Investment Projects in Tomsk Region: Mining, Oil & Gas
Commercial Development of Yuzhno-Aleksandrovsky and Kuskovsko- Shiryayevsky Portions of Tuganskoye Ilmenite-Zirconium Placer Deposit in Tomsk Region 1 Design and construction of a mining and processing plant Project life : 2013–2022 to provide zirconium, ilmenite, rutile-leucoxene concentrates and silica sand for glass production 13 600.00 mln New jobs: 704 Estimated project cost : rubles
Project geography : Tomsky District Project investor/initiator : AO Tugansky gorno-obogatitelny combinat Ilmenite
Exploration of Hydrocarbons in the North-Eastern Part of Tomsk Region (Vostok Program) 2 Recovery of hydrocarbons to feed the Eastern Siberia – Project life : 2009–2018 Pacific Ocean oil pipeline. Oil volume to feed the pipeline: 15–18 mln tons Gas volume: 6 bln m3 11 750.00 mln Estimated project cost : rubles
Project geography : Kolpashevsky District, Kargasoksky District
Project investor/initiator Department of subsurface managment of Central : Siberian District (Tsentrsibnedra), Krasnoyarsk Investment Projects in Tomsk Region: Mining, Oil & Gas
Extraction of Hydrocarbons on the Tomsk region territory
3 Gas production: 2 209.0 mln m3; APG production: Project life : 2009–2020 1 087.0 mln m3; oil production: 1 834.0 thousand tons/year; stabilized condensate production: 188.0 thousand tons/year; commercial propane-butane blend production: 526.0 thousands tons/year Estimated project cost : 99 934.00 mln rubles New jobs: 332
Project geography : Parabelsky District, Kargasoksky District
Project investor/initiator : OAO Tomskgazprom
Oil Well Drilling on the Ugno-Pudinsky License Area 4
Oil production – 2 802.1 thousand ton up to 2048, Project life : 2014–2019 including 1 644.2 thousand ton up to 2024
New jobs: 50 Estimated project cost : 6 640.00 mln rubles
Project geography : Parabelsky District
Project investor/initiator : OOO Gazpromneft-Vostok Investment Projects in Tomsk Region: Mining, Oil & Gas
Increasing the Capacity of the Oil-Trunk Pipeline Aleksandrovskoye - Anzhero-Sudzhensk. Construction of the Oil Pumping Station Pervomayka 5 The construction of a pumping station for increasing the Project life : 2014–2024 volume of oil transported by the main oil pipeline Alexandrovskoye - Anzhero-Sudzhensk to 53 mln tons/year Estimated project cost : 3 051.00 mln rubles New jobs: 41
Project geography : Kolpashevsky District
Project investor/initiator : AO Transneft – Tsentralnayal Sibir Investment Projects in Tomsk Region: Woodworking and Wood Product Manufacturing
Construction of the Wood Products Industrial Park in Asino
Creating the largest forest industry complex (over ten : 2008–2025 major and auxiliary facilities to produce lumber Project life (220 thousand m3/year), plywood veneer (100 thousand m3/year) and plywood, fiberboards (MDF: 200 3 3 1 thousand m /year; particleboard: 300 thousand m /year), furniture and flooring, including timber procurement departments, power plants and the associated infrastructure) with timber processing centers in Asino 32 400.00 mln Estimated project cost : and Bely Yar rubles
New jobs: 5 500
Asino, Asinovsky District, Verkhneketsky District, Project geography : Pervomasky District
Fuhan Wood Industry United Investment Group, AO Ruskitinvest, Project investor/initiator : Avic-Forestry, OOO Henda Sibir
Lumber Production Development
The polished board for production of furniture – 30 thousand m3 : Project life 2015–2018 New jobs: 150
2 Estimated project cost : 330.00 mln rubles
Project geography : Asino, Asinovsky District
Project investor/initiator : OOO Markor Yuan Dun-les Investment Projects in Tomsk Region: Woodworking and Wood Product Manufacturing
3 Construction of a Particleboard Plant
Construction of a modern particleboard plant with a productive capacity of 350 thousand m3/year; increasing Project life : 2012–2017 timber harvesting to 1 mln m3/year
New jobs: 243
Estimated project cost : 6 347.00 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO Tomlesdrev
Modernization of Production Equipment of the Condensate Processing Plant OOO SibLesTrade
4 Increased business efficiency through the acquisition of milling and profiling circular saw line, sorting line, the : timber cutting complex and vehicles Project life 2012–2018
New jobs: 9
Estimated project cost : 106.80 mln rubles
Project geography : Krivosheinsky District, Krasny Yar village
Project investor/initiator : OOO ZPC SibLesTrade Investment Projects in Tomsk Region: Woodworking and Wood Product Manufacturing
Surface Modification of Wood and Wood-Polymer Composites by Plasma Polymerization and Electromagnetic Radiation
5 Research and development in technology and production of wood surface modification equipment to enhance : characteristics of wood products Project life 2015–2018
Creation of pilot production of container plates in the volume is 100 m3/year Estimated project cost : 48.00 mln rubles New jobs: 35
Project geography : Tomsk, Jena (Germany)
Tomsk State University of Architecture and Construction (co-contractor). Coordinators: Germany: INNOVENT e.V. Technology Development Project investor/initiator : (Jena), non-commercial organization. Russia: OOO Vakta Investor: Foundation for Assistance to Small Innovative Enterprises Investment Projects in Tomsk Region: Textile and Garment Industry
Modernization, Reconstruction and Renewal of the Linen Production and Processing Factory 1
Production of linen geotextiles and flax fiber thermal insulation Project life : 2015–2020 materials – 1 100 thousand m3/year
New jobs: 50
Estimated project cost : 70.00 mln rubles
Project geography : Asino, Asinovsky District
Project investor/initiator : OOO Tomsky Len
Setting up Production of Import-Substituting Napped Warp Knit Fabric
2
Production of napped warp knit fabrics (fleece, polar fleece, : coral fleece (Wellsoft), plain dyed and printed) - 360 tons of Project life 2015–2018 fabrics/year
New jobs: 22 Estimated project cost : 75.00 mln rubles
Project geography : Dzerzhinskoye settlement, Tomsky District
Project investor/initiator : OOO Shveinaya fabrika Tsarina Investment Projects in Tomsk Region: Chemical Industry
Polymer Production Development in OOO Tomskneftekhim
1 Production of low-density polyethylene: 140 thousand : tons/year; production of polyethylene: 271 Project life 2012–2020 thousand tons/year
New jobs: 276 Estimated project cost : 9 705.50 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO Tomskneftekhim, PAO SIBUR Holding
Reconstruction and Modernization of Production of Formalin and Urea- Formaldehydes
2 Construction of two new urea-formaldehyde concentrate : (KFK-85) and low-methanol (55 %) formalin plants with Project life 2013–2017 an aggregate capacity of 120 thousand tons/year to replace the existing obsolete technologies
New jobs: 55 Estimated project cost : 948.00 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO Sibmetakhim Investment Projects in Tomsk Region: Chemical Industry
Construction of the BOPP Film Production with the Capacity of 38 thousand tones on the Tomskneftekhim Site 3 Production of biaxially oriented polypropylene film – : 38 thousand tons/year Project life 2012–2019
New jobs: 103
Estimated project cost : 2 716.36 mln rubles
Project geography : Seversk
Project investor/initiator : OOO Biaksplen-T
Construction of New Production of Industrial Gas and Compressed Air
4 Construction of air separation plant, compartment of air : 2013–2026 and nitrogen compression, storage system, gasification Project life and dispensing cryogenic products and utilities systems
New jobs: 56 Estimated project cost : 1 323.70 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO Kriogenmash-Gas Investment Projects in Tomsk Region: Chemical Industry
Development and Organization of Pilot Production of Reagents for Drilling fluids: Stage 1 Creating a Pilot Industrial Production of Reagents, Stage 2 Creating a Large-Tonnage Production of Reagents 5 Pilot production of 3 types of drilling reagents: lubricants, : emulsifier and hydrocarbonaceous base, of total capacity Project life 2016–2018 of 10.1 thousand tons/year
New jobs: 61
Estimated project cost : 360.00 mln rubles
Project geography : ZATO Seversk
Project investor/initiator : OOO NPO ReaSib Investment Projects in Tomsk Region: Pharmaceutical production
Modernization and Expansion of the Hard-Gelatin Capsules Production
1 Production of hard-gelatin capsules – 6 mln pieces/year Project life : 2013–2018 New jobs: 64
Estimated project cost : 337.20 mln rubles
Project geography : Tomsky District, Kaltay village
Project investor/initiator : OAO Artlife Investment Projects in Tomsk Region: The processing productions
Production and Implementation of Heavy-duty Facilitated Grouting Material for Cementation Oil and Gas Wells Cmplicated by Availability of Layers with Low Pressure Hydraulic Fracturing
The heavy-duty facilitated grouting material Project life : 2014–2017 1
Estimated project cost : 103.00 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO NIITEK TPU-Burenie Investment Projects in Tomsk Region: Metal industry
Creation of the High-Tech Production Range Import-Replacing Cutting Tool, Including Solid Alloy with Wear-Resistant coatings for processing 1 of Light Alloys, Titanium Alloys, Superalloys and Stainless Steel
Purchase a new equipment and real estate in order Project life : 2013–2018 to increase production volumes of traditional cutting tools and output of new high-techpositions
New jobs: 31 Estimated project cost : 152.04 mln rubles
Project geography : Tomsk, Loskutovo village
Project investor/initiator : OOO Tomsky instrumentalniy zavod Investment Projects in Tomsk Region: Production of machine and equipment building
Creation and Modernization of Production of Import-Substituting Products Based on the OAO TEMZ
1 Creation production of anti-surge and control valves by building reconstruction and acquisition process Project life : 2016–2018 equipment on the basis of OAO TEMZ
New jobs: 35
Estimated project cost : 1 500.00 mln rubles
Project geography : Tomsk
Project investor/initiator : OAO TEMZ, OOO Tomskie technologii mashinostroeniya Investment Projects in Tomsk Region: Electric, Electronic & Optical Equipment
Modernization of the ZAO Metallist Plant ( 1 stage)
1 Renewal and modernization of the main wire and cable conductor production unit in order to increase the output Project life : 2014–2019 of cable products by at least 176 tons/year and 38.5 thousand km/year across the range of products, the output of net to at least 53.9 thousand m2/year, the output of cords to at least 868.0 thousand cords/year
New jobs: 6 Estimated project cost : 33.15 mln rubles
Project geography : Kolpashevsky District, Kolpashevo
Project investor/initiator : ZAO Metallist
Expansion and Modernization of Existing Production
2 Programmable logic controllers, intelligent electrical actuators Project life : 2014–2017
New jobs: 13 Estimated project cost : 43.78 mln rubles
Project geography : Tomsk
Project investor/initiator : AO EleSi Investment Projects in Tomsk Region: Electric, Electronic & Optical Equipment
Construction of the NPK Microelectronics Production Module
3 Production of Monolithic Integrated Circuits (MIC) of microwave range for production of radio-electronic Project life : 2015–2021 equipment, devices and systems of microwave range
New jobs: 120 Estimated project cost : 1 003.00 mln rubles
Project geography : Tomsk
Project investor/initiator : AO NPF Micran
Upgrade of production of Cable and Conduction Products in Rubber Isolation
4 Construction of the production case and acquisition of the additional equipment for productions of cable and conduction products in rubber Project life : 2013–2019 isolation, the improving quality the made products and expansion of the range
New jobs: 4 Estimated project cost : 648.19 mln rubles
Project geography : Tomsk
Project investor/initiator : ZAO SibCabel Investment Projects in Tomsk Region: Electric, Electronic & Optical Equipment
Modernization and Technological Development of the AO NPF Micran (I priority) 9 Creation of plant for production radioelectronic equipment, devices and systems of microwave range Project life : 2010–2020 production
New jobs: 1088 Estimated project cost : 1 369.62 mln rubles
Project geography : Tomsk
Project investor/initiator : AO NPF Micran
Construction of Electronics Manufacturing Plant ZAO TOMZEL
10 Design and development of mass production of electronic control systems for explosion-proof actuators. Creating the electrical actuators closed production cycle Project life : 2014–2018
New jobs: 25
Estimated project cost : 226.66 mln rubles
Project geography : Tomsk
Project investor/initiator : ZAO TOMZEL Investment Projects in Tomsk Region: Information technology
Data-Center Siberia
1 Creation of large data-center: 6 machine hall, more 1000 IT cabinets, cloud technologies, a wide complex of service Project life : 2014–2018 and group of specialists
New jobs: 58 Estimated project cost : 3 600.30 mln rubles
Project geography : ZATO Seversk
Project investor/initiator : OOO Data-Center Siberia Investment Projects in Tomsk Region: Production of Coke, Petroleum Products and Nuclear Materials
Construction of Fabrication Module and Start-up Module of Re-fabrication of Dense Mixed Uranium-Plutonium Fuel for Fast Breeder Reactors 1 Dense mixed uranium-plutonium fuel: in fabrication – 14 : 2013–2020 tons/year, in re-fabrication - 5 tons/year Project life
New jobs: 300
Estimated project cost : 27 288.85 mln rubles
Project geography : ZATO Seversk
AO Siberian Group of Chemical Enterprises Project investor/initiator : , Rosatom Group of Companies
Construction of a pilot demonstration complex with a BREST-OD-300 fast neutron reactor and an on-site nuclear fuel cycle
2 Maturation of the new-generation nuclear power technologies; construction of a pilot commercial lead- Project life : 2013–2020 cooled reactor with an on-site nuclear fuel cycle. Electrical output: 300 MW/year
New jobs: 650
Estimated project cost : 17 779.27 mln rubles
Project geography : ZATO Seversk
AO Siberian Group of Chemical Enterprises Project investor/initiator : , Rosatom Group of Companies Investment Projects in Tomsk Region: Production of Coke, Petroleum Products and Nuclear Materials
Construction of the Spent Fuel Processing Module of the Fast-Breeder Reactors
3 The mixed oxides of uranium and plutonium for re- fabrication - 5 tons/year Project life : 2014–2020
New jobs: 200
19 574.00 mln Estimated project cost : rubles
Project geography : ZATO Seversk
AO Siberian Group of Chemical Enterprises, Rosatom Project investor/initiator : Group of Companies
December 16, 2015 Investment Projects in Tomsk Region: Power, Water & Gas Production and Distribution
Reconstruction of OOO STES No. 4 Boiler Station Running on Associated Gas with Construction of a mini CHP Station 1 Generation of auxiliary power by No. 4 boiler station and supply to the city mains in parallel with the urban electric Project life : 2010–2017 network in the long term
New jobs: 26
Estimated project cost : 116.24 mln rubles
Project geography : Strezhevoy city
Project investor/initiator : OOO STES
Reconstruction of Central Heating Substations 2 Modernization of the public service infrastructure and ensuring its compliance with the operating standards; Project life : 2010–2018 enhancing the municipal standards of public utility services
Estimated project cost : 91.03 mln rubles
Project geography : Strezhevoy city
Project investor/initiator : OOO STES
Development of Gas Supply and Gasification in Tomsk Region
3 Gas supplying of 33 245 private houses and 430 entities Project life : 2015–2020 in 14 Tomsk region localities by construction of 1 704.60 kilometers of gas pipe line, 3 gas-distributing stations, complex of natural gas liquefaction and 5 station of 15 491.55 mln receiving, storage and regasification of liquefied natural Estimated project cost : gas rubles
Project geography : Tomsk Region localities
Project investor/initiator : Tomsk Region Administration Investment Projects in Tomsk Region: Power, Water & Gas Production and Distribution
Construction and Reconstruction of Electrical Grid PAO FSK EES in 2016-2020
4 Realization of investment program PAO Federal Grid Project life : 2016–2020 Company of Unified Energy System in 2016-2020 (as far as it pertains to the fulfillment of the Agreement on cooperation between PAO Federal Grid Company of Unified Energy System and Tomsk Region Administration in development of the Unified National (all-Russian) : Electrical Grid). Estimated project cost 342.00 mln rubles Ensuring the reliability of electricity supply to consumers, ensuring the possibility of connecting new consumers
Project geography : Tomsk Region
Project investor/initiator : PAO FSK EES
Creation and Reconstruction of Electrical Grid of PAO Tomskaya raspredelitelnaya companiya in 2016–2020
5 Realization of investment program PAO Tomsk : Distribution Company in 2016-2020. Project life 2016–2020 Ensuring reliable supply of power to consumers in Tomsk Region Estimated project cost : 3 737.90 mln rubles
Project geography : Tomsk Region
Project investor/initiator : PAO Tomskaya raspredelitelnaya companiya Investment Projects in Tomsk Region: Power, Water & Gas Production and Distribution
Construction and Reconstruction of Electric Grid of OOO Gorseti in 2015-2019
6 Realization of investment program OOO Gorseti in 2015- Project life : 2015–2019 2019. Increase of reliability of power supply and quality of electric power
Estimated project cost : 800.00 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO Gorseti
Construction and Reconstruction of Electric Grid of OOO Electroseti in 2015-2017
7 Realization of investment program PAO Tomsk Project life : 2015–2017 Distribution Company in 2015-2017. Increase of reliability of power supply and quality of electric power
Estimated project cost : 109.00 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO Electroseti Investment Projects in Tomsk Region: Power, Water & Gas Production and Distribution
Construction and Reconstruction of Electric Grid of AO TomskRTS in 2016-2018
6 Realization of investment program AO TomskRTS in Project life : 2016–2018 2016-2018. Increase of reliability of power supply and quality of electric power, increase the capacity of main heating networks for connection of new consumers Estimated project cost : 1 247.00 mln rubles
Project geography : Tomsk
Project investor/initiator : AO TomskRTS
Construction and Reconstruction of Electric Grid of AO Tomsk Generation in 2016-2018
Realization of investment program AO Tomsk generation Project life : 2016–2018 7 in 2016-2018. Increase of reliability of power supply and quality of electric power
Estimated project cost : 867.56 mln rubles
Project geography : Tomsk
Project investor/initiator : AO Tomskaya generatsiya Investment Projects in Tomsk Region: Agriculture and Forestry
Creation of a Seed Center for Elite Seed Production
1 Production of elite seed potatoes is 4,700 tons/year. Increase of the area of one-time storage by 8 000 tons Project life : 2015–2018
New jobs: 20
Estimated project cost : 228.00 mln rubles
Project geography : Trubachevo settlement, Tomsky District
Project investor/initiator : OOO Kolpakov
Construction of a Cattle-Breeding Complex for 800 Head of Cattle (cows) 2
Production of milk is 5 300 tons/year Project life : 2016–2018
New jobs: 10 Estimated project cost : 579.00 mln rubles
Project geography : Yagodnoye settlement, Asinovsky District
Project investor/initiator : OOO Sibirskoe moloko
Construction of a Barn for 192 Places with a Built-in Dairy Unit and Cattle-Breeding Premises for a Total number of 500 Head of Cattle 3
Production of milk is 1 200 tons/year Project life : 2016–2018 New jobs: 30
Estimated project cost : 70,00 mln rubles
Project geography : Pudovka settlement, Krivosheinsky District
Project investor/initiator : SPK Belostok Investment Projects in Tomsk Region: Agriculture and Forestry
Construction of 240-Cow Dairy Farm (2 priority) 4
Construction of a loose-housing farm. Expansion of the Project life : 2015–2018 milking herd. Milk production - 1 200 tons/year
New jobs: 10 Estimated project cost : 130,00 mln rubles
Project geography : Kudrinsky Uchastok, Tomsky District
Project investor/initiator : SPK Nelyubino
Reconstruction of Dairy Complex With a 800 Head of Cattle 5 Milk production – 2 500 tons/year Project life : 2015–2018 New jobs: 3
Estimated project cost : 186,70 mln rubles
Project geography : Rybolovo settlement, Tomsky District
Project investor/initiator : OOO SPK Mezheninovsky
Construction of Dairy Complex for 1 650 Head of Cattle
6 Milk production – 8 900 tons/year, increasing of dairy : herd up to 2 100 Project life 2015–2016
New jobs: 50 Estimated project cost : 642,00m rubles
Turuntaevo settlement, Tomsky District Project geography :
Project investor/initiator : OOO SPAS Investment Projects in Tomsk Region: Agriculture and Forestry
Reconstruction of the Tomsky Pig-Breeding Complex 7
Meat (pork) production – 34 200 tons/year Project life : 2015–2018
Estimated project cost : 2 500.00 mln rubles
Project geography : Novonikolaevka settlement, Asinovsky District
Project investor/initiator : AO Sibirskaya agrarnaya gruppa
Construction and Modernization of a Meat Cattle Farm for 800 Head of Cattke 8 Meat (cow) production - 50 tons/year Project life : 2016–2018
New jobs: 11 Estimated project cost : 142.00 mln rubles
Project geography : Chazhemto settlement, Kolpashevsky District
Project investor/initiator : Peasant farm enterprise Sinitsin V.S.
Organization of Slaughter and Processing of Meat Shop
9
Construction of slaughtering and meat processing shop, Project life : 2015–2018 in accordance with international standards, producing high quality products. Meat (cow) production – 8 900 tons/year, increasing of dairy herd up to 2 100 Estimated project cost : 642.00 mln rubles
Kargala settlement, Shegarsky District Project geography :
Project investor/initiator : SPK Kargalinsky Investment Projects in Tomsk Region: Agriculture and Forestry
Construction of a Cattle-Breeding Complex of Meat Direction “Mramornaya Ferma” (Marble Farm) for 1 000 brood stock 10 Meat (cow) production – 205 tons/year Project life : 2016–2018
New jobs: 25
Estimated project cost : 410.00 mln rubles
Project geography : Berezovka settlement, Pervomaysky District
Project investor/initiator : OOO Berezovskaya ferma
Construction of the dairy farm “Molochnaya Ferma” (Dairy Farm) for 2 600 Head of Cattle Milking Herd 11 Meat (cow) production - 50 tons/year Project life : 2016–2018
New jobs: 240 Estimated project cost : 3 287.00 mln rubles
Project geography : Mazalovo settlement, Tomsky District
Project investor/initiator : OOO APK Pervomaysky
Development of Production of Leguminous and Feed Crops
12
Production of cereal crops – 43 600 tons/year Project life : 2016–2018
New jobs: 180
Estimated project cost : 1 000.00 mln rubles
Kuyanovo settlement, Pervomaysky District Project geography :
Project investor/initiator : OOO APK Pervomaysky Investment Projects in Tomsk Region: Agriculture and Forestry
Construction of the Cattle-Breeding Complex “Krolichiya Usadba” (Rabbit Manor) for 1 200 brood stock
13 Meat (rabbit) production – 80 000 tons/year Project life : 2016–2018
New jobs: 25
Estimated project cost : 80.00 mln rubles
Project geography : Novo-Kuskovo settlement, Asinovsky District
Project investor/initiator : OOO Universal product Investment Projects in Tomsk Region: Fish culture
Fish Reproductive Complex Aquabiocenter of the Tomsk region
1 Reproduction of fish and compensation for damage Project life : 2014–2019 caused to fish stocks of the Ob River: creating the broodstock of sturgeon (with annual production amount of 1 million units) and whitefish (with annual production amount of 3 million units); organization caviar selection item on whitefish and sturgeon spawning grounds of the Tomsk region and the creation of the broodstock of the Siberian sturgeon, peled, muksun, white salmon, sterlet for annual Estimated project cost : 1 052.30 mln rubles production of caviar with subsequent incubation, rearing larvae and stocking the reservoirs of the Tomsk region
New jobs: 86
Project geography : Tomsky District
Project investor/initiator : Tomsk region Department of Hunting and Fishery Investment Projects in Tomsk Region: Food Industry
Technological Modernization of Production
1 Beer up to 10.0 mln Dal. / Year, non-alcoholic beverages Project life : 2016–2023 up to 4.0 mln dal/year
New jobs: 300 Estimated project cost : 800.00 mln rubles
Project geography : Kozhevnikovo village, Kozhevnikovsky District
Project investor/initiator : OOO Pivovarnya Kozhevnikovo
Technological Modernization, Renewal of Equipment, Production Modernization and Development of the Beer and Soft Drink Market
2 Expansion of in-house market production of beer up to 19.0 mln dL/year, soft drinks up to 4.1 mln dL/year Project life : 2011–2020
New jobs: 110
Estimated project cost : 1 735.00 mln rubles
Project geography : Tomsk
Project investor/initiator : OAO Tomskoye Pivo
Creation of Enterprise for Processing and Preserving Fruits, Vegetables 3 and Wild-Growing Raw Materials of the “Tomsk Konservniy Zavod”
Creation of an enterprise for deep processing of wild plants, vegetables and fruits in order to obtain the Project life : 2016–2018 finished product and its further sales under own brand name Taiga delicacies and Privilegio ‘ Estimated project cost : 49.50 mln rubles New jobs: 12
Project geography : Tomsk
Project investor/initiator : OOO ZagotProm Investment Projects in Tomsk Region: Food Industry
Modernization of Production of Confectionery Products Based on Pine Nuts, Seeds, Berries and Dried Fruits
4 Collection and deep processing of nuts and berries with Project life : 2014–2022 innovative technologies
New jobs: 19 Estimated project cost : 39.71 mln rubles
Project geography : Timiryazevskoye settlement, Tomsky District
Project investor/initiator : OOO Snack Food
Organization of Production of Food Products, Raw Materials for the Production of Dietary Supplements and Cosmetics based on the Complex Processing of Fruit and Berry crops and Pine Nuts 5 Organization of production of fruit and berry puree, juice, : oils from berries, cedar oil, cedar milk and cream from Project life 2014–2019 the core of pine nuts. Star-up production line for the processing of fruit and berry crops with a design capacity for processing berries to 2 000 tons/year and products from the core of pine nuts to 100 tons/year Estimated project cost : 115.00 mln rubles
New jobs: 46
Project geography : Tomsk
Project investor/initiator : OOO TPK Sava Investment Projects in Tomsk Region: Food Industry
Development of Production of Unique Fruit and Fat Stuff for Confectionary Industry based on Nature Hydrocolloids
6 Organization of large-tonnage production and launch of : unique fruit and berry fillings for the confectionery and Project life 2013–2018 dairy industry, including import substituting
New jobs: 93 Estimated project cost : 39.71 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO TPK SAVA
Implementation of Complex Innovative Project for Organization of High-Technology Advanced Processing of Wild Plants 7 Modernization of production, enhancing energy efficiency of industrial processes by using innovative equipment; Project life : 2013–2022 assimilation of new manufacturing technologies to improve product quality and competitiveness; product line extension by adding products of advanced wild crop processing; increasing production and sales, expansion of sales markets in regions of Russia, CIS and EU countries Estimated project cost : 69.90 mln rubles
New jobs: 5
Project geography : Tomsk
Project investor/initiator : OOO NP Sibirskaya Orekhovaya Kompaniya Investment Projects in Tomsk Region: Food Industry
Development of Laboratory Regulations for the Manufacture of Pastilles with Prebiotic, Immunomodulatory and Anti-Inflammatory Properties 8 Development and implementation of laboratory regulations for manufacturing pastille in production Project life : 2015–2021
New jobs: 9
Estimated project cost : 21.00 mln rubles
Project geography : Timiryazevskoye, Tomsky District
Project investor/initiator : OOO NP Sibirskaya Orekhovaya Kompaniya
Modernization of Confectionary Staff Industry Based on Pine Nuts, Crops, Berries and Dry Fruits
9 Creation of enterprise for the collection, deep processing Project life : 2014–2022 of nuts and berries with innovative technologies, transition to high-tech production, improvement of efficiency of organization of business processes
New jobs: 19 Estimated project cost : 50.50 mln rubles
Project geography : Petrovo, Tomsky District
Project investor/initiator : OOO Eco fabrica Sibersky kedr Investment Projects in Tomsk Region: Food Industry
Construction of a Steam Boiler Facility of OOO Derevenskoye Molochko
10 Construction of a steam boiler room independent from centralized power sources of system for providing OOO Project life : 2012–2019 Derevenskoye molochko saturated the ferry boat for production needs and heating objects of the organization
New jobs: 5
Estimated project cost : 75.20 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO Derevenskoye Molochko
Development, Production and Sales of Protein Products Based on Soybeans with a Long Shelf Life
11 Dietary protein products based on soya Project life : 2016–2018 New jobs: 14
Estimated project cost : 13.50 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO Organic Soya product Investment Projects in Tomsk Region: Hotel and Catering
McDonald’s Fast Food Restaurant
1 Construction of a fast food restaurant Project life : 2017–2018 New jobs: 45
Estimated project cost : 180.00 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO McDonald’s Investment Projects in Tomsk Region: Wholesale and Retail Trade, Repair of Cars, Motorcycles, Household and Personal Goods
Creation of the Lexus Sales and Service Center
1 Creating a new complex facility to sell cars and render repair and maintenance services Project life : 2013–2017
New jobs: 15
Estimated project cost : 180.00 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO ElkeAvto Investment Projects in Tomsk Region: Construction of Shopping and Logistics Centers
Creation of the Universal Market Nakhimovsky (Kirov part of town)
1 Creation of a universal market, which will accommodate : about 350 trade places and also will be equipped with a Project life 2016–2018 venue for various events, fairs and holidays
Estimated project cost : 120.00 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO Nakhimovsky managing company
Expansion of Yarche Retail Trade Network
2
Construction of a 10 new stores Project life : 2017–2018
Estimated project cost : 90.00 mln rubles
Project geography : Tomsk region
Project investor/initiator : OOO Kamelot-A Investment Projects in Tomsk Region: Housing Construction
Construction of the “Yugnie Vorota” Residential Area
1 2 Construction of affordable comfort housing – 541 402 m Project life : 2015–2019
23 800.00 mln Estimated project cost : rubles
Project geography : Tomsk
Project investor/initiator : OAO Tomskaya Domostroitelnaya companiya
Development of the Eastern Part Territory of Tomsk
2 Complex development of the eastern part territory of Tomsk, where houses are located, recognized as Project life : 2008–2027 emergency and subject to demolition, are multi- apartment houses, demolition and reconstruction of which is planned on the basis of municipal targeted programs. 2 100 000.00 mln The volume of houses territory - 2 mln m per 100 Estimated project cost : thousand people rubles
Project geography : Tomsk
Project investor/initiator : OAO Tomskaya Domostroitelnaya companiya Investment Projects in Tomsk Region: Housing Construction
Construction of “Severny” Low-Rise Residential Area
3 Construction of affordable comfortable housing and social infrastructure (2 kindergartens, 1 school, children's Project life : 2015–2017 playgrounds and sports fields) – 60 900 m2
Estimated project cost : 2 639.00 mln rubles
Project geography : Kislovka settlement, Tomsky district
Project investor/initiator : Group of Companies Karyeroupravlenie
December 16, 2015 Tomsk Region Infrastructure Projects
Development of Tomsk Embankments Priority Development Area
1 Creation of an administrative and business zone, university Project life : 2013–2029 campus, recreation zone, including Tatar Sloboda historical and cultural center with a view to create a comfortable living and learning environment in the central part of Tomsk
Total gross floor area: 420 ha
83 153.00 mln Estimated project cost : rubles
Project geography : Tomsk
Tomsk Region Administration, Project investor/initiator : Tomsk Administration, retail investors
Tomsk Special Economic Zone Development
2 Creation of an administrative and business, engineering and : exposition centers, sport infrastructure, conference hall, hotels, Project life 2006–2054 plant of the residents
Total gross floor area: 269 ha 57 084.00 mln Residents by 2023: 205 Estimated project cost : New jobs by 2023: 12 250 rubles
Project geography : Tomsk
OAO SEZ, Tomsk Region Administration, Tomsk Project investor/initiator : city Administration, retail investors Tomsk Region Infrastructure Projects
Construction and Development of the Tomsk Industrial Park
3 Construction of two industrial sites with a total area of Project life : 2013–2064 138 ha to locate food, metalworking, mechanical engineering, chemical and construction material companies
New jobs: 2 926 Estimated project cost : 7 320.00 mln rubles
Project geography : Tomsk
Tomsk Region Administration, Tomsk city Project investor/initiator : Administration, industrial park residents, retail investors
Reconstruction of “Peski” Heliport
4 Utility connection to engineering networks, Project life : 2013–2019 construction of a garage with a fire post, reconstruction of an aircraft maintenance building, a helicopter landing site Estimated project cost : 312.60 mln rubles
Project geography : Kolpashevsky District
Project investor/initiator : Tomsk branch of OOO Aviapredpriyatie Gazpromavia Investment Projects of Tomsk Region: Transport and Communications
Reconstruction of Highway Kamaevka – Asino – Pervomayskoe at the Section km 0 – km 53 of the Tomsk Region
1 Reconstruction of the km 0 - km 53 section of the Kamaevka - Asino - Pervomayskoy motor road III of the Project life : 2011–2023 technical category with two lanes and a carriageway width of 7.0 meters that is part of the Tomsk - Asino road route
Estimated project cost : 4 027.00 mln rubles
Project geography : Asinovsky, Tomsky Districts
OGKU Tomskavtodor Project investor/initiator : Tomsk Region Department for Transport, Road Management and Communications Investment Projects of Tomsk Region: Transport and Communications
Construction of the Access Road to the Airport Terminal in Tomsk with Stops and Parking areas at the section 19 km - 20.185 km of the Tomsk-Airport Road 2 Extension of the entrance to the terminal of Bogashevo Airport with stop and parking areas for 360 cars Project life : 2013–2019
Estimated project cost : 320.00 mln rubles
Project geography : Tomsk District
OGKU Tomskavtodor Project investor/initiator : Tomsk Region Department for Transport, Road Management and Communications
Purchase of 20 New Buses MD 6106 KDC (Chinese Production) for Organization Passengers and Baggage Transportations on the Suburban and Urban Routes 3
Creation of conditions for high-quality performance intermunicipal route № 119 Tomsk Airport, № 130 Tomsk1 – Svetly - Kopylovo Project life : 2007–2020
Estimated project cost : 36.58 mln rubles
Project geography : Tomsk
Project investor/initiator : OAO Tomskavtotrans Investment Projects of Tomsk Region: Transport and Communications
Construction and Reconstruction of the Highway Perm-Ivdel-Hanti- Mansiisk-Surgut-Nignevartovsk-Tomsk on the Tomsk region territory 4 Strengthening the relationship between the south of Tyumen region, Ural and West Siberian regions. Northern latitudinal road, which passing through the settlements: Project life : 2008–2030 Kargala, Inkino, Mogilny Mis, Parabel, Kargasok, Sredny Vasyugan, will ensure a stable year-round connection of the basic transport network of the Tomsk region: Tomsk with the Parabelskiy and Kargasoksky districts and creation of a road connection with Aleksandrovsky district and Strezhevoy city 40 198.00 mln Estimated project cost : rubles
Kolpashevsky, Parabelsky, Kargasoksky, Alexandrovsky Project geography : Districts
OGKU Tomskavtodor Project investor/initiator : Tomsk Region Department for Transport, Road Management and Communications
Renovation of the Fleet of Specialized Equipment
5 Renovation of the fleet of specialized equipment
New jobs: 10 Project life : 2016–2019
Estimated project cost : 95.86 mln rubles
Project geography : Tomsk region
GUP TO Oblastnoe dorognoe remontno-stroitelnoe Project investor/initiator : upravlenie Investment Projects in Tomsk Region: Tourism and Recreation
Development of “Okolitsa” Year-Round Theme Nature Recreation Park
1 Development of a park for recreation and tourism events; development of an infrastructure for leisure and food Project life : 2013–2018 facilities, as well as other objects for cultural and leisure activities
New jobs: 130 Estimated project cost : 594.00 mln rubles
Project geography : Zorkaltsevo settlement, Tomsky District
OGAU International festival-competition Prazdnik Project investor/initiator : topora, OGAU Tom Center of Business Cooperation and Recreation
Construction of a Multipurpose Center for Physical Education, Recreation, Sports and Tourism 2 Construction of a sports and fitness cluster in modern premises, with new equipment and leading instructors/coaches to satisfy the existing demand for Project life : 2015–2017 sports activities (tennis, fitness, swimming, volleyball, etc.) among Tomsk citizens
New jobs: 56
Estimated project cost : 302.00 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO Tennisny Club Investment Projects in Tomsk Region: Tourism and Recreation
Construction of Tomsk Museum of Science and Technology
3 Construction of the Museum involves: a 3 300 m2 permanent exhibition room, a 700 m2 temporary : exhibition room, six 100 m2 laboratory complexes, 4 Project life 2015–2017 800 m2 of offices and auxiliary rooms. Besides, there will be a 400 m2 transformer conference room with a 3D movie theater and a 200 m2 scientific theater Estimated project cost : 200.00 mln rubles
Project geography : Tomsk
Project investor/initiator : OGAUK Shatilov Tomsk Museum of Local History
Reconstruction of Seversk Nature Park
4 Development of a modern recreation area in Seversk Project life : 2014–2017 Nature Park to provide a comfortable environment, where residents and guests of the city could have a good rest. Modernization of the amusement park; reconstruction of the zoo enclosures; landscape reconstruction of the park Estimated project cost : 128.31 mln rubles
Project geography : ZATO Seversk
Project investor/initiator : Administration of ZATO Seversk Investment Projects in Tomsk Region: Tourism and Recreation
Academpark - the Center of Sports and Family Holidays
5 Construction of new facilities: Project life : 2013–2029 Ice Palace, a complex of ski jumps, a hockey court, a snowboard park, an extreme park, service infrastructure facilities; development of transport, engineering, and business infrastructure Estimated project cost : 990.00 mln rubles New jobs: more than 100
Project geography : Tomsk
Project investor/initiator : Tomsk Region Administration, Tomsk City Administration Investment Projects in Tomsk Region: Education and Healthcare
The Section Type Hostel of the National Research Tomsk State University
1 Construction of 16-storey hostel for 800 beds -20 Project life : 2014–2020 000 m2 The project is included in the list of priority projects in the concept of INO Tomsk in the direction of Science and Education Estimated project cost : 1 100.00 mln rubles
Project geography : Tomsk
Project investor/initiator : Ministry of Education and Science of the Russian Federation
Construction of Kindergartens in Tomsk Region
2 Construction, equipment and exploitation of 15 buildings Project life : 2013–2020 designed to locate pre-school educational institutions in 9 municipal entities of Tomsk Region. Aggregate capacity of kindergartens: 2 550 places : New jobs: 900 Estimated project cost 2 683.00 mln rubles
Tomsk, ZATO Seversk, Strezhevoy city, Aleksandrovsky District, Verkhneketsky District, Kargasoksky District, Project geography : Kozhevnikovsky District, Pervomaysky District, Tomsky Districts
OAO Tomskaya domostroitelnaya companiya; public- Project investor/initiator : private partnership Investment Projects in Tomsk Region: Education and Healthcare
Reconstruction of the Radiology Department to Accommodate Cancer Patients 3 Increased capacity of radiology department, the Project life : 2014–2018 creation of living conditions of cancer patients
New jobs: 57 Estimated project cost : 245.00 mln rubles
Project geography : Tomsk
Project investor/initiator : Tomsk Region Administration
Construction of the Surgical Building for 120 Beds with a Polyclinic for 200 Visits per Shift Regional Governmental Institution of Health Care Tomsk Regional Ontological Dispensary 4 The construction of the surgical building for the provision Project life : 2016–2019 of high-tech care to the cancer patients
New jobs: 30 Estimated project cost : 3 970.00 mln rubles
Project geography : Tomsk
Project investor/initiator : Tomsk Region Administration
Reconstruction of the Laboratory Building for the Needs of OGBYZ BSMETO 5 Increasing of capacity of the laboratory building Bureau : of Forensic Medicine of the Tomsk region Project life 2016–2018
New jobs: 20 Estimated project cost : 300.00 mln rubles
Project geography : Tomsk
Project investor/initiator : Tomsk Region Administration Investment Projects in Tomsk Region: Education and Healthcare
Creation, Reconstruction and Equipage of Schools in the Tomsk Region 6 Creation, reconstruction and equipage of schools in Project life : 2016–2025 the territory of municipal entities of Tomsk region with total quantity of place – 14 731
New jobs: 1500 15 300.00 mln Estimated project cost : rubles
Aleksandrovsky District, Asinovsky District, Kolpashevsky District, Bakcharsky District, Kargasok District, Krivosheinsky Project geography : District, Pervomaisky District, Teguldetsk District, Tomsky District, Chainsky District, Shegarsky District and Tomsk
Project investor/initiator : Tomsk Region Administration Investment Projects in Tomsk Region: Environment Protection and Municipal Solid Waste Treatment
Construction of Landfill of Toxic Industrial Waste
1 The landfill created capacities for receiving toxic waste up to 30 thousand tons/year in order to prevent Project life : 1992–2019 environmental damage to the area in the amount of 13 mln rubles/year
New jobs: 104 Estimated project cost : 1 447.86 mln rubles
Project geography : Tomsky District
Project investor/initiator : OAO Poligon Investment Projects in Tomsk Region in the cluster Smart Technologies Tomsk
Production of a Line of Active Pharmaceutical Ingredients and Biopharmaceutical Essences
1 Production of polyprenols, biological essenses and medicines based on them, pharmaceutical ingredients, Project life : 2016–2020 strains of microorganisms, hard and soft gelatin capsules
New jobs: 70
Estimated project cost : 5 854.00 mln rubles
Project geography : Tomsk
Project investor/initiator : OOO Artlife, OOO Solagift, OOO Ifar
Technical Vision: a Line of cross Market Products for Air, Land and Sea Unmanned Vehicles, Industrial and Educational Robotics 2 Creation and introduction of a technological platform of built-in machine vision with various spheres of application: for unmanned vehicle management, for Project life : 2016–2020 industrial machine tool robotics and production automation, for education in order to develop programming skills of robots with technical vision
New jobs: 120
Estimated project cost : 1 360.00 mln rubles
Project geography : Tomsk
Group of companies Elecard, OOO NPP TEK, OOO NTP Project investor/initiator : Semantica Investment Projects in Tomsk Region in the cluster Smart Technologies Tomsk
Multifunctional Information - Communication Systems for Regions with Extreme Natural and Climatic Conditions 3 Development and implementation of IKIS "Intellectual production point", hardware-software complex for remote Project life : 2016–2020 monitoring of human health status, "Mobilehealth- products" - sensors and applications for health monitoring
New jobs: 200
Estimated project cost : 1 493.00 mln rubles
Project geography : Tomsk
AO NPF Mikran, AO EleSi, Group of companies Project investor/initiator : Elecard, OOO Center corporativnoy medicini
Robotic Systems and Educational Robotics, Including Local Navigation Systems, Distributed Control Systems for Drive Units, Data Exchange Systems, Intelligent Servos and a Sensory Environment 4 Development and introduction into production of components of integration software and hardware Project life : 2016–2020 platforms for the construction of robotic systems and complexes
New jobs: 200 Estimated project cost : 2 785.00 mln rubles
Project geography : Tomsk
AO EleSi, OOO Inkom, OOO NPF Mehatronica-Pro, Project investor/initiator : OOO LEMZ-T