Appendix-8-5 A-8-5-1
Total Page:16
File Type:pdf, Size:1020Kb
Appendix-8-5 A-8-5-1 A-8-5-2 A-8-5-3 A-8-5-4 A-8-5-5 A-8-5-6 A-8-5-7 A-8-5-8 A-8-5-9 A-8-5-10 A-8-5-11 A-8-5-12 A-8-5-13 A-8-5-14 A-8-5-15 A-8-5-16 A-8-5-17 A-8-5-18 A-8-5-19 A-8-5-20 A-8-5-21 A-8-5-22 A-8-5-23 A-8-5-24 A-8-5-25 A-8-5-26 A-8-5-27 A-8-5-28 A-8-5-29 A-8-5-30 A-8-5-31 A-8-5-32 A-8-5-33 A-8-5-34 A-8-5-35 A-8-5-36 A-8-5-37 A-8-5-38 A-8-5-39 A-8-5-40 A-8-5-41 A-8-5-42 A-8-5-43 A-8-5-44 A-8-5-45 A-8-5-46 A-8-5-47 A-8-5-48 A-8-5-49 A-8-5-50 A-8-5-51 A-8-5-52 A-8-5-53 A-8-5-54 A-8-5-55 A-8-5-56 A-8-5-57 A-8-5-58 A-8-5-59 A-8-5-60 A-8-5-61 A-8-5-62 A-8-5-63 A-8-5-64 A-8-5-65 A-8-5-66 A-8-5-67 A-8-5-68 A-8-5-69 A-8-5-70 A-8-5-71 A-8-5-72 A-8-5-73 A-8-5-74 A-8-5-75 A-8-5-76 A-8-5-77 A-8-5-78 A-8-5-79 A-8-5-80 A-8-5-81 A-8-5-82 A-8-5-83 A-8-5-84 A-8-5-87 A-8-5-88 A-8-5-89 A-8-5-90 A-8-5-91 A-8-5-92 A-8-5-93 A-8-5-94 A-8-5-95 A-8-5-96 A-8-5-97 A-8-5-98 A-8-5-99 A-8-5-100 A-8-5-101 A-8-5-102 A-8-5-103 A-8-5-104 A-8-5-105 A-8-5-106 A-8-5-107 A-8-5-108 A-8-5-109 A-8-5-110 A-8-5-111 A-8-5-112 A-8-5-113 A-8-5-114 A-8-5-115 A-8-5-116 A-8-5-117 A-8-5-118 A-8-5-119 A-8-5-120 A-8-5-121 A-8-5-122 A-8-5-123 A-8-5-124 A-8-5-125 A-8-5-126 A-8-5-127 A-8-5-128 A-8-5-129 A-8-5-130 A-8-5-131 A-8-5-132 A-8-5-133 A-8-5-134 A-8-5-135 A-8-5-136 A-8-5-137 A-8-5-138 A-8-5-139 A-8-5-140 A-8-5-141 A-8-5-142 A-8-5-143 A-8-5-144 A-8-5-145 A-8-5-146 A-8-5-147 A-8-5-148 A-8-5-149 A-8-5-150 A-8-5-151 A-8-5-152 A-8-5-153 A-8-5-154 A-8-5-155 A-8-5-156 A-8-5-157 A-8-5-158 A-8-5-159 A-8-5-160 A-8-5-161 A-8-5-162 A-8-5-163 A-8-5-164 A-8-5-165 A-8-5-166 A-8-5-167 A-8-5-168 A-8-5-169 A-8-5-170 A-8-5-171 A-8-5-172 A-8-5-173 A-8-5-174 A-8-5-175 A-8-5-176 A-8-5-177 A-8-5-178 A-8-5-179 A-8-5-180 A-8-5-181 A-8-5-182 A-8-5-183 A-8-5-184 A-8-5-185 A-8-5-186 A-8-5-187 A-8-5-188 A-8-5-189 A-8-5-190 A-8-5-191 A-8-5-192 A-8-5-193 A-8-5-194 A-8-5-195 A-8-5-196 A-8-5-197 A-8-5-198 A-8-5-199 A-8-5-200 A-8-5-201 A-8-5-202 A-8-5-203 A-8-5-204 A-8-5-205 A-8-5-206 A-8-5-207 A-8-5-208 The Project on Improvement of Service and Safety of Railway in Myanmar Progress Report December 19th, 2014 at Nay Pyi Taw JICA EXPERT TEAM Japan International Cooperation Agency 1 Table of Content 1. Preface 2. Major progress of the Project 2. 1 Recommendation of technical standards relating to administrative and maintenance aspect and drawing up railway facilities improvement plan to improve service and safety level 2.1.1 Recommendation on technical standards relating to administrative and maintenance aspect to improve the service level and safety 2.1.2 Drawing up of short-, medium-, and long-term railway facilities improvement plan 2.1.3 Education/ training in Japan 2.2 Technology Transfer of Track Maintenance Technology through Implementation of the Pilot Project 2.2.1 Schedule of technology transfer (planning and result) 2.2.2 Education/Training in Myanmar 2.2.3 Education/workshop in Japan 2.2.4 Measuring Vibration 2.2.5 Summarization of the points of improvement and reflecting them in the track maintenance manuals/standards 2.2.6 Final summarization and seminars 2.3 Others 3. Concluding Remark 2 A-8-5-209 Appendix-1 Revised Report of Proposals of Recommendation on Technical standards of MR and Short-, Medium-, and Long-Term Railway facilities Improvement Plan 2 Summary of discussion in the workshop for recommendation in technical standards and for drawing up short-, medium-, and long- term Railway facilities Improvement Plan. 3 Report of the Institutional Management Improvement Course in Japan 3 1. Preface This Progress Report deals with the major activities of the Project implemented around between September and December of this year. We should be grateful, if MR senior officials concerned review the Report and provide us with the various advices so that the Project will be implemented more fruitfully in the coming period. 2.Major progress of the Project 2.1 Recommendation of technical standard relating to administrative and maintenance aspect and drawing up railway facilities improvement plan to improve service and safety level ・Preparation of a working plan The Project is progressing as scheduled in Table 2.1 4 A-8-5-210 Table 2.1 Table of working plan schedule 5 2.1.1 Recommendation on technical standards relating to administrative and maintenance aspect to improve the service level and safety JICA Experts collected the relevant major technical standards relating to safety and service level in the respective engineering fields. JICA Expert Team made reviews on these collected technical standards and proposed recommendations on these technical standards [Report of Proposals of Recommendation on Technical Standards of MR and Short-, Medium-, and Long Term Railway Facilities Plan] (Herein after referred to as “Report of Proposals”). 6 A-8-5-211 These recommendations were fully discussed in the workshop held from Sep 30th to Oct 3rd, 2014 by the members of Working Group for Service and Safety Improvement. Based on these discussions, Report of Proposals was revised as required, and was attached to the Progress Report as Appendix 1 「Revised Report of Proposals of Recommendations on technical Standards of MR and Short-, Medium-, and Long-term Railway Facilities Improvement Plan」. The Revised Report of Proposals was explained to the members of the working group for Service and Safety Improvement in the summarizing Workshop held from Dec. 15 to 18. The schedule of the workshop is shown in Table A, and the members of “ Working Group for Service and Safety Improvement” are shown in Table B 7 8 A-8-5-212 Japan International Cooperation Agency 9 Revision of the Report of Proposals was very limited, so we presented several papers rerating to improvement of safety and service of MR, in addition to explanation of revised Report of Proposals. Accordingly the agenda of the summarizing workshop and timetable were as shown in Table C, D. 10 A-8-5-213 Table C Agenda of Summarizing Workshop 1. Explanation of Revision of the Last Report of Proposals 2. Railway Development in Japan 3. Running Performance of Rolling Stock 4. Supervision of Construction Work 5. Maintenance Work for Civil Engineering Railway Structure 6. Supplementary Lecture11 on ATS etc Table D Timetable of Summarizing Workshop Month / Day Dec 15 Dec 16 Dec 17 Dec 18 Dec 19 Day of the Week Mon Tue Wed Thu Fri Morning 9:30-12:00 9:30-12:00 9:30-12:00 9:30-12:00 5th JCC Explanation of Lecture No.2 Lecture No.4 General Revised Report of Maintenance and Maintenance Work Discussion Proposal Design of Rolling for Civil Engineering by Dr. S. Kuroda, Mr. Stock Railway Structure M. Takami. by Mr. M. Ishikawa by Mr. M. Takami Afternoon 13:30-15:30 13:30-15:30 13:30- Lecture No.1 Lecture No.3 Lecture No.5 Railway Supervision of Supplementary Development in Construction Work Lecture on ATS etc.