Previously Completed Work Technical Memo

Total Page:16

File Type:pdf, Size:1020Kb

Previously Completed Work Technical Memo MAY 2015 PREVIOUSLY COMPLETED WORK TECHNICAL MEMO Contact List WASHINGTON COUNTY Lyssa Leitner [email protected] 651-430-4314 Hally Turner [email protected] 651-430-4307 CONSULTANT TEAM Brian Smalkoski, Project Manager [email protected] 651-643-0472 William Reynolds, Deputy Project Manager [email protected] 651-643-0462 May 15, 2015 i M ay Contents Introduction ............................................................................................................................................................................................... 1 Document Review ...................................................................................................................................................................................... 2 Local Transportation Studies ................................................................................................................................................................. 2 2000 - MnDOT Commuter Rail System Plan Draft ............................................................................................................................. 2 2001 - The Red Rock Corridor Commuter Rail Feasibility Study ......................................................................................................... 4 2003 – Saint Paul Union Depot Analysis ............................................................................................................................................. 8 2004 - Midwest Regional Rail System Executive Report .................................................................................................................... 9 2007 - Red Rock Corridor Alternatives Analysis Final Report ........................................................................................................... 10 2008 - 2030 Transit Master Study .................................................................................................................................................... 14 2008 - Hastings Bridge Scoping Study .............................................................................................................................................. 15 2009 - Commuter Bus Feasibility Study ........................................................................................................................................... 16 2010 - Metropolitan Council Park-and-Ride Plan ............................................................................................................................. 19 2012 - East Metro Rail Capacity Study ............................................................................................................................................. 20 Annual Report of Minnesota High Speed Rail .................................................................................................................................. 23 Thrive MSP 2040 Transportation Policy Plan ....................................................................................... Error! Bookmark not defined. 2015 - Minnesota State Rail Plan ..................................................................................................................................................... 24 2014 – Red Rock Corridor Alternatives Analysis Update (AAU) ....................................................................................................... 25 Comprehensive Plans ........................................................................................................................................................................... 26 2008 - Ramsey County Comprehensive Plan – Section B (Transportation, Transit and Surface Water) ......................................... 26 2009 - City of Hastings 2030 Comprehensive Plan: Transportation ................................................................................................. 27 2010 – City of St. Paul Park 2030 Comprehensive Plan: The Plan for Transportation ..................................................................... 27 2010 – Newport 2030 Comprehensive Plan: Transportation Section .............................................................................................. 28 2010 – City of Woodbury 2030 Comprehensive Plan – Transportation ........................................................................................... 28 2010 – City of St. Paul 2030 Comprehensive Plan – Transportation ................................................................................................ 28 2010 – Washington County 2030 Comprehensive Plan – Transportation ....................................................................................... 29 2011 – City of Cottage Grove 2030 Comprehensive Plan – Transportation ..................................................................................... 29 Area Studies ......................................................................................................................................................................................... 30 2011 - Market Assessment Report: Red Rock Corridor Station Area and Site Master Planning Study ............................................ 30 Site Plans .............................................................................................................................................................................................. 32 2009 - Union Depot Environmental Assessment ............................................................................................................................. 32 2010 Union Depot Activation and Development Strategy ............................................................................................................... 32 2012 - Station Area Planning Final Report ....................................................................................................................................... 33 Ordinances or Design Standards .......................................................................................................................................................... 37 1997 Guidelines on Shoulder Use by Buses ..................................................................................................................................... 37 May 15, 2015 ii M ay 2012 Regional Transitway Guidelines .............................................................................................................................................. 38 Data Review ............................................................................................................................................................................................. 39 Travel ................................................................................................................................................................................................... 39 2010 Travel Behavior Inventory (TBI) Survey ................................................................................................................................... 39 Transit On-Board Survey .................................................................................................................................................................. 39 Twin Cities Regional Travel Demand Forecast Model (RTDFM) ....................................................................................................... 39 2014 Annual Regional Park-and-Ride System Report: March 2015 ................................................................................................. 40 Population ............................................................................................................................................................................................ 41 Employment ......................................................................................................................................................................................... 41 Transportation Services ....................................................................................................................................................................... 42 Northstar Commuter Rail ................................................................................................................................................................. 42 2012 Cedar Avenue Transitway Update ........................................................................................................................................... 42 Orange Line (I-35W BRT) .................................................................................................................................................................. 43 Conclusion ................................................................................................................................................................................................ 44 May 15, 2015 iii M ay Table of Figures Figure 1: Forecasted Passenger Rail Growth in St. Paul ............................................................................................................................. 9 Figure 2: Red Rock Corridor Study Area ................................................................................................................................................... 10 Figure 3: Implementation Plan from the Alternatives Analysis ..............................................................................................................
Recommended publications
  • 2016 Annual Regional Park-And-Ride System Report
    2016 ANNUAL REGIONAL PARK-AND-RIDE SYSTEM REPORT JANUARY 2017 Prepared for: Metropolitan Council Metro Transit Minnesota Valley Transit Authority SouthWest Transit Maple Grove Transit Plymouth Metrolink Northstar Corridor Development Authority Minnesota Department of Transportation Wisconsin Department of Transportation Prepared by: Rachel Auerbach and Jake Rueter Metro Transit Engineering and Facilities, Planning and Urban Design Table of Contents Executive Summary .....................................................................................................................................3 Overview ......................................................................................................................................................7 Regional System Profile ...............................................................................................................................8 Capacity Changes........................................................................................................................................9 System Capacity and Usage by Travel Corridor .......................................................................................11 System Capacity and Usage by Transitway ..............................................................................................13 Facilities with Significant Utilization Changes ..........................................................................................15 Usage Increases ...................................................................................................................................15
    [Show full text]
  • TRANSPORTATION ADVISORY BOARD Metropolitan Council Building, 390 North Robert Street, Saint Paul, Minnesota 55101
    TRANSPORTATION ADVISORY BOARD Metropolitan Council Building, 390 North Robert Street, Saint Paul, Minnesota 55101 TAB POLICY COMMITTEE Meeting Minutes: December 15, 2010 Ramsey County Regional Railroad Offices at the Union Depot Members Present: Ken Johnson Co Chair, Russ Stark, Co-Chair, David Gepner, Ron Have, Bill Hargis, Dennis Hegberg, Paul Krause, Peggy Leppik, Randy Maluchnik, Scott McBride, Lisa Peilen, James Meyers. Guests and Staff: Gary Warren, Metropolitan Airports Commission. Mary Karlsson, Metropolitan Council Transportation Services. Connie Kozlak, Metropolitan Council Transportation Services. Tom Randall, Metro Transit. Kevin Roggenbuck, TAB Coordinator. _________________________________________________________________________ I. Call to Order. Co Chair Johnson called the meeting to order at 12:30 PM. II. Adoption of the Agenda. Ms. Leppik moved, seconded by Mr. Krause, to adopt the agenda. The motion passed unanimously by voice vote. III. Approval of the Minutes from October 20, 2010. Ms. Peilen moved, seconded by Ms. Leppik, to approve the minutes from the October 20, 2010 TAB Policy Committee meeting. The motion passed unanimously by voice vote. IV. Information Items and Action Transmittals. a. 2010-73: 2011-2017 Metropolitan Airports Commission Capital Improvements Program. Ms. Kozlak presented this item to the committee. Ms. Kozlak explained that under state statutes, the Metropolitan Council must determine the adequacy of the public participation process conducted by the Metropolitan Airports Commission (MAC), approve any projects that meet certain dollar thresholds and “significant effects” criteria and review and comment on all projects as appropriate. Mr. Warren described the sources of funding and revenue the MAC uses for capital projects. Mr. Warren also discussed development plans at MSP Airport.
    [Show full text]
  • 2015 Guideway Status Report
    This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 2015 Legislative Report Guideway Status November 2015 PREPARED BY The Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-366-3000 Toll-Free: 1-800-657-3774 TTY, Voice or ASCII: 1-800-627-3529 In collaboration with the Metropolitan Council 390 Robert St. North St. Paul, MN 55101-1805 Phone: 651-602-1000 To request this document in an alternative format Please call 651-366-4718 or 1-800-657-3774 (Greater Minnesota). You may also send an email to [email protected]. Cover Photos: Northstar commuter rail train Source: Metro Council Green Line LRT Source: Streets MN Red Line BRT Source: Metro Council 2 Guideway Status Report November 2015 Contents Contents ......................................................................................................................................................... 3 Legislative Request........................................................................................................................................ 6 Statutory Requirement .................................................................................................................... 6 Introduction ................................................................................................................................................... 8 Statewide Planning ........................................................................................................................
    [Show full text]
  • 8. South Central Minnesota Passenger Rail Initiative.Pdf
    8. Council Work Session Memorandum TO: City Council FROM: Tim Murray, City Administrator MEETING DATE: April 6, 2021 SUBJECT: South Central Minnesota Passenger Rail Initiative Discussion: A bill was introduced by Rep. Todd Lippert of Northfield this legislative session (HF 1393) that is requesting $500,000 in funding to prepare a feasibility study and alternatives analysis of a passenger rail corridor connecting Minneapolis and St. Paul to Albert Lea on existing rail line and passing through Faribault and Northfield. Northfield City Councilmember Suzie Nakasian recently reached out to Mayor Voracek regarding this initiative, and Northfield City Administrator Ben Martig has provided the materials they prepared in support of the bill. They are requesting that the Faribault City Council consider adopting a resolution to be submitted in support of the bill. A similar rail proposal was discussed in 2015, but was never funded so a feasibility study was never completed. Support for that proposal included the City of Faribault as well as 40+/- other stakeholders. Attachments: • HF 1393 and memo • Northfield 2021-03-16 Council Packet materials • 2021-03-09 Letter to Senator Draheim w/ attachments • Email correspondence 02/11/21 ​ REVISOR KRB/LG 21-02773​ This Document can be made available​ in alternative formats upon request​ State of Minnesota​ HOUSE OF REPRESENTATIVES​ NINETY-SECOND SESSION​ H. F. No. 1393​ 02/22/2021​ Authored by Lippert and Hausman​ The bill was read for the first time and referred to the Committee on Transportation Finance and Policy​ 1.1 A bill for an act​ 1.2 relating to transportation; appropriating money for a passenger rail feasibility study​ 1.3 in southern Minnesota.​ 1.4 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:​ 1.5 Section 1.
    [Show full text]
  • November 15, 2017 the Honorable Paul
    This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp November 15, 2017 The Honorable Paul Torkelson, Chair The Honorable Scott Newman, Chair House Transportation Finance Committee Senate Transportation Finance & Policy Committee 381 State Office Building 3105 Minnesota Senate Building Saint Paul, MN 55155 Saint Paul, MN 55155 The Honorable Linda Runbeck, Chair The Honorable Scott Dibble House Transportation & Regional Governance Policy Ranking Minority Member Committee Senate Transportation Finance & Policy Committee 417 State Office Building 2213 Minnesota Senate Building Saint Paul, MN 55155 Saint Paul, MN 55155 The Honorable Frank Hornstein, DFL Lead The Honorable Connie Bernardy, DFL Lead House Transportation Policy & Finance Committee House Transportation & Regional Governance Policy 243 State Office Building Committee Saint Paul, MN 55155 253 State Office Building Saint Paul, MN 55155 RE: 2017 Guideway Status report Dear Legislators: The Minnesota Department of Transportation, in collaboration with the Metropolitan Council, is pleased to provide the 2017 Guideway Status report as required under 2016 Minnesota Statutes 174.93, subdivision 2. This report updates information for eight guideway corridors currently in operation, construction or design, and thirteen more that are in planning or analysis phase, or that were at the time of the last report in 2015. The capacity analysis looks at regional guideway funding needs and resources related to capital, operations and capital maintenance for the next ten years. If you have specific questions about this report or want additional information, please contact MnDOT’s Brian Isaacson at [email protected] or at 651 234-7783; or, you can contact Met Council’s Cole Hiniker at [email protected] or at 651 602-1748.
    [Show full text]
  • Background Review Memo
    Technical Memorandum #1 Background Review This technical memorandum provides a summary of background documents, including local transportation studies, comprehensive plans, areas studies, site plans, ordinances, and design standards. It also provides a summary of data related to travel, population, employment, and transportation services that are relevant to the Red Rock Corridor Alternatives Analysis Updates (AAU). April 16, 2013 TECHNICAL MEMORANDUM #1 BACKGROUND REVIEW Table of Contents 1.0 INTRODUCTION ..............................................................................................................1.1 2.0 DOCUMENT REVIEW ......................................................................................................2.2 2.1 LOCAL TRANSPORTATION STUDIES ............................................................................2.2 2.1.1 2000 - MnDOT Commuter Rail System Plan Draft ..............................................2.2 2.1.2 2001 - The Red Rock Corridor Commuter Rail Feasibility Study ........................ 2.4 2.1.3 2003 - Saint Paul Union Depot Analysis .............................................................2.9 2.1.4 2004 - Midwest Regional Rail System Executive Report .................................. 2.10 2.1.5 2007 - Red Rock Corridor Alternatives Analysis Final Report ........................... 2.11 2.1.6 2008 - 2030 Transit Master Study ....................................................................2.17 2.1.7 2008 - Hastings Bridge Scoping Study .............................................................2.19
    [Show full text]
  • Guideway Status November 2013
    2013 Legislative Report Guideway Status November 2013 Prepared by The Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-366-3000 Toll-Free: 1-800-657-3774 TTY, Voice or ASCII: 1-800-627-3529 In collaboration with the Metropolitan Council 390 Robert St. North St. Paul, MN 55101-1805 Phone: 651-602-1000 To request this document in an alternative format Please call 651-366-4718 or 1-800-657-3774 (Greater Minnesota). You may also send an email to [email protected]. Cover Photos: Northstar commuter rail train Red Line (Cedar BRT) vehicle on at Target Field opening day Source: Metro Council Source: Metro Council Green Line (Central Corridor LRT) Blue Line (Hiawatha LRT) in vehicle on tracks for testing operation Source: Streets MN Source: Metro Council 2 Guideway Status Report November 2013 Contents Contents .............................................................................................................................................................. 3 Legislative Request............................................................................................................................................. 5 Statutory Requirement ......................................................................................................................... 5 Cost of Report ...................................................................................................................................... 6 Introduction .......................................................................................................................................................
    [Show full text]
  • SPEEDLINES, Issue #14, HSIPR COMMITTEE
    SECTION NAME 1 International National » p. 18 » p. 6 Different HSR » p. 13 Passenger & Freight Approaches Operations HIGH-SPEED INTERCITY PASSENGER RAIL SPEEDLINES MARCH 2015 ISSUE #14 OF HIGH-SPEED RAIL “CELEBRATE THE PAST, DESIGN THE FUTURE.” Centered around a gigantic complex of railway terminals used by a mind-boggling 3.5 million commuters daily, Shinjuku has everything a megalopolis needs — world-class skyscrapers, shopping and night-time entertainment spots. Shinjuku Station, Tokyo, Japan 2 CONTENTS HIGH-SPEED INTERCITY PASSENGER RAIL SPEEDLINES MAGAZINE 3 CHAIRMAN’S LETTER 4 TOKYO’S 9TH WORLD CONGRESS 5 HUB OF BRITISH RAILWAYS SPEEDLINES 6 PASSENGER & FREIGHT RAIL 9 LEGISLATIVE NEWS 11 CALIFORNIA HSR MOVES AHEAD » p. 4 15 DIFFERENT HSR APPROACHES On the front cover: 17 PASSENGER RAIL PROGRESS The station consists of ten platforms that serve 20 tracks and 12 train links. It has 200 exits including an underground arcade. The JR-East system includes 22 IN THE SPOTLIGHT Yamanote Line, Chūō Main Line, Chūō Rapid Line, Chūō-Sōbu Line, Shōnan-Shinjuku Line and Saikyō Line. Odakyu Electric Railway includes the Odakyu Odawara 23 NEC INSIDER Line while Keio Corporation includes the Keiō and Keiō lines. Tokyo Metro includes the Marunouchi Line and Toei Subway includes the Toei Shinjuku and Toei Ōedo lines. 26 AMERICA CONNECTED The east of Shinjuku station is dedicated for shopping and includes restaurants, department stores and kiosks. 28 RAILROAD HISTORY CHAIR: PETER GERTLER VICE CHAIR: AL ENGEL SECRETARY: ANNA BARRY OFFICER AT LARGE: DAVID CAMERON IMMEDIATE PAST-CHAIR: DAVID KUTROSKY EDITOR: WENDY WENNER PUBLISHER: AL ENGEL ASSOCIATE PUBLISHER: KENNETH SISLAK LAYOUT DESIGNER: WENDY WENNER © 2011-2015 APTA - ALL RIGHTS RESERVED Bustling SPEEDLINES is published in cooperation with the High-Speed & Intercity Passenger Rail of: American Public Transportation Association SHINJUKU 1666 K Street NW People walk through an Washington, DC 20006 underground passage at JR Shinjuku Station, Tokyo, Japan Shinjuku Station.
    [Show full text]
  • Workshop 1 Materials
    ATTACHMENT 1: WORKSHOP 1 MATERIALS Embark Richmond Highway Bus Rapid Transit Workshop #1 April 21, 2016 Workshop Outcomes – Workshop #1 • Identify key design questions • Identify applicable BRT elements • Apply lessons learned from peer BRT systems – Workshop #2 • Confirm framework for defining right-of-way limits and station area plans • Develop concepts for South County and Woodlawn stations 2 Agenda 1. Introductions and workshop objectives (15 min) 2. What is BRT? - brief overview of characteristics (15 min) 3. Richmond Highway context for Bus Rapid Transit (15 min) 4. BRT building blocks - guideway, stations, passenger interface (60 min) 5. Recent BRT project case studies and application to Richmond Highway (60 min) 3 What is BRT? Healthline BRT Cleveland, Ohio 4 BRT System Components: An Integrated Package Vehicles Running Ways Stations & Terminals Systems Service Plan 5 BRT Passenger Experience: High-quality Transit Image: Convenient easy route Frequent service (no schedule needed) map VIVA map Simple Route Structure All-door boarding Image: Faster dedicated bus lane- Dedicated Lanes Mexico Longer Stop Spacing City Traffic Signal Priority Comfortable Station Shelters, seating Vehicle comfort & amenities 6 RICHMOND HIGHWAY CONTEXT 7 Alternatives Analysis (AA) Outcomes • Recommend a program of multimodal transportation improvements for adoption by Fairfax County and Prince William County • Define transit, roadway, and bicycle/pedestrian projects that could be advanced for implementation. 8 Transit Alternatives Evaluated – Alternative
    [Show full text]
  • State Rail Plan
    State Rail Plan DRAFT MARCH 2015 CONTACT LIST MnDOT Dave Christianson, Project Manager Office of Freight and Commercial Vehicle Operations [email protected] 651-366-3710 Dan Krom, Director Passenger Rail Office [email protected] 651-366-3193 Consultant Team Andreas Aeppli, Project Manager Cambridge Systematics, Inc. [email protected] 617-234-0433 Brian Smalkoski Kimley-Horn and Associates, Inc. [email protected] 651-643-0472 MINNESOTA GO STATEWIDE RAIL PLAN Draft Plan PAGE i TABLE OF CONTENTS CONTACT LIST ............................................................................................................................................. I TABLE OF CONTENTS ................................................................................................................................ II EXECUTIVE SUMMARY ............................................................................................................................. VII Overview of the Study .................................................................................................................................... vii Context of the 2015 Rail Plan Update ........................................................................................................... viii The Vision for Minnesota’s Multimodal Transportation System ...................................................................... ix Minnesota’s Existing and Future Rail System .................................................................................................
    [Show full text]
  • Grants to Political Subdivisions This Document Is Made Available
    This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Grants to Political Subdivisions ($ in Thousands) Project Request for State Funds Governor’s Governor’s Planning ($ by Session) Recommend. Estimate Priority Political Subdivision Project Title Ranking 2012 2014 2016 Total 2012 2014 2016 Page Assoc. of Metro Inflow and Infiltration Grant Program 1 8,000 8,000 8,000 24,000 1 Municipalities International Center of Research and Austin 1 13,500 0 0 13,500 13,500 - - 5 Technology Backus Wastewater Treatment Fac. Improvements 1 1,000 0 0 1,000 9 Bemidji Lakeland Public Television Media Center 1 3,000 0 0 3,000 13 Brownton Flood Mitigation 1 375 0 0 375 17 Lake Waconia Regional Park Land and Carver County 1 2,848 0 0 2,848 22 Public Boat Access Chatfield EDA Chatfield Center for the Arts 1 2,245 2,166 2,371 6,782 26 Cook County/Grand Lutsen Lake Superior Water Project 1 3,600 0 0 3,600 3,600 - - 33 Marais EDA Cosmos Municipal Building 1 600 0 0 600 38 Cuyuna Wastewater Infrastructure Upgrade 1 988 0 0 988 42 Drinking Water Infrastructure Upgrade 2 1,375 0 0 1,375 45 Lake Byllesby Dam Spillway Capacity Dakota County 1 2,050 0 0 2,050 50 Upgrade Trail Bridge over Cannon River 2 1,500 0 0 1,500 53 Regional Morgue Facility 3 7,000 0 0 7,000 56 Deer River Wastewater Stabilization Pond Expansion 1 700 0 0 700 60 Detroit Lakes / Frazee Heartland Trail Segment 1 3,000 0 0 3,000 64 Dodge County Stagecoach State Trail 1 3,245 1,862 3,880 8,987 68 Duluth Seaway Port Garfield Dock Terminal Phase I 1 4,000 0 0 4,000 73 Authority East Range Joint East Range Central Water System 1 4,500 0 0 4,500 76 Powers Board Federal Dam Sanitary Sewer Collection System Replace.
    [Show full text]
  • Ramsey County Regional Railroad Authority 2016-2017 Proposed Budget
    Ramsey County Regional Railroad Authority 2016-2017 Proposed Budget Presented to the Regional Railroad Authority for Consideration August 4, 2015 2016-2017 RCRRA Proposed Budget Ramsey County Vision A vibrant community where all are valued and thrive Ramsey County Mission A county of excellence working with you to enhance our quality of life 2 2016-2017 RCRRA Proposed Budget Ramsey County Goals • Strengthen individual, family and community health, safety and well- being through effective safety-net services, innovative programming, prevention and early intervention, and environmental stewardship • Cultivate economic prosperity and invest in neighborhoods with concentrated financial poverty through proactive leadership and inclusive initiatives that engage all communities in decisions about our future • Enhance access to opportunity and mobility for all residents and businesses through connections to education, employment and economic development throughout our region • Model forward-thinking investment, fiscal accountability and transparency through professional operational and financial management. 3 Community Needs The proposed 2016-2017 RCRRA budget is responsive to community needs and Ramsey County goals: • Maintains and nurtures our quality of life by developing a long-range vision of transit services to meet changing needs of the community, ease congestion, improve travel between work and entertainment and increase the economic competitiveness of the county • Provides important services that support a vibrant community at Union Depot,
    [Show full text]