Japan Rail Pass

Total Page:16

File Type:pdf, Size:1020Kb

Japan Rail Pass JAPAN RAIL PASS Can also be Used for Shinkansen Akita Shinkansen "KOMACHI" Hokkaido Shinkansen”HAYABUSA” etc. Akita Shinkansen (662.6 km) Hokkaido Shinkansen (149.0 km) “bullet train” Travel Train Name: KOMACHI Train Names: HAYABUSA,HAYATE Shin-Hakodate-Hokuto Akita Shin-Aomori Yamagata Shinkansen "TSUBASA" Shinjo¯ Morioka Jōetsu Shinkansen "Max-TOKI"etc. Yamagata Shinkansen Hokuriku Shinkansen "KAGAYAKI"etc. Jōetsu Shinkansen (333.9 km) (421.4 km) Niigata Hokuriku Shinkansen (450.5 km) Train Names: TOKI, TANIGAWA Train Name: TSUBASA Yamagata Train Names: KAGAYAKI, HAKUTAKA, Max-TOKI, Max-TANIGAWA TSURUGI, ASAMA Sendai Kanazawa Toyama Nagano Fukushima Takasaki Ōmiya Sanyō & Kyūshū Shinkansen "SAKURA" Sanyō Shinkansen (622.3 km) Train Names: NOZOMI*, MIZUHO*, Tōhoku Shinkansen "HAYABUSA "etc. HIKARI (incl. HIKARI Rail Star), Tōkaidō & Sanyō Shinkansen "HIKARI" SAKURA, KODAMA Tōkaidō Shinkansen (552.6 km) (Tokyo thru Hakata, 1,174.9km) Train Names: NOZOMI*, HIKARI, KODAMA Hakata Kokura Hiroshima Okayama Shin-Ōsaka Kyōto Nagoya Shin-Yokohama Shinagawa Tōkyō * There are six types of train services, “NOZOMI,” “MIZUHO,” “HIKARI,” “SAKURA,” “KODAMA” and “TSUBAME” trains on the Tōkaidō, Sanyō and Kyūshū Shinkansen, and the stations at which trains stop vary with train types. The JAPAN RAIL PASS is only valid for “HIKARI,” “SAKURA,” “KODAMA” Tōhoku Shinkansen "HAYATE," "YAMABIKO,"etc. and “TSUBAME” trains, and not valid for any seats, reserved or non-reserved, on “NOZOMI” and Tōhoku Shinkansen (713.7 km) “MIZUHO” trains. To travel on the Tōkaidō, Sanyō and Kyūshū Shinkansen, the pass holders must take Train Names: HAYABUSA, HAYATE, YAMABIKO, “HIKARI,” “SAKURA,” “KODAMA” or “TSUBAME” trains, or pay the basic fare and the Shinkansen NASUNO express charge to take “NOZOMI” and “MIZUHO” trains. ● Stations in Kansai area that have ● Stations in Tōkyō area that have Kumamoto JAPAN RAIL PASS exchange offices JAPAN RAIL PASS exchange offices ¯ Ikebukuro ¯ Ueno Shinjuku Sannomiya ¯ Tōkyō Kyobashi Narita Airport JR Namba Terminal 2・3 Shibuya HamamatsuchōHamamatsucho Shinagawa Kyūshū Shinkansen “Series 800” Yokohama Narita Airport Nara Terminal 1 Kyūshū Shinkansen (288.9 km) Haneda Airport Kagoshima-Chu¯ o¯ International Terminal Train Names:MIZUHO*, SAKURA,TSUBAME Kansai Airport ‒ Shin-Ōsaka / Ōsaka / Kyōto About 50min. to Shin-Ōsaka, about 75min. to Kyōto by Narita Airport-Tōkyō JR’s limited express “Kansai Airport Express “Haruka”. About 60min. by JR’s limited express “Narita express”. About 70min. to Ōsaka by Kansai Airport Rapid Service. About 90min. by JR’s rapid train..
Recommended publications
  • Yamanaka Onsen Niigata Fukushima
    Tourist map of Yamanaka Onsen Niigata Fukushima and Hokuriku area Nagaoka Joetsumyoko Sta. Itoigawa Echigoyuzawa Sta. Shintakaoka Sta. Iiyama Kurobe Kanazawa Unazukionsen Sta. Nagano Toyama Tateyama/Kurobe Kaga Onsen Sta. Komatsu Annakaharuna Sta. Utsunomiya Kenrokuen Garden Ueda Tojinbo Takasaki Awaraonsen Sta. Shirakawago Sakudaira Sta. Karuizawa Fukui Yamanaka Onsen Omiya The aroma of the Onsen has been healing travelers Nanjo Eiheiji Temple Tokyo since its inauguration 1300 years ago. Tsuruga Maibara Tottori Nagoya Kyoto Shizuoka Kobe Okayama Shinosaka Sta. Access to Yamanaka Onsen Train To JR Line Kaga Onsen Station ◎ Tokyo – Hokuriku Shinkansen (Kagayaki or Hakutaka) – Kanazawa – Hokuriku line express (Shirasagi or underbird) – Kaga Onsen station Approx 2 hours 55 minutes ◎ Tokyo – Tokaido Shinkansen (Hikari) – Maibara – Hokuriku line express (Shirasagi) – Kaga Onsen station Approx 3 hours 50 minutes ◎ Kyoto – Hokuriku line express (underbird) – Kaga Onsen station Approx 1 hour 45 minutes ◎ Osaka – Hokuriku line express (underbird) – Kaga Onsen station Approx 2 hours 20 minutes ◎ Nagoya – Tokaido Shinkansen (Hikari) – Maibara – Hokuriku line express (Shirasagi) – Kaga Onsen station Approx 2 hours 10 minutes ◎ Kanazawa – Hokuriku line express (Shirasagi or underbird) – Kaga Onsen station Approx 25 minutes * Time calculated for the fastest trains available. * Transportation services available from Kaga Onsen Station. * 20 minutes from Kaga Onsen Station by taxi. Hokuriku Shinkansen running between Kanazawa and Tokyo was put into service on March 14th 2015. Hokuriku Shinkansen made it 1 hour and 20 minutes faster to travel from Tokyo to Kanazawa. Airplane To Komatsu airport ◎ From Haneda Approx 1 hour ◎ From Narita Approx 1 hour 20 minutes ◎ From Sapporo Approx 1 hour 45 minutes ◎ From Sendai Approx 1 hour 10 minutes ◎ From Fukuoka Approx 1 hour 30 minutes * Approx 30 minutes by Can Bus from Komatsu airport to Kaga Onsen.
    [Show full text]
  • East Japan Railway Company Shin-Hakodate-Hokuto
    ANNUAL REPORT 2017 For the year ended March 31, 2017 Pursuing We have been pursuing initiatives in light of the Group Philosophy since 1987. Annual Report 2017 1 Tokyo 1988 2002 We have been pursuing our Eternal Mission while broadening our Unlimited Potential. 1988* 2002 Operating Revenues Operating Revenues ¥1,565.7 ¥2,543.3 billion billion Operating Revenues Operating Income Operating Income Operating Income ¥307.3 ¥316.3 billion billion Transportation (“Railway” in FY1988) 2017 Other Operations (in FY1988) Retail & Services (“Station Space Utilization” in FY2002–2017) Real Estate & Hotels * Fiscal 1988 figures are nonconsolidated. (“Shopping Centers & Office Buildings” in FY2002–2017) Others (in FY2002–2017) Further, other operations include bus services. April 1987 July 1992 March 1997 November 2001 February 2002 March 2004 Establishment of Launch of the Launch of the Akita Launch of Launch of the Station Start of Suica JR East Yamagata Shinkansen Shinkansen Suica Renaissance program with electronic money Tsubasa service Komachi service the opening of atré Ueno service 2 East Japan Railway Company Shin-Hakodate-Hokuto Shin-Aomori 2017 Hachinohe Operating Revenues ¥2,880.8 billion Akita Morioka Operating Income ¥466.3 billion Shinjo Yamagata Sendai Niigata Fukushima Koriyama Joetsumyoko Shinkansen (JR East) Echigo-Yuzawa Conventional Lines (Kanto Area Network) Conventional Lines (Other Network) Toyama Nagano BRT (Bus Rapid Transit) Lines Kanazawa Utsunomiya Shinkansen (Other JR Companies) Takasaki Mito Shinkansen (Under Construction) (As of June 2017) Karuizawa Omiya Tokyo Narita Airport Hachioji Chiba 2017Yokohama Transportation Retail & Services Real Estate & Hotels Others Railway Business, Bus Services, Retail Sales, Restaurant Operations, Shopping Center Operations, IT & Suica business such as the Cleaning Services, Railcar Advertising & Publicity, etc.
    [Show full text]
  • About Suspension of Some Trains
    About suspension of some trains Some trains will be suspended considering the transport of passengers due to the outbreak of the Novel Coronavirus. *Please note that further suspension may be subject to occur. 【Suspended Kyushu Shinkansen】 (May 11 – 31) ○Kumamoto for Kagoshima-Chūō ※Service between Kumamoto and Shin-Osaka is available. Name of train Kumamoto Kagoshima-Chūō Day of suspension SAKURA 545 10:34 11:20 May 11~31 SAKURA 555 15:23 16:10 May 11~31 SAKURA 409 12:18 13:15 May 11~31 ○Kagoshima-Chūō for Kumamoto ※Service between Kumamoto and Shin-Osaka is available. Name of train Kagoshima-Chūō Kumamoto Day of suspension SAKURA 554 11:34 12:20 May 11~31 SAKURA 562 14:35 15:20 May 11~31 SAKURA 568 17:18 18:03 May 11~31 MIZUHO 612 18:04 18:48 May 11~31 【Suspended Hokuriku Shinkansen】 (May 1 – 31) ○Tōkyō for Kanazawa Name of train Tōkyō Kanazawa Day of suspension KAGAYAKI 521 8:12 10:47 May 1~31 KAGAYAKI 523 10:08 12:43 May 2. 9. 16. 23. 30 KAGAYAKI 525 10:48 13:23 May 1~4. 9. 16. 23. 30 KAGAYAKI 527 11:48 14:25 May 2. 3. 5. 6 KAGAYAKI 529 12:48 15:26 May 2~6 KAGAYAKI 531 13:52 16:26 May 1. 3~6. 8. 15. 22. 29. 31 KAGAYAKI 533 14:52 17:26 May 1. 8~10. 15~17. 22~24. 29~31 KAGAYAKI 535 17:04 19:41 May 2~6 KAGAYAKI 539 19:56 22:30 May 1~6.
    [Show full text]
  • Omagari Station Akita Station
    Current as of January 1, 2021 Compiled by Sendai Brewery Regional Taxation Bureau Akita Results of the Japan Sake Awards - National New Sake Competition … https://www.nrib.go.jp/data/kan/ https://www.nta.go.jp/about/ SAKE Results of the Tohoku Sake Awards …… organization/sendai/release/kampyokai/index.htm MAP http://www.osake.or.jp/ Akita Brewers Association website …… Legend Shinkansen JR Line 454 Private Railway Kosaka 103 Expressway Major National Highway Town Happo City Boundary Shinkansen Station Town Fujisato 104 Gono Line JR and Private Railway Stations Higashi-Odate 103 Town Station Kazuno Odate Station 282 City Noshiro 101 Towada- Takanosu 7 Odate City Futatsui Ou Main Line Minami Station Higashi- Station City Noshiro Port Station Noshiro 103 7 Station Kanisawa IC 285 Hanawa Line 105 Kazuno-Hanawa Ou Main Line Station Odate-Noshiro Airport 282 7 Mitane Town Kitaakita City Ogata Hachirogata Town 101 Village Kamikoani Aniai Station 285 Village 341 Oga City Gojome Akita Nairiku Jūkan Railway 285 Town Oga Oga Line 101 Ikawa Station 105 Katagami Town City Oiwake Station Funakawa Port 7 Senboku City Akita City 13 Tazawako Akita Port Station n Name of City, Town, and Village No. Brewery Name Brand Name Brewery Tour Phone Number Akita Station se n a 13 k Akita City ① Akita Shurui Seizoh Co.,Ltd. TAKASHIMIZU ○Reservation 018-864-7331 n hi Araya Station S ② ARAMASA SHUZO CO.,LTD. ARAMASA × 018-823-6407 ita 46 k A AKITAJOZO CO.,LTD. YUKINOBIJIN 018-832-2818 Kakunodate ③ × ④ Akita Shuzo Co.,Ltd. Suirakuten ○Reservation 018-828-1311 Daisen Station Akita Shurui Seizoh Co.,Ltd.
    [Show full text]
  • About Suspension of Some Temporary Trains(Translation:PDF76KB)
    About suspension of some temporary trains Some temporary trains will be suspended considering the transport of passengers due to the outbreak of the Novel Coronavirus. *Please note that further suspension may be subject to occur. 【Suspended Sanyo Shinkansen】 (April 1 – May 6) ○Tōkyō for Hakata Name of train Tōkyō Hakata Day of suspension NOZOMI 135 7:12 12:14 May 6 NOZOMI 137 7:21 12:19 May 3. 4 NOZOMI 139 8:12 13:14 May 3 NOZOMI 145 9:12 14:14 May 3. 6 NOZOMI 149 10:12 15:14 May 3 NOZOMI 151 10:42 15:47 May 2. 4 NOZOMI 155 11:42 16:47 May 3 NOZOMI 159 12:42 17:47 May 2 NOZOMI 163 13:42 18:47 May 2. 6 NOZOMI 169 14:42 19:47 May 4 NOZOMI 173 15:21 20:19 May 2. 3. 5. 6 NOZOMI 181 16:42 21:46 May 6 NOZOMI 183 17:12 22:14 May 1. 6 NOZOMI 185 17:21 22:19 May 4 NOZOMI 189 18:12 23:14 May 1. 5 ○Hakata for Tōkyō Name of train Hakata Tōkyō Day of suspension NOZOMI 136 7:58 13:03 May 3 NOZOMI 138 8:31 13:33 May 1 NOZOMI 140 8:58 14:03 May 2. 3. 5. 6 NOZOMI 144 9:58 15:03 May 2. 3. 5. 6 NOZOMI 150 11:31 16:33 May 2. 5 NOZOMI 152 11:58 17:03 May 4 NOZOMI 156 12:58 18:03 May 3 NOZOMI 160 13:31 18:33 May 4 NOZOMI 170 15:31 20:33 May 2.
    [Show full text]
  • Race 1 1 1 2 2 3 2 4 3 5 3 6 4 7 4 8
    HANSHIN SUNDAY,APRIL 7TH Post Time 10:05 1 ! Race Dirt 1800m THREE−YEAR−OLDS Course Record:10Jul.04 1:48.5 DES,WEIGHT FOR AGE,MAIDEN Value of race: 9,550,000 Yen 1st 2nd 3rd 4th 5th Added Money(Yen) 5,000,000 2,000,000 1,300,000 750,000 500,000 Stakes Money(Yen) 0 0 0 Ow. Yoshio Matsumoto 1,450,000 S 00000 Life40004M 30003 1 B 56.0 Ryuji Wada(5.9%,13−29−18−161,22nd) Turf10001 I 00000 1 Meisho Imawaka(JPN) Dirt30003L 10001 0Symboli Kris S(0.97) 0Afleet C3,b. Katsumi Minai(11.7%,9−6−3−59,19th) Course10001E 00000 Wht. 1Prophecy Lights 1Storm the Mint 8Mar.10 Fujiwara Farm Wet 10001 24Mar.13 HANSHIN MDN D1800St 4456 1:55.54th/13Kyosuke Kokubun 56.0 548% Manoir 1:54.9 <1> Zillion <1 3/4> Meiner Gainer 2Mar.13 HANSHIN MDN T2200Go2222 2:18.78th/16RyujiWada 56.0548( Hamano Grade 2:17.6 <1/2> Danon Symphony <3> Sunrise Way 12Jan.13 KYOTO MDN D1800St 11 11 9 13 1:57.3 14th/16 Yutaka Take 56.0 558# Copano Rickey 1:52.4 <5> Dynamic War <1/2> Courage d’Or 16Dec.12 CHUKYO NWC D1800Mu4545 1:57.35th/11Yoshihiro Furukawa 55.0 560$ Mon Chouchou 1:55.5 <2 1/2> Nobu Osbourne <NK> Taisei Windy Ow. Tatsue Ishikawa 4,600,000 S 00000 Life50113M 30102 1 B 56.0 Genki Maruyama(8.2%,18−14−20−168,11th) Turf40112 I 20011 2 Trigger(JPN) Dirt10001L 00000 0Grass Wonder(0.59) 0Sunday Silence C3,b.
    [Show full text]
  • JR EAST GROUP CSR REPORT 2015 Society
    JR EAST GROUP CSR REPORT 2015 Society Relationship with Customers Our fundamental concept of service quality The“JR East Group Management Vision V” states that“Service Quality Reform” is one of the group’s eternal missions. In order to become a corporate group that is the preferred choice of customers and local communities, JR East will reform service quality through cross-divisional and cross-sectional teamwork with the aim of becoming Japan’s number-one railway in terms of customer satisfaction. In order to achieve this, we will work to increase safety and convenience and further improve transport quality while promoting the creation of railways that passengers can use confidently and pursuing the comprehensive delivery of customer-friendly railway services. No.1 for customer Medium-term Vision for Service Quality Reforms 2017 satisfaction in the Japanese Customer satisfaction levels have continued to railway industry increase since the first year of service quality reforms in 2011. However, in order for the JR wth Customer satisfaction level gro East Group to continue growing amid the various le of at least 88% ab changes occurring in the surrounding environment, Improve transportation Pursue customer-friendly in quality railway services a Enhance Realize Realize t we formulated the“Medium-term Vision for information Provide railway railway Provide reliable provision services services s during impressive transportation customers customers customer transportation can use can use services service service u Service Quality Reforms 2017,”
    [Show full text]
  • Shinkansen Bullet Train
    Jōetsu Shinkansen (333.9 km) Train Names: TOKI, TANIGAWA Max-TOKI, Max-TANIGAWA JAPAN RAIL PASS Can also be Used for Shinkansen Jōetsu Shinkansen "Max-TOKI"etc. “bullet train” Travel Akita Shinkansen "KOMACHI" Akita Shinkansen (662.6 km) Train Name: KOMACHI Akita Shin-Aomori Yamagata Shinkansen "TSUBASA" Hokuriku Shinkansen (450.5 km) Yamagata Shinkansen Train Names: KAGAYAKI, HAKUTAKA, (421.4 km) Shinjo¯ Morioka TSURUGI, ASAMA Train Name: TSUBASA Niigata Yamagata Sendai Kanazawa Toyama Nagano Hokuriku Shinkansen "KAGAYAKI"etc. Fukushima Takasaki Omiya¯ Sanyō & Kyūshū Shinkansen "SAKURA" Sanyō Shinkansen (622.3 km) Train Names: NOZOMI*, MIZUHO*, Tōhoku Shinkansen "HAYABUSA "etc. Tōkaidō & Sanyō Shinkansen "HIKARI" HIKARI (incl. HIKARI Rail Star), SAKURA, KODAMA Tōkaidō Shinkansen (552.6 km) (Tōkyō thru Hakata, 1,174.9km) Train Names: NOZOMI*, HIKARI, KODAMA Hakata Kokura Hiroshima Okayama Shin-Osaka¯ Kyōto Nagoya Shin-Yokohama Shinagawa Tokyo¯ ¯ * There are six types of train services, “NOZOMI,” “MIZUHO,” “HIKARI,” “SAKURA,” “KODAMA” and “TSUBAME” trains on the Tōkaidō, Sanyō and Kyūshū Shinkansen, and the stations at which trains stop vary with train types. The JAPAN RAIL PASS is only valid for “HIKARI,” “SAKURA,” “KODAMA” Tōhoku Shinkansen "HAYATE," "YAMABIKO,"etc. and “TSUBAME” trains, and not valid for any seats, reserved or non-reserved, on “NOZOMI” and “MIZUHO” trains. To travel on the Tōkaidō, Sanyō and Kyūshū Shinkansen, the pass holders must take Tōhoku Shinkansen (713.7 km) “HIKARI,” “SAKURA,” “KODAMA” or “TSUBAME” trains, or
    [Show full text]
  • What Is the JR East Group Doing to Prevent Global Warming?
    Environmental Environmental Measures to Prevent Global Warming What is the JR East Group Doing to Prevent Global Warming? In an effort to reduce its CO2 emission levels, the JR East Group promotes greater energy efficiency and the use of renewable energy. It also is promoting intermodal transportation, aimed at reducing CO2 emissions of the country's entire transportation system. Transportation volume (billion car-km) Energy flows of JR East Reducing energy consumption in Trend in energy consumption for train Measures to Prevent operations versus transportation volume Energy consumption for train operations (billion MJ) Energy consumption per unit of transportation train operations volume (MJ/car-km) Global Warming (Billion car-km) (Billion MJ) (MJ/car-km) Inputs/Outputs Electricity sources Energy consumption By the end of fiscal 2004, JR East had 9,410 2.2 50 20.6 (4%reduction) 21 (10%reduction) 19.7 (9%reduction) (11%reduction) (13%reduction) Energy supply and consumption energy-saving railcars in operation. This 18.8 17.9 City gas, kerosene, 18.6 18.3 JR East thermal plant Conventional railway lines (15%reduction) The energy consumed by JR East consists of elec- class C heavy oil amounts to 76% of the entire railcar fleet. 17.5 2.44 billion kWh 39% 3.11 billion kWh 50% Electricity trical and non-electrical power. Electrical power Shinkansen lines We are steadily replacing railcars on conven- 1.29 million t-CO2 *2 2.1 25 15 6.19 44.0 comes from electrical utility companies and JR 1.10 billion kWh 8% tional lines with energy-saving railcars equipped 43.1 JR East hydropower plants billion kWh 41.0 40.6 40.5 39.3 Stations, offices, etc.
    [Show full text]
  • Shinkansen - Bullet Train
    Shinkansen - Bullet Train Sea of Japan Shin-Aomori Hachinohe Akita Shinkansen Akita Morioka Yamagata Shinkansen Shinjyo Tohoku Shinkansen Yamagata Joetsu Shinkansen Sendai Niigata Fukushima North Pacific Ocean Hokuriku Shinkansen Nagano Takasaki Sanyo Shinkansen Omiya Tokyo Kyoto Nagoya Okayama Shin-Yokohama Hiroshima Kokura Shin-osaka Hakata Tokaido Shinkansen Kumamoto Kyushu Shinkansen Kagoshima-chuo Source: Based on websites of MLIT Japan (Ministry of Land, Infrastructure, Transport and Tourism) and railway companies in Japan As of July 2014 The high-speed Shinkansen trail over 2,663 km connects the major cities throughout Japan. The safe and punctual public transportation system including trains and buses is convenient to move around in Japan. < Move between major cities > (approximate travel time) Tokyo to: Shin-Aomori (3 hours and 10 minutes) Akita (3 hours and 50 minutes) Niigata (2 hours and 23 minutes) Nagano (1 hours and 55 minutes) Shin-Osaka (2 hours and 38 minutes) Hakata (5 hours and 28 minutes) Shin-Osaka to: Nagoya (53 minutes) Hiroshima (1 hours and 34 minutes) Hakata (2 hours and 48 minutes) Hakata to: Kaghoshima-chuo (1 hours and 42 minutes) This document is owned or licensed by JETRO and providers of the information content. This document shall not be reproduced or reprinted on any medium or registered on any search system in whole or part by any means, without prior permission of JETRO. Although JETRO makes its best efforts to ensure the correctness of the information contained in Copyright (C) 2014 Japan External Trade Organization (JETRO). All rights reserved. this document, JETRO does not take any responsibility regarding losses derived from the information contained in this document.
    [Show full text]
  • Plan for Opening the Hokuriku Shinkansen Line Between Nagano and Kanazawa
    East Japan Railway Company West Japan Railway Company August 27, 2014 Plan for Opening the Hokuriku Shinkansen Line between Nagano and Kanazawa East Japan Railway Company and West Japan Railway Company hereby announce that they have finalized the outline for a plan to open the Hokuriku Shinkansen Line between Nagano and Kanazawa. Details are as follows. ■Opening the Hokuriku Shinkansen Line to Kanazawa ◇Opening date : Saturday, March 14, 2015 ◇Types/Trips : ・Kagayaki (The fastest operation between Tōkyō and Kanazawa) 10 round trips/day ・Hakutaka (Stopping at most stations between Tōkyō and Kanazawa) 14 round trips/day (Stopping at most stations between Nagano and Kanazawa) 1 round trip /day ・Tsurugi (Shuttle service between Toyama and Kanazawa) 18 round trips/day ・Asama (Current Nagano Shinkansen service between Tōkyō and Nagano) 16 round trips/day T U Ō K H T A K S U N I J I U K T S K ō e m u o a n a a e a i ō t n u o h a k n i m n k n r k d g y e o a r y i n y o y a j a a u u a a a t i z o a n a ō a g ō s k i d n m s g u b m ‐ z a w a a z a o a u a k e a T a y a k h a i m w i ‐ a w a s i a w r y a o k a a e r a a ō n d u k s o a n ō e k a n a Kagayaki ● ■ ● ● ● ● ● ● ● ■ ■ ■ ■ ■ ● ■ ● ● ● ● ● ● Hakutaka ● ● ● ● ● ● ● ● Tsurugi ● ● ● Asama ● ● ● ■ ■ ● ■ ● ● ● ● ● Stopped at by all services, ■ Passed by some services ◇Configuration : Series E7 and W7: 12 car trains * Some Asama services operated with Series E2: 8 car trains ◇Fastest travel times : ・Tōkyō-Kanazawa: 2 hours 28 minutes ・Tōkyō-Toyama: 2 hours 08 minutes ■Subsequent Termination of Limited Express and Other Services on Conventional Lines ◇The following train services will be terminated subsequent to the opening of the Hokuriku Shinkansen Line to Kanazawa.
    [Show full text]
  • Improving Efficiency Through Privatisation of Railways
    European Conference of Ministers Ministry of Land, Infrastructure and Transport of Transport Japanese Government 2-3 March 2005 Akasaka Prince Hotel, Tokyo Improving Efficiency Through Privatisation of Railways Masayuki SATOMI Corporate Planning Headquarters Management Administration Department East Japan Railway Company (JR East) Japan Split and Privatization of JNR (Japanese National Railways) Causes of JNR’s Failure 1 ○Unconsolidated long-term debts (In trillion yen) 6.00 25.00 5.00 20.00 l balance oflong-termdebts i long- term o b n debt s n income a c 4.00 income g l o t 15.00 a m cost e n ・ e r 3.00 c cost ・ m e c 10.00 o d o s 2.00 e f t b t 5.00 1.00 s 0.00 0.00 ‘63 ‘65 ‘70 ‘75 ‘80 ‘85 ‘86 (year) Causes of JNR’s Failure 2 Problems related to the public Problems related to the unified corporation system organization covering the entire nation (1) Interference from the government and (1) Beyond the scope of managerial control administrative bodies (2) Uniform operations (2) Loss of self-reliance in management (3) Unreasonable relationship of (3) Abnormal labor-management relations interdependence (4) Restrictions on the scope of operations (4) Lack of competitive spirit Incapable of accurately responding to changes in circumstances surrounding the corporation Managerial failure JNR Reform Scheme 1 JNR Passenger Railway Companies JR Hokkaido JR West Transformation in April 1987 JR East JR Shikoku JNR Settlement Corporation JR Central JR Kyushu ‘98.10 Japan Freight Railway Company Japan Railway Construction Public Corporation – Railway
    [Show full text]