Public Appendix A

Total Page:16

File Type:pdf, Size:1020Kb

Public Appendix A PUBLIC APPENDIX A 1.1.1.1 FUTURE HIGH STREETS FUND FULL BUSINESS CASE (FBC) A business case is a management tool and is developed over time as a living document as the proposal develops. The Full Business Case (FBC) should summarise the results of all the necessary research and analysis needed to support decision making in a transparent way. The evidence to support the investment decision must be set out in the HMT five case business case model: Strategic, Economic, Financial, Commercial and Management. In its final form the FBC becomes the key document of record for the proposal which summarises the objectives, the key features of implementation management and arrangements for post implementation evaluation. When you have completed your business case, please submit it to the Future High Streets team on [email protected] Please also confirm separately with your delivery manager once you have submitted, via an email with no attachments Version 1.0 Version Date 7 May 2020 Lead Author Simon Machen Place March Town Centre Senior Responsible Officer within Local Authority Paul Medd (SRO) SRO Sign-off Name: Paul Medd Date: Figure 1.1 Figure 1.2 Page 1 of 119 Figure 1.3 MHCLG Full Business Case PROJECT SUMMARY WHAT IS THE INVESTMENT PROPOSAL? Local Authority: Fenland District Council High Street: March Town Centre Brief summary of proposal [499 words]: March is an historic market town that sits at the centre of the Fenland District on the course of the River Nene. March’s heritage is rooted in the railway and the town is well connected through local and regional transport networks. The 2009 Fenland Retail Study and 2019 Growing Fenland strategy identified March as one of Fenland’s two major town centres, providing a range of facilities for an extensive rural catchment area. The Challenges In common with many rural towns, March has suffered from the national trends affecting the way we use our town centres. However, there are specific local factors that are affecting the vitality of the town centre. Broad Street is the at the heart of our town. It is a three-lane carriageway which cuts the town centre in half, providing the only connection over the River Nene. Broad Street is difficult to cross and experiences significant congestion which discourages visitors and shoppers. Similarly, the River Nene waterfront is hidden from the public, being difficult to access and impossible to appreciate. The River Nene and Broad Street are major barriers in the town centre and provide a textbook example of local severance. There are a number of derelict, unused and underused buildings throughout the town centre. This includes properties surrounding the Market Place with its beautiful Town Hall, units along Broad Street and in the Acre Road area which has a particular concentration. Vacancy rates are increasing, and the town centre continues to lose important retail anchors. There is no 24-hour economy in March, the hospitality and leisure offers are poor, and the available first floor space on Broad Street and beyond has failed to attract residents or businesses. All of this is evidence of a town centre struggling with a deteriorating investment climate and large viability gaps. To address these issues we are proposing five transformational projects: • A dramatic intervention to transform Broad Street • Opening up the Riverside areas to improve visibility and access • Redeveloping the historic Market Place • Acre Road Regeneration • Reactivating vacant units & Flats Over Shops programme These proposals respond directly to the 25 factors that the Institute of Place Management has identified as influencing the vitality and viability of local high streets and deliver against the FHSF objectives. By addressing the challenges facing March, our proposals have the potential to create transformative structural change, providing an attractive and vibrant place where residents and visitors are able to spend more time enjoying the high street. These proposals reflect thinking at town, district, county and Combined Authority levels, and are deliverable within the timescales required by the FHSF programme. Narrative Summary Our assessment finds that for the £11.3m investment requested from the Future High Streets Fund, this would generate a total of £40.0m of discounted benefits. This is a benefit cost ratio of 2.4 (Initial BCR FHS Only) or 3.3:1 (FHSF + Co-funding – private cost). The programme will leverage £10.5m private sector funding, and regenerate new and existing, commercial, retail and residential space. Overall funding requested: £11,326,949 Page 2 of 119 MHCLG Full Business Case Figure 1: Wider Study Area Spatial Plan The plan below produced as part of our research shows the wider area study context, which identifies a tightly defined town centre footprint as well as the strategically important station corridor. The spatial context reflects the Growing Fenland report (2019) and was agreed with district and town council members during workshop sessions. Figure 2: Longlisted Intervention Option Packages The plan below shows the long list of intervention packages that were considered. The severance issues are concentrated in Package 3, where the three-lane carriageway of Broad Street cuts the town centre in half and footfall is further constrained by the single river crossing pinch-point over the River Nene. Page 3 of 119 MHCLG Full Business Case Figure 3: Preferred Option Key Plan This plan provides a summary of the preferred option. Full details are available in Appendix B. For details of land ownership see Appendix F. Figure 4: Severance issues in March Town Centre This plan shows the extreme severance issues which run on both East to West and North to South axes. Page 4 of 119 MHCLG Full Business Case Alignment with FHSF Core Objectives The preferred option has been designed to respond to local challenges and the wider strategic objectives of the FHSF programme. These include: • ‘renew and reshape town centres’ – the programme includes proposals which will fundamentally change the way in which March functions as a town centre. This includes improvements in Broad Street which will improve pedestrian flow and footfall, changes in use which will support a 24-hour economy and support resilience, and improvements which will open up underused and derelict areas for commercial development. • ‘improve experience’ - the improvements to Broad Street, the Riverside, the Market Place and supporting public realm will ensure that existing custom is retained, while providing a new offer to businesses and the wider community. These improvements will be visual, environmental and experiential. • ‘drives growth’ – the changes will tackle the existing financial viability gap and release new opportunities for the private sector to re-invigorate the town centre. The provision of mixed use and residential space will drive footfall and dwell time, and help March capitalise on its unique historical and riverside assets. • ‘structural and significant’ – the interventions will change the way in which the town centre functions. These go beyond both ‘surface level change’ and ’beautification’ and consist of important changes in form and land use. A detailed analysis of costing schedules provided by Stockdale QS shows that the proportion of FHSF funding allocated to ‘beautification’ is well below the fund’s 5% maximum. Why the investment is being made? The FHSF investment will arrest the decline in March town centre and enable the area to make the most of its untapped potential. By itself, such investment would not (and has not been) forthcoming from the private sector because of viability and other issues. In addition, there is no other funding mechanism which could realistically drive the required public realm improvements. These proposals amount to a fundamental redesign of how the town centre functions as a retail, entertainment and residential hub. They will ensure growth and resilience and enable the town to surmount its physical and geographic constraints. The following site will be acquired through the FHSF investment. Land and/or Current use Cost (FHSF) Remediation Intended future use Buildings to be /redevelopment cost acquired 1, 2, 3-4, 5, 6 Acre Vacant £4.2m Costs include site Mixed-use Road & Market acquisition costs, development Premises, Acre Road planning costs, viability gap, public realm components, expressed as outturn. This will unlock £10.2m private sector match. What types of physical infrastructure is the FHSF funding required for? Please tick all that apply: Public transport, traffic Public facilities (local government/ Severance and ✓ ✓ management, road health/ education/ leisure) connection improvements and access improvements Digital infrastructure Utility network extension and Public Realm Works ✓ capacity reinforcement Other (please provide details) Page 5 of 119 MHCLG Full Business Case Value for Money Assessment Summary The table below provides a summary of the economic appraisal undertaken for the interventions proposed in March town centre. Table 1 Value for Money Assessment Overview: Preferred Option Adjusted for Deadweight / Optimism Bias Nominal Value of Benefits £70.4m (£84.3m-£13.1m) Present Value of Benefits £40m (£47m-£7m) Nominal Value of Costs £12.7m Present Value of Costs £12.1m Initial BCR (FHSF only 2.4 Initial BCR (FHSF + Co-funding) 3.3 Adjusted BCR (includes non-monetised bens) 2.9 Source: Table 8 (Appraisal Summary Table), Table 15 (Net Present Value Analysis) When considering the total net present value of costs and benefits, the interventions are expected to generate a cost-benefit ratio of 2.4. This represents ‘high value for money’ - based on the guidelines provided in the Department for Transport Value for Money guidance, which considers a BCR of between 2 and 4 as representing a high value for money. We have estimated the net private benefits using land value uplift associated with change of use as per MCHLG guidance. In this case the land value uplift reflects the economic efficiency benefits of converting land into more productive use.
Recommended publications
  • Adopted Core Strategy
    Huntingdonshire D I S T R I C T C O U N C I L Local Development Framework Core Strategy Adopted September 2009 Environment and Community Services - Planning www.huntingdonshire.gov.uk.uk Local Development Framework Core Strategy Adopted September 2009 Environment and Community Services - Planning www.huntingdonshire.gov.uk This document can be viewed and downloaded from www.huntingdonshire.gov.uk. Further copies of this document can be obtained from: Head of Planning Services Huntingdonshire District Council Pathfinder House St Mary’s Street Huntingdon PE29 3TN If you require this document in another format or translated into another language please contact a member of the Development Plans section on 01480 388388 or [email protected]. © Huntingdonshire District Council 2009 Contents Huntingdonshire LDF | Core Strategy: Adopted 2009 Foreword i 1 Introduction 1 2 Links with Other Documents 4 3 The Spatial Vision 6 A Spatial Portrait of Huntingdonshire 6 The Planning Context 9 A Spatial Vision for Huntingdonshire 11 Objectives of the Core Strategy 13 4 The Cornerstone of Sustainable Development 15 5 The Spatial Strategy 19 Key Diagram 19 Strategic Housing Development 21 Settlement Hierarchy 24 Addressing Housing Need 26 Gypsies, Travellers and Travelling Showpeople 29 Economic Development 30 Retail and Town Centre Uses 33 Areas of Strategic Green Infrastructure Enhancement 35 Infrastructure and Implementation 39 6 Monitoring 45 Appendices 1 Glossary 52 2 Evidence Base & Supporting Documents 58 3 Saved Policies to be Superseded 63 Contents Huntingdonshire LDF | Core Strategy: Adopted 2009 Foreword Huntingdonshire LDF | Core Strategy: Adopted 2009 Foreword The District Council knows that Huntingdonshire is an attractive place where people and communities can thrive and develop in a safe and healthy environment.
    [Show full text]
  • Cambridgeshire Green Infrastructure Strategy
    Cambridgeshire Green Infrastructure Strategy Page 1 of 176 June 2011 Contributors The Strategy has been shaped and informed by many partners including: The Green Infrastructure Forum Anglian Water Cambridge City Council Cambridge Past, Present and Future (formerly Cambridge Preservation Society) Cambridge Sports Lake Trust Cambridgeshire and Peterborough Biodiversity Partnership Cambridgeshire and Peterborough Environmental Record Centre Cambridgeshire County Council Cambridgeshire Horizons East Cambridgeshire District Council East of England Development Agency (EEDA) English Heritage The Environment Agency Fenland District Council Forestry Commission Farming and Wildlife Advisory Group GO-East Huntingdonshire District Council Natural England NHS Cambridgeshire Peterborough Environment City Trust Royal Society for the Protection of Birds (RSPB) South Cambridgeshire District Council The National Trust The Wildlife Trust for Bedfordshire, Cambridgeshire, Northamptonshire & Peterborough The Woodland Trust Project Group To manage the review and report to the Green Infrastructure Forum. Cambridge City Council Cambridgeshire County Council Cambridgeshire Horizons East Cambridgeshire District Council Environment Agency Fenland District Council Huntingdonshire District Council Natural England South Cambridgeshire District Council The Wildlife Trust Consultants: LDA Design Page 2 of 176 Contents 1 Executive Summary ................................................................................11 2 Background
    [Show full text]
  • HERITAGE at RISK REGISTER 2009 / EAST of ENGLAND Contents
    HERITAGE AT RISK REGISTER 2009 / EAST OF ENGLAND Contents HERITAGEContents AT RISK 2 Buildings atHERITAGE Risk AT RISK 6 2 MonumentsBuildings at Risk at Risk 8 6 Parks and GardensMonuments at Risk at Risk 10 8 Battlefields Parksat Risk and Gardens at Risk 12 11 ShipwrecksBattlefields at Risk and Shipwrecks at Risk13 12 ConservationConservation Areas at Risk Areas at Risk 14 14 The 2009 ConservationThe 2009 CAARs Areas Survey Survey 16 16 Reducing thePublications risks and guidance 18 20 PublicationsTHE and REGISTERguidance 2008 20 21 The register – content and 22 THE REGISTERassessment 2009 criteria 21 Contents Key to the entries 21 25 The registerHeritage – content at Riskand listings 22 26 assessment criteria Key to the entries 24 Heritage at Risk entries 26 HERITAGE AT RISK 2009 / EAST OF ENGLAND HERITAGE AT RISK IN THE EAST OF ENGLAND Registered Battlefields at Risk Listed Buildings at Risk Scheduled Monuments at Risk Registered Parks and Gardens at Risk Protected Wrecks at Risk Local Planning Authority 2 HERITAGE AT RISK 2009 / EAST OF ENGLAND We are all justly proud of England’s historic buildings, monuments, parks, gardens and designed landscapes, battlefields and shipwrecks. But too many of them are suffering from neglect, decay and pressure from development. Heritage at Risk is a national project to identify these endangered places and then help secure their future. In 2008 English Heritage published its first register of Heritage at Risk – a region-by-region list of all the Grade I and II* listed buildings (and Grade II listed buildings in London), structural scheduled monuments, registered battlefields and protected wreck sites in England known to be ‘at risk’.
    [Show full text]
  • Heritage at Risk Register 2010 / East of England
    HERITAGE AT RISK 2010 / EAST OF ENGLAND Contents HERITAGE AT RISK 3 Reducing the risks 6 Publications and guidance 9 THE REGISTER 11 Content and assessment criteria 11 Key to the entries 13 Bedford (UA) 16 Cambridgeshire 18 Central Bedfordshire (UA) 28 Essex 30 Hertfordshire 37 Luton (UA) 42 Norfolk 42 Peterborough, City of (UA) 53 Southend-on-Sea (UA) 55 Suffolk 55 Thurrock (UA) 64 The English Heritage scheme for identifying and reducing our Heritage at Risk has been running for more than a decade. Over that time, we have reduced the number of historic sites which have been at risk from destruction or demolition in many parts of the East of England region.The first category of assets which we focused on were Buildings at Risk. In our region, which has suffered the vicissitudes of industrial slumps and changing demographics alongside periods of rapid economic growth, this has led to a number of important buildings facing serious threats. Some of these are redundant farm buildings, mills and industrial structures, others are anything from private houses to ornamental follies. With the expansion of the Buildings at Risk Register and developers to proceed with some building projects, to a Heritage at Risk Register we have undertaken an with the reduced availability of funding. We understand, assessment of registered battlefields, registered parks and too, why it may sometimes be necessary to delay a gardens, scheduled monuments, conservation areas and project, although we also know that to put off routine protected wreck sites. These additional categories have repairs can in the long term be a false economy.
    [Show full text]
  • Employment Land Study
    Design & Planning Huntingdonshire District Council January 2014 Huntingdonshire Employment Land Study Prepared by: ............................................................. Checked by: ........................................................................ Richard Jones Tom Venables Associate Director Director MidCityPlace, 71 High Holborn, London WC1V 6QS Telephone: 020 7645 2000 Website: http://www.aecom.com Job No 60272853 Reference Huntingdonshire ELS Date Created December 2013 This document has been prepared by AECOM Limited for the sole use of our client (the “Client”) and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM Limited and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM Limited, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM Limited. Table of Contents Executive Summary ........................................................................................................................................................................ 2 1 Introduction ..................................................................................................................................................................... 10 2 Planning context ............................................................................................................................................................
    [Show full text]
  • MLC Board Meeting Report
    MIDDLE LEVEL COMMISSIONERS At a Meeting of the Middle Level Board hosted at the Middle Level Offices March on Thursday the 30th April 2020 PRESENT M E Heading Esq (Chairman) J E Heading Esq J L Brown Esq (Vice Chairman) M R R Latta Esq P W Allpress Esq Mrs D Laws C D Boughton Esq W Sutton Esq J R Clarke Esq P W West Esq C F Hartley Esq H W Whittome Esq The Chief Executive/Chief Engineer, the Solicitor/Assistant Clerk and the Treasurer were in attendance. Apologies for absence Apologies for absence were received from The Lord De Ramsey, S T Raby Esq and S W Whittome Esq. B.3592 Standing Orders The Chief Executive reported that to allow the Commissioners to modify the manner in which they hold meetings (for a temporary period) whilst special arrangements are in place to deal with COVID-19, Defra have agreed to the adoption of modified standing orders. The Commissioners considered the adapted set of the new model orders, as supplied by ADA, which include two extra clauses at the end of them which include a change to the way in which meetings are held to allow remote attendance. RESOLVED That the Board approve the change. B.3593 Declarations of Interest The Chairman reminded the Commissioners of the importance of declaring an interest in any matter included in today’s agenda that involved or was likely to affect any of them. Councillor Mrs D Laws declared an interest in all matters relating to planning as she is the Portfolio Holder for Planning with Fenland District Council and is also a town councillor on Whittlesey Town Council.
    [Show full text]
  • FIRST STEPS: Admission to Primary School: a Guide for Parents
    First Steps Admission to primary school: a guide for parents Application Deadline 15 January 2019 Apply online at www.cambridgeshire.gov.uk/admissions September 2018 1 Key Information Cambridgeshire Admissions Team Admissions Team 0345 045 1370 OCT1221 FAX 01223 727941 The Octagon Castle Hill Office Hours Cambridge Mon-Thurs 09:00-17:00 CB3 0AP Friday 09:00-16:30 @ [email protected] http://www.cambridgeshire.gov.uk/admissions Social and Education Transport Team (SETT) 0345 0455 208 @ [email protected] www.cambridgeshire.gov.uk/education/transport Advisory Centre for Education (ACE) 0300 0115 142 www.ace-ed.org.uk Department for Education (DfE) OfSTED www.ofsted.gov.uk Schools finder directory: https://data.gov.uk/apps/uk-school-finder School performance tables: http://education.gov.uk/schools/performance/ 2 Foreword I am delighted to present this booklet that has been written especially for parents and carers of children who are due to start primary school either for the first time or for those who are transferring to junior or middle school. We have fantastic schools in Cambridgeshire and we are very proud of them. All children are special and we are committed to making sure they have the best opportunities possible to learn and reach their potential. All the information you need to know about the admissions process is available in this guide and is also available on the County Council’s website at: www.cambridgeshire.gov.uk/admissions In addition to the information you find here, each school produces its own prospectus and provides opportunities for parents to visit and find out more about the facilities and services provided.
    [Show full text]
  • Agenda Reports Pack (Public) 03/07/2012, 19.00
    A meeting of the OVERVIEW AND SCRUTINY PANEL (SOCIAL WELL-BEING) will be held in CIVIC SUITE 0.1A, PATHFINDER HOUSE , ST MARY'S STREET, HUNTINGDON, CAMBS, PE29 3TN on TUESDAY, 3 JULY 2012 at 7:00 PM and you are requested to attend for the transaction of the following business:- Contact (01480) APOLOGIES 1. MINUTES (Pages 1 - 4) To approve as a correct record the Minutes of the meeting of the Miss H Ali Partnership held on 12th June 2012. 388006 2 Minutes. 2. MEMBERS' INTERESTS To receive from Members declarations as to personal and/or prejudicial interests and the nature of those interests in relation to any Agenda Item. Please see Notes 1 and 2 overleaf. 2 Minutes. 3. LOCAL GOVERNMENT ACT 2000: FORWARD PLAN (Pages 5 - 8) A copy of the current Forward Plan, which was published on 13th Mrs H Taylor June 2012 is attached. Members are invited to note the Plan and to 388008 comment as appropriate on any items contained therein. 10 Minutes. 4. UPDATE ON REDESIGN OF MENTAL HEALTH SERVICES To receive an update on NHS Cambridgeshire’s redesign of mental health services across Cambridgeshire and Peterborough. Mr John Ellis, Head of Mental Health, Learning Disability and Substance Misuse Commissioning for NHS Cambridgeshire, Mr K Spencer, Director of People and Business Development and Mr C Denman, Medical Director for Cambridgeshire and Peterborough Foundation Trust will be in attendance for this item. 20 Minutes. 5. VOLUNTARY SECTOR FUNDING 2013/14 ONWARDS To receive a report from the Head of Environmental and Community D Smith Health Services on voluntary sector funding from 2013/14 onwards – 388377 “TO FOLLOW” .
    [Show full text]
  • Fenland District Council Strategic Flood Risk Assessment
    Fenland District Council Strategic Flood Risk Assessment Level 1 SFRA July 2011 Prepared for Fenland District Council Level 1 Strategic Flood Risk Assessment Revision Schedule Level 1 Strategic Flood Risk Assessment Rev Date Details Prepared by Reviewed by Approved by 01 May 2010 Draft SFRA for Helen Judd Elizabeth Gent Jon Robinson comment Assistant Hydrologist Principal Consultant Associate Director pending EA Meeting Gemma Hoad Assistant Water Scientist 02 December Level 1 SFRA Elizabeth Gent Carl Pelling Jon Robinson 2010 for sign off Principal Consultant Principal Consultant Associate Director Gemma Hoad Assistant Water Scientist 03 February Draft FINAL Elizabeth Gent Carl Pelling 2011 Level 1 SFRA Principal Consultant Principal Consultant Gemma Hoad Assistant Water Scientist 04 July 2011 FINAL Level 1 Elizabeth Gent Carl Pelling Carl Pelling SFRA Principal Consultant Principal Consultant Principal Consultant Gemma Hoad Assistant Water Scientist Helen Judd Senior Assistant Hydrologist Scott Wilson Scott House Alençon Link Basingstoke This document has been prepared in accordance with the scope of Scott Wilson's appointment with its client and is subject to the terms of that appointment. It is addressed Hants to and for the sole and confidential use and reliance of Scott Wilson's client. Scott Wilson RG21 7PP accepts no liability for any use of this document other than by its client and only for the purposes for which it was prepared and provided. No person other than t he client may copy (in whole or in part) use or rely on the contents of this document, without the prior written permission of the Company Secretary of Scott Wilson Ltd.
    [Show full text]
  • Development Management Panel 19 March 2012
    DEVELOPMENT MANAGEMENT PANEL 19 MARCH 2012 Case No: 1200085FUL (FULL PLANNING APPLICATION) Proposal: ERECTION OF 2 STOREY DETACHED DWELLING AND CREATION OF NEW VEHICULAR ACCESS Location: LAND AT 10 HOLLOW ROAD RAMSEY FORTY FOOT Applicant: MR AND MRS WALKER Grid Ref: 531202 287987 Date of Registration: 24.01.2012 Parish: RAMSEY RECOMMENDATION - REFUSE 1. DESCRIPTION OF SITE AND APPLICATION 1.1 The site forms part of the existing residential curtilage of No 10 Hollow Road, on the southern side of the highway. No 10 forms the last and most easterly dwelling along Hollow Road within the smaller settlement of Ramsey Forty Foot. Development along Hollow Road is generally characterised by being two storey and traditional in appearance. The site is bounded to the north by the steep bank that Hollow Road is built upon, with the rear (southern) and part of the side (eastern) boundaries containing hedges. The northern part of the eastern boundary contains a post and wire fence offering clear views of the site from Hollow Road. A boundary is yet to be erected along the western boundary with No. 10. To the north of Hollow Road is the Forty Foot drain, and to the east is open countryside. 1.2 The area of garden under consideration is illustrated as being within Flood Zone 2 and 3 ‘high probability’ as shown by the Environment Agency flood zone map. The Huntingdonshire District Council Strategic Flood Risk Assessment identifies the site as within Flood Zone 1 ‘low probability’. A Flood Risk Assessment has been submitted accompanying the planning application. 1.3 Planning permission is sought for the erection of a 2 storey detached dwelling and creation of new vehicular access.
    [Show full text]
  • Archaeological Test Pit Excavations in Ramsey, Cambridgeshire in 2009
    Archaeological Test Pit Excavations in Ramsey, Cambridgeshire in 2009 Catherine Collins Archaeological Test Pit Excavations in Ramsey, Cambridgeshire, 2009 Catherine Collins 2019 Access Cambridge Archaeology Department of Archaeology University of Cambridge Downing Street Cambridge CB2 3ER 01223 761519 [email protected] www.access.arch.cam.ac.uk (Front cover images – left: group shot of RAM/09/5 and right: working shot of RAM/09/5 © ACA) Contents 1 SUMMARY ................................................................................................................................... 4 2 INTRODUCTION .......................................................................................................................... 5 2.1 ACCESS CAMBRIDGE ARCHAEOLOGY ..................................................................................................... 5 2.2 THE HIGHER EDUCATION FIELD ACADEMY (HEFA) .............................................................................. 5 2.3 TEST PIT EXCAVATION AND RURAL SETTLEMENT STUDIES ...................................................................... 6 3 AIMS, OBJECTIVES AND DESIRED OUTCOMES .................................................................... 7 3.1 AIMS ....................................................................................................................................................... 7 3.2 OBJECTIVES ............................................................................................................................................ 7
    [Show full text]
  • Business Coordination Board
    Business Coordination Board Date Time Venue 13th September 2018 13:30 HQ, Conference Room 1 AGENDA 1. Welcome and apologies Niki Howard and Chris Savage 2. Declarations of interest 3. To approve minutes of the Business Coordination Board meeting held on the 19th July 2018 4. Qrt 1 Performance Report Year Ending June 2018 Report from Chief Constable 5. Professional Standards and Complaints Handling – April 2017 – March 2018 Report from Chief Constable and Chief Executive 6. Transforming the approach to funding place-based CSPs Report from Chief Executive 7. Road Safety Partnerships Report from Interim (OPCC) Chief Finance Officer Official Agenda Item: 4.0 To: Business Coordination Board From: Chief Constable Date: 13 September 2018 PERFORMANCE UPDATE – 12 months to June 2018 1. Purpose 1.1 The purpose of this paper is to provide an update to the Business Co-ordination Board (“the Board”) on the Constabulary’s performance against strategic themes identified in the Commissioner’s Police and Crime Plan. 2. Recommendation 2.1 The Board is invited to note the contents of this report. 3. Background 3.1 On the 23rd of May, Cambridgeshire Constabulary went live with the new crime recording system, Athena. This system replaces previous systems for recording crime, intelligence, investigations, custody and defendant management. Athena is a multi-force system and currently there are 7 forces live on Athena. They are: Essex, Norfolk, Suffolk, West Mercia, Warwickshire, Bedfordshire, and Hertfordshire. It is a multi-force system and allows data to be visible to other forces such as Norfolk & Suffolk. Athena will be a key tool in managing investigations across all business areas involved in crime, public protection and Anti-Social Behaviour investigations.
    [Show full text]