs at 3850m IDA / 54170 Post Request for Bids Open - National 69,230.77 0.00 2017-02-27 2017-03-06 2017-03-27 2017-04-10 2017-05-08 2018-05-08 infrastructure Envelope Implementation in Potankadu chl. off RB M/chl. in Kanatle ,Flood damage repairs Kusumankadawela canal bund road (0m to 3650m) ,Flood damage repair LK-MOIWRM-5090-CW-RFB / CRIPAF/WORKS/ID- MON/NCB/60 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 230,769.23 0.00 2017-03-20 2017-03-27 2017-04-17 2017-05-01 2017-05-29 2018-05-29 infrastructure Envelope Implementation Rehabilitation of Main canal and 12 Nos of FCC in Saddatissa Scheme LK-MOIWRM-5091-CW-RFB / CRIPAF/WORKS/ID- MON/NCB/61 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 61,538.46 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 infrastructure Envelope Implementation Construction of canal lining for Horabokka main canl at 3+800km to 4+000km LK-MOIWRM-5092-CW-RFB / CRIPAF/WORKS/ID- MON/NCB/62 Construction of canal lining for Increasing climate resilience of Single Stage - One Pending Halmillapillawa main canal at IDA / 54170 Post Request for Bids Open - National 69,230.77 0.00 2017-03-27 2017-04-03 2017-04-24 2017-05-08 2017-06-05 2018-06-05 infrastructure Envelope Implementation 0+000kmto 0+500km and 0+700km to 0+800km and construction of feeder canal from end of Halmillapillawa main canal to Nikawewa LK-MOIWRM-5094-CW-RFB / CRIPAF/WORKS/ID- MON/NCB/63 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 61,538.46 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 infrastructure Envelope Implementation Rehabilitation of Balaharuwa D3, D5, D6 canals LK-MOIWRM-5096-CW-RFB / CRIPAF/WORKS/ID- MON/NCB/64 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 46,153.85 0.00 2017-02-13 2017-02-20 2017-03-13 2017-03-27 2017-04-24 2018-04-24 infrastructure Envelope Implementation Rehabilitation of Dambewewa RBMC up to 2km and LBMC LK-MOIWRM-5097-CW-RFB / CRIPAF/WORKS/ID- MON/NCB/65 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 61,538.46 0.00 2017-02-13 2017-02-20 2017-03-13 2017-03-27 2017-04-24 2018-04-24 infrastructure Envelope Implementation Rehabilitation of Debarara LBMC & RBMC LK-MOIWRM-5099-CW-RFB / CRIPAF/WORKS/ID- MON/NCB/66 Increasing climate resilience of Single Stage - One IDA / 54170 Post Request for Bids Open - National 192,307.69 0.00 Canceled 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 infrastructure Envelope Rehabilitation of Kandiyapita scheme & Hambegamuwa scheme including IFF LK-MOIWRM-5100-CW-RFB / CRIPAF/WORKS/ID- MON/NCB/67 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 184,615.38 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 infrastructure Envelope Implementation Rehabilitation of Dehiaththawela Schme including IFF Page 6 LK-MOIWRM-5101-CW-RFB / CRIPAF/WORKS/ID- MON/NCB/68 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 138,461.54 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 infrastructure Envelope Implementation Rehabilitation of Baduluoya Schme including IFF LK-MOIWRM-5104-CW-RFB / CRIPAF/WORKS/ID- MON/NCB/69 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 138,461.54 0.00 2017-03-13 2017-03-20 2017-04-10 2017-04-24 2017-05-22 2018-05-22 infrastructure Envelope Implementation Rehabilitation of Monarawana Schme including IFF LK-MOIWRM-5106-CW-RFB / CRIPAF/WORKS/ID- MON/NCB/70 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 200,000.00 0.00 2017-01-09 2017-01-16 2017-02-06 2017-02-20 2017-03-20 2018-03-20 infrastructure Envelope Implementation Rehabilitation of Magandanaoya Schme including IFF LK-MOIWRM-5042-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/20 Increasing climate resilience of Single Stage - One Pending Improvements to D 5 canal , D 6 IDA / 54170 Post Request for Bids Open - National 422,932.60 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 infrastructure Envelope Implementation canal , D 11 FC 04 canal in L.M.C.& D 11 of RB 02 from 1+060Km to 1+130 Km in L.M.C. Padaviya . LK-MOIWRM-5072-CW-RFB / CRIPAF/WORKS/ID- HAM/NCB/46 Reconstruction existing of box culvert at 8.170 km WLB Main Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 100,000.00 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 canal, Widening of existing infrastructure Envelope Implementation Modarapiliwela anicut at 10.500 km WLB Main canal,& Proposed new escape structure at 11.00 km WLB Main canal & Improvements to existing box LK-MOIWRM-5117-CW-RFB / CRIPAF/WORKS/ID- KAN/NCB/76 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 207,692.31 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-24 2018-04-24 Rehabilitation of D26,D27A canal infrastructure Envelope Implementation in D26 FO Area & Rehabilitation of D31 canal in D31 FO Area LK-MOIWRM-5119-CW-RFB / CRIPAF/WORKS/ID- KAN/NCB/77 Rehabilitation of D35,D38 canal Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 153,846.15 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-17 2018-04-17 in D35 FO Area ,Rehabilitation of infrastructure Envelope Implementation D33A canal in D32 FO Area &Rehabilitation of D34 canal in D34 FO Area LK-MOIWRM-5123-CW-RFB / CRIPAF/WORKS/ID- KAN/NCB/78 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 215,384.62 0.00 2017-02-06 2017-02-13 2017-03-06 2017-03-20 2017-04-24 2018-04-24 Rehabilitation of D39 canal in infrastructure Envelope Implementation D39 FO Area & Rehabilitation of D41 canal in D41 FO Area LK-MOIWRM-5124-CW-RFB / CRIPAF/WORKS/ID- KAN/NCB/79 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 269,230.77 0.00 2017-02-20 2017-02-27 2017-03-20 2017-04-03 2017-05-01 2018-05-01 Rehabilitation of D43,D44 canal infrastructure Envelope Implementation in D43 FO Area & D45 canal in D45 FO area LK-MOIWRM-5125-CW-RFB / CRIPAF/WORKS/ID- Increasing climate resilience of Single Stage - One Pending KAN/NCB/80 IDA / 54170 Post Request for Bids Open - National 192,307.69 0.00 2017-02-13 2017-02-20 2017-03-13 2017-03-27 2017-04-24 2018-04-24 infrastructure Envelope Implementation Rehabilitation of D47 canal in D47FO Area LK-MOIWRM-5126-CW-RFB / CRIPAF/WORKS/ID- Increasing climate resilience of Single Stage - One Pending KAN/NCB/81 IDA / 54170 Post Request for Bids Open - National 153,846.15 0.00 2017-02-13 2017-02-20 2017-03-13 2017-03-27 2017-04-24 2018-04-24 infrastructure Envelope Implementation Rehabilitation of D48,D49 canal in D49 FO Area LK-MOIWRM-4984-CW-RFB / CRIPAF/WORKS/ID- AMP/NCB/07 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 238,461.54 0.00 2017-03-22 2017-03-29 2017-04-19 2017-05-03 2017-05-31 2018-05-31 Flood damage repairs and infrastructure Envelope Implementation Improvements to M-5.5.3, M-5.6, M-5.2.1 & M-1.3 canals in Weeragoda Unit LK-MOIWRM-5015-CW-RFB / CRIPAF/WORKS/MASL/NCB/ Increasing climate resilience of Single Stage - One Pending 113 Rehabilitation and IDA / 54170 Post Request for Bids Open - National 38,461.54 0.00 2017-03-06 2017-03-13 2017-04-03 2017-04-17 2017-05-15 2018-05-15 infrastructure Envelope Implementation improvement works of irrigation structures at Dematawewa Block LK-MOIWRM-5017-CW-RFB / CRIPAF/WORKS/MASL/NCB/ 114 Rehabilitation and Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 230,769.23 0.00 2017-03-09 2017-03-16 2017-04-06 2017-04-20 2017-05-18 2018-05-18 Improvement works of irrgation infrastructure Envelope Implementation works of Kalawewa RB main canal LK-MOIWRM-5020-CW-RFB / CRIPAF/WORKS/MASL/NCB/ 116 Rehabilitation and Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 308,461.54 0.00 2017-03-20 2017-03-27 2017-04-17 2017-05-01 2017-05-29 2018-05-29 improvement of right bank main infrastructure Envelope Implementation canal from chainage 33+420 km to 34+640 km LK-MOIWRM-5022-CW-RFB / CRIPAF/WORKS/MASL/NCB/ 117 Construction of gabion Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 140,769.23 0.00 2017-03-23 2017-03-30 2017-04-20 2017-05-04 2017-06-01 2018-06-01 protection work along the left infrastructure Envelope Implementation bank RawanOya - D/S of the bridge near the Open University. LK-MOIWRM-5024-CW-RFB / CRIPAF/WORKS/MASL/NCB/ 118 Construction of gabion Increasing climate resilience of Single Stage - One Pending retaining walls at dam IDA / 54170 Post Request for Bids Open - National 159,230.77 0.00 2017-03-14 2017-03-21 2017-04-11 2017-04-25 2017-05-23 2018-05-23 infrastructure Envelope Implementation maintenance premises for protection embankment in reservoir to control siltation LK-MOIWRM-5026-CW-RFB / CRIPAF/WORKS/MASL/NCB/ Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 461,538.46 0.00 2017-03-22 2017-03-29 2017-04-19 2017-05-03 2017-05-31 2018-05-31 119 Rehabilitation of infrastructure Envelope Implementation Ahetugaswewa Page 7 LK-MOIWRM-5028-CW-RFB / CRIPAF/WORKS/MASL/NCB/ Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 769,230.77 0.00 2017-03-17 2017-03-24 2017-04-14 2017-04-28 2017-05-26 2018-05-26 120 Rehabilitation of infrastructure Envelope Implementation Kiriibbanwewa LK-MOIWRM-5029-CW-RFB / CRIPAF/WORKS/MASL/NCB/ 1 Increasing climate resilience of Single Stage - One Pending 21C onstruction of new bridge IDA / 54170 Post Request for Bids Open - National 1,538,461.54 0.00 2017-03-27 2017-04-03 2017-04-24 2017-05-08 2017-06-05 2018-06-05 infrastructure Envelope Implementation across the Mora-Oya at Singh apura LK-MOIWRM-7307-CW-RFB / CRIPAF/WORKS/MASL/NCB/ 104 Construction of 700 m long Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 230,769.23 0.00 2017-03-01 2017-03-08 2017-03-29 2017-04-12 2017-05-10 2018-05-10 reinforced concrete retaining wall infrastructure Envelope Implementation at 27+610 km to 27+310 km of side canal bank of Right bank main canal LK-MOIWRM-9117-CW-RFB / CRIPAF/WORKS/MASL/NCB/ 115 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 387,000.00 0.00 2017-03-20 2017-03-27 2017-04-17 2017-05-01 2017-05-29 2018-05-29 Construction of Retaining Wall for infrastructure Envelope Implementation RBMC Left Bank from 15+650 km to 16+150 km at Kachchigala. LK-MOIWRM-9142-CW-RFQ / CRIPAF/WORKS/UVA/NCB/419 Request for Single Stage - One Pending IDA / 54170 Project implementation Post Limited 15,384.61 0.00 2017-04-03 2017-05-22 2017-07-21 Quotations Envelope Implementation Office Partitions LK-MOIWRM-8983-CW-RFB / Rehabilitation of D1,D4, D9,D11,D17,D18, D24, Increasing climate resilience of Single Stage - One Pending D26,D27A &D30 canals IDA / 54170 Post Request for Bids Open - National 761,538.46 0.00 2017-03-03 2017-03-10 2017-03-31 2017-04-14 2017-05-19 2018-05-19 infrastructure Envelope Implementation CRIPAF/WORKS/ID- KAN/NCB/82 LK-MOIWRM-8985-CW-RFB / Rehabilitation of D43, D47,D48,D51,D57 canals Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 707,692.31 0.00 2017-03-03 2017-03-10 2017-03-31 2017-04-14 2017-05-12 2018-05-12 infrastructure Envelope Implementation CRIPAF/WORKS/ID- KAN/NCB/83 LK-MOIWRM-8987-CW-RFB / Rehabilitation of D2 canal Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 692,307.69 0.00 2017-03-03 2017-03-10 2017-03-31 2017-04-14 2017-05-12 2018-05-12 infrastructure Envelope Implementation CRIPAF/WORKS/ID- KAN/NCB/84 LK-MOIWRM-8997-CW-RFB / CRIPAF/WORKS/MASL/NCB/ 107 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 154,000.00 0.00 2017-03-03 2017-03-10 2017-03-31 2017-04-14 2017-05-12 2018-05-12 infrastructure Envelope Implementation Construction of Gabion wall U/S and D/S of 503 Anicut LK-MOIWRM-11894-CW-RFB / CRIP/WORKS/RDA/ICB/321 Increasing climate resilience of Single Stage - One Pending Design, Build and Maintenance IDA / 54170 Prior Request for Bids Open - International 1,481,481.48 0.00 2017-04-06 2017-04-11 2017-05-23 2017-07-22 2017-08-26 2018-02-22 infrastructure Envelope Implementation Contract for Stabilizing Rock Fall Locations on Kandy - Mahiyanganaya Road (A026) LK-MOIWRM-9121-CW-RFP / CRIPAF/WORKS/UVA/NCB/409 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 1,092,307.69 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 Medithale -Pathanawatta- infrastructure Envelope Implementation Thennpanguwa-Kiriwehara Road (Ch 15+800), (15+900) LK-MOIWRM-4991-CW-RFB / CRIPAF/WORKS/MASL/NS/ 106 Increasing climate resilience of Request for Single Stage - One Pending IDA / 54170 Post Limited 38,461.54 0.00 2017-04-20 2017-06-08 2017-07-08 Improvement Kandakaduwa tail infrastructure Quotations Envelope Implementation Canal LK-MOIWRM-9412-CW-RFP / CRIP/WORKS/RDA/NCB/320 Increasing climate resilience of Single Stage - One Pending Construction of New Bridge IDA / 54170 Post Request for Bids Open - National 2,222,222.22 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 infrastructure Envelope Implementation Across Thalawila Estuary on Nainamadama - Iranawila- Chilaw road. LK-MOIWRM-9111-CW-RFP / CRIPAF/WORKS/UVA/NCB/402 Kottagoda Podumilla Increasing climate resilience of Single Stage - One Pending Adiyarawattha Yalagamuwa IDA / 54170 Post Request for Bids Open - National 369,230.77 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 infrastructure Envelope Implementation Road (Culvert15/5-15/4) Kottagoda Podumilla Adiyarawattha Yalagamuwa Road (Culvert 16/3-16/4) LK-MOIWRM-9112-CW-RFP / CRIPAF/WORKS/UVA/NCB/403 Medithale -Pathanawatta- Thennpanguwa-Kiriwehara Road (Ch 4+500) Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 115,384.61 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 Medithale -Pathanawatta- infrastructure Envelope Implementation Thennpanguwa-Kiriwehara Road (Ch 5+500) Medithale -Pathanawatta- Thennpanguwa-Kiriwehara Road (Ch 8+700) LK-MOIWRM-9113-CW-RFP / CRIPAF/WORKS/UVA/NCB/404 Increasing climate resilience of Single Stage - One Pending Medithale -Pathanawatta- IDA / 54170 Post Request for Bids Open - National 153,846.15 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 infrastructure Envelope Implementation Thennpanguwa-Kiriwehara Road (Ch 13+700), (Ch 15+700), (Ch 17+800) LK-MOIWRM-9114-CW-RFP / CRIPAF/WORKS/UVA/NCB/405 Karametiya -Kandaketiya- Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 330,769.23 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 GalaUda Road (Ch 17+460), infrastructure Envelope Implementation (Ch 17+720), (Ch 17+950) Drainage Improvement and Removal of Earth cribs Page 8 LK-MOIWRM-9115-CW-RFP / CRIPAF/WORKS/UVA/NCB/406 Increasing climate resilience of Single Stage - One Pending Karametiya -Kandaketiya- IDA / 54170 Post Request for Bids Open - National 161,538.46 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 infrastructure Envelope Implementation GalaUda Road (Ch 19+260), (Ch 19+555-19+640), (Ch 19+875), (Ch 19+980) LK-MOIWRM-9116-CW-RFP / CRIPAF/WORKS/UVA/NCB/407 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 269,230.77 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 infrastructure Envelope Implementation Bridge at Ridimaliyadda- Ekiritankumbura Road LK-MOIWRM-9118-CW-RFP / CRIPAF/WORKS/UVA/NCB/408 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 861,538.46 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 Medithale -Pathanawatta- infrastructure Envelope Implementation Thennpanguwa-Kiriwehara Road (Ch 3+050), (Ch 6+400) LK-MOIWRM-9122-CW-RFP / CRIPAF/WORKS/UVA/NCB/410 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 315,384.61 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 infrastructure Envelope Implementation Haggala Ambagasdowa Road (Ch 3+500) LK-MOIWRM-9123-CW-RFP / CRIPAF/WORKS/UVA/NCB/411 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 215,384.62 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 Badulla-Kuttiyagolla-Kahataruppa- infrastructure Envelope Implementation Ilupathuthenna-Kolongaspitiya Road (7+700) LK-MOIWRM-9124-CW-RFP / CRIPAF/WORKS/UVA/NCB/412 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 415,384.62 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 infrastructure Envelope Implementation Attampitiya-Ketawela-Keenakele Road (Ch+10+500) LK-MOIWRM-9126-CW-RFP / CRIPAF/WORKS/UVA/NCB/414 Kottagoda-Podumilla- Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 1,307,692.31 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 Adiyarawatta-Yalagamuwa Road infrastructure Envelope Implementation (Ch1+140), (Ch4+200), (Ch4+500), (Ch5+400), (Ch5+700), (Ch9+150) LK-MOIWRM-9127-CW-RFP / CRIPAF/WORKS/UVA/NCB/415 Kottagoda-Podumilla- Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 684,615.38 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 Adiyarawatta-Yalagamuwa Road infrastructure Envelope Implementation (Ch11+000), (Ch14+700), (Ch14+850), (Ch 20+400), (Ch 20+700) LK-MOIWRM-9128-CW-RFP / CRIPAF/WORKS/UVA/NCB/416 Medithale -Pathanawatta- Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 230,769.23 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 Thennpanguwa-Kiriwehara Road infrastructure Envelope Implementation (16+700) Drainage Improvement and Removal of Earth cribs LK-MOIWRM-9129-CW-RFP / CRIPAF/WORKS/UVA/NCB/417 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 153,846.15 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 infrastructure Envelope Implementation Karametiya -Kandaketiya- GalaUda Road (Ch 9+240) LK-MOIWRM-9132-CW-RFP / CRIPAF/WORKS/UVA/NCB/418 Bambarapana-Dalukella- Pudumilla bypass Road (C1+538), (C1+607), (C1+711), Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 1,653,846.15 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 (C1+811), (C1+950), (C2+047), infrastructure Envelope Implementation (C2+100), (C2+147), (C2+200). (C2+236), (C2+336), (C2+450), (C2+586) Drainage Improvement and Removal of Earth cribs - By Pas LK-MOIWRM-8991-CW-RFP / CRIPAF/WORKS/UVA/NCB/401 Kottagoda Podumilla Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 192,307.69 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 Adiyarawattha Yalagamuwa infrastructure Envelope Implementation Road (Ch0+650), (Ch4+400), (Ch9+100), (Ch9+200), (Ch9+900) LK-MOIWRM-9125-CW-RFP / CRIPAF/WORKS/UVA/NCB/413 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 3,100,000.00 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 Pooja Nagaraya- infrastructure Envelope Implementation Pangaragammana-Loggaloya Road LK-MOIWRM-9411-CW-RFP / CRIP/WORKS/RDA/NCB/319 Increasing climate resilience of Single Stage - One Pending Construction of New Bridge near IDA / 54170 Post Request for Bids Open - National 2,444,444.44 0.00 2017-04-06 2017-04-13 2017-05-04 2017-05-18 2017-06-15 2018-06-15 infrastructure Envelope Implementation Udappuwa Town on Batthulu Oya- Udappuwa - Andimuni Road (B614) LK-MOIWRM-45206-CW-RFB / CRIP-CERC/Works/Kal/NCB/502 Repairing & Developing of selected roads with taring, Single Stage - One Pending Developing pebble roads with IDA / 54170 Contingent emergency response Post Request for Bids Open - National 61,578.95 0.00 2018-01-23 2018-01-31 2018-02-28 2018-03-28 2018-04-25 2018-09-22 Envelope Implementation J.C.B & Motar Grader, Construction of Ihala Kudaligama Bridge & Concreting of Selected roads in Bulathsinhala P.S. in Kaluthara District. LK-MOIWRM-5037-CW-RFB / CRIP/WORKS/RDA/NCB/309 Rectification of 02 unstable Increasing climate resilience of Single Stage - One Pending slopes at 194 km Post in IDA / 54170 Post Request for Bids Open - National 5,014,615.38 0.00 2017-02-27 2017-03-06 2017-03-27 2017-04-10 2017-05-08 2018-05-08 infrastructure Envelope Implementation Beragala -along Colombo- Rathnapura- Wellawaya Road (A004) LK-MOIWRM-45215-CW-RFB / CRIP-CERC/Works/Kal/NCB/503 Developing and Concreting of Single Stage - One Pending IDA / 54170 Contingent emergency response Post Request for Bids Open - National 105,131.58 0.00 2018-01-23 2018-01-30 2018-02-27 2018-03-27 2018-04-24 2018-09-21 selected roads in Palindanuwara Envelope Implementation Pradeshiya Saba in Kaluthara District Page 9 LK-MOIWRM-45218-CW-RFB / CRIP-CERC/Works/Kal/NCB/504 Concreting and Developing of Selected roads, Developing of Single Stage - One Pending Kalukandawa road's bridge and IDA / 54170 Contingent emergency response Post Request for Bids Open - National 103,881.58 0.00 2018-01-23 2018-01-30 2018-02-27 2018-03-27 2018-04-24 2018-09-21 Envelope Implementation Constructon of Weddekanda Petiwinna Dola retaining wall in Palindanuwara Pradeshiya Saba in Kaluthara District LK-MOIWRM-5089-CW-RFB / CRIPAF/WORKS/ID-TRI/NCB/59 Increasing climate resilience of Single Stage - One Pending Improvements to LB/2 D6 off LB IDA / 54170 Post Request for Bids Open - National 92,307.69 0.00 2017-03-13 2017-03-20 2017-04-10 2017-04-24 2017-05-22 2018-05-22 infrastructure Envelope Implementation Main Channel in Allai Extension Scheme in Muthur Division, Trincomalee Region LK-MOIWRM-5049-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/25 Increasing climate resilience of Single Stage - One Pending Improvements to RB 06 D 10 IDA / 54170 Post Request for Bids Open - National 284,615.38 0.00 2017-03-20 2017-03-27 2017-04-17 2017-05-01 2017-05-29 2018-05-29 infrastructure Envelope Implementation from 0 to 1+125 km in U.M.C. in Padaviya, RB 11 D10 from 0 to 1+200 km in L.M.C. in Padaviya Division, Anuradhapura LK-MOIWRM-4976-CW-RFB / CRIP/WORKS/NBRO/NCB/358 Rectification of unstable slopes Increasing climate resilience of Single Stage - One IDA / 54170 Post Request for Bids Open - National 230,769.23 0.00 Canceled 2017-01-30 2017-02-06 2017-02-27 2017-03-13 2017-04-10 2018-04-10 in the premises of Gampola infrastructure Envelope Buddhist College and Jinaraja Girls' Collage LK-MOIWRM-39179-CW-RFB / CRIP/WORKS/NBRO/NCB/350-1 Rectification of unstable slopes Increasing climate resilience of Single Stage - One Under IDA / 54170 Post Request for Bids Open - National 177,756.18 0.00 2017-12-04 2017-12-01 2017-12-09 2017-12-30 2018-01-13 2018-02-10 2018-08-09 in the premises of infrastructure Envelope Implementation Maha/Molagoda Sri Piyadassi Vidyalaya LK-MOIWRM-45275-CW-RFB / CRIP-CERC/Works/Kal/NCB/508 Repairing & Developing of selected roads, Repairing of Single Stage - One Pending Kottambagas Handiya to Pinwela IDA / 54170 Contingent emergency response Post Request for Bids Open - National 70,723.68 0.00 2018-01-23 2018-01-30 2018-02-27 2018-03-27 2018-04-24 2018-09-21 Envelope Implementation road with taring and Concreting of selected lanes and roads in Bandaragama PS (Millaniya) in Kaluthara District LK-MOIWRM-45146-CW-RFB / CRIP-CERC/Works/Kal/NCB/501 Repairing and Developing of selected roads with taring, Developing of a culvert, Single Stage - One Pending IDA / 54170 Contingent emergency response Post Request for Bids Open - National 77,763.16 0.00 2018-01-23 2018-01-30 2018-02-27 2018-03-27 2018-04-24 2018-09-21 Concreting of selected roads and Envelope Implementation Construction of Kotapanvila Circuler road's retaining wall in Bulathsinhala Pradeshiya Saba in Kaluthara District LK-MOIWRM-45313-CW-RFB / CRIP-CERC/Works/Gal/NCB/601 LOT 1- Interlocking of Ilukmandiyawaththa Road & LOT 2- Improvement of pinikahana Single Stage - One Pending Thotuwa Road in Pinikahana- IDA / 54170 Contingent emergency response Post Request for Bids Open - National 52,960.53 0.00 2018-01-23 2018-01-30 2018-02-27 2018-03-27 2018-04-24 2018-10-06 Envelope Implementation Elpitiya LOT 3- Concreting of Elamodara Road & LOT 4 - Concreting of Aviththawa Panigoda Road in Aviththawa-Elpitiya LK-MOIWRM-45320-CW-RFB / CRIP-CERC/Works/Gal/NCB/603 Lot 1-Concreting the rd near Kotagoga Kanda at Kotagoda Karawwa rd & retaining wall Single Stage - One Pending 2-Developing rd from IDA / 54170 Contingent emergency response Post Request for Bids Open - National 65,789.47 0.00 2018-01-23 2018-01-30 2018-02-27 2018-03-27 2018-04-24 2018-10-06 Envelope Implementation Thuduwagoda to Gugurugoda at Ganegama west 3-Concreating Kasideniya Abayagama rd 4-Reconstruction Brampi mawatha with tar LK-MOIWRM-45500-CW-RFB / CRIP-CERC/Works/Rat/NCB/701 Renovation of Karawita - Hangamuwa Road - Nivithigala & Elapatha D.S.Divisions Single Stage - One Pending IDA / 54170 Contingent emergency response Post Request for Bids Open - National 147,368.42 0.00 2018-01-24 2018-01-31 2018-02-28 2018-03-28 2018-04-25 2018-11-05 Construction of gabion wall for Envelope Implementation Ratmalathenna bridge & repairing the approach road - Ayagama D.S.Division in Ratnapura District LK-MOIWRM-45502-CW-RFB / CRIP-CERC/Works/Rat/NCB/702 Construction of retaining wall and repairs to Gonakumbura road (near 2.00 km) - Pelmadulla Single Stage - One Pending IDA / 54170 Contingent emergency response Post Request for Bids Open - National 103,684.21 0.00 2018-01-24 2018-01-31 2018-02-28 2018-03-28 2018-04-25 2018-11-05 D.S.Division Envelope Implementation Repairs to Kotamulla - Amuwala road (from 0.00 - 2.5km) - Elapatha D.S.Division in Ratnapura District LK-MOIWRM-45507-CW-RFB / CRIP-CERC/Works/Rat/NCB/703 Construction of retaining wall on 29/3 Thiriwanakatiya Agalawatta Single Stage - One Pending Road- Nivithigala D.S. Division IDA / 54170 Contingent emergency response Post Request for Bids Open - National 181,250.00 0.00 2018-01-24 2018-01-31 2018-02-28 2018-03-28 2018-04-25 2018-11-05 Envelope Implementation Construction of bridge no 2/5 at Ayagama kukulegama road - Ayagama D.S. Division in Ratnapura LK-MOIWRM-45509-CW-RFB / CRIP-CERC/Works/Rat/NCB/704 Construction of bridge no 63/9 at Single Stage - One Pending Panadura Nambapana IDA / 54170 Contingent emergency response Post Request for Bids Open - National 197,368.42 0.00 2018-01-24 2018-01-31 2018-02-28 2018-03-28 2018-04-25 2018-11-05 Envelope Implementation Rathnapura road - Kiriella D.S. Division in Ratnapura District LK-MOIWRM-45511-CW-RFB / CRIP- CERC/Works/Ham/NCB/901 Single Stage - One Pending Improvement of Beligalla- IDA / 54170 Contingent emergency response Post Request for Bids Open - National 327,631.58 0.00 2018-01-24 2018-01-31 2018-02-28 2018-03-28 2018-04-25 2018-09-22 Envelope Implementation Witharandeniya-Netolpitiya Road (11,12,13Km) - TDS BDS & BDS in Hambanthota District Page 10 LK-MOIWRM-45514-CW-RFB / CRIP- CERC/Works/Ham/NCB/902 Single Stage - One Pending Improvement of Radawela- IDA / 54170 Contingent emergency response Post Request for Bids Open - National 172,368.42 0.00 2018-01-24 2018-01-31 2018-02-28 2018-03-28 2018-04-25 2018-09-22 Envelope Implementation Dewalegama Road (2.2Km) - ODS & WDS in Hambanthota LK-MOIWRM-45478-CW-RFB / CRIP-CERC/Works/Gal/NCB/605 LOT No.1 - Develop the Dammala Janapada Road LOT No.2 - Develop theWeerapana west janapada Single Stage - One Pending IDA / 54170 Contingent emergency response Post Request for Bids Open - National 50,000.00 0.00 2018-01-24 2018-01-31 2018-02-28 2018-03-28 2018-04-25 2018-09-22 road (Buddagayawa, Envelope Implementation Suduwelipatha,Budumedura road) LOT No.3 - Kudugalpala Hallakanda Road in Thawalama (Galle District) LK-MOIWRM-45480-CW-RFB / CRIP-CERC/Works/Gal/NCB/606 LOT No.1 -Develop Happitiya wadimulla Baraniwala road Road Single Stage - One Pending IDA / 54170 Contingent emergency response Post Request for Bids Open - National 52,631.58 0.00 2018-01-24 2018-01-31 2018-02-28 2018-03-28 2018-04-25 2018-09-22 - Happitiya/ Pannimulla Envelope Implementation LOT No.2 -Develop Mawanana Gulanahena Road - Mawanana in Neluwa (Galle District) LK-MOIWRM-45483-CW-RFB / CRIP-CERC/Works/Gal/NCB/608 LOT No.1 -Taring Thalgaswala to Kumburuhena Road - Thalgaswala/Aluth pahala west/ Aluth Ihala South Single Stage - One Pending IDA / 54170 Contingent emergency response Post Request for Bids Open - National 55,921.05 0.00 2018-01-24 2018-01-31 2018-02-28 2018-03-28 2018-04-25 2018-10-07 LOT No.2 -Taring the road from Envelope Implementation Nagoda bridge to Gammeddegoda sri Sunandarama viharaya- Gammedegoda in Nagoda LK-MOIWRM-5057-CW-RFB / CRIPAF/WORKS/ID- ANU/NCB/32 Increasing climate resilience of Single Stage - One Flood damage RepairsIlluk Wewa IDA / 54170 Post Request for Bids Open - National 76,923.08 0.00 Canceled 2017-03-20 2017-03-27 2017-04-17 2017-05-01 2017-05-29 2018-05-29 infrastructure Envelope LB main canal D6/FC13 Drop, D5/FC4 Canal, L B main canal Bund road, D1/FC1 Canal Bund road LK-MOIWRM-4976-CW-RFB-2 / CRIP/WORKS/NBRO/NCB/358 Rectification of unstable slopes Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 174,000.00 0.00 2018-03-09 2018-03-14 2018-04-04 2018-05-02 2018-06-06 2018-12-03 in the premises of Gampola infrastructure Envelope Implementation Buddhist College and Jinaraja Girls' Collage GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LK-MOIWRM-1420-GO-RFQ / Procurement of Proffessional Request for Single Stage - One Pending IDA / 54170 Project implementation Post Limited 6,153.85 0.00 2017-01-03 2017-02-21 2017-03-23 Digital Camera for PMU Quotations Envelope Implementation CRIP/GOODS/S/47 LK-MOIWRM-1422-GO-RFQ / Request for Single Stage - One Pending Procurement of Multimedia IDA / 54170 Project implementation Post Limited 15,692.31 0.00 2017-01-09 2017-02-27 2017-03-29 Quotations Envelope Implementation Projectors LK-MOIWRM-1421-GO-RFB / Office Furniture for the Project Request for Single Stage - One Pending IDA / 54170 Project implementation Post Limited 19,230.77 0.00 2017-03-17 2017-05-19 2017-07-18 Implementation Unit of NBRO Quotations Envelope Implementation (CRIP/GOODS/S/03) LK-MOIWRM-1436-GO-RFQ / Office Furniture for all component Request for Single Stage - One Pending IDA / 54170 Project implementation Post Open - National 58,615.38 0.00 2017-05-15 2017-07-31 2017-08-30 Quotations Envelope Implementation CRIP/GOODS/S/42-2 LK-MOIWRM-1545-GO-RFB / Request for Single Stage - One Pending Office Equipment for RDA - IDA / 54170 Project implementation Post Limited 15,384.62 0.00 2017-05-10 2017-06-28 2017-07-28 Quotations Envelope Implementation CRIP/GOODS/S/09 LK-MOIWRM-1555-GO-RFQ / Communication system for Increasing climate resilience of Request for Single Stage - One Pending IDA / 54170 Post Limited 6,153.85 0.00 2016-12-19 2017-02-06 2017-03-08 monitoring floods for ID- infrastructure Quotations Envelope Implementation CRIP/GOODS/S/20 LK-MOIWRM-1538-GO-RFQ / GPS Equipment CRIP/GOODS/S/32 Request for Single Stage - One Pending IDA / 54170 Project implementation Post Limited 28,846.15 0.00 2016-09-27 2016-11-15 2016-12-15 (GPS high ended with Photo Quotations Envelope Implementation facilities Tabs to update & monitoring maps) LK-MOIWRM-1544-GO-RFQ / Office Equipment (Package 1) - Request for Single Stage - One Pending IDA / 54170 Project implementation Post Limited 37,692.31 0.00 2016-10-31 2016-12-19 2017-01-18 Photocopy Machines Quotations Envelope Implementation CRIP/GOODS/S/29 (i) LK-MOIWRM-1548-GO-RFQ / Office Equipment (Package 1) - (Photocopy machines (Color) Photocopy Machines (Black & White) Request for Single Stage - One Pending A4 Scanner IDA / 54170 Project implementation Post Limited 37,692.31 0.00 2016-10-31 2016-12-19 2017-02-17 Quotations Envelope Implementation Fax Machine Multimedia Projector Network A3 lasser printer A4 Lasser printer (black & white) A4 Lasser printer (color) ) LK-MOIWRM-1553-GO-RFQ / GPS Instruments and Other Request for Single Stage - One Pending IDA / 54170 Project implementation Post Limited 3,400.00 0.00 2016-12-19 2017-02-06 2017-03-08 machines for Component 01 - A0 Quotations Envelope Implementation Plotter - CRIP/GOOD/S/27-2 (a) LK-MOIWRM-1419-GO-RFB / Field equipments required for Single Stage - One Pending monitoring the ground IDA / 54170 Project implementation Post Request for Bids Open - National 76,923.08 0.00 2017-02-23 2017-03-09 2017-03-23 2017-04-06 2017-04-27 2017-05-27 Envelope Implementation movements during and post construction stage for NBRO LK-MOIWRM-3498-GO-RFB / Office Equipment (Package 2) Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 84,615.38 0.00 2017-01-01 2017-01-08 2017-01-29 2017-02-12 2017-03-12 2018-03-11 infrastructure Envelope Implementation CRIP/GOODS/NCB/30 Page 11 LK-MOIWRM-1437-GO-RFB / Office Furniture for all component Single Stage - One Pending IDA / 54170 Project implementation Post Request for Bids Open - National 76,923.08 0.00 2016-11-07 2016-11-14 2016-12-05 2016-12-19 2017-01-16 2017-03-17 Envelope Implementation CRIP/GOODS/NCB/42 LK-MOIWRM-1438-GO-RFB / Office and IT equipment with Single Stage - One Pending IDA / 54170 Project implementation Post Request for Bids Open - National 76,923.08 0.00 2017-05-09 2017-05-16 2017-06-06 2017-06-20 2017-07-18 2017-09-16 necessary software I-1 Envelope Implementation CRIP/GOODS/NCB/41-1 LK-MOIWRM-1441-GO-RFB / Office and IT equipment with Single Stage - One Pending IDA / 54170 Project implementation Post Request for Bids Open - National 76,923.08 0.00 2018-05-07 2018-05-14 2018-06-04 2018-06-18 2018-07-16 2018-08-15 necessary software II Envelope Implementation CRIP/GOODS/NCB/41 LK-MOIWRM-1442-GO-RFB / Office and IT equipment with Single Stage - One Pending IDA / 54170 Project implementation Post Request for Bids Open - National 122,307.69 0.00 2017-12-07 2017-12-14 2018-01-04 2018-01-18 2018-02-15 2018-03-17 necessary software I Envelope Implementation CRIP/GOODS/NCB/40 LK-MOIWRM-1443-GO-RFB / Modelling Software for Development of basin investment Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 461,538.46 0.00 2017-03-07 2017-03-14 2017-04-04 2017-04-18 2017-05-16 2017-06-15 Component 1 plans Envelope Implementation CRIP/GOODS/NCB/39 LK-MOIWRM-1547-GO-RFB / Procurement of Field Laboratory Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 300,000.00 0.00 2017-04-23 2017-04-30 2017-05-21 2017-06-04 2017-07-02 2017-08-01 Equipment for RDA and NBRO- infrastructure Envelope Implementation CRIP/GOODS/NCB/15 LK-MOIWRM-1549-GO-RFP / Flood Monitoring & Early warning Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 515,384.62 0.00 2017-04-30 2017-05-07 2017-05-28 2017-06-11 2017-07-09 2017-09-07 equipment for ID & current meter infrastructure Envelope Implementation for MASL-CRIP/GOODS/NCB/19 LK-MOIWRM-1536-GO-RFB / Equipments for National Water Single Stage - One Pending IDA / 54170 Project implementation Post Request for Bids Open - National 76,923.08 0.00 2017-07-16 2017-07-23 2017-08-13 2017-08-27 2017-09-24 2017-11-23 Resources Planning Cell-2 Envelope Implementation CRIP/GOODS/NCB/38-1 LK-MOIWRM-1537-GO-RFB / Equipments for National Water Single Stage - One Pending IDA / 54170 Project implementation Post Request for Bids Open - National 138,461.54 0.00 2016-11-07 2016-11-14 2016-12-05 2016-12-19 2017-01-16 2017-03-17 Resources Planning Cell-1 Envelope Implementation CRIP/GOODS/NCB/38 LK-MOIWRM-1540-GO-RFB / Single Stage - One Pending Office Equipment (Package 2) IDA / 54170 Project implementation Post Request for Bids Open - National 76,923.08 0.00 2016-11-06 2016-11-13 2016-12-04 2016-12-18 2017-01-15 2017-02-14 Envelope Implementation CRIP/GOODS/NCB/30 LK-MOIWRM-1546-GO-RFB / Procurement of Geotechnical Single Stage - One Pending IDA / 54170 Project implementation Post Request for Bids Open - National 246,153.85 0.00 2016-11-23 2016-11-30 2016-12-21 2017-01-04 2017-02-01 2017-03-03 Drilling Equipment for NBRO - Envelope Implementation CRIP/GOODS/NCB/07 LK-MOIWRM-1551-GO-RFB / Computers & Accessories ( Single Stage - One Pending IDA / 54170 Project implementation Post Request for Bids Open - National 53,846.15 0.00 2017-07-24 2017-07-31 2017-08-21 2017-09-04 2017-10-02 2017-12-01 Package 3) Envelope Implementation CRIP/GOODS/NCB/28 LK-MOIWRM-1550-GO-RFB / Field equipment required for Single Stage - One Pending application for mitigation IDA / 54170 Project implementation Post Request for Bids Open - National 307,692.31 0.00 2017-02-22 2017-03-01 2017-03-22 2017-04-05 2017-05-03 2017-06-02 Envelope Implementation measures for RDA - CRIP/GOODS/NCB/16 LK-MOIWRM-1554-GO-RFB / Procurement of Field Vehicles II - Single Stage - One Pending (Double Cabs - 1No. Mini bus- IDA / 54170 Project implementation Post Request for Bids Open - National 142,307.69 0.00 2016-12-14 2016-12-21 2017-01-11 2017-01-25 2017-02-22 2017-03-24 Envelope Implementation 01)(Package 2) - CRIP/GOODS/NCB/25 LK-MOIWRM-1557-GO-RFB / Computers & Accessories ( Single Stage - One Pending IDA / 54170 Project implementation Post Request for Bids Open - National 53,461.54 0.00 2017-01-15 2017-01-22 2017-02-12 2017-02-26 2017-03-26 2017-05-25 Package 2) Envelope Implementation CRIP/GOODS/NCB/27 LK-MOIWRM-9119-GO-RFQ / CRIPAF/GOODS/UVA/S/225 Request for Single Stage - One Pending IDA / 54170 Project implementation Post Limited 4,616.00 0.00 2017-03-20 2017-05-08 2017-06-07 Quotations Envelope Implementation Procurement of Office Furniture,Fiittings LK-MOIWRM-9135-GO-RFQ / CRIPAF/GOODS/UVA/S/228 Request for Single Stage - One Pending IDA / 54170 Project implementation Post Limited 3,077.00 0.00 2017-03-23 2017-05-11 2017-07-10 Quotations Envelope Implementation Telephone Lines, Intercom Sstem & Internet equipment's LK-MOIWRM-9138-GO-RFQ / CRIPAF/GOODS/UVA/S/229 Request for Single Stage - One Pending IDA / 54170 Project implementation Post Limited 1,539.00 0.00 2017-11-07 2017-12-26 2018-01-25 Quotations Envelope Implementation Personnel Safety Equipment LK-MOIWRM-9143-GO-RFB / CRIPAF/GOODS/UVA/NCB/230 Single Stage - One Pending IDA / 54170 Project implementation Post Request for Bids Open - National 184,616.00 0.00 2017-08-28 2017-09-18 2017-10-09 2017-10-23 2017-11-20 2018-03-20 Envelope Implementation Four Weel Double Cabs LK-MOIWRM-9144-GO-RFB / CRIPAF/GOODS/UVA/NCB/231 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 384,616.00 0.00 2017-03-22 2017-03-29 2017-04-19 2017-05-03 2017-05-31 2017-11-27 infrastructure Envelope Implementation Bailey bridge LK-MOIWRM-9147-GO-RFB / CRIPAF/GOODS/UVA/NCB/232 Increasing climate resilience of Single Stage - One IDA / 54170 Post Request for Bids Open - National 173,077.00 0.00 Canceled 2017-08-28 2017-09-04 2017-09-25 2017-10-09 2017-11-06 2018-05-05 infrastructure Envelope 01 Cube Lorry Trucks LK-MOIWRM-9148-GO-RFB / CRIPAF/GOODS/UVA/NCB/233 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 115,385.00 0.00 2017-05-15 2017-05-22 2017-06-12 2017-06-26 2017-07-24 2017-11-21 infrastructure Envelope Implementation Skid steer Loaders LK-MOIWRM-9149-GO-RFB / CRIPAF/GOODS/UVA/NCB/234 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 61,539.00 0.00 2017-03-13 2017-03-20 2017-04-10 2017-04-24 2017-05-22 2017-08-20 infrastructure Envelope Implementation Drilling Machine ,Jackhammer and Compressor Machine LK-MOIWRM-9154-GO-RFB / CRIPAF/GOODS/UVA/NCB/236 Increasing climate resilience of Single Stage - One Pending IDA / 54170 Post Request for Bids Open - National 57,693.00 0.00 2017-03-13 2017-03-20 2017-04-10 2017-04-24 2017-05-22 2017-08-20 infrastructure Envelope Implementation Disaster Mangement Equipments LK-MOIWRM-10588-GO-RFQ / CRIP/GOODS/S/48 Development of basin investment Request for Single Stage - One Pending IDA / 54170 Post Limited 15,000.00 0.00 2017-04-07 2017-05-26 2017-07-25 plans Quotations Envelope Implementation Purchase two data servers for DoM Page 12 LK-MOIWRM-9133-GO-RFB / CRIPAF/GOODS/UVA/NS/227 Increasing climate resilience of Request for Single Stage - One Pending IDA / 54170 Post Limited 20,000.00 0.00 2017-04-20 2017-06-08 2017-08-07 Installation of Server System for infrastructure Quotations Envelope Implementation Road Data Management and Software Development LK-MOIWRM-9152-GO-RFB / CRIPAF/GOODS/UVA/NS/235 Increasing climate resilience of Request for Single Stage - One Pending IDA / 54170 Post Limited 11,539.00 0.00 2017-04-20 2017-06-08 2017-08-07 infrastructure Quotations Envelope Implementation GIS Software and Acessories LK-MOIWRM-15964-GO-DIR / Development of basin investment Pending CRIP/GOODS/DP/39-i IDA / 54170 Prior Direct Selection Direct 33,850.00 0.00 2017-05-23 2017-05-28 2017-07-02 2017-12-29 plans Implementation Additional Aerial data for DBIP LK-MOIWRM-16397-GO-DIR / CRIP/GOODS/DP/39 - (ii) Development of basin investment Pending IDA / 54170 Post Direct Selection Direct 18,462.00 0.00 2017-05-29 2017-06-03 2017-07-08 2018-01-04 plans Implementation Procurement of License for ArcGIS Desktop LK-MOIWRM-24977-GO-DIR / CRIP-DOM/GOODS/DP/48 Development of basin investment Pending IDA / 54170 Post Direct Selection Direct 98,725.00 0.00 2017-08-15 2017-08-20 2017-09-24 2017-11-08 Accessing ECMWF digital NWP plans Implementation products - License for 2 years LK-MOIWRM-39200-GO-RFB / CRIP/GOODS/NCB/25 Increasing climate resilience of Single Stage - One Pending Procurement of Field Vehicles II - IDA / 54170 Post Request for Bids Open - National 107,767.18 0.00 2017-12-04 2017-12-18 2018-01-08 2018-02-07 2018-03-14 2018-09-10 infrastructure Envelope Implementation (Double Cabs - 1No. Mini bus- 01)(Package 2) LK-MOIWRM-39211-GO-RFB / CRIPAF/GOODS/UVA/NCB/230 Increasing climate resilience of Single Stage - One Pending Procurement of 03 Nos. of IDA / 54170 Post Request for Bids Open - National 176,344.39 0.00 2017-12-04 2017-12-18 2018-01-08 2018-02-07 2018-03-14 2018-09-10 infrastructure Envelope Implementation Double Cabs for CRIP UVA- PRDD LK-MOIWRM-53002-GO-RFQ / CRIP/GOODS/S/47 Increasing climate resilience of Request for Single Stage - One Pending IDA / 54170 Post Limited 4,460.00 0.00 2018-03-14 2018-05-16 2018-07-15 Procurement of Proffessional infrastructure Quotations Envelope Implementation Digital Camera for PMU NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LK-MOIWRM-14623-NC-DIR / Overseas Training Programme - Increasing climate resilience of Pending Flood Modelling and Design of IDA / 54170 Post Direct Selection Direct 36,500.00 0.00 2017-05-09 2017-05-14 2017-06-18 2017-12-15 infrastructure Implementation Drainage Systems at AIT- Thailand LK-MOIWRM-34060-NC-DIR / CRIP/NCS/PMU/DC/380 Training Programme on "Environmental and Social Increasing climate resilience of Pending IDA / 54170 Post Direct Selection Direct 8,775.00 0.00 2017-10-26 2017-10-31 2017-12-05 2018-06-03 Safeguard Management" for infrastructure Implementation CRIP Staff at Postgraduate Institute of Agriculture in University of Peradeniya CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CRIP/CS/QCBS/01 / Project implementation Consultancy Service for the Contingent emergency response Carrying out Flood and Drought Development of basin investment Quality And Cost- IDA / 54170 Prior Open - International N 5,000,000.00 3,038,177.37 Canceled 2016-05-26 Risk Assessment and plans Based Selection Development of Risk Mitigation Increasing climate resilience of Investment Plans infrastructure LK-MOIWRM-4111-CS-QCBS / Consultancy Service for Strategic Environmental Assessment of Development of basin investment Quality And Cost- Pending Development of River Basin Level- IDA / 54170 Post Open - National 233,333.33 0.00 2016-12-02 2016-12-21 2017-02-10 2017-03-10 2017-03-31 2017-04-21 2017-05-05 2017-10-02 plans Based Selection Implementation Flood and Drought Mitigation Investment Plans (DBIP) CRIP/CS/QCBS/01 LK-MOIWRM-7354-CS-CQS / CRIP/CS/CQS/09-4 Consultant Consultancy on Hydrology study Increasing climate resilience of Pending IDA / 54170 Post Qualification Open - National 3,846.15 0.00 2017-02-15 2017-03-08 2017-03-22 2017-03-29 2017-04-26 2017-10-23 for Udappuwa Town on Batthulu infrastructure Implementation Selection oya - Udappuwa - Andinuni Road (B614) LK-MOIWRM-7364-CS-CQS / CRIP/CS/CQS/09-5 Consultant Hydrology study for proposed Increasing climate resilience of Pending IDA / 54170 Post Qualification Open - National 7,692.31 0.00 2017-02-15 2017-03-08 2017-03-22 2017-03-29 2017-04-26 2017-10-23 Bridge at Thalwila Estuary on infrastructure Implementation Selection Nainamadama - Iranawila - Chilaw Road (B640) LK-MOIWRM-9354-CS-QCBS / CRIP/CS/QCBS/01-01 Consultancy Service for Strategic Development of basin investment Quality And Cost- Pending IDA / 54170 Post Open - National 369,231.00 0.00 2017-03-08 2017-03-08 2017-03-08 2017-04-05 2017-05-05 2017-06-09 2017-07-14 2018-07-14 Environmental Assessment of plans Based Selection Implementation Development of River Basin Level- Flood and Drought Mitigation Investment Plans (DBIP) LK-MOIWRM-10505-CS-QCBS / CRIP/CS/QCBS/16 Development of basin investment Quality And Cost- Under Hiring of Systems Integrator IDA / 54170 Prior Open - National 400,000.00 0.00 2017-03-24 2017-04-14 2017-05-31 2017-06-04 2017-07-02 2017-08-01 2017-08-15 2017-09-12 2018-09-12 plans Based Selection Implementation Consultant for Hydromet Observation and Information Systems Modernization LK-MOIWRM-10581-CS-CQS / CRIP/CS/CQS/13 Hiaring of international expert to Consultant expedite the development of the Development of basin investment Under IDA / 54170 Post Qualification Open - National 250,000.00 0.00 2017-03-24 2017-04-14 2017-04-26 2017-04-28 2017-05-05 2017-06-02 2017-11-29 CONOPS of the integrated plans Implementation Selection forecasting and early warning system - Senior International Advisor on Hydromet Modernization Page 13 LK-MOIWRM-10583-CS-CQS / CRIP/CS/CQS/14 Hiaring of international expert to Consultant Development of basin investment Under expedite the development of the IDA / 54170 Post Qualification Open - National 200,000.00 0.00 2017-03-24 2017-04-14 2017-04-26 2017-04-28 2017-05-05 2017-06-02 2017-11-29 plans Implementation CONOPS of the integrated Selection forecasting and early warning system - International Hydrological Advisor LK-MOIWRM-10586-CS-CQS / CRIP/CS/CQS/17 Consultant Development of basin investment Pending Develop the Architectural and IDA / 54170 Post Qualification Open - National 200,000.00 0.00 2017-03-24 2017-04-14 2017-04-28 2017-05-05 2017-06-02 2017-11-29 plans Implementation Engineering Design for the Selection forecasting and warning center at DoM LK-MOIWRM-17197-CS-QCBS / CRIP/CS/QCBS/01 Development of basin investment Quality And Cost- Pending IDA / 54170 Prior Open - International 6,000,000.00 0.00 2017-06-07 2017-06-07 2017-06-07 2017-06-07 2017-06-07 2017-06-07 2017-06-07 2017-06-07 Consultancy Service for plans Based Selection Implementation Development of Basin Investment Plan for Selected Basins.(ICB) LK-MOIWRM-14668-CS-QCBS / CRIP/CS/QCBS/18 Consultancy Service for Development of basin investment Quality And Cost- Under feasibility studies and detailed IDA / 54170 Post Open - International 2,000,000.00 0.00 2017-05-12 2018-02-15 2017-06-02 2017-05-30 2017-07-23 2017-08-20 2017-09-19 2017-10-03 2017-10-31 2019-10-31 plans Based Selection Implementation engineering designs for flood risk mitigation in Mundeni Aru river basin and Batticoloa LK-MOIWRM-14983-CS-CQS / CRIP/CS/CQS/11 Consultant International Consultant for Development of basin investment Pending IDA / 54170 Post Qualification Open - International 720,000.00 0.00 2017-05-12 2017-06-02 2017-06-16 2017-06-23 2017-07-21 2019-07-21 Design of Urgent River Bank plans Implementation Selection Restoration and protection works of Kelani River LK-MOIWRM-10584-CS-CQS / CRIP/CS/CQS/15 Hiaring of international expert to Consultant Development of basin investment expedite the development of the IDA / 54170 Post Qualification Open - National 150,000.00 0.00 Canceled 2017-03-24 2017-04-14 2017-04-26 2017-04-28 2017-05-05 2017-06-02 2017-11-29 plans CONOPS of the integrated Selection forecasting and early warning system - International Disaster Management Advisor LK-MOIWRM-17198-CS-CQS / CRIP/CS/CQS/20 Consultant Development of basin investment Under IDA / 54170 Post Qualification Open - International 100,000.00 0.00 2017-06-07 2017-10-10 2017-06-07 2017-06-21 2017-06-28 2017-07-26 2018-01-22 Hiring of International consultants plans Implementation Selection to lead the resettlement planning process in Kelani LK-MOIWRM-14660-CS-QCBS / CRIP/CS/QCBS/19 Consultancy service for detail engineering designs, preparation Development of basin investment Quality And Cost- Under IDA / 54170 Prior Open - International 2,000,000.00 0.00 2017-05-09 2017-05-30 2017-06-12 2017-07-20 2017-08-17 2017-09-16 2017-09-30 2017-10-28 2018-10-28 of bidding documents, and plans Based Selection Implementation construction supervision for proposed flood risk mitigation works in Kelani River Basin LK-MOIWRM-21549-CS-CQS / CRIP/CS/CQS/15 Hiaring of national expert to Consultant expedite the development of the Development of basin investment Pending IDA / 54170 Post Qualification Open - National 90,000.00 0.00 2017-07-24 2017-08-14 2017-08-28 2017-09-04 2017-10-09 2018-10-04 CONOPS of the integrated plans Implementation Selection forecasting and early warning system - National Disaster Management Advisor LK-MOIWRM-26051-CS-QCBS / Consultant CRIP/CS/CQS/22 Strategic Development of basin investment Pending IDA / 54170 Post Qualification Open - National 100,000.00 0.00 2017-08-24 2017-09-14 2017-10-28 2017-11-27 2018-01-01 2018-06-30 Social Assessment for Kalani plans Implementation Selection River Basin LK-MOIWRM-33237-CS-QCBS / CRIP/CS/QCBS/22 Strategic Social Assessment (SSA) for Disaster Risk Development of basin investment Quality And Cost- Under IDA / 54170 Post Open - National 100,000.00 0.00 2017-10-23 2017-10-25 2017-11-13 2017-12-27 2017-10-30 2018-01-26 2017-11-28 2018-02-25 2018-04-01 2018-05-06 2018-11-02 Management (DRM) Investment plans Based Selection Implementation Planning in Mahaweli, Attanagalu oya, Kelani and Mundeni Aru River Basins LK-MOIWRM-49995-CS-QCBS / CRIP/CS/QCBS/18 Consultancy Service for Development of basin investment Quality And Cost- Pending feasibility studies and detailed IDA / 54170 Prior Open - International 1,000,000.00 0.00 2018-02-21 2018-03-14 2018-05-04 2018-06-01 2018-07-01 2018-07-15 2018-08-19 2020-08-18 plans Based Selection Implementation engineering designs for flood risk mitigation in Mundeni Aru river basin and Batticoloa INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CRIP/CS/SSS/10 / Short Term Project implementation Local Technical Consultancy for Contingent emergency response LiDAR Survey in Implementation Development of basin investment IDA / 54170 Prior Direct Selection Direct N 0.00 6,903.69 Signed 2016-03-31 of Development of Basin plans Investment Plans under Climate Increasing climate resilience of Resilience Improvement Project infrastructure LK-MOIWRM-9212-CS-INDV / CRIPAF/CS/UVA/SSS/251 Increasing climate resilience of Individual Consultant Pending Consultancy Service for design, IDA / 54170 Post Direct 23,076.92 0.00 2017-03-20 2017-04-06 2017-04-20 2017-05-18 2017-11-14 infrastructure Selection Implementation Development, updating and maintenance of Software on Disaster Information Flat form LK-MOIWRM-9213-CS-INDV / CRIP/CS/SSS/05-1 Increasing climate resilience of Individual Consultant Pending Consultancy Services for IDA / 54170 Post Direct 23,076.92 0.00 2017-03-20 2017-04-06 2017-04-20 2017-05-18 2017-11-14 infrastructure Selection Implementation providing training on Environmental and Social safeguard management LK-MOIWRM-10617-CS-INDV / CRIP/CS/SSS/12 Strengthening the Forecasting Development of basin investment Individual Consultant Under System for Accelerating IDA / 54170 Prior Direct 180,000.00 0.00 2017-03-24 2017-04-10 2017-04-24 2017-05-22 2017-11-18 plans Selection Implementation Improvements in Quantitative Precipitation Estimates for Flood and Landslide early warning in Sri Lanka Page 14 LK-MOIWRM-25846-CS-CDS / CRIP/CS/SSS/23 Consultancy service for Detailed Engineering Designs, preparation of Bidding Documents, Supervision of Geo- Development of basin investment Under IDA / 54170 Prior Direct Selection Direct 2,000,000.00 0.00 2017-08-24 2018-01-09 2017-09-03 2018-02-07 2017-11-07 2020-11-06 technical Investigations for plans Implementation proposed flood risk mitigation works in Kelani River Basin from Hanwella to River mouth (both sides) in LK-MOIWRM-38414-CS-INDV / CRIP/CS/IC/25 Development of Communication Strategy together with Campaign Increasing climate resilience of Individual Consultant Pending IDA / 54170 Post Direct 6,510.00 0.00 2017-11-27 2017-12-07 2017-12-28 2018-02-01 2018-11-28 and Coordination of infrastructure Selection Implementation Implementation of Communication Campaign for the project LK-MOIWRM-38424-CS-CDS / CRIPAF/CS/UVA/SSS/250 Providing consultancy service on Increasing climate resilience of investigation, Design, preparation IDA / 54170 Prior Direct Selection Direct 423,076.92 417,788.48 Signed 2017-11-27 2017-12-08 2017-12-14 2018-01-25 2017-12-08 2018-07-24 infrastructure of BOQs, costing and Construction Supervision for Civil Works LK-MOIWRM-9211-CS-INDV / CRIPAF/CS/UVA/SSS/250 Providing consultancy service on Increasing climate resilience of Individual Consultant IDA / 54170 Post Direct 423,076.92 0.00 Canceled 2017-03-20 2017-11-09 2017-04-06 2017-04-20 2017-11-21 2017-05-18 2017-11-14 investigation, Design, preparation infrastructure Selection of BOQs, costing and Construction Supervision for Civil Works LK-MOIWRM-40102-CS-CDS / CRIP/CS/SSS/21 (A) Hiring of Consultant Team for Development of basin investment carrying out Socio-economic IDA / 54170 Prior Direct Selection Direct 200,000.00 187,772.59 Signed 2017-12-18 2017-12-20 2017-12-28 2018-03-03 2017-11-20 2018-08-30 plans surveys, Inventory of Losses, Census Survey, and Community Consultations for Resettlement Planning LK-MOIWRM-24942-CS-CDS / CRIP/CS/SSS/21 Hiring of Consultant Team for carrying out Socio-economic Development of basin investment IDA / 54170 Post Direct Selection Direct 100,000.00 0.00 Canceled 2017-08-15 2017-08-25 2017-10-29 2018-04-27 surveys, Inventory of Losses, plans Census Survey, and Community Consultations for Resettlement Planning Page 15