New Company Profile 6

Total Page:16

File Type:pdf, Size:1020Kb

New Company Profile 6 16 YESB SDN BHD G7 B B07 B28 ; G7 ME E04 M02 E03 E06 M01 E02 M02 E10 E11 E16 E17 M15. - Dato’ Danny Yip - Company Awards Name of Company YESB Sdn Bhd Registered Address No.7, Jalan YTN 3, Industri Desa Aman, 52200 Kuala Lumpur, W. Persekutuan. Telephone No. +603-6263 7723 Website www.yesb.com.my Date of Establishment 7th June 2002 Bankers HSBC BANK (M) BHD (KEPONG) OCBC BANK (M) BHD (KEPONG) STANDARD CHARTERED BANK (M) BHD (KEPONG) Accountant Group Services Sdn Bhd 2017 Hotel 2017 Specialist Hospital 2017 Hotel Riccarton Capsule Hotel - Titiwangsa KPJ Rawang Specialist Hospital Riccarton Capsule Hotel Jonkerview Cottage Melaka Wisma Q Titiwangsa, Jalan Rawang, Bandar Baru, Jalan Pahang, Kuala Lumpur Rawang, Selangor Jalan Tun Tan Cheng Lock, Taman Kota Laksamana, Melaka Proposed design for electrical system, ELV system and provide electrical renovation Proposed Design for electrical system, ELV system and provide electrical renovation Proposed design for electrical system, ELV system and provide electrical RM536,681.00 renovation. RM1,648,094.00 March 2017 RM105,000.00 April 2017 November 2018 2017 Corporate Office 2017 Airport Lounge 2017 Specialist Hospital HSBC Bursa KL (L6, L7, L8) MAB Golden Lounge KPJ Damansara Specialist Hospital (Satelite, Regional & Domestic) (Level 3) Bursa Malaysia, Jalan Persiaran Maybank, Kuala Lumpur Kuala Lumpur International Airport (KLIA) SS20/10, Damansara Utama, Sepang, Selangor Petaling Jaya, Selangor Proposed Reinstatement Work Proposed Refurbishment Works. Proposed Design for electrical system, RM220,048.00 ELV system, fire protection system and provide electrical renovation. RM518,066.00 December 2017 RM1,770,991.00 April 2018 November 2018 2018 Shopping Center 2018 Financial Institution 2019 Manucfacturer IOI Puchong Mall CIMB Investment Bank KYB-UMW Malaysia Sdn. Bhd. Jalan Puchong, Tropicana Office Tower, Kawasan Industri, Bandar Puchong Jaya, Selangor Petaling Jaya, Selangor Telok Panglima Garang, Selangor Proposed design for eletrical system and provide electrical renovation Proposed design for electrical Supply, Delivery, Installation, Testing, system, fire protection system and Commissioning and Maintainance of RM1,305,741.00 provide electrical renovation. the electrical installation February 2019 RM2,105,446.00 RM2,550,000.00 December 2018 February 2020 2019 Factory 2019 Logistics Services 2019 Office Building Factory at Kundang Rawang CJ Century Logistics Warehouse AIA at Menara Standard Chartered Bandar Kundang, Kawasan Perindustrian Bukit Raja, Menara AIA Sentral, Mukim Rawang, Selangor Daerah Klang, Selangor Jalan Sultan Ismail, Kuala Lumpur Proposed for Low Voltage and Extra Low Voltage services. Proposed design for electrical system Proposed design for electrical system and provide eletrical renovation. and provide eletrical renovation. RM866,341.00 RM175,550.00 RM2,147,358.00 May 2019 January 2020 March 2020 CIMB Bank Berhad IOI Puchong Mall KYB-UMW Malaysia Sdn Bhd CJ Century Logistics YESB Sdn Bhd (772348-A) No.7, Jalan YTN 3, Industri Desa Aman, 52200 Kuala Lumpur, W. Persekutuan, Malaysia. +603-6263 7723.
Recommended publications
  • Company Information
    Sri Binaraya Sdn Bhd Company Profile 1 Table of Contents About Us .................................................................................................................................. 3 Company Information .............................................................................................................. 3 Corporate Structure .................................................................................................................. 4 Board of Directors .................................................................................................................... 5 List of Management................................................................................................................ 12 Plant and Equipment Inventory .............................................................................................. 14 Key Current Projects ............................................................................................................... 16 Residential .......................................................................................................................... 16 Mixed-use ........................................................................................................................... 19 Key Completed Projects .......................................................................................................... 21 Development Project ........................................................................................................... 21 Local Projects......................................................................................................................
    [Show full text]
  • Download Proclamation of Sale
    PROCLAMATION OF SALE IN THE HIGH COURT OF MALAYA AT SHAH ALAM IN THE STATE OF SELANGOR DARUL EHSAN, MALAYSIA APPLICATION FOR EXECUTION NO: BA-38-617-06 / 2016 (In the matter of Section 256 National Land Code, 1965) And (In the matter of Order 83 Rules of Court 2012) And (In the matter of Charge dated 08-01-2007 registered on 22-03-2007 held under Presentation No.1554/2007 over the land held under Title No. Geran 44267/M2/1/98 Lot No. 1032 Town of Kundang District of Gombak State of Selangor) BETWEEN HONG LEONG BANK BERHAD (97141 - X) …PLAINTIFF (yang telah mengambilalih semua asset dan liability Eon Bank Berhad melalui Perintah Letakhak bertarikh 17-06-11) AND 1. MUHAMAD JIBRIL BIN MUZAIYIN (NRIC NO.860418-56-6053) 2. BAZILAH BINTI ACHMAD SATTAR (NRIC NO. 860719-56-5564) …DEFENDANTS In pursuance to the Orders of the High Court of Malaya at Shah Alam about Order for Sale dated 17/05/2016 and Orders dated 03/08/2016, 24/11/2016 and 18/04/2017 respectively, it is hereby proclaimed that the Deputy Registrar / Senior Assistant Registrar, High Court of Malaya at Shah Alam with the assistance of the Licensed Auctioneer who is appointed by the Court. WILL SELL BY PUBLIC AUCTION ON TUESDAY 06TH JUNE, 2017 AT 10.30 A.M. AT THE AUCTION ROOM, HIGH COURT OF MALAYA AT SHAH ALAM, BANGUNAN MAHKAMAH SULTAN SALAHUDDIN ABDUL AZIZ SHAH, TINGKAT 1, SAYAP KIRI, PERSIARAN PEGAWAI, SEKSYEN 5, 40000 SHAH ALAM, SELANGOR DARUL EHSAN. Note: Prospective bidders are advised to conduct an official title search at the relevant Land Office and to inspect the subject property and make the necessary enquiries prior to the auction sale and to seek legal advice on the Condition of Sale.
    [Show full text]
  • MAH SING GROUP BERHAD Registration No.: 199101019838 (230149-P) (Incorporated in Malaysia)
    MAH SING GROUP BERHAD Registration No.: 199101019838 (230149-P) (Incorporated in Malaysia) Interim Financial Report 30 June 2021 MAH SING GROUP BERHAD Registration No.: 199101019838 (230149-P) (Incorporated in Malaysia) Interim Financial Report - 30 June 2021 Page No. Condensed Consolidated Statement Of Financial Position 1 Condensed Consolidated Statement Of Profit Or Loss 2 Condensed Consolidated Statement Of Other Comprehensive Income 3 Condensed Consolidated Statement Of Changes In Equity 4 - 5 Condensed Consolidated Statement Of Cash Flows 6 - 7 Notes To The Interim Financial Report 8 - 21 MAH SING GROUP BERHAD (199101019838 (230149-P)) (Incorporated in Malaysia) CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION As at 30 June 2021 (The figures have not been audited) (Restated) (Restated) AS AT AS AT AS AT 30/06/2021 31/12/2020 01/01/2020 RM'000 RM'000 RM'000 ASSETS Non-Current Assets Property, plant and equipment 342,346 242,021 225,674 Prepaid lease payments 3,753 3,960 4,511 Right-of-use assets 52,272 46,068 18,561 Investment properties 185,880 185,880 195,880 Land held for property development 1,902,950 1,784,776 1,743,445 Intangible assets 5,129 5,145 5,174 Deferred tax assets 182,789 175,676 151,921 2,675,119 2,443,526 2,345,166 Current Assets Property development costs 1,469,305 1,541,522 1,518,138 Inventories 716,816 736,772 746,965 Trade and other receivables 624,959 622,016 559,953 Contract assets 359,011 265,321 352,012 Contract cost assets 59,802 52,630 51,480 Current tax assets 9,766 11,214 8,182 Deposits, cash and
    [Show full text]
  • Ls Transformer
    PROJECT REFERENCES: LS TRANSFORMER Last updated: 17-Apr-18 CERTIFICATIONS & APPROVALS KEMA Type Test comply to IEC60076 - Made in KOREA. - Manufacturer Cast Resin Transformer. 2 CONDOMINIUMS HIGHPARK by GAMUDA AMANJA CONDOMINIUM ONE CENTRAL PARK BLK B HYPERMARKETS BANGI AVENUE HOMEMART G-ORANGE MYDIN SEMENYIH 3 FACTORIES TELE-PAPER GOLD COLD FACTORY ADTEK MALAYSIA HOTELS & RESORTS RITZ CARLTON KL VIVA HOTEL, UE3 SWISS GARDEN KL 4 SHOPPING MALL & OFFICE BLOCKS SUMMIT USJ SHAW PARADE QUILL 9 FACILITIES UKM KL NAVY BASE, LUMUT 5 Project References in Malaysia - LS Transformer (Made in Korea) Power Rating No. Project Name Quantity Transformer Detail Year (kVA) 1 QUELL 9, SECTION 19, PJ 2 2500 11KV/433V, Cast Resin, Copper / Copper 2008 2 NAVY BASE, LUMUT 1 1000 11KV/433V, Cast Resin, Aluminium / Aluminium 2008 3 SWISS GARDEN, KL 2 2500 11KV/433V, Cast Resin, Aluminium / Aluminium 2008 1 1500 11KV/433V, Cast Resin, Copper / Copper 2010 4 C2C - WANGSA MAJU 2 2000 11KV/433V, Cast Resin, Copper / Copper 2010 5 FACTORY ADTEK MALAYSIA SDN BHD 1 1600 11KV/433V, Cast Resin, Copper / Copper 2010 2 2500 33KV/433V, Cast Resin, Copper / Copper 2011 6 FULLOOP 2 3000 33KV/433V, Cast Resin, Copper / Copper 2011 7 PROJECT IN VIETNAM 1 630 6.6KV/400V, Cast Resin, Copper / Copper 2011 8 ASTON VILLA-KLANG LAMA 6 1500 11KV/433V, Cast Resin, Copper / Copper 2011 9 GLOMAC DAMANSARA 1 1600 11KV/433V Cast Resin Copper / Copper 2012 10 VIVA HOTEL UE3, KL 2 2000 11KV/433V, Cast Resin, Copper / Copper 2012 6 Project References in Malaysia - LS Transformer (Made in Korea) Power Rating No.
    [Show full text]
  • BSL CORPORATION BERHAD Company No
    BSL CORPORATION BERHAD Company No. 200401012615 (651118-K) Website : www.bslcorp.com.my Email : [email protected] UNAUDITED CONDENSED CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME FOR THE QUARTER ENDED 31 MAY 2021 INDIVIDUAL QUARTER CUMULATIVE QUARTER CURRENT PRECEDING CURRENT PRECEDING YEAR YEAR YEAR YEAR QUARTER QUARTER TO DATE TO DATE 31-May-21 31-May-20 31-May-21 31-May-20 RM'000 RM'000 RM'000 RM'000 Continuing Operations Revenue 43,635 20,017 128,516 93,985 Cost of sales (40,452) (20,636) (117,433) (89,769) Gross profit 3,183 (619) 11,083 4,216 Other income 1,541 522 4,058 1,913 Other expenses (3,208) (2,382) (8,786) (8,021) Results from operating activities 1,516 (2,479) 6,355 (1,892) Interest expense (111) (111) (336) (448) Profit before tax 1,405 (2,590) 6,019 (2,339) Income tax expense (465) 178 (1,503) (21) Profit for the period/year 940 (2,412) 4,516 (2,360) Other comprehensive income: Revaluation gain on property, plant and equipment 3,824 - 3,824 - Exchange differences on translation of foreign operations 6 - 19 (1) TOTAL COMPREHENSIVE INCOME FOR THE PERIOD/YEAR 4,770 (2,412) 8,358 (2,361) Profit/(Loss) attributable to : Equity holders of the company 1,050 (2,305) 4,579 (2,063) Non-controlling interest (110) (107) (63) (298) 940 (2,412) 4,516 (2,360) Total comprehensive profit/(loss) attributable to : Equity holders of the company 4,880 (2,305) 8,421 (2,064) Non-controlling interest (110) (107) (63) (298) 4,770 (2,412) 8,358 (2,361) Basic Earnings Per Share based on the weighted average number of shares in issue (Sen) 1.09 (2.39) 4.74 (2.13) Notes: The Unaudited Condensed Consolidated Statements Of Comprehensive Income should be read in conjunction with the Annual Financial Statements of BSL Corporation Berhad for the financial year ended 31 August 2020.
    [Show full text]
  • Integrated Annual Report 2020 Inside This Report Cover Rationale
    MAH SING GROUP BERHAD Registration No.: 199101019838 (230149-P) No.: Registration CENTRAL REGION (HQ) +603 9221 6888 / 1-300-80-6888 NORTHERN REGION +604 6288 188 • PENANG SOUTHERN REGION +607 3554 888 • JOHOR EAST MALAYSIA +6088 278 688 • SABAH www.mahsing.com.my INTEGRATED ANNUAL REPORT 2020 REPORT ANNUAL INTEGRATED INSIDE THIS REPORT COVER RATIONALE OUR BUSINESS 02 06 07 08 10 11 About This Corporate Our Vision. Corporate Corporate Corporate Report Information Our Mission Milestones Profile Structure OUR INTEGRATED REPORTING JOURNEY 24 25 27 30 32 33 Our Approach Our External Our Business Property Building Homes, Plastics to Value Environment Strengths Value Chain Creating Values, Manufacturing Creation Empowering Value Chain Households OUR SUSTAINABILITY OUR CORPORATE STATEMENT GOVERNANCE 81 88 92 112 130 131 Profile Of The Profile Of Our Sustainability Corporate Directors’ Responsibility Additional Board Of Directors Senior Statement Governance Statement in Respect Compliance Management Overview Statement of the Preparation of Information Team the Annual Audited Financial Statements 154 156 160 163 263 264 Statements of Statements of Statements of Notes to the Statement by Declaration by the Financial Position Changes in Cash Flows Financial Directors Officer Primarily Equity Statements Responsible for the Financial Management of the Company The year 2020 saw the world impacted by the COVID-19 pandemic, The above business strategies and developments are anchored by as almost all businesses worldwide were disrupted by lockdowns, a driving passion and commitment to sustainability; an increased industry shutdowns, restricted movement orders and other focus on environmental, social and governance performance as developments amidst a new normal scenario. well as the importance of improving non-financial performance in tandem with revenues and profits.
    [Show full text]
  • MAH SING GROUP BERHAD Registration No.: 199101019838 (230149-P) (Incorporated in Malaysia)
    MAH SING GROUP BERHAD Registration No.: 199101019838 (230149-P) (Incorporated in Malaysia) Interim Financial Report 30 September 2020 MAH SING GROUP BERHAD Registration No.: 199101019838 (230149-P) (Incorporated in Malaysia) Interim Financial Report - 30 September 2020 Page No. Condensed Consolidated Statement Of Financial Position 1 Condensed Consolidated Statement Of Profit Or Loss 2 Condensed Consolidated Statement Of Other Comprehensive Income 3 Condensed Consolidated Statement Of Changes In Equity 4 - 5 Condensed Consolidated Statement Of Cash Flows 6 - 7 Notes To The Interim Financial Report 8 - 17 MAH SING GROUP BERHAD (199101019838 (230149-P)) (Incorporated in Malaysia) CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION As at 30 September 2020 (The figures have not been audited) (AUDITED) AS AT AS AT 30/09/2020 31/12/2019 RM'000 RM'000 ASSETS Non-Current Assets Property, plant and equipment 208,770 225,674 Prepaid lease payments 3,964 4,511 Right-of-use assets 8,480 18,561 Investment properties 195,880 195,880 Land held for property development 1,794,183 1,750,409 Intangible assets 5,160 5,174 Deferred tax assets 169,020 145,606 2,385,457 2,345,815 Current Assets Property development costs 1,602,463 1,531,647 Inventories 694,208 763,276 Trade and other receivables 520,626 559,953 Contract assets 303,965 403,492 Current tax assets 5,593 8,182 Deposits, cash and bank balances and investment in short-term funds 1,134,770 1,063,461 4,261,625 4,330,011 TOTAL ASSETS 6,647,082 6,675,826 EQUITY AND LIABILITIES Equity Attributable
    [Show full text]
  • Chip Bee Steel Sdn. Bhd. (216771-M)
    CHIP BEE STEEL SDN. BHD. (216771-M) COMPANY PROFILE 10, Hala Menglembu Timur 12, 31450 Menglembu, Perak. D.R. Tel : 05-2822 880 (Hunting Line) Fax : 05-2822 900 CHIP BEE STEEL SDN. BHD. Is the manufacturer of metal door & window frames. With headquarters and factory operated in Ipoh, Perak, we provide superior products & services for the local construction & building industry. Chip Bee Steel Sdn. Bhd. brings a fresh and innovative approach to the building material sector. Our goal is to exceed the expectations of every client by offering outstanding customer service, increased flexibility, and greater value. Our associates are distinguished by their functional and technical expertise combined with their hands-on experience, thereby ensuring that our clients receive the most effective and professional service. In order to meet the individual needs of clients, Chip Bee Steel Sdn. Bhd. maintains a wide range of qualifications. We excel in local building projects which are developed using the latest inovation of building technology. Our extensive knowledge base entails the suitability of our products application. At Chip Bee Steel Sdn. Bhd. we are continually expanding upon our knowledge and services to assist clients with successfully implementing new building technology using the Industrial Building Systems (IBS) throughout various locations. Exceptional functional and technical expertise coupled with extensive industry knowledge makes Chip Bee Steel Sdn. Bhd. the ideal choice for a manufacturing firm to supply you with our best and commited products. CONTENTS 1. INTRODUCTION 2. JKR PROJECT REFERENCE 3. HOUSING PROJECT REFERENCE 4. SIRIM CERTIFICATION 5. IKRAM CERTIFICATION 6. JKR APPROVAL LIST CHIP BEE STEEL SDN.
    [Show full text]
  • Tanco Holdings Berhad
    ANNUAL b/w 23/5 3/6/02 9:46 AM Page 25 TANCO HOLDINGS Reports & Financial Statements BERHAD 24 - 28 Directors’ Report 29 - 30 Balance Sheets 31 Income Statements 32 Statements of Changes in Equity 33 - 36 Cash Flow Statements 37 - 69 Notes to the Financial Statements 70 Statement by Directors 71 Statutory Declaration 72 - 73 Report of the Auditors 23 ANNUAL b/w 23/5 3/6/02 9:46 AM Page 26 TANCO Directors’ Report HOLDINGS BERHAD for the year ended 31st December 2001 The directors hereby submit their report together with the audited financial statements of the Group and of the Company for the financial year ended 31st December 2001. PRINCIPAL ACTIVITIES The principal activities of the Company consist of investment holding and provision of management services. The principal activities of its subsidiary and associated companies are disclosed in Notes 5 and 6 to the financial statements. There have been no significant changes in the nature of these principal activities during the financial year. RESULTS Group Company RM’000 RM’000 Profit for the year after taxation 676 336 Minority interest (1) - Net profit for the year 675 336 DIVIDEND No dividend was paid or declared by the Company since the end of the previous financial year. The directors do not recommend the payment of any dividend in respect of the financial year ended 31st December 2001. RESERVES AND PROVISIONS All material transfers to and from reserves and provisions during the financial year have been disclosed in the financial statements. BAD AND DOUBTFUL DEBTS Before the income statements and balance sheets of the Group and of the Company were made out, the directors took reasonable steps to ascertain that action had been taken in relation to the writing off of bad debts and the making of provision for doubtful debts, and satisfied themselves that all known bad debts had been written off and that adequate provision had been made for doubtful debts.
    [Show full text]
  • Activity Report 2019– 2020
    ACTIVITY REPORT 2019– 2020 WOMEN’S FEDERATION FOR WORLD PEACE MALAYSIA “Serving Communities Together” INTRODUCTION WFWP is an NGO in General Consultative Status with the Economic and Social Council (ECOSOC) of the United Nations. VISION Women working together to realise one global family rooted in a culture of sustainable peace. MISSION Empowering women as peacebuilders in the family to transform the community, nation and world through education, partnership and humanitarian service. To create an enviroment of peace and well-being for future generations and people of all races, cultures and religious creeds. AREA OF FOCUS ▪ Humanitarian & Community Service Projects ▪ Enhancing Unity within the Community ▪ Capacity Building & Educational Programmes WFWP Malaysia's Initiatives Achieve UN Sustainable Development Goals (SDGs) 2 WFWP MALAYSIA CONTENTS 4 About The Founder 5 Message from WFWP International President 6 Message from WFWP Malaysia Advisor 7 Message from WFWP Malaysia President 12 Vegetarian Day Health Talk 14 Health Screening & Health Talk 16 Asia Pacific First Ladies Summit 18 Christmas Party with Estate Children 19 “A Circle of Light” Covid-19 Humanitarian Aid 20 Baking & Cooking Workshop 24 Official Launch of “Give Me a Chance” Education Assistance Fund 2021 26 Covid-19 Humanitarian Assistance Publisher: WFWP Malaysia | Editor: Tan Wan | Proofreading: Lina Cheng | Designer: Michelle Koay, Wong Hon Lim ABOUT THE FOUNDER The Women's Federation for World Peace International was founded by Dr. Hak Ja Han Moon and her late husband Rev. Dr. Sun Myung Moon. Working together on the global arena for over fifty years, they supported one another in their mutual quest for peace. Dr.
    [Show full text]
  • Contents Company Overview the Firm Our Services Organisation Chart Our People & Strength Certificate & Recognition Projects
    CONTENTS COMPANY OVERVIEW PAGE 1 THE FIRM PAGE 2 OUR SERVICES PAGE 3 ORGANISATION CHART PAGE 5 OUR PEOPLE & STRENGTH PAGE 6 CERTIFICATE & RECOGNITION PAGE 9 PROJECTS PAGE 19 ENVIRONMENTAL IMPACT ASSESSMENT (EIA) MIXED DEVELOPMENT WITH STP EIA ENVIRONMENTAL MANAGEMENT PLAN (EMP) ENVIRONMENTAL MONITORING REPORT (EMR) ENVIRONMENTAL COMPLIANCE PROGRAM (ECP) POST-EIA STUDIES OTHER STUDIES COMPANY OVERVIEW EUROPASIA ENGINEERING SERVICES SDN BHD is a local environmental consultancy registered with the Department of Environment (F00054) and is one of the leading consultants in EIA and Post EIA work. Incorporated in 1992, EUROPASIA has to-date secured approval for more than 200 environmental related studies and has achieved an impressive success track record. EUROPASIA has also obtained ISO 9001:2015 Certification for Environmental Consultancy and Training Services in its efforts to continuously upgrade its services. EUROPASIA offers services in the field of Environmental Impact Assessments (EIA); preliminary and detailed, environmental audits, Post EIA compliance reporting and environmental studies. Employing multi-disciplinary personnel with the required certification to undertake EIAs, EUROPASIA is able to be a one-stop consultancy to undertake studies and audits. EUROPASIA strongly believes that through offering a multitude of services in the environmental sector, it would result in a positive long term effect on the deteriorating quality of the Malaysian environment and also enable us to bequeath upon our future generation a cleaner, greener
    [Show full text]
  • Scientex Berha Dd
    COMPANY U PDAT E Tuesday, May 14, 2019 FBMKLCI: 1,601.09 Sector: Consumer THIS REPORT IS STRICTLY FOR INTERNAL CIRCULATION ONLY* SScciieenntteexx BBeerrhhaadd TP: RM9.80 (+14.0%) Last Traded: RM8.60 Landbanking for Future Selangor Township Buy Jeff Lye Zhen Xiong Tel: +603-2167-9730 [email protected] www.taonline.com.my Yesterday, Scientex Berhad announced a proposed acquisition of two Share Information pieces of freehold lands in Rawang, Selangor and Bandar Kundang, Bloomberg Code SCI MK Selangor, with a total area of 166 acres for a total cash consideration of Stock Code 4731 Listing Main Market RM123.3mn (RM17.00/sqf.). We are positive on the long-term prospect Share Cap (mn) 515.2 as this is expected to strengthen its existing market presence as a Market Cap (RMmn) 4,430.9 property developer in Selangor. We make no change to earnings 52-wk Hi/Lo (RM) 9.48/6.51 forecasts. Maintain Buy on Scientex with unchanged target price of 12-mth Avg Daily Vol ('000 shrs) 297.7 RM9.80/share. Estimated Free Float (%) 42.9 Beta 0.7 Major Shareholders (%) Projects in Rawang Scientex Holdings Sdn Bhd 20.5 To recap, Scientex has an existing property development project in Rawang, Scientex Leasing Sdn Bhd 9.2 Selangor with total area of 66 acres. Since its maiden township launch in FY19, Scientex Infinity Sdn Bhd 8.0 we understand Scientex has successfully launched 140 units of landed terrace LIM Teck Meng Sdn Bhd 7.5 houses and 70 units of landed semi-detached houses (combined GDV of Forecast Revision FY19 FY20 RM140mn).
    [Show full text]