Suburb Profile Walloon Qld 4306
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Section 3.7 – Local Area Frameworks
Draft Ipswich Planning Scheme 2019 Statement of Proposals 3.7 Local Area Frameworks 3.7.1 Preliminary (1) The Ipswich Local Government Area has been divided into thirty local area strategic planning units based on geographically identifiable communities of interest (areas with identifiable boundaries and within which there are broad land use and planning commonalities) to which individual Local Area Frameworks apply. (2) The thirty Local Area Frameworks provide a more detailed spatial expression of the policies included in the Whole of City Strategic Framework (refer to sections 3.1 to 3.6) for each of the local area strategic planning units by: (a) including a description of the geographic extent of the strategic planning unit to which the Local Area Framework applies; (b) identifying the Valuable Features in the area that are of significance and are to be protected; (c) identifying the most significant Development Constraints that impact on development in the area and that need to be considered and addressed in allocating precincts and for development assessment; (d) setting out the Growth Management outcomes that are to be delivered in the area; (e) identifying the key Infrastructure that needs to be delivered to support growth and development in the area; (f) showing the preferred use of land in the area by including each property in a land use precinct designation; and (g) where there are different development options (including for example building heights, lot sizes, dwelling densities or different land uses) for an area or individual -
Off-Street Parking Off-Street C
134 the Ipswich City Centre, at schools, parks and sporting schools, at City Centre, the Ipswich do not have spaces The majority of these facilities. within specific parking areas however time restrictions as necessary. time limited are City Centre the Ipswich the by use for available generally are spaces These no charge. public and have and stations railway Hospital, the Ipswich at facilities and offices. facilities government such specific people, by use for dedicated are these others while within a shopping centre, as customers of these in some Parking public use. for available are charge park operators other car while is free, facilities their use. for fees Existing Situation Parking On-Street servicing Ipswich throughout parking is located On-street schools, areas, industrial and residential centres, activity facilities. and other community parks, sports centres or of charge free parking is provided on-street Typically, City Centre. in the Ipswich low-cost at parking car of 2,200 on-street formal is in the order There of which City Centre within the Ipswich marked spaces with time limits parking meters by managed are about 700 many also are one and nine hours. There between ranging are that City Centre within the Ipswich spaces kerbside metered. and/or time restricted marked, not formally parking is usually car on-street City Centre, In the Ipswich Friday, to 8am and 5pm, Monday between time limited 8am and 11:30am on a Saturday. and between time and/or marked spaces on-street also are There facilities the city near across on other roads restricted schools, (e.g. -
Fixing the Trains 14
Queensland Rail Annual and Financial Report 2017-18 General information This is the consolidated Annual and Financial Report 2017-18 (“the Translation and interpreting assistance report”) of Queensland Rail (ABN 68 598 268 528) and its subsidiaries, Queensland Rail is committed to providing accessible services to Queensland Rail Limited (ABN 71 132 181 090) (QRL) and On Track Queenslanders from all culturally and linguistically diverse backgrounds. Insurance Pty Ltd (ABN 18 095 032 670) (OTI). Queensland Rail is a statutory authority established under the Queensland Rail Transit Authority If you have difficulty in understanding the report, please contact Queensland Act 2013 (Qld) (“QRTA Act”) and is a statutory body for the purposes of the Rail on 13 16 17 and we will arrange an interpreter to share the report with Financial Accountability Act 2009 (Qld) and the Statutory Bodies Financial you. Arrangements Act 1982 (Qld). Queensland Rail’s functions are detailed in Section 9 of the QRTA Act. Queensland Rail discharges its statutory functions through its wholly owned subsidiary QRL. QRL does not employ any personnel, but owns all non- employee related assets and contracts. It performs the role of rail transport operator under the Transport (Rail Safety) Act 2010 (Qld). OTI is a wholly-owned subsidiary of QRL. It provides insurance cover for claims on Queensland Rail, QRL and the Aurizon group of companies in respect of events up until 30 June 2010. Unless the context otherwise requires, Queensland Rail together with its subsidiaries QRL and OTI, are collectively referred to as “Queensland Rail” for the purposes of the report. -
Thursday, 28 July 2016 ______
Estimates—Energy, Water Supply, Main Roads, Road Safety and 28 Jul 2016 1 Ports THURSDAY, 28 JULY 2016 _______________ ESTIMATES—TRANSPORTATION AND UTILITIES COMMITTEE—ENERGY, WATER SUPPLY, MAIN ROADS, ROAD SAFETY AND PORTS EST IMATES—ENER GY, W ATER SU PPLY, M AIN R O ADS , R O AD S AFET Y AND PO RTS Estimate Committee Members Mr SR King (Chair) Mr R Molhoek Mr JN Costigan Mr MJ McEachan Mr DA Pegg Mr CG Whiting _______________ Members in Attendance Mr MJ Hart Mrs JR Miller Mr AC Powell Mr JH Langbroek _______________ In Attendance Hon. MC Bailey, Minister for Main Roads, Road Safety and Ports and Minister for Energy, Biofuels and Water Supply Ms D Spinks, Chief of Staff Department of Energy and Water Supply Prof. P Simshauser, Director-General Mr B Barr, Deputy Director-General, Energy Mr K Sedgwick, Deputy Director-General, Water Energy Queensland Mr T Effeney, Chef Executive Officer Seqwater Mr P Dennis, Chef Executive Officer Department of Transport and Main Roads Mr N Scales, Director-General Far North Queensland Ports Corporation Limited Mr C Boland, Chief Executive Officer Gladstone Ports Corporation Mr P O’Sullivan, Chief Executive Officer _______________ Committee met at 9.00 am CHAIR: Good morning. I declare open this estimates hearing for the Transportation and Utilities Committee. I acknowledge the traditional owners of the land on which our parliament stands. I am Shane King, the member for Kallangur and chair of this committee. Rob Molhoek, the member for Southport, is the deputy chair. Other committee members are Mr Jason Costigan, the member for Estimates—Energy, Water Supply, Main Roads, Road Safety and 2 28 Jul 2016 Ports Whitsunday; Mr Matt McEachan, the member for Redlands; Mr Duncan Pegg, the member for Stretton; and Mr Chris Whiting, the member for Murrumba. -
Statement of Proposals
Draft Ipswich Planning Scheme 2019 Statement of Proposals Table of Contents 1 ABOUT THE NEW IPSWICH PLANNING SCHEME ................................................................... 1 1.1 What is a planning scheme? ............................................................................................................................ 1 1.2 Why do we need a new planning scheme? ...................................................................................................... 1 1.3 What form will the new planning scheme take? .............................................................................................. 2 2 ABOUT THIS STATEMENT OF PROPOSALS ............................................................................. 3 2.1 What is the purpose of a Statement of Proposals? .......................................................................................... 3 2.2 What is a Draft Strategic Framework? ............................................................................................................. 3 2.3 What feedback is being sought from the community and key stakeholders? ................................................... 4 2.4 How can I obtain information? ........................................................................................................................ 4 3 DRAFT STRATEGIC FRAMEWORK .......................................................................................... 5 3.1 Preliminary ..................................................................................................................................................... -
Bill Appropriation Bill Community Ambulance
2066 Approp. Bills; Comm. Amb. Cover Levy Repeal & Rev. & O’r Leg. A’ment Bill 17 Jun 2011 invested in a service that is there to keep each and every one of us safe at the peril of those individual officers. What you see in this budget is an additional investment in order to put GPS tracking into Corrective Services to ensure community safety is enhanced. There are also investments in the vehicle fleet for the Police Service to ensure the fleet is upgraded and maintained. There is an opportunity to make further investments into the future for such things as the technology the member is talking about, and that will be taken seriously in each budget process. The member’s question goes directly to an interest in public service delivery—the sort of public service delivery that the opposition wants to cut out from those on the Sunshine Coast, who have a legitimate expectation that the full $2 billion that was put into the Capital Statement should be kept for the Sunshine Coast. I make a prediction here that we will not see the ridiculous concept of Campbell Newman standing in front of someone at a press conference today; in fact, I do not think we will see him at all today. I think he would have scarpered. He will be running at a million miles an hour. He will be running around up there on level 6, up on tippy-toes, waving his arms around, projecting himself, pointing fingers and blaming people, hopping into all the staff members, getting into the shadow Treasurer, saying to the Leader of the Opposition that it is his fault, doing a nana. -
Record of Proceedings
PROOF ISSN 1322-0330 RECORD OF PROCEEDINGS Hansard Home Page: http://www.parliament.qld.gov.au/hansard/ E-mail: [email protected] Phone: (07) 3406 7314 Fax: (07) 3210 0182 Subject FIRST SESSION OF THE FIFTY-THIRD PARLIAMENT Page Thursday, 10 June 2010 PETITIONS ..................................................................................................................................................................................... 1997 TABLED PAPERS .......................................................................................................................................................................... 1997 MINISTERIAL STATEMENTS ........................................................................................................................................................ 1997 Infrastructure Projects ........................................................................................................................................................ 1997 Budget, Regional Projects .................................................................................................................................................. 1998 Shanghai World Expo ......................................................................................................................................................... 1999 Mental Illness ..................................................................................................................................................................... 1999 Queensland -
Tuesday, 30 July 2019 ______
30 Jul 2019 Estimates—Transport and Main Roads 1 TUESDAY, 30 JULY 2019 _______________ ESTIMATES—TRANSPORT AND PUBLIC WORKS COMMITTEE—TRANSPORT AND MAIN ROADS EST IMATES—TR AN SP ORT AND M AIN R O ADS Estimate Committee Members Mr SR King (Chair) Mr TJ Sorensen Mr CE Boyce Mr RI Katter Mr BJ Mellish Mrs JR Miller _______________ Members in Attendance Mr SJ Minnikin Ms SL Bolton Mr MC Berkman Mr MJ Hart Mr J-P H Langbroek _______________ In Attendance Hon. MC Bailey, Minister for Transport and Main Roads Ms T Van Alphen, Chief of Staff Department of Transport and Main Roads Mr N Scales, Director-General Queensland Rail Limited Mr N Easy, Chief Executive Officer _______________ The committee met at 9.00 am. CHAIR: Good morning. I declare this hearing of estimates for the Transport and Public Works Committee open. I would like to acknowledge the traditional owners of the land on which our parliament stands. My name is Shane King, member for Kurwongbah and chair of the committee. The other committee members here today are Mr Ted Sorensen, member for Hervey Bay and deputy chair; Mr Colin Boyce, member for Callide; Mr Robbie Katter, member for Traeger; Mr Bart Mellish, member for Aspley; and Mrs Jo-Ann Miller, member for Bundamba. The committee has granted leave for non-committee members to ask questions at the hearing today and so other members may be present over the course of the proceedings. Today the committee will consider the Appropriation Bill 2019 and the estimates for the committee's areas of responsibility. -
Cognate Debate; Bills Referred to Committees
PROOF ISSN 1322-0330 RECORD OF PROCEEDINGS Hansard Home Page: http://www.parliament.qld.gov.au/hansard/ E-mail: [email protected] Phone: (07) 3406 7314 Fax: (07) 3210 0182 Subject FIRST SESSION OF THE FIFTY-THIRD PARLIAMENT Page Friday, 17 June 2011 PRIVILEGE ..................................................................................................................................................................................... 2057 Alleged Deliberate Misleading of the House by a Minister ................................................................................................. 2057 Tabled paper: Electronic device containing audio recording of conversation between Mr Rob Messenger MP and a QR executive. ......................................................................................................... 2057 Tabled paper: Client Information Brief, dated 11 February 2010, from the Queensland Parliamentary Library regarding the recording of telephone and face-to-face conversations. ...................................................... 2057 Tabled paper: Non-conforming petition to Minister for Transport, minister responsible for Queensland Rail and CEO of Queensland Rail, regarding changing the purchasing of sleepers and bridge timbers. .............. 2057 SPEAKER’S STATEMENT ............................................................................................................................................................ 2057 Questions on Notice, Lodgement ...................................................................................................................................... -
Growth and Infrastructure Committee Meeting Held on 14/05/2019
Draft Ipswich Planning Scheme 2019 Statement of Proposals Table of Contents 1 ABOUT THE NEW IPSWICH PLANNING SCHEME ................................................................... 1 1.1 What is a planning scheme? ............................................................................................................................ 1 1.2 Why do we need a new planning scheme? ...................................................................................................... 1 1.3 What form will the new planning scheme take? .............................................................................................. 2 2 ABOUT THIS STATEMENT OF PROPOSALS ............................................................................. 3 2.1 What is the purpose of a Statement of Proposals? .......................................................................................... 3 2.2 What is a Draft Strategic Framework? ............................................................................................................. 3 2.3 What feedback is being sought from the community and key stakeholders? ................................................... 4 2.4 How can I obtain information? ........................................................................................................................ 4 3 DRAFT STRATEGIC FRAMEWORK .......................................................................................... 5 3.1 Preliminary ..................................................................................................................................................... -
Accessibility Action Plan 2014 Contents
Accessibility Action Plan 2014 Contents Introduction 1 Executive Summary 2 Principles 2 Top 3 Commitments 3 Summary of community feedback 4 Development of this action plan 5 Context 6 Disability Discrimiation Act and the Disability Standards 6 Queensland Rail services 10 Queensland Rail’s unique challenges 14 A statutory authority 15 Our achievements 16 Our trains 17 Our stations 18 Our customer service 19 Partnerships and engagement 20 Our focus 28 Customer service 28 Customer engagement and advocacy 29 Maximising resources 30 Transport industry partnerships 31 Conclusion 32 Monitoring and review 41 Introduction I am excited to present our new Queensland Rail Accessibility Action Plan 2014, which I feel will make a real difference to customers safely accessing and navigating our network. At Queensland Rail, we strive to promote accessibility for all members of the community. We do this by working with our customers to remove barriers and pioneer solutions that support inclusive communities. Whether you are an older adult; have a disability; or are travelling with children, a pram or luggage, we take pride in providing rail services that are equitable, dignified and comfortable for all. This plan outlines our achievements and future steps towards this goal. As a quick snapshot, last year we were pleased to announce two new, independently accessible stations Springfield Central and Springfield. We also delivered full station upgrades at Narangba and Sandgate stations. All of these stations now contain accessible paths of travel, including lifts and ramps, accessible unisex toilets, hearing loops, braille signs, tactile ground surface indicators and accessible parking. For our customers at Graceville, Newmarket, Alderley and Dinmore, new station designs are delivering higher levels of safety, security and comfort.