Addicks & Barker Reservoirs

Total Page:16

File Type:pdf, Size:1020Kb

Addicks & Barker Reservoirs HCFCD watersheds: ADDICS ACSN ARMAND I CRSS BARR C BRAS SAN ACIN RIR SAN ACIN RIR BFFA & GASN BA CARNRS SIMS CDAR SRING CR SRING CR & CAR CR GS CR CRSS CR INC GRNS WHI A Briefing Document HNING WIW CR ADDICKS & BARKER RESERVOIRS Walnut Creek-Spring Creek Little Cypress Creek Cypress Creek ADDICKS White Oak Bayou RESERVOIR Buffalo Bayou Buffalo Bayou San acinto River BARKER RESERVOIR Brays Bayou Upper Oyster Creek Figure 1 Watersheds impacting or impacted by Addicks and Barker History of Addicks & Barker Benefits of Addicks & Barker Reservoirs HCFCD ublicly announced proects Addicks Dam/Reservoir and Barker Dam/Reservoir are two federal flood Addicks and Barker Reservoirs and Dams hold water during large rainfall scale 100000 control projects located in western Harris County that are designed to store events, reducing the flow of water into Buffalo Bayou and mitigating the risk of water during large rainfalls to reduce downstream flooding along Buffalo flooding along the bayou. This protects areas of significant economic impact 0 1mi mi mi 10mi 18mi Bayou within the City of Houston. in Houston, including Downtown, Memorial, River Oaks, Washington Avenue, Middle Oyster Creek Montrose, Fourth Ward, and the East End. Without the reservoirs, Harvey would Addicks and Barker Dams were constructed between 1942 and 1948 as partAustin Bayou Halls Bayou of a larger U.S. Army Corps of Engineers 1940 flood protection plan for the likely have caused significantly more flooding in these areas. City of Houston. At the time, around $4 million were spent on construction of these two dams, including land acquisition for the dams and for some of the land area behind the dams within the design flood pool of the reservoirs. The reservoirs were intended as part of a larger system that was never implemented: 1. A levee to prevent flood water from Cypress Creek watershed from overflowing into the Addicks Reservoir. 2. A reservoir on upper White Oak Bayou. 3. Bypass channels to direct high volumes of water being released from the dams out of Buffalo Bayou and around Houston. The two dams were redesigned and reconstructed in the 1980s to meet updated Figure 2 Congress & Milam Intersection During a Flood (1929) safety criteria for federal dams. Initially, these two dams and reservoirs were far from developed areas of Houston; however, today, development has occurred in and around both, including thousands of single-family homes built within the reservoirs’ design flood pool for each dam, and within the pathway of floodwater releases from these dams along and outside the banks of Buffalo Bayou. The reservoirs are designed to hold more rainfall than a 1% event, so land upstream of the reservoir is considered “safe” because it is protected from flooding due to rainfall in a 100-year event. Therefore, FEMA does not map these areas within the 1% floodplain, but in an event larger than the 100-year, they will flood. Similarly, during events larger than the 1%, dam releases can occur, flooding areas downstream, along Buffalo Bayou, that are not mapped in the FEMA 100-year floodplain. This scenario occurred during Harvey. Figure 3 Congress & Milam Intersection During Harvey (2017) 1 Briefing Document 2 | 05.07.18 How Do the Dams/Reservoirs Work? Addicks and Barker capture and store excess rainwater that runs off of the land Thus, as the reservoirs start filling up, at a certain level some of the water upstream from the dams, creating a flood control reservoir, or pool, of water stored behind the dams can begin to flow over the spillways. The spillways all for an extended period of time until the stored water can be released through have neighborhoods and commercial developments downstream of them. The outlet pipes or conduits located at the bottom of each dam. Where Buffalo reservoir levels have reached high enough to spill over, and it is not known what Bayou starts, both dams have Controlled Outlet Gates that allow outflow to be flooding might result from an overflow. released at a desired rate. The flood control reservoirs hold floodwater and then At its highest point near the outlet structure, Addicks Dam is 121 feet above slowly release through gated outlet pipes. The gates at the ends of the pipes mean sea level, while Barker Dam is about 115 feet. The top of the dams slope can be incrementally opened to regulate the amount of water released from downward to a ground level approximately 70 feet above mean sea level, these dams so as to mitigate flooding downstream. Emergency Spillways are according to FMA making the dams about 45-50 feet tall. For Addicks Dam,being theinside spillways the 1 A are at located at the far ends of both dams. Emergency spillways are built to allow elevation 112 feet to 115 feet; for Barker, the spillways areone at elevation also knon 106 asfeet. water to flow out of reservoirs during extreme conditions in order to prevent Large areas behind each of the dams and within the reservoirs’Special Flood footprints Haard are dam failures, similar to an emergency overflow drain on a bathtub or sink. Area (SFHA) is hat is inundated when the dams are filling up. referred to as being inside the floodplain Normal Flow ADDICKS RESERVOIR OUTLET controlled op of Dam 121 ADDICKS Harvey High oint 109.1 RESERVOIR WATERSHED Bottom of the Dam 70 BUFFALO CNRD RAS BAYOU ADDICKS RESERVOIR BARKER BUFFALO/ RESERVOIR WHITE OAK WATERSHED WATERSHED BARKER RESERVOIR OUTLET controlled BARKER RESERVOIR op of Dam 115 Harvey High oint 101.5 BRAYS controlled gate WATERSHED spillay Bottom of the Dam 70 BUFFALO CNRD RAS BAYOU Spillway Flow ADDICKS RESERVOIR SPILLWAY uncontrolled op of Dam @ utlet 121 ADDICKS op of Dam @ Spillay 112-115 RESERVOIR Harvey High oint 109.1 WATERSHED BUFFALO/ WHITE OAK BAYOU Bottom of the Dam 70 WATERSHED ADDICKS RESERVOIR BARKER BUFFALO/ BARKER RESERVOIR SPILLWAY uncontrolled RESERVOIR WHITE OAK WATERSHED WATERSHED BARKER op of Dam @ utlet 115 RESERVOIR op of Dam @ Spillay 10 Harvey High oint 101.5 BRAYS BRAYS controlled gate WATERSHED BAYOU WATERSHED spillay Bottom of the Dam 70 Harvey did not eceed emergency spillay levels 2 Briefing Document 2 | 05.07.18 ADDICKS & BARKER DURING HARVEY Figure 4 North Addicks Before Harvey Figure 5 North Addicks After Harvey Upstream Flooding Within the Reservoir Pool During Harvey, unprecedented amounts of rainfall caused water levels to reach More than 10,000 homes located inside of these two reservoirs are estimated 109.1 feet above mean sea level inside Addicks Reservoir and 101.5 feet to have experienced some level of flooding during Hurricane Harvey. As the inside Barker Reservoir, both of which were record pool levels. In Addicks, water level in these reservoirs began to rise significantly, water was released the water level was high enough to flow out of the reservoir, going around the through the gated flood control structures at the outlets of each dam. northern spillway that meets up with the natural ground at 108 feet elevation. MA SSIB HAR FDRA GRNMN RR op of Dam 121 op of Spillay 112-115 Harvey High oint 109.1 Bottom of the Dam 70 land outside federal govt property but inside reservoir federal government property flooday 1annual chance floodplain (100-year) 0.2 annual chance Shown in Figure 4 & 5 floodplain (500-year) etent of 109.1 elevation pool levels from Harvey Figure 6 Diagram of Addicks as a Result of Harvey Rainfall 3 ADDICKS & BARKER DURING HARVEY Figure 6 South Dairy Ashford Road @ Buffalo Bayou - Before Controlled Release Figure 7 South Dairy Ashford Road @ Buffalo Bayou - During Controlled Release Downstream Flooding Due to Dam Releases top of spillway In order to minimize upstream flooding, risks of spillway overflows from the 115 reservoirs, and the risk of further rainfall exceeding the reservoir capacity, the 110 Army Corps of Engineers released water at a controlled rate through the outlet gates during and after Harvey. The combined amount of water released through 105 the gates of both dams exceeded 15,000 cubic feet per second (cfs), well above 100 the capacity of Buffalo Bayou, resulting in flooding in neighborhoods downstream of the dams. Such reservoir releases have never happened before. Typically, 95 combined reservoir releases have not exceeded 2,000 cfs. Neighborhoods 90 between State Highway 6 and Beltway 8 were especially affected by the releases and an estimated 4,000 homes were flooded. 85 80 What Is the Status of the Reservoir Projects? Reservoir Elevation (Feet) 75 New outlet gate structures will replace the existing ones at both Addicks and Barker Dams, expected completion in 2019. Like all dams, Addicks and Barker 70 are at some risk of failing, and failure could be catastrophic. More information 65 about this can be found in later fact sheets. 100 Risk of Future Dam Releases 90 water released to clear reservoir Addicks and Barker Dams could again release large amounts of water downstream 85 or flood homes upstream during extreme rain events like Harvey, or as a result of 80 a number of smaller rains occurring over a short period of time. HARVEY RAINFALL 75 top of bank Some solutions that have been suggested to avoid future releases include 70 excavating and/or clearing vegetation in the reservoirs’ storage areas to increase their volumes, expanding Buffalo Bayou to increase its capacity and allow more 65 flow, adding more flood control structures upstream, and additional regulations 60 stream elevation for upstream development to reduce the amount of water entering these reservoirs. Buffalo Bayou Elevation (Feet) 55 50 KEY POLICY QUESTIONS 45 AUG 18 AUG 25 AUG 31 SEP 7 SEP 14 SEP 21 SEP 28 Could a new regional flood management strategy help use our current Figure 8 Stream Gages 08/12/17-09/30/17 structures to their full ability and help target future funds for improvements? Could regional policy restricting development inside the reservoir pool or For More Information Visit overflow path help prevent damages in future events? HCFCD Could a policy requiring better water storage for developments lessen the hcfcd.org demand for new storage structures in the future, or even prevent flooding in Greater Houston Flood Mitigation Consortium areas not near the reservoirs? HoustonConsortium.com 4 Briefing Document 2 | 05.07.18.
Recommended publications
  • Upstream Addicks and Barker Dams
    In the United States Court of Federal Claims Sub-Master Docket No. 17-9001L (Filed: December 17, 2019) ********************************** ) IN RE UPSTREAM ADDICKS AND ) Post-trial decision; government-induced BARKER (TEXAS) FLOOD- ) flooding on private property; application of CONTROL RESERVOIRS ) factors identified in Arkansas Game & ) Fish; liability for a taking of a flowage ********************************** ) easement THIS DOCUMENT APPLIES TO: ) ) ALL UPSTREAM CASES ) ) ********************************** ) Daniel H. Charest and E. Lawrence Vincent, Burns Charest LLP, Dallas, Texas, Charles Irvine, Irvine & Conner PLLC, Houston, Texas, and Edwin Armistead Easterby, Williams Hart Boundas Easterby, LLP, Houston, Texas, Co-Lead Counsel for Upstream Plaintiffs. With them at trial were Vuk. S. Vujasinovic, VB Attorneys, PLLC, Houston Texas, Lawrence G. Dunbar, Dunbar Barder, P.L.L.C., Houston, Texas, Jack E. McGehee, McGehee, Chang, Barnes, Landgraf, Houston, Texas, Michael J. Dulaney, Sullins, Johnson, Rohrbach & Magers, Houston, Texas, Lydia A. Wright, Burns Charest LLP, Dallas, Texas, Mary Conner, Irvine & Conner, LLC, Houston, Texas, Kyril V. Talanov, Houston, Texas, and Hilary S. Greene, Houston, Texas. William Shapiro, Trial Attorney, Environmental & Natural Resources Division, United States Department of Justice, Sacramento, California, for defendant. With him at trial and on the briefs were Kristine S. Tardiff, Laura W. Duncan, Sarah Izfar, Jessica Held, Bradley L. Levine, David L. Dain, and Mayte SantaCruz, Trial Attorneys, Environmental
    [Show full text]
  • The Shape of Things to Come: Houston Storm Water Management Post-Harvey
    The Shape of Things to Come: Houston Storm Water Management Post-Harvey John S. Grounds, III, PhD, PE, CFM, D.WRE Vice President, Director of Water Resources November 26, 2018 The Shape of Things to Come: Houston Storm Water Management Post-Harvey Hurricane Harvey has proven to be an historic event on many fronts. While the scale and breadth of destruction from the record rainfall cannot be understated, Harvey demonstrated widespread failures of a system intended to protect the fourth most populous city in the country. Numerous public and private entities are looking ahead to rebuilding and fostering new development in the most “flood-proof” ways possible. Changes to the way data is gathered and used for floodplain mapping was underway prior to Harvey, specifically Atlas 14, which is a compendium of precipitation-frequency estimates by region. What will be the impact of these changes on Houston’s floodplains? How are the regulatory agencies changing design and analysis criteria and building codes? What are the resulting implications? What will adoption of these changes mean for jurisdictional bodies? Read on for a current assessment of possible changes, and how they could drastically change Houston’s landscape. “WHILE REDUCING RISK IS POSSIBLE, ELIMINATING RISK IS NOT.”: HOUSTON’S HISTORY WITH STORM WATER MANAGEMENT The Allen brothers landed in Houston in 1832 where White Oak Bayou meets Buffalo Bayou, on the northern edge of present day downtown. The first steam ship arrived in Houston from Galveston Bay in 1837. By 1840 an accumulation of sunken ships along that stretch of Buffalo Bayou made access to downtown so challenging that a $2,000 taxpayer-funded program began removing the wrecks.
    [Show full text]
  • Buffalo Bayou Community Plan Lit Tle Cyp Res S 1960 Upper Cypress Creek G a Watershed Rn E
    S p ri ng C re ek k Sp e ring re C C re 2920 e w k Will o 99 Buffalo Bayou Community Plan Lit tle Cyp res s 1960 Upper Cypress Creek G a Watershed rn e r Land protection, restoration, s shallow storage B Cypres ayo s C u ree k Greens Bayou Addicks Watershed G Retention, r e e creekside storage n s Addicks ReservoirWhite Oak Ba B Excavate y a o Ha y l o u ls B 75,000 acre feet ayo u C u a r p 99 e B n e t a e r r C Tunnel interceptors H s r u e B e to help reduce flooding 40-Foot n k t along Bualo Bayou in a g y Flood Tunnel 10,000 cfs B o a u y o u B u Barker Reservoir u o al y Excavate o B a 86,000 acre feet FLOOD PROTECTION PLAN COSTS ou Brays Bay Construct additional storage in the Cypress u Stream yo a 45 Reservoir boundary S B ¨¦§ Creek over�low/upper Addicks watershed $ 0.20 B i ms County Line Restore/offset Addicks storage capacity* $ 0.60 B ¤£90A Restore/offset Barker storage capacity* $ 0.90 B FEMA Flood Type )"288 Construct Buffalo Bayou Bypass Tunnel** $ 4.20 B * Provide storage to offset previously available volume Total Cost $ 6.00 B Floodway )"35 Mitigate/restore wetlands $ 0.10 B 100-year Floodplain ** on private property. Lower �lowline of reservoirs so that excavated areas drain by gravity to �lood tunnel.
    [Show full text]
  • Buffalo and Whiteoak Bayou Tmdl
    Total Maximum Daily Loads for Fecal Pathogens in Buffalo Bayou and Whiteoak Bayou Contract No. 582-6-70860 Work Order No. 582-6-70860-21 TECHNICAL SUPPORT DOCUMENT FOR BUFFALO AND WHITEOAK BAYOU TMDL Prepared by University of Houston CDM Principal Investigator Hanadi Rifai Prepared for Total Maximum Daily Load Program Texas Commission on Environmental Quality P.O. Box 13087, MC - 150 Austin, Texas 78711-3087 TCEQ Contact: Ronald Stein TMDL Team (MC-203) P.O. Box 13087, MC - 203 Austin, Texas 78711-3087 [email protected] MAY 2008 Contract #- -582-6-70860/ Work Order # 582-6-70860-21 –Technical Support Document TABLE OF CONTENTS LIST OF TABLES ……………………………………………………………..……………..….vi LIST OF FIGURES ………………………………………………………………..……… ... ….ix CHAPTER 1 : PROBLEM DEFINITION...................................................................................... 1 1.1 WATERSHED DESCRIPTION................................................................................. 1 1.2 ENDPOINT DESIGNATION.................................................................................... 5 1.3 CRITICAL CONDITION........................................................................................... 8 1.4 MARGIN OF SAFETY.............................................................................................. 8 CHAPTER 2 : SUMMARY OF EXISTING DATA...................................................................... 9 2.1 WATERSHED CHARACTERISTICS...................................................................... 9 2.1.1 LAND USE........................................................................................................
    [Show full text]
  • Buffalo Bayou and Tributaries Flood Control Project Addicks & Barker Dams & Reservoirs 101 Past, Present & Future
    1 BUFFALO BAYOU AND TRIBUTARIES FLOOD CONTROL PROJECT ADDICKS & BARKER DAMS & RESERVOIRS 101 PAST, PRESENT & FUTURE “The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.” Location 2 Piney Point Gage Houston Average Annual Rainfall – 49.77 inches ADDICKS, BARKER AND BUFFALO BAYOU WATERSHEDS 3 Early Houston Floods 4 31 May-2 June 1929 and 7-10 December 1935 Buffalo Bayou & Tributaries 1940’s Original Plan 5 Ungated Conduits 6 at Addicks and Barker Dams Jan. 20, 1945 Houston 1950, 1992, 2016 7 GATING OF UNGATED CONDUITS 8 9 CHANGES AND THEIR IMPACTS Project Modifications • Deletion of South Canal = Results of Changes • Deletion of Cypress Creek Levee • Gating of the Structures • More Frequent Pools • Faster Rising Pools + Downstream Changes • Larger Pools • Increased Development • Decreased Releases • Longer Lasting Pools – + Upstream Changes • Increased Development • Increased Run-off • More Rapid Run-off Top Ten Pools – Addicks and Barker Reservoirs 10 ADDICKS DAM & RESERVOIR BARKER DAM & RESERVOIR SURFACE AREA CAPACITY IN % CAPACITY % CAPACITY OF SURFACE AREA CAPACITY IN % CAPACITY % CAPACITY OF DATE ELEV. (1) IN ACRES ACRE-FEET (2) MAX. POOL (3) GOL (4) DATE ELEV. (1) IN ACRES ACRE-FEET (2) MAX. POOL (3) GOL (4) 30 Aug '17 109.09 16,982 217,726 100.0+ 100.0 30 AUG '17 101.56 15,149 170,941 81.6 100.0 23 APR '16 102.65 12,834 123,067 61.1 96.5 25 APR '16
    [Show full text]
  • Recreational Use Attainability Analysis of Buffalo/White Oak Bayou
    PRELIMINARY RESULTS OF A RECREATIONAL USE ATTAINABILITY ANALYSIS OF THE BUFFALO BAYOU/WHITE OAK BAYOU STREAM SYSTEM IN HOUSTON, TEXAS BY Dr. Kirk Winemiller Dr. David Scott Dr. Scott Shafer John Baker Bibiana Correa Po-Hsin Lai TEXAS A & M UNIVERSITY COLLEGE STATION, TEXAS August 2008 TABLE OF CONTENTS Page Acknowledgements 5 Introduction 6 Historic Information 7 Description of the Study Area 13 Methods 14 Results 19 Summary 40 Recommendations 43 References 44 Appendix 1: On-Site Observations of Recreation Uses along Buffalo Bayou 46 Appendix 2: Environmental Assessment Methodology Definitions 53 2 LIST OF TABLES Table 1. Description of surveyed streams in Buffalo Bayou/White Oak Bayou Stream System. Measurements were conducted during the summer of 2008. Stream type represents the dominant condition in the stream. Table 2. Stream Flow measurements in Buffalo Bayou/White Oak Bayou Stream System. Measurements were conducted during the summer of 2008 on eleven cross sections. Table 3. Maximum depth and mean of physicochemical water characteristics of Buffalo Bayou/White Oak Bayou Stream System. Values are presented from upstream to down stream and were calculated from measurements conducted during the summer of 2008, excluding obvious outliers. Abbreviations: VMD = Secchi disk was still visible at maximum depth. Table 4. Location, general surroundings, and point sources present at 85 sampled stations in the Buffalo Bayou/White Oak Bayou Stream System. Table 5. Stream channel and corridor assessment per sampled station in the Buffalo Bayou/White Oak Bayou Stream System. Table 6. Human activity registered in Buffalo Bayou/White Oak Bayou Stream System during the summer of 2008.
    [Show full text]
  • Drainage/Spring Creek Watershed Project
    Proposal Prepared for: The Woodlands Township Drainage/Spring Creek Watershed Project (C-2017-0481) November 2017 Professional Engineering Services The Woodlands Township Drainage/Spring Creek Watershed Project C-2017-0481 TABLE OF CONTENTS 1 HISTORY OF THE FIRM .......................................................................................................................................................... 4 2 PROJECT MANAGEMENT TEAM & ORGANIZATIONAL CHART ............................................................................... 5 3 EXPERIENCE .............................................................................................................................................................................. 7 4 RESUMES ................................................................................................................................................................................... 13 5 PROJECT MANAGEMENT METHODOLOGY / APPROACH ......................................................................................... 13 5.1 Project Approach ........................................................................................................................................................................ 13 5.2 Project Management Methodology ........................................................................................................................................... 14 6 EXAMPLES OF SIMILAR PROJECTS ................................................................................................................................
    [Show full text]
  • Cypress Creek Watershed: Analysis of Flooding & Storage Options
    CYPRESS CREEK WATERSHED: ANALYSIS OF FLOODING & STORAGE OPTIONS SSPEED Center - Rice University Texas Southern University May 2019 May 2019 Contributors Larry Dunbar, Rice University SSPEED Center Matt Garcia, Rice University SSPEED Center Andrew Juan, Rice University SSPEED Center Phil Bedient, Rice University SSPEED Center Definitions and Abbreviations AEP Annual Exceedance Probability - the probability of a storm event exceeding a particular flood level in one year. LID Low Impact Development 1 Cypress Creek Watershed: Analysis of Flooding & Storage Options GREATER HOUSTON FLOOD MITIGATION CONSORTIUM Since the devastating blow of Hurricane Harvey in the greater Houston region,local jurisdictions have taken a hard look at their flood preparedness, from regulations to structural projects, and regional level projects to site specific solutions. However, significant vulnerabilities remain. The Greater Houston Flood Mitigation Consortium convened after Hurricane Harvey to advance greater Houston’s resiliency and to ensure that all communities benefit from flood mitigation efforts. This independent collaborative of expert researchers and community advocates is committed to compiling, analyzing and sharing a rich array of data about flooding risk and mitigation opportunities; and translating this data into information to engage the public and help guide and support decision- makers at all levels as they direct the Houston region’s redevelopment. Consortium members are affiliated with local, regional and statewide universities, research centers and community organizations with deep expertise in hydrology, climate science, engineering, coastal resiliency, energy, community development and urban planning. Houston-based Huitt-Zollars, a planning, engineering and architectural firm, manages the consortium. The consortium is focusing its work on Harris County’s 22 watersheds, several of which extend to surrounding counties.
    [Show full text]
  • Harris County, Texas and Incorporated Areas VOLUME 1 of 12
    Harris County, Texas and Incorporated Areas VOLUME 1 of 12 COMMUNITY NAME COMMUNITY NO. COMMUNITY NAME COMMUNITY NO. Baytown, City of 485456 Nassau Bay, City of 485491 Bellaire, City of 480289 Pasadena, City of 480307 Bunker Hill Village, City of 1 480290 Pearland, City of 480077 Deer Park, City of 480291 Piney Point Village, City of 480308 El Lago, City of 485466 Seabrook, City of 485507 Galena Park, City of 480293 Shoreacres, City of 485510 Hedwig Village, City of1 480294 South Houston, City of 480311 Hilshire Village, City of 480295 Southside Place, City of 480312 Houston, City of 480296 Spring Valley Village, City of 480313 Humble, City of 480297 Stafford, City of 480233 Hunter’s Creek Village, City of 480298 Taylor Lake Village, City of 485513 Jacinto City, City of 480299 Tomball, City of 480315 Jersey Village, City of 480300 Webster, City of 485516 La Porte, City of 485487 West University Place, City of 480318 Missouri City, City of 480304 Harris County Unincorporated Areas 480287 Morgans Point, City of 480305 1 No Special Flood Hazard Areas identified REVISED: November 15, 2019 FLOOD INSURANCE STUDY NUMBER 48201CV001G NOTICE TO FLOOD INSURANCE STUDY USERS Communities participating in the National Flood Insurance Program have established repositories of flood hazard data for floodplain management and flood insurance purposes. This Flood Insurance Study may not contain all data available within the repository. It is advisable to contact the community repository for any additional data. Part or all of this Flood Insurance Study may be revised and republished at any time. In addition, part of this Flood Insurance Study may be revised by the Letter of Map Revision process, which does not involve republication or redistribution of the Flood Insurance Study.
    [Show full text]
  • Buffalo Bayou East Master Plan Brings the Community’S Vision for Its Waterfront to Life
    Authentic Connected Inclusive Resilient A VISION FOR BUFFALO BAYOU EAST BUFFALO BAYOU PARTNERSHIP MICHAEL VAN VALKENBURGH ASSOCIATES Landscape Architecture HR&A ADVISORS Economic Development HUITT-ZOLLARS Engineering and Transportation LIMNOTECH Hydrology UTILE Urban Design and Architecture The Buffalo Bayou East Master Plan brings the community’s vision for its waterfront to life. Like other cities such as New York, Boston and St. Louis While most of Buffalo Bayou Partnership’s green space where Frederick Law Olmstead designed park systems, development has occurred west of Downtown, for more Houston hired Cambridge, Massachusetts landscape than a decade the organization has been acquiring architect Arthur Coleman Comey in 1912 to provide property and building a nascent trail system along the a plan that would guide the city’s growth. In his plan, waterway’s East Sector. The Buffalo Bayou East Master Houston: Tentative Plans for Its Development, Comey Plan brings the community’s vision for its waterfront asserted: “The backbone of a park system for Houston to life. Informed by significant outreach and engagement, will naturally be its creek valleys, which readily lend the plan envisions integrating new parks and trails, themselves to ‘parking’ … All the bayous should dynamic recreational and cultural destinations, and be ‘parked’ except where utilized for commerce.” connections to surrounding neighborhoods. Building upon Comey’s vision, Buffalo Bayou Partnership’s This plan is an important step forward for the future of (BBP) 2002 Buffalo Bayou and Beyond Master Plan Houston’s historic bayou—a project that will take decades and envisioned a network of green spaces along the Bayou require creative partnerships to unfold.
    [Show full text]
  • Public Law 107-337 107Th Congress an Act to Authorize the Secretary of the Interior to Study the Suitability and Feasibility Dec
    PUBLIC LAW 107-337—DEC. 16, 2002 116 STAT. 2883 Public Law 107-337 107th Congress An Act To authorize the Secretary of the Interior to study the suitability and feasibility Dec. 16, 2002 of establishing the Buffalo Bayou National Heritage Area in west Houston, Texas. [H.R. 1776] Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, Buffalo Bayou National SECTION 1. SHORT TITLE. Heritage Area Study Act. This Act may be cited as the "Buffalo Bayou National Heritage Area Study Act". SEC. 2. NATIONAL PARK SERVICE STUDY REGARDING BUFFALO BAYOU, TEXAS. (a) FINDINGS.—^The Congress finds the following: (1) The area beginning at Shepherd Drive in west Houston, Texas, and extending to the Turning Basin, commonly referred to as the "Buffalo Bayou", made a unique contribution to the cultural, political, and industrial development of the United States. (2) The Buffalo Bayou is distinctive as the first spine of modern industrial development in Texas and one of the first ailong the Gulf of Mexico coast. (3) The Buffalo Bayou played a significant role in the struggle for Texas independence. (4) The Buffalo Bayou developed a prosperous and produc­ tive shipping industry that survives today. (5) The Buffalo Bayou led in the development of Texas' petrochemical industry that made Houston the center of the early oil boom in America. (6) The Buffalo Bayou developed a sophisticated shipping system, leading to the formation of the modem day Houston Ship Channel. (7) The Buffalo Bayou developed a significant industrial base, and served as the focal point for the new city of Houston.
    [Show full text]
  • How's the Water?
    This story was made with Esri's Story Map Cascade. Read it on the web at http://arcg.is/1OKTKW. How’s the Water? 2018 Houston-Galveston Area Council Basin Highlights Report Watershed Characterizations for the Houston Ship Channel/Buffalo Bayou Tidal, Chocolate Bayou Tidal, and Chocolate Bayou Above Tidal Clean water is essential. Just as clean water is essential for life itself, it is also essential for the quality of our lives. Water is all around us. It flows through rural areas, our neighborhoods, and our cities. These waterways come in all shapes and sizes, from small drainage ditches and meandering creeks to seemingly lazy bayous and major rivers. All of them connect to one of the most productive estuaries in the nation, Galveston Bay, and ultimately the Gulf of Mexico. We walk and picnic near them, splash, swim, fish, and sail on them. Keeping them clean must be a priority for all of us. These waters help fuel a strong economy, bringing in billions of dollars a year and providing tens of thousands of jobs in commercial and recreational fishing and tourism. The 2018 Basin Highlights Report provides an overview of water quality and data trends in the Houston- Galveston region’s surface waters. Houston Ship Channel This report characterizes the Houston Ship Channel/Buffalo Bayou Tidal (Segment 1007), Chocolate Bayou Tidal (Segment 1107), and Chocolate Bayou Above Tidal (Segment 1108) watersheds to identify • Specific water quality issues and trends. • Sources of point and nonpoint pollution. • Current strategies and plans to reduce pollution within these watersheds. • Current and potential stakeholders working within these watersheds Since 1991, the Texas Clean Rivers Program (link: https://www.tceq.texas.gov/waterquality/clean-rivers) (CRP) has provided a framework for addressing water quality issues through an all-inclusive watershed approach.
    [Show full text]