Fdot District Five Hq Partial Hvac Replacement
Total Page:16
File Type:pdf, Size:1020Kb
FLORIDA DEPARTMENT OF TRANSPORTATION TECHNICAL SPECIFICATIONS for FDOT DISTRICT FIVE HQ PARTIAL HVAC REPLACEMENT Financial Project Number: 440452-3-52-01 FDOT “FCO” Program Prepared By: Wantman Group, Inc. December 2018 100% Submittal TECHNICAL SPECIFICATIONS For FDOT DISTRICT FIVE HQ PARTIAL HVAC REPLACEMENT Financial Project ID 440452-3-52-01 The official record of this Technical Special Provision has been electronically signed and sealed using a Digital Signature as required by Rule 61G 15-23.004, F.A.C and Rule 61G1-16.005, F.A.C. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. O F F L E O Approved By: L UT R T T M C A I A I D N T R ARCHITECTURAL N A E S Registered Architect: ✩ ERIC LUTTMANN, AIA Date: R 12/10/2018 E T Fla. License No.: G AR97111 C AR97111 I E S T R. F T I EN OR MECHANICAL E CH H E NS K RED AR P I C E N Professional Engineer: E L E STEPHEN R. FORKNER, PE T No 80532 R Date: S 12/10/2018 Fla. License No: PE 80532 P ELECTRICAL R STATE OF R O E Professional Engineer: C. A F F E ROBERT C. ANSTON, PE RT N E L A N E S S O R I D I Date: CE NS E T S G 12/10/2018 B L I O IO N Fla. License No.: O N NAL E PE 40858 R No 40858 P R STATE OF R O E F F E E L A S O R I D I N SI G ONA L EN Date: 2018 Firm Name: Wantman Group Inc. Firm Address: 3111 W. Dr. Martin Luther King Jr. Blvd, Suite 375 City, State, Zip Code: Tampa FL, 33607 Certificate of Authorization: # 6091 State of Florida DOT SIGNATURE SHEET Page 1 of 1 FDOT District Five HQ Partial HVAC Replacement 100% Construction Document Submittal Date – December 10. 2018 FPID 440452-3-52-01 FLORIDA DEPARTMENT OF TRANSPORTATION TECHNICAL SPECIFICATIONS For FDOT DISTRICT FIVE HQ PARTIAL HVAC REPLACEMENT TABLE OF CONTENTS SECTION TITLE DIVISION 01 – GENERAL REQUIREMENTS 01 10 00 SUMMARY 01 12 16 PHASING, SEQUENCING, AND WORK RESTRICTIONS 01 31 00 PROJECT MANAGEMENT AND COORDINATION 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION 01 33 00 SUBMITTAL PROCEDURES 01 40 00 QUALITY REQUIREMENTS 01 42 00 REFERENCES 01 60 00 PRODUCTS REQUIREMENTS 01 73 00 EXECUTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 01 77 00 CLOSEOUT PROCEDURES 01 78 23 OPERATION AND MAINTENANCE DATA 01 79 00 DEMONSTRATION AND TRAINING 01 91 13 COMMISSIONING State of Florida DOT TABLE OF CONTENTS Page 1 of 3 FDOT District Five HQ Partial HVAC Replacement 100% Construction Document Submittal Date – December 10, 2018 FPID 440452-3-52-01 DIVISION 02 – EXISTING CONDITIONS 02 41 16 SELECTIVE DEMOLITION DIVISION 09 – FINISHES 09 22 16 NON-STRUCTURAL METAL FRAMING DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING 23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 23 05 17 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 23 05 48.13 VIBRATION CONTROLS FOR HVAC 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 07 13 DUCT INSULATION 23 07 19 HVAC PIPING INSULATION 23 08 00 COMMISSIONING OF HVAC 23 09 23 DIRECT DIGITAL CONTROL (DDC) SYSTEM FOR HVAC 23 09 23.12 CONTROL DAMPERS 23 23 00 REFRIGERANT PIPING 23 31 13 METAL DUCTS 23 33 00 AIR DUCT ACCESSORIES 23 37 13 DIFFUSERS, REGISTERS, AND GRILLES 23 81 29 VARIABLE REFRIGERANT VOLUME (VRV, VRF) HVAC SYSTEM 23 81 30 VARIABLE REFRIGERANT VOLUME (VRV, VRF) 100% OUTDOOR AIR HVAC SYSTEM DIVISION 26 – ELECTRICAL 26 05 00 BASIC METHODS AND REQUIREMENTS ELECTRICAL 26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 26 05 44 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 27 26 WIRING DEVICES 26 28 13 OVERCURRENT PROTECTIVE DEVICES 26 29 13 MOTOR CONTROLLERS AND CONTACTORS 26 29 23 VARIABLE FREQUENCY MOTOR CONTROLLERS State of Florida DOT TABLE OF CONTENTS Page 2 of 3 FDOT District Five HQ Partial HVAC Replacement 100% Construction Document Submittal Date – December 10, 2018 FPID 440452-3-52-01 26 43 13 SURGE PROTECTION DEVICES FOR LOW VOLTAGE ELECTRICAL POWER CIRCUITS DIVISION 28 – ELECTRONIC SAFETY AND SECURITY 28 31 11 DIGITAL ADDRESSABLE FIRE ALARM SYSTEM SECTION TITLE ATTACHMENTS No attachment. END OF TABLE OF CONTENTS State of Florida DOT TABLE OF CONTENTS Page 3 of 3 FDOT District Five HQ Partial HVAC Replacement 100% Construction Document Submittal Date – December 10, 2018 FPID 440452-3-52-01 SECTION 01 10 00 SUMMARY PART 1 - GENERAL 1.1 PROJECT DESCRIPTION A. The general overall description of the work of the Contract for the: FDOT District Five HQ Partial HVAC Replacement 719 S Woodland Blvd, DeLand, FL 32720 can be summarized as follows: The Florida Department of Transportation (Department) intends to partially replace the existing HVAC system at the District 5 headquarters office annex building. The proposed work will consist of new mechanical equipment that consists of Outdoor VRF Heat Pump With Heat Recovery Systems. tasks include architectural and electrical work to support the complete project scope. This project will require phasing to allow for functional operations of the existing facility while the HVAC replacement takes place. In addition to the new HVAC equipment, work includes selective demolition, architectural finishes, ductwork and electrical items. B. Refer to Asbestos Containing Materials (ACM) and Lead Based Paint (LBP) report provided by the FDOT. C. Contract Documents: 1. Requirements of the work are contained in the Contract Documents, and include cross-references herein to published information, which is not necessarily bound therewith. 1.2 ASSIGNMENT OF MANUFACTURERS’ OR OTHER SELLERS’ WARRANTIES A. The Contractor shall assign to the Department any and all manufacturers’ or other sellers’ warranties that come with any products, material or supplies which are incorporated into or are consumed in the project in any way. Assignment of such warranties shall be effective on the date of Final Acceptance. To the extent that any such warranties do not extend to subsequent purchasers or owners or such warranties contain a limitation on assignment, the Contractor agrees that the Contractor purchased the products, materials and supplies on behalf of the Department with the intent that the Department be the intended recipient of any State of Florida DOT SECTION 01 10 00 SUMMARY FDOT District Five HQ Partial HVAC Replacement Page 1 of 3 100% Construction Document Submittal Date – December 10, 2018 FPID 440452-3-52-01 warranties. All documents associated with or describing any such warranties shall be delivered to the Engineer along with the other project Final Acceptance documents and shall be deemed to be a part of the required Final Acceptance documentation. The Contractor shall not take any action or fail to act in any way which voids any such warranties. All subcontracts shall contain a similar provision which requires subcontractors to assign any such warranties to the Department. B. All costs for manufacturers’ or other sellers’ warranties shall be borne by the Contractor, as no separate payment shall be made for this work. All costs associated with this warranty shall be included in the Lump Sum Cost of this work. The Department reserves the sole right to determine defects in the materials and systems installed or modified by this project and the acceptability of the warranty repair and defect correction, including adjustment of equipment provided as a part of this project. 1.3 LIMITS OF CONSTRUCTION A. All existing facilities disturbed by the Contractor outside the construction limits indicated on plans, shall be restored, to the Engineer's satisfaction, at the Contractor's expense. 1.4 CONSTRUCTION LAYOUT AND STAKES A. The Contractor shall furnish all lines and measurements necessary for the proper protection and control of the work under these Contract Documents. 1.5 SCHEDULING A. The Contractor shall be responsible for the planning and scheduling, and the coordination of all work performed under the Contract Documents, and the entire project as a whole so that materials will arrive on schedule and installation will proceed without delay. 1.6 COOPERATION BETWEEN CONTRACTORS A. The Department reserves the right to contract for and perform other or additional construction on or near the work covered by this Contract. B. When separate contracts are let within or near the limits of this project, the Contractor shall conduct his work so as not to interfere with or hinder the progress of completion of the construction performed by other contractors. Contractors working on the same project shall cooperate with each other as directed by the Engineer. State of Florida DOT SECTION 01 10 00 SUMMARY FDOT District Five HQ Partial HVAC Replacement Page 2 of 3 100% Construction Document Submittal Date – December 10, 2018 FPID 440452-3-52-01 C. The Contractor shall arrange his work and shall place and dispose of the materials being used so as not to interfere with the operations of the other contractors within or near the limits of this project. The Contractor shall join his work with that of the others in an acceptable manner and shall perform it in proper sequence to that of the others.