16.1 Basic Electrical Materials and Methods (16050)

Total Page:16

File Type:pdf, Size:1020Kb

16.1 Basic Electrical Materials and Methods (16050) EL QAA RECREATIONAL SPACES UNDP ELECTRICAL SPECIFICATIONS BASIC ELECTRICAL MATERIALS AND METHODS PART 1 - General Requirements General The scheme includes all work of an electrical nature connected with the electrical services . All services must be carefully coordinated to provide a complete working installation. Works, materials, equipment or services not specifically mentioned in these clauses but mentioned or implied in other must check on the exact method of connecting up to the power supply brought to the substation and allow for coordinating with and receiving approval of the Electricity Authority. The L.V. shall be 3 phase and neutral 220/380 volts, 4 wire earthed neutral system. Scope of work The scope covers the supply to site, complete erection and installation, site testing, commissioning, and setting to work of all the necessary materials and equipment required for this installation as detailed in the specification and as shown on the drawings comprising the following : Main clauses of these specifications or indicated on the drawings must be included as part of the contract. Submain distribution boards, secondary distribution panel including all fixing supports, equipment protection, instrumentation, etc... Connections to submain distribution board, main distribution board and necessary connection to equipment. GN ELEC /1 EL QAA RECREATIONAL SPACES UNDP ELECTRICAL SPECIFICATIONS Lighting and power including all light points and fittings, supports, wires, conduits, electrical switches, socket outlets, plugs including supply and devices to all equipment requiring power. Earthing system, including all wires, cables, rods, pits and any expense in providing satisfactory tests for the satisfaction of the Engineer, that satisfactory earth connection has been established. Supply and installation of isolators and electrical outlets to serve equipment. All additional sundry equipment or materials necessary to form a complete and comprehensive installation whether specifically mentioned in the specifications or not, but which normally form part of such an installation. Testing of installation and taking over. Design drawings : The drawings supplied with the specifications are indicative only. The Contractor is required to submit complete shop drawings. GN ELEC /2 EL QAA RECREATIONAL SPACES UNDP ELECTRICAL SPECIFICATIONS Shop drawings : Before commencing with the work, the Contractor shall prepare and submit detailed shop drawings for all equipment and distribution services described herein. The Contractor shall submit all drawings for approval within the time specified. Large scale details shall be 1/10. Signed and approved drawings shall not be departed form, unless a signed variation order or site instruction is issued in writing by the Engineer. Drawings returned to the Contractor for alteration or amendment are to be resubmitted to the Engineer for approval. The contractor shall be responsible for any discrepancies, errors, or omissions in the drawings and other particulars supplied by him whether such drawings and particulars have been approved by the Engineer or not, provided such discrepancies, errors, or omissions are not due to inaccurate information or particulars furnished in writing to the Contractor by the Engineer. Design drawings : The Contractor shall submit drawings showing accurately the general layout of the whole installation and equipment. The exact routing of cables, conduits, cable ducts, cable trays, etc., are to be detailed by the Contractor, together with supports, exact sizes of conduits and trunking to be used in each location, and number and sizes of cables and wires run into conduits. The exact positions of lighting fittings and equipment shall be shown. Detail drawings are required for distribution boards showing exact method of fixing and locating and showing feeder cables. Diagramatic charts showing schematically each electrical system and designation of each panel circuit breaker etc., are also required. As built drawings : As per conditions of contract, the Contractor shall supply the Engineer with "as installed or as built drawings" all in accordance with the requirements for "shop drawings" updated to show the exact way the equipment have been installed. These drawings shall be on reproducible negatives. Circuit and System Layout : Before starting on any work connected with the electrical installation, the Contractor shall secure the approval of the Engineer to the whole of the layouts and the positioning of cable and conduit runs, GN ELEC /3 EL QAA RECREATIONAL SPACES UNDP ELECTRICAL SPECIFICATIONS junction boxes, boards, fittings and accessories etc... It is particularly important that all requirements are complied with and full approval is obtained. Guarantee : The Contractor shall guarantee in writing to the Engineer that all electrical works installed by him shall be free from any and all defects in workmanship and materials, and that all equipment shall withstand variations in temperature, load and atmospheric conditions which arise under working conditions without undue distortion, deterioration or setting up of undue stresses and strains in any part of such magnitude as to offset the strength and suitability for the various parts. It shall also be guaranteed that all equipment have or will perform the capacities and characteristics indicated on the drawings or specified, and that if during a period of ONE YEAR from date of the certificate of completion and acceptance of his work, any such defects in workmanship, materials or performance appear, he will promptly remedy them to the satisfaction of the Engineer. All costs involved in carrying out this work shall be to the Contractor's expense. Accessibility All work shall be so designed and installed as to be easily accessible for operation, maintenance and repair. Rejection All work shall be carried out to the satisfaction of the Engineer. Any work refused by the Engineer shall be removed and rebuilt and replaced by the contractor at no cost to Engineer in a satisfactory manner as governed by this specification. All work disturbed, injured or destroyed in the course of removal of the said work shall be made good at the contractor's own expense. GN ELEC /4 EL QAA RECREATIONAL SPACES UNDP ELECTRICAL SPECIFICATIONS Erection The Contractor shall be responsible for organizing his work as shall be necessary to enable him to execute the works, keep the site reasonably clean, remove all waste material as it accumulates and as directed by the Engineer. The Contractor shall provide all lifting beams and slings for moving and erecting equipment on site, unless otherwise specified. He also shall provide, erect, alter as required and alternatively remove all temporary scaffolding required to facilitate erection of works. Storage of Materials and Equipment All materials and equipment are to be stored in a manner as not to obstruct the work of others. It shall be adequately protected at all times against corrosion, deterioration and the ingress of foreign matter. All equipment must be kept clear of the floor or ground by means of wooden bearers or other approved means. Safeguard to Equipment It shall be the Contractor's responsibility to safeguard by means of temporary or permanent supports or otherwise all cables, pipes and equipment and other materials and equipment which would be liable to suffer damage if such precautionary measures were not taken. Safeguard to Equipment Temporary and permanent safeguards shall be to the approval of the Engineer. Safeguard to personnel All "Live" parts of electrical equipment shall be protected in such a way as to adequately safeguard from injury all personnel working on or in the vicinity of equipment. Wherever possible, all protective guards shall be supplied by the equipment manufacturer. All precautioning means must be taken to safeguard all personnel against site hazards. GN ELEC /5 EL QAA RECREATIONAL SPACES UNDP ELECTRICAL SPECIFICATIONS Standards and Regulations All the electrical installation shall be in accordance with the International Electro-technical Commision (IEC) recommondations and the following codes : UTE manufacturing standards. NFC 13-100 for high voltage power supply. NFC 15-100 for meduim voltage power distribution. NFC 17-100 for low voltage systems. NEC. BS 7671 (The IEE wiring regulations). However, the Contractor may offer materials and equipment to alternative standards provided such items conform to the real intent of the specifications and approval is obtained for these alternatives. All equipment and materials to be incorporated in the works shall be brand new bearing stamped ratings as required and must be approved by the Engineer prior to their use. Omissions If anything necessary to the proper installation or operation of the electrical system is omitted from the drawings and specifications, or if indicated incorrectly, the Contractor shall immediately call the attention of the Engineer to this Omission or inaccuracy, before work drawings are prepared. Should the Contractor fail to do so, he shall be held responsible and shall make good at his own expense such errors or any damages caused by such Omissions. Samples Samples of parts, fittings and fixtures shall be submitted to the Engineer by the Contractor for approval before work commences. The parts used in the work done by the Contractor shall not vary in any manner from the samples submitted and approved. GN ELEC /6 EL QAA RECREATIONAL SPACES UNDP ELECTRICAL SPECIFICATIONS Tests The completed systems
Recommended publications
  • Basics in Low Voltage Distribution Equipment
    Thought leadership White paper Basics in low voltage distribution equipment Mark Rumpel Basics of electricity generation Product line manager Eaton In the U.S., as elsewhere, electricity has historically been generated from precious natural resources including coal, oil or natural gas. Nuclear energy and hydropower innovations advanced electrical Executive summary generation capabilities at the end of the 20th century. Today, Depending on their unique needs, multi-family, commercial and alternative and renewable fuels such as geothermal energy, wind industrial sites typically rely upon either low or medium voltage power, biomass and solar energy are gradually becoming more service entrance equipment to control or cut off the electrical readily available; these sources are popular both for their higher supply of their buildings from a single point. Low voltage efficiency and long-term sustainability. distribution equipment typically operates at less than 600 volts; Once harvested, natural resources and mechanical energy sources in contrast, medium voltage equipment affords a wider range must first be converted into electrical energy to make it transmis- of 600 to 38,000 volts. sible and usable. Power plants complete this function using steam This paper provides a basic overview of the definitions, turbines. components, applications and other details associated Water is heated in a massive boiler to produce steam, which is used with low voltage distribution equipment. It covers electrical to turn a series of blades mounted on a shaft turbine. The force of panelboards, switchboards and switchgear operating at the steam rotates a shaft connected to a generator. The spinning 600 volts alternating current (AC) or direct current (DC) or below.
    [Show full text]
  • Electric Power Generation and Distribution
    ATP 3-34.45 MCRP 3-40D.17 ELECTRIC POWER GENERATION AND DISTRIBUTION JULY 2018 DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited. This publication supersedes TM 3-34.45/MCRP 3-40D.17, 13 August 2013. Headquarters, Department of the Army Foreword This publication has been prepared under our direction for use by our respective commands and other commands as appropriate. ROBERT F. WHITTLE, JR. ROBERT S. WALSH Brigadier General, USA Lieutenant General, USMC Commandant Deputy Commandant for U.S. Army Engineer School Combat Development and Integration This publication is available at the Army Publishing Directorate site (https://armypubs.army.mil) and the Central Army Registry site (https://atiam.train.army.mil/catalog/dashboard). *ATP 3-34.45 MCRP 3-40D.17 Army Techniques Publication Headquarters No. 3-34.45 Department of the Army Washington, DC, 6 July 2018 Marine Corps Reference Publication Headquarters No. 3-40D.17 Marine Corps Combat Development Command Department of the Navy Headquarters, United States Marine Corps Washington, DC, 6 July 2018 Electric Power Generation and Distribution Contents Page PREFACE.................................................................................................................... iv INTRODUCTION .......................................................................................................... v Chapter 1 ELECTRICAL POWER ............................................................................................. 1-1 Electrical Power Support to Military Operations
    [Show full text]
  • Distribution Board
    Released By: The Development Commissioner (SSI), Ministry of SSI, New Delhi Distribution Board PRODUCT CODE (ASICC) 77308 QUALITY AND STANDARDS IS 8623:1977 IS 2675:1983 PRODUCTION CAPACITY Qty.: 600 Nos. (per annum) Value Rs. 75,00,000 YEAR OF PREPARATION 2002- 2003 PREPARED BY Small Industries Service Institute Vikas Sadan College Square Cuttack - 753003 and Office of the Development Commissioner Small Scale Industries Electrical and Electronics Division 7th Floor, Nirman Bhavan, New Delhi - 110 011. Introduction The Distribution Board, refers to an equipment which consists of bus bars, and possible switches, fuse links and Automatic protective equipment, bypass equipment, for connecting, controlling and protecting a number of branch circuits fed from one main circuit of a wiring installation in a building or premises for easy and safe handling of incoming power supply. These are, also used to protect the electrical distribution system in turn, connected electrical equipment from being damaged due to various faults like short circuit, over load, earth leakage, etc. The Conductor system by means of which electrical energy is conveyed from bulk power source or sources to the consumers is known as distribution system, which may be divided into two systems known as high voltage (primary) distribution and low voltage (secondary distribution). From generating stations the Electrical Power is usually transmitted to various Sub- stations, through extra high tension transmission lines at voltages from 33 to 220 kV and at these Sub-stations this voltage is stepped down to 11 or 6.6 or 3.3 kV and power at this voltage is conveyed to different sub-stations for distribution and to the bulk supply consumer.
    [Show full text]
  • Use of Electric Transmission and Distribution Equipment Technical
    TECHNICAL SUPPORT DOCUMENT FOR PROCESS EMISSIONS OF SULFUR HEXAFLUORIDE (SF6) AND PFCs FROM ELETRIC POWER SYSTEMS: PROPOSED RULE FOR MANDATORY REPORTING OF GREENHOUSE GASES Revised November 2010 Office of Air and Radiation U.S. Environmental Protection Agency Contents 1. Source Description...............................................................................................................................................1 a. Total U.S. Emissions.......................................................................................................................................1 b. Emissions to be Reported................................................................................................................................1 c. Facility Definition Characterization................................................................................................................1 2. Options for Reporting Threshold .........................................................................................................................4 3. Options for Monitoring Methods .........................................................................................................................6 4. Procedures for Estimating Missing Data..............................................................................................................7 5. QA/QC Requirements ..........................................................................................................................................7 6. Reporting Procedures...........................................................................................................................................9
    [Show full text]
  • “Electrical Safety in the Workplace”
    “Electrical Safety in the Workplace” This material was produced under Grant #SH-16609-07-60-F-26 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not necessarily reflect the views or policies of the U.S. Department of Labor, nor does mention of trade names, commercial products, or organizations imply endorsement by the U.S. Government. September 2008 “Electrical Safety in the Workplace” Course Goal – The aim of this program is to provide comprehensive on-site training to high-risk workers (i.e. skilled trades and maintenance workers) and management on the requirements of Sub Part S, and the prevention of serious injuries from electrical hazards at their worksites. Participants will develop understanding of the requirements of OSHA Sub Part “S” and NFPA, 70E and will be able to identify and reduce or eliminate electrical safety hazards in their workplace. Electrical Safe Work Practices including electrical safety principles, guidelines for qualification of personnel, job planning requirements and Management and Personal Responsibility will be covered. Section Content Objective 1 Introduction to Participants will be able to: Electrical Safety • Explain the issues (statistics) associated with poor electrical safety in the workplace. • Recall key electrical terms which are essential to understanding and meeting the requirements of key electrical safety standards; i.e. OSHA 29 CFR 1910.331-.335, NFPA 70E, NEC (NFPA 70) • Define and differentiate between qualified and unqualified persons under OSHA Sub Part S. and the training requirements for each. • Describe the intent of an Electrical Safety Program and list the essential elements of an effective program.
    [Show full text]
  • Electrical Equipment Maintenance
    51 ELECTRICAL EQUIPMENT MAINTENANCE EEM-i .+ +++,- '- . ;\; ..+,' .. , ,, y, +,~ ":'+ =+, "-+. RePOrt of Committee on .... ElectriCal Equipment Maintenance '- , ° - Swaffield Cowan, Ch'airman. FaetorY .Insurance Aesn., 131 Providence Rd., Char~tte, NC 28207 (Retli~l 12/1/72) Alan Reed, Chairman-Blect, (Dec. i', 1072) "' , . Daniel-Wocdbead Co., 3411 Woodhekd Dr., Northbrook, IL 60062 • , . , . (Pep. National Safety CorintH) + . ". George O. Hunt, Vice Oluzirman .... Monssnto Company,'800 N. Lindbergh Blvd., St. Louis, MO 63166 •. : (REX/. NFPA Seetional.Committee on F3eetalce] Equipment in 'Chemlcal A t~nespheres) -+"' " .... mcha~d W. Sh~ul,'t e~-o s~.~ " " ' Natl. Electrical Mandlaeturem'Assn., 155<East 44th.St., New Yoik, NY I0017' angert, Jr., Low Voltage Distribution Abbott H. Lucas, Elect+-ieal Fuse Manu- %Bquipment Section, National Electrical facturers Guild. Manufoct~rers Assn. ' . + .... • Donald W. Lutz, Elect~ical Msintonance C. T. Baxter, ~ Industrial and Comm~reisl Englnecra Assn. ~+ Lighting Equip. Section, National Elec- Henry S. Orth, Multi-Amp Institute.. ~"cel Manulacturem Aesn. md P~ko, Plant Engineering Magazine. " ++- Warren H. Gook, Western Electric Co., Inc. J. M. Parker, International Brotherhood of Leonard S. Corey, Eastman Kodak Co. Electrical Workers. Charles J. Eiart, Nsti0nal Electrical Con- R. W. Mummer, Aluminum Co. of Ameri~: ~ trectom Association. Carlton E. SClmad, American Insuran~ee C. F. Hedlund, Factory Mutual Rese~ A~n. Corp. R. L. Schultz, James G. Biddle Co. Z. J. Kruzic, Industrial Control and Sys- H. Dole Sheets, .Procter & Gamble Co. tems Section, National Electrical Manu- R. F. ~Sorenson, St. Regis Paper Co. - facturers Assn. G. H. St. On~e, Eeso Rescarch and Engi- L. E. LaFehr, International Associatibn of necring Co. Electrical Inspectors.
    [Show full text]
  • Electronics and Electrical Engineering Laboratory
    NISTR 7568 Programs, Activities, and Accomplishments March 2009 NISTIR 7568 ELECTRONICS AND ELECTRICAL ENGINEERING LABORATORY U.S. Department of Commerce Gary Locke, Secretary National Institute of Standards and Technology March 2009 Patrick D. Gallagher, Deputy Director INDEX Electronics and Electrical Engineering Laboratory at a Glance . 6 Director’s Message . 7 EEEL Strategic Technical Area: Energy . 8 EEEL Strategic Technical Area: Bioelectronics . 9 EEEL Strategic Technical Area: Nanotechnology. 10 EEEL Strategic Technical Area: Spintronics. 11 EEEL Strategic Technical Area: Homeland Security . 12 Office of Law Enforcement Standards . 14 Office of Microelectronics Programs . 16 Semiconductor Electronics Division . 19 Power Device and Thermal Metrology . 20 Micro-Nano-Technology (MNT) . 22 Nanobiotechnology . 24 CMOS Device and Reliability . 26 Macro Electronics . 28 Nanoelectronic Device Metrology. 30 Infrastructure for Integrated Electronics Design and Manufacturing . 32 Knowledge Facilitation . 34 Optoelectronics Division. 37 Display Metrology . 38 Laser Radiometry. 40 High-Speed Measurements. 42 Fiber Sources and Applications . 44 Quantum Information and Terahertz Technology . 46 Nanostructure Fabrication and Metrology . 48 Semiconductor Growth and Devices. 50 Optical Materials Metrology . 52 Quantum Electrical Metrology Division . 55 Quantum Voltage System Development and Dissemination . 56 Metrology of the Ohm . 58 Quantum Conductance/Graphene-Based Quantum Metrology . 60 AC-DC Difference . 62 Farad and Impedance Metrology . 64 Electronic Kilogram . 66 Electric Power Metrology and the Smart Grid . 68 Quantum Sensors. 70 Quantum Information and Measurements . 72 Quantum Magnetic Sensors and Materials. 74 Electromagnetics Division. 77 This document describes Advanced High Frequency Devices . 78 the technical programs of the Advanced Materials Metrology. 80 Fundamental Guided-Wave Metrology . 82 laboratory. Antenna Metrology. 84 Field Parameter Metrology .
    [Show full text]
  • Guide to Electric Power in Texas
    Third Edition Guide to Electric Power in Texas January 2003 Houston Advanced Research Center and Institute for Energy, Law & Enterprise University of Houston Law Center Guide to Electric Power in Texas Third Edition January 2003 Houston Advanced Research Center 4800 Research Forest Drive The Woodlands, Texas 77381 281/367-1348 Fax 281/363-7924 http://www.harc.edu Institute for Energy, Law & Enterprise University of Houston Law Center 100 Law Center Houston, TX 77204-6060 713/743-4634 Fax 713/743-4881 [email protected] http://www.energy.uh.edu our Public Utility Commission and Legislature, Preface are important benchmarks. This edition of the Guide, like previous ver- sions, was prepared to provide a comprehen- This Third Edition of Guide to Electric Power sive and balanced educational resource for a in Texas comes at a time of great change and wide range of retail customer groups, from uncertainty in the electric power industry in interested residential consumers to large com- Texas and the United States. Nationwide, the mercial and industrial organizations. The outstanding questions deal with how best to Guide was first published in 1997, after the build workably competitive markets for bulk, Texas Legislature created our own wholesale wholesale transactions of power and the finan- market and when thinking began to coalesce cial settlements that accompany these sales. with regard to participation in the marketplace Should we adopt a national market design that by retail customers. Our goal was then, and will establish and enforce common standards remains, to provide both background on our for how these transactions take place? Will state’s electric power industry and history and such an approach ensure adequate and effi- the points of debate on how best to provide cient investments in transmission capacity? free choices and a different set of options so How can we best provide open, transparent that the benefits of competition can be intro- flows of information so that trading, market- duced and flourish.
    [Show full text]
  • Global Industry Classification Standard Contents
    GICS® Global Industry Classification Standard Contents The Global Industry Classification Standard (GICS®) ......................................................................................................... 3 A Guide to the GICS Methodology .......................................................................................................................................... 4 Company Classification Guidelines ....................................................................................................................................... 5 The GICS Structure .................................................................................................................................................................. 6 Energy .............................................................................................................................................................................. 12 Materials ............................................................................................................................................................................. 14 Industrials ........................................................................................................................................................................... 18 Consumer Discretionary .................................................................................................................................................... 24 Consumer Staples .............................................................................................................................................................
    [Show full text]
  • Guide to Managing Electrical Equipment in Departmental Schools and Workplaces
    Guide to managing electrical equipment in departmental schools and workplaces Reviewed May 2019. V3. Organisational Safety and Wellbeing Uncontrolled when printed. Contents Part 1: Electrical safety requirements 1.1 Legislative requirements ……………………………………….……………………………………..………. 2 1.2 What are electrical risks? ……………………………………….…………………………………..………… 2 1.3 What must be done to ensure electrical safety in schools? ……………………………………….……..... 2 1.4 General precautions for all electrical equipment …………………………………….……………………… 3 1.5 What is specified electrical equipment? …………………………………………………………….……….. 5 1.6 Categories of specified electrical equipment and controls……………………………………….…………. 6 1.7 What is not specified electrical equipment? ……………………………………………………..…………... 11 1.8 Can staff bring electrical items to school/workplaces? ……………………………………….…………... 11 1.9 Ceiling spaces …………………………………………………………………………………….…............... 12 Part 2: Quick reference guide for specified electrical equipment 2. Quick reference guide for specified electrical equipment ………………………………………..………… 13 Part 3: Maintaining electrical safety 3.1 What is testing and tagging of electrical equipment? …………………………………………….………… 14 3.2 What is a safety switch? …………………………………………………………………………….………… 14 3.2.1 Why do safety switches need to be tested? ……………………………………………………….. 16 3.2.2 How do I perform the ‘user’ testing of safety switches using the TEST button? ……………….. 16 3.2.3 What do we do if the safety switch trips during normal activities? ……………….………………. 16 3.2.4 Who pays for testing and tagging and
    [Show full text]
  • Electrical Equipment of Industrial Machinery Exported to North America
    White Paper Machinery Equipment for North America www.eaton.eu Electrical equipment of industrial machinery exported to North America Learning from the good, and bad, experience of others White Paper Dipl.-Ing. Wolfgang Esser Electrical equipment of industrial machinery exported to North America Learning from the good, and bad, experience of others Clarifications to Topics Seite Table 1 Table 2 Machinery for export to North America 4 Certification choices for electrical equipment Point 6, Point 7 4 Knowledge and application of standards 5 Source references 6 Dealing with inspection issues 6 Using the right codes and standards Point 1, Point 2 Point 1 7 The most common and serious offenses 8 • Unevaluated products Point 2, Point 3 8 • Unauthorized modifications of certified equipment, Point 3, Point 7 9 triggering a re-evaluation process • Power supplies Point 7 9 • Application related errors 9 – Miniature Circuit Breakers Point 4 9 – Manual Motor Controllers Point 5 9 • Use of IP... environmental ratings per IEC/EN standards Point 6 9 • Wiring materials Point 3, Point 4 10 • Wiring/Cable installations Point 3, Point 4 10 Feeder and Branch Circuits Point 2, Point 10 12 Branch Circuit Protective Devices Point 3 Point 2, Point 10, Point 11 15 Appropriate power distribution networks and nominal voltage ratings Point 3 Point 3 17 Distinctive aspects of North American motor currents and voltage Point 3, Point 4 19 ratings High fault ratings Point 3 Point 3 20 Enclosures and environmental ratings Point 2, Point 4 Point 6 21 Grounding issues Point 3, Point 4 Point 12 23 Errors on nameplate ratings, warning markings and documentation Point 4 Point 8 24 Traceability of materials certification Point 2 Point 9 24 Short Circuit Current Rating (SCCR) Point 5 25 Summary 26 Bibliography 27 2 Notable differences in the rules governing the export of IEC based electrical equipment and machinery to North America 1.
    [Show full text]
  • Understanding Electrical Terms
    Understanding Electrical Terms ® Understanding Electrical Terms In today’s computer-intensive work environments, a critical issue is clean, reliable power. Haworth is the industry leader in furniture-based power solutions. The ability to handle any power requirement is an important component in Haworth’s mission to completely satisfy customers’ needs. This booklet is designed to help you become familiar with electrical terms commonly used in the contract furniture industry. You’ll find descriptions of specific Haworth electrical products as well. Having a working knowledge of these terms and descrip- tions will help you understand Haworth’s furniture-based power capabilities. Remember, Haworth field sales engineers are also always ready and available to answer specific customer inquiries. Use this booklet to become conversant in the language of power, and as a companion to the other Haworth booklets on electrical topics: “Using the 6-Circuit Power Base,” “Complying with Electrical Standards,” and “Interfacing with Building Power.” Table of Contents Industry-Common Electrical Terms . 2-15 Access Flooring Floor Duct Power Zone Ampacity Floor Monument/Floor Access Receptacle Outlet Amperage, Ampere, Amp Ground Conductor Separate Neutral Balancing, Load Balancing Harmonic Currents, Harmonics Shared Neutral Ballast Hot Conductor Short Circuit Branch Circuit Inspector Surge Protector, Spike Protector Circuit Isolated Ground Terminal Circuit Breaker(s) Junction Box Three-Phase Power Clean Power Load 3+D Circuit Configuration Codes, Local Electrical
    [Show full text]