Download Document

Total Page:16

File Type:pdf, Size:1020Kb

Download Document 159th Meeting of State Level Expert Appraisal Committee (SEAC-1) Date: 07th January ,2019 to 11th January, 2019 Time: 10:00 AM Onwards. Venue:- Maharashtra Economic Development Council, Board Room, 3rd Floor, Y. B. Chavan Centre, Gen. Jagannathrao Bhosale Marg, Near Mantralaya, Mumbai- 400 020. All District authorities are requested to ensure to submit following documents for appraisal as mandatory documents. 1. Form – 1 (M) 2. Prefesibility Report 3. EIA 4. EMP 5. Public Consultation documents as per procedure mentioned in Sand Policy 03/01/2018. 6. District Survey Report 7. Approved Mining Plan. Sr. No. UID Project Name Status Date & Time Environment Clearance for Sand mining at chandrapur by 07/01/2019 1 2103 DMO chandrapur New 10.00 a.m. onwards Environment Clearance for Sand Mining at Aashtha, Tehsil 2 2114 – Bhadravati, District - Chandrapur, State - Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Arvi Sand (Minor Mineral) Mining Project for Aarvi, Tehsil – Gondpipri, District - 3 2130 Chandrapur, State - Maharashtra by Additional Collector Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 0.36 Ha. at Yergaon Village, Tehsil – MulDistrict- 4 2138 Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 1.50 Ha.at Khasra no 8,11 and 12 for Kodsi Bu., 5 2142 Tehsil – Korpana Kodsi Village, Tehsil – Korpana,District- Chandrapur, State- Maharashtra by Additional Collector Chandrapur New 07/01/2019 10.00 a.m. onwards Environment Clearance for Proposed Sand Mining Project of Area 0.90 Ha. at Wadhona Village, Tehsil –Nagbhid 6 2148 District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 1.50 Ha. At Vittalwada-1 Village, Tehsil 7 2152 –Gondpipri, District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 0.96 Ha.at Khasra no 114, 146 for Chandankheda 8 2157 Village, Tehsil –Bhadrawati District- Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 3.42 Ha. At Usegaon, Tehsil – Chimur District- 9 2161 Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Kosambi Rith Sand (Minor Mineral) Project Category ‘B2’(M.L.Area – 0.27 ha )Production Capacity of 955 Brass/3 Month at Khasra no 10 2162 182,183,184 &185 for Kosambi Rith, Tehsil – Chimur, District -Chandrapur, State - Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 1.0 Ha. At Tarsa BK Village, Tehsil 11 2165 –Gondpipri, District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Ahernavargaon Sand (Minor Mineral) Project at Khasra no 833,1050 for 12 2168 Ahernavargaon, Tehsil – Brahmapuri, District - Chandrapur, State -Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 0.75 Ha. at Tamsi Village, Tehsil – Korpana,District- 13 2171 Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 4.0 Ha. at Khasra no 23/1,34 and 454 for Soit Near 14 2173 Village, Tehsil – Warora,District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Kunada-1 Sand (Minor Mineral) Project Category ‘B2’(M.L.Area -1.50 ha ) Production Capacity of 3181 Brass/3month at Khasra no 15 2176 22, 23,24,25 & 26 for Kunada-1, Tehsil – Bhadravati, District -Chandrapur, State - Maharashtra by Additional Collector, Chandrapur New 07/01/2019 10.00 a.m. onwards Environment Clearance for Proposed Sand Mining Project of Area 2.0 Ha. At Sonegaon Gawande Village, Tehsil– 16 2177 Chimur District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 2.40 Ha. At Sondri Village, Tehsil – 17 2181 Brahmapuri, District-Chandrapur, State- Maharashtra. By Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 0.35 Ha. At Shirpur Village, Tehsil – ChimurDistrict- 18 2188 Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 4.025 Ha. At Khasra no 820, 825, 826, 827 & 828 19 2191 Ahernavargaon-2 Village, Tehsil – Brahmapuri, District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Ladbori Sand (Minor Mineral) Category ‘B2’ (M.L.Area -0.195 ha ) Production Capacity of 20 2192 345 Brass/3 month at Khasra no 113 & 114 for Ladbori Village, Tehsil – Sindewahi District - Chandrapur,State – Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 0.195 Ha. at Sarandi Village, Tehsil – 21 2196 Sindewahi, District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 1.61 Ha.at Bori, Village, Tehsil – Warora, District- 22 2200 Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 1.20 Ha. At Dhaba Village, Tehsil – 23 2202 Gondpipri, District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 4.80 Ha. at Khasra no 24 2205 139/1,139/2,139/3,140,141&142 Ajaypur Village, Tehsil –Chandrapur, District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Londholi Sand (Minor Mineral) Category ‘B2’(M.L.Area -0.60 ha ) ProductionCapacity of 2121 Brass/3month at Khasra no 571, 573 & 624 for 25 2207 Londholi Village, Tehsil – Sawali District - Chandrapur,State – Maharashtra by Additional Collector, Chandrapur New 07/01/2019 10.00 a.m. onwards Environment Clearance for Proposed Sand Mining Project of Area 3.0 Ha. At Khasra no 353,354 & 356/1 for Tulana-1 26 2212 Tulana -1 Near Village, Tehsil –Warora, District- Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 4.0 Ha. At Khasra no 265, 269, 270 & 272 Belgaon 27 2214 Village, Tehsil –Brahmapuri, District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Pipri De Sand (Minor Mineral) Project Category ‘B2’(M.L.Area -0.75 ha ) Production Capacity of 1856 Brass/3month at Khasra no 46, 47, 48/2, 28 2216 49, 50, 52, 54 & 55. for Pipri De, Tehsil – Bhadravati, District -Chandrapur, State - Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 0.80 Ha. at Dudholi Village, Tehsil – 29 2217 Ballarpur, District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 1.86 Ha. At Bodada Village, Tehsil – 30 2221 Brahmapuri, District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 1.75 Ha.at Khasra no 145,146,147 Karanji , Village, 31 2223 Tehsil – Warora,District- Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Raipur Sand (Minor Mineral) Category ‘B2’(M.L.Area -0.36 ha ) Production Capacity of 32 2224 637 Brass/3month at Khasra no 1, 2 & 121 for Raipur Village, Tehsil – Korpana, District - Chandrapur, State –Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 0.775 Ha. At Goneda-1, Tehsil – Chimur District- 33 2226 Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 1.98 Ha. At Khasra no 293, 300, 301 Borchandli 34 2228 Village, Tehsil – Mul District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 0.715 Ha. At Goneda-2, Tehsil – Chimur District- 35 2230 Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New 07/01/2019 10.00 a.m. onwards Environment Clearance for Ralegaon Reeth-1 Sand (Minor Mineral) Project Category ‘B2’(M.L.Area – 5.0 ha )Production Capacity of 7068 Brass/Annum at Khasra no 36 2231 15, 17, 19, 21, 22, 23, 24 & 25.. for Ralegaon Reeth-1, Tehsil –Bhadravati, District - Chandrapur, State - Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 3.30 Ha. At Khasra no 384 to 386, 389, 390,408, 37 2232 417, 420, 422, 425 Palasgaon -1 Near Village, Tehsil– Ballarpur, District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 4.875 Ha. At Halda-3 Village, Tehsil – 38 2233 Brahmapuri, District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 2.34 Ha. At Khasra no 672, 677, 682 Bormala1 39 2234 Village, Tehsil – Sawali District-Chandrapur, State- Maharashtra by Additional Collector, Chandrapur New Environment Clearance for Proposed Sand Mining Project of Area 0.81 Ha. At Hiwara-1 Village, Tehsil – 40 2236 Gondpipri, District-Chandrapur,
Recommended publications
  • List of 6038 Schools Selected for Establishment of Atal Tinkering
    LIST OF 6038 SCHOOLS SELECTED FOR ESTABLISHMENT OF ATAL TINKERING LABS (SCHOOLS ARE KINDLY REQUESTED TO WAIT FOR FURTHER INSTRUCTIONS FROM ATAL INNOVATION MISSION, NITI AAYOG ON THEIR REGISTERED EMAIL IDs) PLEASE NOTE:- 1. LAST DATE FOR COMPLETING THE COMPLIANCE PROCESS : 31st JANUARY 2020 2. THESE SELECTED SCHOOLS MUST OPEN A NEW BANK ACCOUNT IN A PUBLIC SECTOR BANK FOR THE PURPOSE OF ATL GRANT. 3. THESE SELECTED SCHOOLS MUST NOT SHARE THEIR INFORMATION WITH ANY THIRD PARTY/ VENDOR/ AGENT/ AND MUST COMPLETE THE COMPLIANCE PROCESS ON THEIR OWN. 4. THIS LIST IS ARRANGED IN ALPHABETICAL ORDER OF STATE, DISTRICT AND FINALLY SCHOOL NAME. S.N. ATL UID CODE UDISE CODE SCHOOL NAME STATE DISTRICT 1 2760806 28222800515 ANDHRA PRADESH MODEL SCHOOL PUTLURU ANDHRA PRADESH ANANTAPUR 2 132314217 28224201013 AP MODEL SCHOOL ANDHRA PRADESH ANANTAPUR 3 574614473 28223600320 AP MODEL SCHOOL AND JUNIOR COLLEGE ANDHRA PRADESH ANANTAPUR 4 278814373 28223200124 AP MODEL SCHOOL RAPTHADU ANDHRA PRADESH ANANTAPUR 5 2995459 28222500704 AP SOCIAL WELFARE RESIDENTIAL SCHOOL JUNIOR COLLEGE FOR GIRLS KURUGUNTA ANDHRA PRADESH ANANTAPUR 6 13701194 28220601919 AVR EM HIGH SCHOOL ANDHRA PRADESH ANANTAPUR 7 15712075 28221890982 AVR EM HIGH SCHOOL ANDHRA PRADESH ANANTAPUR 8 56051196 28222301035 AVR EM HIGH SCHOOL ANDHRA PRADESH ANANTAPUR 9 385c1160 28221591153 AVR EM HIGH SCHOOL ANDHRA PRADESH ANANTAPUR 10 102112978 28220902023 GOOD SHEPHERD ENGLISH MEDIUM SCHOOL ANDHRA PRADESH ANANTAPUR 11 243715046 28220590484 K C NARAYANA E M SCHOOL ANDHRA PRADESH ANANTAPUR LIST OF 6038 SCHOOLS SELECTED FOR ESTABLISHMENT OF ATAL TINKERING LABS (SCHOOLS ARE KINDLY REQUESTED TO WAIT FOR FURTHER INSTRUCTIONS FROM ATAL INNOVATION MISSION, NITI AAYOG ON THEIR REGISTERED EMAIL IDs) PLEASE NOTE:- 1.
    [Show full text]
  • Oct Nov 2006
    Dams, Rivers & People VOL 4 ISSUE 9-10 OCT-NOV 2006 Rs 15/- Lead Piece Climate Change is Here – when will we wake up? There is increasing evidence that shows that Another recent report, titled Feeling the Heat from the ? climate change is already here. It is already Christian development agency Tearfund predicts that affecting the rainfall, floods, droughts, sea- Climate change threatens supplies of water for millions levels, land erosion and so on. of people in poorer countries. By 2050, five times as much land is likely to be under "extreme" drought as The frequency of extreme weather incidents is clearly now. "It's the extremes of water which are going to increasing, the unprecedented floods in Mumbai and provide the biggest threat to the developing world from Gujarat in 2005 and 2006, the unprecedented floods in climate change… droughts will tend to be longer, and Barmer this year the unusual rainfall deficit in Bihar and that's very bad news. Extreme droughts currently cover Assam this year are only a few of the recent incidents. about 2% of the world's land area, and that is going to 2005 has already been declared the warmest year in spread to about 10% by 2050." it said. The positive side recent times. of the Tearfund report is that simple measures to A recent study at the School of Oceanographic Studies "climate-proof" water problems, both drought and flood, of Jadavpur University (The Hindustan Times 011106) have proven to be very effective in some areas. In Niger, says that 70 000 people would be affected in the eastern the charity says that building low, stone dykes across and western part of the Suderbans due to rising sea contours has helped prevent runoff and get more water levels.
    [Show full text]
  • Index 1 Executive Summary
    PFR for Proposed Sand Mining Project of Area 0.7 Hect Hingoli, Tehsil – Hingoli District- Hingoli , State- Maharashtra. Index INDEX 1 EXECUTIVE SUMMARY .......................................................................................... 1-4 2 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION ...... 2-6 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT .......................................... 2-6 2.2 NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY/ REGION ........... 2-6 2.3 DEMAND – SUPPLY GAP ........................................................................................................ 2-6 2.4 IMPORTS VS. INDIGENOUS PRODUCTION ......................................................................... 2-7 2.5 EXPORT POSSIBILITY ............................................................................................................. 2-7 2.6 DOMESTIC/EXPORT MARKETS ............................................................................................ 2-7 2.7 EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT 2-7 3 PROJECT DESCRIPTION ......................................................................................... 3-7 3.1 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY 3-7 3.2 LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES; ......................... 3-8 3.3 DETAILS OF ALTERNATE SITES CONSIDERED AND THE BASIS OF SELECTING THE PROPOSED SITE, PARTICULARLY THE ENVIRONMENTAL CONSIDERATIONS GIVEN
    [Show full text]
  • Scanned with Camscanner DISTRICT SURVEY REPORT-HINGOLI
    Scanned with CamScanner DISTRICT SURVEY REPORT-HINGOLI CHPATER -1 INTRODUCTION As per Gazette Notification of 15th January, 2016 of Ministry of Environment, Forest and Climate Change a survey shall be carried out by the District Environment Impact Assessment Authority (DEIAA) with assistance of Irrigation department, Drainage department, Forest department, Mining department and Revenue department in district of preparation of District Survey Report as per the sustainable sand mining guidelines, 2016 to ensure identification of area of aggradations or deposition where mining can be allowed, and identification of areas of erosion and proximity to infrastructural structures and installation where mining should be prohibited and calculation of annual rate of replenishment and allowing time for replenishment after mining in thatarea. Every effort has been made to cover sand mining locations, areas and overviews of mining activity in the district with all the relevant features pertaining to geology and mineral wealth in replenish- able and non-replenish-able areas of rivers, stream and other sources. The mineral potential is calculated based on field investigation taking coordinates of the area and gather all relevant information and geology of the catchment area of the river or stream. Also as per the site condition and location depth of mineable mineral is defined. The area of removal of mineral in the river and stream is decided on geomorphology and other factors, it can be 50% to 60% of the area of a particular river or stream. This District Survey Report shall form the basis of application for environmental, preparation of reports and appraisal of projects. HISTORICAL PERSPECTIVE: The district „Hingoli‟ was created bifurcating the Parbhani district and formed on 24th April 1999.
    [Show full text]
  • Annual Administration Report Fy-2018-19
    ANNUAL ADMINISTRATION REPORT FY-2018-19 1 I N D E X Sr Topic Particulars Page Nos. No 1. Executive Summary 3-4 2. Brief Progress of various schemes 5-19 3. Annexure-3: 33kV & 22kV Sub-Transmission Lines 20-34 energized during 2018-19 Annexure-4: New 33/11 kV Sub-Stations & 22kV 4. Switching Stations Commissioned during year 35-40 2018-19 Annexure-4-a: Augmentation of Transformer 5. Capacity at 33/11kV & 33/22 kV Sub-Stations 41-43 during 2018-19 6. Annexure-4-b: Additional Transformer Capacity at 44-47 33/11kV & 33/22 kV Sub-Stations during 2018-19 7. Annexure-11: Transmission lines (11 KV & above) 48 8. Annexure-12: Transmission lines (11 KV & above) 49 region wise breakup 9. Annexure-13: Distribution lines ( below 11 KV ) 50 2018-19 10. Annexure-14: Transformation capacity in service 51 2018-19 11. Statement ShowingMSEDCL Details Of Power T/Fs In 52 Service As on 31.3.2019 12. Statement Showing Details Of Distribution T/Fs In 53-54 Service As on 31.3.2019 13. Statement Showing Zone wise detail of HT Line 55 commissioned As on Mar-19 14. Statement Showing zone wise Details of LT Line 56 commissioned As on Mar-19 15. 33 kV & 22 kV Substations, Switching stations in 57 MSEDC LTD. As on 31.03.2019 16. Annexure- 28: Village Electrification 58 17. Annexure- 29 A : Districtwise abstract of village 59 Electrificattion 18. Annexure- 29 B : Ag Pump Energisation Progress 60 2 EXECUTIVE SUMMARY OF AAR-2018-19 New Sub-stations & Switching Stations as on March-2019 Added During Voltage Level As on 31.03.2018 As on 31.03.2019 2018-19 33/11 KV Substion 3069 199 3268 33/22 KV Substion 49 0 49 22/11 KV Substion 159 19 178 33 KV Switching 4 0 4 Station 22 KV Switching 213 7 220 Station 11 KV Switching 8 0 8 Station Total 3502 225 3727 Total Power Transformer as on March-2019 Added During As on 31.03.2018 As on 31.03.2019 2018-19 Voltage Level Capacity Capacity Capacity Nos.
    [Show full text]
  • Pre-Feasibility Report Proposed Ajansara Barrage Project for Lift
    PRE-FEASIBILITY REPORT PROPOSED AJANSARA BARRAGE PROJECT M/s. Vidharbha FOR LIFT IRRIGATION CAPACITY:TOTAL 30004 CCA Irrigation Development at Village Ajansara, Taluka Hinganghat, District Wardha, Maharashtra Corporation (VIDC) STUDY PERIOD PROPOSED AJANSARA BARRAGE PROJECT FOR LIFT IRRIGATION FOR TOTAL 30004 CCA AND 24000 ICA AT VILLAGE AJANSARA, TALUKA HINGANGHAT, DISTRICT WARDHA, MS INDEX BY M/S. VIDHARBHA IRRIGATION DEVELOPMENT CORPORATION (VIDC) INDEX Sr. No. Particular Page No. 1 Executive Summary 1 2 INTRODUCTION OF THE PROJECT/ BACKGROUND 6 INFORMATION 2.1 Identification of project 6 2.2 Brief History of nature of the project 7 2.3 Need for the project and its importance to the country and 7 region 2.4 Benefit of Project 9 3 PROJECT DESCRIPTION 10 3.1 Type of project including interlinked and interdependent 10 projects, if any 3.2 Regulatory Frame Work 10 3.3 Location (map showing general location, specific location, 11 and project boundary & project site layout) with coordinates 3.4 Details of alternate sites considered and the basis of 21 selecting the proposed site, particularly the environmental considerations gone into should be highlighted 3.5 Size or magnitude of operation 21 3.6 Project description with process details (a schematic 21 diagram/ flow chart showing the project layout, components of the project etc. 3.6.1 Design Feature of Head Work 21 3.6.2 Rolled Filled Earth Dam 22 3.6.3 Barrage 23 3.6.4 Design of Barrage 23 3.6.5 Foundation of Barrage 23 4 IRRIGATION PLANNING 24 4.1 Existing and Proposed Facilities in Command Area 24 4.2 Existing and Proposed Cropping Patterns 24 4.3 Soil Survey 24 4.4 Evaporation Losses 25 5 SURVEY AND INVESTIGATION 25 5.1 Topographical Survey & Investigation 25 5.2 Survey for Barrage 25 5.3 Submergence Survey 25 5.4 Canal and Command Area Survey 25 5.5 Survey for Construction Material 25 5.6 Geotechnical Investigation 26 6 PROJECT HYDROLOGY 26 6.1 General Climate and Hydrology 26 6.2 Hydrological Data 27 6.2.1 Catchment Area 27 SMS Envocare Ltd.
    [Show full text]
  • Homoeopathic Academy of Research & Charities
    HOMOEOPATHIC ACADEMY OF RESEARCH & CHARITIES PARBHANI ANNUAL REPORT Awareness Treatment Rehabilitation HIV+ PATIENTS Society Reg. No. : MH-943/2008(Parbhani) Trust Reg. No. : F-9440 (Parbhani) Pan card No. : AABTH0608Q 12AA(1) Registration No. : औ./आ.आ/तकनीक/12A(1)/162/79/2012-13 80G(5) Registration No. : औ./आ.आ/तकनीक/80G(5)/िव.सं.सं./162/79/2012-13 Homoeopathic Academy of Research & Charities, Parbhani Annual Report 19-20 HOMOEOPATHIC ACADEMY OF RESEARCH & CHARITIES, PARBHANI Head Office : 'Shradha', Vishnu Nagar, Basmat Road, Parbhani - 431 401. MS. Maharashtra, India. Email: [email protected] Tel: 02452-222261 Cell: +91-9422924861 Trust Account Details : A/c Name : Homoeopathic Academy of Research and Charities Account No: 31997507742 IFSC: SBIN0003667 Bank : State Bank of India Branch: Parbhani Main BOARD OF TRUSTEE President : Dr. Pawan Satyanarayan Chandak BHMS Vice-President : Dr. Shailesh Badrinarayan Mantri BHMS Secretary : Dr. Sachin Sitaram Mantri MBBS Joint Secretary : Mr. Vijay Jayram Tapdiya B.Com. Treasurer : Mr. Vinay Govindprasad Mantri Members : Dr. Mrs. Asha Pawan Chandak BHMS Dr. Mrs. Sunita Shailesh Mantri BAMS Mr. Shyam Narayanrao Saraf BA Legal Advisor : Adv. Munjappa Kondiba Ubale LLM Homoeopathic Academy of Research & Charities, Parbhani Annual Report 19-20 Aims & Objecves : To serve the human society by providing prevenve, curave and palliave care based on principles of homoeopathy, with special focus on socially and economically weaker secons. To stand for integrated medical research in homoeopathy. Epidemiological survey of different diseases to find out the most suitable medicine for prevenon and eradicaon. To do scienfic research in crical illness like AIDS, Diabetes, Heart Disease, Cancer etc.
    [Show full text]
  • DISTRICT SURVEY REPORT for SAND MINING INCLUDING OTHER MINOR MINERAL CHANDRAPUR DISTRICT, MAHARASHTRA
    DISTRICT SURVEY REPORT For SAND MINING INCLUDING OTHER MINOR MINERAL CHANDRAPUR DISTRICT, MAHARASHTRA As per Notification No. S.O. 3611 (E) New Delhi, the 25th July, 2018 of Ministry of Environment Forest and Climate change, Government of India Prepared by: District Mining Officer Collector Office, Chandrapur 2019 - 2020 .. ;:- CERTIFICATE The District Survey Report preparation has been undertaken in compliance as per Notification No. S.O. 3611 (E) New Delhi, the 25th July, 2018 of Ministry of Environment Forests and Climate Change, Government of India. Every effort have been made to cover sand mining location, area and overview of mining activity in the district with all its relevant features pertaining to geology and mineral wealth in replenishable and non-replenishable areas of rivers, stream and other sand sources. This report will be a model and guiding document which is a compendium of available mineral resources, geographical set up, environmental and ecological set up of the district and is based on data of various departments, published reports, and websites. The District Survey Report will form the basis for application for environmental clearance, preparation of reports and appraisal of projects. Prepared by: Approved by: ~ District Collector, Chandrapur PREFACE The Ministry of Environment, Forests & Climate Change (MoEF&CC), Government of India, made Environmental Clearance (EC) for mining of minerals mandatory through its Notification of 27th January, 1994 under the provisions of Environment Protection Act, 1986. Keeping in view the experience gained in environmental clearance process over a period of one decade, the MoEF&CC came out with Environmental Impact Notification, SO 1533 (E), dated 14th September 2006.
    [Show full text]
  • Mr. VK Singh, MD
    Vol 6. Issue 4. 1 - 30 JUN 2019 | For Private Circulation Only pg 4. India Waterways: Turning the Corner pg 37. Interview – Mr. V. K. Singh, MD - Shreyas Shipping pg 39. Indian Economy – Trend Indicators pg 41. Valuation Summary Ground View - Previous Issues GROUND VIEW Vol 6. Issue 4. 1 - 30 JUN 2019 MANAGING DIRECTOR & CEO IT SERVICES Vineet Bhatnagar Vibhor Singhal Shyamal Dhruve EDITORIAL BOARD Manish Agarwalla INFRASTRUCTURE Kinshuk Bharti Tiwari Vibhor Singhal Deepika Bhandari DESIGN, ILLUSTRATION Chaitanya Modak LOGISTICS, www.inhousedesign.co.in TRANSPORTATION Vikram Suryavanshi EDITOR Roshan Sony MEDIA, CONSUMER DISCRETIONARY st st RESEARCH Ankit Kedia 1 May 2019 Issue 3 1 February 2019 Issue 2 AUTOMOBILS Saksham Kaushal METALS Vikash Singh AGRI INPUTS Deepak Chitroda MIDCAP Deepak Agarwal BANKING, NBFCs Akshay Mokashe Manish Agarwalla Pradeep Agrawal REAL-ESTATE Sujal Kumar Vaibhav Agarwal Dhaval Somaiya CONSUMER Vishal Gutka STRATEGY Preeyam Tolia Anjali Verma Neeraj Chadawar CEMENT Vaibhav Agarwal TECHNICALS Subodh Gupta ECONOMICS Anjali Verma PRODUCTION MANAGER st Aditi Mohol Ganesh Deorukhkar 1 January 2019 Issue 1 1st November 2018 Issue 4 ENGINEERING, EQUITY SALES & EVENTS CAPITAL GOODS Rosie Ferns Jonas Bhutta Vikram Rawat SALES & DISTRIBUTION Sandesh Shetty Ashka Gulati Archan Vyas HEALTHCARE, Jignesh Kanani SPECIALTY CHEMICALS Sneha Baxi Surya Patra Amarinder Sabharwal Mehul Sheth Rishita Raja CORPORATE COMMUNICATIONS Zarine Damania FOR EDITORIAL QUERIES PhillipCapital (India) Private Limited. No. 1, 18th Floor, Urmi Estate, 95 Ganpatrao Kadam Marg, Lower Parel West, Mumbai 400 013 [email protected] 1st September 2018 Issue 3 1st April 2018 Issue 2 2 GROUND VIEW 1 - 30 Jun 2019 1 - 30 Jun 2019 GROUND VIEW 3 Letter from the MD CONTENTS The government’s focus on developing India’s rich and varied natural water resources by promoting waterways for commercial use have started showing results.
    [Show full text]
  • Hyderabad's Second Plan
    HYDERABAD’S SECOND PLAN G O N'T ENTS Page 1. Great Aims I' 2. Agriculture 5 3. Marketing' 7 4. 'Veterinary 9 5. Forests .. II 6. Fisheries 13 7. Community Development 15 \ .8. Co-operatio|i- 17 9. Consolidation of Holdings .K zi 10. Irrigation Projects 23 11. Power Projects 27 12.^ Education 29 13. Health .. 33 14. Housing .. 35 15. Industry “ 37 16. Labour .. 39 17. Social Welfare 41 18. Roads . 43 19. Publicity 45 20. Statistics 47 ui Second Five Year Plan takes up the threads where the First has left, and carries forward the development programme at an increased pace to enhanced targets. In terms of money the Hyderabad Plan is a little over double the size of the First Plan. In terms of physical targets too it envisages considerable advance in all vital sectors. In respect of irrigation, for instance, while the additional acreage developed during the First Plan period was 96,800, the Second Plan provides for the irrigation of 7,00,000 acres more. Similarly, new roads built during the First Plan period were about 500 miles; during the Second Plan the aim is to build 786 miles of new roads. Industry received very limited attention during the Fiist Plan but now it is to get a much larger allotment and the production targets are set high : coal to increase from i . 5 million tons to 3.00 million tons per annum; gold to go up from 11,000 fine ozs. to 30,000 fine ounces. That the Second Plan is to be more of a people's Plan is generally realised ; not only lending an active hand in the working out of the schemes in the public sector, the people have an opportunity to move forward with greater eneigy in the private sector also and thus raise production and increase the national wealth, Puring the First Plan the national income has risen by i8 per cent; now the aim is to raise it by 25 per cent during the next five years— ^not obviously too high an aim, if all the shoulders are put to the wheel.
    [Show full text]
  • Village Map Jintur Taluka: Parbhani District: Parbhani Pingli Kothala Jodparli Zari
    Aundha (Nagnath) Sailu Village Map Jintur Taluka: Parbhani District: Parbhani Pingli kothala Jodparli Zari Takli Bobade Mirzapur Digras Mandwa Kumbhari Khanapur Tarf Zari Kashtagaon Karla Sadegaon Gokulwadi Sawangi kh. Wadgaon tarf takli GovindpurSarangapur Jalalpur Pimpalgaon sayyadmia Nandapur Ekrukha Tarf Pedgaon Sultanpur Wadi damai µ Ismailpur tarf parbhani Arvi 3.5 1.75 0 3.5 7 10.5 Basmath Hingla Sambar km Sanpuri Dharangaon Kinhola Matakarala Takli kumbhakarna Mangangaon Bramhapuri tarf pedgaon Narsapur tarf pedgaon Sukapurwadi Karadgaon Shahapur Pimpalgaon tong Tuljapur Pedgaon Satla Durdi Samsapur Location Index Dhar Nandkheda Deothana Murumba Panhera Hasnapur Dharmapuri Bhogaon District Index Saba Nandurbar Mohapuri Nandgaon kh. Bhandara Wangi Nandgaon bk. Dhule Amravati Nagpur Gondiya Jalgaon Alapur pandhari Akola Wardha Parawa Buldana Aland Nashik Washim Chandrapur Jamb Parbhani (M Cl) Rahati Yavatmal Aurangabad Kaudgaon tarf singanapur Asola Palghar Manwath PARBHANI Jalna Hingoli Gadchiroli !( Thane !. Ahmednagar Parbhani Dhangarwadi Mumbai Suburban Nanded Karegaon Mumbai Bid Ukhalad Raigarh Pune Latur Bidar Mandakhali Osmanabad Bramhangaon Sonna Babhali Satara Solapur Raipur Bramhapuri tarf lohgaon Ratnagiri Sangli Nagapur Pimpari deshmukh Maharashtra State Sendra Balsa kh. Pingali Kolhapur Dafwadi Babhulgaon Narsapur tarf parbhani Tattu jawala Ujalamba Sindhudurg Taroda Dharwad Sayala Borwand kh. Ithalapur Deshmukh Umari Taluka Index Takalgavhan Mirkhel Pimpalgaon Thombare Paralgavhan Tadlimbla Singnapur Jintur Anandwadi Borwand bk. Pandhari Surpimpari Purna Amadapur Varpud Zadgaon Purjawala Sailu Lohagaon Pathra Tamaswadi Wadgaon tarf bharaswad Tadpangari Sahajpur Jawala Manwath Parbhani Bharaswad Kuotamwadi Pathri Pegargavhan Sirsi kh. Purna Pokharni Ambe takli Dampuri Sirsi bk. Legend Sonpeth Palam Kailaswadi Indewadi !( Taluka Head Quarter Gangakhed Bramhapuri tarf pathri Porwad Thola District Head Quarter !. District: Parbhani Daithana Railway Dhondi Malsonna Salapuri National Highway Village maps from Land Record Department, GoM.
    [Show full text]
  • Original Research Paper
    PARIPEX - INDIAN JOURNAL OF RESEARCH Volume-7 | Issue-5 | May-2018 | PRINT ISSN No 2250-1991 ORIGINAL RESEARCH PAPER Commerce A STUDY OF DAM IRRIGATION IN MAHARASHTRA: KEY WORDS: Erratic, SPECIAL REFERENCE TO ISAPUR DAM Salinization, Catchment area. Prof. Jaishree R . Department of commerce Dr. Babasaheb Ambedkar Marathwada University, Suryawanshi Aurangabad-431004 (M.S.) India. Agriculture is the single most important contributor of Indian economy. Agriculture contributes about sixteen percent (16%) of total GDP and ten (10%) of total exports India secured 2nd position worldwide in terms of farm output & second largest country in terms of total arable land over 60 % of India's land area is arable. The geographical area of the state is 30.7 Mha. & Cultivable area is 22.5 Mha. (73% GA). Out of this 40% area is drought prone. About 7% areas is flood prone. The highly variable rainfall in Maharashtra ranging from 400 to 6000 mm occurs in 4 months period 100 days. The agriculture suffers due to vagaries of monsoon. Nearly 148 Talukas are drought prone. There are 5 major ABSTRACT river basis in the state i.e. Krishna, Godavari, Tapi & Narmada. West flowing rivers in Kokan Region. annual availability of water resources in the state constant of 164 km3 of surface water & 20.5 km3 of subsurface water. Summary: Importance of irrigation in Indian Agriculture Water is part & parcel for the growth of agriculture and irrigation Indian economy is based on agriculture & agriculture is totally provides supply of water to agriculture. In recent period due to depend on water it may be from natural source i.e.
    [Show full text]