rica MANHATTAN DISTRICT HISTORY EOOK I - GENERAL VOLUME I - GENERAL

APPENDIX E GENERAL INDEX Q T ’i COPT ^ / t “gr a s — I------m m — mm— ^

REDACTED COPY CLASSIFICATION CANCELLED OB-eKnK'G» » ?T- W. . •Y AUTHORITY -tspJiP^y x ' K E S T TA Of iThis dccumerT Restricted Oaf* .... DATE. .f.&lii3 as defined in rnic Cnorgy Act 61 BGLmJAcSOP- 1954. I pU'lcxut* tc any JlCi

Department of E *rgy Declas^j ation Review

unation: [Circle Number(s)] 1M Review Date 3 ^ 5 assification Retained A uth ority: Q D C g DD Classification Changed To:_____ Contains No DOE Classified Info oordinate W ith:______^slficatlon Cancelled 2nd Review Date: * f/| 1 T^ZlS^gfied Info Bracketed A u th o rity Ihe^fcpe c ify)

l§8l p l ®

'■". - 'i ,T- ‘:T". '.I

' £Lo iSmoUsll 25441 U.SAE.C., WASH., D, C.

SEP 26 1952 (JIEGHNICAL LIBRA RY S & C M l f F M B » SECURITY I^uKMAIIOtf

M P H - 6k I Ur,f 1 Rt>pS.

THIS DOCUMENT QCNSISTS OF . . . J . U f . . FAGE(S

NQ‘ ...... OF ■ COPIES, SERIES

MAJJHATTAU DISTRICT HISTORY BOOK I - GEFIEAL VOLOKE I - GENERAL

APPENDIX E GENERAL IEDEX 5£gv;:agr~>r

JLJUI'HTir EEAHHATlaw GENERAL INDEX

Notes t

1. This General Index supplements the Combined Indices of the Manhattan District History, in Appendix C of this Volumei C(l) Index of Names of Persons; C(2) Index of Names of Agencies, Industrial Organizations, P ‘ r-J Universities, etc,

2, The items included in this Index are confined for the most part to general Bubjects end general headings only* for more detailed items, reference should be made to the indices which are included in the separate Books and Volumes of the History,

S. In most oases, the reference to a subject shows* first, the Book number (in Roman numerals)j then the Volume number (in Arabic numerals) and, finally, one or more Page numbers (in Arabic numerals). For example, the reference reading*

“Ac c i d e n t s "Electromagnetic Project "V, Vol. 4 - 3,7, 5,8, 5*12n

■will be found on Pages S.7, 8,8 and 5,12 of Volume 4 of Book V of the History,

4, References to Book VIII, Volume 2 (represented thus* "VIII, Vol. 2"), end to the Supplement to Book VIII, Volume 2 (represented thus* "VIII, Vol. 2 (Supp.)n), give each Page number by Roman numerals followed by Arabic numerals, because the Pages in these two parts of the History ere so num­ bered, the Roman numeral representing the Chapter number and the Arabic numeral representing the Page number in the Chapter. Thus:

"Aooi d e n t s "Los Alamos Project "VIII, Vol. 2 - 111-41, X7-S, XV-4n

will be found on Pages 111-41, I7-S, and XV-4 of Book VIII, Volume 2,

5, In some cases, the Section number (in Arabic numerals), and in some cases the Chapter .number (in Roman numerals) is inserted between the Volume number and the Page number (aB* "Sec, 2’* or "Ch,9w)j in references to Volume 2 of Book IV, which is divided into two "Parts”, the Part number (in Roman numerals) is inserted between the Volume number and the Page number (as* "Pt,!!"); in references to Book III or to Book VI, no Volume number is given, because these two Books of the History are not divided into Volumes,

6, When the referenced subject continues on several consecutive Pages (three or more), the reference usually Includes the number of the first of these Pages only, followed by the abbreviation "ff" (but in some cases, the reference is given thus* "5,12 to 5,17")j where the referenced subject con­ tinues in general through the whole of a Section or a Chapter, etc., the page numbers are usually omitted. u n i n Atomic Act 1946 •flTTV Specific, rioted Data v T A Cleara; red N 1 7. Wherever in this Index the reference "I, Vol. 14 (F'gn. Int. Supp.)" occurs (as, for example, under the entry "ALSOS Missions”) it is intended to mean Foreign Intelligence Supplement No. 1 of Volume 14 of Book I. Subsequent to the compilation of this Index, Foreign Intel­ ligence Supplements Nos. 2 and 3 to Book I, Volume 14, were incorporated in the History and at that time "Foreign Intelligence Supplement" was redesignated "Foreign Intelligence Supplement No. 1".

8. Because of the incorporation of the two additional supple­ ments, to Book I, Vol. 14, (Foreign Intelligence Supplements Nos. 2 and 3), the following entries are added(and references thereto have been inserted in their proper alphabetical positions in the main Index):

ADDENDA.

Export Control Intelligence & Security - I, Vol. 14 (F'gn. Int. Supp. No. 3) Liaison, Continuation and Development of, 2 Status as of 31 Dec 46, 7 Transfer to AEC, 10

PEPPERMINT Intelligence & Security - I, Vol. 14 (F'gn* Int. Supp. No. 2) Preparations in the United Kingdom, 3 Preparations in the United States, 2

Piadioactive Materials (possible enemy use of, as a weapon) see PEPPERMINT above.

«Ablen Site Storage Project I* Vol. 4, T.St Supplement « Ut 14* 1 6 y 19 "Able" Test Lob Alamos Project - Till, Vol< 2 (Supp.) - I-13ff, II-5 Operation Crossroads - Till, Vol. 3# Ch.8 - 8.10, 8.11, 8.34ff Absenteeism Central Facilities * I, Vol. 12 - 18,1 Los Alamos Project - VIII, Vol. 1 - 6.62 P e r s o n n e l - I, Vo l . 8 - 3.3> 3.4- Pile Project - IV, Vol. 5 - 4*21, 4.22, 6.26, 10.1 Accelerators, Particle Los Alamos Project VIII, Vol. 2 - Vl-lff Till, Tol. 2 (Supp.) - IV-8ff Access to Project Central Facilities - I, Tol. 12 - 1.2 Los Alamos Project - VIII, Vol. 1 - 2.4ff A c c i d e n t s Central Facilities - I, Vol. 12 * 19.23 Electromagnetic Project V, Tol. 4 - 3.7, 3.8, 3.12 T, Tol. 5 - 5.8, 5.9 T, Tol. 6 - 7.3 Project II, Tol. 4 - 4.1 II, Tol. 5 - 8.5 Los Alamos Project Tin, Tol. 2 - 111-41, XV-3, XV-4 VIII, Tol. 2 (Supp.) - 1-9, II-l6ff, 11-22, 11-33, V-4 Pile Project IT, Tol. 5 - 10.6, 10.7 IT, Tol. 6 - 7.1 Safety Program - I, Tol. 11 - 5.3, 5.4# 5.2, "S« 5.3 Accountable Property Officer Los Alamos Project - Till, Tol. 2 (Supp.) - 11-13, 11-14 Los Angeles Procurement Office - Till, Tol. 3, Ch.l - 2.11ff Pile Project - IT, Tol. 6 - 14.1, 14.2, 1 4 . 4 Accountability Feed Materials Feed Hat»l.* Special Proc. & Geo. Expl. - Til, Tol. 1 - Sec. 13 (T.S.) P l u t o n i u m Pile Project - IT, Tol. 6 - 2.8 P r o p e r t y Los Alamos Project - Till, Tol. 2 (Supp.) - II-l3ff Pile Project - IV, Vol. 6 - Sec. 14 S i l v e r Electromagnetic Project - V, Vol. 4 - Sec. 6 U r a n i u m s*CB!mn^*pp*aw!PT i oar

Accounting Department (Contractors) Loa Angeles Procurement Office VIII, Vol. 3» Ch. 1 * 2.13 Accounting, Fiscal and Cost Fiscal Procedures - I, Vol. 5 - S e c . 6 Los Angeles Procurement Office - VIII, Vol. 3» Ch.l - 2.13ff Acheson - Lilienthal Report Contributions of Rep. of the H.D. to the Disc, and Prop, for International Control I, Vol. 4> Ch. 7 - 7.6 Acid Neutralizing Plant Gaseous Diffusion Project Construction -II, Vol. 4 “ 3.4-9 Design - II, Vol. 3 - 11.30, 11.31 Operation - II, Vol. 5 - 6.10 Acquisition of Land - See "Land Acquisition" under "Clinton Engineer Worke", Acreage Acquired "Lo b Alamos Project" and Land Acquisition CEE - I, Vol. 10 - 2.4.7 "Pile Project" Los Alamos Project - VIII, Vol. 1 - 3.5» 3.6 Pile Project - IV, Vol* 4. - 6.2, 6.4 A c t i n i u m Pile Project IV, Vol. 6 - 4.28ff Activated Carbon Pile Project IV, Vol. 3-5.71 Activated Charcoal Pile Project IV, Vol. 2, Pt.I - 6.4 IV, Vol. 3 - 5.17 IV, Vol. 6 - 2.9 Activation of the Manhattan District General - I, Vol. 1 - 3.6 Priorities Program - I, Vol. 9 - 2 . 5 Activities of the National Bureau of Standards - See "Rational Bureau of Standards/ iUfllvl Lim; t-t” Administration Electromagnetic Project - V, Vol. 1 - 1.3 Feed Mat’l. Special Proc, & Geo. Expl. VII, Vol. 1 - 1.8(T.S.) VII, Vol. 2 - Sec. 3 Gaseous Diffusion Project - II, Vol. 1 - 8.1, 8.2 General - I, Vol. 1 - 3.14ff Los Alamos Project VIII, Vol. 1 - Sec. 6 VIII, Vol. 2 - III-6ff, II1-12, in-19, IX-10, IX-11 Pile Project - IV, Vol. 1 - Sec. 3 Adminis tration Feed Kat'l. Special Proc. & Geo. Expl. Expenditures - VII, Vol. 2 - 3.1» 3.2 pr;Z7«— .HUH. ry jf-* TO, T?

Health and Welfare - VII, Vol. 2 - 3.6 Personnel - VII, Vol. 2 - 3.2ff Protective Security * VII, Vol. 2 - 3.4ff Administration Area Central Facilities - I, Vol. 12 - 5.1# 10.4. Electromagnetic Project - V, Vol. 5 - 3.15# 3.16 Gaseous Diffusion Project II, Vol. 1 - 3.5* 4.1, 4.4 II, V o l . 3 - Se c . 13, 14.17 II, V o l . A - 3.51ff Lo b Alamos Project - VIII, Vol. 1 - 5.11, 5.23 Pile Project IV, Vol. 2, Pt.I - 2.4 IV, Vol. 2, Pt.II - 2.6 IV, Vol. 3, - 8.5, 8.23 IV, Vol. 5, - 1.5, 5.4# 7.Iff, 7.11, 8.5ff Administrative Board Los Alamos Project VIII, Vol. 2 - IX-3 Administrative Jurisdiction Pile Project IV, Vol. 1 - 3.3 Administrative end Services Division Los Alamos Project Maintenance, Technical Area - VIII, Vol. 2 (Supp.) - 11-15, 11-16 Organization * VIII, Vol. 2 (Supp.) - II-3# II-4 Personal Services - VIII, Vol. 2 (Supp.) - II-8, II-9 Personnel • VIII, Vol. 2 (Supp.) - II-4ff Photographic Group - VIII, Vol. 2 (Supp.) - 11-18, 11-19 Safety - VIII, Vol. 2 (Supp.) - II-l6ff Shops - VIII, Vol. 2 (Supp.) - II-9ff Supply and Property - VIII, Vol. 2 (Supp.) - II-12ff Adsorption Processes, Separation Pile Project IV, Vol. 2, Pt.I - 6.3, 6.4 IV, Vol. 2, PtII - 5.1# 5.7, 5.8 IV, Vol. 3, - 6.1, 6.4# 6.7 Advances of Funds to Other Government Ageneies Fiscal Procedures - I, Vol. 5 - 4*8* 4*9 Legislative Contacts of Manhattan District - I, Vol. 4, Ch.l - 2.2, 2.3 - VIH, Vol. 3, Ch.2 - 2.1, 2.5, 2.6 Advisor on Patent Matters Pate n t s I, Vol. 13 - l.lff Advisory Committee (AISOS) Intelligence and Security I, Vol. 14 (F'gn. Int. Supp.) - 2.3, 4.1# 6.2 Advisory Committee - Brookhaven Foundation of the National laboratories I, Vol. 4# Ch.2 - 2.24 a g £ R E T * wfirnTjy IFF0>M4TIQ.

Advisory Committee on Operation •* Argonne Foundation of the National Laboratories I* Vol. A, Ch.2 - 2.9ff Advisory Committee (District’s) on Research end Development - See "District’s Advisory Committee on Research end Development” Advisory Committee on Activities of the National Bureau of Standards - 1, Vol. 4, Ch.12 - 12,2, 1 2 . 3 General - I, Vol* 1 - 3.2, 3.3 Patents - I, Vol. 13 - 2.1 Pile Project - IV, Vol. 1 - 3.1 Press Releases - I, Vol. 4, Ch.8 • Item 99 African Source Uranium, Procurement of Feed Kat'l, Special Proc. & Geo. Expl, - VII, Vol. 1 - Sec. 2 (T.S.) Contract Negotiations - VII, Vol. 1 - 2.3ff (T.S.) Operations - VII, Vol. 1 - 2.Iff (T.S.) Transportation of Ore - VII, Vol. 1 - 2.5ff (T.S.) Weighing, Sampling and Assaying of Ore - VII, Vol. 1 - 2.7ff (T.S.) After Effects of Bombing in Japan, Investigation of - See "Bombing in Japan, Investigation of After Effects” Agreements with U. S* Treasury Electromagnetic Project V, Vol. 4 - 2.1, 2.2 Agriculture, IT. S. Department of Investigation of Misc. Processes of Separation of Uranium - I, Vol. 4» Ch.14. - 14.39 Los Alamos Project - VIII, Vol. 1 - 3*5 Air Cooling, Pile Pile Project IV, Vol. 2, Pt.I - 3.4, 3.6, 3.10, 3.11 IV, Vol. 2, Pt.II - 4.2, 4.5, 4.6, 4.8, 4.9 A i r P a t r o l Pile Project IV, Vol* 6 - 8.3 Air Transport Command Los Angeles Procurement Office * VIII, Vol. 3 t Ch.l - 2.11 Pile Project - IV, Vol. 5 - 4*8, 5.38, 6.20, 6.29, 9.4 Aircraft, B-29, For Bomb Delivery Los Alamos Project VIII, Vol. 2 - VII-36ff, m - i , XIX-2 VIII, Vol. 2 (Supp.) - 1-12, IV-16 ' 1 Project Camel - VIII, Vol. 3# Ch.2 - 2*34 Supplementary Activities - VIII, Vol. 3, Ch.9 - 9.6ff, 9.14ff Alabama Ordnance Works, Heavy Water Plant - See "Heavy Water Project" Alamogordo Test Los Alamos Project - VIII, Vol. 2 - Ch. XVIII Press Releases - I, Vol. 4, Ch.8 - Item 4 Alamogordo Test Site Los Alamos Project WjaMBMBBWBgaEagWgBMB

A l a - A l p

m w u i M i K io^

VIII, Vol. 1 - 7.11 VIII, Vol. 2 - xrai~2ff VIII, Vol. 2 (Supp.) - II-3, V-8, V-9 "Alarm Clock” Thermonuclear System Los Alamos Project VIII, Vol. 2 (Supp.) - III-4, IU-lOff Albemarle, U.S.S. Los Alamos Project - VIII, Vol. 2 (Supp.) - 1-16, 11-13 - VIII, Vol. 3, Ch.8 - 8.16, 8*24, 8.25, 8.27, 8.31 A l b e r t a Los Alamos Project - VIH, Vol. 2 - IX-6, IX-7, XIV-1, Ch.XIX Press Releases - I, Vol. 4, Ch,8 - Item 34 ^Delivery Group - VIII, Vol. 2 - HX-1, HX-2 C— Destination - VII, Vol. 2 - XIX-5f.f ^Organization and Tests - VIII, Vol. 2 - XIX-2ff Albuquerque Engineer District Los Alamos Project VIII, Vol. 1 - 2.2ff, 4.1, 4.4, 5.1ff, 5.18, 6.2, 7.11 VIII, Vol. 2 - 1-10, 111-12, I11-47 Sandia Ease - VIII, Vol. 3, Ch.6-1 Allard Sub-station Pile Project IV, V o l . 5-7.4, 7 . 3 2 Allied Control Commission Intelligence and Security I, Vol* 14 (F'gn. Int, Supp.) - 3.2 Allied War Supplies Corporation (Canadian) Heavy ^'ater Project I H - 3 . 3 Allotment of FundB, Fiscal Procedures - I, Vol. 5 - 2.4??* 4.2ff General - I, Vol. 1 - 3.3, 3.20, 4*2, 4.3 Alpba Building Construction Electromagnetic Project V, Vol. 5 * 3.8ff, 3.17ff, 3.23 Alpha Charge Material Preparation Buildings Electromagnetic Project V, Vol. 3 - 2.2ff Alpha Chemical Operations Electromagnetic Project V, Vol. 6 - 4.3 Alpha Buildings Electromagnetic Project V, Vol. 3 - 3.21ff, 3.32, 3.33, 3.36ff Alpha Process Development Electromagnetic Project V - Vol. 2 - 3.1ff, 4.4, 4.5 A l p h a S i t e Los Alamos Project VIII, Vol. 1 - 5.12 VIH, Vol. 2 (Supp.) - V-ll RESTlW^p DATA y rr': ATOMIC EfERG Y ACT 1946

■ ...... ' •' ' ■ -...... "" ' ■■■ ' ----7 ■" ‘ - -• • ; • A I S O S Missions Intelligence & Security - I, Vol. 14 (F'gn. Int. Supp.) Establishment of AISOS Missions - I* Vol. 14 (F'gn. Int. Supp.) - Sec. 2 General *• Ij Vol. 14 (F'gn Int. Supp.) - Sec. 1 Italian Investigations - I, Vol. 14 (F'gn. Int. Supp.) - Sec. 3 Japanese Investigations - I, Vol. 14 (F'gn. Int. Supp.) - Sec. 5 Intelligence & Security Organization and Personnel - I# Vol. 14 (F'gn. Int. Supp.) - Sec. 6 Western and Central European Investigation -I, Vol. 14. (F'gn. Int. Supp.) - Sec. 4 A l u m i n a Gaseous Diffusion Project II, Vol. 3 - 8.40, 8.41, 10.9, 10.23, 11.29, 11.33ff Aluaini.zed TUT Navy Participation VIII, Vol. 3, Ch.5 - 5.2 Aluminum - Silicon Pile Project IV, Vol. 3 - 5.49 Aniberllte IR-1 Pile Project IV, Vol. 2, Pt.I - 6.4 American Federation of Labor Los Alamos Project - VIII, Vol. 2 - 111-48 Personnel - I, Vol. 8 - 2.1, 2.2, 4*1 Pile Project IV, Vol. 5 - 4.9, 4.15# 4.16 IV, Vol. 6 - 13.3 American Ore Concentration Feed Mat'l., Special Proc. & Geo. Expl. By U.S. Vanadium Gorp. - VII, Vol. 1 - 7.8ff (T.S.) By Vanadium Corp. of America - VII, Vol. 1 - 7.l3ff (T.S.) American Source Uranium, Procurement of Feed Mat'l., Special Proc. & Geo. Expl. - VII, Vol. 1 - Sec. 4 Contract Negotiations - VII, Vol. 1 - 4.3ff (T.S.) Operations - VII, Vol. 1 - 4.1ff (T.S.) (Iowa State College) *• I, Vol. 4, Ch.11 Analytical Chemistry - I, Vol. 4# Ch.11 - 11.49ff General Ghemistry - I, Vol. 4# Ch.11 - 11.31ff - I, Vol. 4# Ch.ll -11.5ff Physics - I, Vol. 4# Ch.ll - 11.53# 11.54 Purpose and Scope -I, Vol. 4* Ch.ll - 11.Iff X-ray Structure - I, Vol. 4# Ch.ll - 11.52, 11.53 Anaaonia Refrigerating System Gaseous Diffusion Project II, Vol. 3 - 10.8, 10.10 Ammonia, Synthetic, Production Method Ohio State Cryogenic Laboratory VIII, Vol. 3, Ch.3, Pt.I - 1.1, 1.2 Analytical Chemistry Ames Project (Iowa State College) I, Voir 4, Ch.ll - 11.49ff Analytical Methods - Chemistry and Metallurgy Los Alamos Project Tin, Vol. 2 - VIII-25ff, XVII-17ff Analytical Research Electromagnetic Project - V, Vol. 2 - 4.8, 4.9 Los Alamos Project - VIII, Vol. 2 (Supp.) - VI-4, VI-5 Anchor Ranch Los Alamos Project V m , Vol. 1 - 2.7, 3.5, 3.6, 5.3, 5.13, 5.14, 5.26, 5.28 Anchor Ranch Proving Ground Los Alamos Project VIII, Vol. 1 - 5.12, 5.20 Tin, Vol. 2 - VI1-2, VI1-8, VII-10, VI 1- 12 , VI1-25, VII-30, VII-31, HV-6, XIV-7 Tin, Vol. 2 (Supp.) - VII-6 Announcement of Radioisotope Distribution Press Releases - I, Vol. 4, Ch.8 - Item 62 Program for Production and Distribution of Radioisotopes - I, Vol. 4 Ch.3 - 3.10, 3.12 Annular Space (Column) Liquid Thermal Diffusion Project VI - 2.5, 2.7, 2.8, 2.12, 3.4, 3.7, 4.2 Annular Space (Tube) Pile Project IV, Vol. 3 - 3.3, 5.22, 5.41 IV, Vol. 6 «■ 2.6, 2.12 Antagonism, Scientific - Military Personnel Los Alamos Project T i n , Vol. 2 - 1-10, 1-34, IH-6, IH-7 VIII, Vol. 2 (Supp.) - 1-4 Antimony, Radioactive, Research Pile Project IV, Vol* 2, Pt.II - 4.10 IV, Vol. 6 - 4.32 Applications for Patents P a t e n t s I, Vol. 13 - Sec. 3 Appraisal of Results of Field Reconnaissance and Exploration Feed Mat*l., Special Proc. & Geo. Expl. VII, Vol. 2 - 1.19ff Appraisals, Land Acquisition land Acquisition CEK - I, Vol. 10 - 2.20.1ff Los Alamos Project - VIII, Vol. 1 - 3 . 3 Pile Project - IV, Vol. 4 - 1.2, 4.7ff, 4.23 Appraisers, Land Acquisition Land Acquisition CES - I, Vol. 10 - 2.20.1ff, 2.27ff, 2.30 Los Alamos - VIII, Vol. 1-3.5 Pile Project - IV, Vol. 4 - 4.7ff

SI

ATOMIC Aro-Arg SECimiTY XNE0RMATI01

Archie (APS/13) Los Alamos Project VIII, Vol. 2 - VII-19, VI1-20# XIV-8 Architect - Engineer - VIII, Vol. 3, Ch.4 - 4.7 Electromagnetic Project V, Vol. 3 - 1.3, 1.4* 3.51 V, Vol. 5 - 2.1 Gaseous Diffusion Project II, Vol. 1 - 3.3# 3.4 II, Vol. 3 - 3.4# 3.5 Heavy Water Project - III - 2.10, 2.12, 3.3, 3.4# 3.16, 3.17, 4.1 Liquid. Thermal Diffusion Project - VI - 3.1, 3.2 Los Alamos Project - VIII, Vol. 1 - 4.1ff, 5.1, 5.4, 5.5, 5.11, 5.27, 7.14 Pile Project IV, Vol. 2, Pt.I - 2.5, 2.7 IV, Vol. 2, Pt.II - 2.Iff IV, Vol. 3 - 1.2 Storage Project - I, Vol. 4# T.S. Supplement - 6,7, 9# 10 Argonne Forest Pile Project IV, Vol. 1 - 4.4# 4.5 IV, Vol. 2 - 2.6 Argonne Laboratory Assistance on Canadian Pile Project - I, Vol. 4# Ch.9 - 9.2, 9.5 Foundation of National Laboratories - I, Vol. 4# Ch.2 - 2.6, 2.7 Los Alamos Project VIII, Vol. 2 - III-5 VIII, Vol. 2 (Supp.) - V-5 Pile Project IV, Vol. 2, Pt.I - 2.6, 3.9, 3.12, 3.13, 3.14, 7.1 IV, Vol. 6 - 4.U, 4.24 Argonne Rational Laboratory Foundation of National laboratories Advisory Committee on Operation - I, Vol. 4# Ch.2 - 2.9ff Authorization For - I, Vol. 4, Ch.2 - 2.10, 2.11 Board of Governors (C.ofP.tJ.) - I, Vol. 4 1 Ch.2 - 2.13ff» 2.17ff Council of Participating Universities - I, Vol. 4, Ch.2 - 2.4, 2.11ff Director - I, Vol. 4# Ch.2 - 2.14 General - I, Vol. 4, Ch2 - 2.3ff, 2.9, 2.13ff Operating Contractor - I, Vol. 4# Ch.2 - 2.16, 2,17 Operation - I, Vol. 4# Ch.2 - 2.4, 2.11, 2.13, 2.14 Plan of Organization - I, Vol. 4, Ch.2 - 2.14, 2.15 Research Program and Budget - I, Vol. 4# Ch.2 - 2.15, 2.16 Site - I, Vol. 4, Ch.2 - 2,17ff Argonne National Laboratory Assistance on the Canadian Pile Project - I, Vol. 4# Ch.9 - 9.5 Intelligence and Security - I, Vol. 14 - S 7.3 Medical Program - I, Vol. 7 - S 2.6 Pile Project - IV, Vol. 1-4.5

8 Arra-Ato

SEGtiaummmmmtA t i c

Press Releases - I, Vol. Ut Ch.8 - Item 99 Program for Production and Distribution of Radioisotopes - I, Vol. Ut Ch.3 - 3.12 Research and Development of Atomic Energy for Power - I, Vol, 4» Ch.4 - 4.4, 4.8, 4.9, 4.11ff Armltage Field Project Camel VIII, Vol. 3, Ch.2 - 2.35, 2.37 Arming and Fusing Devices, Atomic Weapons Los Alamos Project - VIII, Vol. 2 - VII-l6ff, XIV-7ff Navy Participation - VIII, Vol. 3, Ch.5 - 5.9, 5.10 A r m o r p l a t e B a r r i c a d e Liquid Thermal Diffusion Project VI - 3.9, 4.4, 5.23 Army Air Fields Supplementary Activities VIII, Vol. 3, Ch.9 - Sec. 3 Asbestos, Blue African Pile Project IV, Vol. 6 - 4.19 Assay Laboratories Liquid Thermal Diffusion Project VI - 4.6, 5.16, 5.17 Assay Research Electromagnetic Project V, Vol. 2 - 4.8ff Assistance to American Representative U.N.A.E.C. Contributions of Rep. of the M.D. to the Discussions and Proposals for Int. Control I, Vol. Ut Ch.7 - 7.6 Associated Universities Inc. Foundation of National Laboratories - I, Vol. 4, Ch#2 - 2.4, 2.25, 2.28, 2 . 2 9 Intelligence and Security - I, Vol. 14 - S 7.2 Asymmetric Implosions Los Alamos Project VIII, Vol. 2 - V-12, X-3, X-4, XI-4, XI-5, XTO-4ff VIII, Vol. 2 (Supp.) - V-llff Atomic Bomb, Announcement by President Truman General - I, Vol. 1 - 1.1 Press Releases - I, V o l . Ut Ch.8 - Item 1 Atomic Bomb Casualty Commission Investigation of the After Effects of the Bombing in Japan I, Vo l , Ut Ch.6 - 6.38 Atomic Energy Control Board (Canadian) Assistance on Canadian Pile Project I, Vol. Ut Ch.9 - 9.7, 9.21 Atomic Energy Research Laboratory, Harwell, England Assistance on Canadian Pile Project I, Vol. Ut Ch.9 - 9.7

DATA. Uttl/l ct m e Atomic Mass Pile Project IV, Vol. 2 - Pt.I - 1.4# 1.5# 1.11 Atomic Number Pile Project IV, Vol. 1 - 2.2, 2.3 IV, Vol. 2, Pt.I - 1.4ff# 1.11 Atomic Structure Pile Project IV, Vol. 2, Pt.I - 1.3ff Audit Division Lob Angeles Procurement Offico m i , Vol. 3# Ch.l - 2.14 Audit (Contract) Procedures Fiscal Procedures I, Vol. 5 - Sec. 3 Authorizations General - I, Vol. 1 - Sec. 3 Storage Project - I, Vol. 4# T.S. Supplement - 5ff Authority For Research Research and Development of Atonic Energy for Power I, Vol. 4# Ch.4 - 4.3 Autocatalytic Assembly Method Los Alamos Project VIII, Vol. 2 - 1-18, 1-24, 1-29# HII-10, HII-11 VIII, Vol. 2 (Supp.) - III-ll Auto else Testing (Slugs) Pile Project IV, Vol. 6 - 2.4# 4.8# 4.9 Auxiliary Construction Camp Pile Project IV, Vol. 5 - 5.21ff Auxiliary Equipment, Pile Pile Project IV, Vol. 2, Pt.I - 3.2, 4.12# 4.13# 4.14 A u x i l i a r y S e r v i c e s Electromagnetic Project V, Vol. 6 - Sec* 7 AID Radio Altimeter Los Alamos Projedt VIII, Vol. 2 - VII-19

"BBn P ro^ r a m Project Camel VIII, Vol. 3, Ch.2 - 2.$ B Division, L o e Alamos Operation Crossroads ft) "Detector" Test * VIII, Vol. 3, Ch.8 «* 8.24ff General - VIII* Vol. S, Ch.8 - 8.20ff laboratory Shops * VIII, Vol. 3, Ch.8 - 8.24, e.25, 8.27, 8.31ff Measurement Section • VIII, Vol. 3, Ch.8 - 8.27ff Postponement of Tests - VIII, Vol. 5, Ch.8 - 8.25 Williams Plan * VIII, Vol. 5, Ch.8 - 8.21, 8.22 Back Scattering Measurements Los Alamos Project VIII, Vol. 2 - VI-18ff "Baker" Site Storage Project I, Vol. 4, T*S* Supplement • 4, I4ff, 18, 19 "Baker" Test Los Alamos Project « VIII, Vol. 2 (Supp.) - I-lSff, II-5 Operation Crossroads - VIII, Vol. S, Ch,8 - 8.11, 8.24, 8.57, 8.38 Ballistic Research laboratory Los Alamos Project VIII, Vol. 2 «* 1-8 Ballistics, Bomb Los Alamos Project VIII, Vol. 2 - VII-7, VII-36, XIV-9, XU-2 VIII, Vol. 2 (Supp.) - VII1-5, VIII-4 Project Camel VII, Vol. 5, Ch.2 - 2,8, 2.9, 2.24, 2.3S, 2.35, 2.36 Baratol Explosives Research laboratory - VIII, Vol. 5, Ch.9 - 9.22 Los Alamos Project VIII, Vol. 2 - X-6, X-7, XVI-12 VIII, Vol. 2 (Supp.) * VII-3 Barium, Radioactive * See "Radiobarium" Bames Hospital, St. Louis, Mo, Los Alejnoe Project VIII, Vol. 2 • Barometric Switches - See "Switches Barometric" Baronol Los Alamos Project VIII, Vol. 2 - X-4, XVI-£, XVI-6, XVI-12, XVI-16 Barrier Development Gaseous Diffusion Project II, Vol. 2 - Sec. 4 II, Vol. 3 - 8,2ff, 14.9 Barrier Operation Gaseous Diffusion Project II, Vol. B - 3.6, 6.2, 6.6ff, 8.12ff Bartol Research Foundation Project Camel I, Vol. 4, Cxi.2 * 2.21 Batch Product Pile Project Histories - IV, Vol, 6 - 5.5 Size for Shipment - IV, Vol, 6 • 3,S Batista Field, Cuha Supplementary Activities VIII, Vol* 3, Ch.9 * 9.16 Bayo Canyon Site Los Alamos Project VIII, Vol, 2 - IV-16, VIII-25, XV-11, XVI1-2 VIII, Vol. 2 (Supp.) - 11-19, 11-22, V-ll Feed Kat»l*, Special Proc, & Geo, Bjcpi, VII, Vol* 1 — 1*5, 1,7, 1,8, 2,1, 4,1 Benefits to United States Assistance on Canadian Pile Project I, Vol, 4, Ch.9 -* 9,26ff Berlin Operation (ALSOS) Intelligence and Security I, Vol, 14 (Foreign Intelligence Supp.) * 4,46 Pile Project IV, Vol. 2, Pt.I - 1,5, 2,9, 5,5, 5,l0ff IV, Vol. 3 - 5*2, 5*26, 5.29 Beryllium Alloys Ames Project - I, Vol. 4, Ch.ll * 11,26 Pile Project - IV, Vol, 5, - 5,28, 6,29 Beryllium Metal, Production of Ames Project I, Vol* 4, Ch.ll - 11*6, 11.19, 11.20 Beryllium Metal Production, Physiological Hazards Feed ISat’l*, Special Proc*

RES1 i l. u u n FA i atomic act 194&

'rr - r ^ v T r - — — 7 /r - . i;:/* ' - • . , : I , - - •- • ' • ; - v I. - *: , -*»t” » ..r'v Bin-Bcna SECURITY INFORMATION

Bins, Alpha, Process Electrons!gnetie Project V# Vol. 3 - 2.6, 2.7, 2.11, 3.5ff, 3.16, 4.7ff V, Vol. 5 - 3.11* 3.12 gr^ V, Vol. 6 •» 3.7, 4*12, 4*14* 4*15 <• - Bins, Beta, Process Electromagnetic Project V, Vol. 3 - 2.15, 2.16, 4.8ff x Bisingen, Haigerloch, Hechingen end Te,Ilfingen Operation (AI£0S) Intelligence and Security 1 1 Vol. 14 (Foreign Intelligence Supp.) - 4.37ff Cooling, Pile Pile Project IV, Vol. 2, Pt.I - 3.4» 3.10, 3.11 IV, Vol. 3 - 5.9, 5.10, 5.13, 5.14 Bismuth Irradiated Pile Project IV, Vol. 6 - 5.13 Bismuth, Metallic Pile Project IV, Vol. 6 - 1.6, 4.23 Bismuth Phosphate W Pile Project IV, Vol. 2, Pt.I - 6.6, 6.7 IV, Vol, 2, Pt.II - 5.1, 5.7, 5.8 IV, Vol. 3 - 6.S, 6.9 IV, Vol. 6 - 2.20ff, 2.25 Blistered Slugs * See "Slug, Blisters* Board of Consultants (Appointed January 1946) Contributions of Rep. of the K.D. to the Discussions and Proposals for Int. Control I, Vol. 4, Ch.7 - 7.5# 7.6 Board of Govejiors - Council of Participating Universities Argonne National laboratory I, Vo l . r 4 1 Ch.2 - 2.13ffj 2.17ff Board of Govenors Oak Ridge Institute of Nuclear Studies I, Vol. 4> Ch.10 - 10.9ff B o a 3rd o f H i g h e r E d u c a t i o n , N e w Y o r k C i t y Foundation of National Laboratories I, Vol. 4, Ch.2 - 2.21 Board of Trustees, Associated Universities Incorporated Brookhaven National Laboratory I, Vol. 4> Ch. 2 - 2.25, 2.26, 2 . 3 4 B o n k A s 3enkly Buildings, Base Los Alamos Project - VIII, Vol. 2 - HX-6 Project Camel - VIII, Vol. 3, Ch.2 - 2.38 Boirib Bursts, Above-water and Under-water Comparison Operation C r o s s r o a d s VIII, Vol. 3» Ch.8 - 8*3, 8.4

RESTMfiKD DATA A T O M IC . 3^ r E H ^ ^ A C T 1S4 « un-Bor

Bomb Improvement Studies Los Alamos Project VIII, Vol. 2 (Supplement) - V-2 Bombers# British Lancaster A r m y A i r F i e l d s VIII, Vol. 3, Ch.9 - 9.6 Bonfcing in Japan Investigation of After Effects I, Vol. 4* Ch.6 - See also I, Vol. 7 Further Investigations in 1946 - I, Vol. 4, Ch.6 - 6.32ff General - I, Vol. 4» Ch.6 - Items 64a, 64b and 66, I, Vol. 7 Graphic Descriptions, I, Vol. 4» Ch.6 - 6.43ff Inception of J&ssion, I, Vol. 4f Ch.6 - 6.1, 6.2 Intensity of Radioactivity, I, Vol. 4* Ch.6 - 6.26ff Medical Findings in Hiroshi be. and Nagasaki, I, Vol. 4, Ch.6 - 6.11ff Other than Manhattan District Investigations, I, Vol. 4* Ch.6 - 6.39ff Physical Damage in Hiroshima and Nagasaki, I, Vol. 4» Ch.6 - 6.8ff Psychological Effects I, Vol. 4» Ch.6 - 6.31 Purpose of Mission I, Vol. 4, Ch.6 - 6.2, 6.3 Bonds, Irrigation District, Land Acquisition Pile Project IV, Vol. 4 - 4.3* 4.22 Bonneville Dam Pile Proj oct IV, Vol. 3 - 2.7, 7.1, 7.2 IV, Vol. 4 - 2.12 IV, Vol. 5 - 2.1, 2.8 Bonneville Power Administration Pile Project IV, Vol. 1 - 5.2, 8.3 IV, Vol. 3 - 7.Iff IV, Vol. 4 - 2.12 IV, Vol. 5 - 2.5, 2.8, 7.Iff IV, Vol. 6 - 9.3, 18.8 Bonneville Hydro-Electric Plant Pile Project IV, Vol. 5 - 7.1 Booster Components Los Alamos Project VIII, Vol. 2 - H I I -3, XIII-7, XI11-11, Z1II-12, XVI-7, XYI-S VIII, Vol. 2 (Supplement) III-8, III-9 B o r o n Pile Project IV, Vol. 3 - 5.32, 5.50, 5.52, 5.53, 5.55 IV, Vol. 6 - 2.9 (B*C) Los Alamos Project General - VIII, Vol. 2, - IY-13, IV-14, V-27, VXI-12, VI1-13, VIII-19 B o r o n (b ^C) Boron Trifluoride - VUI, Vol. 3, Ch.7 - 7.3, 7.4 Crystalline Boron - VIII, Vol. 3, Ch.7 - 7.3, 7.4, 7.6, 7.7 .g^rsa^I'"

Bor-Bro m ^ A T I O H

Isotope Separation - VIII, Vol. 3# Ch.7 - 7.5# 7.6 Boron Steel, Research Pile Project IV, Vol. 2, Pt.II - 4.6 Bradbury - Felbeck - Keith Committee - See "Safety Committees" Branching Ratio Los Alamos Project VIII, Vol. 2 - VI-16, VI-17 B r i d g e s CEE? Central Facilities - I, Vol. 12 - 5.5# 5.9# 16.5# 16.13# I6.17ff, 1 6 . 2 1 Gaseous Diffusion Project - II, Vol. 4 ** 3.10, 3.11 Bilquetting Pile Project IV, Vol. 6 - 4.23 British Cooperation Assistance on Canadian Pile Project - I, Vol. 4# Ch.9 - 9.1# 9.3ff Declassification and Distribution of Project Information - I, Vol. 4# Ch.5 - 5.24 Gaseous Diffusion Project II, Vol. 1 - 3.3# 3.4 II, Vol. 2 - 3.10, 3.11, 4.3# 5.26 XI, Vol. 3 - Sec. 15 General - I, Vol. 1 - 1.2 Intelligence & Security - Foreign Intelligence Supplement - I, Vol. 14, Bk.I — 1.1, 4.2, 4*8, 4.9# 4.35# 6.1 Legislative Contacts of Manhattan District - I, Vol. 4# Ch.l - 2 Los Alamos Project VIII, Vol. 2 - 1-2, 1-21, 1-25# H-lff# VI-9, XV-17 VIII, Vol. 2 (Supp.) - I1-3 Pile Project - IV, Vol. 1 - 3.2 Press Releases - I, Vol. 4# Ch.8 - Item 29 British Mission Los Alamos Project VIII, Vol. 2, Ch.ll VIII, Vol. 2 (Supp.) - II-3 British Mission to Japan Investigation of the After Effects of the Bombing in Japan I, Vol. 4# Ch.6 - 6.40, 6.41 Brookhaven National laboratory Advisory Committee - I, Vol. 4# Ch,2 - 2.24 Associated Universities, Inc, - I, Vol. 4# Ch.2 - 2.4# 2.25# 2.28, 2.29 Board of Trustees, Assoc, Univ., Inc. - Ims, I, Vol. 4# Ch.2 - 2.25# 2.26, 2 . 3 4 Director - I, Vol. 4# Ch.2 - I, Vol, 4* nii.2~» 2.35# 2,36 Financial and Contractual Arrangements - I, Vol, 4# Ch.2 - 2,29ff Initiation of Program - I, Vol, 4# Ch.2 - 2.20ff Initiatory University Group - I, Vol. 4# Ch.2 - 2,25# 2,27, 2,33# 2,34 Intelligence & Security - I, Vol, 4# Ch,2 - S 7,2 Planning Committee - I, Vol, 4# Ch,2 - 2.25ff» 2,30, 2,34 Bro-Bue ...... mini io

Press Releases - I, Vol. 4, Ch.8 - Items 73, 76# 79 Program - I, Vol. 4, Ch.2 - 2.34ff Site - I, Vol. 4, Ch.2 - 2.29, 2.31ff Brown Oxide and Orange Oxide# Production of Feed lixt’l., Special Proc. & Geo. Expl, - VII# Vol. 1 - Sec. 8 du Pont Brown Oxide Plant - VII, Vol. 1 - 8.4# 8.5 du Pont Scrap Recovery Plant - VII# Vol. 1 - 8.7ff Linde Brown Oxide Plant - VII, Vol. 1 - 8.5ff Mallinckrodt Brown Oxide Plant - VII, Vol. 1 - 8.2ff Operations, General - VII, Vol. 1 - 8.1, 8.2 Bruns General Hospital Los Alamos Project VIII, Vol. 1 - 6.16, 6.44ff, 6.56, 7.4 VIII, Vol. 2 (Supp.) - 11-35 Budgets - See "Estimates (Fiscal) and Budgets" Bureau of Ordnance, DSN Los Alamos Project VIII# Vol. 2 - VII-2# VII-3, VI1-7, VII-10, VII-36, XIX-4 VIII, Vol. 2 (Supp.) - 1-12 Kavy Participation - VIII, Vol. 3, Ch.5 - 5.5, 5.9 Norden Laboratories & Lukas Harold Corp. - VIII, Vol. 3, Ch.9 - 9.4 Project Camel - VIII, Vol. 3# Ch.2 - 2.5ff, 2.19, 2.25, 2.45ff, 2.52, 2.56, 2.59# 2.62 Bureau of Standards - See "National Bureau of Standards" Bureau of lards and Docks, ESN Los Alamos Project - VIII, Vol, 2 - XIX-A, XIX-5 Project Camel - VIII, Vol. 3, Ch.2 - 2.6, 2.7, 2.38, 2.47, 2.48, 2.60, 2.62 Busbar Fabrication, Silver Program Electromagnetic Project V, Vol. V- 3.12, 3.13 Business Office Los Alamos Project VIII# Vol. 2 - III-22ff VIH, Vol. 2 (Supp.) - II-3, II-24ff, 11-32, 11-37 Bus Terminals C M Central Facilities - I, Vol. 12 - 18.8, 18.24 Gaseous Diffusion Project - II, Vol. U - 3.55, 3.56 Pile Project - IV, Vol. 3 - 8.28

C-2144 - Sea MFluorolubesM Gi'CC Laboratory (300 Area) Pila Project IV, V o l . 6 - 4 . 1 2 O P - 2 P i l a Pile Project IV, Vol. 2, Pt.I - 3.12, 3.13 IV, Vol. 3 - 4 . 2 O P - 3 P i l e Pile Proj ect IV, Vol. 2, Pt.I - 3.13* 3.14 "C» R u b b e r Gaseous Diffusion Project II, Vol. 3 - 3.21 II, Vol. 5 - 5.3 Cafeteria (ifeas Hall) Facilities C3ff Central Facilities - I, Vol. 12 - 1,5, 4*2, 4.6, 5.1, 6.2, 6.3* 6.5* 6.7, 7.9* 3.1ff, 8.6, 3.7, 9.4* 9.5* 9.9 Electromagnetic Project V, Vol. 5 - 3.15 V, Vol. 6 - 7.5 Caseous Diffusion Project - II, Vol. 4 “ 2.4* 3.14* 3.52, 3.53* 3.63* 3.64 Liquid Thermal Diffusion Project - VI - 4.1* 5.25 Los Alamos Project VIII, Vol. 1 - 5.3, 6.1, 6.3, 6.9ff VIII, Vol. 2 - I I I - l l Pile Project IV, Vol. 2, Pt.II - 2.6 IV, Vol. 5 - 4.25* 5.4* 5.12* 5.13, 5.19* 5.22, 3.4 Camel Project - Sea "Project Carnal" Cam e r a s Los A l a m o s VIII, Vol. 2 - VII-10, VI1-29, XV-13, XV-19, XVI-6 VIII, Vol. 2 (Supp.) V-15 Project Camel - VIII, Vol. 3* Ch.2 - 2.12, 2.19* 2.20, 2.40 Camp Campbell, Ky. Storage Project I, Vol. 4 (T.S. Supp.) - 4>3, 11, 14* 15* 16, 13, 19 Camp Hood, Texas Storage Project I, Vol. 4 (T.S. Supp.) - 3* 4* 5* 11* 14ff» 13* 19 Camp Upton, L.I. Foundation of National Laboratories I, Vol. 4* Ch.2 - 2.5* 2.33 Can Failure, Detection of Pile Project IV, Vol. 2, Pt.I - 5.3ff IV, Vbl. 2, Pt.II - 6.1ff Can-Car ,’WO wmiB¥ -ix y t m m iic Canadian Atomic fhergy Act of 1946 Assistanc® on Canadian Pile Project - I, Vol. 4, Ch.9 - 9.7, 9.21 Canadian Cooperation Assistance on Canadian Pile Project - I, Vol. 4, Ch.9 - 9.1# 9.3ff Declassification and Distribution of Project Information - I, Vol. 4 Ch.5 - 5.24 Peed Mat1!., Spec. Proc. & Geo. Expl. VII, Vol. 1 - Sec. 3 VII, Vol. 2 - 1.10, 2.3, 2.4 General <* I, Vol. 1 - 1.2 Heavy Water Project - III Intelligence & Security - I, Vol. 14 - S 3.2 Los Alamos Project - VIII, Vol. 2 - II-4, V-4 Canadian Pile Project, Assistance On Benefits to United States - I, Vol. 4, Ch.9 - 9.26ff British^- Canadian - American Cooperation - I, Vol. 4, Ch.9 - 9.3ff Description of Project - I, Vol. 4, Ch.9 - 9.3ff Progress and Costs * I, Vol. 4, Ch.9 - 9.23ff Purpose - I, Vol. 4, Ch.9 - 9.2, 9.3 Zero Energy Exponential Pile - I, Vol. 4, Ch.9 - 9.22ff Canning, Cylindrical Slug Pile Project IV, Vol. 2, Pt.I - 4.6ff, 4.12, 5.3ff IV, Vol. 2, Pt.II - 4.2, 4.7ff, 5.2, 6.1ff IV, Vol. 3 - 3.2, 4.1, 5.26, 5.47ff IV, Vol. 5 - 1.3 IV, Vol. 6 - 2.2ff, 4.1, 4.4ff> 5.7, 5.3 Canning, Bod Los Alamos Project VIII, Vol. 2 (Supp.) - IV-4 Cannonsburg, Pa., Refinery Feed Mat’l., Spec. Proc. & Geo. Expl, VII, Vol. 1 - 7.4 Capacity of Plant, Planned Electromagnetic Project V, Vol. 1 - 1.1, 2.2 Capacity, Plant Production Gaseous Diffusion Project II, Vol. 3 - 3.2ff, 7.1ff, 14.2 Capacity, Pile Pile Project IV, Vol. 6 - 1.4 Capture Cross Sections Los Alamos Project VIII, Vol. 2 - 1-26, VI-14ff, XII-9 Capture of Uranium Products Intelligence & Security (Foreign Int. Supp.) In Belgium - I, Vol. 14 - 4.S, 4.9 In France - I, Vol. 14 - 4.9 Carbon (See also "") Gaaeous Diffusion Project - II, Vol. 3 - 11.33ff Pile Project-lV, Vol. 2 - 1.11, 3.3, 3.10

13 _ RESTED DATA ATOMIC 1946 Car-Cat wimi-fMi. Tmaniiwroi

Carbon M i x i n g Plant Gaseous Diffusion Project Construction - II* Vol, 4 - 3.38 Design - H , Vol. 3 - 11.33ff Operation - II, Vol. 5 - 6.10 Caraotite Ore Feed Uat'l., Spec. Proc. and Geo. Expl. VII, Vol. 1 - 1.3, 1.10, 4.Iff# 4.8 VII, Vol. 2 - 1.13, 1.16 Car r i e r s Pile Project IV, Vol. 2, Pt.I - 6.5# 6.6 IV# Vol. 2, Pt.II - 5.1# 5.4# 5.6 IV, Vol. 6, 2.21, 2.22, 2.25 — Cascade, Diffusion Gaseous Diffusion Project II, V o l , 3 - 4*4-# 4.5, 4 . 6 Cascade Inventory Gaseous Diffusion Project II, T.S, App. No. 2 - 6, 7 Cascade of Cascades Principle Gaseous Diffusion Project II, Vol. 3 - 15.2, 15.3 Cascade Plant Gaseous Diffusion Project Construction - II, Vol, 4 - 3.28ff, 3.40, 3.41 Design - II, Vol. 3 - 7.5ff» Sec. 9, 14.2, 14.3 Operation, Preliminary - II, Vol. 5# Sec. 3 Operation, Production - II, Vol. 5# Seo. 4 Cascade Section Design Gaseous Diffusion Project II, Vol. 3 - 7.l6ff Case Operation Gaseous Diffusion Project II, Vol. 5 - 4.11, 6.4# 6.5, 3.1, 8.4 Cask, Transporting Pile Project IV, V o l . 3-5.57 Cast Explosives * See "Explosives, Cast" Operation, Silver Program Electromagnetic Project V, Vol. 4 - 3.3, 3.4 Catastrophe Program Carbide & Carbon Chemical Corp. - I, Vol, 7 - 3.27 Clinton Laboratories - I, Vol, 7 - 3.56 Electromagnetic Project - V, Vol, 6 - 6.3 Hanford Engineer Works - I, Vol, 7 - 3.52 , 4.39 - IV, Vol. 3 - 2.1, 8.19 Los Alamos Project - VIII, Vol. 2 (Supp.)- 11-23# 11-24 - I, Vol. 7 - 3.59 Cel-Cen

Cell Design Gaseous Diffusion Project II, Vol. 3 - 7.11ff C e l l e Operation Intelligence & Security (Foreign Int. Supp.) I, Vol. 14 - 4.34ff Cells, Separation Areas Pile Project IV, Vol. 3 - 3.5, 3.6, 6.l3ff, 6.21 IV, Vol. 5 - 6.26ff, 6.30 Central Control Laboratory Activities of the National Bureau of Standards I, Vol. 4, Ch.12 - 12.7, 12.12, 12.13 Central Facilities* Area Facilities Communications - I, Vol. 12 - Sec. 15 Electrical System - I, Vol. 12 - Sec. 12 Railroad System - I, Vol. 12 - Sec. 17, 13.20, 18.21 Roads, Streets, Walks and Bridges - I, Vol. 12 - Sec. 16 Security System - I, Vol. 12 - Sec. 19 - I, Vol. 14. - 1.4ff, S 7.3 Sewerage System - I, Vol. 12 - Sec. 14 ^ater Supply System - I, Vol. 12 - Sec. 13 Basic Considerations - I, Vol. 12 - Seo. 3 General Description - I, Vol. 12 - Sec. 1 Oak Ridge Facilities Commercial Facilities - I, Vol. 12 - Sec. 8 Construction - I, Vol. 12 - Sec. 5 Housing -I, Vol. 12 - Seo. 7 Medical Facilities - I, Vol. 7 - 4.7ff, S 4.1ff - I, Vol. 12 - Seo. 10 Operations - I, Vol. 12 - Seo. 6 Planning ard Design * I, Vol. 12 - See. 4 School System «• I, Vol. 12 - Sec. 9 Social and Welfare Facilities and Services - I, Vol. 12 - Sec. 11 Site Selection and Preparation - I, Vol. 10 - I, Vol. 12 - Sac. 2 Central Procurement Agencies Pile Project IV, Vol. 5 - 3.5 Central Safety Section Pila Project IV, V o l . 5-10.4 Central Shops, Construction Pile Project IV, Vol. 5 - 5.23, 5.24, 5.28, 5.29, 5.31, 5.33, 7.7, 11.4 Centrifuge Method, Uranium Separation Activities of the National Bureau of Standards I, V o l . 4 > Ch,12 * 12.3 Investigations of Miscellaneous Processes of Separation of Uranium I s o t o p e s Development - I* Vol. 4, Ch.14 - 14.14ff Discontinuance - I, Vol. 4* Ch.14 - 14.21ff General - I, Vol. 4, Ch.14 - 14.1ff Operation (Pilot Plant) - I, Vol. 4, Ch.14 - 14.l6ff Research - I, Vol. 4, Ch.14 - I4.6ff Centrifuges# Reparation Area Pile Project IV, Vol. 3 - 6.H, 6.12 # Research Pile Project IV, Vol. 2# Ft.II - 5.4 C e r i u m .‘.fatal# Production Ataea Project (Iowa State College) I, Vol. 4» Ch.11 - 11.6, 11.14# 11.15 Chain Reaction Los Alamoa Project VIII*: Vol. 2 - I«12#-1-13* VI-3# XV-3 Chain Reaction Pile Project IV, Vol. 1 - 1.1# 3.2 IV, Vol. 2, Pt.I - 1.1, 1.9# 1.10, 1.12, 1*13, 2.1, 3.2ff, 3.6ff, 4.3, 4.4# 7.1 IV, Vol. 3# - 5.1# 5.10# 5.24 IV, Vol. 6 - 1.3, 1.4 Changeover# Operation# Clinton Laboratories Pile Project IV, Vol. 2, Pt.II - 3.5, 3.6 Changeover, Operational Control Pile Project IV, Vo l . 6-14.5# Sac. 1 6 Charge Bottles Eleotronagnetic Frojeot V, Vol. 6 - 4.7 Charge Material Electromagnetic Project V, Vol. 2 - 4.2ff V# Vol. 3 - 2.2ff V, Vol. 6 - 3.2, 3.3, 3.5# 3.6,,4.1> 4.3# 4.11ff# 4.17# 5.6 Charge Jgaterial, Preparation of Sleotroiaagnetio Project Alpha * V# Vol. 3 - 2.2ff# 3.18# 3.2lff-V, Vol. 6 - 4.3 Beta - V, Vol. 3 - 2.l2ff, 3.27ff - V, Vol. 6 - 4.3 Charge Material Studies Electromagnetic Project V, Vol. 1 - 4.2ff Charges and Criticisms land Acquisition 03* - I, Vol, 10 - 2.9# 2.12ff, 2.29# 2.34# 2.35# 2.41ff HSSf * IV, Vol. 4 * 4.3, 4.13# 4.26 Charging, Pile Pile Project IV* Vol. 3 - 5.25 IV, Vol, 6 - 2,7# 2.3, 5.3, 5.3

21 JAIft r g r o ATOMIC #ER(?SssACT 1946 -X c iliij'f t 'RD Chtt-Che v m t m i x Jin u iu iiAJFTba

^Charlie* Sits Storaga Project I, Vol. 4» T.S. Supp. - 5, U f t , 13, 19 "Charlie" Teat Loa Alamoa Project-VIII, Vol. 2 (Supp.)- 1.13ff Oparationa Grossroads-VIII, Vol. 3# Ch.8 - 8.11, 3.12 Chemical Operation Electromagnetic Project Alpha-V, Vol. 6 - 4.3 Beta-V, Vol. 6 - 4.6ff Chemical Research Electromagnetic Project V, Vol. 2 — 1.3, 1.9* Sec* 4 Chemical Research and Development ___ - ____ - Loa Alamoa Project VIII, Vol. 2 (Supp.) - VI-5 Chemical Work, Preliminary Electromagnetic Project V, Vol. 6 - 3.2, 3.3, 3.6 Chemicals, Special, For K-25 - Feed Mat'la., Spec. Proc* and Geo, Expl, Fluorine (C-216,0G) and Rydrofluorina A d d (HF)-VII, Vol. 1, App, G» G . 2 3 f f Fluoroluba - C2144, FL, FIS,MFL, W 1 and C-2144S-VII, Vol. 1, App. G- G . 1 3 f f n-perfluorodimathylcyclohexane (C-816) and Hexsflnoroxylene (p-45)- VII, Vol, 1, App, G-G.6ff Polytetrafluorethylene (D-29, K-419, TFE)-VII, Vol. 1, App, G-G.27, G.23 Research Contracts American Cyanamid - VII, Vol, 1, App. G - G.29, G.30 du Pont Contract W 7412 eng 151 - VII, Vol. 1, App. G - G.30 Hooker Contracts W 7405 eng 75 and V 7405 eng 76 - VII, Vol. 1, App. G - G.30, G.31 Johns Hopjfina University Contract W 7401 eng 43 - VII, Vol, 1, App. G - G.31, G.32 Maas. Inst, of Technology Contract W 7405 eng 288 - VII, Vol. 1, App, G - G.33 Purdue University Contract W 7405 eng 74 - VII, Vol. 1, App, G - G.32, G.33 Chemistry and Metallurgy Los Alamos Project - VIII, Vol..2 - 1-22, 1-28, 1-32, IV-l2ff, Ch.VIII, 2-9, x-io, Ch.xra Analytical Methods - VIII, Vol. 2 - VIII-25ff> XVTI-l7ff Cryogeny - VIII, Vol. 2 - VIII-31, VIII-32 DP Site - VIII, Vol, 2 - XVII-20ff Miscellaneous Metallurgy - VIII, Vol. 2 - VIII-19ff> XVII-11, XVII-12 Organization -VIII, Vol. 2 - Vlll-lff, XVII-1, XVII-2 Plutonium Metallurgy - VIII, Vol. 2 - VIII-l6ff, XVII-8ff Plutonium Purification - VIII, Vol. 2 - VIII-12ff, XVII-5ff Radiochendstry - VIII, Vol., 2 - VIII-2lff, X7II-12ff J^ _ n O C* ’T* ... Che-Cl*

Uranium Metallurgy - VIII, Vol. 2 - VIII-8ff, XVII-3ff Uranium Purification - VIII, Vol. 2 - VIII-7, VIH-8, XVII-2, XVII-3 Gharaistry and Metallurgy Research Division Los AlaraoB Project * VIII, Vol. 2 (Supp.)- 1-10, 1-11, II-9, 11-16, 11-17, 11-22, V-16, Ch.VI Chemistry Activities - VIII, Vol. 2 (Supp.) - VI-4ff General Policy - VIII, Vol. 2 (Supp.) - VI-2ff Health Instruments and Indoctrination - VIII, Vol. 2 (Supp.) - VI-12 Metallurgical Developments - VIII, Vol. 2 (Supp.) - VI-7ff Organization - VIII, Vol. 2 (Supp.) - VI-1, VI-2 Plutonium Production - VIII, Vol. 2 (Supp.) - Vl-lOff Chemistry Building Construction Ele ctronagnetic Project ' ______V, Vol. 5 - 3.13ffV 3.21ff, 3.30ff — C h e m i s t r y G e n e r a l Amea Project (Iowa State College) I, Vol. 4# Ch.ll * 11.3Iff Chemiatiy Research Gaseous Diffusion Process II, Vol. 2 * Sec. 8 Chicago Purchasing Office Loa Alamos Project - VIII, Vol. 2 - 111-28, II1-31, 111-33, IX-14 Los Angeles Project - VIII, Vol. 3, Ch.l - 1.3, 2.1ff, 3.2 China lake Pilot Plant Project Camel VIII, Vol. 3, Ch.2 - 2.19, 2.44, 2.53 Chronology, Production Electromagnetic Project - V, Vol. 6 - Sec. 4 Gaseous Diffusion Project - II, Vol, 5 " See. 8 Liquid Thersal Diffusion Project - V I - 5,2ft Pile Project - IV, Vol. 6 - Sec. 5 C h u r c h e s CESf Central Facilities - I, Vol. 12 - 11.8, 11.9, 11.12, 11.13 Pile Project IV, V o l . 3-8.20, 8 . 2 1 IV, Vol. 5 - 5.16, 5.17 IV, Vol. 6 - 9.1, 9.11, 9.12 Classification of Lands Pile Project IV, Vol. 4 - 3.Iff Classifications, Buildings and Equipment Los Alamos Project VIII, Vol. 1 - 5.11, 5.12 Cleanliness Gaseous Diffusion Project lit Vol. 3 - 4.9ff» 5.4» 8.16, 8.18, 8.19, 11.1, 11.2, 11.13, 11.14 II, Vol. 4 - 3.73ff II, Vol, 5 - 2.5, 2,6, 6.3, 6.4 Clearance, Personnel and Company Intelligence and Security I, Vol. 14 - Sec. 3 and Supplement Cle-Cli SBflM&MM■ HffWlMilf IQIft

Cleveland Clinics Feed I-tett’l., Spec. Proc. and Geo. Expl. VI#, Vol. 1 - X.35 Clinical Dentistry CEW Central Facilities - I, Vol. 12 - Sec. 10 Medical Program - I, Vol. 7 - Sec. 4 and Supplement Pile Project - IV, Vol. 6 -9.3 Clinical Sledicina CEW Central Facilities - I* Vol. 12 - Sec. 10 Medical Progran - I, Vol. 7 - Sec. 4 and Supplement Pile Project - IV, Vol. 6 - Sec. 9.3 Clinton Engineer Works Central Facilities * I, Vol. 12 Fiscal Procedures - I, Vol. 5 - 4.3, 5,3ftt 7 . 1 Gaseous Diffusion Project II, Vol. 1 * 3.2, 3.3, 4.1> 5.9 II, Vol. 3 - 6.1ff, 12.3 General - I, Vol. 1 - 1.2, 1.3 Ins'irance Program - I, Vol. 6 - 2.6, 3.19 Land Acquisition CEW - I, Vol. 10 (see also I, Vol. 12 - Sec. 2) CEW Bus Authority CEW Central Facilities - I, Vol. 12 - 13.2, 18.5* 13.13, 13.15 Gaseous Diffusion Project - II, Vol. 5 - 10.9 Clinton Laboratories, General Activities of the Rational Bureau of Standards « I, Vol. 4, Ch.12 - 12.6, 12.7 Ames Project - I, Vol, 4* Ch.ll - 11.46 Assistance on Canadian Pile Project - I, Vol, 4, Ch.9 - 9.4, 9.5 Dayton Project - VIII, Vol. 3, Ch./, - 4.2, 4.3* 4.6 Insurance Program - I, Vol. 6 - 3.4ff# 5.3# 6.2, 7.2, 7.3 Los Alamos Project VIII, Vol. 2 - III-5, VIII-6 vin, vo l , 2 (Supp.) - in-3 Ifedical Program - I, Vol. 7 - 3.55* 5.5ff, 5.16, 5.19, 5,20 Oak Ridge Institute of Nuclear Studies - I, Vol* 4, Ch. 10 - 10.1 Pile Project IV, Vol, 1 - 4.3» 5.1, 9.2 IV, Vol. 6 — 2.20, 4.2, 4.3# 4.6, 4.11# 4,19# 4.26, 4.30, 4*32, 4.33# 5.9# 13,1 Press Release * I, Vol. 4# Ch,8 * Item 72 Program for Production and Distribution of Radioisotopes - I, Vol. 4, C h . 3 Research and Developezmnt of Atomic Energy for Power - I, Vol. 4, Ch.4 - 4.4ff Clinton Laboratories, Construction of Pile Project Chemical Processing Plant - IV# Vol. 2, Pt.II - 2.4 General Service Facilities - IV# Vol, 2# Pt.II - 2.5# 2.6 Pile Facilities -*IV, Vol. 2, Pt.II - 2.3# 2.4 Power and Communication Facilities - IV, Vol. 2, Pt.II - 2.5 Process Area, Service Facilities - IV, Vol. 2, Pt.II - 2.6 Training Facilities - IV, Vol. 2, Pt.II - 2.4, 2.5 Clinton laboratories Research Pile Project Contractual Arrangements - IV, Vol. 2, Pt. II - 2.2, 2.3# 3.2, 3.3 Cost - IV, Vol. 2, Pt.II - 2.3, 2.10, 3.3 Design and Construction - IV, Vol. 2, Pt.II - Sec. 2 Design and Operating Problems - IV, Vol, 2, Pt.II - Sec. 6 Operation - IV, Vol. 2, Pt.II - Seo. 3 Organization and Personnel - IV, Vol. 2, Pt.II - Sec. 8 Production of Plutonium - IV, Vol. 2, Pt.II - Sec. 4 Purpose and Scope - IV, Vol. 2, Pt.II - Sec, 1 Separation Process Development - IV, Vol, 2, Pt,II - Sec. 5 ...... Training of Personnel - IV, Vol. 2, Pt.II - Seo. 7 Clinton Laboratories Training Program Oak Ridge Institute of Nuclear Studies I, Vol. 4, Ch.10 - 10.6 Goal Handling System, Power Plant Gaseous Diffusion Project Design - II, Vol. 3 - 12.6, 12.7, 12.3 Coffins, Slug Pile Project IV* Vol. 3 - 5.29, 5.30 C o l l o q u i u m Los Alamos Project VIII, Vol. 2 - II1-3» HI-7 VIII, Vol* 2 (Supplement) - 1-11 Colorado Plateau Region Feed L&t'l,, Spec. Proc. and Geo, Ebtpl* VII, Vol. 1 - 1.3, 1.10, 4.1* 4.3 VII, Vol. 2 - 1.6, 1.11, 1.16, 2.7, 3.1 Columbia Basin Project Pile project IV, Vol. 6 - 10.2* 10.3 Columbia Camp Pile Project IV, Vol, 6 - 10.4 Columbia River Pile Project IV, Vol. 3 - 2.6, 2.7, 3.1, 3.3# 3.6, 5.35# 5.62ff, 5.70, 8.2, 8.24, 8.25 IV, Vol. 4 - 1.1# 1.2, 2.7, 2,10, 2.11 IV, Vol, 6 - 2,3# 2,17, 5.13 Columbia River Telephone Company Pile Project IV, Volf 4 - 2.12, 4.11 C o l u m b i u m Pila Project IV, Vol, 3 - 6.5 IV, Vol. 6 - 3.2

RESTFttS® DATA

ATOMIC E W ^ g H # C T 1946 o ^ u -rf e * . m r

Columns Process Liquid Thermal Diffusion Project VI - 2.1ff, 2.5ff, 3.4, 3.7, 3.3, 4.2, 4.3, 5.3, 5.13 Combined Policy Conmittee Assistance on Canadian Pile Project - I, Vol. 4, Ch.9 - 9.3* 9.4, 9.5 General - I, Vol. 1 - 3.16, 3.17 Los Alamos Project - VIII, Vol. 2 - II-l, II-4 Patents - I, Vol. 13 - 2.14, 2.15 Combustion System, Power Plant Gaseous Diffusion Project Design * II, Vol. 3 - 12.3ff Commander, JTF On* Operation Crossroads ---- VIII, Vol. 3, Ch.3 - 8.8 Commander, Western Sea Frontier Los Alamos Project VIII, Vol. 2 - XIX-4 Commercial Facilities Central Facilities I, Vol. 12 - Sec. 3 Pile Project Design - IV, Vol. 3 - 8.10ff Operation - IV, Vol. 6 - 9.15 C o m m i s s a r y Los Alamos Project VIII, Vol. 2 - III-ll VIII, Vol. 1 - 6.1, 6.3, 6.13ff, 7.4 Commissioner of Patents P a t e n t s I, Vol. 13 - 2.2, 3.3 Committee on Declassification (Tolman Consulttea) Declassification and Distribution of Project Information I, Vol. 4, Ch.5 - 5.1, 5.3ff, 5.9, 5.14ff» 5.13, 5.19, 5.27 Communication Facilities CEW Central Facilities - I, Vol. 12 - Sec. 15 Electromagnetic Project - V, Vol. 3 Los.Alamos Project VIII, Vol. 1 - 5.23, 5.24 VIII, Vol. 2 - 1-10, 111-25, XVII1-3 VIII, Vol. 2 (Supp.) - 11-29 Los Angeles Project - VIII, Vol. 3, Ch.l - 1.3* 1*4, 2.2, 2.4* 2.6, 2.3 Pile Project IV, Vol. 2, Pt.II - 2.5 IV, Vol. 3 - 7.3, 7.4, 3.3, 3.5, 3.23 IV, Vol. 5 - 5.11, 5.22, 5.27, 7.5ff IV, Vol. 6 - Sec. 12, 13.2 Community Association (Council) Los Alamos Project VIII, Vol. 1 - 6.20, 6.21 VIII, Vol. 2 - 111-10, III-ll

26 RES' a t o m i c Community law Los Alamos Project VIII, Vol. 1 - 6.35ff Comparative Sales, Land Acquisition Land Acquisition, CEW - I, Vol. 10 - 2.26, 2.27 Pile Project - IV, Vol. 4 - 4.10, 4.11 Comparison of Three Manufacturing Piles Pile Project IV, Vol. 6 - 5.5, 5.6 Component (Bomb) Safety Factors Los Alamos Project VIII, Vol. 2 (Supp.) - VIII-2, VIII-3 Composite Core, Implosion Bomb Los Alamos Project VIII, Vol. 2 - XI-2, XX-1 VIII, Vol. 2 (Supp.) - 1-13, III-5, III-6, V-5 Composition B Los Alamos Project VIII, Vol. 2 - X-6, X-7, XVI-5, XVI-6,,XVI-12, XVI-15 VIII, Vol. 2 (Supp.) - V-14, VII-3, VTI-6 Kavy Participation - VIII, Vol. 3* Ch.5 - 5.2, 5.3, 5.5 Supplementary Activities - VIII, Vol. 3, Ch.9 - 9.22 Confessed Air Plant Gaseous Diffusion Project II, Vol. 3 - 10.12, 10.13, 14.15 II, Vol. 4 - 3.38, 3.45, 3.46 II, Vol. 5 - 5.4 Concentration of Product, Gaseous Diffusion Project - See ^ P r o d u c t Concentration" Concentration Step Pile Project IV, Vol. 3 - 3.5, 6.2, 6.4, 6.10, 6.18 IV, Vol. 6 - 2.22ff, 4.20, 5.11, 5.16 Condemnation Trials, Land Acquisition land Acquisition CEW - I, Vol. 10 - 2.11 Pile Project - IV, Vol. 4 - 4.4* 4.28, 4.29 C o n d e n s a t e Iiauld Thermal Diffusion Project VI - 2.14, 3.11, 4.8, 4.9 Conditioning Gaseous Diffusion Project - II, Vol. 5 - 2.4ff, 3.5, 3.6, 6.Iff, 8.2, 8.3 Liquid Thermal Diffusion Project - VI - 5.17, 5.18 Conditioning Area Gaseous Diffusion Project Construction - II, Vol. 4 - 3.46ff Design - II, Vol. 3 - Sec. 11, 14.17 Operation - II, Vol. 5 - Sec. 6 Conditioning Building Operation Gaseous Diffusion Project II, Vol. 5 - 6.Iff

27 ED DA IA

'T;'- ,7v? r ; , ~ ------v ------Conferences With Legislative Leaders Legislative Contacts House of Representatives I, Vol. 4, Gh.l - 2.6ff Senate I, Vol. 4* Gh.l - 2,8ff Congress of Industrial Organizations Caseous Diffusion Project II, Vol. 5 - 10.7 Congressional Approval for Operation Crossroads Operation Crossroads VIII, Vol. 3, Ch.6 - 8.6 Conservation of Personnel P e r s o n n e l I# Vol. 8 — Sec* 3 Construction, Plants and Facilities Boron (B^-O) - VIII, Vol. 3, Ch.7 - Sec. 5 SEW Central Facilities - I, Vol. 12 - Sec. 5, 7.10ff, 8.3, 9.8, 9.9, I0.2ff, 11.5ff, 12.9ff, 12.l4ff, 12.18, 12.19* 12.21ff, 12,25ff, 13.5ff, 14.3ff, 15.3, 15.4* 15.7, 15.8, 16.2ff, 17.2, 17_*3* 17,5* 17.6, 18,24* 19.8, 19.9 Dayton Project - VIII, Vol. 3* Ch,4 - 4,6 Electromagnetic Project V, Vol. 1 - 2.4, 2.5 V, Vol. 5 Feed Kat'l., Spec, Proc. 6 Geo. Expl. - VII, Vol. 1 - 7.7, 7.9, 7.10, 8,4ff, 8,8, 9,2, 9.8, 10,3 and 10.5 Gaseous Diffusion Project II, Vol, 1 - 3.5 II, Vol. 4 Heavy Water Project - III, Sec. 4 Liquid Thermal Diffusion Project - VI - See, 3 Los Alamos Project VIII, Volv 1 * Sec. 5 VIII, Vol, 2 - 1-9, 1-10, 111-10, III-ll, III-47ff, VI-2, VI-22, YII-8, VII-9, VI1-37, XV-9* XV-10, XVI-17, m ~ l 8 , EVTI-2, x v i i - 20ff, mu-3, xvin- 9, m-5, m-6 Vin, Vol, 2 (Supp.) - 11 -9, iv

Consultants, Silver Program Electromagnetic Project V, Vol. 4 “ 3.1, 4*1, 7.2 Consumption of Process Material Caseous Diffusion Project II, T.S. App. No.3 - 2 Contract Administration P a t e n t s I, Vol. 13 * Sec. 4 Contractor's Purchasing Department Los Angeles Procurement Office VIII, Vol. 3, Ch.l - 1.3, 1.4 Contractor's Requisitions Los Angeles Procurement Office VIII, Vol. 3, Ch.l - 2.5, 2.6 Contractual Arrangements B o r o n (B*0) . n n , Vol. 3, Ch.7 - 7.2ff CEW Central Facilities - I, Vol. 12 - 4.6, 4.7, 5.3* 6.3ff, 7.10ff, 8.4, 8.5, 12.9ff, 16.4, 17.1, 18.l2ff Dayton Project - VIII, Vol. 3, Ch.4, - 4.2, 4.3 Electromagnetic Project V, Vol. 1 - 1.3, 2.1; V, Vol. 2 - Sec. 2 V, Vol. 3 - 1.3ff Vol. 4- ” 2.4., 3.1, 3.3, 3.5, 3*9, 3*12, 4.1, 4.3, 4*4 V, Vol. 5 * Sec. 2 V, Vol. 6 - Sec. 2 Feed Mat'l., Spec. Proc. & Geo. Expl. VII, Vol. 1 - 2.3ff, 3.2, 3.3, 4.3ff, 5.1, 5.2, 6.1ff, 7.3ff VII, Vol. 2 - 1.1, 2.1 Gaseous Diffusion Project II, Vol, 1 - Sec. 3 II, Vol. 2 - Sec. 2 II, Vol, 4 * Sec. 2 II, Vol. 5 *■ Sec. 2 Heavy Water Project - III-3.3ff, 4.1, 4.2, 4.10, 4.16, 4.21, 5.Iff, 5.11ff Liquid Thermal Diffusion Project - VI-3.Iff, 5.1, 5.2 Los Alamos Project VIII, Vol. 1 - 4.1ff, 5.2ff, 5.8 VIII, Vol. 2 - 1.5, 1.6 Los Angeles Procurement Office - VIII, Vol. 3, Ch.l - 1.1, 1.2 Ohio Stste Univ. Cryogenic Laboratory VIII, Vol. 3, Ch.3, Pt.I - 3.1 VIII, Vol. 3, Ch.3, Pt.II - 1.2 Pile Project IV, Vol. 1 - Sec. 4 IV, Vol. 2, Pt.I - Sec. 2 IV, Vol. 2, Pt.II - 2.2, 2.3, 2.2, 3.3 IV, Vol. 5 - 1.2 IV, Vol. 6 - 3.1, 4.23, 6.3, 9.1, 14.5, 14.6, Sec. 16, 18.1 Supplementary Activities - VIII, Vol. 3, Ch.9 - 9.Iff

W ffct RESUMED DATA " ATOMIC ENERG^ACT 1946 Control Devices, Pile Pile Project Borax Solution - IV, Vol. 3 - 5.50, 5.51, 5.54, 5.55 Control and Shim Rods IV, Vol. 3 - 5.16, 5.31, 5.32, 5.50ff IV, Vol. 6 - 1.4, 2,10ff, 4.12, 4.16 G e n e r a l IV, Vol. 2, Pt.I - 3.2, 4.2ff, 4.13, 6.2 IV, Vol. 2, Pt.II - 4.2, 4.6, 4.8 Safety Rods IV, Vol. 3 - 5.16, 5.31, 5.32, 5.50ff Control Devices, Separation Process Pile Project IV, Vol. 2, Pt.II - 5.3 Control Equipment, Electrical Electromagnetic Project V, Vol, 3 - 2.9, 3.6, 3.9ff, 3.13, 4.3, 4.4 V, Vol. 6 - 5.3, 5.4 Control Office, Silver Program Electromagnetic Project V, Vol. 4 - 6.1 Control, Quality, Uranium and Thorium Feed Ifcterials and Special Procurement VII, Vol. 1 - Sec, 12 Control Records Pile Project IV, Vol. 6 - 6.1, 6.2 Control Room, Central Gaseous Diffusion Project II, Vol. 3 - 8.23, 8.29 Control Room, Pile Pile Project IV, Vol. 6 - 2.10 Control, Transfer of Storage Project I, Vol. 4* T.S. Supp. - 19, 20 Convection, In Column Liquid Thermal Diffusion Project V I - 2 . 1 Convection Loop Liquid Thermal Diffusion Project VI, 2.13, 3.9, 4.4, 5.5 Conversion Program Electro>aagnetic Project V, Vol. 1 - 3.2, 3.3 C o n v e r t e r s Gaseous Diffusion Project Design and Procurement - II, Vol, 3 - 8,6ff, 14,10 Construction - II, Vol, 4 - 3.69

3 0 restricted a t o m i c - ACT 1946 Cook County Forest Preserve Foundation of National laboratories I, Vol. 4, Ch.2 - 2*17ff Coolant Drying and Storage Plant Gaseous Diffusion Project Decign - II, Vol. 3 - lO.lff, 14.12, 14.13 Construction - II, Vol. 4 - 3.31, 3.32 Operation - II, Vol. 5 - 5.1, 5.2 Coolant, Process Gaseous Diffusion Project II, Vol. 3 - 5.4, 5.5, 7.9, 11.11 II, Vol. 5 - 5.1ff, 5.6, 5.7, 8.2 Coolants, Pile Pile Project A i r IV, Vol. 2, Pt.I - 3.4, 3.6, 3.10, 3.11 IV, Vol. 2, Pt.II *■ 4.2, 4.5, 4.6, 4*8, 4*9 G e n e r a l IV, Vol. 2, Pt.I - 1.1, 3.2, 3.4, 3.6, 3.l0ff, 3.14ff# 4.1» 4.8 IV, Vol. 3 - 1.1, 1.2, 5.3ff Heavy Water - IV, Vol. 2, Pt.I * 3.4, 3.6, 3.10 Helium IV, Vol. 2, Pt.I - 3.4, 3.6, 3.10ff, 3.l4ff IV, Vol. 2, Pt.II - 4.1 IV, Vol. 3 - 1.3, 3.4, 5.9, 5.10. 5.14 Urenluia Hexafluoride IV, Vol. 3-5.12 Cooling System, Pile (KRX) Assistance on Canadian Pile Project I, Vol. Ut Ch.9 - 9.15, 9.16 Cooling Systems Electronagnetic Project V, Vol. 3 - 2.17, 2.18 V, Vol, 5-3.24 V, Vol. 6 - 4.2, 7.5ff Cooling Water Liquid Theraal Diffusion Project VI - 2.14, 3.14, 3.15, 4.10, 4.11 Cooling Water System - Gaseous Diffusion Project - See •’Recirculating Cooling Water System1' Cooling Water System Pile Project IV, Vol. 6 - 2.11, 2.12 Cooling Water System, Power Plant Gaseous Diffusion Project Design - II, Vol. 3 - 12.20, 12.21 Construction - II, Vol. 4 ” 3.24* 3.25 Coordinating Council Los Alamos Project VIII, Vol. 2 - III-2 VIII, Vol. 2 (Supp.) - 1-5, 1-11 Coordinating Organization Directors Declassification and Distribution of Project I, Vol. 4, Ch.5 - 5.10ff, 5.14* 5.17, 5.20ff Corrosion Problems Pile Project IV, Vol. 2, Pt.I - 3.16, 4.4ff* 4.9, 6.4, 6.7 IV, Vol. 3 - 3.3, 5.22, 5.28, 5.33, 5.35, 5.43, 5.44, 5.62 IV, Vol. 6 «• 2.12 Corrosion, Process Gaseous Diffusion Project II, Vol. 3 - 2.2, 4.8, 7.22 Cosmic Radiation Studies Los Alamos Project VIII, Vol. 2 (Supp.) - IV-15 Cosmic Ray Los Alamos Project VIII, Vol. 2 - 1-16, VI-8 C o s t Boron (B*0) - VIII, Vol. 3, Ch.7 - 7.4, 7.6 CB? Central Facilities - I, Vol. 12 - 1.6, 2.8ff, 4.6, 4.7, 5.2, 5.4ff 5.6ff, 7.1, 7.10ff, 8.9, 8.10j 9.9, 10.6, 10.9, 10.10, 11.5ff# 11.9ff, 11.13, 12.9ff, 13.3, 13.7ff, 14.3ff, 15.2, 15*3, 15.6ff, 15.10, I6.4ff, 16.12, I6.17ff, 17.3ff, 18.18, 18.19, 18.24, 19.8, 19.9, 19.15ff Dayton Project - VIII, Vol. 3, Ch.4 - 4.7 Electromagnetic Project V, Vol. 1 - 2.9, 2.16 V, Vol. 3 - 3.54* 4.4* 4.7, 4.10, 4.12, 4.14* 4.21, 4.23, 4.24 V, Vol. 4 - 1.2 V, Vol. 5 - 2.5ff V, Vol. 6 - 4.2, 4.10, 4.14* 4.18 Feed Mat'l., Spec. Proc. & Geo. Expl. VII, Vol. 1 - 1.15 V H , Vol. 2 - 1.8, 2.6, 2.7, 3.1* 3.2 Gaseous Diffusion Project II, Vol. 1 - Sec. 7 II, Vol. 2 - Sec* 10 II, Vol. 3 - 3.6, Sec. 17 II, Vol. 4 - Sec. 6 II, Vol. 5 - Sec. 11 II, T.S. App. No. 4 General - I, Vol. 1 - Sec. 4 Heavy later - i n - 3.11, 3.21, 4.9 , 4.15 , 4.20, 4.26, 5.9 Intelligence & Security - I, Vol. 14 - 1.5, 4.8 Investigation of Miscl, Proc. of Separation of Uranium Isotopes - I, Vol. 4* Ch.14 - 14.25, 14.34 land Acquisition * CEW - I, Vol. 10 - 2.47, 2.48 Liquid Thermal Diffusion Project - VI - 1.2, 3.22, 5.28, 5.29 Los Alamos Project - III, Vol. 1 - 3.6, 4.3, 4.4* 5.1, 5.25, 5.27, 5.28 Los Angeles Procurement Office - VIII, Vol, 3, Ch.l - 3.1 Medical - I, Vol. 7 - 3.30, 3.40, 3.55, 3.57, 3.58, 3.65, 4.22, 4.23, 4*31, 4*40, 5*23 Ohio State University Cryogenic Laboratory VIII, Vol. 3, Ch.3, Pt.I - 3.1 VIII, Vol. 3, Ch.3, Pt.II - 1.2 Pile Projects IV, Vol. 1 - 5.1, 5.2 IV, Vol. 2, Pt.I - 2.8 IV, Vol. 2, Pt.II - 2*3, 2.10, 3.3, 3.6 IV, Vol. 3 - Sec. 9 IV, Vol. 4 ** Sec. 7 IV, Vol. 5 -Sec. 11 IV, Vol. 6 - Sec. 17 Project Camel - VlII, Vol. 3, Ch.2 - 2.43, 2.60, 2.61 S&ndia Base - VIII, Vol. 3, Ch.6 - 8 Storage Project - I, Vol. 4, T.S. Supp. - 18 Supplementary Activities - VIII, Vol. 3, Ch.9 - 9.1, 9.21 CoBt Accounting Procedures Fiscal Procedures I, Vol. 5 - Sec. 6 Costs and Prices Program for Production and Distribution of Radioisotopes I, Vol. 4, Ch.3 • 3*14, 3*15, 3*21 Council of Participating Universities Argonne National Laboratory I, Vol. 4, Ch.2 - 2.4, 2.11ff Counter-Current Electromigration Method, Uranium - See "Electromigration (Counter-Current) Method, Uranium Isotope Separation*. Counter-Current Reflux Molecular Method, Uranium Isotope Separation - See "Molecular Stills (Counter Current, Reflux) Method, Uranium Isotope Separation." Counter Intelligence Intelligence and Security I, Vol. 14 - Sec, 2 and Supplement Cowpuncher Committee Los Ala mo b Project - VIII, Vol. 2 - IX-3, IX-5, X-7, XVIII-11 Project Camel - VIII, Vol. 3, Ch.2 - 2.7, 2.31, 2.50 Critical Assemblies Los Alamos Project VIII, Vol. 2 - IX-17, IX-18, X-9, XIII-11, XV-2ff VIII, Vol. 2 (Supp.) - 11-22, IV-4, IV-5, V-2, V-4ff Critical Assembly Experiments, Los Alamos Project VIII, Vol. 2 (Supp.) V-4ff Critical Mass Gaseous Diffusion Project II, Vol. 5 - 4*9, 9.5 Los Alamos Project VIII, Vol. 2 - I-13ff, 1-23, IV-3, IV-4, IV-19, V-lff, V-6, V-10, V-13, VII-5, VII-11, VII-12, VII-27, X-2, XI-3, XII-8, XV-4 Critical Pressure Liquid Thermal Diffusion Project V I - 2.13 Critical Kadius Los Alamos Project VIII, Vol. 2 - 1-13, XII-8 Critical Temperature liquid Thermal Diffusion Project VI - 2.6, 2.12 Crops, Land Acquisition land Acquisition CEW - I, Vol. 10 - 2.13, 2.34, 2.46 Pile Project - IV, Vol. 4 - 2.8, 2.9, 4.13, 4.21, 7.2 Crossroads Airline Operation Crossroads VIII, Vol. 3, Ch.8 - 8.23 Crossroads Operation - See ’•Operation Crossroads” Cross Section Experiments Los Alamos Project VIII, Vol. 2 (Supp.) - IV-12 Cross Sections Los Alamos Project VIII, Vol. 2 - 1-14, 1-15, 1-23, 1-25, 1-26, IV-4, V-2, Vl-lOff, VII-5, X-9, XII-4, XII-5, XIII-11, XIII-12 Crucible Research Los Alamos Project VIII, Vol. 2 - VIII-20, VI11-21, XVI1-3, XVII-4, XVI1-8, XHI-12, X V I I - 1 8 Cryogenic Laboratory, Ohio State University - See "Ohio State Cryogenic Laboratory.B Cumberland Sound, U.S.S. Los Alamos Project - VIII, Vol, 2 (Supp.) - 1-16, 11-13 Operation Crossroads - VIII, Vol, 3, Ch.8 - 8,16, 8,24, 8,26, 8.27, 8.31, 8.32 Curran and Wade Lease F e e d lfe.t'1,, S p e o . P r o c , & G e o . Expl. VII, Vol, 2 - 2.4ff C r y o g e n y Los Alamos Project VIII, Vol. 2 - VHI-31, VI11-32 Cryogeny laboratory Ohio State University VIII, Vol. 3, Ch.3 C y c l o t r o n Pile Project - IV, Vol. 2, Pt.I - 1,13, 2,4, 3,7, 6,1 Electromagnetic Project - V, Vol, 2 - 1,5, 1.7

34 REST!, ;d data 194C Cyclotron Studies Los Alamos Project n il, Vol. 2 (Supp.) - IV-15 Cylindrical Slugs Pile Project IV, Vol. 2, Pt.I - 4.2, 4.3, 4.6ff, 5.3ff

D P S i t e Dayton Project - VIII, Vol. 3, Ch.4 - 4.5 Loa Alamoa Project VIII, Vol. 2 - IX-16, IX-17, XVII-2, XVII-20ff VIII, Vol. 2 (Supp.) - 11-11, 11-19, IV-4, IV-9, VI-2, VI-5, VI-7, VI-10, VI-11 DP Sita Transfer Pila Project IV, Vol. 6 - 4.25 iJahlgren, Va., Proving Ground Loa Alamoa Project VIII, Vol. 2 - VII-3, VI1-8, VI1-17, VII-36 Daniels Pile Research and Development of Atomic Energy for Power Preliminary Design Proposal - I, Vol. 4* Ch.4 - 4*6, 4.7 Development Factors - 1, Vol. 4, Ch.4 - 4»8ff • Dayton Project VIII, Vol. 3, Ch.4 Deaeration, Cooling Water Pile Project IV, Vol. 6 - 2.6, 2.15 Decay, Radioactivity Pile Project IV, Vol. 6 — 1.3, 2.6, 2.17, 2.18, 4.10, 4.28, 4.29, 5.14# 5.17 Declassification and Diatribution of Project Information General - I, Vol. 4, Ch.3 - Itema 88 and 89 Organization and Procedure - I, Vol. 4, Ch#5 - 5.9ff Operation Program - I, Vol. At Ch.5 - 5.l6ff Publication Program - I, Vol. 4, Ch.5 - 5.25ff Reasons for Establishing System - I, Vol. 4, Ch*5 - 5.1ff Status as of 31 December, 1946 - I , Vol. 4, Ch.5 • 5*30 Declassification Program Los Alamoa Project VIII, Vol. 2 (Supp.) - IX-5ff Deconta ruination Pile Project IV, Vol. 2 - Pt.I - 6.2, 6.4, 6.5, 6.7 IV, Vol, 3 - 6.11, 6.18 IV, Vol. 6 - 2.21, 2.22, 4.24 Decontamination Factor, Separation Process Pile Projeot IV, Vol. 2, Pt.II - 5.4 Deep River, Canada Assistance on Canadian Pile Project I, Vol. 4# Ch,9 - 9.9, 9.21 Defense Industries Ltd, Assistance on Canadian Pila Project I, Vol. At Ch.9 - 9.21, 9.22 S£6ilg? Def-Dat

Deferments, Selective Service Los Alamos Project - VIII, Vol. 2 - 111-16, 111-17 Lo3 Angeles Procurement Office - VIII, Vol. 3, Ch.l - 2.9, 2,10 Personnel - I, Vol. 8 - 6.1ff Pile Project - IV, Vol. 5 - 4.19 Deflection Test for Gan Failure Pile Project IV, Vol. 2, Pt.II- 6.2, 6.3 Delayed Neutrons Los Alamos Project VIII, Vol. 2 - 1-25, 1-26, IV-1, XV-3, X7III-18 Delayed Payments, Land Acquisition Pile Project IV, Vol. 4 — 4.3* 4.27, 4.28 Delays, Construction Pile Project IV, Vol. 5 - 5.18, 6.8, 3.2, 8.6 Delivery, Bombs Los Alamos Project viii, vol. 2 - vn-35ff» xix-i, m - 2, nx-8ff Delivery of Equipment and S&terial Los Alamos Project VIII, Vol. 2 - 111-30, I11-31 Demineralization, Cooling Water Electromagnetic Project - V, Vol* 3 - 2.25 Pile Project - IV, Vol. 6 - 2.5, 2.6, 2.15, 2.16 Demolition of Hanford Camp Pile Project IV, Vol. 6 - Sec. 15 Dental Service Central Facilities CEW - I, Vol. 12 - 4.3, 4.4, 10.5ff Los Alamos Project - VIII, Vol. 1 - 6.47, 6,48 Medical Program - I, Vol. 7 - 4.l6ff, 4.22, 4.30, 4.34, 4.37, 4.38 Pile Project - IV, Vol. 6 - 9.8 Depleted i&terial, Disposal of Liquid Thermal Diffusion Project VI - 5.13, 5.14 Deputy Task Force Commander For Technical Direction Operation Crossroads VIII, Vol. 3, Ch.8 - 8.8, 8.9 Destructive Effects of Bomb Los Alamos Project VIII, Vol, 2 - 1-20, 1-21, 1-24, V-25, V-26, XI-10, XI-ll, XIII-7ff D e t o n a t i o n Lcs Alamos Project VIII, Vol, 2 - 1-16, 1-23, IV-10, IV-11, XIII-2, XIV-9, XVI-4. XVI-5, XVI-7, XVI-8, XVI-10, XVI-11 VIII, Vol. 2 (Supp.) - Vltf-5ff Detonation Point Required, Bomb Los Alamos Project - VIII, Vol. 2 - XV-16, XVT-8, XVI-9* XVI-19, XVI-20 Project Camel - VIII, Vol, 3> Ch.2 - 2.15, 2.17, 2.31

RESTfWCTBTDATA 9 atomic gtdf&imcT ms Det-Dif

Detonator Committee Los Alamos Project VIII, Vol. 2 - IX-6 Detonator leading Los Alamos Project VIII, Vol. 2 (Supp.) - VI1-6 Detonator Studies Los Alamos Project VIII, Vol. 2 (Supp.) - VII-6 D e t o n a t o r s Los Alamos Project - VIII, Vol. 2 - XV-12, XV-l6ff, XVIH-17 Project Camel - VIII, Vol. 3, Ch.2 - 2.17ff Detroit Office Army Air Fields -VIII, Vol. 3, Ch.9 - 9.8, 9.9 Gaseous Diffusion Project n , Vol. 1 - 4.5, 3.1 II, Vol. 3 - 1.2, 16.2, 18.1, 18.4, 18.5 Los Alamos Project - VIII, Vol. 2 - VII-2, VII-4, VI1-5, VI1-21, VII-37, XEV-7 Navy: Participation - VIII, Vol. 3, Ch.5 - 5.9 Project Camel - VIII, Vol. 3, Ch.2 - 2.26 D e u t e r i u m Los Alamos Project v m , Vol. 2 - 1-19, 1-28, V-22, VIII-31, VIH-32, XIII-3 VIII, Vol. 2 (Supp.) - IH-7ff Pile Project - IV, Vol. 3 - 5.10 Deuterium Bomb, Los Alamos Project - See "Super" Deuterium Contamination Ohio State University Cryogenic Laboratory VIII, Vol. 3^Pt.II - 2.1ff, 2.5, 2.9 Deuterium Gas Produced from Heavy Water Ohio State University Cryogenic Laboratory VIII, Vol. 3, Ch.3, Pt.II - 2.9 Deuterium Oxide - See "Heavy Water* Deuterium Tritium Cross-Section Measurements, Purdue University Supplementary Activities VIII, Vol. 3, Ch.9 - 9.23, 9.25 Deuterium and Tritium Reaction Cross-Sections Los Alamos Project VIII, Vol. 2 - 2-9, XII1-11, XII1-12 D e u t e r o n s Pile Project IV, Vol. 2, Pt.I - 1.11 Development Program, Ordnance Los Alamos Project VIII, Vol. 2 (Supp.) - VIII-4, VIII-5 ( h Difficulties, Operating Electromagnetic Project V, Vol. 6 - 4.2, 4*4, 4.5, 5.2 Diffusion Barriers - See "Barrier Development"

/ DATA ACT 1346 Diffusion Problems tos Alamos Project Till, Vol. 2 - V-lff, H-2, XI-3 Diffusion Poops, Vacuum System Electromagnetic Project V, Vol. 3 - A.l6ff Diffusion Studies A m a Project (Iowa State College) I, Vol. At Ch.11 - 11.31ff Diphenyl Cooling, Pile Pila Projeat IV, Vol. 2, Pt.I - 3.16 IV, Vol. 3, - 5.21, 5.22, 5.23 Direction - Joint Task Force One Operation Crossroads VIII, Vol. 3, Ch.8 * 8.8ff Directive Operation Crossroads VIII, Vol. 3, Ch.8 - 8.7 Directive, Presidential General, I, Vol. 1 - 3.11ff Legislative Contacts - I, Vol. 4, Ch.l - 1.3 D i r ector Argonne National Laboratory ~ I, Vol. At Ch.2 - 2.14 Brookhaven National Laboratory - I , Vol. At Ch.2 - 2.35, 2.36 Clinton Laboratory - IV, Vol. 2, Pt.I - 8.2 Los Alamos Project VIII, Vol. 2 - 1-1, 1-5, XII-6, III-32, 111-38, IX-15 VIH, Vol. 2 (Supp.) - 1-5, 1-9, II-l, IX-1 Metallurgical Laboratory - IV, Vol. 2, Pt.I - 7.1 Research and Development of Atonic Energy for Power - I, Vol, At C h . A ~ 4.12 Disaster Plan - See ‘‘Catastrophe Program* Disbursing Procodures Fiscal Procedures I, Vol, 5 * Sec. 5 Discharge Pit, Clinton Pile Pile Project IV, Vol. 2, Pt.II - 4.7 Discharging, Pile Pile Project IV, Vol. 3 - 5.16, 5.25, 5.30, 5.31, 5.55ff Discussions at Metallurgical laboratory Assistance on Canadian Pile Project I, Vol. At Ch.9 - 9.6 Disposal of Buildings Liquid Thermal Diffusion Project VI - 5.28 Disposal of Construction Material Scrap Electromagnetic Project V, Vol. 5 - 4.A RESTRICTED DATA ATOMIC 1946 D i s - D r y BIOW

Disposal of Equipment Liquid Thermal Diffusion Project VI - 5.23 Disposal of Lands land Acquisition CEW - I, Vol, 10 - 2 .46 Pile Project * IV, Vol. 4 - 4.6 Disposal of Records Liquid Thermal Diffusion Project VI - 5.28 Distribution, Proposal For Program for Production and Distribution of Radioisotopes I, Vol. 4, Ch.3 - 3.10 District’s Advisory Committee on Research and Development Foundation of the National Laboratories - I, Vol. Ut Ch,2 - 2.3, 2.5, 2.11, 2.24, 2.39 Press Releases - I, Vol. 4, Ch.8 - Item 99 Research and Development of Atomic Energy for Power - I, Vol. 4, Ch.4 — 4.4 Documentary Division Los Alamos Project Declassification Program - VHI, Vol, 2 (Supp.) - IX-5ff General - VIII, Vol. 2 - 1-10, II-2, II-3, 11-19, 11-20, Ch.IX Organisation - VIII, Vol, 2 - 12-2, IX-3 Technical Series - VIII, Vol. 2 - IX-2ff Documents Los Alamos Project VIII, Vol. 2 - III-35ff Door (D) IIait3, Process Bins Electromagnetic Project V, Vol. 3 - 2.7, 2,9, 2.11, 2,12, 2,16, 3.10, 3.12, 3.13 Door Handling Equipment, Process Bins Electromagnetic Project V, Vol. 3 - 4,12ff Dormitories Central Facilities CEW - I, Vol. 12 - 1.5, 4.2, 4.4, 4.6, 5.1, 6.2, 7.5ff, 7.13, 7.17, 7,13, 7.23, 10.4, 19.13, 19.14 Los Alamos Project - VIII, Vol. 1 - 6,4, 6,8, 6,9 Pile Project IV, Vol. 3 - 8,9, 3,10 IV, Vol. 5 - 5.33ff IV, Vol. 6 - 9.6 Dragon Los Alamos Project VIII, Vol. 2 - XV-3 VIII, Vol. 2 (Supp.) - III-2, I11-12 Dry Air Plant Gaseous Diffusion Project Design - II, Vol. 3 - 10.7ff, 14.14, 14.15 Construction -II, Vol. 4 ** 3,37, 3,38 Operation - II, Vol. 5 - 5.2ff -

ilf** ■ t <-i DATA a, JJ 3 " ”------'' Y ACT 18tt Dry-Dur T* H"* I )fi iii 1.1" ~~L~ 1— .^siiin SEOUfliiW TTflTHiHWAXXOfl

Dry Nitrogen Supply System Gaseous Diffusion Project Design - II, Vol. 3 - 10.l6ff, 14.15 Construction - II, Vol. 4 ** 3.49 O peration -II, Vol. 5 * 5.5 Durango, Colorado, Plant Feed KSat’l., Spea. Proc. and Geo. 3xpl, VII, Vol. 1 - 4.2, 4.5, 4.6, 7.2, 7.9, 7.10, 7.12

REST! D DATA ATOMIC c r 1946

sssezpssbe^s!) BBms«ms$ararowmssgs^5Ba»aeBBaMHeasa

...... - ' • • ■ _ B -Ela C? if? tiT* ';p5 *"jpi

/BEL, East Gate Laboratory Los Alamos Project VIII, Vol. 2 - XI1-3 Eastman Kodak, Rochester Laboratory Electromagnetic Project V, Vol. 2 - 2.7 Eaton Canyon Pilot Plant Project Camel VIII, Vol. 3, Ch.2 - 2.11, 2.18, 2.19, 2.52 Economics in Operation Gaseous Diffusion Project II (Supp. No.l) - 2.3ff Economizers, Steam Generation Liquid Thermal Diffusion Project VI - 3.12, 3.13 Educational Facilities for Solitary Personnel Loa Alamos Project VIII, Vol. 1 - 6.56, 6.57 Effects of Test and Conibat Nuclear Explosions Los Alamos Project VIII, Vol. 2 (Supp.) - III-4* III-5 Efficiency, Nuclear Bomb Los Alamos Project VIII, Vol. 2 - I-15ff, 1-23, IV-4, IV-5, V-10, V-13ff, VII-27, XI-8ff VIII, Vol. 2 (Supp.) - III-l, HI-5* III-6, VTII-2 Eldorado Mina Feed Ifaterials, Spec. Proc. and Geo. Expl. VII, Vol. 1 - 1.3, 3.1, 3.2 Electric Power Supply C entral Facilities CEW - I- Vol. 12 - 1.4, 2.7, 3.5* 4.4* Sec. 12 Electromagnetic Project V, Vol. 3 - 2.23, 2.24 V, Vol. 5 - 3.25, 3 .26, 3.37 V, Vol. 6 - 7 . 6 Gaseous Diffusion Project II, Vol. 1 - 3.5# 3.8 II, Vol. 3 - 6.3# 7.1, 9.2, 12.1ff, I2.22ff, 14.16, 14.17 II, Vol. 4 - 3.19, 3.23, 3.25ff, 3.35, 3.43, 3.44, 3.70ff Heavy Water Project * III - 4.7, 4.13, 4.19, 4.23 Liquid Thermal Diffusion Project - VI - 4.11ff Los Alamos Project VIII, Voll- 3.3# 5.14ff> 5.25 VIII, Vol. 2 - IX-10 Pile Project IV, Vol, 1 - 1.2, 8.1ff IV, Vol. 2 - Pt.II- 2.5 IV, Vol. 3 - 2.3# 7.Iff, 8.23, 8.24 IV, Vol. 4 - 2.11, 2.12, 4.11 IV, Vol. 5 - 2.7, 2.8, 5.22, 5.32, 7.1ff, H . 3 IV, Vol. 6 - 2.17, 2.18, 5.2 J Ele-Ele asfiBMATIO H

Electrode, High Voltage Electromagnetic Project V, Vol. 3 - 2.8 Slectronagnotic Project Construction Construction Program - V, Vol. 5 - Sec, 3 Contractual Arrangements - V, Vol. 5 - Sec, 2 Coat - V, Vol. 5 - 2.5ff labor Relations f Safety and Security - V, Vol. 5 - Sec, 5 Materials of Construction - V, Vol. 5 - Sac. 4 Organization and Personnel - V* Vol. 5 " Sec. 6 Design Contractual Arrangements - V, Vol. 3 - 1.3ff Description of Plant - V# Vol. 3 • Sec. 2 Design Program - V> Vol. 3 - Sec. 3 Organization of Personnel - V* Vol. 3 - Sec. 5 Procurement of Equipment - V, Vol. 3 - Sec. 4 Purpose and Scope - V, Vol. 3 - Sec. 1 G e n e r a l Description -V, Vol. 1 - Sec. 3 Development • V, Vol* 1 - Sec. 2 Organization and Personnel - V# Vol. 1 - Sec. 4 Purpose and Scope - V, Vol. 1 - Sec. 1 Operation Auxiliary Services - V, Vol. 6 - Sec. 7 Contractual Arrangements V, Vol. 6 - See. 2 Costs «* V» Vol. 6 — 4.2# 4.10, 4*14, 4.18 Mobilization (Personnel Procurement) - V, Vol, 6 - Sec. 3 Plant Operation - V, Vol. 6 - Sec. 4 Process Improvement - V, Vol, 6 - Sec, 5 Purpose and Scope - V* Vol. 6 - Sec. 1 Security - V, Vol. 6 - Sec. 6 Silver Program Accounting for Metal - V» Vol. 4 " Sec# 6 Cost - V, Vol. 4 - 1.2 Fabrication » V, Vol. 4 ** Sec, 3 Organization and Personnel - V» Vol. 4 *• Sec. 7 Procurement - V» Vol. 4 ” Sec. 2 Purpose and Scope - V# Vol. 4 *■ Sec. 1 Eetums to Treasury - V, Vol, 4 “ Sec, 4 Security Measures - V# Vol. 4 - Sec, 5 Electromigration (Counter-Current) Method Uranium Isotope Separation General *• I, Vol, 4* Ch,14 — 14.36ff Attempted Separation - I,. Vol. 4» Ch.14 * 14.38 Electronic Fusing Los Alamos Project VIII, Vol. 2 - HI-19, VII-20, XIV-7f? Vlli, Vol, 2 (Supp.) - VIII-4, VIII-5 n o M Eie-Kxp

Hordon Laboratories and Lukas Harold Corp* » VIII, Vol. 3* Ch.9 9,4 Project Camel - VIII, Vol. 3, Ch.3 # 2.20, 2*29 Electronics Los Alamos Project VIII, Vol, 2 # HI-39, 111-41* 111-42* 7 H 3 , VT-27ff, IX-16* IV-19, XV-20 ~ VIII, Vol* 2 (Supp.) IV-0, IV-15 CJ) Ellipsoids Project Camel VIII, Vol, 3, Ch.2 - 2*28 Employees Benefit Plan Insurance Program I* Vol*, 6 - See, 6 Saergy Release, and High Temperature Collisions Los Alamos Project VIII, Vol* 2 - 1-12, XlII-2ff, XIII-7* X7III-1* X7III-17, XVTII-18 Engineering Procurement Division Los Angeles Procurement Office VIII, Vol, 3, Ch.l - 2,1, 2,6ff*. 2,12, 3,1 Enriched Uranium Pile Pila Project IV, Vol, 3 * 5,l0ff Enriching Section Process Gaseous Diffusion Project (M II, Vol* 3 - 4,6, 4*7* 7*17 Equipment (Process) Design and Procurement Gaseous Diffusion Project II* Vol* 3 * Sec, 8 , 14.9ff Establishment of ALSOS missions I* Vol, 14 (Foreign Intelligence Supp,) * Sec, 2 Establishment of Joint Task Force One VIII* Vol* 3* Ch,8 * 8,7 Estimates (Fiscal) and Budgets I* Vol* 5 ** Sec, 2 / Ether-Water Method* Uranium Isotope Separation I* Volf 4* Ch,14 * 14,4S* 14*47 European Investigation ALSOS Missions I* Vol* 14 (Foreign Intelligence Supp,) ** Sea* 4 Evergreen Area Assistance on Canadian Pile Project I, Vol* 4* Ch.9 - 9,8 Executive Committee Oak Ridge Institute of Nuclear Studies I, Vol* 4* Ch. 10 - 10.8ff* 10*13 Expansion Joints* Elimination of Liquid Thermal Diffusion Frojeot VI 5* 3,15 t -;i '.y 44

S*r# j

ST /nr* Expa-Sxpe

Expansion of Graphite Pile Project IV, Vol. 6 - A.15ft Expediting Material Electromagnetic Project V, Vol. 5 - 4.1ft Expediting Purchases Los Angeles Procurement Office VIII, Vol. 3, Ch.l - 2.8, 2.10 Expenditures by L&nhattan District Legislative Contacts I, Vol. 4, Ch.l - 2.2 Experimental (M) Division Los Alamos Project ______Critical Assembly - VIII, Vol. 2 (Supp.) - V-4ff Design and Production - VIII, Vol. 2 (Supp.) - V-3 t V-4 Electric Method - VIII, Vol. 2 (Supp.) - V-10, V-ll General Responsibilities - VIII, Vol. 2 (Supp.) - V-l, V-2 Initiator Group - VIII, Vol. 2 (Supp.) - V-7ff Organization - VIII, Vol. 2 (Supp.) - V-l Photography, Technical - VUI, Vol. 2 (Supp.) - V-13ff RaLa Group - VIII, Vol. 2 (Supp.) - V-llff Experimental (Development) Plant Electromagnetic Project V, Vol. 5 - 3.3, 3.7, 3.3 Experimental Physics Division Los Alamos Project Capture Cross Sections,the "Branching Ratio" - VIII, Vol. 2,VI-14ff Energy Spectrum of Fission Neutrons - VIII, Vol. 2 - VI-9, VI-10 Equipment - VIII, Vol. 2 - Vl-lff Fission Cross Sections - VIII, Vol. 2 - VT-lOff Instrumentation - VIII, Vol. 2 - VI-27ff Miscellaneous Experiments - VIII, Vol. 2 - VI-25ff Number - VIII, Vol. 2 - VI-5, VI-6 Organization ** VIII, Vol. 2 - VI-1 Preliminary Experiments - VIII, Vol. 2 - VI-3ff Scattering Experiments, Choice of Tamper - VIII, Vol. 2 - VI-17ff Spontaneous Fission Measurements - VIII, Vol. 2 - VI-6ff Water Boiler - VIII, Vol. 2 - VI-20ff Experimental Physics Program Loa Alamos Project VIII - Vol. 2 - I-24ff, 1-31 Experimental Units Electromagnetic Project XAX - V, Vol. 3 - 2.19, V, Vol. 6 - 3.5, 3.6, 5 .Ut 5.5 XBX - V, Vol. 3 - 2.19, 3.13 XA - V ; Vol. 6 - 3.2, V, Vol. 6 - 3.6, 3.7, 5.4 :■ Experiments, (1946), Critical 3&iss Gaseous Diffusion Project II, T.S. App. No. 1 - 2.3 II, T.S. Supp. No. 1 - 8 RESTATED DATA * ATOMIC Experiments, Preliminary, Relevant to Plant Safety Gaseous Diffusion Project T.S. App. No. 1 - If2 Exploration Research /;% Feed !Sa.t*l* Spec. Proc. fit Geo. Exp. J VII, Vol. 2 - l.Sff Explosives Cast Explosives Research Laboratory - VUI» Vol. 3, Ch.9 - Sec. 4 Los Alamos Project - VILE, Vol. 2 * VII-30, XVT-7, XVI-12ff VIII, Vol. 2 (Supp.) - VII-3 Navy Participation - VIIIj Vol. 3,Ch.5 * 5»2ff Project Camel - VIII, Vol* 3, Ch.2 - 2.13ff Sandia Base - VIII, Vol. 3, Ch.6 - 2 Explosive Components, Development of Project Camel VIII, Vol. 3, Ch.2 - 2.3ff, 2.15, Sec. 3 Explosives Components, Storage and Shipment N a v y P a r t i c i p a t i o n VIII, Vol. 3, Ch.5 - 5.9 Explosives Division Los Alamos Project - VIII, Vol. 2 •» V-12, VII-34, VII-35, IX*1» IX-2, X-3ff, XI-5 - Ch.XVI (|| P Detonating System - XVI-19, XVI-20 Engineering, Testing Assembly - XVI-21 Explosives Development and Production - XVI-12ff Lens Program * XVI-9ff Non-lens Implosion Studies - XVI-4ff Organization - XVI-Iff Recovery Program * XVI-18, XVI-19 Timing Studies <* XVI-?ff VIII, Vol. 2 (Supp.) - I-10ff, 11-10, 11-17 - Ch.VTI Detonation and Shock Phenomena - VII-5ff Explosives Production - VII-4, VII-5 Explosives Research - VII-3, VII-4 Organization - VII-1, VII-2 Radiographic Research - VII-2, VII-3 Explosives Engineering Los Alamos Project VIII, Vol. 2 - XVI-21 Explosives, Investigation of Explosives Research Laboratory VIII, Vol. 3, Ch.9 - ?'.20ff Explosives Production Los Alamos Project VIII, Vol. 2 (Supp.) - 1-12, VII-4, VII-5 Explosives Research ~ Los Alamos Project, (Ji VIII, Vol. 2 (Supp.) - VII-3, VII-4 Expl ~ Ext ... tUil

Explosives Research laboratory VIII, Vol. 3, Ch.9 - Sec* 4 Los Alamos Project VIII, Vol. 2 - VII-10, VI1-25, XVI-3, XVI-4, XVI-8, XVI-14 H av y Participation _____C h . 5 - 5 *2------Export* Control, sea addenda, pH2 Express Shipments, Construction Pile Project IV, Vol* 5 - 6.5, 6.20, 6.29, 9.4 Expulsion of Property Owners, Land Acquisition Pile Project IV, Vol. 4 - 4.2, 4.3, 4.25 Ext r a c t i o n Process Assistance on Canadian Pile Project I> Vol* 4, Ch.9 - 9.17ff Pile Project IV, Vol. 6 - 2.21, 4.24, 4.25 Extrusion Process Pile Project IV, Vol. 6 — 2.1, 4.3, 4*4, 4.6, 4.7, 5.12 *

.

-

'

rT~~lrr i r ■ ■.

. F Division Los Alamos Project VIII, Vol. 2* Ch.XIII Deuterium and Tritium Reaation Cross Sections • XI11-11, XIII-12 Neutron Physics Experiments - XIII-14, XIII-15 Super - Xlll-lff Water Boiler - XI11-13, XIII-U Fabrication of Charge Material Pile Project IV, Vol. 6 — 4.1# 4«2* 5.1 Fabrication Shops, Construction Pile Project IV, Vol. 5 - 5.25* 6.15* 6.16, 10.5 Fabrication, Silver Program Eleotromgnetia Project V* Vol. 4 * Sec. 3 Farms and Orchards, land Acquisition P i l e P r o j e c t IV, Vol. 1 - 3.1, 8.2 IV, Vol. 4 - 2.5* 3.1 Fatalities Electromagnetic Project - V, Vol. 5 - 5 . 9 V* Vol. 6 - 7.3 Los Alamos Project - VIII, Vol. 1 - 6.63» 6.64 VIII, Vol, 2 - 111-27 VIH, Vol. 2 (Supp.) * 1-9* H-19* H-22* II-33ff* V-4ff Pile Project - IV* Vol. 5* - 10.6 F a t IJkn A ssembly Los Alamos Project VIII, Vol. 2 - VII-37ff* XIV-2, XIV-3, XEV-S, XIV-9, XVII1-13* XVIII-14* XIX-1, HX-2, XIX-4, XIX-8, XIX-10, XIX-11 VIII, Vol. 2 (Supp.) - VIII-2ff , Models Army Air Fields - VIII, Vol. 3, Ch.9 - 9.3, 9.9 Detroit Office - VIII, Vol* 3* Ch.9 - 9.2 Project Camel - VIII, Vol^ 3* Ch.2 — 2.9* 2.17* 2.24* 2.28, 2.33ff* 2.37, 2.43 Sandia Base - VIII, Vol. 3, Ch.6 - 2 "Feasibility Report", Metallurgical Laboratory Pile Project IV, Vol. 3 - 5.1* 5.9* 6.5* 6.6 Federal Public Housing Authority Gaseous Diffusion - II* Vol. 4 - 3*64* 3.65 Pile Project - IV, Vol. 6 - 9.3* 9.6 I, Vol. 12 - 3.4 Federal Works Agency, Construction Pile Project IV, Vol. 5 - 4.26

* RESlKlID DATA ATATOMIC 1948 Feed and Purification System Gaseous Diffusion Project Design - II, Vol. 3 - 7,19 to 7.22 - 14,3 to 14.5 Operation * II, Vol* 5 * 4*4, 4.5 Feed and Withdrawal System Liquid Thermal Diffusion Project 71 - 2.13, 2.14, 3.3, 3.9, 4.5, 4*6, 5.9ff, 5.14, 5.15 Feed Jfeterial, Enriched Electromagnetic Project V, Vol* 2 - 4.10 F e e d !fe.terial Gaseous Diffusion Project II, Vol. 5 - 3.15 Feed 'materiala Accountability Feed I3aterial3 and Special Procurement VII, Vol, 1 - Sec. 13 re Feed Materials and Spec. Proc.,Uranium., Occurences, Uses and Properties of VII, Vol. 1 - 1.3ff Costs,General - VII, Vol, 1 - 1.15 Future Considerations -.VII* Vol. 1 - 1.14, 1*15 Organisation and Personnel - VII* Vol. 1 - 1.15ff Prices, Raw Material, General - VII, Vol. 1 - 1.9, 1.10 Program, Development of - VII, Vol. 1 — 1.7, 1.3 Procurement, General - VII, Vol* 1 - 1.3, 1*9 purpose and Scope - VII, Vol* 1 - 1*1, 1*2 Recovery Operations and By-Products, General - VII, /ol. 1 — 1.13, 1*14 Refining and Treatment, General - VII, Vol. 1 - l.lOff Research and Development, General - VII, Vol. 1 - 1.12 Results (General) of Program - VII, Vol. 1 - 1.14 Feed Materials, Spec. Proc, and Geo, Expl. VII, Vol, 2 Acquisition of land - VII, Vol* 2 - Sec, 2 Administration - VII, Vol* 2 - Sec, 3 General - VII, Vol, 2 - Sec. 1 Field Exploration Feed Mat’l Spec, Proc, & Geo. Expl. VII, Vol. 2 - l*6ff Field Test Activity Los Alamos Project VIII, Vol. 2 (Supp.) - 1-12 54 Stage Pilot Plant Gaseous Diffusion Project - See "Pilot Plant - 54 Stage" 58th W in g Array Air Fields VIII, Vol. 3, Ch.9 - 9.18, 9.19 Film Formation, Pile Tubes Pile Project IV, Vol. 2 - Pt.I - 4.4ff IV, Vol. 6 - 2.5, 2.12, 4.12ff, 5.4, 5,10 F i l - F i r

Filter Plant Pile Project IV, Vol. 3 - 5.63, 5.64, 5.66 IV, Vol. 6 - 2.14, 2.24 Final Product Building Electromagnetic Project V, Vol. 3 - 3.50 Final Product Preparation Electromagnetic Project V, Vol. 3 - 2.15 Finance Procedures I, Vol. 5 - See. 4 Financing and Contractual Arrangements Brookhaven National Laboratory I* Vol. 4 - Ch.2 - 2.29ff Findings of Italian Mission Intelligence & Security I, Vol* 1 4 (F'gn. Int. Supp.) - 3.3, 3.4 Fineness, Silver Program Electromagnetic Project V, Vol. 4 - 2.3, 4.4 Fire Prevention and Protection I, Vol. 11 — Supp. Sec. 7 I, Vol. 12 -19.9 to 19.17 IV, Vol. 5 - 5.14, 5*17, 10.2f 10.3 IV, Vol. 6 - 9 . 1 * 9.12, 9.13 V, Vol. 1 - 3.4 V, Vol. 3 - 2.22 V, Vol. 5 - 5.1Qff V, Vol. 6 - 6.3 VIII, Vol. 1 - 6.37ff VIII, Vol. 2 - HI-38, IX-20 Clinton Laboratories - Pile Project IV, Vol. 2 - Pt.II - 2.6 Gaseous Diffusion II, Vol. 4 ** 3.16, 3*17, 4*1, 4»2 II, Vol. 5 - 9.1, 9.2, 9.3 Intelligence and Security I, Vol. 14 — 1.5, 4.1, 4.4» 4*5, 4*9, 4»12, S7.3 Richland Village IV, Vol. 3 - 8.3, 8.21, 8.22 Firing Systems Los Alamos VIn, Vol. 2 - VII-l6ff, xr/-7ff, xvi-19ff VIII, Vol. 2 (Supp.) - VII1-4, VIII-5 Project Camel VIII, Vol. 3, Ch.2 - 2.29ff First Chain Reacting Pile See "West Stand, Stagg Field, Pile"

50 lat Ordnance Squadron, Special Aviation A m y Air Fields VIII, Vol. 3, Ch.9 - 9.14 First Racetrack Operation Electromagnetic Project V, Vol* 6 - 4.2ff Fiscal Procedures* General Account of Legislative Contacts I, Vol. 4# Ch.l - 2.Iff Fiscal Procedures Contract Audit - I, Vol. 5 - Sec. 3 Cost Accounting - I, Vol. 5 - Sec. 6 Disbursing - I* Vol. 5 - Sac. 5 Estimates and Budgets - I# Vol. 5 - Sec. 2 Finance - I, Vol. 5 - Sec. 4 General - I, Vol. 5 • Sec. 1 Organization and Personnel - I, Vol. 5 - Seo. 7 Fission Pile Project IV, Vol. 1 - 1.1, 2.2ff, 3.1 IV, Vol. 2 - Pt.I - l.Sff, 3.1ff» 3.6, 3.8 IV, Vol, 3 - 5.1# 5.10ff Fission Products P i l e P roject IV, ,Vol. 2 * Pt.I - 1.1, 4.6, 5.2, 6.1ff IV, Vol, 2 - Pt.II - 2.2, 4.1# 5.4# 5.5# 5.8, 5.9, 6.4* 6.5# 6.6 IV, Vol. 3 - 1.1# 4.2, 5.23, 6.1ff IV, Vol. 6 - 1.1, 2.3, 2.5, 2.19# 2.21ff, 4.2# 4.24# 4.28 F i s s i o n S p e c t r u m Los Alamos Project VIII, Vol, 2 - 1-25, VI-9, VI-10, X-9# XII-3# XII-4 Flight and Static Tests Lbs Alamos Projeot VIII, Vol, 2 - VII-19# VII-35ff» XVI-21, XlX-lff Project Camel VIn, Vol. 3 - Ch.2 - Sec. 5 Flight Test Section Sandia Base VIII, Vol. 3# Ch.6 - 3 Fluorine (C-216, OG) and Hydrofluoric Acid (HF) Feed Mat*l, Spec. Proc. & Geo. Expl. VII, Vol. 1, G-23ff Fluorine (Code C-216) Gaseous Diffusion Project II, Vol. 3 - 4.9» 10.21ff, 11,4# U.5# 16.1 II, Vol. 5 - 2.6, 2,7, 3.5# 3.6, 5.6, 5.7, 6.1ff Pile Project IV, Vol. 2 - Pt.I - 2.9, 6.3 IV, Vol. 3 - 6 . 4

51 Fluorine Disposal Plant Gaseous Diffusion Project Construction * II* Vol* 4 - 3,48, 3*49 Design - II, Vol* 3 - 11.25 to 11*30 Operation * II* Vol* 5 - 2*5, 8*1, 6*9, 3*10 Fluorine Generating Plant Gaseous Diffusion Project Construction * II* Vol* 4 •* 3*47, 3*48 Design - II. Vol* 3 - 11*18 to 11*25 Operation • II* Vol* 5 — 1*1, 2*8* 2»7j 8*8 . o,9 Fluorolube - C-2144, Ft* FLS, I4FL, idFX and C-2144s Gaseous Diffusion Project II* Vol, 5 * 5*8 Feed iJat’l. Soea, Proo* & Geo. 2xpl. VII* Vol* 1 - G.13ff Fluoroplastice Gaseous Diffusion Project Jl’F-lO * II* Vol* 3 - 8*21* 8*22 Poly TFE (Polytetrafluoroethylene) - II* Vol* 3 - 8*22* 14*11 Foils Pile Project IV* Vol* 2 - Pt, II - 4.4* 6.6 Food Supplies Los Alamos Project VIII, Vol* 1 * 6*1, 6*3, S*13ff Foothill Plant Project Camel VIII* Vol* 3* Oh*2 * 2,18* 2*22* 2*25, 2*41, 2.42 Force Account Los Alamos Project VIII, Vol* 1 - 5*4* 5.8ff, 5*13, 5*27* 6,5* 6*27, 7*14, 7*15 Foreign Intelligence I, Vol* 14* Foreign Intelligence Supp. Fort Wingate Depot Los Alamos Projeot VIII* Vol* 2 (Supp*) - 1-12 Fort Wingate* Gallup* N.M. Sandia Base VIII* Vol* 3* Ch*6 <* 2 Foundation (Building) Problems Electromagnetic Project V* Vol* 5 - 3*5ff* 3*12 Fourth Storage Area (Proposed) Storage Project I* Vol* 4* T*S* Supp. - 9, 16, 17 Fractional Sublimation Method, Uranium Isotope Separation I, Vol, 4, Ch.14 - 14*44, 14*45 Fractional Volatilization Process, Separation Pile Project IV, Vol* 2 Pt.I - 6.3, 6.4 IV, Vol. 2 Pt.II - 5.1 IV, Vol. 3 - 6.1, 6,4, 6.5, 6.7 Frankfurt Operation Intelligence and Security I, Vol. 14 (Fgn. Int. Supp.) - 4,21ff Freeze-off Technique Liquid Thorraal Diffusion Project VI, 2.12, 4.3, 4*5, 4.6, 4.11 Fresh rJetal Storage Euilding, Construction Pile Project IV, Vol. 5 - 6.6, 6.12 ____ Fuel System Liquid Thermal Diffusion Project VI - 4*3 Functions, Area Engineer's Office Los Angeles Procurement Office VIII, Vol. 3, Ch.l - l.lff Funds, Allotment Project Camel VIII, Vol. 3, Ch.2 - 2.1, 2.5, 2.6 Funds Storage Project I, Vol. 4, ’f. S . Supp. - 8, 9 Fuses, Contact (Impact) Los Alamos Project Vin, Vol. 2 - VII-20 Project Camel VIII, Vol. 3, Ch.2 - 2.22, 2.23 Fuses, Bon& Los Alamos Project VIII, Vol. 2 - VII-4, VII-l6ff, XEV-7ff VIII, Vol. 2 (Supp.) VIII-4, VIII-5 Fusing and Firing Laboratory S a ndla B a s e VIII, Vol. 3, Ch.6 - 4 Fusing, Bomb A m y Air Fields VIII, Vol. 3, Ch.9 * Sec. 2 Future Considerations Feed I&t'l. Spec. Proc. and Geo. Expl. VII, Vol. 1 - 1.14, 1.15

ED DW& f t + S S t 1 8 ** '

.

- G a d o l i n i u m Pile Project in IV, Vol. 2 - Pt.II - 6.5 Gadolium Oxide P i ^ e Pro j e c t IV, Vol. 6 - 4.28 G a l l i u m Los Alamos Project VIII, Vol. 2 - XVII-10, XVII-18, XVI1-19 VIII, Vol. 2 (Supp.) - VI-11 Gas (Natural) System Los Alamos Project VIII, Vol. 1 - 5.24» 5.25 Gaseous Diffusion (K-25 and K-27) Project Construction Contractual Arrangements - II, Vol. 4 - Sec. 2 Costs * II, Vol. 4 “ Sec. 6 Organization and Personnel - II, Vol. 4 “ Sec. 7 Personnel Procurement and Industrial Relation - II, Vol. 4 - Sec. 5 Plant Areas and Facilities - II, Vol, 4 “ Sec. 3 Purpose and Scope - 31, Vol. 4 * Sec. 1 Safety and Security - II, Vol. 4 - Sec. 4 Desi g n A dmi n i s t r a t i o n A r e a -II, Vol. 3 - Sec. 13 Assistance from British Sources - II, Vol. 3 - Sec. 15 Conditioning Area -II, Vol. 3 ** Sec. 11 Contractual Arrangements - II, Vol. 3 - Sec. 3 Costs - II, Vol. 3 - Sec. 17 Initial Work Under OSRD - II, Vol. 3 - Sec. 2 K-27 Area - II, Vol. 3 • Sec. 14 Organization and Personnel - II, Vol. 3 “ Sec. 18 Plant Site - II, Vol. 3 - Sec. 6 Power Plant - II, Vol. 3 - Sec. 12 Preliminary Planning - II, Vol. 3 - Sec. 3 Principles of Process - II, Vol. 3 * Sec. 4 Process Design - II, Vol. 3 “ Sec. 7 Process Buildings - II, Vol. 3 “ Sec. 9 Process Equipment - HI, "Vol. 3 - Sec. 8 Process Service Installations - II, Vol. 3 - Sec. 10 Purpose and Scope - II, Vol. 3 - Sec. 1 Safety and Security - II, Vol. 3 - Sec. 16 Testing (Small Scale) Plant Design - II, Vol. 3 - Sec. 5 General Basic Theory - II, Vol. 1 - Sec. 2 Costs - II, Vol. 1 - Sec. 7 Description of Project-I, Vol. 4 t Ch.8 - Item 12 - II, Vol. 1 - Sec. 4 £fe.jor Problems - II, Vol. 1 - Sec. 5 Organization and Personnel - II, Vol. 1 - Sec. 8 Planning - II, Vol. 1 - Sec. 3 Purpose and Scope - II, Vol. 1 - Sec, 1 Safety and Security - II, Vol. 1 - Sec. 6 Gas-Gen s s e m i t w c ikformatioit

Gaseous Diffusion (K-25 and K-27) Project (continued) Operation Conditioning Area - II, Vol. 5 - Sec, 6 Contractual Arrangements - II, Vol, 5 - Sec, 2 Costs - II, Vol, 5 - Sec, 11 Material Balance - II, Vol, 5 - (T.S.) Organization and Personnel - II, Vol, 5 * Sec, 12 Personnel Procurement and Industrial Relations - II, Vol, 5 - Sec, 10 Power Plant Area - II, Vol, 5 *• Sec, 7 Preliminary Cascade - II, Vol, 5 - Sec, 3 Production - II, Vol, 5 - (T.S,) Process -II, Vol. 5 - Sec. 4 Production Chronology - II, Vol. 5 - Sec. 8 Purpose and Scope - II, Vol. 5 - Sec, 1 Safety and Security - II, Vol, 5 - Sec, 9 Service Installations - II, Vol, 5 - Sec, 5 Special Hazards - II, Vol. 5 - (T.S,) Research Barrier Development - II, Vol, 2 - Sec, 4 Chemistry and Physics - II# Vol, 2 - Sec, 8 Contractual Arrangements - II, Vol, 2 - Sec, 2 Costs - II, Vol. 2 - Sec, 10 H H ? Instruments (Special) Development - II, Vol, 2 - Sec, 6 Organization and Personnel - II, Vol, 2 - Sec, 11 Pilot Plant Development - II, Vol, 2 - Sec, 7 Pumps (Special) Development - II# Vol, 2 - Sec, 5 Purpose and Scope - H , Vol, 2 - Sec, 1 Safety and Security - II# Vol. 2 - Sec, 9 Theory of Process - II, Vol. 2 Sec, 3 Gamma Radiation Pile Project IV, Vol. 1 - 2.2 IV, Vol. 2 - Pt.I - 4 . M IV# Vol. 2 - Pt.II - 4.5# 6.6, 6.7 IV, Vol. 3 - 5.45 Gaseous Wastes Pile Project IV, Vol. 2 - Pt.II - 5.3 IV, Vol, 6 - 2.23# 2.26 Gateway Alloys Property Feed Mat'l. Spec. Proc. & Geo. Expl. VII, Vol. 2 - 2.7, 2.8 Geiger-Covmters, Research Pile Project IV, Vol. 2 - Pt.II - 6.7 General Accounting Office L o 3 Angeles Procurement Office VIII, Vol.3# Ch.l - 2.13, 2.14 Gen-Gov C? O s WX\ •“ps SaSWiijjJNFORMATIOM-

General - Feed Mat‘1. Spec. Proc. & Geo. Expl. Appraisal of Results of Field Reconnaissance and Exploration - VII t Volo 2 - 1.19ff Bibliographic Search * VII, Vol. 2 - 1.4ff Description of Project * VII, Vol. 2 - 1.3# 1.4 Establishment of Murray Hill Area - VII, Vol. 2 - 1.1, 1.2 Establishment of Inion Mines Dev. Corp. - VII, Vol. 2 - 1.2# 1.3 Exploration Research * VII, Vol. 2 - l,8ff Fnnfl Itt1! . Ppinoi Prcirii F- finn, E s p l r * VIIf-Vo3 ^ £ •* Field Exploration - VII# Vol. 2 - 1.6ff Metallurgical Research - VII, Vol. 2 - 1.13ff Summary of Worldwide Uranium and Thorium Resources - VII, Vol. 2 - l.l6ff General, Manhattan Project General It Vol. 1 I, Vol. 4# Ch.8 - Item 8, Item 87 General Policy Group General I, Vol. 1 - 1.2 General Review# April 194-3 to August 1944 Los Alamos Project VIII, Vol. 2 - Ch.Ill General Review# August 1944 to August 1945 Los Alamos Project VIII# Vol. 2 - Ch.IX General and Technical Review, September 1945 to December 194© Los Alamos Project VIII, Vol. 2 (Supp.) - Ch.l Generators# Wind Driven Project Camel VIII# Vol. 3# Ch.2 - 2.31 Geographical Exploration Project# Description of Feed Mat'l. Spec. Proc. & Geo. Expl. VII, Vol. 2 - 1.3# 1.4 Geological Survey (Japan) Intelligence & Security I, Vol. 14 (Fgn. Int. Supp.) - 5.3 Geophysical Laboratory Lob Alamos Project VIII, Vol. 2 - VII-7 German and Belcher Claims Feed ISat'l, Spec, Proc. & Geo. Expl. VII, Vol. 2 - 2.2 Governing Board Los Alamos Project VIII, Vol, 2 - III-l, III-2, III-5# IV-8, IV-17# V-23# VI-4# VII-2# IX-3# IX-20 Government Interest in # Earliest General I# Vol. 1 - 3.2 Gov-ffre

Government Procurement by Transfer Los Angeles Procurement Office VIII, Vol. 3, Ch.l - 2.5, 2.6 Graduate Education Committee Oak Ridge Institute of Nuclear Studies I, Vol. 4* Ch.10 - 10.4 Grand Coulee Dam Pile Project IV, Vol. 4 - 2.12 IV, Vol. 5 - 2.1, 2.8, 7.1 Grand Junction, Colorado, Plant Feed Mat’l. and Special Procurement. VII, Vol. 1 - 4.5, 4.6, 7.2, 7.9, 7.10, 7,12 Grand Junction Sub-office F e e d ISat’l. Spec, Proc. & Geo. Expl. VII, Vol. 2 - 1.6, 3.3 Graphite Electromagnetic Project V, Vol. 3 - 4.21, 4.22 Los Alamos VIII, Vol. 2 - IH-43, VI-2, VIII-27, VIII-29, XIII-14, XVII-4 National Bureau of Standards I, Vol. 4, Ch.12 - 12.4, 12.7, 12.8, 12.9 Pile Project IV, Vol. 2 - Pt.I - 1.13, 2.9, 3.3, 3.6, 3.7, 3.8, 3.10, 3.11, 3.12, 3.13, 3.14, 4.2, 5.1, 5.2 IV, Vol. 2 - Pt.II - 4.2, 4.3, 4.7, 6.7 IV, Vol, 3 — 3.2, 3.4, 4*2, 5.1, 5.2, 5.8, 5*9, 5.10, 5.12, 5.13, 5.15, 5.16, 5.18, 5.21, 5.28, 5.38ff, 5.53 IV, Vol. 5 - 6.14ff, 6.l8ff IV, Vol. 6 - 1.2, 1,3, 2.6, 2.7, 4.Hff, 4.33 Graphite Shop, Construction Pile Project IV, Vol. 5 - 5 . 2 4 Grazing Land, land Acquisition File Project IV, Vol. 4 - 2.4, 3.1 Great Bear Lake Region Feed Kat’l. Spec, Proc, & Geo, Expl, VII, Vol. 1 - 1,3, 3,1 VII, Vol. 2 - 2.2, 2.3 Green Hornet Air Line Army Air Fields VIII, Vol. 3, Ch.9 - 9.13, 9.17 Green Salt and Hexafluoride, Production of Feed Mat’l. and Special Procurement - VII? Vol. 1 - Sec. 9 duPont Green Salt KLant - VII, Vol. 1 - 9.2"ff Harshaw Green Salt Plant - VII, Vol. 1 - 9.4, 9.5 Karshaw Hexalluoride Plant - VII, Vol. 1 - 9.6ff Linde Green Salt Plant - VII, Vol, 1 - 9.6 Lfcllinckrodt Green Salt Plant - VII, Vol. 1 - 9.1, 9.2 Operations, General - VII, Vol. 1 - 9.1 J RESTATED DATA ATOMIC ACT 194C Group Insurance 1 : Volu 6 - Sec. 7 Guaranteed Cost Insurance I, Vol. 6 - Sec. 4 Guards and Guard Facilities I, Vol. 12. - 19.Iff Electromgnetic Project V, Vol. 3 - 2.22 V, Vole 5 - 5.29, 5.9, 5.10 Y, Vol. 6 - 6.2, 6.3 Gaseous Diffusion Project II, Vol. 5 - 9.7, 9.8 Liquid Therm1 Diffusion VI, 5.26, 5.28

VIII, Vol. 1 - 6.1, 6.9, 6.13, 6.33ff, 6.50ff, 7.3ff, 7.11 Pile Project IV, Vol. 2 - Pt.II - 2.6 IV, Vol. 5 - 1.8, 5.H» 5.17, 5.18, 7.8 Gun Assembly Kethod Los Alamos Projsct v 7 VIII, Vol. 2 - 1-17, 1-18, 1-29, 1-30, IV-5, IV-6, IV-17, IV-1S, V-7, VIII, Vol. x ^ ra XIV-5ff Gun Initiator Program Dayton Project VIII, Vol. 3 - Ch.4 - 4.3, 4.5 Los Alamos VIII, Vol. 2 - VTI-15, VII-16, XVII-14 Guns and projectiles Navy Participation S e a e i W B - .

.

• .

w * * w * H -Ilea SEflWS&gy FORMATION

Haigerloch, Hechingen, Bieingen and Tailfingen Operations Intelligence & Security I, Vol. 14 (Fgn. Int. Supp.) - 4»37ff Hamburg Operation Intelligence & Security I, Vol. 14 (Fgn. Int. Supp.) - 4.44ff Handling and Storage, Active Material Hods Assistance on Canadian Pile Project I, Vol* 4 - Ch.9 - 9.16, 9.17 Handling and Storage of Deuterium Gas Ohio State Cryogenic laboratory VIII, Vol. 3, Ch.3 - Pt.II - 2.9, 2.10 Hanford Camp Pile Project IV, Vol. 5 - 5.Iff, 5.29, 5.33, 5.36, 9.4ff, 11.3, 11.4 Hanford Camp, Demolition of Pile Project IV, Vol. 6 - Sec. 15 Eanford Engineer Works I, Vol. 1 - 1.3 I, Vol. A Fiscal - I, Vol. 5 - 3.8, 3.11, 3.12, 3.13, 4.4, 4.5, 4.10, 5.3, 5.4, 5.5, 6.8, 7.1 Insurance - I, Vol. 6 - 1.8, 3.12, to 3.18, 6.2 Intelligence & Security - I, Vol. 14 “ S3.2, S4.3, S7.3, S7.4 Haydite-baryte s Concrete Pile Project IV, Vol. 2 - Pt.II - 4.3, 4.5 Hazards of Operation Dayton Project - VIII, Vol. 3 - Ch.4 - 4.4, 4.5, 4.7 Electromagnetic Project - V, Vol. 2 - 4.10, 4 . H V, Vol. 3 - 3.53 V, Vol. 6 - 7.2 Feed Mat’l. Spec. Proc. & Geo. Expl. - VII, Vol. 1 - App. K - K-34 Gaseous Diffusion Project - II, Vol. 2 - 9.1, 9.2 XI, Vol. 3 - 6.2, 8.36 II, Vol. 5 - 4.8, 9.5, 9.6, 9.10 II - T.S. App. No. 1 - 7ff Liquid Thermal Diffusion Project - VI - 2.11, 2.12, 3.9, 5*3 Los Alamos Project - VIII, Vol. 2 - III-40ff, VIII, Vol. 2 (Supp.) - II-21ff. Medical - I, Vol, 7 - Sec, 2,3 and Supplement IV- 7, VI - 5, VI-6, VI-10, VI-12 Ohio State Cryogenic Laboratory - VIII, Vol, 3 “ Ch.3 - Pt.II - 3.2, 3.3 Operation Crossroads - VIII, Vol. 3 - Ch.8 - 8,17, 8,18 Pile Project - IV, Vol. 2 Pt.I - 1.1, 3.4, 3.5, 3.15, 4.13, 4.14 IV, Vol. 2 - Pt.II - 3.4 IV, Vol, 3 - 3.4, 5.2, 5.3, 5.36, 5.37, 5.62 IV, Vol. 6 - 7.4, 7.5 Health and Welfare Feed Mat’l. Spec, Proc, & Geo, Expl, VII, Vol. 2 - 3.6 Health Division Pile Project Clinton laboratories - XV, Vol, 2 - Pt.II - 6.2 Health Program Los Alamos Project - VIII, Vol. 2 - III-38ff, IX-15ff VIII, Vol.2 (Supp.) 1-9, II-3, II-19ff, V-13, VI-2, VI-3, VI-11, VI-12 Pile Project - IV, Vol. 2 Pt.]# - 3.4 IV, Vol. 3 - 8.19 Heat Dissipation, Pile Pile Project IV, Vol. 2 - Pt.I - 1.1, 3.4> 3.15 IV, Vol. 6 - 1.4 Heavy Hydrogen, Proportion in Normal Hydrogen Ohio State Cryogenic Laboratory VIII, Vol. 3, Ch.3, Pt.I - 1.2, 5.1 Heavy Hydrogen, Proposed Method of Obtaining Ohio State Cryogenic laboratory VIII, Vol. 3, Ch.3, Pt.I, 1.1, 1.2 Heavy Water Manufacture (European) Intelligence & Security I, Vol. 14 (Fgn. Int. Supp.) - 1.1, 1.2, 4.15, 4»4& Heavy Water (P-9) Project Construction - III - Sec. 4 Description of Project - III-3.5ff, 3.l8ff Design and Engineering - III - Sec. 3 General - III - Sec. 1 Operation - III - Sec. 5 Organization and Personnel - III - Sec. 6 Research and Development - III - Sec. 2 Heavy Water German Activity I, Vol, 14 (Fgn. Int. Supp.) General * I, 1.1, 1.2, 4*15, 4*46 Heavy Water Project - III-l.l Moderator, Pile Asst. on Canadian Pile Project - I, Vol. 4» Ch.9 - 9.5, 9./ Pile Project - IV, Vol. 2 - Pt.I - 2.6, 3.4, 3.6, 3»10ff IV, Vol. 3 - 5.2, 5*9* 5.10 K@s6s

6 0 kLw D DATA P45 ATOJ.DC He1-Hoe

SEiUllIBMi. IinWWAMlON

Helium Cooling, Pile Pile Project IV, Vol. 2 - Pt.I - 3.4# 3.6, 3.10ff, 3.14ff IV, Vol. 2 - Pt.II - 4.1 Helium 3 Deuterium - Cross Section Measurements Purdue University VIII, Vol. 3, Ch.9 - 9.23, 9.25 He^rogeneous Pile Pile Project IV, Vol. 2 - Pt.I - 3.5# 3.6, 3.9, 3.11, 3.14 Power Pile Research I, Vol. 4# Ch.4 - 4.13# 4.14 High Explosive Production Technique, Development of - Salt Wells Plant Project Camel VIII, Vol. 3, Ch.2 - Sec. 7 Hiroshima Bomb Damage Investigation of the After Effects of the Bombing In Japan I, Vol. 4# Ch.6 British Mission Survey - I, Vol. 4# Ch.6 - 6.40, 6.41 General -I# Vol. 4# Ch.6 -6.1 Graphic Descriptions - I, Vol. 4# Ch.6 - 6.43ff ifeuhattan Project Surveys - I# Vol. 4# Ch.6 - 6.6ff, 6.32ff, 6.38 Medical Findings - I, Vol. 4# Ch,6 - 6.11, 6.12, 6.14ff» 6.34ff Naval Technical Mission Survey - I, Vol. 4# Ch.6 - 6.40 Physical Damage - I# Vol. 4# Ch.6 - 6.8ff Persistent Radioactivity - I# Vol. 4# Ch.6 - 6.30 Psychological Effects — I, Vol. 4# Ch.6 • 6.31 Survey by Joint Commission for Investigation of Atomic Bomb in Japan - I# Vol. 4# Ch.6 - 6.40 Survey by Major deSeversky - I, Vol. 4# Ch.6 - 6.41ff U. S. Strategic Bombing Survey - I, Vol. 4# Ch.6 - 6.39, 6.40 Hiroshima# Bomb Drop Los Alamos Project VIII# Vol. 2 - VII-15# XVII-5# Xix-11, XIX-12 Hiroshima Type Weapon Los Alamos Project VIII# Vol. 2 (Supp.) - 1-5# III-l# IH-4# HI-5# V-15 History of, Early Electromagnetic Project Vj Vol. 3 - 1.2, 1.3 Homogeneus Pile Pile Project IV, Vol. 2 - Pt.I - 3.5, 3.6, 3.9 Hospital Facilities Central Facilities I, Vol. 12 - 4.2ff, 6.5, lO.lff, 10.9, 10.10 Electromagnetic Project V, Vol. 5 - 5.8 Hospital Facilities (continued) Gaseous Diffusion IX, Vol. 2 - 6 . 2 IX, Vol. 4 - 2.4 Ios Alamos VIII, Vol* 1 * 6.Iff* 6.46, 6.47, 7.6 VIII, Vol. 2 - III-ll, 111-12 VIII, Vol* 2 (Supp.) - II-7, II-8, 11-22, 11-23, 11-31, 11-35 Medical Program X, Vol, 7 - Sec. 4 Pile Project IV, Vol* 3 - B.16 XV, Vol. 6 - 5.15, 5.16 IV, Vol, 6 - 9 . 6 Housing Central Facilities CEW X, Vol. 12 - 4.Iff, 5.5 - Sec* V * 6.8, 8.9 Electromagnetic Project V* Vol. 5 - 5.3 V, Vol. 6 - 7.4* 7.5 Gaseous Diffusion XI, Vol, 4 - 2*4, 2.5, 5,61ff II, Vol, 6 - 10.7, 10.8 Heavy Water Project III* - 3.12, 3.14, 3.16 liquid Thermal Diffusion Project VI* « 5.24, 5.25 Los Alamos Project VIII, Vol. 1 * 5.5, 5.6, 5*8, 6.2ff VIII, Vol. 2 - 1-9, X-ll, III-7, 111-12, II1-19, HI-25, IX-11, IX-22 VIII* Vol. 2 (Supp.) - 11-10 Pile Project XV, Vol. 1 - 1*2 XV* Vol. 2 * Pt. XI - 2*8, S.5 XV, Vol. 3 - 8*6ff IV, Vol* 5 — 4*2* 5.1, 5.6ff, 5.19, 5*20, 5.22, 5.23, 5*33ff* 8.Iff, 11.4 IV, Vol, 6 - 9*Iff, 9,14 Project Camel VXII, Vol. 3 - Ch,2 - 2.59 Sandia Base VIII* Vol. 3 - Ch.6 - Sff Storage Project X, Vol, 4 T.S. Supp. <-15, 16 Housing Control I, Vol. 12 - 6.9, 7.14ff IV, Vol* 6 - 9.Iff VIII, Vol. 1 - 6.2, 6.3, 6.5, 6.6 VXII, Vol. 2 - 111-12, IH-19, IX-11 VIII, Vol. 2

62 RESTRICT# DATA hii, fill '' " ' k j ' ATOMIC f j & k 194f Hyd-Hyd

*; iKWuiiii w m m m m m

Hydride Program Los Alamos Project VIII, Vol. 2 - IV-4, IV-5# IV-10, IV-12, IV-14, V-5, VI-10, VI-11, VI-13, VI-20, VII-11, VII-12, VII1-8, VIII-9, XV-2, XV-3, XVI1-2 l ) Hydrogen Isotope Separation Liquid Thermal Diffusion Project VI - 2.3 Hydrogen Liquefaction, Problems of Ohio State Cryogenic Laboratory VIII, Vol. 3» Ch.3, Pt.I - 2.1 Hydrogen Liquefying Plant, Proposed Size Ohio State Cryogenic Laboratory VIII, Vol. 3, Ch.3, Pt.I - 1.2 Hydrogen Peroxide Pile Project IV, Vol. 2 - Pt.II - 6.7 IV, Vol. 3 - 5.35 . a e s n m O f

.

.

‘ I -Ini _ ___ SEqvmwr FWnnmHWff

Ichthyologlcal Studies Pile Project IV, Vol, 3 - 3«4 IV, Vol, 6 - 5<13 Implosion Assembly Method (Bomb) Los Alamos Project VIII, Vol. 2 - 1-13, 1-29, 1-30, II-3, II-4* IV-6ff, IV-14, 17-18, V-8ff, V-19, VI1-3, VI1-16, VII-21, VII-24ff# IX-1, x-3ff> n-4ff, XIII-10, XV-2, XV-Aff, XVI-3ff> xrai-i3ff, m - i , xix- 2, m-4, zix-5, XIX-10ffj VIII, Vol. 2 (Supp.) - 1-13, III-l, III-5, III-6, Implosion Initiator Program 111-11, V-3, V-10, V-12, VTII-2f VIII, Dayton Project Vol» 3* Ch*2 " 2*13» 2 *14 VIII, Vol* 3, Ch*4 - 4-3, 4.5 Intplosion Studies and Research Los Alamos Project VIII, Vol. 2 - VEI-24ff, XV-5ff, XVI-4ff Inception of Project Assistance on the Canadian Pile Project I, Vol. At Ch.9 - 9.1, 9.2 Industrial Accident and Health Insurance I, Vol. 6 - Sec* 5 Industrial Medicine I, Vol. 7 - Sec. 3 and Supplement Initial Problems Program for Production and Distribution of Radioisotopes I, Vol. At Ch.3 - 3.11 Initial Shipment, Polonium D a y t o n P ro j e c t VIII, Vol. 3, Ch.4 - A*A Initiation a n d Purpose Storage Project I, Vol. At T.S. Supplement Initiation of Program Brookhaven National laboratory I, V o l # At Ch.2 - 2.20ff Initiation of Program Oak Ridge Institute of Nuclear Studies I, Vol. 4 - Ch.10 - 10.2ff Initiator Chemistry L03 Alamos Project Vin, Vol. 2 (Supp.) - VI-5, VI-6 Initiator Committee Los Alamos Project VIII, Vol. 2 - 12-6 Initiators D a y t o n P roject VIII, Vol. 3, Ch.4 - 4.3ff

64 RESTRICTED DATA

ATOMIC 1 3 4 1 Ini-Int

~ B8MT1 T iY-'ftTT'^l * v v

Initiators (continued) Los Alam o s VIII, Vol. 2 - 1-18, II-3, IV-6, IV-7, IV-16, IV-17, V-19, VII-11, VI1-15, VII-16, VIII-22, VIII-23, IX-6, XI-6, XI-7,, XIV-6, XV-7, XV-13ff, XVII-ll, XVII-12, XVI1-13, XVII-1A, XVII-21 VIII, Vol. 2 (Supp.) 1-12, 1-13, V-7, V-8, VI-5, VI-6 Initiatory University Group Brookhaven National Laboratory I, Vol. 4, Ch.2 - 2.25, 2.27, 2.33, 2.3-4 Inspection of GEW by Congressional Representatives Legislative Contacts I, Vol. 4» Ch.l - 2.12, 2.13 Inspections, Silver Program Electromagnetic Project V, Vol. 4-5*3 Instrument Repair Building, Construction Gaseous Diffusion Project II, Vol. / - 3.34 Insurance Program Employees Benefit Plan I, Vol. 6 - Sec. 6 General I, Volf 6 — Sec. 1 Group Insurance I, Vol. 6 - Sec. 7 Guaranteed Cost Insurance I, Vol. 6 — Sec* 4 Industrial Accident and Health Insurance I, Vol, 6 - Sec. 5 LSodified Insurance Rating Plans I, Vol. 6 - Sec. 3 War Department Insurance Rating Flan I, Vol. 6 - Sec. 2 r Insurance^,______fElactrom gnetic Project Feed IJaterials I V, Vol. 2 - 2.3 VII, Vol. 2 - 3.6 % = V61. Los Alamos VIII, Vol. 1 - 6.69 VIII, Vol* 2 - III—26, 111-27, IX-11 VIII, Vol. 2 (Supp.) - Ij>33ff_ Pile Projeot Intercolumn Mixing IV, Vol. 1 - 5.2 Liquid Thermal Diffusion Project IV, Vol. 6 - 16.1, 17.3 VI - 5.7, 5.8 Interim Advisory Committee Program for Production and Distribution of Radioisotopes I, Vol, 4» Ch.3 - 3.12, 3.13 Intermediate Scheduling Conference Los Alamos Project VIII, Vol. 2 - IX-3, IX-4

RESTRICTED data

a t o m ic I ^ O V ACT SECUR HM W W n K A T I OF

International Control of Atomic Energy, Contributions of Representatives of the Manhattan District to the Discussions and Proposals for* I, Vol, 4, Inventory, Cascade Ch,7 Gaseous Diffusion Project - See "Cascade Inventory* Inverse Urchin Los Alamos Project v ir r , vol. 2 (supp.) - v-7, v-a Investigation of Nuclear Research in Japan Intelligence & Security I, Vol. H (Fgn. Int. Supp.) 5.Iff Investigation of the After Effects of the Bombing in Japan See "Bombing in Japan, Investigation of After Effects" Investigation of Various Methods of Separating Uranium Isotope3 See rtUranium Isotopes* Separation of, Miscellaneous Methods" Investigations Applicable to Liquefaction Hydrogen Ohio State Cryogenic Laboratory VIII, Vol. 3, Ch.3# Pt.I - 4.1> 4.2 Inyokern Los Alamos Project See "NOTS Inyokern" Ionic Centrifuge Method, Uranium Isotope Separation I, Vol. 4 - Ch.U - Sec. 7 Ionization Chambers, Pile Pile Project IV, Vol, 2 * Pt.II - 4. <4* 6.6 I r r a diated B i s m u t h Pile Project IV, Vol. 6 - 5.13 Irradiated Graphite Pile Project IV, Vol. 6 — 4*14, 4*13, 4.19# 4.31» 4.33 Irradiations Pile Project IV, Vol. 6 - 4.26ff Irregularities in Engineering Procurement Division Los Angeles Procurement Office VIII, Vol. 3, Ch.l - 2.7, 2.3 Isolation Process Pile Project IV, Vol. 2 - Pt.II - 1.1, 3.4, 5.5» 5.6 IV, Vol. 3 - 3.1, 3.5, 6.10, 6.11, 6.18, 6.19 IV, Vol. 5 - 1.4 IV, Vol. 6 - 1.1, 2.22 Isotron Method, Uranium Isotope Separation I, Vol. 4,,Ch.14. - Sec. 2 Italian Investigation AISOS.Missions I, Vol. 14. (Fgn. Int. Supp.) X » Sec. 3

X j KIKV! '“ "-S'/ 7*.

Jet Foraation (Implosion) Los Alamos Project Tin, Vol. 2 - II-3, IT-10, IT-11, TII-33# VII-34, X-3ff* XT-7, XTI ~ 4 f f T in , Tol. 2 (Supp.) T-3> T-10, T - H Joaehimstahl Mines Intelligence & Seourity I, Tol. U (Fgn. Int. Supp.) 3.6, 4.22, 4.27 Joint Commission for the Investigation of the Atomic Bomb in Japan Investigation of the After Effects of the Bombing In Japan I, Tol. 4, Ch.6 - 6.40 "Junfco" Program Los Alamos Project VIII*-Tol*-2-- TII-31, VI1-32, XVI-19, XTIII-1, XVIII-6 Jurisdiction Over lands loa Alamos Project VIII, Tol. 1 - 3.4* 3.5 Justice Department, Land Acquisition Pile Project IT, Tol. 4 - 4.29, 4.30

K -Kir

K Site Los Alamo3 P roject VIII, Vol. 2 - XV-9 VIII, Vol. 2 (Supp.) V-16 K-25 Special Hazards Committee Sea "Safety Committees” Kansas City Area Office Storage Project I, Vol. 4# Supplement - 10, 11, 12 Kennewick Valley Telephone Co* Pile Project IV, Vol. h - 2.12, 4.11 Kirk, Hilda and Jeanette Claims Feed LlaUl. Spec. Proc.-and Geo. Expl. VII, Vol, 2 - 2.6, 2.7 Kirtland Field Sandia Base VIII, Vol, 3, Ch.6 - 3

L - L e m agguBWf Kiigflmfioy

Land Deals Feed liat’l. Spec. Proc. and Geo. Expl. VII, Vol. 2, 2.2ft Land Ownership# Value of Feed S&t’l* Spec. Proc. and Geo. Expl. VII, Vol. 2, 2.1, 2.2 l anthanum Loa Alamos VIII, Vol. 2 (Supp.) VI-5 Pile Project IV, Vol. 2 - Pt.II - 5.5> 5.6 Lanthanum Fluoride Pile Project IV, Vol. 2 - Pt.I - 6.6, 6.7 IV, Vol. 2 - Pt.II - 5.1 IV, Vol. 3 - 6.8, 6.9 IV, Vol. 6 - 2.21, 2.22^ 2.25 Lanthanum, Radioactive, Research Pile Project IV, Vol. 2 - Pt.II - 4-.10 Layout, General, Buildings and Utilities Assistance on Canadian Pile Project I, Vol. A, Ch.9 - 9.20, 9.21 Leak Detectors Gaaeous Diffusion Project Operation ** II, Vol. 5» 3.3, 3.A, 5.5# 6.5 Legal Aspects of Management Pile Project IV, Vol. 6 - Sec* 16 Legal Review Board Declassification and Distribution of Project Information I, Vol. At Ch.5 - 5.22 Legislative Contacts of Manhattan District Conferences With Legislative Leaders I, Vol. At Ch.l - 2.4ff Congressional Investigation of Complaints I, Vol. At Ch.l - 3.Iff General Account of Fiscal Procedures I, Vol. At Ch.l - 2.Iff Hearings for Procurement of Funds I, Vol. At Ch.l «* 2.11ff Manhattan Distiict Participation in Domestic Atomic Energy Legislation I, Vol. At Ch.l- 4«lff Purpose I, Vol. At Ch.l - l.lff Le -p5iy Subcommittee Operation Crossroads VIII, Vol,3, Ch.8 - 8.6, 8.8, 8.9

69 RESTWQTED DATA ATOMIC ACT 1946 Len-Liq SECWfin^rtNFORMAXIOIT

Lens Casting Los Alamos VIII, Vol. 2- IX-?, IX-9, XI-6, XVI-llff Project Camel VIII, Vol. 3, Ch.2 - 2.15, 2.50, 2.51, 2.56, 2.57 Lens Development Explosives Research laboratory VIII, Vol. 3, Ch.4 - 9.22 Lens J&chining Los Alamos VIII, Vol.. 2 - XVI-13, XVI-16 Project Canal VIII, Vol. 3, Ch.2 - 2.52 Lens Program . • Los Alamos Project VIII, Vol. 2 - 711-34* VI1-35, x-4ff, XI-5, XI-6, XV-10, X7I-9ff, W I - 2 1 Lens Production Los Alaasos Project VIII, Vol. 2 (Supp.) - 1-12, VTI-3ff Levitated Core Los Alamos Project VIII, Vol. 2 - XI-2, XX-1 v m , Vol* 2 (Supp.) V-3, V-7, V-10, V-12ff Liaison* Camel Project Los Angeles Procurement Office VIII, Vol* 3* Ch.l - 2.8, 2.9 Library Los Alamos Project VIII, Vol. 2 - III-35ff Library, Technical Los Alamos Project VIII, Vol* 2 (Supp*) - 11*26, II-31ff* IX-2 Liquefaction of Hydrogen, Principles Ohio State Cryogenic laboratory VIII, Vol. 3, Ch.3, Pt.II - 2.7ff Liquefier, Development of Ohio Stats Cryogenic Laboratory VIII, Vol.3, Ch.3, Pt.II - 2.Iff Liquid Deuterium, Heed for Ohio State Cryogenic laboratory Vm, Vol.3, Ch.3, Pt.II - 1.1 Liquid Deuterium Production Ohio State Cryogenic Laboratory VIII, Vol* 3, Ch.3, Pt.II - 2.Iff Liquid Deuteritaa Research Ohio State Cryogenic Laboratory VIII, Vol. 3, Ch.3, Pt.II Liquid Hydrogen, Production Ohio State Cryogenic laboratory VIII, Vol. 3, Ch.3, Pt.I - 4*1 Liq-Los

SECUiM'y iMORMII OK

Liquid Hydrogen Research Ghio State Cryogenic laboratory Till, 7ol.3, Ch,3 - rt.i Liquid Phase, Charge 'Saterial Preparation Slectroraagnetio Project 7* 7ol.3 - 3.22, 3.23, 3.33, 3.33 7* 7ol.6 - 3.3, 3.6, 4.3 Liquid Thermal Diffusion ifethod National Bureau of Standards I, 7ol. 4 - Ch.12 - 12.3 Liquid Thermal Diffusion Project Description of Plant 71 - See. 4 Design and Construction 71 * Sec. 3 Operations 71 — Sec. 5 Organization and Personnel 71 - Sec. 6 Purpose and Scope 71 - Sec. 1 Research and Development 71 - Sec. 2 Lindaw Operation Intelligence & Security I, 7ol. M (Fgn. Int. Supp.) 4.31ff Little B o y Los Alamos Project 7III, Vol. 2 - 711-33, 217-2* XI7-3, 217-9, HZ-1, XIX-4, 212-3 7III, 7ol. 2 (Supp.) - 11-19, 7III-2 "Little B o y " Models Sandia Base 7III, 761. 3, Ch.6 -2 Little Pasco Camp Pile Project 17, 7ol. 5 - 5.34* 5.37 Little Pasco Engineer Redistribution Depot Pile Project 17, 7ol. 6 - 14.2 Loading Method, Pile Pile Project 17, 7ol. 2 - Pt.II - 4.3 Los Alamos Canyon (Omega) Site Los Alamos Project VIII, 7ol, 2 - 71-22, XV-2 VIII, Vol. 2 (Supp.) - 11-23> IV-4 Los Alamos Laboratory Ames Project - I, Vol. 4* Ch.ll - 11.7 Army Air Fields - VIII, Vol.3* Ch.9 - 9.7, 9.9* 9.13* 9.16 Boron Bl® - VIII* Vol. 3* Ch.7 - 7.1* 7.2 Los-Los SECWWW* #»0RMAT ION

Loa Alamos laboratory (continued) Dayton Project - VIII* Vol, 3, Ch,4 - 4.1# 4.2* 4.5* 4*6 Detroit Off lea - VIII, Vol. 3, Ch.9 - 9.1* 9.3 National Bureau of Standards - I* Vol.4 - Ch.12 - 12.7 Navy Participation - VIII, Vol. 3, Ch.5 - 5.1, 5.2, 5.3, 5.5» 5.6 Ohio State Cryogenic Laboratory - VIII, Vol. 3, Ch.3, Pt.II - 1.1, 1.2 Operation Crossroads - VIII, Vol. 3* Ch.3 - 8.3* 8.4, 8.2.0ff Project Camel - VIII, Vol.3* Ch.2 - 2.1ff Purdue University - VIII, Vol. 3* Ch.9 - 9.23 Sandia Base - VIII, Vol. 3* Ch.6 - 3.6 Loa Alamos Project, General Description I, Vol 4, Ch.8 - Item 15 Los A l a m o a P roject General VIII, Vol. 1 Administration and Operation of Community - VIII* Vol. 1 - Sec. 6 Construction - VIII* Vol. 1 - Sec. 5 Design and Engineering - VIII* Vol, 1 - Sec. 4 General - VIII* Vol, 1 - Sec, 1 Land Acquisition - VIII, Vol, 1 - Sec, 3 Organization and Personnel - VIII, Vol, 1 - Sec. 7 Site Selection «* VIII, Vol, 1 - Sec. 2 Technical (From Inception up to August 1945) VIII, Vol, 2 - Introduction Ch, I British Mission • VIII, Vol, 2 - Ch.II Chemistry and Metallurgy * VIII* Vol, 2 - Ch.VIII* Ch.XVII Experimental Physics Division - VIII* Vol, 2 — Ch.VIy ^Conclusion — VTII, Explosives Division - VIII* Vol, 2 - Ch.XVI (. Vol. 2^-^ F Division - VIII* Vol. 2 - Ch.XIII General Review* Period April 1943 ** August 1944 “ VIII* Vol. 2 *• Ch,III General Review, Period Auguat 1944 - August 1945 - VIII* Vol. 2 - Ch.IX Ordnance Division ■* VTII, Vol, 2 - Ch,VII* Ch.XIV Project Alberta - VIII* Vol* 2 - Ch.XIX .. -trr-TT _ . , m i t t t t t o ^ ■jnft t t —|R6868irch Div • Vol» Project - VIII* Vol, 2 - Gn.AVlii— ^ ^ 2 _ Ch.XII Technical Review to August 1944 - VIII* Vol. 2 - Ch.IV *---- Technical Review, Period August 1944 - August 1945 - VIII* Vol. 2 - Ch.X Theoretical Division “ VIII* Vol, 2 - Gh.V* Ch.XI Weapons Physics Division - VIII* Vol, 2 - Ch. XV Technical (From Auguat 1945 to December 1946) VIII, Vol. 2 (Supp.) Administrative and Sendee Division - VIII, Vol, 2 (Supp.) - Ch.II ^ Chemistry and Metallurgy Research Division - VIII* Vol, 2 (Supp,) - Ch,VI Conclusion - VIII* Vol, 2 (Supp,) - Ch.X Documentary Division VIII* Vol. 2 (Supp.) Ch.IX Experimental (M) Division - VIII* Vol. 2 (Supp.) ■* Ch,V Explosives Division «• VIII* Vol, 2 (Supp.) - Ch.VII General and Technical Review - VIII* Vol. 2 (Supp.) - Ch.l Ordnance Engineering (Z) Division - VIII* Vol. 2 (Supp.) - Ch.VIII Physics Division - VIII* Vol, 2 (Supp.) - Ch.IV Theoretical Physics Division - VIII* Vol, 2 (Supp.) - Ch,III

RESTR&I® DATA •t o m ic 19« Los Alamos Ranch School Los Alamos Project VIII* Vol* 1 - 2.3, 2.4, 2.7, 3.3ff, 5.18, 5.20, 6.4, 6.65 VIII, Vol. 2 - 1-3, HI-10 Los Alamos University Loa Alamos Project VIII, Vol. 2, (Supp.) - 1-6, 1-7 Los Angeles Area Intelligence and Security I, Vol. H - S7.1, S7.4 Project Canal VIH* Vol. 3, Ch.2 - 2,3, 2.50 Los Angeles Procurement Office VIII,. Vol.. 3, Ch.l General * VIII, Vol 3, - Sec. 1 (Ch.l) Historical Account - VIII, Vol. 3, - Sec. 2 (Ch.l) Supplementary Information - VIII, Vol. 3 - Sec. 3 (Ch.l) Project Camel VIII, Tol. 3, Ch.2 - 2.2, 2.3, 2.20 Los Angeles Purchasing Office Los Alamos Project VIII, Vol. 2 - 1-6, III-22, 111-23, III-26ff, III-31ff, III-36, IX-13 VIII, Vol. 2 (Supp.) - 11-11, 11-25, 11-26 Losses of Material Liquid Thermal Diffusion Project VI - 5.13 Losses of Material, Silver Program Elactroraagnetio Project V, Vol. 4 - 3.3, 6.4 Low Temperature Laboratory Facilitie8 Ohio State Cryogenic laboratory VIH, Vol; 3, Ch.3, Pt.I - 3.1, 4.1 Lubricating Oil System, Process Gaseous Diffusion Project Design — II, Vol. 3 - 10.13 to 10.15 - 14.15 Operation - II, Vol. 5 “ 5.4, 5.5

REST D DATA

a t o m ic US? ACT IM S

.s&diaon Square Area Ames Project I, Vol. 4 - Ch.11 - 1 1 . 7 B o r o n (Bl° ) VIII, Vol. 3 - Ch.7 - 7.2, 7.3 Declassification I, Vol. 4, Ch.5 - 5.21 Electromagnetic Project V, Vol. 1 - 4.1 V, Vol. 2 - 2.5# 2.6 V, Vol. 6-3.3 VII, Vol. 1 - 1.9, l.l6ff VII, Vol. 2 - 3.2 Fiscal - Cost Account I, Vol. 5 - 6.3 Gaseous Diffusion ii, vol. i - a.i II, Vol. 3 - 16.1, 13.1 II, Vol. 5 - 2.7, 3.15 II, T.S. App, No. 2 - 1 Intelligence & Security I, Vol. 14 - S3.2, S3.3, S7.1, S7.2, S7.4 Pile Project IV, Vol. 6 - 2.1, 4.2, 6.1 I&gazine Storage Building Pile Project IV, Vol. 5 1.4 IV, Vol. 6 - 2.25 Magnet Coils Electromagnetic Project V, Vol, 3 - 3 . 7 , 4.4TC V, Vol. 5 - 3.10, 3.U, 3.18, 6.5 Signet Coils, Fabrication of, Silver Program Electromagnetic Project V, Vol. 4 - 3.l0ff V, Vol. 6 - 4.2 Uagnat Development Electromagnetic Project V, Vol. 2 - 3.4 Magnets, Experimental Plant Eleotroraagnetio Project V, Vol. 5 - 3.7, 3.8 Manhattan District Aotivation I, Vol, 1 - 3.6ff History, Arrangement I, Vol. 1 - 1.12ff History, Purpose and Scope I, Vol, 1 - 1.6ff Mission of - I, Vol. 1 - 2.Iff DATA. ATOMIC ,c r 1346 Man-Mat

/RQ»

Manhattan District Participation Operation Crossroads VIII, Vol. 3, Ch.3 - 3.12ff Activities After Creation of JTF-1 - 8.14ff B Division - Los Alamos. - 8,20ff Fra - JTF-1 Activities - 9.12ff Manhattan Project, Authorizations and Lines of Authority I, Vol. 1 - 3.Iff, 3.18ff Manhattan Projeat Editorial Advisory Board Declassification s* I, Vol. Ut Ch.5 - 5.27 Los Alamos Project - VIII, Vol. 2 (Supp.) - IX-6, I3&-7 i&nhattan Project Technical Series Declassification and Distribution of Project Information I, Vol. 4, Ch.5 - 5.26ff Manual for Declassification of Scientific and Technical ’Ma t t e r s Declassification and Distribution of Project Information I, Vol. 4* Ch.5 - 5 .Ut 5.5 Market and Miscellaneous Uranium Stock, Procurement of Feed Mat'l. and Spec. Proc. VII, Vol. 1 - Sec. 5 Contract Negotiations - VII, Vol. 1 - 5.1, 5.2 Miscellaneous - VII, Vol. 1 - 5.2 Operations - VII, Vol. 1 - 5.1 Masonite Pile Project IV, Vol. 2 - Pt.II - 6.6, 6.7 IV, Vol. 3 - 3.4* 5.38, 5.45 IV, Vol. 5 - 2.8, 5.25, 6.13, 6.14 IV, Vol. 6 - 1.5* 2.7 Massachusetts General Hospital Feed Mat1!. Spec. Proc. & Geo. Expl. VII, Vol. 1 - S.35 Mass Spectrograph Electromagnetic Project V, Vol. 2 - 1.1, 1.3* 1.6, 1.7, 2.2, 2.7, 3.1* 4.4, 4.5 Mass Spectrometer Analyses National Bureau of Standards I, Vol. Ut Ch.12 - 12.22, 12.23 jlfeterial Circuit Liquid Thermal Diffusion Project VI, - 2.13, 3.3, 3.9, 4.2ff Material (Product) Enriched, Removal of Liquid Thermal Diffusion Project VI, - 2.11, 2.13, 2 . 1 4 Material Feed to Plant Gaseous Diffusion Project From K-25 Waste - II, T.S. App. No, 2 - 2, 3 From S-50 - II, T.S. App. No. 2 - 1, 2 From 1-12 - II, T.S. App. No. 2 - 2 Normal - II, T.S. App. No. 2 - 1

RESWjgTED DATA ATowcfkmqri a c t 1946 Ivsaterials a n d Services Made Avai l a b l e b y United States Assistance on Canadian Pile Project I, Vol. 4# Ch.9 - 9.5, 9.7, 9.10 iktarials, riiscellaneous, For P-9 Feed Mat*l. Spec. Proc* & Geo. Expl, VII, Vol. 1, App. H Materials, Miscellaneous, For X-10 Feed f&t'l. and Spec. Proc. VII, Vol. 1, App. I Mayo Foundation I, Vol. 4> Ch.2 - 2 . 1 2 Measurement Section* B Division - Overseas Activities Operation Crossroads VIII, Vol. 3, Ch.8 * 3.30ff Able Day - 3 .3Aft 3aker Day - 8.37 Queen Day - 8.33» 3.34 William Day - 3.36, 3.37 Measurement Section B Division - Technical Responsibilities Operation Crossroads V I H , Vol. 3» Ch.8 - 8,27ff Airborne Blast Gauge Group - 3.29 Electronics Group - 3.28, 3.29 Fast Neutron Group - 8.27 Gamma Timing Group - 8.27, 8.28 Phenomenological Group - 8.29 Photographic Group - 8.27 Radiochemical Group - 3.29 Total Radiation Group - 8.29, 8.30 Medical Findings Investigation of the After Effects of the Bombing in Japan I, Vol. 4» Ch.6 - 6 . 1 1 f f Medical Program Clinical Medicine and DenlLstry - I, Vol. 12 - Sea. 10 - Sec. 4 and Supp. Costs - I, Vol. 12 - see respective sections & Supp. General -I# Vol* 7 - Seo. 1 Hazards of Operation - I, Vol* 7 — Sec. 2, 3 and Supp. Industrial Medicine - I, Vol. 7 - Sec. 3 and Supp, Investigation of Bombing in Japan •» I, Vol. 7 (Supp.) see also ------v- f Organization and Personnel - I, Electromagnetic Projeci^ Vol. 7 - Sec. 6 Research - V, Vol. 1 -4,10, 4 . 1 1 /Research - I, Vol, 7 - Sec, 5 and Gaseous Diffusion (K-25 and K-27) Project I g Construction * II, Vol, 4 “ 2,4 General - II, Vol, 1 - 6,2 Operation - II, Vol, 5 - 9,2 Research - II, Vol, 2 - 9.2 Pile Project Design (Richland Village) - IV, Vol, 3 - 8.16 to 8.20 Research (Clinton Laboratories) - IV, Vol. 2 - Pt.II - 2,6

76 RESTRICTED DATA O |2 j f T T * ! ’ ATOMIC ACT IBM Med-Met SECilMIWWMrORMAIION

Medicine, Industrial Medical Program I, Vol. 7 - Sec. 3 Memorial Hospital I, Vol. 4, Ch.2 - 2.22 Los Alamoa - VIII, Vol. 2 - 1-3 Mess Facilities Sea "Cafeterias (Mess Halls), Facilities” Metal Components, Development of Project Camel VIII, Vol.3, Ch.2 - 2.8ff, 2.15, Sec. 4 Metal Fabrication and Tasting Area Pile Project IV, Vol. 3 - 3 .1 , 3 .2, Sac. 4, 7.3, 7.6 IV, Vol. 5 - 1.3, 5.27, 6.Iff, 6.11, 6.15, 6.17, 6.18, 7.1ff, 7.7, 7.9, 7 . 1 1 IV, Vol. 6 — 2.1, 2.4, 2.5,i 4.3# 4.4, 4*23, 5.1, 5.3, 5.12, 7.3 Metal (Uranium), Production of F eed M a t ’l* and Spec. Proc* Brush laboratories Metal Plant - 10.9, 1 0 . 1 0 Slectro Motallurgical Company Metal Plant - 10.3 Mallinpkrodt Metal Plant - 10.2, 10.3 Operations, General <• 10.1, 10.2 jlestinghouse Metal Plant - 10.9 Metallurgical laboratory I, Vol. 4# Ch.4 - 4 .2f f , 4 . 1 2 I, Vol. 4, Gh.9 - 9.4, 9.6 I, Vol. 4, Ch.12 - 1 2 . 1 3 I, Vol. 7 - 3.2, 3.53, 3.59i 5.4 I, Vol. 14 - S7.3 III, - 2.13 IV, Vol. 1 — 4.1, 4.2, 4*4 t 4*6, 5.1 IV, Vol. 2 - Pt.I IV, Vol. 2 - Pt.II - 1.1, 2.1ff, 3.1, 5.1ff, 5.9, 6.2, 6.5, 8 . 1 f f IV, Vol. 3 — 1.2, 1.3, 2.1, 4*1, 5.1, 5.2, 5.4, 5.14, 5.17, 5.21, 5.47, 5.53, 5.58, 6.1, 6.5 IV, Vol. 6 — 2 .20, 3.1, 4*12, 4 . 1 4 t 4.24* 4.26ff, 5.2, 5.12, 5.13, 1 8 . 1 VII, Vol. 1 - 12.2 VII, Vol. 2 - 1 . 1 1 V I H , Vol. 2 - 1-1, 1-7, 1-11, III-4, III-5, VIII- 2ff, VIII-6, VI11-26, 12-11, IX-16, IX-23 I, Vol. 4, Ch.2 - 2.6ff, 2 . 1 0 I, Vol. 4> Ch.ll - 1 1 . 4 Metallurgical Project - I, Vol. 4, Ch .2 - 2.1 , 2.4ff Argonna Laboratory I, Vol. 4* Ch.2 - 2.6ff Metallurgical laboratory I, Vol. U* Ch.2 - 2.6ff, 2.14ff Pile Project - IV, Vol, 2 - Pt.I - 2.9, 7.1 IV, Vol. 1 - 4.1, 4.3, 4.5, 9.2 Metallurgical Research Feed Mat’l. Spec. Proc. & Geo. Expl. VII, Vol. 2 - 1.13ff Met-Min SECURI T£ INFORMATION

Metallurgy I, Vol. At Ch.11 - 1 1 ,5 f f V III, V ol. 2 - 1-28, IV-12ff, VIII-2, VIII-3ff, VIII-l6ff, XVII-3ff, XVII-8ff VIII, Vol. 2 (Supp.) - VI-7ff

Feed Mat'l. Spao. Proc. & Geo. Expl, VII, Vol. 1 - A.lft» A.5fft K.7, K.8 Meteorological Station Pile Project IV, Vol. 3 - 6.22 IV, Vol. 5 - 7.5 IV, Vol. 6 * 2.26, 2.27 MFl S e e "FluorolubesM MFL See ”Fluorolubasw mfp- io ... S e e ’’Fl't^'oplasties" Middlesex Warehouse Feed Mat'l, Spec, Proc. & Geo, Expl, v n , Vol. 1, 2.6ff, K,ll, K.12 Midway Sub-station Pile Project IV, Vol. 3 - 2.7, 7.1, 7.2 IV, Vol . A - 2.12 IV, Vol. 5-7.1, 7.3 IV, Vol. 6-9.3 Military Advisory Board to Officer-in-Charge Atomic Bomb Proje ct Operation Crossroads VIII, Vol, 3, Ch.8 - 8.9 Military Policy Committee I, Vol. 1 - 1.2, 3.15ff

III, - 1.3, 6.1 II, Vol. 1 - 1.2, 3.1, 3.2 II, Vol. 3 - 3.1, 3.3, 3.4 IV, Vol. 2 - Pt.II - 1.2, 2.1 IV, Vol. 6 - 1.2 V, Vol. 1 - 1.2 V, Vol. 3 - 1.2, 3.3, 3.4 I, Vol. 12 - 3.2 M ilking Liquid Thermal Diffusion Project VI - 2.13, 2.14, 4.5, 4.6, 5.6, 5.8ff Milwaukee Sub Area n Vol. 6 - 2.7 II, Vol. 1 - 4.5 II, Vol. 3 - 1.2, 16.2, 13.Iff Minerslogioal Research laboratory Feed Mat’l, Spec. Proc, & Geo, Expl, VII, Vol. 2 - 1.12 Mobile Service Units Gaseous Diffusion Project • Dosign - II, Vol. 3 - 10.19 to 10*23 R e s earch -II, Vol. 2 - Bee. 6 Models, B o m b VIII, Vol, 2 - VII-36ff, XI1-8, XIII-6, XIII-7, XIX-1, XIX-2 VIII, Vol. 3s Ch.9 - 9.2 Moderator, Considerations For Pila Pile Project General - IV, Vol. 3 - 1.1, 1.2, 5.2, 5.9, 5*13, 5*13 IV, Vol. 2 - Pt.I - 1.1, 3.2ff, 3.5ff Graphite - IV, Vol, 3 - 1.1, 1.2, 5.2, 5.9, 5.13, 5.13 IV, Vol. 2 - Pt.I - 3.3, 3.6, 3.3, 3.10ff Heavy Water -IV - Vol. 2 - Pt.I - 3.6, 3.10ff IV, Vol. 3 - 1.2, 5.2, 5.9 Helium - IV, Vol. 2 Pt.I - 3.9ff Ordinary vVater - IV, Vol. 3-5.9 IV, Vol. 2 - Pt.I - 3.10 Modified Insurance Rating Plans I, Vol. 6 - Sec. 3 fields Conndttee Los Alamos Project VIII, Vol. 2 - VII-23 Molds, Lens VIII, Vol. 2 - VTI-22, VII-23, X-6ff, XVI-11, XVI-21 VIII, Vol. 3 - Ch.2 - 2.20ff, 2.a Molecular Effusion II, Vol, 3 - 4,lff Molecular Stills (Counter-Current Reflux) Method, Uranium Isotope Separation General I, Vol. 4> Ch.14 - 14.39ff Performance I, Vol. 4, Ch,14 — 14.4lff Monticello, Utah, Plant Feed ’Ja t ’l. Spec, Proc, and Geo. Expl. VII, Vol. 1, 4.2, 4.7, 7,13 Morgantown Ordnance tforks, Heavy Water Plant Sea RHeavy Water (P-9) Project” Moscow Meeting of Foreign Ministers (December 1945) Contributions of Manhattan District Representatives to Discussions a n d Proposals for International Control of Atomic Energy I, Vol. 4> Ch.7 - 7.2, 7.3 Multiplication Experiments Los Alamos Project r tiplication Factor ("K") VILE, Vol. 2 - XII-6ff______J Pile Project Munich and Urfeld Operation ^ IV, Vol. 2 - Pt. I - 3.2, Intelligence & Security I, Vol. 14 (Fgn. Int, Supp.) - 4.42ff 3.3, 3.7, 3.9, 4,2ff, 5,3 IV, Vol. 3 - 3.10, 3.11, Muroc, Army Air Ease 5.11, 5.23, 5.27, 5.50 Vol. - VII-17, VII-37, VII-3S vm , 2 IV, Vol. 6 - 1.3,1.4 -•'i■ ft'XV V‘-.'::*, ■■•• y‘^ ; —' i

Muro-Murr 'w -!£m* of?n

;.iuroc, Army Air Baao (continued) '/III, Vol. 3, C h . 5 * 5.7, 5.10 VIII, Vol. 3, Ch.9 - 9.9, 9.10 Ivfurray Hill Are a I, Vol. 14. - $7.4 VII, Vol. 2

P. DATA ATOMXC 1946

— a>n«j£, j-l*. .. — —-

N -Nat

a .SCUMBti-XH?pBMA^ ION

NagaJ^ci Bomb Los Alamos Project viii, Vol. 2 - rv-7, xix-n, xi-^12 Nagasaki Bomb Damage ("| Investigation of the After Effects of the Bombing in Japan y- J I,. Vol. 4» Ch.6 British Mission Survey - In Vol, 4* Ch.6 - 6.AO, 6.41 General * I, Vol. A, Ch.6 - 6.1 Graphic Descriptions - I, Vol. A, Ch.6 - 6.43ff Manhattan Project Surveys - I, Vol.4, Ch.6 - 6.7, 6.32ff, 6.33 Medical Findings - I, Vol. A * Ch.6 * 6,llff, 6.34ff Naval Technical Migsion Survey - I , Vol* A# Ch.6 «* 6.AO Physical Damage - I* Vol. A, Ch.6 - 6.3ff Persistent Radioaotivity - I, Vol. 4r Ch*6 - 6.30 Psychological Effects - I, Vol* 4» Ch.6 - 6.31 Survey by Joint Commission for the Investigation of the Atomic Bomb in Japan «* I, Vol* A, Ch.6 ** 6.A0 Survey by Major de Seversky * I* Vol. 4» Ch.6 - 6.41ff U.S. Strategic Bombing Survey - I, Vol* A» Ch*6 ** 6*39, 6.AO Nagasaki Tjpe Weapon Los Alamos Project VIII, Vol. 2 (Supp.) 1-5, 1-13, I-1A, HI-1, IH-A, HI-5,. VIII-3, ( J V I I I - A National Academy of Sciences Electromagnetic Project V , Vol*, 2 - 1*6 National Academy Reviewing Committee I, Vol. 1 - 3.A, 3.5 I, Vol. A - Ch. 12 •« 12,4* 12*5 I, Vol*' A - C h . l A - 14.1 National Advisory Committee on Aeronautics I, Vol*, 4> Ch.4 — 4»14# 4*15 National Bureau of Standards, Central Control Laboratory I, Vol., 4, Ch. 12 - 12.12, 12.13 Concentration of Isotopes I, Vol., 4, Ch. 12 - 12.21, 12.22 General Participation I, Vol., 4, Ch. 12 - 12.1 to 12.,7 Graphite Problem I,, Vol. 4, Ch. 12 - 12.7 to 12*9 Mass Spectrometer Analyses I, Vol, 4, Ch.12 - 12.22, 12.23 Power Project I, Vol. 4, Ch.4 - 4.3 Radioactivity Measurements I, Vol. 4» Ch.4 - 12.23 to 12.27 ( Spectrographic Analyses, Ui’anium I, Vol. 4, Ch«12 - 12.13 to 12.17 Uranium First Spectrum of - I, Vol. 4, Ch.12 - 12.20, 12.21 Metallurgical Investigation of - I, Vol. 4, C h . 12 - 12.17 t o ^2.19 a , RESTRICTED DATA Nat-Nat SE(?WKM!¥. -*fff?5RMAT ION

National Bureau of Standards (continued) uranium Physical and Mechanical Propertiea of - I, Vol. At Oh.12 - 12.19# 12.20 Uranium Problem I, Vol. At Ch.12 - 12.9 to 12.11 Uranium* Separation of Isotopes I, Vol. At ChJ4 - U.36ff, 14.39ff National Bureau of Standards I, Vol* At Ch.4 — 4»8 I, Vol* 7 - 2.10 I# Vol. 13 - 2.1, 7.1 IV, Vol. 2 - Pt.I * 2.1, 2.9# 4.10, 5.2, 7.3 V, Vol. 2 - 5.4» 5.5 V, Vol. 6 - 3.5 VI - 2.4# 3.3 VII, Vol. 1 - 1.22, 2.9, 12»2ff I, Vol. At Ch.11 - 11.7 VIII, Vol. 2 - 1-7# VII-36 National Cancer Institute I, Vol. 7 - 5.4# 5.22 National Defense Research Committee - I# Vol. 1 - 3.3# 3.4 I, Vol. At Ch.12 - 12.3# 12.4 I, Vol. 4# Ch.14 - 14.1 I, Vol. 13 - 2.1, 2.3# 2.4 IV, Vol. 1 - 3.1# 3.2, 4.2# 9.1 IV, Vol. 2 - Pt.I - 1.2 V# Vol. 2 - 1.6 VI - 1.2 I, Vol. 4# Ch.11 - 11.1 VIII, Vol. 2 - 1-3, III-5 VIII, Vol. 3# Ch.2 - 2.5# 2.7 VIII# Vol. 3# Ch.9 * 9.20 NDRC, Uranium Section Pile Project IV, Vol, 1-3.2 National Laboratories, Foundation of I, Vol. 4# Ch.2 Argonne National Laboratory I, Vol. At Ch.2 - 2.5ff Brookhaven National laboratory I, Vol. At Ch.2 - 2.20ff Proposed West Coast laboratory I, Vol, At Ch.2 - 2.38, 2.39 Purpose I, Vol. At Ch.2 - 2.Iff National Research Council (German) Intelligence and Security I, Vol. 14 (Fgn. Int. Supp.) - 4.32 National Research Council Laboratories Assistance on Canadian Pile Project I, Vol. At Ch.9 - 9.8 SECUR W rTn‘Tr,M*T ION

Naturita, Colorado* Plant Feed Ifet'l. Spec* Proc. & Geo. Expl. VII, Vol. 1, 4.2, 4.5# 4.6, 7.13 Naval Ammunition Depot, Hawthorne, Nevada VIH, Vol. 3, Ch.2 - 2.44* 2.45 Naval Ammunition Depot, McAlester, Oklahoma VIII, Vol. 2 - XIX-5 VIH, Vol. 3# Ch.2 - 2.22, 2.24, 2.37, 2.63 VIII, Vol. 3, Ch.5 - 5.2, Sec. 2 Naval Ammunition Depot, Port Chicago, California VIII, Vol. 3, Ch.l - 2.10 VIII, Vol, 3, Ch.5 - 5,9 Naval Auxiliary Air Station, Salton Sea (Sandy Beach) , California VIII, Vol, 2, XIV-9 VIII, Vol. 2 (Supp.) - 1-12 VIII, Vol, 3, Ch.2 - 2.35# 2.63 VIII, Vol. 3# Ch.5 - See. 3 VIH, Vol. 3, Ch.6 - 5 Naval Gun Factory, Washington, D. G. VIII, Vol. 2 - IV-6, VII-2, VII-3, VII-7, VII-lO, XIV-7 VIII, Vol. 3, Ch.5 - 5.9 Naval Office, University of New Mexico VIII, Vol. 3, Ch.5 r 5,10 Naval Mine Depot, lorktown, Va, VIII, Vol. 2 - XVI-4, XIX-5 VIII, Vol. 3, Ch.2 - 2.22, 2.37, 2,63 VIII, Vol. 3, Ch.5 .* Sec. 1 Naval Ordnance Plant-* Center Line Mich. VIII, Vol. 2 - HV-7 VIII, Vol. 2(Supp.) - VII-6 VIII, Vol. 3, Ch.5 - 5.9 Naval Ordnance Test Station, Inyokern, California VIII, Vol. 2 * XIX-5 VIH, Vol. 3, Ch.2 VIII, Vol. 3, Ch.5 - 5.3, 5.9 VIII, Vol, 2 (Supp.) - 1-12, VII-3, VII-5 Naval Research laboratory I, Vol, 4, Ch.12 - 12.3, 12,24 I, Vol, 4, Ch.14 - 14.1# 14.3# 14.9 I, Vol. 13 - 2.1 IV, Vol. 2, Pt,I - 2.1 VI - V-f* 2.4, 2.11, 3,4# 3,6ff, 3,12, 6,1 Naval Station, Anacostia, I&ryland VI - 2.4, 2.6, 2.7, 2,9 Naval Technical Mission Investigation of the After Effects of the Bombing in Japan I, Vol. 4, Ch.6 - 6 .40 Navy Participation Intelligence & Security I, Vol. 14 (Fgn. Int. Supp.) - 2,1, 2.3 0 ^ r ^ t Nav-New

Navy Proving Ground# Dahlgren, Virginia m i , Vol. 2, - VII-3, VII-8, VII-17, VII-18, VII-36 VIII, Vol. 3, Ch.5 - 5.9, 5.10 N a v y Yard, liaro Island, California vm , Vol. 2 - nx-4 VIII, Vol. 3, Ch.2 - 2.43 VIII, Vol. 3, Ch.5 - 5.9 Navy lard, Philadelphia, Pennsylvania VI - 2.4, 2.9» 2.11» 3.2, 3.4» 5.3 I, Vol. 6 * 3.19 N e p t u n i u m Pila Project IV, Vol. 1 - 2.3 F/, Vol.- 2 - Pt.I - 1.6, 1.11 IV, Vol. 6 - 4.26, 4.27, 5.13 Neutron Flux IV, Vol. 2 - Pt.II - 4.8 IV, Vol. 6 - 4.16, 4.26 Neutron Number Measurements Los Alarms Project VIII, Vol. 2 - 1-24, 1-25, 17-1, VI-5, VI-6, X-9, XII-2, XI1-3 Neutron Physics Experiments Los Alamos Project VIII, Vol. 2 - mi-14* XIII-15 Neutrons IV, Vol. 1 - 2.2, 2.3 IV, Vol. 2 - Pt.I - 1.3ff» 1.7ff» 3.1ff> 3.6ff, 4.3, 4.4, 4.6, 4.U, 5.1, 5.5 IV, Vol. 3 - 5.1, 5.11, 5.43, 5.45, 5.46, 5.50 IV, Vol. 6 - 1.2, 1.3, 2.U, 4*2, 4.9, 4*10, 4.H, 4.16, 4.26ff, 7.4f 7.5 Neutrons Absorption of Pile Project IV, Vol. 6 - 4.9 Neutrons, Caoture Cross Section IV, Vol. 2 - Pt.I - 3.13 IV, Vol. 6 - 4.27 Neutrons, Delayed IV, Vol. 2 - Pt.I - 3.8 Neutrons, Fast IV, Vol. 1 - 2.3 IV, Vol. 2 - Pt.I - l.llff, 3.2, 3.3 Neutrons, Slow (Thermal) IV, Vol. 1 - 2.3 IV, Vol. 2 - Pt.I - l.llff, 3.3, 4.14, 5.2 IV, Vol. 3, - 5.43, 5.45 New Boiler Plant, Description of Liquid Thermal Diffusion Project VI - 4.7ff N e v r - N r x juNirdRHATSOH

New Mexico St a t e Highway Department Loa Alamos Project . VIII, Vol. 1-jrf 2.6 New York Area I, Vol. 5 - 6.8 I, Vol. 14 - S7.1, S7.4 II, Vol. 1 - 8.1 II, Vol. 3 - 1.2, 16.Iff, 13.Iff New York Purchasing Office Los Alamos Project VIII, Vol. 2 - 111-28, 111-31, IH-33, 12-14, VIII, Vol. 3, Ch.l - 1.3, 2.1ff, 3.2 New York Safety Committee Saa "Safety Committees" N i t rogen Gaseons Diffusion Project II, Vol* 5 — 3*1, 3.4? 3.6, 4.3, 4*5, 4*9ff» 5.5, 6.1ff, 6.10 Nitrogen Liquid Electromagnetic Project V, Vol. 3 - 4.23 V, Vol. 6 - 3.8, 7.2, 7.8 Ni t rogen Plant Gasaous Diffusion Project Design - II, Vol. 3 - 11.31, 11.32, 11.33 Operation - II, Vol. 5 - 6.10 Nitrogen Supply System Gaseous Diffusion Project See "Dry Nitrogen Supply System" Non Lens Casting Los Alamos Project VIII, Vol. 2 - 12-8, 12-9, XVI-12ff VIII, Vol. 3, Ch.2 - 2.15, 2.44ff» 2.56, 2.57 Nonr&l Feed to Plant Gaseous Diffusion Project See "Material Feed to Plant" North Continent Mines, Inc., Property, Feed iSat’l, Spec. Proc. and Geo. Expl. VII, Vol. 2 - 2.7 Northeastern (lator Brookhaven) National Laboratory See "Brookhaven National Laboratory" Nozzle3, Deauperheating Liquid Thermal Diffusion Project VI - 3.10, 3.11 n- Derfluoroheptana (C-716) Feed Jfet'l, Spec. Proc, & Geo. Expl, VII, Vol. 1 - G,2ff n- Perfluoroheptana (Coda Name C-716) II, Vol. 5 - 3.1, 3*4, 5.7, 5.8 N R X Pile Assistance on Canadian Pile Project I, Vol. 4, Ch,9 - 9,3

GY ACT 194S Nuc-Nuo

Suclear Disintegration rile Project Artificial - 17, Vol. 1 - 2.1, 2.2 Natural - IV, Vol. 1-2.1 Nuclear Ertargy for Propulsion of Aircraft (NEPA) I, Vol. 4, Ch.4 - 4.14, 4.15 I, Vol. 4, Ch.3 ~ Item 68 IV, Vol, 2 ~ Pt.II - 7.3 Nuclear Energy for Ship Propulsion Research and Development of Atomic Energy for Power I, Vol. At Ch.4 - 4,15, 4.16 Nuclear Forces IV, Vol. 2 - Pt.I - 1.5, 1.7 Nuclear Phenomena Electromagnetic Project V, Vol. 2 - 1.5ff Nuclear Research in Japan, Investigation of I, Vol, 14 (Fgn, Int. Supp.) Bk. -X Sec. 5 Nuclear Specifications of Bomb Loa Alamos Project VIII, Vol. 2 - r/-2ff

/ REST DATA

A t o m ic ^EaG'W^.CT 1946

013 Los Alamos Group Operation Crossroads VIII, Vol. 3* Ch.8 - S.Hff 013 Radioactivity Group Operation Crossroads VIII, Vol. 3# Ch.8 - 8.17ff Oak Ridge Institute of Nuclear Studies Initiation I, Vol. At Ch.10 - lO.Xff Objectives, Long Range I, Vol. At Ch.10 - 10.6, 10.7 P r o g r a m I, Vol. At Ch.10 - 10.5* 10.6 Proposal for and Incorporation of Institute I, Vol. At Ch.10 - 10.8ff Purpose and Scope I, Vol. At Ch.10 - 10.1, 10.2 Office of Field Services Intelligence & Security I, Vol. 14 (Fgn. Int. Supp.) - 4*1# 6.2 Office of Naval Intelligence I, Vol. 14 - 1.6 I, Vol. 14 (Fgn. Int. Supp.) - //2.3 Office of Price Administration II, Vol. 5 - 10.9 IV, Vol. 6 - 9.14 VIII, Vol. 1 - 6.64 Office of Strategic Services Intelligence & Security I, Vol. 14 (Fgn. Int. Supp.) - 6.1 Office Scientific Research and Development General I, Vol. At Ch.14 - 14.2, 14.16, 14.21, 14.22, 14.35 I, Vol. 13 (Patents) I, Vol. 14 (Fgn. Int. Supp.) / - 1.2, 1.4, 4.1, 2.3, 4.1 > 4.49 in , - 2.2, 2.5, 2.9 , 2.10, 6.1 II - Vol, 1 - 1.2, 3.1* 3.3, 7.2 II, Vol. 2 — 2.1, 3.8ff, 4*1, 4*11, 7.4 1 8.1, 10.1, 11.1 II, Vol. 3 - 1.2, Sec. 2, 3.1, 3.2, 5.1, 8.12 II, Vol. 4 - 2.2 IV, Vol. 1 - 3.2, 3.3, 4.2, 9.1, 9.2 IV, Vol. 2 - Pt.I - 1.2, 1.14, 2.1, 2.9 IV, Vol. 2 - Pt.II - 3.1 IV, Vol. 3 - 2.1 V, Vol. 1-2.1 V, Vol. 2-1.6 V I - 1.2 VII, Vol. 1 - 1.11, 3.1, 7.5, 8.1, 6.2, 9.1, 9.3, 9.4, 9.7, 10.1, 10.7, 10.9, 10.10, 12.1, 12.3, 13.1#"6.3* G.7, G.10,

87 | MBS2ZZ HrfT ' \ ■?-'**'4 ' i_-fs£Jgb**| 4*~\ F 7 Of f-Ope SEyy^llX-IMORMAlIOK

Office Scientific Research and Development (continued) General VII, Vol. 1 - G.14, 0.24, G.25, G.29, G.30 I, Vol. 4, Ch.5 - 5.10, 5.21, 5.22 I, Vol. 4, Ch.ll - 11.1, 11.4, 11.7 I, Vol. 4, Ch.12 - 12.6, 12.14, VIII, Vol. 2 - 1-3, 1-5, 1-6, 111-14» III-15, 111-49, IH-50, 111-52, III-53, VII-18, VI1-19, VIII-4 VIII, Vol. 2 (Supp.) 1-1, II-4, IX-2 VIII, Vol. 3, Ch.3, Pt.I - 5.1 VIII, Vol, 3, Ch.l - 2,8 VIII, Vol. 3, Ch.2 - 2.3ff, 2.13, 2.25, 2.41, 2.42 VIII, Vol. 3, Ch.7 - 7.2 VIII, Vol. 3, Ch,9 - 9.2, 9.3 VIII, Vol. 3, Ch.9 - 9.20, 9.21 VIII, Vol. 3, Ch.9 - 9.4 VIII, Vol. 3, Ch.9 - 9.24 I, Vol. 1 - 1.2, 3.3 Ohio State Board of Health Feed Mat’l. Spec* Proc, & Geo, Expl, VII, Vol. 1 - K.35 Ohio State Cryogenic Laboratory Activities Liquid Deuterium Research VIH, Vol. 3, Ch.3 * Part II liquid Hydrogen Research VIH, Vol. 3, Ch*3 - Pt.I Ohio State University Research Foundation Ohio State Cryogenic laboratory VIII, Vol. 3, Ch.3 - Pt.I - 3.1 VIII, Vol. 3, Ch.3, Pt.II - 1.2 Oil Purification Electromagnetic Project V, Vol. 3 - 2*18 V, Vol. 6 - 4.2, 7.8, 7.9 Oil Storage Tanks Liquid Thermal Dlffus5.on Project VI - 4.9 Olympic CommiRsary Company Pile Project IV, Vol* 5 - 3.13ff, 5.7, 5.12, 5.36, 12.4 Omega (Los Alamos Canyon) Site Los Alamos Project VIII, Vol. 2 - VI-22, XV-2 VIH, Vol. 2 (Supp.) 11-12, 11-34, IV-7, V-5 One component Bombs Los Alamos Project- VIII, Vol. 2 (Supp.) - III-5, III-6 O p e r a t i o n Crossroads VIII, Vol. 2 (Supp.) - I-13ff, 11-3, II-5, II-6j I1-13, 11-19? 11-20, 11-22, II-24ff, II-3&, I H “3» IV-15, V-15 V-16, VIII-6, VII1-7, IX-2, X-4 Ope-Ord

SECU ItflS*8® *® ® #^^ 1 0 K

Operation Crossroads (continued) VIII, Vol. 3, Ch.6 - 3# 4, 7 VIII, Vol. 3, Ch.9 - 9.18# 9.19 Authorisation VIII, Vol. 3, Ch.8 * 8.6, 8.7 Direction - Joint Teek Force One VIII, Vol. 3, Ch.8 - 8.8ff Early Studies VIII, Vol. 3, Ch.8 - 8.3ff Manhattan District participation VIII, Vol. 3, Ch.8 - 8.12ff Bfenhattan District Personnel VIII, Vol. 3, Ch.8 * 8.38ff Purpose VIII, Vol. 3, Ch.8 - 8.Iff Results and Conclusions VIII, Vol. 3, Ch.8 - 8.45

vn i, Vol. 3, Ch.8 - 8.10ff Operation With Tetrachloride liquid Thermal Diffusion Project VI - 2.7 Operations Office Electromagnetic Project V, Vol. 6 - 8.Iff Ordnance Division Los Alamos Project VIII, Vol. 2 » V-8 - Ch. VII, IX-1, IX-13, X-l, Ch.XIV, XV-5 Arming and Fusing - VII"l6ff, XIV-7ff Bomb Ballistics - XIV-9 Delivery - VII-35ff Engineering * VII-20ff Qun Assembly ■« XIV-3ff Gun Design, Proving Interior Ballistics - Vll-5ff Organisation - Vll-lff, XIV-1, XIV-2 Projectile, Target and Initiator Design - VII-llf£ Research on Implosion - VII-24ff Surface and Underwater Explosions - XTV-9, XIV-10 VIII, Vol. 3, Ch.l - 2.1 VIII, Vol. 3, Ch.9 ** 9.1, 9.3 Vill, Vol. 3, Ch.9 - 9.6 Ordnance Engineering Los Alamos Project VIII, Vol. 2 - \ttl**20ff, VI1-35, XIV-2 Ordnance Engineering Division Los Alamos Project VIII, Vol. 2 (Supp.) I-10ff, 1-16, 1-17, IV-6, Ch.VHI, IX-5 Bomb Assembly - VIII-5ff Designing Program - VIH-3* VIII-4 Development - VIII-4> VIII-5

89 Ord-Oxn

i r m a t i o k

Ordnance Engineering Division (continued) Organization - VIII-1, VIII-2, VIII-7 Testing Program - VIII-2, VIII-3 Stockpile Program - VIII-5 Ordnance Program Los Alamos Project VIII, Vol* 2 - I-28ff, 1-32, 1-33, Ch.VII, Ch.XIX Ortho - Para Deuterium Conversion Ohio State Cryogenic Laboratory VIII, Vol. 3, Ch«3 - Pt.II - 2.6 Overseas Movement AAF Personnel A r m y A i r Fields VIII, Vol. 3, Ch.9 * 9.16 ftOj3alaten Process Electromagnetic Project V, Vol. 3 - 3.28ff Oxnard Field VIII, 7ol. 2 (Supp.) 1-12 VIII, Vol. 3, Ch.6 - 1

90 f j— -

- P-9 Project See "Heavy Water (P-9) Project* Paoific Telephone and Telegraph Co. Pile Project IV, Vol. 5 - 7.6ff Packing Facilities, Special Tropical Navy Participation VIII, Vol. 3, Ch.5 - 5.9 Pajarlto Canyon Site Loa Alamos Project VIII, Vol. 2 - VI-7, VI-3, XII-3, XV-8 VIII, Vol. 2 (Supp.) 11-34, V-5, V-6 Parasitic Neutron Absorption Pile Project IV, Vol. 6 - 4.9ff Paris Operation (ALSQS) Intelligence and Security I, Vol. 1/, (Fgn. Int. Supp.) 4.3ff Participation, General, In Ifenhattan Project National Bureau of Standards I, Vol. At Ch.12 - 12.Iff Pasadena Office I, Vol. 14 - S7.1 VIII, Vol. 3, Ch.l - 2.8ff Pasadena Plant Project Camel Vin, Vol. 3, Ch.2 - 2.11, 2.31, 2.60, 2.61, 2.63 Patent Considerations in Declassification Declassification and Distribution of Project Information I, Vol. At Ch.5 - 5.12, 5.16, 5.17 Patent Office, U.S. I, Vol. At Ch.14 - 14.38, 14.43 I, Vol. 13 - 2.9, 3.2, 3.3, 7.1 Patents Applications I, Vol. 13 - Sec. 3 Contract Administration I, Vol. 13 - Sec. 4 Cooperative Agencies I, Vol. 13 - Sea. 7 Electromagnetic Project Research - V, Vol. 2 - 2.3 General I, Vol. 13 - Sec. 1 Los Alamo3 VIII, Vol. 2 - III-49ff VIII, Vol. 2 (Supp.) II-2, IX-2, IX-6 Organization I, Vol. 13 - Sec. 6 Patents (continued) Pile Project Research - IT, Vol. 2 - Pt.II - 2,3> 3*3 P o l i c y I, Vol. 13 - Sec. 2 Project Camel VIII, Vol. 3, Ch.2 - 2.13 Records I, Vol. 13 - Seo. 5 Pentolite Los Alamos Project _ VIII, Vol. 2 - XVI-12, XVI-15______Perfluorodimethylcyclohexane (Code C-816) PEPPHTiLlINT, see Addenda, p. HZ Gaseous Diffusion Project II, Vol. 5-5.7 Perfluorodimethylcyclohexane (C-816) and Haxafluoroxylene (P-45) Feed Mat’I. Spec. Proc, & Geo. Expl. VII, Vol. 1 - G.6ff Personnel and Equipment, Required Operation Crossroads VIII, Vol. 3 t Ch.8 - B.lOff Personnel Office Los Alamos Project VIII, Vol. 2 - III-8, III-9, in-19 VIII, Vol. 2 (Supp.) II-4, 11-6 Personnel pr ocurement Electromagnetic Project Operation - V, Vol. 6 - Seo. 3 Gaseous Diffusion Project Construction - II, Vol. 4 - 5.1 to 5.3 Operation — II, Vol. 5 - 10.1 to 10.6 Personnel Program Conservation and Utilization I, Vol# 3 - Sec. 3 G eneral I, Vol. 8 - Sec, 1 Labor Relations I, Vol, 8 - Sec, 4 Military Personnel I, Vol. 3 - Sec. 7 Naval Personnel , I, Vol, 8 — Sec, 3 Organization and Personnel I, Vol. 3 - 1.4* 1.5* 1.6 Recruiting Program I, Vol. 8 - Sec. 2 Selective Service Program I, Vol. 8 - Sec. 6 Wages and Salaries I, Vol. 3 - Sec. 5 Per-Phy

SSCUI***iLiMQRXAIIQ2f

Personnel, Selection of Army Air Fields VIII, Vol. 3, Ch.9 - 9 . H Personnel Training ( 1 Electromagnetic Project V, Vol. 2 - 3.1 PETN Los Alamos Project VIII, Vol. 2 - XVI-3 P Q , Lo3 Alamos Project VIII, Vol. 2 (Supp*)viI-4 PGT Los Alamos Project VIII, Vol. 2 (Supp.) VII-4 PH Pile Project IV, Vol. 2 - Pt.I - 4*5 Phosgene Disposal System Electromagnetic Project V, Vol. 3, - 3.23 i J Phosgene Gas Alarm Electromagnetic Project V, Vol. 2 - 4.10 Phosphorus Pile Project IV* Vol. 6 - 4.32 Photochemical Method, C ranium Isotope Separation General Ii Vol. 4 ** Ch.14 “ 14.49, 14*50 Investigation and Research - I, Vol. 4, Ch.14 «* 14*50, 14.51 Termination of Work I* Vol. 4, Ch.14 “ 14*51, 14*52 Photographic Group Los Alamos Project VIII, Vol. 2 (Supp.) 11-13, II-19 Photography Project Camel VIII, Vol. 3# Ch.2 - 2.39, 2.40 Photography (Technical) Los Alamos Pro!eat VIII, Vol. 2 - III-36, 111-43, IV-10, VI-9, VI1-9, VII-29ff, VIII-30, XI1-3, ZII-4, XV-6, XV-13, XV-19, XVI-6, XVII-19, XVIII-2, XSTIII-20 Vin, Vol. 2 (Supp.) V-13, V- 14, VII-5 ( ) Physical Damage Caused by Combat Bombs Investigation of the After Effects of the Bombing in Japan I, Vol. 4» Ch.6 - 6.8ff

93

'T ATOMIC

(w •. - • w- - . ... ijf. P h y - P i l

SlWWniTY - §N?ORMAXIOit

Physical Research Electromagnetic Project V, Vol. 2 - Sea. 3 Physics Ames Project (lowa State College) I, Vol. 4, Ch.ll - 11.53, 11.54 Physics Division Los Alamos Project VIII, Vol. 2 (Supp.) 1-10, Ch.IV Activities - IV-3ff Cockcroft - Walton Accelerator and Short Tank - IV-9ff Organization - IV-1, IV-2 Physics Research Gaseous Diffusion Process II, Vol. 2 - Sec. 8 P i l e Areas Pile Project IV, Vol. 3 - Seo. 5 Construction, General IV, Vol. 5 * 1.3, 1«7, 2.6ff» 5*25, 5*30, 5*31, 6.5ff, 6.24, V.l, 7.2, 7.7, 7.10ff BeraLneralization Bldg. - IV, Vol. 5 - 6.8 Electrio Power - IV, Vol. 5 - 7.1, 7.2 Fresh Metal Storage Bldg. - IV, Vol. 5 * 6.6, 6.12 Helium Purification Bldg, - IV, Vol. 5 - 6.12 Helium Storage Tanks - IV, Vol, 5 - 6,12 Retention Basin - IV, Vol, 5 * 6,6 River Pump House Bldg, - IV, Vo^. 5 .- 6.10, j6.11 „ Pile, Clinton Laboratories^ ------(Ventilation Exhaust Stack - IV, Vol. 5 - 6.12 Pile Project IV, Vol. 2 -Pt.II - 1.1, 2.3, 2.4, 4,Iff Area - 2.4, 2.10 Area Cost - 2.10 Building - 2.4 Cooling System - 4«5, 4*6 Construction of - 2.3, 2.4 Controls - 4*6 Description of - 4*2 to 4*6 General - 5*8, 6.Iff Graphite Fatrix - 4.2, 4»3 Openings - 4*2, 4,4 Operating Level - 4*7, 4»8, 4*9 Poisoning - 6,1, 6,4, 6,5 Removable Core - 4«2» 4»4 Shielding - 4*3, 4*4, 4,5 Slug Handling Facilities - 4*6, 4»7 Start-up - 4*7, 4*8 Pile, Considerations for Production Pile Project IV, Vol. 2 - Pt.I - Sec. 3 and Sec. 4

94 RESTRtGJED DATA

ATOMIC 19,8 Pi 1-Pi1

I ON Pile (HRX) Description Assistance on Canadian Pile Project X, Vol. 4f Ch.9 * 9,llff Pile Development, Research Argonne Experimental Piles IV, Vol. 2 * Pt.I - Par» 3.4 First Chain Reaction System IV, Vol. 2 - Pt.I - 3.2 Pila Project IV* Vol, 2 - Pt.I Piles Considered IV, Vol. 2 - Pt.I - 3.3 Selection of Production Pila IV, Vol. 2 * Pt.I - 3.5 Types of Piles IV* Vol. 2 * Pt.I - 3.1 Pile* Enriched Uranium Pila Project IV, Vol. 3 - 5.10ff P i l a P r o j e c t X-I O Construction IV* Vol. 5 Costa • Sec. 11 Construction Labor • Seo* 4 Organization and Personnel - Sea. 12 Operating Plant - See. 6 Planning - Seo* 2 Procurement of Equipment & Materials - See. 3 Purpose and Scope * See. 1 Richland Village - Seo. 3 Safety * Sec, 10 Service Facilities - See. 7 Temporary - See. 5 Transportation - Sec. 9 D e sign IV, Vol. 3 Costa - See. 9 Metal Fabrication and Testing Area - See. 4 Operating Plant Description «* Sec. 3 Organization and Personnel - See. 10 P i l e A r e a •* See. 5 Purpose and Scope - See. 1 Richland Village - Sec. 3 Separation Area - Seo. 6 Service Facilities * Sec. 7 Site Criteria and Selection - See. 2 G eneral IV, Vol. 1 Administration * See. 3 Care of Real Estate - See. 3 Costa • Seo. 5

95 _ :, -...... \l: .

Pil-Pil

ffa C IU i iiiii^^mimifiTfff T 105*.

Plla Project 2-10 (continued) General (continued) IV , Vol. 1 Contractual Arrangements - Sec* 4 ascription -Cl. V ol. U, Ch.3 - ItemJAL-rEu.ly Development - See. 2 Intelligencse and Security' - Sec. 6 *- l a w Enforcement end Jurlsdiotlon - Sect* 7 . . _ , purpose and Scop. - Seo. P (frgmUation and Personnel - See. 9 land Acquisition IV , Vol. 4 Accomplishments - Sec* 8 Acquisition Operations # Sec* 4 Classification of lands in the Area - Sec. 3 Description of Site * Sec* 2 Estimated Costs - Sea. 7 Leases, Restriction Agreements and Permanent Basements - Sec. 6 Progress of Aaquisition <* Sec. 5 Selection of Site - Sec. 1 Operation - IV, Vol. 6 Communications * Sec. 12 Costs * Sec. 17

restric ted d ata

atomic •n pir* r ^ r '- C V ^ S1

Pile Project X-10 (continued) Rasearch# Metallurgical laboratory -17» Vol. 2 * Pt.I (continued) Operating Problems - Sec. 5 Organisation and Personnel - Sec. 7 Piles# Development - Seo. 3 Problems of Pile Design ■** Sec. 4 Purpose and Scope » Sec. 1 Separation Process Development - Sec. 6 Pile# Test (300 Area) Pile Project IV, Vol. 3 - 3.2# 4.1# 4*2 IV# Tol. 5 ** 1.3# 6.2# 6.4# 6*11# 6.15# 6.17# 6.13 IV# Vol. 6 * 2.4 Pile# West Stand I# Vol. 4# Ch.12 - 12.6 Piles Heterogeneous IV* Vol. 2 - Pt.I - 3.5* 3.6# 3.9# 3.11# 3.14 Homogeneous IV# Vol. 2 - Pt.I * 3.5# 3.6# 3.9 Horizontal IV# Vol* 3 - 5.24 Po w e r I, Vol. 4 - 4.13# 4.14 Piles (Construction) pile Project ^ General - IV# Vol. 5 “ 1.3# 2.3# 2.8# 6.1# 6.2# 6.4# 6.7# 6.11# 6.12, 6.13 to 6.22 Srection * IV# Vol. 5 •* 6.13 to 6.22 Shielding - IV# Vol. 5 - 6.13 to 6.18 Test - IV# Vol. 5 - 1.3 Piles# Development - Research Pile Project IV# Vol. 2 - Pt.I - Sec. 3 Piles# 3xperimental Pile Project Argonne • Graphite (CP-2) IV, Vol. 2 - Pt.I - 3.12# 3.13 IV# Vol. 3-4.2 Argonne - Heavy Hater (CP-3) IV* Vol. 2 * Pt.I - 3.13# 3.14 West Stand# Stagg Field IV# Vol. 2 - Pt.I - 3*7ff IV# Vol. 3 - 5.2 Piles (Production) ( Design). Pile Project IV# Vol. 3 Areas - 3.2 to 3.5 Canning - 5.47# 5.48# 5.49 Coolants - 5.4^ 5.25# 5.32 to 5.37, 5.43# 5.44# 5.47# 5.62 to 5.70 Control and Safety Features • 5.4# 5.16# 5.28, 5.31 to 5.33# 5.35 5.36# 5.5^# 5.51 to 5.54 RESTRICTED DATA AJOMIO. ENERGY ACT 1348 Pile-Pilo SECUM#lMW*W^1101*

Julies (production) (Design) (continued) Pile Project (continued) IV, Vol. 3 Design Alternates and Decisions - 5*21 to 5*28 Design Problems - 5.3# 5«4* 5.28/to 5.35 Early Considerations - 5.8 to 5.21 Facilities and Auxiliary Apparatus - 5.17* 5.19* 5.20, 5,23, 5.26* 5.29* 5.30* 5.35* 5.36, 5.56 to 5.72 Final Design • 5.35 to 5.72 General <* 5.1 to 5.3 lifederatoi* ■* 5.2, 5*8, 5«9* 5.13* 5.15* 5.18* 5.21* 5.24* 5.25* 5.37 to 5.41* 5.43 Process Material - 5.2* 5*6to 5.12* 5.15? 5.18* 5.24 to 5.28* 5.30|-^55* 5.56 Shielding * 5.5* 5.8* 5.16 to 5.19# 5.26* 5.28* 5.29* 5.34* 5*38* 5.42 to 5.46* 5.60* 5.61 Piles (Production) (Operation) , Pile Project XT* Vol. 6 C a p a c i t y - 1 . 4 Control * 2.9f f Discharging - 5.6 ^ General ■» 1.2* 1.3* 2.1* 2.2, 2.5ff* 4»9ff* 4.19* 4.20* 4»26ff, 5.1ff* 5.8ff* 5.13ff Graph!to - 4»14ff Power Level - 5.3ff* 5»3ff Preparation • 5.1* 5.2 Refrigeration of Cooling 7ater - 5.13* 5.14 Secondary Products - 1.5* 1.6* 4.26ff, 5.13 piles. Types of Pile Project IV, Vol. 2 - Pt.I - 3.1 to 3.6 Pilot Plant Ames Project (Iowa State Collage) I* Vol. 4* Ch.ll * 11.3# 11.10 P i l o t P l a n t P i l e P r o j e c t IV, Vol* 2 « Pt.I * 2*5, 4.3* 4.9 IV# Vol* 2 - Pt.II - 1.1* 2.1, 4.1* 7,1 IV, Vol. 3 - 1.2, 2.1 Pilot Plant Development Gaseous Diffusion process; II, V o l * 2 * Seo. 7 II, Vol* 3 * Sec. 5 Pilot Plant 20 Stage Gaseous Diffusion Project II, Vol. 5 -» 6.6 Pilot Plant, 54 Stage Gaseous Diffusion Project II, Vol. 5 • 3.1* 3.2

RESTRICTED DATA,

^jTOSiOEC ACT 1343 , Pilo-Pla

SECUMSiHaSPRMATlOlJ

Pilot Plants Electromagnet^ Broject V, Vol. 2 - 1.1* 4.6 P i l o t Plants Liquid Thermal(Diffusion Projaot Anacoatia -71# 2.4* 3.6# 2.9 Philadelphia - VI* 2.4* 2.9# 3.4* 3.6, 5.3 Pipe# Construction Pile Project IV, Vol. 5 - 1.6# 3.10* 5.24# 6.9# 6.12# 6.26# 6.2Sff Piping# Construction Gaseous Diffusion Process II# Vol. 4 Dry Air - 3.37, 3.38 Process -* 3.63# 3.69# 3.74 Sowers Sanitary - 3.18 Storm - 3.13 W a t e r Fir® Protection - 3.16# 3.17 Sanitary - 3.15# 3.16 Piping# High Pressure liquid Thermal Diffusion Project VI# 4.6# 4*7# 4*9 Piping# Process# Design and Procurement Gaseous Diffusion (K-25 - K-27) Project H # Vol. 3 - 8.15 to 8.19# 14.11 P i t Project Camel VIII# Vol.j 3# Ch.2 - 2.27# 2.28 pit Assembly (Intoloslon Bonb) Los Alamos Project VIII# Vol.; 2- XV-2# XV-4 VIH# Vol. 2 (Supp.) 11-12# V-2# V-4 Pitching liquid Thermal Diffusion Project VI - 2.9# 5.3# 5.9 plan of Operation Argonne National laboratory I# Vol. 4* Ch.2 2.14# 2.15 Planning Board (DSHD) I# Vol. 1 f 3.6 I# Vol. 4 r Ch.12 - 12.5 IV# Vol. 2 - Pt.I - 2.9 IV# Vol. 3. - 5.2 Planning Committee Brookhaven National laboratory I, Vol. 4#f Ch.2 - 2.25ff# 2.30# 2.34 Planning# Construction Pile Project IV# Vol. $ * Sec. 2

t i v ' f RESTRICTED data a t o m ic ACT 194t SECUJflffPHHlFOKMATIOlSr

Planning, laboratory Los Alamos Project v i i i , vol. a - 1-9 Plans and Operations Sandia Base VIII# Vol. jj, Ch.6 - 3ff P l a n t P r o t e c t i o n I, Vol. 14 W Seo* 4 and Supplement Plugs Liquid Thermal; Diffusion Project VI - 5.6, 5*7 Plugs, Elimination of liquid Thermal Diffusion Project VI - 5.6, 9.7 Plutonium .. I ■ ' P ile P r o j e c t I , „ . IV, Vol. 2 - Pt.I - 1.1# 1*6, 1*7* 1.11, 1.12, 1*13, 4*U» 6.1, 6.2 IV, Vol. 3 ** 1*1» 1*2, 3.1> 3.2, 4*2, 5.1* 5*4# 5*10, 5.11# 6.1ff IV, Vol. 5 - 1.1# 1*3# 2.9 IV, Vol. 6 • l.lff* 2.6# 2.11, 2.18ff, 3.1ff» 5.2 Plutonium 240, Discovery of Los Alamos Project VIII# Vol. 2 - IV-l6ff, VI-8, VIII-5 Plutonium Accountability P ile P r o j e c t i IV, Vol. 6 - 2.8 Plutonium Assay j ? Pila Project j IV, Vol* 6j * 3.3 Plutonium Chemisjtry Ames Project (Iowa State College) I, Vol. 4*: Ch.ll - 11.36ff Plutonium, Discovery Pile Project | Plutonium * 2!38 IV, Vol. I - 2 . 4 IV, Vol. i - Pt.I - 1.11, 1.12 Plutonium - 239 IV, Vol. 1 - 2.4 IV, Vol. 2 - Pt.I - 1.11# 1*12 Plut o n i u m Physiological Hazards I, Vol. 7 j* 2.5# 3.40# 5.11# 5.12 Plutonium Processing Operation Pile Project IV, Vol. 6-4*25 Plutonium# Production of, Clinton laboratories Pile Project,1 IV, Vol. 2 - Pt.II - Sec. 4 Plutonium Production Los Alamos frtojeat vxn. vol4 a - v m RE!W ED DATA Plutonium Research (Early) ifetallurgical Laboratory - IV, Vol. 2 - Pt.I - l.llff Plls Project ) g0e «*piutonium Separation, Research" Research J Plutonium* Separation I, Vol.4* Oh.11 - 11.36 to 11.42 Inc. Plutonium Separation* Research Pile Project *! IV* Vol. 2 - Pt.X Background (Research - Par. 6.1 General Problems * par. 6.2 Processes Considered - par. 6.3 Selection ojf Process * Par. 6.4 Plutonium, Studies of Chemistry of Pile Proj ect •' IV, Vol. 2 Pt.II - 5*9 P I E Unit Los Alamos Project. VIII, Vol, 2 - XlV-ft P M R U n i t Project Camel Vin, Vol. 3, Ch.2 * 2.29 Pois o n i n g Pile Project IV, Vol. 2 - Pt.I - 5.2, 5.3 IV, Vol. 2 - Pt.II - 6.1, 6.4, 6.5 IV, Vol, 3 - 5o38* 5.50 IV, Vol, 6 - 2,21 Policy, Patents I, Vol* 13, * Sec* 2 p o l o n i u m Los Alamos Project , __ „ VIII* Vol. 2 * IV-16, VII-4* VI1-16, VIII-3* VIII-22* VI11-23, 11-17* X-8, X-9, XI-7, XV-15* XVII-12 VIH, Vol, 2 (Supp,) V-7* V-8, VI-6 P o l o n i u m Physiological Hazards I* Vol. 7 w 2.5? 3*62 Polonium, Initial Shipment of Dayton Project VIII, Vol.3, Ch.4 - 4*4 Fcloniu® Production Pile Project ^ . IV, Vol. 6 — 1*5, 1.6, 4*22, 4*24* 5*13* 6*2 Polonium Production Dayton Project VIII, Vol. 3# Ch.4 Polonium production Method Dayton Project VIII* Vol. 3* Ch.4 - 4.3* 4.4 Polytechnic Institute of Brooklyn I, Vol. 4; Ch.2 - 2.22 |K?S^S2S3fJE^E22S213CI3E23 Pol-POTr WOFSSAXIOH

Polytetrafluorethylene (D-29, K-419, TFE) Feed Materials and Special Procurement VII, Vol. 1 - G.27, G.2S Polytetrafluoroethylene (Poly TFE) See "Fluoroplastics” Population of Site, land Acquisition Pile Project XVi Vol. 4- “ 2.3, 2.4 Port Hope Refinery- Feed Material® and Special Procurement VII, Vol. 1, 3.1, 3.2, 7 .Iff Poet Exchange Los Alamos Project VIII, Vol. 1 - 6.1, 6.5, 6.13, 6.14, 6.16ff, 7.4 VIII, Vol. 2 - III-ll Post Office Los Alamos Project VIII, Vol. 1 * 6.21, 6,22 Post Office, Richland Village Pile Project IV, Vol. 3 - 8.11, 8.12, 8.13 IV, Vol. § * 4.24, 5.13, 5.18 Power Consumption Electromagnetic Project V, Vol. 6 * 7.6 Poser, Electrical Pile Project iV* Vol. 1 * 1.2, 5.2, 8.1, 8.2, 8.3 IV, Vol. 5 - 2.7, 2.8, 5.27, 5.32, 7.1ff P o w e r House, K-25 Liauld Thermal Diffusion Project VI - 3.2, 3.5, 3.9ff Power Output, Clinton Pile Pile Project IV, Vol. 2 - Pt.II - 4.2, 4.7* 4.8, 4.9 Power Output, Various Piles Pile Project IV, Vol. 3, 1.1, 3.2, 5.13, 5.35 Power Pile Program at Oak Ridge Research and Development of Atomic Energy for Potter I, Vol. 4, Ch«4 •• 4*5 Power Plant Area Gaseous Diffusion Project Construction » II, Vol. 4 *• 3.19 to 3.28 Design - II, Vol. 3 - Sec. 12 General - II, Vol. 1 - 4.4 Operation - II, Vol. 5 - Sec. 7 Power Producing Devices Los Alamos Project VIII, Vol, 2 (Supp.) II1-12, 111-13

RESTRICTED DATA ATOMIC 0Nb%Y ACT 1 * ' ' r Pow-Pre

w m w xw

Power, Research and Development of Atomic Energy for Daniels Power Pile Development Factors - I, Vol. At Ch.4 - 4.8ff Preliminary Design - I, Vol. 4# Ch.4 - 4*6, 4*7 Program - I, Vol. 4* Ch.4 - 4*5, 4.6 Purpose and Scope - I, Vol. 4, Ch.4 - 4«3ff G en e r a l I* Vol. 4» Ch.4 - 4.1ff I# Vol. 4> Ch.8 - Item 91 Retergeneous Pile Preliminary Design - I, Vol. 4* Ch.4 - 4.13* 4.14 Purpose and Scope - I, Vol. At C h . 4 - 4.13 Knolls Atomic Power Laboratory If Vol. 4, Ch.8 - Items 89 and 99 Kuclear Energy For Propulsion of Aircraft - I, Vol. 4, Ch.4 - 4.14, 4.15 Is Vol; 4* Ch.8 — Item 68 For Ship Propulsion - I, Vol. At Ch.4 - 4.15, 4.16 Zinn B r e e d e r Pile Preliminary Design • I* Vol. At Ch.4 - 4*12# 4.13 Purpose and Scope - I, Vol. At Ch.4 - 4*11, 4*12 - P o w e r S i m p l y P Liquid Thermal Diffusion Project VI - 4.11, 4.12, 4*13 Power Supply and Distribution, K-27 Gaseous Diffusion Project Design - II* Vol. 3 * 14*16, 14.17 Power Supply and Distribution Pile Project Clinton Laboratories - IV, Vol. 2,Pt.II - 2.5 HEf * IV, Vol. 3, 2.3, 7.1, 8.23, 8.24 Ii t Vol. 6 - 2.17 Power System Los Alamos Project Vin, Vol. 2 - HI-11, IX-10 Precipitation Processes, Separation Pile Project IV, Vol. 2 - Pt.I - 6.3, 6.5, 6.6, 6.7, 6.8 it, Vol. 2 - Pt.II - 5.1, 5.8 IV, Vol. 3 - 6.1, 6.2 IV, Vol. 6 - 2.20, 2.21 Predetortation Los Alamos Project VIII, Vol. 2 - 1-16, V-19, Vn-26, VI1-27, XI-9, HI-8, IV-5 V3jll, Vol. 2 (Supp.) III-6 Preliminary Operations Liquid Thermal Diffusion Project VI - 5.3, 5.4 Preparations, Trinity Los Alamos Project VIII, Vol. 2 - imi-lff, XVIII-8ff Pre-Pri

sasyus«yf information

Presidential Message to Congress (October 194-5) Concerning Control of Atomic Energy Contributions of Manhattan District Representatives to Discussions and Proposals for International Control of Atomic Energy h Vol. 4, Ch.7 - 7,1, 7.2 President's Announcement of Hiroshima Bomb I? Vol, 1 - 1,1* 1.2 - I, Vol. 4, Ch.8, PtI, - Item 1 Persistent Radioactivity Investigation of the After Effects of the Bombing in Japan Is Vol. 4, Ch.6 * 6.30 Press Releases I, Vol. 4» Ch.8 Pressor* Sensitive Contactor Norden laboratories, and Lukas-Earold Corp. V?n, Vol. 3, Ch.9 * 9.5 Prioes, Raw Material, General Feed Materials and Special Procurement VII, Vol. 1 - 1.9, 1.10 Priest Rapids, Irrigation District Pile Project itf, Vol. 4 - 2.6, 2.7, 4.23 IV, Vol. 5 - 5.31, 5.32, 7.4, 7.5 Powej* Generating Plant IV, Vol. 1-8.2 XV, Vol. 4 *■ 4 . H ■XV, Vol. 5 - 7.4 Ii t Vol. 6 - 10.2 P u m p i n g S ta t i o n IV, Vol. 1 — 8.2 IV, Vol. 4 - 4.H iy, Vol. 6 - 10.2 Priorities Los Angeles Procurement Office V?H, Vol. 3, Ch.l - 2.8ff P r i o r i t i e e Program District Authorizations and Organization I, Vol. 9 - Sec» 2 General I, Vol. 9 - Sec. 1 Operations I, Vol. 9 * Sec. 3 Organization and Personnel 1^ Vol. 9 * 2.4 to 2.10 Pile Project IV, Vol. 5 - 3.6, 3.7 IV, Vol. 6 - 6.2 Princeton, Institute of Advanced Study I, Vol. 4, Ch.2 - 2.21

V a,flf ED ATO&QC *V ACS. 1946 Pri-Proo

SlCUWWrtBlWRlAT I OK

Princetop University I, Vol. 4, Ch.2 - 2.2, 2.21ff I, Vol. 4, Ch.12 - 12.4 I K , 3.3 II, Vol. 1 - 1.1, 3.3 II, Vol 2 * 2*4> 3.8, 11.4 II, Vol. 3 - 11.26 IV, Vol. 2 * Pt.I * 2.1, 7.3 VII, Vol. 1 - 1.22, 2.9, 12.2ff V2*II, Vol. 2 - 1-7, VI-1, VI-4 VIII, Vol. 2 (Supp.) IH-3 P r o b l e m s , Design and Operating, Clinton Laboratories Pile iProject IV, Vol. 2 - Pt.II - Sec. 6 Problem of Pile Design, Research Pile Project IV, Vol. 2 - Pt.I - Sec. 4 P roblem , Plutonium Separation Pile Project XV, Vol. 2 - Pt.I - 6.2 Process Buildings, Description Electromagnetic Project V, Vol. 1 - 3.1, 3.2 Process

SE

Process Improvement Division Electromagnetic Project V* Vol. 2-1.2 V, Vol. 6 - 5.Iff Process Selection Liquid Thermal Diffusion Project V I - 1.2 r roc ess Service Installations Gaseous Diffusion Project Construction * 11$ Vol. 4 - 3.31 to 3.34, 3.37# 3.3&, 2.44 to 3 Design * II, Vol. 3 - Sec. 10 Operation * II# Vol. 5 « Sec. 5 Process St*am Liquid Thermal Diffusion Project VI, 2.14* 3.9ff, 4.6ff Processes Considered, Plutonium Separation Pile Project IV, Vol. 2 - Pt.I - 6.3 to 6.6 Procurement Detroit Office VIII, Vol. 3, Ch.9 - 9.2 Procurement and Supply Los Alamos Project e VIII, Vol. 1 - 6.29ff, 7.2 Procurement by Camel Project * Los Angeles Procurement Office VIII, Vol. 3» Ch.l - 2.8 Procurement Department Electromagnetic Project V, Vol. 6 - 3.1, 3.7, 3.8 Procurement, General F e e d feteriels and Special Procuroment VII, Vol. 1 - 1.6, 1.9 Procurement of Equipment Electromagnetic Project V, Vol. 3 Chemical Process Equipment - 4*14, 4.15 Costs «* 4*23, 4.24 Diffusion Promps - 4.16 Door Handling Equipment - 4*l2ff General * 4*Iff Graphite • 4.21, 4.22 Liquid Nitrogen - 4.23 Magnet Coils - 4»4ff Power Supply and Control Equipment - 4.3, Process Bins - 4*7ff Process Cable - 4*19, 4.20 Silver t 4.21 Vacuum Tubes - 4.15 Vacuum Valves ** 4«l0ff Zircon *• 4.22, 4.23 '1 Proc-Prod

<^*W*ttSfed|KF ORMA TI03? Procurement of Equipment and Materials liquid TherEfil Diffusion Project VI - 3.17, 3-18 Pile Project IV, Vol. 5 * Sec# 3 Procurement of Equipment, Design Electromagnetic Project V, Vol. 3 ** Sec. 4 Procurement of Equipment and Supplies Ohio State Cryogenic Laboratory VIII, Vol. 3* Ch.3 * Pt.II - 1.2, 1.3 Procurement of Funds, Hearings to t Legislative Contacts I, Vol. Ut Ch.l * S.llff Procurement Office Los Alamos Project VIH, Vol. 2 - 1-6, III-27ff, 111-34, IX-13, IX-14 VIII, Vol. 2 (Supp.) 11-12, 11-26 Procurement of Material Electromagnetic Project , V, Vol. 5 - 4.1 Procurement Operations Los Alamos Project VIII, Vol. 2 - 1-5, 1-6, 1-34, 111*7, III-22ff, III-27ff, VII-2, VII-3, VII-21, VIII-4, IX-13, IX-14, X7I-11, XVI-21 Procurement, Silver Program Electromagnetic Project , V, Vol. 3 - 4.21 V, Vol. 4 - Sec. 2 Procurement (Summary) for Site 1 F4ed Materials and Special Procurement VII, Vol* 1 - App. J Product, Acceptance of Piile Project IV, Vol. 6 * 5.11 Product Blending Liquid Thermal Diffusion Project VI - 5.1 4 Product Concentration Gaseous Diffusion Project ill, T.S. App. Ho. 1 - 1, 2, 3, Ho. 2 - 3 to 7 II, T.S. Supp* Ho. I - 3 to 11 Product Control Liqtdd Thermal Diffusion Project VI, 5.15, 5.16 Product U q U i d T hermal Diffusion P roject VI - 5*14 Produci Material Gaseous Diffusion Project _ «, Vol. 5 - 8.16 „rr.1®\r\E0

- 1 0 7 ' 1 A T O ^ c , Prod-Prod & SECf^^^ORMAT IOK

Prpduot Recovery Electromagnetic Project Alpha - V, Vol. 6 - 4.7 _ Beta - V* Vol. 6 - 4.8 | ;• Product Specifications liquid Thermal Diffusion Project ; VI - 1.1, 5.2 H i e Pxv>joct XV, Vol. 6 * Sec. 3 P rcduot Withdrawal System iGaseous Diffusion Project Design - H , Vol. 3 - 7.29, 7.30, 14.8, 14.9 Operation * II, Vol. 5 •* 4«H* 4*12 P r o d u c t i o n iLiquid Theraal Diffusion Project V I - 5.4 gaseous Diffusion Project j II, S.S. App. No. 2 Production Accelerated, Abandonment of JPile Project IV, Vol. 6- 5 . 2 SB Production, Alpha Electromagnetic Projeot V, Vol. 6 - T.S. App. - 1, 2 Production and Distribution of Radioisotopes See •’Radioisotopes, Pro grata for Production and Distribution of Production and Procurement Project Camel i Vin, Vol. 3* Ch.2 - Sec. 6 Production, Beta Electromagnetic project ■ V, Vol. 6 - T.S. App. 2, 4 Prodtiujtion, Boron (BlC) — VIII, Vol. 3f Ch.7 Production Capacity of Pile (NRX) Assistance on Canadian Hie Project 1 X, Vol. 4, Ch.9 - 9.10 production Chronology Gaseous Diffusion Project ill. Vol. 5 - Sec. 8 ill, T.S. Supp. No. 1 - 3, 4* 5 Production Data, Silver Program Electromagnetic Project iV, Vol. 4 - 3.4* 3.5* 3.7, 3.H* 3.13 Production Difficulties Electromagnetic Project V, Vol. 2 - 2.5 Production Methods ^ Progiwm for Production a n d Distribution of Badioisotopes I, Vol. 4* Ch.3 - 3.3ff Production Rate at Pilot Plant Ames Project (Iowa State College) Vol. 4, Ch.ll - 11.10 } VfXint d t * juor i9*e

- 7 •- -'v- - " " “ , *■ * - r - ~ * ~ ‘ ‘ * : \ • • ' " "• • " • • ‘ ■ Prod-Proj

SafWHIIHf-'lffFORMAT 101

Pr o d u c t i o n Schedules Electromagnetic Project V, Vol. 6 - 4.17, 4.16 P r o g r a m Brookhaven National Laboratory 1 0 I, Vol. 4# Ch*2 - 2.34ff Oak Ridge Institute of Nuclear Studies X, Vol. 4# Ch.10 - 10.5, 10.6 Program Development Feed Materials end Special Procurement vii, vol. i - 1.7, i.e Program for Consultants Los Alamos Project Vin, Vol. 2 (Supp.) 1-7, 11- 26, 11-27, III-3 Program, Laboratory Los Alamos Project VHI, Vol. 2 * 1-11 Progress, Construction Los Alamos Project VIII, Vol. 1 - 5.25ff progress of Construction Pile Project Administration Area - IV, Vol. 4 - 8.5» 8.6 General <* IV, Vol 5 * 5*21, 6.2, 6.6ff, 6.22ff, 8.1, 6.2, B.5# 8.6 Hanford Camp - IV, Vol. 5 - 5*21 Metal Fabrication and Testing Area - IV, Vol. 5 - 6.2 Pile Area - IV, Vol. 5 •* 6.6ff Richland Village - IV, Vol. 5 - 8.1, 8.2 Separation Area - IV, Vol. 5 - 6.22ff Proj ect Alberta See "Alberta" Project Auditor Los Angoles Procurement Office VIII, Vol. 3, Ch.l - 2.14 Project Camel A r m y A i r Fields VIII, Vol. 3» Ch.9 - 9.16 Los Alamos Project VIII, Vol. 2 - IX-7ff, HV-9, XVI-3, m - 2 1 Construction VIII, Vol. 3, Ch.2 - Sec. 9 Development of Explosive Components VJII, Vol. 3, Ch.2 - Sec. 3 Development of High Explosive Production Techniqu© - Salt Wells Plant VIII, Vol. 3» Ch.2 - Sec. 7 Development of Metal Components VIII, Vol. 3, Ch.2 - Sec. 4 Flight and Static Tests VIII, Vol. 3* Ch.2 - Sec. 5 Organisation of Project VIII, Vol. 3, Ch.2 4 Sec. 2

RESTRICTED DATA ATOMIC ENERC^ ACT 1940 Project Camel (continued) Production end Procurement VIII, Vol. 3, Ch.2 - Sec. 6 Purpose VIII, Vol. 3, Ch.2 - Sec. I S e c u r i t y VUI, Vol. 3* Ch.2 - Sec. 10 Termination end Transfer of Camel Activities VIII, Vol. 3, Ch.2 - Sec. 6 Project Director (Los Alenas) L o b A n g elas Procurement Office VIII, Vol. 3, Ch.l - 1.2, 1.3, 2.16 Project Shops Electromagnetic Project V, Vol. 5 - 3.2, 3.3-4, 3.35 Project Trinity See "Trinity" Projectiles and Guns N a v y P a r ticipation VIII, Vol. 3* Ch.5 - 5.9 Projectile, Target and Interior Design,Gun Assembly Los Alamos Project VIII, Vol. 2 - Yll-llff Propane Gas, Supply Liquid Thermal Diffusion Project VI - 5.19 property Accountability Los Angeles Procurement Office VUI, Vol. 3, Ch.l - 2.11ff Pile Project IV, Vol. 6 * See. U Property, Disposal Pile Project IV, Vol. 6 - Sec. 14 Proposal For and Incorporation of Oak Ridge Institute of Nuclear Studies I, Vol. 4, Ch.9 - 10.8ff Proposals Leading to Operation Crossroads VIII, Vol. 3, Ch.8 - 8.4ff Piroton Pile Projeot IV, Vol. 1 - 2.2 IV, Vol. 2 - 1.3ff Proving Ground Technique, Gun Assembly Los Alamos Project VIII, Vol. 2 - VI1-9, XV-15 Provisional Engineer Detachment Los Alamos Project VIII, Vol. 1 - 6.1, 6.9, 6.13, 7.3, 7.4, 7,13 P Sit e Los Alamos Project VIII, Vol. 2 - XV-7 3 ! € f l j g r ’ RESTRICTED DATA ArOraC^EKERGY ACT 194G afssE OH

-rrftiFiTiim' Fsjr' Pur0 & /iliUr pti-mm t t y - 3KFORMATI OK

■j Psychological Effects After Effects of the Bombing in Japan I, Vol. 4* Ch.6 • 6.31 i Public Health Service (U.S.) I, Vol. 7 - 2.12, 5.22 j Public Relations Pile Project IV, Vol. 6 - Sec. 13 Public Roads Administration Los Alamos Project VIII, Vol. 1 *• 2.6 Public Safety General Program I, Vol. 11-Sec. 3 tnd 5 Supplement Pump Souses, Oil Electromagnetic Project V, Vol. 3* - 2.1S Pump Houses, Water Electromagnetic Project V# Vol. 3* - 2.10 “Pushkin" Drops k r a y Air Fields VUI, Vol. 3* Ch.9 - 9.16 Pumpkins Los Alamos Project VIII, Vol. 2 - HV-9 K a v y Participation VUI, Vol. 3# Ch.5 - 5.5 P r o j e c t C a m e l VIII* Vol. 3, Ch.2 - 2.9* 2.24, 2.25* 2.28, 2.33ff* 2.37* 2.42* 2.4 j> PuapkinE, Loading of Kavy Participation VIII, Vol. 3* Ch.5 - 5.5 Pumps, Desuperheater Liquid Thermal Diffusion Project VI - 3.10, 4.6 pumps, ifeke-up Liquid Thermal Diffusion Project Boiler - VI - 4*7 Cooling Water — VI * 4.10 pumpe (Special) Gaseous Diffusion Project Construction ~ II, Vol. 4 *■ 3.69* 3.70 Design - II* Vol. 3 **■ S.12 to 8.14* 14.10 Development “ II, Vol. 2 * Sec. 5 pumps, Water Pile Project IV, Vol. 5 * 2.7, 2.8 Purohases, Money Value of Los Angeles Procurement Office VIII, Vol. 3* Ch.l - 2.3

RESnHjtED DATA.

’ '* ‘ ATOMIC/W «r >«

■’ • • ...... ' . . Purchasing by University of California Los Angeles Procurement Office VIII, Vol. 3# Ch.l - 2.3 Purchasing Program Lob Angeles Procurement Office VIII, Vol. X, Ch.l - 2.1ff Purdue Research Foundation Purdue University VIII, Vol. 3* Ch.9 - 9.24 Purdue University I, Vol. 4# Ch.2 - 2.12 I, Vol. 6-5.3 V, Vol. 1 - 1.3, 4.2 V, Vol. 2 - 1.2, 2.5# 2.6, 2.9, 4.3, 4.8 VII, Vol. 1 - G.6, G.7, G.32, G.33 VIII, Vol. 2 - 1-2, 1-7# HI-51 VIII# Vol. 3# Ch.9 - Sec. 5 Purge and Product Systems (Temporary) Gaseous Diffusion Project II, Vol. 3# - 7.30, 7.31# 7.32 Purging System Gaseous Diffusion Project Construction - II, Vol. 4 - 3.31# 3.42 Design - II, Vol. 3# - 7.23 to 7.26, 14.5# 14*6 Operation - II, Vol. 5 * 4.6 to 4.8 Purification, Uranium end Hutoniirr. Los Alamos Project > VIII, Vol. 2 - 1-32, IV-Uff# VIII-2, VIII-5ff# srci-5» m i - 6 Purpose Assistance o n Canadian Pile Project I, Vol. 4» Ch.9 - 9.2, 9.3 Purpose and Scope A b b s Project (Iowa State College) I, Vol. 4# Ch.ll - ll.lff Manhattan District History I, Vol. 1 - 1.6ff

112 RESTRICTED d a ta

1 gfin I • ■■ pA ATOMIC ENfcNp* ACr 1 9 4 8 '“- V i ' Siv*? i

Quality Control Feed ?

R - R a d " 3 i o k

Racetracks Elect jtamagnetic Project Al p h a - V, Vol. 3 - 2.6, 2.10, 2.11, 2.19, 3.3, 3.5* 3.6, 3 .8 f t , 3.14ff, 3.19 7 # >Vol. 5 - 3.10ff, 3.19, 3.23 V* .Vol. 6 - 3.6, 3.7, 4.2, 4*4. 4*5, 4.8ff, 4.14# 4.15, 5.4 B e t a - V, V ol. 3 - 2.15, 2.16, 2.19, 3.3, 3.4, 3.11ff V, Vol* 5 - 3.20, 3.23 V, Vol. 6 - 3.6, 4.6ff • Exparimantal - 7 , V ol, 3 - 2.19, 3.13 7 , ]7o1. 6 - 3.5 R a c k Liquid; Thermal Diffusion Project VI r 3.6ff, 4.2ff, 5.5 Radiation) Pll« Project IV,, Vol. 2 - Pt.II - 4.2, 4.4, 4.5, 5.3, 6.1, 6.4, 6.6, 6.7 IV, Vol. 3 - 1.1, 5.16, 5.43 IV, Vol. 6 - 1.5, 4.17, 7.4, 7.5 Radiation Hydrodynamics Loa Alamos Project v n i , vol. 2 (supp.) - m-i, m-2, in-5, m-io, m-ii C Radioactive Disintegration Liquid thermal Diffusion Project V I 2 . 1 1 Radioactive Lead Feed MaVl* and Spec. Proc. VII, Vol. I, 6.1, 6.3 Radioactive Materials, Other, Procurement of Feed Mat'l. and Spec. Proc* VII, Vol. 1 - Sec. 6 Contract Negotiations - 6.1ff Operations - 6.1 sea also. Addenda, p. N2 Radioactivity Pile Project IV, Vol. 1 - 2.1, 2.2, 2.3 IV, Vol. 2 - Pt.I - 1.6, 1.7, 4.5, 4.6, 4.13, 5.4ff> 6.2 IV, Vol. 3 - 1-4, 3.2, 3.4ff* 5.3, 5.70, 6.13ff, 6.18, 6.19 IV, Vol. 5 - 1.4 IV, Vo*. 6 - 1.4, 1.5, 2.1B, 2.19, 7.4, 7.5 Radioactivity Iteasurements national Bureau of Standards I, Vol., 4 - Ch.l2 - 12.33ff Radio Altimeter (AID) Los Alamos Project VIII, Vbl. 2 - VII-19 Radio barium IV, Vol. 2 - Pt.II - 4.10 VIII, Vol. 2 -VIII-6, 37-11, XVII-15 VIII, Vol. 2 (Supp.) - VI-5

1 1 4 *3"'! DATA n # . REST W ATOM^fiNERG^^Crr 1946 Rad-Rad

i I Radiochoi&stry Amos Project (Ic^a State Collage) I,; Vol. Ut Ch.11 - 11.45, 11.46 I03 Alamos Project TOI» Vol. 2 - 1-23, IV-16, 71-7j 71-3, VI-22, VI-23, 711-16, ! VIII-21ff* HI-4* 37-16, X7II-12ff Till, Vol. 2 (Supp.) - VI-6* VI-7 Radiographic Research Los Alamos Project vr:i, vol. 2 (Supp.) vii-2, 711-3 Radioisotope Committee of Clinton laboratories Program for Production a ad Distribution of Radioisotopes I* . Vol. 4* Ch.3 - 3.10, 3.12 Radioisotopes, Program for Production and Distribution of Announcement to Public I,iVol. 4, Ch.3 - 3.10, 3.12 I, Vol. Ut C h . 8 — I t s ® 6 2 General I, Vol. 4, Ch.8 - Items 62 and 65 P r o g r a m Hfii Vol. 2 - P t . I I - 5.9# 5.10 I, Vol. Ut Ch.3 - 3.10ff Advisory Committee on Distribution - I, Vol. Ut Ch.3 - 3.12ff Costs and Prices * I, Vol* Ut Ch.3 - 3.14* 3.15* 3.21 Firfrt Proposal - X, Vol. 4 - Ch.3 - 3.10 Isotopes Branch, The - I, Vol* 4, Ch.3 - 3.10, 3.11 Operation « I, Vol. 4* Ch.3 - 3.11, 3.12 Requests for Radioisotopes * I, Vol. Ut Ch.3 - 3.20 - IV, Vol* 2 PtII - 5.9* 5.10 Prsss Releases I, Vol. Ut Ch.3 - Items 62, 65, (fit 70 Production of Rfcdioisotopes in Pile - X, Vol. Ut Ch.3 - 3.3ff Canning Operation - I, Vol* Ut Ch.3 * 3*3* 3*4 Cherafcal Processing - I, Vol* 4, Ch*3 • 3*6, 3.7 General - X, Vol. Ut Ch*3 - 3.3* 3.4 - IV, Vol. 2 - Pt.II - 5.9* 5.10 Instrumentation - I, Vol. 4* Ch*3 - 3.7, 3.8 Loading, Irradiation and Unloading - I, Vol. 4* Ch.3 - 3*5, 3.6 Value to1 Sciences and Medicine - I* Vol. Ut Ch.3 - 3*1# 3*2') Availability - I, Vol. 4* Ch*3 - 3.1, 3.2 , . . i, vol. a. oh.3 - 3 .2 z ? T f s 9 R a d i o L a n t h a n u m v. Vol» 4* Ch»3 " 3*8» 3*9 Los Alamos Project Tin, Vol. 2 - 7III-6. 7111-25, 17-11, XV-12, 2711-15, X7II-16 VIII, Vol. 2 (Supp.) 11-12, 11-22, V-llff, VI-5* VI-6, VII-2 Radio Station, Community (KTS) Los Alamos Project Till* Vol. 2 (3upp.) II-3, II-9, H-26, 11-30 R a d i u m Feed ifet'l and Spaa* Proc. 711, Vol, 1, 1.3ff, 1.9* 2*1, 4*1* 6*lff

1 1 5 R a d —Rar

s s c u w ^ ^ i n p o r m a t I0»

Radium (continued) File Project IV, Vol. 3, - 4.2, 5.3 IV, Vol. 6 - 1.5# 2.5, 4.28 Radium Bearing Sludge Peed !3at*l» and Spec* Proo. VII, Vol. 1 -^2.6 Radium - Beryllium Source Pile Project IV, Vol. 2 - Pt.I - 3.7 IV, Vol. 3 - 4.2 IV, Vol . 6-2.5 Radium Neutron Source Feed Mat'l. and Spec. Proc. H I # Vol. 1 - 1.9# 6.2 Radium, Relationship to Cranium Feed Mat'l. and Spec. proc. VII, Vol. 1-1.6# 1.7 R a d o n Los Alamos Project VIII# Vol. 2 - IV-16, IV-17, VI-7# VI-8, VIII-23 Radon - beryllium Los Alamos Project VIII# Vol. 2 - VI-6 Railroad System Clinton Engineer Works - I# Vol. 12 - 13.20» 13.21 Area Facilities — I, ^ol. 12 - Sec. 17 Gaseous Diffusion Project - II# Vol. 4 - 2.4# 2.5# 3.7, 3.11, 3.12, 3.13, 3.39, 3.40, 3.58# 3.59 Pile Project - IV, Vol. 1 - 3.1, 8.3 Electromagnetic Project V, Vol. 3 - 2.21 V, Vol. 5 - 3.27, 3.23# 4.3# 5.4 Hanford Engineer Works - IV, Vol. 5 - H.3, 1.6# 2.3ff» 5.4# 5.25ff, 5f29# 5.30, 7.1, 7.3# 7.9, 7.11ff, 9.1ff, 11.3 Area Facilities - IV, Vol. 3, - 7.4 to 7.7 Railroads, Land Acquisition Pile Project IV, Vol. 4 - 2.9# 3.3# 4.11 Railway Car, Shielding Pile Project IV, Vol* 3 - 3.5# 5.58 RaLa Program Los Alamos Project VIII, Vol, 2 - V-28, VII-31# IX-17, X-9, XV-8# XV-ll, XV-12, XVII-2, XVII-15# XVI1-16 Rare Earth Studies Ames Project (Ohio State College) I, Vol. 4# Ch.11 - 11.16

116 RESTRICTED* DATA

T O K S ' t S - .MIC Bara Earths I* Vol* 2, Ch.11 - 11.26, 11.46 to 11.49 Inc* V, Vol. 6-3.7 Rare Earths Alloy Studies Ames Project (io’-vs. State College) I, Vol. 4# Ch.ll - 11.26 Rare Earths Chemistry Amss Project (lo'wa S t a t e College) I, Vol. At Ch.ll - 11.46ff Haw Oreo to Black Oxida and Soda Salt, Refining of Feed Mat'l. and Speo* Proc* - VII, Vol, 1 - Sec* 7 Eldorado Operation - 7 *2f f Linde Air Products Company Operation - 7*5ff Operations» General - 7.1* 7.2 Vitro Manufacturing Company Operation - 7.4# 7.5 R e a c tivity IV, Vol. 2 - Pt.I - 3*7, 3*3, 5*2 IV, Vol, 6 - 4*24# 5.4 Reactor# Fast Los Alamos Project . VIII# Vol. 2 (Supp.) IV-3ff, VI-7, VI -8 Real Estate Pile Project IV* Vol. 6 - Sec. 10 Real Estate, Cara of Pila Project IV# Vol. 1 - Sec. 3 Reassessment Reviewing Committee II* Vol. 1-3*1# 3.2 II* Vol. 3 - 3 .3 , 3 .4 Rebolairo Mine Feed Mat’l* St>eo. Proc. and Geo. Expl. VII* Vol. 2 - 1.16 Receiver (E) Units Electromagnetic Project V* Vol. 2 - 1,4* 3 *6ff V, Vol. 3 - 2.3, 2.9# 3 *6 , 3.7, 3*10, 3*13# 3.17,3*19 Reciraulating Cooling Water System Gaseous Diffusion Project Construction - II# Vol. 4 - 3*33# 3*34# 3*44# 3*45 Design - II* Vol* 3 - 10.3 to 10.7, 14.13# 14*14 Operation - II# Vol. 5 *• 5.2 Reconstruction Finance Corporation Sandia Base 7HI, Vol. 3# Ch *6 - 1 Record, Operation Pile Project IV, Vol, 6 - Sec. 5 Records, Patent I, Vol, 13 * Sec. 5 Rec-Ref

SECURIpf-- 'itWefeAA'i ION

Recovery, Alpha Material Electromagnetic Project V, Vol. 3 - 3.25ff, 3.31, 3.35# 3.36, 3.33ff Recovery and Refinement of Uranium Salts Electromagnetic Process V, Vol. 2 - A.Aft Recovery# Beta Material Electromagnetic Project V, Vol. 3 - 2.14# 3.45# 3.46. 3.43 Recovery of Uranium Scrap Metal Ames Project (Iowa State College) I, Vol. 4# Ch.ll - 11.12, U.13 Recovery Operation, Slugs Pile Project IV, Vol. 6 - 2.4 Recovery Operations and By-Products, General Feed Mat’l. and Spec. Proc. VII, Vol. 1 - 1.13, 1.14 Recreation and Welfare, Construction Electromagnetic Project V, Vol* 5 - 5.4# 5.5 Gaseous Diffusion Project XI# Vol. 4 - 2.4# 3.62, 3.64# 3.65# 5.4 Recreational Facilities Los Alamoa Project VIII, Vol. 1 - 6.57, 6.58 Pila Project IV, Vol. 3 - S.22, 3.23 IV, Vol. 5 - 4.23ff# 5.12, 5.14 IV, Vol. 6 - 9.1# 9.16, 9.17 Recruiting Program, Personnel I, Vol. 8 * Sec. 2 Los Alamos Project VIII, Vol. 2 (Supp.) - II-6 Recruitment Program, Personnel Electromagnetic Project V, Vol. 6 - 3.1# 3.3ff Redox Solvent Extraction Process Pile Project IV, Vol. 6 — 4.24» 4*25# 5.16 Reference Committee of National Research Council Pile Project IV, Vol. 1-3.1 Refining and Treatment Feed Matl. and Spec. Proc. VII, Vol. 1 - l.lOff Refractory Bodies, Development of Ames Project (Iowa State College) I, Vol. 4# Ch.11 - ll,26ff Refrigeration Electromagnetic Projfact V, Vol. 6 - 7.9 RESTRICTED DATA.

ATOMIC ENERGY ACT 1946 Raf~Rese i ,r-jiulj •*''

Refrigeration, Cooling Water File Project XV, Vol. 3 - 3.3* 5.36, 5.67, 5.68 IV, Vol. 6 « 2.5#- 2.6, 2.13, 2.16, 5.3, 5.13# 5.14 Regional Air Priorities Control Board Loa Angeles Procurement Office VIII, Vol. 3# Ch.l - 2.10 Regulating Rods Pile Project IV, Vol. 3 * 5.31, 5.50ff Regulating Rod3, Clinton Pile Pile Project IV, Vol. 2 - Pt.II - 4.4# 4.6 Rehearsal Test, Trinity. Los Alamos Project VIH, Vol. 2 - XVIII-6ff Reich's Research Council (AISGS) Intelligence and Security I, Vol. 14 (Fgn. Int. Supp.) - 4.20, 4*21, 4.31, 4.43 Release of Materials for Research and Application Program for Production and Distribution of Radioisotopes I, Vol. 4, Ch.3 - 3.2 Religious Services Los Alamos Project VIII, Vol. 1-6.55# 6 . 5 6 Rental, Equipment Pile Project IV, Vol. 5 - 3.12, 3.13 Rental Rates, Housing Los Alamos Project VIII, Vol. 1 - 6.6ff R eports to P res i d e n t I, Vol. 1 - 3.6ff I, V01. 4, Ch.l - 1.2, 1.3 Reproduction Constant, Pile Pile Project S e e ^Multiplication Factor** Requisition Procedure Los Angeles Procurement Office VIII, Vol. 3, Ch.l - 2.3ff Research Electronsgnetic Project Chemical — V, Vol. 2 — 1.8, 1.9# Sec. 4 General *■ V, Vol. 1 - 1.2, 2.1, 2*2, Vol. 2 Physical - V, Vol. 2 — Sec. 3 M edical I, Vol. 7 - Sec. 5 and Supplement Pile Project IV, Vol. 1 - 4.2, 4.3 IV, Vol, 2 - Pt.I r /, Vol. 2 - Ptjci Rese-Reat

S.SCiMMBIis;ii#OKMAX I UK

Research and Development Feed Matl. and Spec. Proc. VII, vol. 1 - 1.12 Heavy Water (P-9) Project III - Sec. 2 Liqtdd Thermal Diffusion Project VI - Sec. 2 Research and Development of Atomic Energy for Power See "Power# Research and Development of Atomic Energy for* Research Corporation I# Vol. At Ch.2 * 2.22 Research Division Los Alamos Project VIII, Vol. 2 - IX-1* X-2, X-9# XI-2, Ch.XII Fission Cross Sections — XII-4-# XH-5 Fission Spectrum - XII-3, XII-4 ill'scells.neoua Experiments * XII-9# XII-10 Multiplication Experiments - XII-6ff Neutron Number Measurements - XII-2, XII-3 Organization - XII-1, XII-2 Other Integral Experiments - XII-8, XII-9 Scattering Experiments - XII-5» XT 1-6 Spontaneous Fission Measurements - XII-3 Research Program Ohio State? Cryogenic Laboratory VUI, Vol. 3* Ch.3# Pt.II - Sec. 2 Research Program and Budget Argonne National laboratory I, Vol. At Ch.2 - 2.15 t 2.16 Research Program Contract Ohio State Cryogenic laboratory VIII, Vol. 3* Ch.3* Pt.I - 3.1 VUI, Vol. 3 1 Ch.3 - Pt.II - 1.2 HosdZ^voir liquid Thermal Diffusion Project VI - 2*13# 4*4* 5.11f?* 5.17# 5.13 Reservoirs

I, Vol. Ap Ch.5 - 5.10* 5.12# 5.1At 5.17

Pile Project XV, Vol. A - 1.1* 2.1, 3.1* 3.2, 4.1* 5 *At 6.2# 6.3

120 Resu-Ric

- ''' 1OS?

Results and Conclusions Operation Crossroads V I I I , V o l. 3# Ch.3 - 8 .4 5 f f Evaluation Board Preliminary Statement - 8.46ff Results of Investigations (AISQS.) Intelligence & Security I, Vol. H (Fgn. Int. Supp.) Italian Mission - 3.2ff Japanese Mission - 5.2, 5*3 Western and Central European Mission - 4.47ff Results (General) of Program Feed Mat’ l . and Spec. Proc* VII, Vol. 1 - 1.14 Results, Trinity Los Alamos Project V m , vol. 2 - X7III-17ff Retention Basin Pile Project s IV, Vol. 3 - 3.4# 5.36, 5.70 IV, Vol. 5 - 6.6 IV, Vol. 6 - 2.6, 2.17 Returns to Treasury, Silver Program Electromagnetic Project V, vo l. 4 - Sec. 4 Revenues, Land Acquisition Pile Project IV, Vol. 4 - 7.2 Reviews of Activities Los Alamos Project . See either "General Review* or "Technical review* Rice Institute Los Alamos Project VIII# Vol. 2 * 1-2, 1-25* VI-9 Richland Airport Pile Project IV* Vol. 6 - 8.3 Richland Cemetery Pile Project IV, Vol. 6 - 10.3 Richland Irrigation District Pile Project IV* Vol. 4 - 2.6ff# 4.23 IV, Vol. 5 - 5.31 Richland, Land Acquisition Pile Project IV, Vol. 4 * 2.Iff, 2.5# 2.10ff Richland V illa g e pUe^ProJeot^ ^ 1 . 5, 5. 1 . 6.2, 7.9, Seo. 3

RESTRICTED DATA AtOMK^ENCTGY ACT 131# R ic ~ R o a SECURITY F O R M A T IO N

Richland V illa g e (continued) Administrative Area - IV , Vol, 3* - 7.6, 3.5 and 3 ,2 3 IV, Vol. 5 - 7.11, 3.5ff Churches * IV, Vol. 3 - 3.20, 8.21 Commercial Facilities - IV, Vol. 3 - 3.10 to 3.13 IV, Vol. 5 - 8.1* 3,4 Communications - IV, Vol, 3 - 8,23 Coats, Construction - IV, Vol. 5 - 11,2, 11,4 Fir* Protection - IV, Vol. 3 - 3.3, 3.21, 3.22 General - IV, Vol. 3 - 3,1 to 3,5 ivy Vol. 6 - Sec. 9 Housing Facilities - IV, Vol, 3 - 8,5 to 8,10 IVk Vol. 5 - 3.2, 3.4* 3.5 Uedical and Dental Facilities - IV, Vol. 3 * 3,16 to 3,19 Recreational Facilities -IV , Vol, 3 - 8,22, 3,23 Sanitary Facilities * IV, Vol, 3 - 8,24, 3,25 Service Facilities - IV, Vol, 3 - 3,13 to 8.16 IV* Vol. 5 - 7.1, 7.2, 7,3* 7.7 Streets and Walks - IV, Vol. 3 - 8.27 to 8,28 IV, Vol, 5 - 7.11 i Transportation Facilities - IV, Vol. 3 - 3.28 IV, Vol. 5 - 9.1, 9.5 U tilities - IV, Vol. 3, - 8.23* 8.24 Water Supply - IV, Vol. 3 - 8^25 to 8.27 R ichland V illa g e , Management Pile Project IV,i Vol. 6 - 9*1 Riverland Irrigation D istrict, Land Acquisition Pile Project IV, Vol. 4 * 2.6 Hiverland Sards Pile Project IV,i Vol. 5 - 5.30, 7.11 IV,i ol. 6 - 3.1, 3.2 River Pump House Pila Project IV# Vol, 5 - 6.10ff IV,; Vol. 6 - 2.5* 2.13* 2.14 Roads Electron#gnetic Project V, fool. 3 - 2,21 V, Vol, 5 - 3.27, 3.37, 4.3 Los Alamoa P r o je c t vnjl, Vol. 1 - 2.4ff* 5.2, 5.3* 5.13* 504* 5.26, 5.23 Roads and Streets Pile Project IV,| Vol. 1 - 3.1, 8.2 IV,| Vol. 3 - 7,4* 7.5* 8,27* 8,23

IV* Voll 5 - 2,*5? 5.12* 5.27ff, 7.1, 7.3ff, 8,3* 9.1, 11.3* H .4 IV* Vol. 6 - 10.1, 10.2

V RESTRICTED DATA ATOM ^fejERG? ACT 1948 ^ .rv-r7i T* ‘Tf* /(Da Roa-Rut c f Z X T b i j * n r s j ^ gEWfl*fll9h'ORMiioisr

Roads# Construction Gaaeous Diffusion Projact II, Vol. 4 - 2.4, 2.5# 3.6, 3.7, 3.10, 3.11, 3.39, 3.40, 3.53 Rochester Area I, Vol, 14 — S7.4 Rochester, University of I, Vol. 4# Ch.2 - 2.23 I, Vol. 6 - 4.1» 6.2 I, Vol. 7 - 4.13, 5.7, 5.8, 5.10, 5.15, 5.16, 5.20, 5.21, 5.22 I, Vol. 12 - 10.1, 7, Vol. 2 - 5.4 Los Alamos Project m i, Vol. 2-1-7 VIII, Vol. 2 (Supp.) - III-3 Rockefeller Institute of Medical Research I, Vol. 4, Ch.2 * 2.22 I, Vol. 4, Ch.14 - 14.38 Rods (Uranium) Pile P r o je c t IV, Vol. 3 * 5.25ff* 5.29ff, 5.47ff IV, Vol. 6 - 4.3, 5.12, 5.16 Rods, Control Pile P r o je c t IV#, Vol. 3 - 5.30, 5.31, 5.50? 5.52, 5.53, 5.54 IV,| V o l. 5 - 6 .1 3 IV, Vol. 6 - 1.4, 2.9ff, 4.16, 5.1, 5.4, 5.5 Roma Investigation (AIS0S) Intelligence and Security I, Vol. 14 (Fgn. Iat. Supp.) - 3.4ff Rosw ell Arngr A ir F ie ld , N.M. Arsy Air Fields VIH, Vol. 3, Ch.9 - 9.18 Royal Canadian Mounted Police I, Vol. 14 - S3.2 Rural Electrification Administration Pile Project IV, Vol. 1 - 8.3 Rutgers University I, Vol. 4# Ch.2 - 2.22

DATA a ACT ,48 , ■ s -Saf

S - l Executive Committee (OSIID) I, Vol. 1 - 3.6, 3.17 I , V o l. At Ch. 12 - 12.6 I , V o l. At Oh.14 - 14.21, 14.22, 14.34? 14.35 III, 1.3, 3.5> 3.8, 3.9 II, Vol. 1 - 1.2, 3.1 II,.Vol, 3 - 3.1. 3.2 IV, Vol, 1 - 1.2 IV, Vol. 2 - Pt.II - 1.2 IV, Vol. 6 - 1.2 V, Vol. 1 - 1.2 5-1 Section (OSED) I, Vol. 1 - 3.5, 3.6 I, Vol. 4, Ch.12 - 12.3, 12,4> 12.5, 12.6 I , V o l. At Ch.14 - 14.25 IV, Vol. 1 - 3.2 5-50 Materiel Feed to Plant Gaseous Diffusion Project See w#Saterial Feed to Plant® S a fe ty liquid Themil Diffusion Project Construction - VI » 3.21, 3.22 Operation - VI * 5.22ff Los Alamos Project VIII, Vol. 1 - 6.63, 6.64 VIII, Vol. 2 (Supp.) II-l6ff, IV-7, V-ll Safety Committees Brafibtoy-Felbeck-Keith Committee II, T.S* App. No. 1 — 4 II, T.S. Supp. No. 1 - 15 to 20 Central Safety Committee - E.E.W. IV, Vol. 6~- 7.1, 7.2 K-25 Special Hazards Committee II, T.S. App. Ho. 1 -5 New York Safety Committee II, Vol, 3 - 16.1, 16.2 I, Vol. 7 - 3.2, 3.3 Plant II - Special Hazards Committee II, T.S. App. Ho. 1 - 4, 5 Safety Advisory Committee if, Vol. 2 - 9.1 Special Hazards Comittee I I , V o l. 5 - 9 .6 Safety Committee (Laboratory) Los Alamos Project VIII, Vol. 2 - 111-36, IX-19 S a fe ty , H.E.W. Pile Project IV, Vol. 3 - 5.2, 5.3, 6.50ff IV, Vol. 5 - Sec, 10 IV, Vol. 6 - Sec. 7

ENERGY ACT 19* s SECUftiffif^irra'ORMATIOE

Safety Measures, Polonium Production Dayton Project VHX, Vol. 3, Oh. 4 - 4.4* 4.5 Safety Program Electromagnetic Project Construction - V, Vol. 5 - 5.5ff Design - V, Vol* 3 -3 .5 3 Operation - V, Vol. 6 - 7.Iff Research - V, Vol. 2 - 2.11» 4*10* 4.11 Fire Prevention E n d Protection I* Vol. 11 (Supp.) Sec. 7 I, Vol. 12 - 19.9 to 19.17 Gaseous Diffusion (K-25 end K-27) Project Construction - II# Vol. 4 * Sec. 4 Design - II* Vol. 3 ** 7.2# 16.1* 16.2 General - II# Vol. 1 * 6.1* 6.2 Operation - II* Vol. 5 - 9.1 to 9.6 Research - II* Vol. 2 - 9.1* 9.2 General I* Vol. H - Sec. 1 I, Vol. 11 (Supp.) Los Alenas Project VIII, Vol. 2 - III-3S* III-40* III-41* VI-22* IX-19* H II-ll, 2V-3* xv-4* XW17* m .i-8* xvii-13 Occupational Safety I* Vol. 11 Sec. 5 and Supp. I* Vol. 11 Sec. 2 and Supp. I* Vol. 7 - 3.2* 3.3* 3.26* 3.27* 3.52 Organisation and Personnel %t Vol. 11 - Sec. 6 and Supp, Other Safety Activities X* Vol. 11 - Sec. 4 and Supp. Pile Project Construction - IV* Vol. 5» Sec. 10 Reso&rch (Clinton Ifibowtories) m IV# Vol# 2 ** Pt^H • 3#4 Public Safety I* Vol. 11 - Sec. 5 end Supp. I, Vol. H - Sec. 3 end Supp. S a fe ty Rods, Clinton Pile Pile Project IV* Vol. 2 - Pt.II - 4.2* 4.4 1 4 .6 Safety Hods, Hanford Piles Pile Project IV* Vol. 3 - 5.31* 5.32* 5.50 to 5.55 IV* Vol. 6 - 2.9ff» 4*16* 5.5# 5.10 Safety Tubes, Clinton Pile Pile Project IV, Vol. 2 - Pt.II - 4.6 St. Louis Area I, Vol. 6 - 2.7 I, Vol. 14 - S7.4 VII, Vol. 1* 1.20* 1.21. fc-J* tf—# \isr^ & &*?.A Sri XPI% Sai-San rv$&* secumjli ^ omui

St. Louis University I, Vol. 4> Ch.2 ^ 2.12 Salary Problem Los Alamos Project VIII, Vol. 2 - 111-14, III-15, III-20ff, 12.12, IX-20, 12-21 VIII, Vol. 2 (Supp.) II-4» H-5# H -7, 11-10, 11-25 S ales Comparison, Land A cq u isitio n Pile Project IV, Vol. 4 - 4.10, 4.11, 7.2 Salt Wells Pilot Plant Navy Participation VIII, Vol'. 3, Ch.5 - 5.4 P r o je c t Camel VIII, Vol. 3# Ch.2 - 2.22, 2.45# 2.50ff Salvage Items, Hanford Camp Pile Project IV, Vol. 6 - 15.2 Selvage Material liquid Thermal Diffusion Project VI - 5.12, 5.13 SAM Laboratory I , V0li 4-# Ch. 14 — 14.16 H , Vol. 1 - 3.3 I I , V o l. 2 II, Vol. 3 - 7.20, 11.16 II, Vol. 5 - 2.3 VIII, Vol. 2 - 12-11 VIII, Vol. 3# Ch.7 - 7*lff Sasarium Pile Project IV, Vol. 2 - Pt.II - 6.5 Samarium Oxide Pile Project IV, Vol. 6 - 4.23 Sandia Base VIII, Vol. 3> Ch.6 I, Vol. 14 - S7.5 Costs - VIII, Vol. 3, Ch.6 - 8 Intelligence and Security- VIII, Vol. 3, Ch.6 - 6 Operations - VIII, Vol. 3, Ch.6 - 3ff Organization and Personnel «• VIII, Vol. 3, Ch.6 — 6f£ Purpose and Scope - VIII, Vol. 3, Ch.6 - 1, 4 2761st Engineer Battalion (Special) - VIII, Vol. 3, Ch.6 - 6 Storage Project ,, I, Vol, 4, T.S, Supplement - 2, 3, 4# 6, /» j-4j> lw ±-} Sandia Site tosvra 7 v0:u f Supp.) - 1-12, v-11, v-15, vxn -i, n n -2 , m i -6 Sanitary Facilities, Richland Village Pile Project IV , V o l. 3 - 8 .2 4 k S.25

126 RESTRICTED DATA ATOMIC y I A ^ 1 * S a n ita ry ?

Scrap Collection; Silver Program Electromagnetic Project V* Vol* 4 # 4*2; 4-3 Scrap Material Pile Project IV , V o l. 6 - 4*2, 4*23, 6.2 Sealing Fluids Ohio State Cryogenic laboratory T in , Vol, 3# Ch.3* Pt.II - 2.4* 2.5 S eals* Pttap Gaseous Diffusion Project II, Vol. 3 - 5.3* 5.6* 10.7* 10.8* 10.16, 10.18* 11.12 II, Vol. 5 - 6.3* 6.4* 6.5* 8.2 Secondary Products Pile Project IV , V o l. 6 - 1.5* 1*6* 4.26ff* 5.13 Secretary of State’s Committee (January 1946) Contributions of Manhattan D istrict Representatives to Discussions and Proposals for International Control of Atonic Energy I, *ol. 4, Ch.7 - 7.5 S e cu rity am X* V o l. 1 -1 .5 1 , Vol. 4* Ch.l - 1.3* 2.5* 2.6* 2.9* 3*2* 3.3

Amy Air Fields VIII, Vol. 3* Ch.9 - 9.7ff* 9.13* 9.14 Camel m i, Vol. 3* Ch.2 « Sec. 10 Canadian Pile Project I* Vol. 4* Ch.9 - 9.4 Declassification and Distribution of Project Information I , V o l. 4* Ch.5 - 5. 2, 5.5ff* 5.16* 5*23, 5.25* 5.30 Electronicgnetic Project V* V o l. 6 - S e c. 6 Gaseous Diffusion Project XI* vo l . 1 - 6. 2* 6 .3 XX, V o l. 2 - 9.2 to 9 .4 XI, Vol. 3 * 16.2 to 16.6 II, Vol. 4 * 3.61, 4.2 I I * V o l. 5 - 9.6 to 9 .1 0 liauid Thermal Diffusion Project VI - 3,21, 5.25* 5.26 Los Alamos VIII* Vol. 2 (Supp.) IX-1, IX-6 _ VIII, Vol. 2 - I-4ff* 1-9, 1-34* III-4ff, II^ l^ ?* trtr n/ YTTTT T IT1 - 22* 111-29* 111-31* III-5&* Vll*4i VH-24, XVIII-16 s: Los Angeles ' , „ fteJ vm* V o l. 3* c h . l - 1 . 2* 1 .3 * 2. 6f f , 2 . 12 * 2, 1 _> Ohio S ta te VIII, Vol. 3* Ch.3 - Pt.II - 3.1* 3.2 Pile Project IV* Vol. 5 - 1*7* 4.18 Security (continued) Storage roject I, Vol. 4, T.S. Supplement - 11# 12 Security of Information If Vol. 14 - Sec, 6 and Supplement Security Program Electromagnetic Project Construction - V> Vol. 5 - 5.9ff General - V# Vol. 1 - 3.2# 3.3 Research - V# Vol. 2 • 2.10 Security# Shipping Procedure Los Angeles Procurement O ffice VIII# V o l. 3# C h .l - 2. 2, 2. 6# 2.15 Security# Silver Program Electromagnetic Project V , V o l. 4 - &ac, 5 Security System C lin ton Engineer Works I, Vol* 13 - 1.4# 1.5* 1.6# 1.7 Area Facilities - I# Vol. 12 - Sec. 19 Electromagnetic Project Operation - V# Vol. 6 - 3.5# 6. I f f Selection of Site# Land Acquisition Pile Project 17, Vol. 4 - Sec. 1 Selection of Wendover as Test and Training Base Arsy Air Fields ¥1 1 1 , V o l. 3# Ch.9 - 9 .1 1 , 9 .1 2 Selective Service Program I# V o l. 8 - S e c, 6 IV, Vol. 5 - 4.1S Semi-works Pile Project IV# V o l. 1 - 4 .3 IV# Vol. 2 - Pt.II - 5.2, 5.4 IV, Vol. 3 - 5.20# 5.21 Semi-Works, Separation Plant Pile Project IV# Vol. 3 - 3.2# 4.2# 6.22 IV# Vol. 5 - 6.4# 6.5 p Senate Special Comralttee to Investigate the National Defense ^rograe Legislative Contacts I# Vol. 4, Ch.l - 3 . 2f f Action Regarding Complaints - 3.2ff Inspection at K.E.W. - 3.5ff Seneca Ordnance Works Feed Mat'l and Spec. ^roc. VII# Vol. 1 - 2.5 Senior Responsible Reviewers Declassification and Distribution o f Project Information I, Vol. 4, Ch.5 - 5.14? 5.15 Separation Area, Design Pile Project IV, Vol. 3 - Sec. 6 Separation Areas, Operation Pile Project IV , V o l. 6 - 2.1, 2.18ff, 5. 6, 5*7, 5.9, 5.31, 5.12, 7*3# 8. 1 , 1 8 .3 Separation Buildings Pile Project IV , V o l. 6 - 2*23ff# 5.9# 5.11 Separation, Clinton Laboratories Pile Project Area * IV, Vol. 2 - Pt.II - 2.4# 2.10 Plant - IV, Vol. 2 - Pt.II - 5*5ff Process - IV, Vol. 2 * Pt.II - 1.1, 3.4# 5.Iff Sepsration Factor Liquid Thermal Diffusion Project VI - 2 .8 Separation Process, Plutonium, Construction Pile Project IV, Vol. 5 ** 1*3# 1*4# 1*7, 2.3# 2.6, 2.7, 5*27, 5.31# 6.4# 6. / , 6. 22ff, 7.1, 7.2, 7.5# 7.7 Separation Process, Plutonium, Design Pile Project IV , V0i , 3 Alternate Processes -IV , Vol. 3 - 6.1ff Areas — IV, Vol. 3 * 3*1# 3*2# 3*5ff# 4*1, 4*2, 7*3# 7*6 Capacity - IV, Vol. 3 - 3*5 Decay Storage - IV, Vol. 3 * 3*5# 6.10, 6.11 Early History of - IV, Vol. 3 - 6*5ff Final Design - IV, Vol. 3 - 6.9 General - IV# V01 . 3 - 1.3ff# 3.1# 3.2, 6. I f f Isolation System - IV, Vol. 3 - 3*1# 3.5# 3.6, 6.18, 6.19 Lag Stoiage - IV* Vol. 3 — 3.2, 6.10, 6.11 Plants - IV, Vol. 3 - 3*5# 5.27, 5*28, 6»9ff Building - IV, Vol. 3 - 3*5# 3.6, 6.9ff Cells - IV, Vol. 3 - 3*5# 3*6# 6.13ff Concentration - IV, Vol* 3 - 3*5# 3*6, 6*10, 6.18 Crane - IV, Vol. 3 " 6.16, 6*17 Facilities - IV, Vol. 3 - 3*5# 6.9ff Instruments - IV, Vpi. 3 - 6.17, 6.18 Piping - IV, Vol. 3 - 6.15 Ventilation - IV, ^ol. 3 - 6.10, 6.20, 6.21 Process Easte Storage ■■ IV, Vol. 3 “ 6.10, 6.19, 6.20 Semi-Tsorks ■» IV, Vol. 3 m 3*2, 4.2, 6.22 Steam System - IV, Vol. 3 - 3*5# 6.21, 6.22 Water System » IV, Vol. 3 - 3*5# 5*64ff# 6.21 Separation Process, Plutonium, Operation Pile Project IV , V o l. 6 - 2 .1 8 ff Sep-She

SEqtfBiflT'flfFORMATIl

Separation Process# Plutonium# Research and Development Pile Project 17, Vol. 2 - Pt.I - 1.12, 2.2, 4.12, Sec. 6 IV, Vol. 2 - Pt.II - Sec. 5 Septic System, Clinton Laboratories Pile Project IV, Vol. 2 - Pt.II - 2.6 Sequence of Start-Ups Pile Project IV, Vol. 5 ■- 6.2, 6.23ff Service Contract, Construction ■^ectromagnetic Project V, V o l. 5 * 3 .2 9 ff Service Facilities Electromagnetic Project V, Vol. 3 - 2.19ff Pile Project IV, Vol. 1 * 1.2 IV, voi. 2 - Pt.II - 2.5* 2.6 IV, Vol. 3 - Sec. 7, 6.13 to 8.16 IV, Vol. 5 - 1.6* 2.5* 5.11, 5. 22, 5.27ff, Sec. 7, 8.3 9.Iff# 11.3, 11.4 IV , vo l . 6 * 2 .2 4 Service Installations, Process, Design Gaseous Diffusion Project II, Vol. 3 - Sec. 10, 14.12 to 14.18 Service Shops Electronagnotic Project V, Vol. 3 - 2.19# 2.20 Settlements in Excess of Appraised Value, Land Acquisition Pile Project IV, Vol. 4 - 4.3* 4.4 Semge Disposal Liquid Thermal Diffusion Project VI * 4.11 Sewage System C lin ton Engineer Works Area Facilities - I, *ol. 12 - Sec. 14 Clinton Laboratories - IV, Vol. 2 - Pt.II - 2.5 Electromagnetic Project - V, V01 . 5 - 3.24* 3.25 V, Vol. 3 - 2.25* 2.26 Gaseous Diffusion Project » II, V01 , 4. - 3,17 to 3 .1 9 , 3.3? E E W * Eichland Village - IV, Vol. 3 - 8.24* 8.25 Los Alaaos Project VIII, Vol. l - 5,22, 5.23 Shell Assembly (Implosion ^onib) * Los Alamos Project VIII, Vol. 2 (Supp.) - 11-12 r jtr 'f rgpe Shi-Shu

sHMBWS*tNFORMATI<

S h ie ld in g Pile Project nr, Vcl«, 2 - Pt.I - 3.4* 3.5, 3.9* 3.13, 3.14* 4.3 IV, Vol. 2 - Pt.II - 4.2# 4.3, 4.4? 4.5, 5.3, 6.5, 6.6 IV, Vol. 3 - 3.4, 5.2?, 5.33, 5.39, 5.44ff IV, Vol. 5 - 2.8, 6.13ff, 6.18 IV, Vol. 6 - 1.5, 2.7, 2.9, 2.19, 2.20, 2.22, 4.15, 4.16 Shielding, Railway Car Pile Project IV , V o l. 3 - 3 . 5, 5.58 Shim Rode Pile Project XV, V o l. 2 * P t .I I ** 4*4, 4 .6 IV, Vol. 3 - 5.31, 5.50ff Shins;, Magnetic Electromagnetic Project V, Vol. 2 - 3.4 Shihkolobwe Mine Feed Matfl. Spec. Proc. end Geo. Expl. VII, Vol. 1 - 1.3, 1.8, 2.1, 2.2, 2.3, 3.2 VII, Vol. 2 - 1.16 Ship Danege Operation^ Crossroads VIII, Vol. 3, Ch.8 - 8.11 Ship Propulsion Nuclear Energy for - I, Vol* 4, Ch.4 - 4.15, 4.16 Shipment Program for Product5.on and Distribution of Radioisotopes I, vol. 4* °b.3 - 3.8, 3.9* 3.18, 3.19 Shipment, First of Product Electromagnetic Project V, vol. 6 - 4.5 Shipments (Operating) Gaseous Diffusion Project S-ec t >r f rLliipasnts" "Schedule (Operation) Shipment Security I, Vol. 14 - Sec. 5 and T.S. App. IV, Vol. 6 - 11.5 Shop, Conditioning liquid Thermal Diffusion Project VI «* 5*18 Shops Los AlamoF P r o je c t VIII, Vol* 2 - III-42ff, VII-21, IX-19ff, XVI-13, VUI, Vol. 2 (Supp.) - n -9 f f , 11-15 Shops, Los ALamos Detroit Office VIII, Vol. 3, Ch.9 - 9.1 Shutdown Liauid Thermal Diffusion Project VI - 5.26ff

; 1 3 2 R ESTR IC T Ei DATA ATOMC j^ JJIS IG Y .ACT 1846 Shu-Sit SEC'U'Ri^g* INFORMATIO

Shutdown o f Alpha Electromagnetic Project V, V o l. 6 - 4 .1 4 Shutdomis Electromagpactic Project V, Vol. 6 - 3.7, 4.2, 4.14, 4.15 Side Purge Operation Gaseous Diffusion Project IX, Vol. 5 - 4.3, 4.9 Sidewalks Los Alamos Project VIII, Vol. 1 - 5.13, 5.14 S ilv e r Electromagnetic Project V, Vol. 3 - 4.21 •Silver Plate*1 Modifications Amy Air Fields VIII, Vol, 3, Ch.9 - 9.7, 9.8, 9.14, 9.15 Silver Program, Definition Electromagnetic Project V, V v l. 4 * 2 .1 S it e Argoiine National Laboratory I, Vol. 4, Ch.2 - 2.17ff Brookhaven National Laboratory I, Vol. 4, Ch.2 - 2.29, 2.31ff Electronagnetic Project Description - V, Vol. 1 -3 .1 Selection - Vj voi* 3 - 1.9, 1.10 Gaseous Diffusion P r o je c t II, Vol. 1 - 3*2, 3*3, 4.1, 5.9, 5.10 H> Vol, 3 * Sec. 6 - 14.1, 14.2 II, Vol. 4 - 3.6 to 3.9, 3.39, 3.40 P rO ^ 0C ti Acquisition - IV, Vol. 4 “ l.lff, 2.1fi, 2.11, 2.12 Clinton laboratories - IV, Vol. 2, Pt.II - 1.2, 1.3 Development - IV, Vol. 5 - 2.1, 2.2 Preliminary Investigation - IV, vol. 3 - 2.4? 2.5, Requirements - IV, Vol. 3 “ 2*Iff Selection - IV, Vol. 3 - 2.6, 2.7, 2.8 Site Considerations Los Alamos Project VIII, Vol. 1 -2 .2 Site, Description of (Land Acquisition) I, Vol. 12 - 2.6ff IV, Vol. 3 - 2.6ff IV , V o l. 4 - £ ©e« 2 IV, Vol. 2 - Pt.I - 2.6 VIII, Vol. 1 - 2.4ff

1 3 3 RESTftOED DATA ATOM ^^ERGY ACT 194S Site Requirements Los Alamos ^roject VIII. Vol. 1 - 2.1, 2.2 Storage roject I, Vol. 4, T.S, Supp. - 2 Site Selection Dayton Plant VIII, Vol. 3, Oh.4 - 4.7 Liquid Thermal Diffusion Project VI - 3 .5 Los Alamos Project VIII, Vol. 1 - Sec. 2 VIII, Vol. 2 - I~3ff Site Selection and Location Assistance on Canadian Pile Project I, Vol. 4s Ch.9 - 9.9 Site Selction, Trinity Los Alamos Project VIII, Vol. 2 - rfIII-2, XVIII-3 S ite s Los Alamos Project Sites are listed under the following names in this index; Alpha, Anchor Ranch Proving Ground, Bayo Canyon, Beta Storage Project I , V0i , At T.S. Supp. - Iff 603rd Air Engineer Squadron Army Air Fields VIII, Vol. 3, Ch.9 - 9.13 S^zilard Effect Pile Project IV, Vol. 6 ~ 4.14, 4.19 Slug, Blisters Pile Project IV, Vol. 6 -4 .2 2 , 5.14, 5,16 Slug Canning Pile Project IV, Vol. 3 - 3.2, 4.1, 5.26, 5.47ff IV, Vol. 2 - Pt.I - 4.6 to 4-10, 4.12* 5.3? 5.4, 5.5 IV, Vol. 2 - Pt.II - 4.2, 4.7, 4.8, 4.9, 5.2, 6.1ff IV , V o l. 5 - 1 .3 IV, Vol. 6 - 2.2ff, 4.1 Slug Swelling and Can Failure Pile Project IV, Vol. 2 - Pt.I - 5.3 to 5.6 Slug Swelling and Can Failure, Detection of, Research Pile Project IV, Vol. 2 - Pt.II - 6.Iff Slugs, Bismuth Pile Project IV, Vol. 6 - 1.6 Slugs, Blistered Pile Project IV, Vol. 6 - 4.22, 5.14s 5.16 Slugs (HE??) Pile Project IV, Vol. 3 - 3.2, 4.1# 4.2, 5.41» 5.47ff IV, Vol. 6 - 2.2, 2.4# 2.6, 2,18,* 4.2ff* 4.13, 4.22, 5 .1 , 5.4# 5.8ff, 5.16 /2.21, Slugs, Thermocouple Pile Project IV, Vol. 6 - 4.25# 4.26 Declassification and Distribution of Project Information I, Vol. 4, Ch.5 - 5.5# 5.6# 5.13 Initial Issue I, Vol. 4# Ch.8 - Items 31# 31a Preparation and Publication of I, Vol. 1 - 1.3ff I, Vol. 4, Ch. 13 I, Vol. 4 - 1.4* 1.5 SMX (Clinton) Pile Pile Project IV, Vol. 3 - 4.2, 5.20, 5.21 S o i l , Land A cq u isitio n Pile Project IV , V o l. 4 -2 .3 Solvent Extraction Processes, Separation Bile Project IV, Vol. 2 - Pt.I - 6.3, 6.4# 6.5 IV, Vol. 2 - Pt.II - 5.1 IV, Vol. 3 - 6 ,lff, 6.7 IV, Vol. 6 - 4.24, 4.25# 5.16 Source (M) Units Electromagnetic Project V, Vol. 2 - 1.4* 3.5# 3.6 V, Vol. 3 - 2.7ff, 2.11, 2.12# 3.3# 3.5ff, 3.17# 3.19 Sources of Operating Trouble IV, Vol. 3 - 5.7# 5.8 South Mesa S it e Los Alamos Project VIII, Vol. 2 (Supp.) VII-6 S p e c ia l B a tta lio n , U. S . Anay Los Alamos Project VIII, Vol. 2 (Supp.) - VIII-6, VIII-7 Special Chemicals, Operation Gaseous Diffusion Project II, Vol. 5 - 5.7 to 5.9 Special Components (Bomb) Machining end Assembly Navy Participation VIII, Vol. 3, Ch.5 - 5.9 57j%y ‘;~^fTy-'r:?f^^|,T.'?r v~r

. *pa Spe-Sta Ujig S f t f e 1 T>5,rr. TIGS'

Special Engineer Detachment Lob Alamos P r o je c t VUI, Vol* 1 - 6.9, 7,3* 7.5* 7.9* 7.10 viii, Vol. 2 - m - i 7 f f VIII# Vol. 2 (Supp,) II-6, 11-10 Sandia Base V I I I , V o l. 3# Ch.6 -2 ,3 Special Hazards Committee See ^Safety Committees*1 Special Instrument Shops and Test Facilities Pile Project IV, Vol. 3 - 4.2, 4*3 ■ Special Ordnance Detachment (Wendover Field) Sandia Ease VIII, Vol, 3* Gh.6 - 2, 3 Special Reviewing Committee Los Alamos P r o je c t VIII, Vol. 2 - 1-11, I-31ff, III-4* III-6ff, VII1-2, VIII, Vol. 2 (Supp.) - II-l Specifications for Final Product Pile Project IV, Vol, 6 - See* 3 Spectrographic Analyses, Uranium JJational Bureau o f Standards I , V o l. 4* Ch.12 - I 2 .1 3 ff Spheres (la gilosion Eomb) Los Alamos P r o je c t VIII, Vol. 2 - XV-11, XVI-6, M I-9 , XVII-10 VIII, Vol. 2 (Supp.) - 11-12, Vt-S P r o je c t Camel VIII, Vol. 3# Ch.2 - 2.26, 2.27 Spontaneous Fission Measurements Los Alamos P r o je c t VIII, Vol. 2 - IV-17, VI-6ff, X-9, H I-2, HI-3 S S it e Kavy Participation VIII, Vol. 3* Ch.5 - 5.3 S Site (Samd.ll) Los Alamos Project VIH, Vol. 2, - VII-3, VII-30, VII-31* XVI-2, XVI-14, XVI-15, XVI-17 VIH, Vol. 2 (Supp.) - II-10ff S ta ck , f o r Gaseous; SJaste Pile Project IV, Vol. 2 - Pt.II - 4,2, 4,5* 4.8, 5,3 IV, Vol. 3 - 5.20, 6,20 Stadtilm Operation Intelligence and Security i I, Vol. 14 (Fgn. Int, Supp.) - 4.25ff Stage Design Gaseous Diffusion Project II, Vol. 3 - 7.8 to 7.H

ATOMl< VC-T 1946 f S ta -S t<

t m

Stainless Steel Pile Project IV, Vol* 3 - 3. 6, 5.6* 5.36# 6. 6, 6.16 Standard O il Development Col I, Vol. Ch.2 - 2.22 Standard Oil Co, of Indiana Boron (E^O) - VIII, Vol. S, Ch.7 - 7.4ff Standards Building Pile Project IV , V o l. 6 -2 .5 Stanford University Los Alamo8 P r o je c t VIII, Vol. 2 - 1-2, 1-7, 1-25, IH-51, VC-9, VI-10 Start-up Procedures Pile Project IV, Vol. 6 - 5.1 Stassfurt Operation Intelligence and Security I# V0i . 14 (Egn. Int. Supp.) 4.36ff Statement by Secretary of lar Regarding Use of Atonic Bonfc I, Vol. 4i Ch.8 - Item 8 1, Vol. 1 - 1.2 Statistics, Construction Electromagnetic Project V, V o l. 5 - 4 .4 f f Status of laboratory Shortly After Close of fcar Los Alamos P r o je c t VUI, Vol. 2 (Supp.) - i-3 ff Steam and Condensate System, Power Plant Gaseous Diffusion Project Design — II,' Vol. 3 — 12.21, 12.22 Steam Generating Plants I, Vol* 12 - 12.4, 12.23, 12.24 II, Vol. 3 - 11.35ff, 12.13ff# 14.17 II, Vol. 4 - 3.20ff, 3.49ff H , Vol. 5 - 6.10, 6.11, 7.Iff IV, Vol. 2 - Pt.II - 2.6 IV, Vol. 3 - 5.71* 5.72, 6.21 IV, Vol. 5 - 5.18, 5.33 IV, Vol. 6 - 2.18 V, Vol. 3 - 2.16, 2.17 V, V o l. 5-3.26 VI <* 3.2, 3.4> 3.9ff, 3.l6ff, 4.2, 4.7ff VIII, Vol. 1 - 5.21, 5.22 Steam Leaks Liquid Thermal Diffusion Project VI - 5.3«_5.4> 5.19, 5.20 \ $ >

D gL® HINTED T Z g w 1 Ste-Stc /T T f j sm U & i& XxJ- KFOBKA TI c

DELETED >

Steam Process Pile Project IV, Vol. 3 - 5.69 , 5.71, 5.72, 601, 605, 6,20ff Steam System, Design of Liquid Thermal Diffusion Project VI - 3.9ff Steering Committee Project Camel VIII, Vol. 3 - Ch.2 - 2.1 Stevens Institute of Technology I, Vol. 4, Ch.2 - 2.22 Stipulations, land Acquisition Pile Project IV, Vol. 4 - 4.4ff, 4.30, 5.Iff Stock Pile Activities Sandia Base m i, Vol. 3, Ch.6 - 4 S to c k p ilin g , Weapons Los Alamos Project VIII, Vol. 2 (Supp.) - V-2, V-4, VH I-5ff Storage and Maintenance Building, Construction Gaseous Diffusion Project II, Vol. 4 - 3.45 Storage Facilities Electromagnetic Project V, Vol. 3 - 2.20, 2.21 V, Vol. 6 - 4.16 Pile Project Decay - IV, Vol. 3 - 3.5, 3.6, 6.10 Final Product - IV, Vol. 3 ** 3.7 General - IV, Vol. 3 - 3.5ff, 5.64, 6.10 Process later -IV, V o l. 3 - 5 .6 4 Baw Hater - IV, Vol. 3 - 5.64ff Waste - IV, Vol. 3 - 3.6, 6.19 Storage Project I, Vol. 4, T.S. Supplement Architect-Engineer Contract - 9, 10 Area Engineer • 10, 11 Authorisations and Funds - 5ff Choice of Sites *? Iff Construction - 17ff Design - I2ff Proposed Fourth Storage Area - 16, 17 Purpose and Initiation of Project - 1 Security - 11, 12 Transfer of Control - 19, 20

138 SEWJRTTf INltRf.WTIO!

Storage, Silver Program Electromagnetic Project V, Vol. 4 - M* 3.9 Strasbourg Operation Intelligence & Security I, Vol* 14 (Fgn. Int. Supp.) 4.11ff Strip Forming Operation# Silver Program Electromagnetic Project V, Vol. 4 - 3.6ff Structures end U tilities* Obtained With Site Los Alamos Project VUI, Vol. 1 - 2.7, 5.10, 5.11, 6.4 Sub-Contract (Chads&ck) Detroit Office VIII, Vol. 3, Ch.9 - 9*1 SuiEaaxy o f Worldwide Uranium and Thorium Resources Feed M at'l. Spec. Proc. & Geo* Expl. VII, Vol. 2 - l.l6 ff Sunnyside I r r ig a t io n D is t r ic t , Land A cq u isitio n Pile Project IV, Vol. 4 - 2.6 •Super" Bomb Lob Alamos Project VIII, Vol. 2 - I-lS ff, V-19ff, VIII-31, X-8, X lll-lff VIII, Vol. 2 (Supp.) - 1-7, III-6ff, IV-1, V-2 Ohio State Cryogenic Laboratory VIII, Vol. 3, Ch.3 - Pt.II - 1.1, 1.3, 2.1, 2.5, 2.7 Superheater Liquid Thermal Diffusion Project VI - 3.12, 4-7 •Super* Weapon Mechanics Los Alamos Project VIII, Vol. 2 (St^jp.) V-2 Supply & Property Los Alamos Project VIII, "ol. 2 (Supp.) * II-l2ff Surface & Undenvater Explosions Los Alamos Project v u i , V o l. 2 « v n -20 , m i-8, nv-9, xrv-io Surge and Yiaste System Gaseous Diffusion Project Construction - n , Vol. 4 - 3.32, 3*33, 3.42 Design - H , Vol. 3 - 7.22, 7.23, 14.5 Operation - II, Vol. 5 - 4.5, 4*6 Surge for Purge Method Gaseous Diffusion Project II, Vol. 5 - 4.8ff T. S. App. Ho. 1 «• 2 S u r-S y n

SECURITY DTFORftW'

Surveys Investigation of the /iftor Effects of the Bombing in Japan I> Vol, 4, Ch.6 - 6.6ff, 6.32ff, 6.38ff Suspension and Release Mechanism (Bomb) Ariqy A ir F ield s VIH# Vol. 3# Ch.9 - 9.9 ______

r m i m m d e l e t e d | S-citcheaT^Barometrio ~ ...... "...... ' VUI, Vol. 2 - Vll-17ff VIII* Vol. 3# Ch.9 - 9.4r 9.5 Synthane Boron V I H , V o l. 3 , Ch.7 - 7.4 Szilard Effect Pile Project IV, Vol. 6 - 4.14, 4.19 p*M«o«««waCT3agK«MM«8L£2B^::&vrssEaS5a^^

T -Tem gg^ p gn n sKciaiaarfwoRMwio]

Tailfingen, Haigerloch, Hechingen end Bisingen Operation Intelligence & Security I , V o l. 14. (Fgn. Int. Supp.) - 4.37ff T a ils Los Alamos Project n n , v o l . 2 - vn -33, v i i -39 P r o je c t Camel VIII, Vol. 3# Ch.2 - 2.25# 2.26 Tamper Los Alamos Project VIII, Vol. 2 - 1-13, 1-15# 1-26, II-2, II-3* IV-5, V-3ff, V-8, V -ll, 7-12, V -U ff, VI-14, VI-15, VI-17ff, IX-5, X-4, XIII-13, HII-14# XIV-4, XVII-11 VIII, Vol. 2 (Supp.) - III-8, III-ll Tank Farm Liquid Thermal Diffusion Project VI - 3.13, 3.14# 3.20, 4.9# 4.10 Pile Project IV, Vol. 6 - 2.24, 4.21 Technical andQeneral Review - September 1945 to December 1946 Los Alamos Project VIII, Vol. 2 (Supp.) - Ch. I Technical Area, Construction Los AlaiaoB P r o je c t VIII, Vol. 1 - 5.4, 5.5# 5.9, 5.11, 5.12, 5.2lff, 5.29, 6.52 Technical Board Los Alamos Project VIII, Vol. 2 - IX-3ff VIII, Vol. 2 (Supp.) - 1-11 Technical Review Los Alamos Project VIII, Vol. 2, Ch.IV, Ch.X Technical Scheduling Conference Los Alamos Project VIII, Vol. 2 - IX-3, IX-5 Technical Series, Los Alamos Los Alamos Project VIII, Vol. 2 (Supp.) - IX-2ff Telemetering P r o je c t Camel VIII, Vol. 3# Ch.2 - 2.39 Telemetering Development Program Los Alamos Project VIII, Vol. 2 (Supp.) - VIII-2, VHI-3 Telephone end Telegraph Systems See "Communication F a cilitiesw Temporary Construction Pile Project IV, Vol. 5 - 1.2, 2.9# 3.3# Sec. 5, 8.2, 6.6 vrg9r’^iX'Tirp?^r'r'V'^:' Yi^tiSiiasitli*eSi

Tem-Tes S^ttWHff^PORKAIIOJ

Temporary F acilities Electroioagnetic Project V, Vol. 5 - 3.33ff 1027th Air Material Squadron Army A ir F ie ld s VIII, Vol. 3* Ch.9 - 9.13 Tennessee* University of I, Vol. 4, Ch.10- lO .lff, 10.9 X, Vol. 7 - S 5.6 I I , V o l. 4 - 3.64 V, Vol. 6 - 3.5 Tennessee Valley Authority Electromagnetic Project V# Vol. 6 - 7.6, 8,5 Gaseous Diffusion Project II, Vol. 4 * 2.8 XX, Vol. 5 - 7.2, 7.3, 8.9 Pile Project IV, Vol. 2 - Pt.II - 2.5 Termination, AI&OS Mission, see below Termination and Transfer of Caiasl A ctivities P r o je c t Camel VUI, Vol. 3# Ch.2 - Sec. 8 Termination, Heavy Hydrogen Investigation Ohio State Cryogenic Laboratory VIII, Vol. 3, Ch.3 - Pt.I - 5.1 Termination cf Activities Feed Mat’l. Spec. Proc. & Geo, Expl. VII, Vol. 2 - 1.2, 1.3 Termination of AISOS Mission Intelligence & Security I, Vol. 14 (Fgn. Int. Supp.) • 4.47, 4.49, 4.50 Termination o f Work P r o je c t Camel VIII, Vol. 3# Ch.2 - 2,55ff Test and Training for Weapon Delivery, Development of Amy Air Fields VIII, Vol. 3* Ch,9 - 9*15j 9 .1 6 Test Facilities, Construction of P r o je c t Camel VIII, Vol. 3, Ch,2 - 2,37, 2.38 Test Pile (300 Area) Pile Project IV, Vol. 3 - 3.2, 4,1, 4.2 IV , V o l. 5 m 1.3, 6*2, 6.4, 6.11, 6.15, 6.17, 6,18 IV, Vol. 6 - 2.4 Testing, Canned Slugs Pile Project IV, Vol. 6 * 2.3# 4.8, 4.9 Testing, Electrical, Construction Gaseous Diffusion Project II, Vol. 4 - 3.27, 3.71 Testing, Process Equipment Gaseous Diffusion Project Construction - II, Vol. 4 - 2.2, 2.3, 3.1, 3.2 Operation - II, Vol. 5 - 3.2 Testing Program# Ordnance Los Alamos Project VIII, Vol. 2 (Supp.) VIII-2, VIII-3 T e stin g , Vacuum, C on struction Gaseous Diffusion Project Ilf Vol# 4 *• 3.1# 3.73 Tests Operation Crossroads VIII, Vol. 3, Ch.S - S.lOff Able - 8.10, 8.11 Baker -8.1 1 Charlie (Postponement) - 8.11, 8.12 Tests f Boobing Navy P a rtic ip a tio n VIII, Vol. 3f Ch.5 - 5.7, 5.8 Texas, University of I, Vol. 4* Ch.10 - 10,11 Thallium Nitrate Pile Project IV f V o l. 6-4.31 Theatres Richland Village IV, Vol. 3 - 8.23 Theoretical Division Los Alamos ^rojeet VIII, Vol. 2, Ch.V, VI-19, VI-21, VII-33, IX-1, IX-2, X-3, X-4# X I, XV—5* XV—13 Damage * V-25# V-26, U -10, XI-11 Diffusion Problems - V -lff, XI-2, XI-3 Efficiency - V-13ff, H -8ff Exparinrants - V-26ff, XI-11, XI-12 Organization - VI, XI-1, XI-2 The Gun - V -7 , V -8 , X I-3 , X I-4 The Icqplosion - V-8ff, XI-4ff ' The Super - V-19ff Water Boiler - V-6* V-7 Theoretical Physics Division Los Alamos Project VIII, Vol. 2 (Supp.) - 1-20, 1-11, Ch.III Alarm Clock Thermonuclear System - i n - 4, I l l - l O f f Con5>osIte Core - 1-13, III-5# III-6, V-5 Depletion - III-5 E ffe c ts o f Test and Combat N uclear E xplosions - I I I - 4 , I I I - 5 Organization - III-lff Power Producing Devices - 111-12, 111-13 Radiation Hydrodynamics - .111-1, III-2, III-5f III-lO , 111-13 Super - 1-7, III-6ff, IV-1 The-Tho SECUS*** T I C

Theoretical Program Los Alamos Project VIII, Vol. 2 - I-23ff Theory II, Vol. 2 - Sec. 3, II-Vol. 3 - Sec* 4, 14*2 Gaseous Diffusion (K-25 and K-27) Project II, Vol. 1 - Sec. 2 Heavy Water (P-9) Project III - 2.1, 2.2 Theory, Development of liquid Thermal Diffusion Project VI - 2.2ff Thermal Insolating Materials Ohio State Cryogenic Laboratory VIII, Vol. 3* Ch.3 - Pt.II - 2.6, 2.7 Thermal Properties, Gaseous Deuterium Onder Pressure Ohio State Cryogenic laboratory VIII, Vol. 3, Ch.3 - Pt.II - 2.10 Thermal Shield Pile Project IV, Vol. 2 - Pt.II - 6.6 IV, Vol. 3 - 5.38, 5.46, 5*47 Thermal Stability IV, Vol. 2 - Pt.I - 3.7 Thermonuclear Bomb Los Alamos Project (See also Super) VIII, Vol. 2, 1-18, 1-19, I-24» 1-32, V-19£f, H ll-lff P r o je c t Camel VIII, Vol. 3, Ch.2 - 2.9, 2.35 •Thin Man* Model Army A ir F ie ld s VIII, Vol. 3, Ch.9 - 9.8, 9.9 Thorium IV, Vol. 2 - Pt.I - 1.11, 2.9, 4.11, 4*12 IV , V o l. 6-4.27, 5.17 Feed Mat*l. & Spec* Proc. VII, Vol. 1 - Sec. 11 Procurement of - 11.1 Thorium Alloy Studies Ames Project (Io«a State College) I, Vol. 4, Ch.ll - 11.25, 11.26 Thorium Chemistry Ames Project (lorn State College) I, Vol. 4» Ch.ll - 11.42ff Thorium Confounds, Purification of Ames Project (Iowa State College) I, Vol. 4, Ch.ll - 11.43ff Thorium Pure Metal, Production of Ames Project (Iowa State College) I, Vol. 4, Ch.ll - 11.6, 11.16, 11.17, 11.18, 11.19 DAJft R Act 1846 ATOMIC Tho-Top SBW JW PP INFORMATION

Thorium, Resources Summary Feed Mat1!* Spec, Proc, & Geo, Ebcpl. ■VIZ, Vol. 2, 1.18, 1.19 Threer-l'ia'tion Agreed Declaration (November 1945) Contributions of j&Sanhattan District Representatives to Discussions and Proposals for International Control of Atomic Energy I, Vol. 4, Ch,7 - 7.2 313th Bomb Wing Amy Air Fields VIII, Vol. 3, Ch.9 - 9.12 320th Troop Carrier Squadron Army Air Fields VIII, Vol, 3, Ch.9 - 9.13, 9.15 390th Air Service Group Army Air Fields i VIII, Vol, 3, Ch.9 - 9.13 393rd Bombardment Squadron (VH) Army Air Fields VIII, Vol. 3, Ch.9 * 9.12, 9.15, 9.16 1395th Military Police Company (Aviation) Array- Air Fields VIII, Vol. 3, Ch,9 - 9.13 Tinian Los Alamos Project VIII, Vol, 2 - XIX-5ff Tinian Base Army Air Fields VIII, Vol. 3, Ch.9 - 9,16, 9.17 Toaav/anda Area I , Vol. 6-2,7 I , Vol. 14 - S7,4 II, Vol* 1 * 4.5 VII, Vol. 1 - 1,20 Tonawaada, Kev? York, Refinery Feed Mat'l, & Spec, Proc, VII, Vol, 1 • 7,2 Topography, Lend Acquisition Pile Project IV, Vol, 4 *> 2,2, 2,3 Top Policy Croup I, Vol. 1 - 3,5, 3.17 I, Vol. 4, Ch.l - 1.2 IV, Vol. 1 - 3.2, 4.5 I, Vol, 12 - 3,2 Top Secret Parts of the History I , Vol, 4, TS Supp, IV, Vol, 6, TS Appendix I, Vol. 14, Supp,, TS Appendix V, Vol. 6, TS Appendix II, Vol, 5, TS Appendix VI, TS Supp, II, Vol. 5, TS Supp. No, 1 VII, Vol. 1 IV, Vol. 2, Pt,II, TS Appendix

145

j ) j ! / . ; / , atomic AQ. ^ f -j ' -,V.

T or-T ra

sEQuuanfisFomiAn

Torpex Los Alamos Project VIII, Vol. 2 - XVI-5, XVI-12, XVI-16 Navy P a rtic ip a tio n Vin, Vol. 3, Ch.5 - 5.2 Total Exclusion Area Ho. 3 Pile Project IV, Vol. 1 - 7.2 To«n Council Los Alamos Project VHI, Vol. 1 ** 6.35, 6.36, 6.59, 6.60 Town P lo t s , Land A cq u isitio n *ile Project IV, Vol. 4 - 2.5, 2.6, 3.1 Traffic Lavs Los Alamos P r o je c t VIII, Vol. 2 - HI-11 T r a il I, Vol. 14 - S3.2, S7.3, S7.4 T rail, Heavy Water Plant See *Heavy Water (P-9) Project*5 T r a ile r Camp (j Pile Project IV, Vol. 5 - 5.2, 5.5, 5*I0ff T rain in g f o r D elivery o f Combat Bombs Los Alamos Project VIII, Vol. 2 - XlX-lff Training of Personnel Electromagnetic Project V, Vol. 6 - 2.2, 2.3, 3.1, 3.2, 3.5, 4.4, 4.9, 5.3 Liquid Theraal Diffusion Project VI - 5.3, 5.20, 5.21, 5.22 Training of Personnel, Clinton Laboratories Pile Project IV, Vol. 2 - Pt.II - 1.1, 3.3 - Sec. 7 Training Unit^ P r o je c t C^mel VIII, Vol. 3, Ch.2 - 2.6, 2.24 Transfer Area Pile Project IV, Vol. 3 - 5.57 Transfer Facilities Pile Project IV, Vol. 3 - 5.56 Transfer of Funds, Initial I, Vol. 1 - 3.3 I, Vol. 4, Ch.12 - 12.2 ■c< ) Transfer Rooms Liquid Thermal Diffusion Project VI - 3.9, 4.1, 4.4, 5.11 S -E & m n * INFORMATION

Transient Quarters Pile Project IV , V o l. 3 - 8.10 Transportation Electromagnetic Project V, Vol. 5 - 3.27, 3.28, 4.3, 5.3, 5.4 Liquid Thermal Diffusion Project VI - 4.13, 5.25 Los Alamos Project VIII, Vol. 1 - 6.2, 6.22ff VIII, Vol. 2 - 1-9, 1-10, H I-2, III-7, III-ll, ZIX-6 Los Angeles Procurement O ffice VIII, Vol. 3, Ch.l - 2.2, 2.6, 2.10, 2.13, 2.15, 2.16 Transportation Facilities Electromagnetic Project V, Vol. 3 - 2.21, 2.22 V, Vol. 6 •« 7.4 Pile Project IV, Vol. 4 - 2.9, 2.10 IV , V o l. 6 - S e c. 8 Transportation Service C lin ton Engineer Works - Area F a c i l i t i e s I, Vol. 12 - Sec. IS Clinton Laboratories IV, Vol. 2 - Pt.II - 2.8, 3.S Gaseous Diffusion Project - Construction II, Vol. 4 - 5.4, 5.5# 2.5, 3.10, 3.55, 3.56 Pile Project IV, Vol. 3 - 8.28 IV, Vol. 5 - 2.5, Sec. 9 IV, Vol. 6 - 9.1, 9.12 Transportation, Silver Program Electromagnetic Project V, Vol. 4 - 2.4# 2.5# 3.5, 3.12 Traps, Process, Design and Procurement Gaseous Diffusion (K-25 & K-27) Project II, Vol. 3 - 8.39, 8.40, 8.41# 14.12 Traps, Process, Operation Gaseous Diffusion Project II, Vol. 5 - 4.8, 8.2 Travel Disbursements Los Alamos P r o je c t VIII, Vol. 2 (Supp.) - 11-25, 11-26 Treatment and R fining Feed iaat'l. & Spec. Proc. VII, Vol. 1 - l.lOff Trifluorochlorocthylece (P-539) Feed Kat’l. & Spec. Proc. VII, Vol. 1 - G.28, G.29 T r in it y Sandia Base VIII, Vol. 3, Ch.6 - 3.4 sBBEmmBmmmBSS3EW SSBS3SSSBSW S^SSSSS2S^S^^^S!SS^i-^M ZS^^jS!I^^^t^^^!^^^^

Tri-Tv,'® /r r B ~ .rrninairf nrrormatxoi

Trinity Bomb Los Alamos P r o je c t VIII, Vol. 2 (Supp.) III-l, III-4, IH -5 Trinity (Project) Los Alamos Project VIII, Vol. 2 - 111-53, IX-6, IX-7, IX-13, IX-18, X-7, X-8, X-10, x-ii, n-6, n-7, xr-9, xii- 2, xm -n, nn- 15 , XV-18, XVI-2, xn~21> m 1-10, Ch. XVIII Organization - XVIII-4ff Preparations - XVIII-lff, XVIII-8ff Rehearsal Test - XVIII-6ff Results - xrai-17ff Trinity Test - XVIH-15, XVIII-16 Trinity Test Los Alamos Project VUI, Vol. 2 (Supp.) - II-3, II-24ff, 11-29, IH -1, III-4ff, V -8, V-9 P r o je c t Camel VIII, Vol. 3, Ch.2 - 2.22, 2.23 T ritium Los Alamos Project VIII, Vol. 2 - V-21, V-22, V-24, H II-2ff VIII, Vol. 2 (Supp.) III-7, IH -9, IV-1G* IV-11, VI-3, VI-6, VI-7 Pile Project IV, Vol* 6 - 4.30 Purdue University VIII, Vol. 3, Ch.9 - 9.25 Tritium Program Los Alamos P r o je c t VUI, Vol. 2 (Supp.) IV-10 T S ite Los Alamos P r o je c t VIII, Vol. 2 (Supp.) VII-3 Tubes, Pile Pile Project IV, Vol. 2 - Pt.I - 3.16, 4.2, 4.4, 4.5, 4.6, 5.4 IV, Vol. 3 - 5.40ff IV, Vol. 6 - 4.13ff, 5.10 Tulane University I, Vol. 4, Ch.10 - 10.11 Turbo-Genera tor System, Power Plant Gaseous Diffusion Project Construction - II, Vol. 4 - 3.21 to 3.23 Design - II, Vol. 3 - 12.20 Operation - II, Vol. 5 - 7.1, 7.2 12th Naval D istrict Los Alamos Project VIII, Vol. 2 - XIX-4 20th Air P’orce Los Alamos Project VIII, Vol.2 - XIX-4, XIX-8 t *TfV Twe-Typ

SEC m LLTV T I O i s r

20 Stage Pilot Plant Gaseous Diffusion Project See “Pilot Plant - 20 Stage* 2761st Engineer Battalion Sandia Base VIII, Vol. 3, Ch.6 - 5 , 7 g?6lwt -Englnrffr Da LLillvn—^pgeia^y- JSftndifc Baae Two Cycle Liquefying System Ohio State Cryogenic Laboratory VIII, Vol. 3, Ch.3 - Pt.II - 2.10 Two M ile Mesa S ite Los Alamos Project VIII, Vol. 2 (Supp.) VII-6 Types of Piles See KPiles, Types of*

149

ruMiwm ra ■ irntm u iwi ’i n i ...... n i

U -Uni

X$^jg££jj^Wj?OWi.k '-f IC

Underground Magazines Sandia Base VIII, Vol. 3, Ch.6 - 6 Undersater Explosion Studies Operation Crossroads VIII, Vol. 3, Ch.8 - 8.12, 8.13 Union Mines Developnent Corp, Establishment of Feed Mat*!. Spec. Proc. & Geo. Ezpl. VII, Vol. 2, 1.2, 1.3 Union Miniere du Haut Katanga Feed Mat’l. & Spec. Proc. VII, Vol. 1 - 1.3, 2.1, 2.2 VII, Vol. 2 - 1.14 Intelligence & Security I, Vol. 14- (Fgn. Int. Supp.) 4.7, 4*8, 4.22 Unions, Pipe, Replacement of Liquid Thernal Diffusion Project VI, 3.18, 5.19, 5.20 United Rations Atomic Energy Commission Contributions of Manhattan D istrict Representatives to Discussions and Proposals for International Control of Atomic Energy I, Vol. 4» Ch.7 - 7.2, 7.3, 7.4, 7.7 U.S. Bureau of Mines Electromagnetic Project V, V o l. 6 -8 .5 Explosives Research Laboratory V I I I , V o l. 3 , Ofc.9 - 9 .2 0 Feed Mat’l. Spec. Proc. & Geo. Expl. VII, Vol. 2 - 1.8, 2.8 U.S. Bureau of Recla;£ nation Pile Project IV, Vol. 6 - 10.3 U.S. Civil Service Oomission Los Alamos Project VIII, Vol. 1 - 6.62 U.S. Department of Agriculture Los Alamos Project VIII, Vol. 1 -3 .5 U.S. Department o f Commerce Declassification and Distribution of Project Information I, Vol. 4, Ch.5 - 5.12, 5.28, 5.29 U.S. Department of Interior Los Alamos Project VIII, Vol. 1 - 3.5 U.S. Employment Service Electromagnetic Project t ) V, Vol. 6 - 3.3, 8.5 Liquid Thermal Diffusion Project VI - 3.21, 5.21 Los Alamos Project VIII, Vol. 2 - III -48

.JU’OMy; yX'MB^ACi: im- f ~ ' ^ —1 “— / .r, „ sSi — -»•«. - £«£&£!&§; -.- o . . j

Uni-Ura gEClttS**5* IWFORMATI* 9BB

U.S. Geological Survey Feed Mat*l, Spec. Proc. & Geo. Expl. VII, Vol. 2, - 1.8, 1.10, 2.7 U .S. Patent Office Los Alamos Project -;'.y VIII, Vol. 2 - IU-53 U.S. Selective Service Loa Alamos Project VIII, Vol. 2 - in -1 6 , 111-18 U.S. Strategic Bombing Service Investigation of the After Effects of the Bombing In Japan I, Vol. A, Ch.6 - 6.39 University A ffiliation Conference Los Alamos Project VIII, Vol. 2 (Supp.) - 1-8 Uranium Pile Project IV, Vol. 2 - Pt.I - 1.6 to 1.11 IV, Vol. 3 - 3.1ff, 4.1* 4.2* 5.1, 5.2 IV, Vol. 6 - l.lff, 2.Iff, 2.19, 2.21, 2.22, 4.1ff, 4.22ff, 6.1, 6.2 Uranium Alloys I, Vol. 4 - Ch.ll - 11.23, 11.24, 11.25 Uranium Alloy Studies Ames P r o je c t (low . State College) I, Voli 4 - Ch.ll - 11.23ff Uranium and Thorium, Quality Control Feed ftfat’ l . and S p ec. P roc. VII, Vol. 1 - Sec. 12 Thorites VII, Vol, 1 - Sec. It - 12.5 lows State College - 12.5 National Bureau of Standards - 12.5 Uranium VII, Vol. 1 - Sec. 12 - 12.Iff Massachusetts Institute of Technology - 12.3, 12.4 National Bureau of Standards - 12.4 Operations, General - 12.1, 12,2 Princeton University - 12,3 — 12,2, 12,3 Uranium, Assay I, Vol. 4 - Ch.12 - 12.12, 12.13 Uranium Balance Gaseous Diffusion Project U , T*S« App. No, 3 *• 1 Uranium, Chemistry V, Vol, 2 — 1,3, 1.6, 1,8, 4.5, 4.7, 4*H Ames P r o je c t (lorn State College) I, Vol. 4 - Ch.ll * 11.33ff Uranium Corrosion Problems Ames Project (Iowa State College) I , Vol. 4 - Ch.ll - 11.21, 11.22 S B c a w w ' f RESTRICTED DATA ATOMIC JWERGV ACT 1S40 Ura-Ura SEC13IW! M •INFORMATIC

Uranium Hex?..fluoride II, Vol. I - 2.3, 2.4, 5*6 I I , V o l. 2 II, Vol. 3 ~ 2.1, 2.2, 4.7ff V, Vol. 3 - 2.2, 2.4 Uranium He>:afluoridc Conversion F a c i l i t i e s Electromagnetic Project V, Vol. 3 - 3*47 Uranium Eeocafluoride Production Feed Mat’l . & Spec. Proc. VII, Vol. 1, 9.1# 9.5ff Uranium Isotopes, Sep5.rs.tion o f Electro a&gnetic Method V G&Benuc D iffusion Method II, Vol. 1 - 1*1, 2.1, 2*2, 3.1 II, Vol. 2 - 3.1ff, 7.1, 7.2 General I, Vol. 4 - Ch.12 - 12.21 to 12.25 inc. I, Vol. 7 - 3.3 to 3.40 Liquid Thern&l Diffusion Method

Miscellaneous Methods I, Vol. 4 - Ch.14 Centrifuge Method - Sec. 1 Counter-Current Electromigration Method - Sec. 3 Counter-Current Reflux Molecular Method - Sec. 4 Ether Water Method - Sec. 6 Fractional Sublimation Method - Sec. 5 Ionic Centrifuge Method - Sec, 7 Ieotron Method - Sec. 2 Photochemical Method - Sec. 8 Uranium M etal, Casting o f Aaes Project (Iewa State College) I, Vol. 4 - Ch.ll - 11.5# 11.6, 11.13, 11*14 Uranium, Metal Production I, Vol. 4 - Ch.12 - 12.9 to 12.21 inc. I, Vol. 7 - 3.9, 3.10, 3.11# 3.12, 3.13# 3.43# 3.44 Uranium, Occurrences, Uses and Properties of Feed Mat’l. and Spec, Proc, VII, Vol. 1 - 1.3ff Uranium Oxide Pile Project IV , V o l. 6-4.28 Uranium Pure Metal, Production of Araes Project (Iowa State College) I, Vol. 4 - Ch.ll - 11.5ff Uranium, Raw M aterial I, Vol. 4, Ch.12 - 12.A I, Vol, 7 - 3.5# 3.6, 2.6 II, Vol. 1 - 2.1, 2.3

Hi t i I Ura-Us€

SB M M ttK INFORMATION'

Uranium, Resources Summary Feed M at'l. Spec. Proc. & Geo. Expl. *11, Vol. 2 - 1.16ff Uranium Rods Assistance on Canadian Pile Project X, Vol. 4 • Ch.9 *• 9.5 Uranium Supplied for Separation Process Elebtromignetic Project V, Vol. 6 - 3.8, 4.1 Uraniun 234 II, Vol. 1 - 2.1 IX , V o l. 2-6.25 Uranium 235 II, Vol. 1 — 1.1, 2.Iff, 3.2, 3*4 XX, Vol* 2 - 3 . I f f , 3 .8 , 6.25 IV, Vol. 3 - 5.l0ff Uranium 235 Balance Gaseous Diffusion Project II, T.S. App. Ho, 3 - 1, 2 Uranium 235 Concentration Gradient in Enriching Cascade Gaseous Diffusion Project II, T.S. App. Ho. 2 - 5, 6 Uranium 235 Produced Gaseous Diffusion Project II, T.S, App, Ho. 2 — 4*5 Uranium 235 Production Los Alames P r o je c t VIII, Vol. 2 (Supp.) - VI-9 Uravsn, Colorado, Plant Feed M at'l. and Spec. Proc, vn , Vol. 1 - 4.2, 4.4ff, 7.2, 7.9ff Urchin Dayton Project VIII, Vol. 3, Ch,4 - 4.3, 4.5, 4.6 Los Alamos P r o je c t VIII, Vol. 2 - X-8, XI-7, XV-7, XV-15, XV-16, X7II-13 VIII, Vol. 2 (Supp.) 1-12, 1-13, V-7ff, VI-5, VI-6 Urchin, Inverse Los Alamos Project VIII, Vol. 2 (Supp.) V-7, V-8 U rfeld and Munich O peration Intelligence and Security I, Vol, 14 (Fgn. Int. Supp.) 4*42ff U rgeirics Mine Feed U at'l. Spec. Proc. & Gao, Expl. VII, Vol,2- 1.16 Uses for Radioisotopes Program for Production and Distribution of Radioisotopes I, Vol. 4, Ch.3 - 3.2

^ 153 ,, prr R F f n m p W ) d a t a 5, C i 19-H' ATOKOi Uti-tfti

Stffl ■PWps^NFOjRJiCATI ( U t ilit ie s Liquid Thermal Diffusion Project VI - 4.11ff, 5.19 Los Alamos Project TTX,,. 1 5*8» 5.13ff, 6,Iff, 6,7 U tilities,J 111’ ConstructionVo1' • Gaseous Diffusion ?roject i i , V o li 4 Electrical Power Distribution - 3*19 Railroads - 3.11, 3.12, 3.13 Roads - 3.10, 3.11 Sew3rage - 3.17, 3.18, 3.19 Water Potable - 3.13 to 3.16 Fire Protection - 3,16 to 3.17 Pile Project IV, Vol. 5 - 5.27ff, 7.1ff, 8.3ff U tilities, Description of Liquid Thermal Diffusion Project vi - ^.iiff U tilities, Electrical Electromagnetic Project V, Vol. 3 - 2.23, 2.24 U tilities, land Acquisition Pile Project IV, Vol. 4 - £.11, 2.12 U tilities, Richland Village Pile Project IV, Vol. 3 - 8.23, 8.24 U tility Charges Los Alamos Project VIII, Vol. 1 - 6.7 U tilization Committee Pile Project IV , V o l. 5 - 4 .1 9 f f Utilization of Personnel I, Vol. 8 • Sec. 3

JE D D M * ACT IS*1 atomic y » n

'

■ 'r".'‘ '~r&-'7,'^™'.„ r ’’''.'T - . ~';rl'^ v'r>"v •j- ,r r ‘~""r^r— ’ ' ’ T ’ " ~~r>-r * v-*r- ~ - -r*- —— -7 ''y—

V -Yol

SECHR'K‘¥ * IKFORtt'AT 10

V Sit© Los Alamos P r o je c t VIH, Vol. 2 - VII-37 Vaeirjm Engineering S ch ool Gaseons Diffusion Project II, Vol. 2 - 7.8 II, Vol. 3 - 5,5 Vacuum System Electromagnetic Project V, Vol. 2 - 3.9, 3.10 V, Vol. 3 - 2.10, 3.13, 3.16, 3.17 V, V o l. 6 - 4.12, 4*14# 4<15» 5.4, 5.5 Vacuum Tightness, Construction Gaseous Diffusion ^rcject II, Vol. 4 * 3.72 Vacuum Tubes, Control Equipment Electromagnetic Project V, Vol. 3 - 4.15 Valves, Process, Design and Procurement Gaseous Diffusion (K-25, K-27) Project II, Vol. 3 - 8.19 to 8.27, 14.11, 14.12 Valves, Vacuum System Electromagnetic Project V, Vol. 3 - 4.10ff Van de Gra£ff Construction Program Los Alamos P r o je c t VIII, Vol. 2 (St^p.) - IV rllff, VI-8 Vapor Phase, Charge Material Preparation Electromagnetic Project V, Vol. 3 - 3.21, 3. 22, 4 .3 Ventures, Ltd., Clairs Feed Uat’1. Spec. Proc. & Geo. Expl, V I I, V o l. 2 * 2 .2 f f Verticel Pile PilS Project IV, Vol. 3 - 5.24, 5.25 Vertical Safety Rods Pile Project IV, Vol. 3 - 5.32, 5.50, 5.53ff IV, V o l. 6 - 4.16# 5.5 Veterans Administration Pile Project - IV, Vol. 6 - 9.15 Veterinary Service Los Alamos Project VUI, Vol. 1 - 6.48, 6.49 Vienna Operation Intelligence & S e cu rity I, Vol. 14 (Fgn. Int. Supp.) 4 .465 4*47 Volatility (Fractional) Processes, Separation Pile Project IV, Vol. 2 - Pt.I - 6.3? 6.4 IV, Vol. 2 - Pt.II - 5.1 _ I IV , Vol. 3 - 6. 1 , 6.4, 6.5, 6.7 RESMCTED DftTfi ™ < A g i a o )» i

3HBCKE I W -W&s secumty- F ormat

WAG Detachment lo s AJLamos P r o je c t VIII, Vol. 2 - II1-18 VIII, Vol. 1 - 6.9, 6.11, 6.12, 6.19, 7.2ff Wabash River Area I* Vol. 6 2.7 Wabash R iver °rdnance Works, Heavy Water P lant See "Heavy Water (P-9) Project" Wages liquid Thermal Diffusion Project VI - 3.21, 5.22 Wages and S a la rie s I, Vol. 8 - Sec. 5 War Assets Administration Pile Project IV, Vol. 6 - 14.2 War Department Announcement o f Atomic Bomb Project General I, Vol. 1 - 1.2, 1.3 War Bepartment Insurance Rating Plan I, Vol. 6 * Sec. 2 War Manpower Commission Liquid Thermal Diffusion Project VI - 3 .2 0 Los Alamos Project VIII, Vol. 1 - 6.62 VIH, Vol. 2 - 111-48 War Production Board P ile P r o je c t IV, Vol. 3 - 2.5 IV, Vol. 5 - 2.4, 3.6, 3.7, 4.23 IV, Vol. 6 - 6.4 I , V o l. 5 - 4 .1 VII, Vol. 1 - 5.1, K.14 Warehouses, Construction Gaseous Diffusion Project II, Vol. 4 - 3.35, 3.36, 3.37 Warren Grove Los Alamos Project VIII, Vol. 2 - VII-20 Washington Liaison Office See, also "Priorities Program* IV, Vol. 6 - 6.2, 6.4 VI, - 3.17, 3.20 VIII, Vol. 2 - 111-16, 111-17, 111-33, IX-14, HX-12 VIII, Vol. 3 - Ch.l - 2.8, 2.9 VIII, Vol. 3 - Ch.2 - 2.13, 2.49, 2.64 VIII, Vol. 3 - Ch.3 - Pt.II - 1.3 Sandla Base VIII, Vol. 3, Ch.6 - 6 aaaBS3£sss!i8g3sas^sss

Was-Wat

SEKIfTliiiiii HffjiQRMATI'(

Washington University X, V o l. U - Ch.2 - 2.12 I, Vol. 6 - 5.3, 6.2 J / 7 " 5.4, 5.13, 5.16, 5.23, S2.10 IV, Vol. 2 - Pt.I - 6.1, 7.3 XV, V o l. 6 - 5.13 Waste Disposal Electromagnetic Project V, Vol. 6 - 4.15# 4.16 Waste D isposal Tanks Pile Project IV# V o l. 5 — 1 .4 IV, Vol. 6 - 2.23, 2.24, 4.20 Waste, Process Electromagnetic Project V, Vol. 6 - TJ5. App. - 3 Waste Produced by Cascade Gaseous Diffusion Project II, T.S. App. No. 2 - 3 , 4 Waste Products, Quantity of Pile Project IV, Vol. 6 - 2.22, 2.23 Waste S e t t lin g Tank Pile Project IV, Vol. 6 - 4.20, 4.21 Waste Stack Pile Project IV# Vol. 2 — Pt. II — 4.2# 4.5, 4*8, 5.3 IV, Vol. 3 - 5.20, 6.20 IV, Vol. 5 - 1.4, 6.12 Waste Storage Pile Project IV, Vol. 3 - 3.6, 6.19 IV , V o l. 5 - 1 .4 IV, Vol. 6 - 5.11, 5.12, 5.14ff Waste System, Clinton Separation Process Pile Project IV, Vol. 2 - Pt.II - 2.6, 5.3 •Water B o ile r * Los Alamos ^rojeet VIII, Vol. 2 - 1-26, 1-27, IV-5, IV-18, IV-19, V-6, V-7, VI-20ff VIII-5, VIII-6, VIII-24, VII1-25, IX-17, IX-18, x-9, ni-8, m i-i, nn-i3ff, xvn- 14 , x v r i-15 VIII# Vol. 2 (Supp.) - II-23, IV-4, IV-6ff, VI-6, VI-7 Water Cooling, Pile Pile Project IV, Vol. 2 Pt.I - 3./;, 3.6, 3.10ff, 3.14, 3.16, 4.1, 4.6 Water, Drinking, Clinton laboratories Pile Project IV, Vol. 2 - Pt.II - 2.5, 2.6

1 5 7 - ; :.i 1^'.'. - - ■ ^rf. ■•~"-1‘~7^- jT;^ - -~ 7- ' r—.-■ ■ • - - — ■<^>,__ —. . ______^ ^ ^ ^

Wat-Wen

BSClStt’rtr 'lN F ORMLA T).(

Water Shortage Lob Alamos Project w 4 yin » Vo1- 2 (Supp.) 1-9, 1-10, IV-9, IV-10, VII-5 Water Supply System CEW - Area Facilities - I, Vol, 12 - Sec. 13 Electromagnetic Project - V# Vol. 5-3.24 V, Vol. 3 - 2.24# 2.25 V, Vol. 6 - 7.5, 7.6 Gaseous Diffusion Project - II, Vol. 4 - 3.13ff HEW - General - IV, Vol. 3 -2 .3 *V# Vol. 5 - 1.6, 5.30ff, 11.3 Clinton laboratories - IV, Vol. 2 - Pt.II - 2.5, 2.6 Land Acquisition - IV, Vol. 4 - 2.11 Pile Areas - IV, Vol. 3 - 3.3ff, 5.21, 5.32ff, 5.62ff , Vol. 5 - 2.2, 2.7, 2.8, 5.31, 5.32 Separation Areas - IV, Vol. 3 - 3.5, 6.21 IV, Vol. 5 - 5.31 Los Alamos P r o je c t VIII, Vol. 1 - 5.3, 5.16ff Water System Los Alamos Project VIII, Vol. 2 - III-ll Water Treatment Plant Liquid Thermal Diffusion Project VI - 4.1, 4.11 Weapon P it Maintenance Los Alamos Project VIII, Vol. 2 (Supp.) V-2 Weapons Committee Los Alamos Project VIII, Vol. 2 - VII-22, IX-5, IX-6, XIV-2, XIX-3, XIX-4 Weapons Panel Los Alamos Project VUI, Vol. 2 (Supp.) - 1-11 Weapons P h ysics D iv is io n Los Alamos Project VIII, Vol. 2 - IX-1, IX-2, X-3ff, X-9, XI-3, XI-11, Ch.XV Critical Assemblies - XV-2ff Electric Detonators - XV-16ff Electronics - XV-19, XV-20 Implosion Studies - XV-5ff Ini tie toi*s - XV-14ff Organization - XV-1, XV-2 Photography - XV-18, XV-19 W elfare, Community Los Alamos Project VIII, Vol. 2 - 111-11 Wendover Army A ir Base Amy Air Fields, Participation in Manhattan Project Los Alamos Project VIII, Vol. 2 - XT V-7, XVI-21, XlX-lff VIII, Vol. 2 (Supp.) 1-12

158 RESTRfcrfD DATA . i'll,k 0 i a t o m ic En e r g y ^ c t m s Wen-Wor SWfiRi'T^INFORMAXIO]

Wendover Army Air Ease Activities Array A ir F ield s VIII, Vol, 3, Ch.9 - 9*llff Wendover Field Sandia Ease V III* V o l. 3# Ch.6 ■ 2j 3 Wendover F ield * Utah Navy P a rtic ip a tio n VIII, Vol. 3* Ch.5 - 5.7 P r o je c t Carnal VIII, Vol. 3* Ch.2 - 2.34* 2.35, 2.63 West Coast National Laboratory (Proposed) I , V o l. At Ch.2 - 2.38**2.39 Western Defense Command Pile Project IV , V o l. 1 -7 .2 Western Reserve University I, Vol, 4> Ch.2 - 2.13 I, Vol. 7 - S2.12 iVest Stand* Stagg Field, Pile Pile Project IV, Vol. 2 - Pt.I - 3.7ff signer Effect Pile Project IV, Vol. 2 - Pt.I - 5.1* 5.2 IV, Vol. 6 * 4*14* 4.19 •William Day* Rehearsal Operation Crossroads VIII* Vol. 3* Ch.8 - 8.11* 8.36* 8.37 Williams Plan Operation Crossroads VIII, Vol. 3* Ch.8 - 8.13* 8.21* 8.22 Wilmington Area I, Vol. 5 - 6,8 I, Vol. 6 - 2.7 I, Vol. 14 - S7.4 II, Vol. 1 - 4.5 IV, Vol. 3 - 10.1 IV, Vol. 6 - 4.2, 5.2, 6.2, 18.3 VII, Vol. 1 - 1.20 Wisconsin, University of I , V o l. 4 i Ch.2 - 2,13 Los Alanos Project VIII, Vol, 2 - 1-2, 1-7* 1-8* 1-25* 1-26* VI-1, VI-2 Witwatersrand Feed Mat *1, Spec. Proc, & Geo, Expl, VII, Vol. 2 - 1.16 Work Stoppages, Construction Electromagnetic Project V, V o l. 5-5.5 Woric Stoppagesy Construction (continued) Gaseous Diffusion Project X I, V o l. lv m 5, 3., 5.4- Pile Project IV, Vol, 5 - 4.17 Work Week Los Al&iaos P r o je c t VIII, Vol, 2 (Supp,) II-lO Wright Field Activities &riqy Air Fields VIII, Vol. 3, Ch.9 - 9*7ff

160 m /, Ji i I i v

a t o m ic jevN?-r g v 2L4 Experimental Units Electromagnetic Project V, Vic I. 6-3.2 X/iK Experimental Unit klectroEGgnetie Project V, V o l. 3-2.19 V, V o l. 6 - 3.5, 3.6, 5. 4, 5,5 XBX Experimental Unit Electromagnetic Project V, V o l. 3 - 2.19, 3.3.3 V, Vol. 6 - 3.6, 3.7, 5.4 Xenon Pile Project IV, Vol. 3 - 5.27 IV, Vol. 6 - 4.9ff Xenon Absorption Cross Section Pile„Project IV, Vol. 6 - 4.10 Xenon Poisoning Pile Project IV, Vol. 2 - Pt.I - 5.2, 5.3 IV, Vol. 2 - Pt.II - 6.5 IV, Vol. 6 - 5.4 X-Ray Structures Ames Project (Iowa State College) I, Vol. 4, Ch.ll - 11.52, 11.53 X Units Los Alamos Project VIII, Vol. 2 - XIX-5 VIII, Vol. 2 (S^p.) V-12, V-14, VIII-4 ptiaSESSS^X 222S3ESES

V p Y “ Yor ^—> '^-i^ Vvy^ i^L v ‘W# ^

/ j T D S E W T R ^ r IWFORMATIOi

Y-12 Extension Authorization Electronsgiie.tic Project V, Vol, 3 - 3.3, 3.4, 3.15, 3.32 5-12 Extension Construction Electrons gnetic Project. IV, Vol, 5 - 3.l6ff* 3.21 1-12 Material Feed to Plant Gaseous Diffusion Project- Sec "Material Feed to Plant*1 Zakina River? Land Acquisition Pile Prefect IV, Vol, 4 - 2.2. 2.7j 2,8 XV, V o l. 5 - 5*31, 9 .1 Y&le University I, Vol. 4, Gh.2 - 2.2, 2.22, 2.23 I, Vol. 4-* Ch.14 ** 14*33, 14.46, 14*47 VII, Vol. 1 - 1.22, 8.4, 8.9 lorictoTsn Ksval Fines Depot Los Alamos Project VIII, Vol. 2 - m -4» 212-5 Z -Z ir * £ a IQ! /Tv? tjp&a t j w Zero Energy Exponential P ile (ZEEP) Assistance on Canadian Pile Project I, Vol. 4, Ch.9 - 9.22ff Zia Company Los Alamos Project VIII, Vol. 1 - 5.10, 6.2, 6.13, 6.15, 6. 26, 6.29, 6.47, 6.61, 6.69, 7.3, 7.14, 7.15 Zinn P ile Research and Development of Atomic Energy for Power I, Vol. 4, Ch.4 - 4.4, 4.11ff Z ircon Electromagnetic Project V, Vol. 3 - 4.22, 4.23 V, Vol. 6 - 4.10, 5.3 Zirconium Pile Project IV, Vol. 2 - Pt.II - 5.4 IV, Vol. 6 - 3.2 Zirconium, Radioactive, Research Pile Project IV, Vol. 2 - Pt.II - 4.10

163

■*? :