Milepost 37 April 2016

Total Page:16

File Type:pdf, Size:1020Kb

Milepost 37 April 2016 MILEPOST 37 APRIL 2016 Class 73s in Scotland – from page 65 Photo – Sandy Smeaton RPS railway performance society www.railperf.org.uk Milepost 37 - 1 - April 2016 Milepost 37 – April 2016 The Quarterly Magazine of the Railway Performance Society Honorary President: John Heaton FCILT Commitee: CHAIRMAN Frank Collins 10 Collett Way, Frome, Somerset BA11 2XR Tel: 01373 466408 e-mail [email protected] VICE CHAIRMAN Michael Rowe Burley Cottage, Parson St., Porlock,Minehead, Somerset, TA24 8QJ . Tel 01643 862182 E-mail: [email protected] SECRETARY Frank Price, Penn House, Middle Common Rd., Pennington, Lymington (co-opted) SO41 8LE Tel: 01590 672235 Email: [email protected] TREASURER Peter Smith 28 Downsview Ave, Storrington, W Sussex, RH20 (and membership) 4PS. Tel 01903 742684 e-mail: [email protected] EDITOR David Ashley 92 Lawrence Drive, Ickenham, Uxbridge, Middx, UB10 8RW. Tel 01895 675178 E-mail: [email protected] Fastest Times Editor Martin Robertson 23 Brownside Rd, Cambuslang, Glasgow, G72 0NL e-mail: [email protected] Distance Chart Editor Ian Umpleby 314 Stainbeck Rd, Leeds, W Yorks LS7 2LR Tel 0113 266 8588 Email: [email protected] Database/Archivist Lee Allsopp 2 Gainsborough, North Lake, Bracknell, RG12 7WL Tel 01344 648644 e-mail [email protected] Technical Officer David Hobbs 11 Lynton Terrace, Acton, London W3 9DX Tel 020 8993 3788 e-mail [email protected] David Stannard 26 Broomfield Close, Chelford, Macclesfield, Cheshire,SK11 9SL. Tel 01625 861172 e mail: [email protected] Meeting Secretary: Michael Bruce, 234A Otley Rd., West Park, Leeds LS16 5AB Tel 0113 305 0367 Committee member: David Sage: 93 Salisbury Rd, Burton, Christchurch, Dorset BH23 7JR Tel 01202 249717 E-mail: [email protected] Non-committee official:- Foreign Fastest times: Alan Varley, 285 Chemin de la Costiere, 06000 Nice, France, e-mail: [email protected] Directors of The Rail Performance Data Foundation: RPS nominees: Frank Collins, Peter Smith, Frank Price Trustees: John Rishton, Nigel Smedley, David Lloyd Roberts CONTENTS Notices 2 Class 350s up north Bevan Price 7 Liverpool to Preston – diesel and electric John Rishton 12 Fastest Times Martin Robertson 15 Festive Settle Scotsman Sandy Smeaton 24 Early timing experiences John Rishton 26 EMUs on ECML Andrew James 31 No further fastest times Michael Rowe 37 Three steam logs from GC William Alcock 43 Almost an Artic Circle Mike Burrow 46 Cab ride to Bendigo Malcolm Simister 52 Letters 56 News: 100mph scheduled services Jeremy Hartill 59 Sleeper diversions Martin Robertson 59 Virgin shuttles Martin Robertson 62 Class 73/9s in Scotland Sandy Smeaton 65 Network developments Ian Umpleby 67 10 minutes late David Ashley 68 Cover: 73967 on the Awe Viaduct with the 1225 ecs to Polmadie on 27th Feb- Photo Sandy Smeaton Enclosures : AGM papers Copyright The Railway Performance Society Ltd, registered in England & Wales No. 04488089 Milepost 37 - 2 - April 2016 Use of the material in the magazine is permitted only for the private purposes of the reader No material in the magazine can otherwise be used for publication or reproduction in any form without the express permission of the Society The views expressed in this magazine are not necessarily those of the RPS, the Editors or any of their advisers. Whilst efforts are made to ensure accuracy, the Editor his advisers and the RPS accept no responsibility for any loss or damage arising from any inaccuracies howsoever caused. Readers are asked to note that the RPS encourages contributions from all members, and articles may appear that are interesting in content, but occasionally may not be to the standard of the rest of the publication. Material sent to the Editors, whether commissioned or freely submitted is provided entirely at the contributors own risk; neither the Editor nor the RPS can be held responsible for any loss or damage howsoever caused. Published by The Railway Performance Society Limited, 92 Lawrence Drive, Ickenham, Uxbridge, Middx, UB10 8RW Printed by Prontaprint Harrow, 7 Central Parade, Station Rd., Harrow, Middx, HA1 2TW. PUBLICATION OF MILEPOST Milepost is published in April, July, October, and January. If you have not received your copy by the end of the month of publication it may have gone astray. Requests for replacements of missing or defective copies should be directed please to the Editor. REPRESENTING THE SOCIETY The RPS is always keen to be represented at special media-type occasions. However, we do ask that anyone wishing to do this should do so with the express agreement of the Committee. Should the opportunity arise for any member or in exceptional circumstances, friend of a member, to do this please can contact be made with the Secretary (either by telephone or e-mail) setting out the circumstances of the occasion. Please give us at least one week in advance of the occasion. SUBMITTING ARTICLES Submissions may be sent as attachments to an email or by post as documents on a CD or diskette or as a printed document. If sending a diskette or CD, please enclose a hard copy of the article; this helps if file(s) are unreadable for any reason. Please send all submissions to the editor whose contact details are in the inside front cover of Milepost. The editor will normally acknowledge email submissions within a few days, and always within 3 weeks. If sending by post and you wish to have a receipt, please enclose an SAE for reply. If you wish any material/CD/diskette to be returned, please clearly state this. Milepost 23¾ gave detailed guidelines for submissions. The editor is happy to supply these, on request by email or by post. Please note that page margins are critical: one inch or 2.54cm top, bottom, left and right. FASTEST TIMES Alan Varley has taken on the compilation of Foreign Fastest Times. Details are shown on page 2. This means that UK and Ireland will be managed by Martin Robertson, and others by Alan Varley. HISTORIC FASTEST TIMES For members who subscribe, you should receive the printed copy with the July edition of Milepost. Please send contributions for future issues to a new email address: [email protected] Or by post to Bevan Price, 24 Walmesley Road, Eccleston, St. Helens, Lancs., WA10 5JT. Logs need not be sent to me, but could you please provide a copy to Lee Allsopp, for the logs database. ANOTHER SALE OF THE CENTURY We have reviewed our policy regarding the availability of back issues of “Milepost” for purchase by members, and - as all previous copies of the magazine are now available on the RPS website or can be obtained from the British Library - it has been decided that it is not necessary to offer back issues of the magazine in the future. Milepost 37 - 3 - April 2016 We are, however, giving members a final chance to buy back issues of “Milepost”, from Milepost 6, if they are still available. Until mid-May multiples of 10 copies will be available at the bargain price of £5 if collected from the AGM in May, or £10 including postage and packing. Please contact David Ashley in the first instance to establish whether the editions you require are still available. THE MEETINGS SECTION. SATURDAY THURSDAY 26TH THURSDAY 30th SATURDAY 9th TUESDAY19TH 21ST MAY 2016 MAY 2016 JUNE 2016 JULY 2016 JULY 2016 The Lamb, The Royal Oak, The Beaufort Mass Timing Day The Grove Inn, Bloomsbury, Borough, Arms, BRISTOL LEEDS LONDON LONDON Parkway 1215 for 1230 1645 1600 1700 AGM and 40th Area Meeting Area Meeting See flyer Area Meeting anniversary discussion of HSTs DIRECTIONS TO THE VENUES LONDON – THE LAMB PUBLIC HOUSE, Lambs Conduit Street, London WC1. From Russell Square Piccadilly Line station turn right, then turn first right into Grenville Street then first left into Guilford Street (Great Ormond Street Hospital on right), turn first right into Guilford Place (by the fountain and underground Gents toilet) and it is on the left - walking time about 5 minutes. OR. From King’s Cross station cross Euston Rd and turn left towards Grays Inn Road, where you turn right, and walk southwards down Grays Inn Rd to the junction with Guildford Street, where you turn right. Turn left at Guildford Place, and Lamb's is on the left. (About 10mins walk from King's Cross) We will use the Empire Theatre Bar / Dining Room upstairs LONDON – The Royal Oak, 44 Tabard Street, London SE1 4JU. From Borough tube station, turn left and at first road junction turn right into Great Dover Street and the almost immediately left into Long Lane. Tabard Street is a few yards on the right (5 minutes walk). OR from London Bridge walk down approach road and turn left into Borough High Street, Turn left by Southwark Local Studies Library, with St Georges Church on right, into Tabard Street. Cross Long Lane and continue down Tabard Street with Royal Oak on right (just over 10 minutes). Please let Richard Howlett know if you are coming on 020 8394 0340 or [email protected] LEEDS – The Grove Inn, Back Row (off Neville Street), Leeds. LS11 5PL Please note that there is a slight change to the directions to The Grove Inn from Leeds City station as follows: The South Entrance to Leeds City station is now open accessed from the west end footbridge. Go down the two escalators from the south entrance there are then a number of ways to get to Neville Street but the easiest way to go forward from the escalator through the doors and turn right down Dark Neville Street at the end turn right onto Neville Street cross the traffic lights (water Street) at the corner of Bridgewater Place tower block turn right and the Grove Inn is visible.
Recommended publications
  • 1.7\ SUSSEX INDUSTRIAL ARCHAEOLOGY SOCIETY The
    1.7\ SUSSEX INDUSTRIAL ARCHAEOLOGY SOCIETY NEWSLETTER 126 April 2005 ISSN 0263 516X Regislered charity no 267159 The SIAS President and Michael Palmer enjoy a chat at Coultershaw Pump Working Day, Sunday 13th March. Officers President Chairman Air Marshal Sir Frederick Sowrey, J. S. F. Blackwell, Home Farm, 21 Hythe Road, Heron's Ghyll, Brighton, Ucicfield BN1 6JR 01273 557674 Vice-Chairman General Secretary Brig. A. E. Baxter, R. G. Martin, 9 Madeira Avenue, 42 Falmer Avenue, Worthing, Saltdean, Brighton, BN11 2AT 01903 201002 BN2 8FG 01273 271330 Treasurer & Membership Chief Editor Secretary B. Austen, P.J. Ho!them, 1 Mercedes Cottages, 12 St Helens Crescent, St. Johns Road, Hove, BN3 8EP Haywards Heath 01273 413790 RH16 4EH 01444 413845 Newsletter Editor Programme Coordinator R. E. Allen, Pat Bracher, 7 Heathfield Road, 2 Hayes Close, Seaford, BN25 1TH Ringmer, Lewes, BN8 5HN 01273 813902 BN25 1TH 01323 896724 Archivist P. J. Holtham Area Secretaries Eastern Area R. F.Jones, 3 Nutley Mill Road, Stone Cross, Pevensey, BN24 5PD 01323 760595 Western Area Brig. A. E. Baxter, 9 Madeira Avenue., Worthing, BN11 2AT 01903 201002 Central Area J. S. F. Blackwell, 21 Hythe Road, Brighton, BN1 6JR 01273 557674 Northern Area E. W. Henbery, 10 Mole Close, Langley Green, Crawley, RH11 7PN 01293 406132 COMMITTEE MEMBERS C. Bryan, M.H.Dawes, Diana Durden, C.C. Hawkins, P.J. Hill, Claire Seymour, R.L. Wilson. Visit our web site : www.sussexias.co.uk Copy for the July Newsletter should be sent by June 14th to : R. Allen, 7 Heathfield Road, Seaford, E./Sussex,
    [Show full text]
  • 160 BOROUGH HIGH STREET, LONDON, SE1 2,217 - 16,070 Sq Ft Newly Refurbished, Contemporary Self-Contained Office Building
    160 BOROUGH HIGH STREET, LONDON, SE1 2,217 - 16,070 sq ft Newly Refurbished, Contemporary Self-Contained Office Building 10 STONEY STREET, LONDON, SE1 0NE | 020 3757 7777 | @UNIONSTPARTNERS UNIONSTREETPARTNERS.CO.UK Subject to Contract. USP for themselves and the vendor of this property give notice that these particulars do not form, or form part of, any offer or contract. They are intended to give fair description of the property and whilst every effort has been made to ensure their accuracy this cannot be guaranteed. Any intending purchaser must therefore satisfy themselves by inspection or otherwise. Neither Farebrother, nor any of its employees, has any authority to make or give any further representations or warranty whatsoever in relation to this property. All prices and rents quoted are net of VAT. 160 BOROUGH HIGH STREET, LONDON, SE1 2,217 - 16,070 sq ft Newly Refurbished, Contemporary Self-Contained Office Building 160-166 Borough High Street is a self-contained office building undergoing a comprehensive refurbishment behind a new facade, to provide highly contemporary design led office space arranged over lower ground, ground and four upper floors. The lower ground and ground will provide an independent unit with a dedicated entrance and interlinking staircase. The buildings will benefit from a terrace at both third and fourth floor levels. Location The property is located on the west side of Borough High Street, approximately 350 meters to the south if its junction with Southwark Street. Both London Bridge Station, which is undergound significant redevelopment, and Borough Market are within easy walking distance. Borough Tube Station is within a few minutes walk to the south.
    [Show full text]
  • Strukturell Kontroll Av Stratiform Jernmalm Ved Kvannevann Øst, Dunderlandsdalen, Nordland
    Institutt for geovitenskap Strukturell kontroll av stratiform jernmalm ved Kvannevann øst, Dunderlandsdalen, Nordland Fredrik Lie Masteroppgave i geologi, GEO-3900, Mai 2019 i Sammendrag Stratiform jernmalm av verdensklasse fremgår i Dunderlandsdalen, der de prinsipielle malmmineralene består av hematitt og magnetitt. Jernmalmen tilhører Dunderlandsformasjonen, som er del av Ramnålidekket innenfor Rødingsfjell dekkekompleks i det øverste allokton av den kaledonske fjellkjeden. Sidebergartene til jernmalmen består av godt folierte glimmerskifere, metapsammitter og tykke lagpakker av dolomittisk og kalsittisk marmor, som har gjennomgått metamorfose i amfibolitt fase. Sekvensen med bergarter som jernmalmen inngår i, ble avsatt i neoproterozoikum. Bergartene ble deformert gjennom flere faser (D1-D3) under den kaledonske fjellkjededannelsen. D1 omfatter F1 folder som er resultat av Ø-V strykende makro- til meso og mikro-skala isoklinale skjærfolder av antatt primærsedimentære lag, som har medført repetisjoner av stratigrafien, og samtidig utviklet en gjennomgående akseplanfoliasjon (S1). Foliasjonen er i dag subvertikal og inneholder blant annet strekningslineasjoner og mylonittiske skjærsoner med interne, disharmoniske F1-folder og komplekst transponerte foldehengsler. D2 førte til refolding av S1 og tilhørende intrafoliale strukturelementer gjennom asymmetriske og svakt overbikkede tett til moderat åpne folder (F2), koaksialt til F1 folder, og sannsynligvis var årsaken til vertikalstilling av lagrekken. Det siste duktile deformasjonsstadiet foregikk gjennom refolding av hele dekkesekvensen i makro skala. Mikroteksturelle studier av hematitt- og magnetittmalm har påvist tidlig hematitt langs rytmiske lag/bånd sammen med kompetente kvartsrike lag. Større tabulær hematitt (spekularitt) er utviklet parallelt med S1 i forbindelse med den første påviste foldefasen, og en enda senere generasjon langs F2 akseplan. Magnetitt utgjør større anhedrale korn som har vokst over hematitt og indikerer en senere dannelse.
    [Show full text]
  • New Southwark Plan Preferred Option: Area Visions and Site Allocations
    NEW SOUTHWARK PLAN PREFERRED OPTION - AREA VISIONS AND SITE ALLOCATIONS February 2017 www.southwark.gov.uk/fairerfuture Foreword 5 1. Purpose of the Plan 6 2. Preparation of the New Southwark Plan 7 3. Southwark Planning Documents 8 4. Introduction to Area Visions and Site Allocations 9 5. Bankside and The Borough 12 5.1. Bankside and The Borough Area Vision 12 5.2. Bankside and the Borough Area Vision Map 13 5.3. Bankside and The Borough Sites 14 6. Bermondsey 36 6.1. Bermondsey Area Vision 36 6.2. Bermondsey Area Vision Map 37 6.3. Bermondsey Sites 38 7. Blackfriars Road 54 7.1. Blackfriars Road Area Vision 54 7.2. Blackfriars Road Area Vision Map 55 7.3. Blackfriars Road Sites 56 8. Camberwell 87 8.1. Camberwell Area Vision 87 8.2. Camberwell Area Vision Map 88 8.3. Camberwell Sites 89 9. Dulwich 126 9.1. Dulwich Area Vision 126 9.2. Dulwich Area Vision Map 127 9.3. Dulwich Sites 128 10. East Dulwich 135 10.1. East Dulwich Area Vision 135 10.2. East Dulwich Area Vision Map 136 10.3. East Dulwich Sites 137 11. Elephant and Castle 150 11.1. Elephant and Castle Area Vision 150 11.2. Elephant and Castle Area Vision Map 151 11.3. Elephant and Castle Sites 152 3 New Southwark Plan Preferred Option 12. Herne Hill and North Dulwich 180 12.1. Herne Hill and North Dulwich Area Vision 180 12.2. Herne Hill and North Dulwich Area Vision Map 181 12.3. Herne Hill and North Dulwich Sites 182 13.
    [Show full text]
  • DELEGATE INFORMATION English Language Teaching Conference Friday 17 - Saturday 18 January 2020 Prospero House, London
    DELEGATE INFORMATION English Language Teaching Conference Friday 17 - Saturday 18 January 2020 Prospero House, London Sponsored by ELT Conference 2020 Getting to the conference etc.venues Prospero House is clearly sign posted and is the red brick building next to Starbucks opposite Borough Tube station entrance. WiFi By Underground Free wifi is available throughout Borough, Northern Line the venue. Password will be available at the venue. Borough tube station is located on the Northern Line Bank Branch. Exit the station and go directly across the road. Turn right on the other side, go past Starbucks and Prospero House is the large red building next to Starbucks. By Train London Bridge Mainline or Underground stations – Northern or Jubilee Line, & Mainline stations Security Turn left out of station. Go towards London Bridge and You are required to wear your turn south (left) and walk along Borough High Street. official conference name badge at Continue past Borough Station and Prospero House is all times during the event. next to Starbucks. Parking There are two public car parks nearby one on Kipling Street, and the other on Trinity Street, both approximately five minutes’ walk from Prospero House. Alternative short-term parking is also available in Avon Social media Close which is to the rear of the venue. Join in the conversation using Please remember that the venue sits within the @englishuk #eukconference congestion charge zone – for further information visit www.cclondon.com. etc.venues Prospero House 241 Borough High Street London SE1 1GA 2 #eukconference ELT Conference 2020 General information Our service providers Special dietary This conference has been generously supported by our requirements participating service providers.
    [Show full text]
  • Strategic Corridor Evidence Base
    Transport Strategy for the South East ___ Strategic Corridor Evidence Base Client: Transport for the South East 10 December 2019 Our ref: 234337 Contents Page 4 Introduction 4 Definitions 5 Sources and Presentation 6 Strategic Corridor maps Appendices SE South East Radial Corridors SC South Central Radial Corridors SW South West Radial Corridors IO Inner Orbital Corridors OO Outer Orbital Corridors 3 | 10 December 2019 Strategic Corridor Evidence Base Introduction Introduction Definitions Table 1 | Strategic Corridor definitions 1 This document presents the evidence base 5 There are 23 Strategic Corridors in South East Area Ref Corridor Name M2/A2/Chatham Main Line underpinning the case for investment in the South England. These corridors were identified by SE1 (Dartford – Dover) East’s Strategic Corridors. It has been prepared for Transport for the South East, its Constituent A299/Chatham Main Line SE2 Transport for the South East (TfSE) – the emerging Authorities, and other stakeholders involved in the South (Faversham – Ramsgate) East M20/A20/High Speed 1/South Eastern Main Line SE3 Sub-National Transport Body for South East England development of the Economic Connectivity Review. (Dover – Sidcup) A21/Hastings Line – in support of its development of a Transport Since this review was published, the corridors have SE5 (Hastings – Sevenoaks) A22/A264/Oxted Line Strategy for South East England. been grouped into five areas. Some of the definitions SC1 (Crawley – Eastbourne) and names of some corridors cited in the Economic South M23/A23/Brighton
    [Show full text]
  • Representing the SPANISH RAILWAY INDUSTRY
    Mafex corporate magazine Spanish Railway Association Issue 20. September 2019 MAFEX Anniversary years representing the SPANISH RAILWAY INDUSTRY SPECIAL INNOVATION DESTINATION Special feature on the Mafex 7th Mafex will spearhead the European Nordic countries invest in railway International Railway Convention. Project entitled H2020 RailActivation. innovation. IN DEPT MAFEX ◗ Table of Contents MAFEX 15TH ANNIVERSARY / EDITORIAL Mafex reaches 15 years of intense 05 activity as a benchmark association for an innovative, cutting-edge industry 06 / MAFEX INFORMS with an increasingly marked presence ANNUAL PARTNERS’ MEETING: throughout the world. MAFEX EXPANDS THE NUMBER OF ASSOCIATES AND BOLSTERS ITS BALANCE APPRAISAL OF THE 7TH ACTIVITIES FOR 2019 INTERNATIONAL RAILWAY CONVENTION The Association informed the Annual Once again, the industry welcomed this Partners’ Meeting of the progress made biennial event in a very positive manner in the previous year, the incorporation which brought together delegates from 30 of new companies and the evolution of countries and more than 120 senior official activities for the 2019-2020 timeframe. from Spanish companies and bodies. MEMBERS NEWS MAFEX UNVEILS THE 26 / RAILACTIVACTION PROJECT The RailActivation project was unveiled at the Kick-Off Meeting of the 38 / DESTINATION European Commission. SCANDINAVIAN COUNTRIES Denmark, Norway and Sweden have MAFEX PARTICIPTES IN THE investment plans underway to modernise ENTREPRENEURIAL ENCOUNTER the railway network and digitise services. With the Minister of Infrastructure The three countries advance towards an Development of the United Arab innovative transport model. Emirates, Abdullah Belhaif Alnuami held in the office of CEOE. 61 / INTERVIEW Jan Schneider-Tilli, AGREEMENT BETWEEN BCIE AND Programme Director of Banedanmark. MAFEX To promote and support internationalisation in the Spanish railway sector.
    [Show full text]
  • Publicity Material List
    Early Guides and Publicity Material Inventory Type Company Title Author Date Notes Location No. Guidebook Cambrian Railway Tours in Wales c 1900 Front cover not there 2000-7019 ALS5/49/A/1 Guidebook Furness Railway The English Lakeland 1911 2000-7027 ALS5/49/A/1 Travel Guide Cambrian & Mid-Wales Railway Gossiping Guide to Wales 1870 1999-7701 ALS5/49/A/1 The English Lakeland: the Paradise of Travel Guide Furness Railway 1916 1999-7700 ALS5/49/A/1 Tourists Guidebook Furness Railway Illustrated Guide Golding, F 1905 2000-7032 ALS5/49/A/1 Guidebook North Staffordshire Railway Waterhouses and the Manifold Valley 1906 Card bookmark 2001-7197 ALS5/49/A/1 The Official Illustrated Guide to the North Inscribed "To Aman Mosley"; signature of Travel Guide North Staffordshire Railway 1908 1999-8072 ALS5/29/A/1 Staffordshire Railway chairman of NSR The Official Illustrated Guide to the North Moores, Travel Guide North Staffordshire Railway 1891 1999-8083 ALS5/49/A/1 Staffordshire Railway George Travel Guide Maryport & Carlisle Railway The Borough Guides: No 522 1911 1999-7712 ALS5/29/A/1 Travel Guide London & North Western Railway Programme of Tours in North Wales 1883 1999-7711 ALS5/29/A/1 Weekend, Ten Days & Tourist Bookings to Guidebook North Wales, Liverpool & Wirral Railway 1902 Eight page leaflet/ 3 copies 2000-7680 ALS5/49/A/1 Wales Weekend, Ten Days & Tourist Bookings to Guidebook North Wales, Liverpool & Wirral Railway 1902 Eight page leaflet/ 3 copies 2000-7681 ALS5/49/A/1 Wales Weekend, Ten Days & Tourist Bookings to Guidebook North Wales,
    [Show full text]
  • 2021 Accessible Places to Visit in East Sussex
    ACCESSIBLE PLACES TO VISIT IN EAST SUSSEX Eastbourne is ideally placed for touring or visiting the historic and picturesque sights of East Sussex, where both the countryside and the coastline are outstanding. The county provides a wealth of memorable places to visit, including castles, manor houses and gardens. Listed below are a few of the attractions that are within a one-hour car drive of Eastbourne that Eastbourne Access Group members have listed as accessible or partially accessible. Please make sure you contact the attraction before your visit to ensure it is suitable for your needs. The local Eastbourne Visitor Centre, Welcome Building, BN21 4BP can provide you with more general information on places to visit. Tel: 01323 415415 or visit http://www.visiteastbourne.com/ We hope you enjoy discovering some new places in East Sussex … Battle Abbey, High Street, Battle, TN33 0AD Tel: 01424 775705/776787. Need help 0370 333 1181 . Minicom Tel: 0800 015 0516. Parking varies maximum £4.00, flat rate all day fee. Open Daily March – October. Open weekend only November – March except the week between Christmas & New Year – daily and February half term – open daily. Explore the site of the Battle of Hastings and discover the history of the Abbey. 3 mobility scooters available – free of charge. There are routes for less mobile visitors around the Abbey ruins, audio guide. Fully accessible Visitor Centre houses café, toilets (includes wheelchair accessible), exhibition. Audio loop available. Web: www.english- heritage.org.uk/battleabbey Bexhill on Sea Seafront, TN40 is very accessible and flat, promenade shared with walkers, wheelchairs, cyclist, skaters and dog walkers.
    [Show full text]
  • Jernbanemagasinet Nr 1-2011.Pdf
    NR 1•2011 Null feil i nåløyet Fornyelse av infra- strukturen og økt vinterberedskap har halvert forsinkelsene i vinter. Størst er utslagene der fornyelsen har kommet lengst. I den nyrenoverte trakta mellom Nationaltheatret og Oslo S har det vært null feil. Side 4–9 SIgnaler Innhold Mot lysere tider Vinteren 2010/11 har til nå gitt jernbanen færre problemer enn det foregående vinter gjorde. Det er ikke bare vinterens skyld. jernbanemagasinet kan i denne utgaven vise en oversikt over hvor mange forsinkelsestimer togene ble påført på grunn av feil i jernbaneverkets anlegg i perioden fra 15. desember til 15. januar. nedgangen i forhold til tilsvarende periode i fjor er stor, og den er spesielt stor i de områdene der det ble gjort en stor for nyelses innsats sist sommer. 28 Denne tendensen kunne vi også observere gjennom høstmåne- Butikk dene i 2010, men vinteren er jo den virkelige syretesten på hvor Kameraovervåking av kritiske spor- Han representerer robuste vi er. Vinterberedskapen er forbedret i år, og alt tyder 10 veksler tas nå i bruk, i visshet om at norske Baneservice, på at vi har gjort riktige prioriteringer gjennom en forsterket Overvåker det vil føre til færre forsinkelser. som nå er i ferd med ved likeholds- og fornyelsesinnsats. til sommeren blir det en ny, å gjøre butikk som stor innsats med fornyelse av anleggene i vårt viktigste knute- operatør av svenske punkt, Oslo s. kombiterminaler. Pålitelighet er et nøkkelbegrep. Kundene vil svikte jernbanen hvis vi ikke klarer å levere det vi lover – tog som kommer fram slik det er forutsatt i ruteplanen.
    [Show full text]
  • Jernbaneverket Norwegian High Speed R Assessment Project
    Jernbaneverket Norwegian High Speed Railway Assessment Project Contract 5: Market Analysis : Location and Services of Stations / Terminals Final Report 17/02/2011 /Final Report Contract5 Subject 4 Location of Stations_170211_lkm_ISSUED.docx Contract 5, Subject 4: Location and Services of Stations /Terminals 2 Notice This document and its contents have been prepared and are intended solely for Jernbaneverket’s information and use in relation to The Norwegian High Speed Railway Assessment Project. WS Atkins International Ltd assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. Document History DOCUMENT REF: Final Report Contract5 Subject 4 JOB NUMBER: 5096833 Location of Stations_170211_lkm_ISSUED.docx Revision Purpose Description Originated Checked Reviewed Authorised Date 4 Final Report LM AB MH WL 15/02/11 3 Draft Final Report LM TH JT WL 01/02/11 2 Interim Report LM JD MH WL 23/12/10 1 Skeleton Report MH LM JD WL 28/10/10 5096833\Final Report Contract5 Subject 4 Location of Stations_170211_lkm_ISSUED.docx Contract 5, Subject 4: Location and Services of Stations /Terminals 3 Contract 5: Market Analysis Location and Services of Stations /Terminals Final Report 5096833\Final Report Contract5 Subject 4 Location of Stations_170211_lkm_ISSUED.docx Contract 5, Subject 4: Location and services of stations/terminals 4 Table of contents Executive Summary 9 1 Introduction 12 1.1 Background 12 1.2 Overall Context of the Market Analysis Contract 13 1.3 Purpose of Subject
    [Show full text]
  • New £1.8M Footbridge Opens at Eridge Station in East Sussex
    The new footbridge at Eridge station Oct 30, 2020 17:30 GMT New £1.8m footbridge opens at Eridge station in East Sussex Network Rail have issued the following press release: Passengers will now benefit from improved access at Eridge station in East Sussex after the opening of a new £1.8m footbridge. The work was needed due to the age and condition of the old structure, in order to protect the safety of those using the bridge and the trains operating below. Eridge station serves the rural district in East Sussex with Southern trains services via the Uckfield branch of the Oxted line. The existing staircases and bridge have been replaced with a new modern-designed footbridge. Glazing panels have been incorporated into the footbridge to allow for natural light. The platform canopies at Eridge station have also been refurbished, improving the overall passenger experience for passengers commuting to London or visiting the Spa Valley Railway. Paul Harwood, regional investment director for Network Rail, said: “I’m very grateful to passengers for their patience whilst we improved the footbridge at Eridge station. The new bridge will deliver a safe and reliable walking route over the railway while maintaining access between the lineside communities. “We are committed to improving the railway environment for passengers, and this footbridge will enhance their journey experience for many years to come”. Chris Fowler, Customer Services Director for Southern and Gatwick Express, said: “On behalf of our Eridge customers, we welcome Network Rail’s major investment in modern safety and comfort standards. “The new footbridge will complement the comprehensive refurbishment in the pipeline for Eridge station, including improvements to the main building, better seating and toilets, as part of our network-wide, multimillion-pound station improvement programme.
    [Show full text]