DISTRICT COUNCIL

TENDER NOTICE District Council Dera Ghazi Khan Intends to call sealed tenders for its development project pertaining to ADP 2017-18 from contractors who are enlisted / Renewed in Zila Council D.G.Khan for the financial year 2017-18 .

1. The bid documents will be issued on charges of Rs.500/- per bid document by the Head Clerk (I&S Branch) on written request of contractors from the date of publication of tender notice till to 08-12- 2017 accompanying the following documents.

i) Enlistment letter along with Govt Fee deposit slip for financial year 2017-2018 from zila council Dera ii) Ghazi Partnership Khan. deed in case of limited company

iii) No Litigation certificate on letter head pad.

2. The sealed bid document alongwith 5% earnest money in the shape of call deposit from any scheduled bank in Punjab in favour of Chairman District Council D.G.Khan from date of publication to date 11- 12-2017 at 12:00 pm .

3. All the received / Sealed bids will be received /opened on dated 11-12-2017 at 01:00 pm in the office of District Council D.G.Khan by the Tender opening committee in the presence of available contractores or their authorized representatives.

4. It is compulsory on all participated contractors to quote their rates in Nos as will as in words on above or below the estimate on percentage basis.

5. Additional performance guarantee 10% of tender cost ( balance amount adjusting 5% of earnest money) should be deposited by the bidder whose rates are approved by the competent authourity within 7 days. If he does not deposit the required amount, his 5% CDR deposited will be forefeited by the District Council and his tender rate will be rejected and process of re-tendering will be initiated. This action cannot be challenged in any Court of Law. 6. Conditional, unsigned, incomplete, cutting, over written and doubtful bids will be dealt as rejected.

7. The competent authourity may reject all bids at any time prior to the approval / acceptance of the tender rate. 8. When work order issued to approved contractor, he has to make the agreement with department on stamp paper of value specified by Government.

9. The period for completion of each project will be mentioned in work order after approval of rates of the lower bidder.

10. The bids poured by contractores within 5% CDR without getting receipt from Head Clerk will be dealt cancelled. 11. The sealed bids should be with orignal CDR. The bid documents not issued from the office of Head Clerk will be considered as rejected. The bidder has no right to challenge it.

12. The contractores to Whom work order are issued, are bound to conduct the required quality control tests on their own expences. The detail of work to be tendered is as below.

Last date for Tenders Sr. Estimated Earnest Tender Completion Name of Development Schemes issue of /receipt No. Cost Money Fee Time tenders opening date Construction of Soling, Drain & Culverts Basti Kotani U/C 11-12-2017 1 Kotani . 1000000 50000 500 90-Days Receipt 12:00 08-12-2017 pm Construction of Drain Soling Street Sajjad Khitran U/C Kotani . 2 300000 15000 500 60-Days Opening 01:00 PM Construction of Drain, Soling Basti Mithay Wali Mohallah 3 Gazar and Mohallah Buzdar U/C Kotani. 500000 25000 500 60-Days

Installation of Handpump Basti Jaday Wali, Basti Wajan & 4 50000 500 90-Days Soling Basti U/C Lakhani 1000000 5 Construction of Drain Soling Basti Jallo Wali U/C Jallo Wali 1000000 50000 500 90-Days Construction of Drain, soling , Culverts Basti Chooni Mouza 6 50000 500 90-Days Chooni U/C Jallo wali. 1000000 Construction of Boundary Wall Janaza Gah Basti Maral, Basti 7 50000 500 90-Days Lashari U/C Kalo Wala 1000000 Construction of Drain, Soling & Boundary wall Janazagah Basti 8 50000 500 90-Days Kaloo wala. U/C Kalo Wala. 1000000 9 Repair of Road Basti U/C Nutkani 2360000 118000 500 120-Days 10 Construction of culverts U/C Nutkani 1000000 50000 500 90-Days Construction of Soling & Earth filling Basti Azeem U/C 11 Panjgraien 1000000 50000 500 90-Days

Construction of Drain, Soling & Tuff Tile Basti Ladha Mouza 11-12-2017 12 Rakh Gharbi & Marri Darmini U/C Panjgraien 1000000 50000 500 90-Days 08-12-2017 Receipt 12:00 Upto pm 13 Construction of Culvert Basti Manjotha U/C Bubbi 253000 12650 500 60-Days 12:00 PM Opening Construction of Soling street Girls School Basti Sobha U/C 01:00 PM 14 25000 500 60-Days Babbi. 500000 Construction of Drain Soling Street Haji Akhtar Khan Tibbi 15 23450 500 60-Days U/C Bubbi 469000 Construction of Nala Main street Basti Dawoo Wali U/C Bubbi 16 546000 27300 500 60-Days

Construction of Soling & Drain street Bashir Leghari Basti 17 7250 500 60-Days Dawoo Wali U/C Bubbi 145000 18 Construction of B/Wall Janaza Gha Basti Gazar U/C Bubbi 350000 17500 500 60-Days

19 Construction of Drain Soling Basti Hamal Wali U/C Bubbi 300000 15000 500 60-Days Construction of Drain, Soling Basti Bolani U/C More Jhangi 20 1000000 50000 500 90-Days

Construction of Drain, Soling Qasba Rehman Abad ( Lashari 21 50000 500 90-Days Birdari ) U/C More Jhangi 1000000 Construction of culvert Basti Tibba Malkani & Drain / Soling 22 50000 500 90-Days Basti Malkani U/C 1000000 Construction of Drain, Soling,Qasba Retra U/C Tibbi Qasrani 23 1500000 75000 500 60-Days

Repair & R/H of Mettled road from Indus High Way adda 24 228900 500 120-Days Phehar To High School Phehar U/C Tibbi Qaisrani. 4578000 Construction of Nala & Drain / Soling Basti Nari U/C Nari 25 50000 500 90-Days Janubi 1000000 26 Desalting of Nala Masoo Wah Qasba Nari U/C Nari. 1000000 50000 500 90-Days Construction of Boundary wall Janaza Gha Dona & Drain / 27 50000 500 90-Days Soling Basti Dona U/C Dona 1000000 Construction of Drain & Soling Basti Jerh Leghari U/C Dona. 28 500000 25000 500 60-Days

29 Construction of Nala Basti Tub Mohallah Sharqi U/C Bindi 1000000 50000 500 90-Days Construction of culvert, Laying of Sub base, Soling & Slaib 30 from Khoja Masjid to Farm Haji Abid Buzdar Mouza Tub U/C 1000000 50000 500 90-Days Bindi. 11-12-2017 31 Construction of Drain Soling Basti Tub U/C Bindi 500000 25000 500 60-Days 08-12-2017 Receipt 12:00 Repair of Mettled road from Indus road adda Hairo to Bindi Upto pm 32 341800 500 120-Days U/C Bindi 6836000 12:00 PM Opening 01:00 PM Construction of Drain, soling, Culverts, sub Murcible Pump, 33 Basti Bechra, Basti Makwal, Basti Nazim Abad, Basti Chowki 1000000 50000 500 90-Days Wala, U/c Repair of Mettled road from Indus High Way adda choki wala 34 to Jhoke Saddique abad wali U/C Makwal Kalan. 4956000 247800 500 120-Days Construction of Drain, soling, Culverts, sub Murcible Pump, 35 Basti Bechra, Basti Makwal, Basti Nazim Abad, Basti Chowki 500000 25000 500 60-Days Wala, U/c Makwal Kalan Repair & R/H of Mettled road fromJhoke Saddique abad wali 36 253700 500 120-Days to Exchange Makwal Kalan U/C Makwal Kalan. 5074000 37 Repair of Metalled road Basti Bate Alyani U/C Cholani 1770000 88500 500 90-Days Construction of Drain Soling Basti Sadoo from Link Road to 38 25000 500 60-Days Dera Haji Bahar Khosa U/C Cholani 500000 Construction of soling Basti Chatani, Basti Mehrowani, Chah 39 25000 500 60-Days Gidder wala, Basti Bhanday wala U/C Pardan Sharqi 500000 Construction of soling Basti Mureedani, Basti Ahmadni, Basti 40 25000 500 60-Days Jindani, Basti Kanla. U/C Pardan Sharqi. 500000 Construction of soling Basti Mureedani U/C Pardan Sharqi 41 500000 25000 500 60-Days

Construction of Drain , Soling Qasba Kot Mohi U/C Pardan 42 50000 500 90-Days Sharqi. 1000000 Installation of Hand Pumps , Sub Murcible Pump, PVC Pipe 43 62500 500 90-Days Line Mouza Chit Pani, Mouza Ghoona, U/C Bohar 1250000 44 Installation of Hand Pumps Mouza Jatt Gaadi,U/C Sokar 750000 37500 500 60-Days Construction of Nala & drain Soling sub Murcible Pump Basti 45 65000 500 90-Days Koro & Basti Buzdar U/C Basti Buzdar 1300000 Construction of Drain soling & culvert Zumbo wali Bhuttay wali 46 25000 500 60-Days Beroon Taunsa U/C Basti Buzdar 500000 Construction of culverts, installation of Sub Murcible pump, 47 Sharqi, Mangrotha Gharabi, Jhoke Bakhwani, 1000000 50000 500 90-Days Jhoke Manglay Wali,U/C Mangrotha Installation of Hand pumps Basti Chapri & Basti Bahar Wali & 48 Construction of soling Drain Kot Qaisrani. U/C Kot Qaisrani. 1000000 50000 500 90-Days

Providing & Laying PVC pipe line Mohallah Saleem abad 49 15000 500 60-Days street Masjid wali Ward No.01 U/C Kot Qaisrani 300000 Construction of Drain . Soling , Qasba Bodo U/C Jhoke Bodo 50 1000000 50000 500 90-Days

Construction of soling from link road Chatri to Basti Tibbay wali 51 50000 500 90-Days and main street Basti Ladhacha U/C Litra 1000000 Construction of of Drain Soling Mohallah Itlani Vehova. U/C 52 50000 500 90-Days Janobi. 1000000 Construction of Drain Soling & culvert Basti Bilwani U/C 53 50000 500 90-Days Vehova Chak Shumali U/C Vehoa Chak Shomali. 1000000 Construction of Bridge at Gang Basti Borani U/C Vehoa Chak 54 17500 500 60-Days Shomali 350000 Excavation of Gang though Nala Excavator U/C Vehova Chak 55 25000 500 60-Days Shumali 500000 Construction of Culvert Basti Bilwani U/C Vehova Chak 56 17500 500 60-Days Shumali 350000 Construction of Drain, soling, Culverts Basti Kandi Wala, Basti 57 50000 500 90-Days Tibbi Sahani U/C Ahmadani 1000000 Construction of Drain. Soling Basti Noor Pur U/C Shahdan 58 50000 500 90-Days 1000000 i.Construction of soling, from Indus High Way to Basti 59 Baggar,Ghulam Abbas Baggar. Ii.Const,of Drain, Soling,Basti 1000000 50000 500 90-Days Sekhani U/C Basti Ranjha 11-12-2017 08-12-2017 Receipt 12:00 Construction of Drain, soling, Culverts, Tuff Tile Qasba Kala 60 1000000 50000 500 90-Days Upto pm U/C Kala 12:00 PM Opening Construction of Drain, soling, Culverts & Earth Filling Basti 01:00 PM 61 Marhay wala, Basti Hutwani, Basti , Basti Thaddi, Basti 1000000 50000 500 90-Days Jatt, Basti Ghulam Siddique U/C Chack Raman

Construction of Drain, soling, Culverts Basti Baig, Basti Gujjani, Basti Umedya Wala, Basti Bhandy Wala, Basti 62 Bisharat Wala, Basti Turbani, Basti Bhatti, Basti Bhojani U/C 1000000 50000 500 90-Days Shero Dasti Construction of Drain, Soling, Tuff Tile and construction of 63 drain at Siddqui Market Qasba U/C Shah 500000 25000 500 60-Days Sadar Din. Construction of Drain, Soling, Street Ahmad Shah, Qasba 64 Shah Sadar Din and Basti Rindi, Dhandlay Wala, U/C Shah 785000 39250 500 90-Days Sadar Din. Construction of Drain Soling Ramoon Wala, Khaji Wala, Sair 65 Wala, Darkhan Wala, Kikar Wala. Basti Khan Muhammad 700000 35000 500 90-Days Dhorhatta U/C Shah Sadar Din. Construction of Drain Soling at Basti Tauheed Abad, Basti 66 Hafiz Qasim, Mauza Bhatti Metla, U/C Shah Sadar Din 580000 29000 500 60-Days

Construction of M / Road Basti Chandia Mouza Phapri 400Ft 67 32500 500 90-Days (Remaning Portion ) U/C Shah Sadar Din 650000 Construction of Bridge on Peer Adil Minor at Jogi wala,U/C 68 20000 500 60-Days Marhata 400000 Construction of V.R Bridge at peer Adil Minor Basti Haji 69 17500 500 60-Days Sohanra U/C Marhata 350000 Construction of metalled road from Indus Highway to Usman 70 66350 500 90-Days Bara Road, Length 900 feet. U/C Paki. 1327000 Construction of Soling & V.R. Bridge at Burjee # 2300 at 71 Raqba Aman Ullah Khosa on Peer Adil Minor Tehsil & District 800000 40000 500 90-Days D.G.Khan.U/C Paki. Construction of Soling at Darkhan Wala, Sewerage at Basti 72 37500 500 60-Days Sahib Wala. U/C Paki 750000 Construction of Drain Soling from residence Azmat Khan / 73 25000 500 60-Days Adbul Razaq Khan to land Zafar Khan Khosa.U/C Paki 500000 Construction of Drain, soling, Village Peer Adil U/C Peer Adil 74 1000000 50000 500 90-Days

Construction of Drain Soling, Basti Khalil-ur-Rehman, Wahid Bakhsh, Muhammad Faiz, Qadir Bakhsh, Muhammad Nawaz, 75 Abdul Hameed, Basti Dhoray Wali, Mouza , U/C Pir 500000 25000 500 60-Days Adil Construction of Drain Soling, Darkhan Wala, Basti Shehwani, 76 Jiwan Wala, U/C . 1050000 52500 500 90-Days Construction of Drain, Soling, Culverts at Ali Wala, Ruk Wala, 77 Noor Wala, Batil wala, Shahal Wala, Basti Durvesh, Mouza 500000 25000 500 60-Days Shumali.U/C Bhadur Garh Construction of Drain Soling, Tuff Tile from Metalled road 78 (Bahdur Garh to Manka Canal) to Basti Bahadur Garh U/C 800000 40000 500 60-Days Bhadur Gharh Construction of Soling Ch. Muhammad Jamil, Dari Dholay Wali, installation of Water Supply System Basti Jarwar and 79 Water Supply System Ghuzi Stai, Construction of 2 No. 1050000 52500 500 90-Days Culverts U/C Stai Construction of Culvert on Qabool Minor at Gaman Wala, 80 16250 500 60-Days Mauza Shero Dasti patli Tali U/C Stai. 325000 Construction of Drain Soling, Village Kot Mubarak, U/C Kot 81 Mubarak 1000000 50000 500 90-Days Construction of Drain , Soling Street School Wali, Village Kot 82 25000 500 60-Days Mubarak.U/C Kot Mubarak. 500000 Laying of G.I. Pipe line Basti Abdul Aziz Jiani Mouza Chak 83 Kaura Khan RWSS Chak Kaura Khan U/C Kot Mubarak. 300000 15000 500 60-Days

84 Construction of Drain Soling, U/C Dahoo, 1000000 50000 500 90-Days Construction of Drain Soling Mouza Maqsood Chujhra, Mouza 85 22500 500 60-Days Sakhani Kot Meer U/C Dahoo. 450000 86 Construction of Drain Soling, Village U/C Yaroo 1000000 50000 500 90-Days Construction of Drain Soling at Mohallah Eisani Village 87 25000 500 60-Days Yaroo.U/C Yaroo 500000 Construction of V.R. Bridge On Dhora ( Same Nala) at Pakky 88 40000 500 60-Days Wala, U/C Yaroo 800000 Construction of V.R. Bridge On Dhora ( Same Nala) at Jhalar 89 40000 500 60-Days Wala, U/C Yaroo 800000 Construction of Drain, Soling , Earth Filling Basti Peer Wala, 90 8350 500 60-Days Mouza Yaro U/C Yaroo 167000 Construction of Culverts on minor Kotla Sikhani at Chah Dadli 91 Wala, Chah Dahat Wala, Mauza Rakh Chabri, U/C Chabri 500000 25000 500 60-Days Zarin Construction of Drain , Soling ,Culverts Basti Dhoor Pur , Basti 92 Fardani, Basti Gishkorri mouza Rakh Chabri Zareen U/C 1200000 60000 500 90-Days Chabri Zareen Construction of Drain, Soling at Tibbi Eisran U/C Chabari 93 1000000 50000 500 90-Days Zareen 11-12-2017 Construction of Drain, Soling, Tuff Tile, sewer, culverts basti 08-12-2017 Receipt 12:00 94 yasir abad mouza nooria koria, Basti Ghurwangh mouza ladan 1000000 50000 500 90-Days Upto pm U/c Ladan. 12:00 PM Opening Construction of Drain Soling, Langay wala, Karmo Wala, Basti 01:00 PM 95 Bijrani, Chah Bijar Wala, Mauza , U/C Chak Nau Abad. 1000000 50000 500 90-Days

Providing and laying of Tuff tile and construction of drain from baithak Imran Khan to residence of Sami Ullah Khan via 96 Residence Aown Muhammad, Qasba Chabri Bala U/C Chabri 1000000 50000 500 90-Days Bala . Providing Laying R.C.C Slaib On culvert (i) at Belay Wala,(ii) at 97 baghay wala, const. culvert Rohail wala, U/C Chabari Bala. 285000 14250 500 60-Days

Construction of Soling Basti Ladhayani, Band Rahi Wala, 98 20000 500 60-Days Mouza Chabri Bala U/C Chabri Bala 400000 Installation of Hand Pump, Basti Alyani, Basti Bara,Basti 99 Chahtari Ganda,C/o Adnan Khosa U/C Wador 1000000 50000 500 90-Days Construction of soling Chahra Basti Inam Ullah Khosa,Basti 100 Atta Muhammad Chandia, Basti Razaq Buzdar, Basti Khosa, 1000000 50000 500 90-Days c/o Adnan Khosa.U/C Wador. Construction of Drain , Soling Basti Chandia , Basti Machi, U/C 101 Bela 1000000 50000 500 90-Days Construction of Drain , Soling at Lurkay wala, Basti Rafiq 102 Abad, Const, of V.R. Bridge at Chandia Minor U/C Gadai 1000000 50000 500 90-Days Gharbi. Construction of Drain, Soling,Sludge carrier Basti Gud Pur U/C 103 50000 500 90-Days Basti Khosa. 1000000 Construction of Drain , Soling at Basti Kotla Sikhani, Basti 104 50000 500 90-Days Dorhatta, U/C Tibbi Kharak, 1000000 Construction of Drain Soling, Basti Hafiz Abdul Rahman 105 Baghani, Basti Sultan Baghani, Mouchi Wala,Talhi Wala, Basti 800000 40000 500 60-Days Abdul Malik U/C Churhatta Kot Habiat, Providing and laying of Sewer System and construction of 106 drain soling at basti musa khan khosa, Chah Sahib Ram Wala, 700000 35000 500 60-Days Mouza Churhatta , U/C Kot Haibat. Construction of Drain Soling, Basti Faqeer Bakhsh Mastoi 107 Mouza Chorahta Pachdh U/C Churhatta Kot Habiat, 400000 20000 500 60-Days

Construction of Drain, Soling,Basti Sarwar wali , Halail wala, 108 50000 500 90-Days Banghy Wala U/C Darhma. 1000000 Construction of Drain , Soling Basti ranjha Wali, Basti Wada Hasam wala, Basti Peer Bakhsh , Basti Sadiq Hussain, Basti 109 Ajmal,Basti Hameed, Basti Raheed, Basti Akbar U/C Haji 1000000 50000 500 90-Days ghazi gharbi. Construction of Soling Kot Chuuta Bypass to Chah phol Nai 110 wala, From Masjid Tobe Wli to Chah Ghulam Fareed 1000000 50000 500 90-Days Chandia,U/C Samina. Construction of Bridge on Nala Samdari near Hafiz Ghulam 111 Rasool, Const.Bridge Basti Arrain, Const. Culverts Mouza 1000000 50000 500 90-Days Bhai.U/C Sabra Nacha Construction of Boundary Wall Grave Yard Dinay wala, 112 7500 500 60-Days Ibrahim wala.Mouza Sabra Nacha U/C Sabra Nacha 150000 Construction of Tuff Tile , Drain,Basti Shahdi wala, Basti Bur 113 50000 500 90-Days Bochi Wala.U/C . 1000000 Construction of Bridge on Kiryia Minor near House Mahar 114 Ramzan Chah Baig Wala, Const.of Culverts , Soling Chah 1000000 50000 500 90-Days Loty Wala u/c Khakhi. Construction of Drains,Soling, Tuff Tile, Sewer chah Pongher wala, Basti Meer Wala, Basti Gull, Chah Darkhan 115 Wala, Jinah Colony,Chah Gaddi Wala.U/C Gaddai Sharqi. 1000000 50000 500 90-Days

Construction of Tuff Tile , Soling, Drain Basti Izat Wala, 116 50000 500 90-Days Mansoor Wala, Ahmad Wala U/C Paighan # 57 1000000 Constuction of Soling Basti Sonary Wala, Ahmad wala, u/c 117 25000 500 90-Days Paighan # 57 500000 Construction of Soling Chah Kheray Wala.U/C Paighan # 58 118 1000000 50000 500 90-Days

Construction of Soling Chah Chandia Wala ,Basti Mural, Basti 119 50000 500 90-Days Lund.U/C Mamori. 1000000 Construction of Soling, Tuff Tile Basti Kaper Shah U/C Mamori 120 800000 40000 500 60-Days

Construction of Drain , Soling, Tuff Tile Qasba Alli wala U/C 121 50000 500 90-Days Alli Wala. 1000000 Construction of Drain, Soling,Basti Gull Wala, Mouza 122 Rikera,Chaha Punjay Wala,Basti Rikera, Chah Lal Wala,U/C 1000000 50000 500 90-Days Haider Qureshi. Construction of Soling at Chara Basti shah wala, Basti Khowi Arrain, Basti Lashari, Basti Mamar, Basti Zulfiqar Malik, Street 123 Rana Younis , Street Munshi Shamla U/C Ghusa Abad. 1000000 50000 500 90-Days

Construction of Mattel Road in Basti Bishrat pur U/C Hazara. 124 1000000 50000 500 90-Days

Construction of Soling ,Drain , Culverts Chaha Jiweni 125 wala,chah Hunair Wala, Qasba Jhoke Utra.U/C Jhoke Utra 1000000 50000 500 90-Days Construction of Drain , Soling ,Basti Cheena,Basti Naseer 126 Sharqi , Gharbi, Basti Lurky Wala U/C Kotla Ahmad Khan. 1000000 50000 500 90-Days

Construction of Soling from Chah Manjhi wala to Graveyard Mohab Laskani, From Road Dadi wala to Graveyard Mohab 127 Laskni, Const.of Drain, Soling Mouza Mohab Laskani U/C Haji 1000000 50000 500 90-Days Kamand. Construction of Soling Basti Kanho, Basti Sandhila, Basti 128 Mohna, Bait Cheen Wala, Basti Sial Bate Bait wla , Basti Haji 1000000 50000 500 90-Days Khadim Bate Cheen Wala.U/C Bate Bait Wala Construction of Drains, Soling, Culverts Basti Kanho, Basti Nach Arrain,Basti Chundrh,Basti Hafiz Naseer, Basti Abdul Kareem, Basti Mureed Ahmad Nach, Basti Ch.Kala, Basti 129 Murid Hussain Budoi, Basti Ajmal Kanho,Basti Malik Allah 500000 25000 500 60-Days Ditta, Basti Ameer Bakhsh, Basti Manzoor Hussain U/C Bate Bait Wala

Construction of Drain , Soling, Tuff Tile Basti Mural, Basti 130 Shero, Mouza Noor Wahi Mural, Basti Bubray Wala.U/C 1000000 50000 500 90-Days . Construction of Drain , Soling , Basti Wajay 131 50000 500 90-Days Wala, Basti Diyat Lashari U/C Basti Malana. 1000000 Construction of Drain, Soling Basti Mahar Asif Ward # 6 Adda 132 Notak, Basti Nazar Arwal Basti Malana, Basti Qasai Wala U/C 500000 25000 500 60-Days Basti Malana Construction of Soling From Shoria Canall To Chah Mando 133 Wala, From Mando Wala to chah Mouchi Wala U/C Basti 1000000 50000 500 90-Days Jaam. Construction of Culverts Quatob Wala, Peer Muhammad 134 Ghoori , Laay wala,Iqbal Khakh, Drain , Soling Mouchi Wala, 1000000 50000 500 90-Days Bhatti Wala, Quatob Wala, U/C Construction of Drain , Soling Basti Shalee, Khano Wala, Chah 135 50000 500 90-Days Tahrry wala, u/c Notak Mehmeed. 1000000 Construction of Soling Street Rehmat ullah Basti Yary Wali,street Gull Bahar, Street Bakhat Ali wahocha mouza Hala,chahra Wahid Bakhsh Malukh wala, Makra Ahmadni,Chahra Riaz Khan Makra, Mouza Tuba Dari, Chahra 136 1000000 50000 500 90-Days Shabeer Khan Ahmadi, Chah Bahndo wala, chahra Majeed khan Baghola,M.Sadiq Lalwani,Ghulam Shabeer khan(Late) U/C Arra Jafar. Construction of Culverts Bhundh Wala, Drain , Soling Bohar Wala,Ward # 2 Drain , Soling Street Dahdee Birtheri, & Lashari Brotheri, Ward #3 Drain , Soling street Buglani Brotheri, ward #4 Drain , Soling Ahmadni Brotheri, ward #5 Drain , Soling 137 1000000 50000 500 90-Days Wahid Bakhah Ahmadni, ward #6 Tuff Tile, Drain Soling Mohalla Arrain U/C .

Construction of Drain Soling Bashir colony, New Saadat 138 colony, Street Rehan Lodhi Street Zulfiqar Rajpoot U/C Mana 500000 25000 500 60-Days Ahmadani Construction of Drain , Soling Basti Kot Jano, Basti Rock 139 Nagar, Chaha Chaty wala, Basti near Zila Tax. U/C Basti 1000000 50000 500 90-Days Fouja Construction of Drain, soling Basti Rehmat ullah khosa Farooq 140 abad, Basti Razi jogyani,Abbas Wala, U/c Khan Pur Junabi. 1000000 50000 500 90-Days

Construction of Drain, Soling Tuff Tile from khan pur to Basti 141 25000 500 60-Days Hafiz Manzoor Hussain.U/C Khanpur Janubi 500000 Repair of Metled Road From Choti , Road To 142 274600 500 120-Days Nawan Shahar Road U/C Mutafraq Chahan. 5492000 Repair of Metled Road from Chack Masoo Hajan Murad to 143 141000 500 120-Days Shoria canal U/C Mutfariq Chahan 2820000 Construction of soling Basti Peer Muhammad U/C Mutfariq 144 16250 500 60-Days Chahan 325000 Construction of soling Basti Ahmad Khan Khundrani U/C 145 27000 500 60-Days Mutfariq Chahan 540000 Construction of Soling Chahra Basti Peer Bakhsh , Mubarak Wala, Rangahy wala, Basti Jindani wala, Basti Dhora, Basti 146 Lalani,Basti Birmani Gharbi, Basti Ghulam Rasool Ramdani, 1000000 50000 500 90-Days U/C Thutha Gabolan Construction of Tuff Tile Street Abdullah Shah, Street Iqbal 147 Darzi, Const, Soling Tufil Abad Mian Street, Mohallah Islam 1000000 50000 500 90-Days Abad . U/C

148 Laying of Tuff Tile Street Yateem Khana, U/C Choti Zareen 500000 25000 500 60-Days 11-12-2017 Construction of Drain , Soling Basti Sami wala, U/C Nawan 08-12-2017 Receipt 12:00 149 50000 500 90-Days Januabi 1000000 Upto pm Construction of Tuff Tile Basti , Street Zulfiqar Talpur, 12:00 PM Opening 150 25000 500 60-Days u/c Nawan Janubi 500000 01:00 PM Construction of Soling Basti Haji Hazoor Bakhsh Ahmadni, Soling Remaining Work Shahik Baghyani,Basti Karam Jindani,Basti Talib Hussian Hamzani, Basti Sola, Basti Bitta Ghulam Ali Ahmadni,Basti Allah Wasaya Sirjani,Basti Gafoor 151 1000000 50000 500 90-Days kaloi, Basti Raham Khan Machi, Basti Peer Bakhsh Bohar, Basti Meer Muhammad Ahmadni,U/C D J Khan Junabi

Construction of RCC Slaib at Badro manka Oppst, Shop Yousif Bohar, V.R Bridge Basti M.Ramzan, Soling Basti Allah 152 Ditta Kachla, Soling Abdul Gafoor Chandia U/C D.J Khan 1000000 50000 500 90-Days Darmayni Construction of Soling chahra Basti Faiz Kareem Ahmadni, Dr. Iqbal Ahmadni,Fida Hussain Bughlani, Chahra Basti 153 Buzdar,Chahra Basti Shokarani, Basti Kijayani,Basti 1000000 50000 500 90-Days Bubber,Basti Khosa,U/C D.J Khan Darmani Construction of Soling Basti Meer Muhammad Khosa, Basti Wahid Bakhsh Shahani,Soling Wahid Bakhsh Kaloi, Basti Shah Bakhsh Buzdar. Basti Haji Jetha Tondwani,Const.of Culverts Basti Shafi Kaleri, Basti Mitto Khan Kaleri, Khaala Basti Maqsood Khosa. Khaala Basti Meer Hazar 154 1000000 50000 500 90-Days Khalyani,Basti Nazar Muhammad Kechala, Basti Punjabi, Basti Langrana,Basti Peer Bakhsh Chandia, Basti Mitta Khan Hasnani,Basti Nazar Muhammad Hasnani U/c D.J Khan Gharabi

Construction of Culverts Basti Mohsin Kaleri, Basti Nasrullah Kaleri, Chahra New Jamal Abad to Mian Phero,chara Ranjha Khalilani,chahra farooq chanida,chara Ibrahim dewani,Const, of Water Tank & Laying of pipe line Basti Joghyani, Chak 155 Joghyani,Laying of water supply pipe line Gull Muhammad 1000000 50000 500 90-Days Joghyani, Laying of Tuff Tile Matel Road to High School Bakhar Wah U/C Bakhar Wah

Construction of Foot Bridge Nalla Noor Wah Near Ghee Mill,const. soling Basti Gull Muhammad S/o Haider Buglani 156 near Dandi Sardar Farooq Khan Leghari wli,u/c Chack Dodara, 1000000 50000 500 90-Days Concert & Drains chowk Near Well Aab Noshi Choti Bala U/C Choti Bala

Construction of Soling Talpur Road to Basti Nika Talpur,Soilng Talpur road to Basti Nazar Hussain Kachala, 157 Talpur Road to Basti Khuda Bakhsh, Soling Link #4 To Basti 1000000 50000 500 90-Days Mirza Sinjarani U/c Chak Dodara Construction of Soling Basti Allah Wasyia Kachala, Allah Dewiya Lashari, Allah Dewyia Buzdar Tahirani, Sadiq Khan 158 Member ,Allah Bakhsh, Jafar Buzdar, Maher Bakhsh Buzdar 1000000 50000 500 90-Days Gamoani,Sawan Khan Jhur,Allah Bakhsh Jhur. U/c Nawan Shomali

Construction of concerte Flooring & Drain from Chowk Fayyaz Medical Store to Arra Ghulam Akbar , const. of Drain street 159 Peer Bakhsh Tiba Dulyani,& Street Peer Bakhsh Barhimani, 1000000 50000 500 90-Days U/c Sharqi Construction of Drain, Soling Butta Kot Near Darbar Shareef, 160 Bindo Wala, Basti Manzoor, Basti Allah Wasaya, Basti Ghulam 1000000 50000 500 90-Days Muhammad U/c Sakhi Sarwar Gharbi. Construction of jeepable track Bathi to Lerri. U/C Mithwan 161 1000000 50000 500 90-Days

Construction of jeepable track Basti Mehal to Phugla U/C 162 50000 500 90-Days Barot Mundwani. 1000000 Providing & laying of water supply pipe Suka Chur to Opra, 163 Nala to Mar Sar and installation sub mercible pump at 1000000 50000 500 90-Days Gulnokh, Basti Korh U/C Fazla Kuch Construction of jeepable track Marunj Daff to Kachi Wanga 164 50000 500 90-Days U/C Fazla Kuch. 1000000 Construction of jeepable track Sallari to Marave Basti Malghani, Khinay wit to Admani Thokh, Johlo Tak to Sharqi 165 Khalo Mouza Dumbar, from Pheer Tak Ali to Kandha 1000000 50000 500 90-Days graveyard, Soling Basti Hamzani.U/C Barthi

166 Repair of water Supply Scheme Zain U/C Barthi. 245000 12250 500 60-Days Construction of jeep able Track Basti Aziz Buzdar U/C Barthi 167 100000 5000 500 60-Days

Installation of hand pumps at Basti Mat & Phuglo U/C Barthi 168 500000 25000 500 60-Days

169 Installation of Hand pumps in U/C Barthi 864000 43200 500 60-Days Construction of jeepable track from Dahar to Jaroo U/C Barthi 170 875000 43750 500 60-Days

Construction of jeepable track Gawalagh Gur to Marsar, 171 Durmat to Karisar and Karisar to Dub Ghoray Vail U/C Tehkar 1000000 50000 500 90-Days

Construction of jeepable track Kandha Graveyard to Basti Gari 172 25000 500 60-Days tak U/C Tehkar 500000 Construction of jeepable tracks Choki Tak via Rojha to Mubaraki Sandh, Gurkh dad to Mossa khund,Mat Chandia To 173 Baghul Chur Via Graveyard, Repair of Jeep able Track Dar Sar 1000000 50000 500 90-Days To Shatrat To Lophanidaf U/C Mubarki.

Construction of Drain, Concerte Flooring, Basti Kharar Buzdar 174 55000 500 90-Days U/C Mubarki. 1100000 Laying of pipe line , water supply scheme kashoba, Const. of 175 Kacha Jeep Able Track at Jogiani Tak, Shaheed Tak U/C 1000000 50000 500 90-Days Tuman Khosa. Installation of Hand Pumps at Sari Road, Basti Jameel, Basti 176 Ghulam Hussain , Constt: of Jeepable Track from Sari Nala 1000000 50000 500 90-Days To Basti Ramdani U/C Zareen. Construction of Water Tank and laying of Pipe Line U/C 177 50000 500 90-Days Tuman Leghari Bala. 1000000 178 Renovation of offices Chairman Block 1300000 65000 500 60-Days 179 Renovation of Offices Chief Officer Block 1400000 70000 500 60-Days Repair of Vehical Complete in all respect DGE 4848 District 180 50000 500 90-Days Council D.G.Khan . 1000000 Repair of Vehical Complete in all respect DGE 4948 District 181 50000 500 60-Days Council D.G.Khan 1000000 Repair Road Rolar Complete in all respect District Council 182 25000 500 60-Days Dera Ghazi Khan 1 No. 500000 Repair Road Rolar Complete in all respect District Council 183 25000 500 60-Days Dera Ghazi Khan 1 No. 500000 184 Repair of RWSS Thul Allo U/C Bakhar Wah 500000 25000 500 60-Days Laying of sewerage pipe line office District Council, D.G. Khan. 185 400000 20000 500 60-Days

Repair of Vehical ( Hud, tyers ) Complete in all respect DGE 186 10000 500 30-Days 4949 200000 Upgradation of Sound System District Council 187 Hall, District Council D.G.Khan 1000000 50000 500 60 Days

179217000

Furmaish Ali Ch. Sardar Abdul Qadir Khan Khosa Chief Officer Chairman District Council D.G.Khan District Council D.G.Khan Endst. No. ______Dated.______/2017

A copy is forwarded for information to the:-

1. Residant Deputy Director Audit & Accounts District Council D.G.Khan

2. District Officer (Finance) District Council D.G.Khan

3. Head Clerk, O/o the District Officer (I&S) District Council D.G.Khan. He is directed to upload Tender Notice on PPRA website.

Furmaish Ali Ch. Sardar Abdul Qadir Khan Khosa Chief Officer Chairman District Council D.G.Khan District Council D.G.Khan OFFICE OF THE DISTRICT COUNCIL DERA GHAZI KHAN PH: 064-9260177-78 Email: [email protected]

TENDER NOTICE District Council Dera Ghazi Khan Intends to call sealed tenders for its development project pertaining to ADP 2017-18 from contractors who are enlisted in any Local Government in D.G.Khan Division for the financial year 2017-18 . 1. The bid documents will be issued on charges of Rs.500/- per bid document by the Head Clerk (I&S Branch) on written request of contractors from the date of publication of tender notice till to 08-12- 2017 accompanying the following documents. i) Enlistment letter along with Govt Fee deposit slip for financial year 2017-2018 from zila council Dera ii) Ghazi Partnership Khan. deed in case of limited company

iii) No Litigation certificate on letter head pad.

2. The sealed bid document alongwith 5% earnest money in the shape of call deposit from any scheduled bank in Punjab in favour of Chairman District Council D.G.Khan from date of publication to date 11-12-2017 at 12:00 pm .

3. All the received / Sealed bids will be received /opened on dated 11-12-2017 at 01:00 pm in the office of District Council D.G.Khan by the Tender opening committee in the presence of available contractores or their authorized representatives.

4. It is compulsory on all participated contractors to quote their rates in Nos as will as in words on above or below the estimate on percentage basis.

5. Additional performance guarantee 10% of tender cost ( balance amount adjusting 5% of earnest money) should be deposited by the bidder whose rates are approved by the competent authourity within 7 days. If he does not deposit the required amount, his 5% CDR deposited will be forefeited by the District Council and his tender rate will be rejected and process of re-tendering will be initiated. This action cannot be challenged in any Court of Law.

6. Conditional, unsigned, incomplete, cutting, over written and doubtful bids will be dealt as rejected. 7. The competent authourity may reject all bids at any time prior to the approval / acceptance of the tender rate.

8. When work order issued to approved contractor, he has to make the agreement with department on stamp paper of value specified by Government.

9. The period for completion of each project will be mentioned in work order after approval of rates of the lower bidder.

10. The bids poured by contractores within 5% CDR without getting receipt from Head Clerk will be dealt cancelled. 11. The sealed bids should be with orignal CDR. The bid documents not issued from the office of Head Clerk will be considered as rejected. The bidder has no right to challenge it.

12. The contractores to Whom work order are issued, are bound to conduct the required quality control tests on their own expences. The detail of work to be tendered is as below.

Tenders Last date Sr. Estimated Earnest Tender Completio /receipt Name of Development Schemes for issue of No. Cost Money Fee n Time opening tenders date Construction of Soling, Drain & Culverts Basti 1 Kotani U/C Kotani . 1000000 50000 500 90-Days 11-12-2017 Receipt Construction of Drain Soling Ramoon Wala, 08-12-2017 12:00 pm Khaji Wala, Sair Wala, Darkhan Wala, Kikar 2 700000 35000 500 60-Days Opening Wala. Basti Khan Muhammad Dhorhatta U/C 01:00 PM Shah Sadar Din Construction of Soling street Girls School 3 Basti Sobha U/C Babbi. 500000 25000 500 60-Days

Installation of Handpumps Basti Jaday Wali, 4 Basti Wajan & Soling Basti Jarwar U/C 1000000 50000 500 90-Days Lakhani Construction of Drain Soling Basti Jallo Wali 5 1000000 50000 500 90-Days U/C Jallo Wali Construction of Drain, Soling Qasba Rehman 6 Abad ( Lashari Birdari ) 1000000 50000 500 90-Days Construction of Boundary Wall Janaza Gah 7 Basti Maral, Basti Lashari U/C Kalo Wala 1000000 50000 500 90-Days

Repair of Road Basti Nutkani To Basti Fateh 8 2360000 118000 500 120-Days Khan. Construction of Soling & Earth filling Basti 9 Azeem U/C Panjgraien 1000000 50000 500 90-Days

Desalting of Nala Masoo Wah Qasba Nari 10 1000000 50000 500 90-Days U/C Nari. Construction of Culvert Basti Manjotha U/C 11 268000 13400 500 60-Days Bubbi 11-12-2017 Construction of Drain, Soling Basti Mithay 08-12-2017 Receipt 12 Wali Mohallah Gazar and Mohallah Buzdar 500000 25000 500 60-Days Upto 12:00 pm 12:00 PM Opening Construction of Drain, Soling,Qasba Retra 13 1500000 75000 500 60-Days 01:00 PM Construction of Drain Soling Street Haji 14 469000 23450 500 60-Days Akhtar Khan Tibbi Qaisrani U/C Bubbi Construction of Drain Soling Street Sajjad 15 300000 15000 500 60-Days Khitran Construction of culvert, Laying of Sub base, 16 Soling & Slaib from Khoja Masjid to Farm Haji 1000000 50000 500 90-Days Abid Buzdar Mouza Tub Construction of B/Wall Janaza Gha Basti 17 350000 17500 500 60-Days Gazar U/C Bubbi Construction of Drain, soling, Culverts, sub Murcible Pump, Basti Bechra, Basti Makwal, 18 1000000 50000 500 90-Days Basti Nazim Abad, Basti Chowki Wala, U/c Makwal Kalan Construction of Drain, Soling Basti Bolani 19 1000000 50000 500 90-Days U/C More Jhangi Construction of culvert Basti Tibba Malkani & 20 Drain / Soling Basti Malkani U/C Tibbi 1000000 50000 500 90-Days ConstructionQaisrani of M / Road Basti Chandia 21 Mouza Phapri 400Ft (Remaning Portion ) U/C 650000 32500 500 90-Days Shah Sadar Din Construction of Nala & Drain / Soling Basti 22 1000000 50000 500 90-Days Nari U/C Nari Janubi 23 Construction of culverts U/C Nutkani 1000000 50000 500 90-Days Construction of Boundary wall Janaza Gha 24 Dona & Drain / Soling Basti Dona U/C Dona 1000000 50000 500 90-Days

Construction of Drain Soling at Mohallah 25 Eisani Qasba Yaroo. 500000 25000 500 60-Days

Repair & R/H of Mettled road from Indus High 26 Way adda Phehar To High School Phehar U/C 4578000 228900 500 120-Days Tibbi Qaisrani. Construction of Drain , Soling Qasba Kot Mohi 27 1000000 50000 500 90-Days 11-12-2017 28 Construction of Drain Soling Basti Tub 500000 25000 500 60-Days 08-12-2017 Receipt Construction of Soling at Darkhan Wala, 29 750000 37500 500 60-Days Upto 12:00 pm Sewerage at Basti Sahib Wala. 12:00 PM Opening Repair of Mettled road from Indus High Way 01:00 PM 30 adda choki wala to Jhoke Saddique abad wali 4956000 247800 500 120-Days . Construction of Drain, Soling, Street Ahmad 31 Shah, Qasba Shah Sadar Din and Basti Rindi, 785000 39250 500 90-Days Dhandlay Wala. Excavation of Gang though Nala Excavator 32 500000 25000 500 60-Days Repair of Metalled road Basti Bate Alyani U/C 33 1770000 88500 500 90-Days Cholani Construction of soling Basti Chatani, Basti Mehrowani, Chah Gidder wala, Basti Bhanday 34 500000 25000 500 60-Days wala U/C Pardan Sharqi

Repair & R/H of Metled Road from Chack 35 2820000 141000 500 120-Days Masoo Hajan Murad to Shoria canal. Providing and laying of Tuff tile and construction of drain from baithak Imran 36 Khan to residence of Sami Ullah Khan via 1000000 50000 500 90-Days Residence Aown Muhammad, Qasba Chabri Bala U/C Chabri Bala . Construction of Drain , Soling Street School 37 Wali, Village Kot Mubarak. 500000 25000 500 60-Days Installation of Hand Pumps , Sub Murcible 38 Pump, PVC Pipe Line Mouza Chit Pani, Mouza 1250000 62500 500 90-Days Ghoona, U/C Bohar Installation of Hand Pumps Mouza Jatt 39 750000 37500 500 60-Days Gaadi,U/C Sokar Construction of Nala & drain Soling Basti Koro 40 & Basti Buzdar U/C Basti Buzdar 1300000 65000 500 90-Days

Construction of culverts, installation of Sub Murcible pump, Mangrotha Sharqi, 41 1000000 50000 500 90-Days Mangrotha Gharabi, Jhoke Bakhwani, Jhoke Manglay Wali,U/C Mangrotha Construction of soling Basti Mureedani, Basti 42 Ahmadni, Basti Jindani, Basti Kanla. U/C 500000 25000 500 60-Days Pardan Sharqi. Installation of Hand pumps Basti Chapri & 43 Basti Bahar Wali & Construction of soling 1000000 50000 500 90-Days Drain Kot Qaisrani. U/C Kot Qaisrani. Construction of soling Chara Basti Inam Ullah Khosa,Basti Atta Muhammad Chandia, Basti 44 1000000 50000 500 90-Days Razaq Buzdar, Basti Khosa, c/o Adnan Khosa.

Construction of Drain, soling, Culverts, sub Murcible Pump, Basti Bechra, Basti Makwal, 45 500000 25000 500 60-Days Basti Nazim Abad, Basti Chowki Wala, U/c Makwal Kalan Construction of Drain . Soling , Qasba Bodo 46 U/C Jhoke Bodo 1000000 50000 500 90-Days Construction of soling from link road Chatri to 47 Basti Tibbay wali and main street Basti 1000000 50000 500 90-Days Ladhacha U/C Litra Construction of of Drain Soling Mohallah 48 1000000 50000 500 90-Days Itlani Vehova. U/C Vehoa Janobi. Construction of Drain Soling & culvert Basti 49 Bilwani U/C Vehova Chak Shumali U/C 1000000 50000 500 90-Days Vehoa Chak Shomali. Construction of Nala Main street Basti Dawoo 50 546000 27300 500 60-Days Wali U/C Bubbi Laying of G.I. Pipe line Basti Abdul Aziz Jiani 51 Mouza Chak Kaura Khan RWSS Chak Kaura 360000 18000 500 60-Days Khan Construction of Drain, Soling & Tuff Tile Basti 52 Ladha Mouza Rakh Marri Gharbi & Marri 1000000 50000 500 90-Days Darmini Construction of Drain, soling, Culverts Basti 53 Kandi Wala, Basti Tibbi Sahani U/C 1000000 50000 500 90-Days Ahmadani 11-12-2017 Construction of Drain. Soling Basti Noor Pur 08-12-2017 Receipt 54 1000000 50000 500 90-Days U/C Shahdan Lund Upto 12:00 pm i.Construction of soling, from Indus High Way 12:00 PM Opening to Basti Baggar,Ghulam Abbas Baggar. 01:00 PM 55 1000000 50000 500 90-Days Ii.Const,of Drain, Soling,Basti Notak Sekhani U/C Basti Ranjha Construction of Drain, soling, Culverts, Tuff 56 1000000 50000 500 90-Days Tile Qasba Kala U/C Kala Construction of Drain, soling, Culverts & Earth Filling Basti Marhay wala, Basti 57 Hutwani, Basti Rind, Basti Thaddi, Basti Jatt, 1000000 50000 500 90-Days Basti Ghulam Siddique U/C Chack Raman

Construction of Drain, soling, Culverts Basti Baig, Basti Gujjani, Basti Umedya Wala, Basti 58 Bhandy Wala, Basti Bisharat Wala, Basti 1000000 50000 500 90-Days Turbani, Basti Bhatti, Basti Bhojani U/C Shero Dasti Construction of Drain, Soling, Tuff Tile and construction of drain at Siddqui Market Qasba 59 500000 25000 500 60-Days Shah Sadar Din U/C Shah Sadar Din.

Construction of Drain, soling Basti Chooni 60 1000000 50000 500 90-Days Mouza Chooni Construction of Drain, Soling & Boundary wall 61 Janazagah Basti Kaloo wala. 1000000 50000 500 90-Days

Repair of Mettled road from Indus High Way 62 6836000 341800 500 120-Days road adda Hairo to Bindi Construction of Bridge at Gang Basti Borani 63 350000 17500 500 60-Days Construction of Drain Soling at Basti Tauheed 64 Abad, Basti Hafiz Qasim, Mauza Bhatti Metla. 580000 29000 500 60-Days

Construction of Drain Soling Basti Sadoo from 65 Link Road to Dera Haji Bahar Khosa U/C 500000 25000 500 60-Days Colani Construction of Bridge on Peer Adil Minor at 66 400000 20000 500 60-Days Jogi wala,U/C Marhata Construction of metalled road from Indus 67 Highway to Usman Bara Road, Length 900 1327000 66350 500 90-Days feet. U/C Paki. Repair & R/H of Mettled road fromJhoke 68 Saddique abad wali to Exchange Makwal 5074000 253700 500 120-Days Kalan U/C Makwal Kalan. Construction of Drain Soling from residence 69 Azmat Khan / Adbul Razaq Khan to land 500000 25000 500 60-Days Zafar Khan Khosa. Construction of Drain, soling, Village Peer Adil 70 1000000 50000 500 90-Days U/C Peer Adil Construction of Drain Soling, Darkhan Wala, 71 Basti Shehwani, Jiwan Wala, U/C Bahadur 1050000 52500 500 90-Days garh. Construction of V.R Bridge at peer Adil Minor 72 350000 17500 500 60-Days Basti Haji Sohanra U/C Marhata Construction of Soling Ch. Muhammad Jamil, Dari Dholay Wali, installation of Water Supply 73 System Basti Jarwar and Water Supply 1050000 52500 500 90-Days System Ghuzi Stai, Construction of 2 No. Culverts U/C Stai Construction of Drain Soling Mouza Maqsood 74 Chujhra, Mouza Sakhani Kot Meer. 450000 22500 500 60-Days

Construction of Drain Soling, Village Kot 75 Mubarak, U/C Kot Mubarak 1000000 50000 500 90-Days

76 Construction of Culvert Basti Bilwani 350000 17500 500 60-Days Construction of Nala Basti Tub Mohallah 77 1000000 50000 500 90-Days Sharqi U/C Bindi Construction of Drain Soling, U/C Dahoo, 78 1000000 50000 500 90-Days Construction of Drain & Soling Basti Jerh 79 500000 25000 500 60-Days Leghari Installation of Hand pumps in U/C Barthi 80 864000 43200 500 60-Days Construction of Drain Soling, Village Yaroo 81 1000000 50000 500 90-Days U/C Yaroo Construction of Soling & V.R. Bridge at Burjee 82 # 2300 at Raqba Aman Ullah Khosa on Peer 800000 40000 500 90-Days Adil Minor Construction of Drain , Soling ,Culverts Basti Dhoor Pur , Basti Fardani, Basti Gishkorri 83 1200000 60000 500 90-Days mouza Rakh Chabri Zareen U/C Chabri Zareen Construction of Drain Soling, Basti Khalil-ur- Rehman, Wahid Bakhsh, Muhammad Faiz, 84 Qadir Bakhsh, Muhammad Nawaz, Abdul 500000 25000 500 60-Days Hameed, Basti Dhoray Wali, Mouza Pir Adil,

Construction of Drain soling & culvert Zumbo 85 500000 25000 500 60-Days wali Bhuttay wali Beroon Taunsa Construction of Drain, Soling, Tuff Tile, sewer, culverts basti yasir abad mouza nooria koria, 86 1000000 50000 500 90-Days Basti Ghurwangh mouza ladan U/c Ladan. 11-12-2017 08-12-2017 Receipt Construction of Drain Soling, Langay wala, Upto 12:00 pm Karmo Wala, Basti Bijrani, Chah Bijar Wala, 12:00 PM Opening 87 1000000 50000 500 90-Days Mauza Umrani, U/C Chak Nau Abad. 01:00 PM

Construction of Culverts on minor Kotla 88 Sikhani at Chah Dadli Wala, Chah Dahat 500000 25000 500 60-Days Wala, Mauza Rakh Chabri. 89 Construction of soling Basti Mureedani 500000 25000 500 60-Days Construction of Soling Basti Ladhayani, Band 90 400000 20000 500 60-Days Rahi Wala, Mouza Chabri Bala. Installation of Hand Pumps, Basti Alyani, 91 Basti Bara,Basti Chahtari Ganda,C/o Adnan 1000000 50000 500 90-Days Khosa U/C Wador Construction of jeepable track Sallari to Marave Basti Malghani, Khinay wit to Admani Thokh, Johlo Tak to Sharqi Khalo Mouza 92 Dumbar, from Pheer Tak Ali to Kandha 1000000 50000 500 90-Days graveyard, Soling Basti Hamzani.U/C Barthi

Construction of Drain , Soling Basti Chandia , 93 Basti Machi, U/C Bela 1000000 50000 500 90-Days Construction of Drain , Soling at Lurkay wala, Basti Rafiq Abad, Const, of V.R. Bridge at 94 1000000 50000 500 90-Days Chandia Minor U/C Gadai Gharbi.

Construction of Drain, Soling,Sludge carrier 95 1000000 50000 500 90-Days Basti Gud Pur U/C Basti Khosa. Construction of Drain , Soling at Basti Kotla 96 Sikhani, Basti Dorhatta, U/C Tibbi Kharak, 1000000 50000 500 90-Days

Construction of Drain Soling, Basti Hafiz Abdul Rahman Baghani, Basti Sultan 97 800000 40000 500 60-Days Baghani, Mouchi Wala,Talhi Wala, Basti Abdul Malik U/C Churhatta Kot Habiat, Construction of soling Basti Ahmad Khan 98 540000 27000 500 60-Days Khundrani U/C Mutfariq Chahan Construction of Drain, Soling,Basti Sarwar 99 wali , Halail wala, Banghy Wala U/C Darhma. 1000000 50000 500 90-Days

Construction of Drain , Soling Basti ranjha Wali, Basti Wada Hasam wala, Basti Peer Bakhsh , Basti Sadiq Hussain, Basti 100 Ajmal,Basti Hameed, Basti Raheed, Basti 1000000 50000 500 90-Days Akbar U/C gharbi. Construction of Soling Kot Chuuta Bypass to Chah phol Nai wala, From Masjid Tobe Wli to 101 1000000 50000 500 90-Days Chah Ghulam Fareed Chandia,U/C Samina.

Construction of Bridge on Nala Samdari near Hafiz Ghulam Rasool, Const.Bridge Basti 102 1000000 50000 500 90-Days Arrain, Const. Culverts Mouza Bhai.U/C Sabra Nacha Construction of Boundary Wall Grave Yard 103 Dinay wala, Ibrahim wala.Mouza Sabra 150000 7500 500 60-Days Nacha. Providing Laying R.C.C Slaib On culvert (i) at 104 Belay Wala,(ii) at baghay wala, const. culvert 285000 14250 500 60-Days Rohail wala. Construction of Tuff Tile , Drain,Basti Shahdi 105 wala, Basti Bur Bochi Wala.U/C Khakhi. 1000000 50000 500 90-Days

Construction of Drains,Soling, Tuff Tile, Sewer chah Pongher wala, Basti Meer Wala, Basti 106 Nawan Gull, Chah Darkhan Wala, Jinah 1000000 50000 500 90-Days Colony,Chah Gaddi Wala.U/C Gaddai Sharqi.

Construction of Tuff Tile , Soling, Drain Basti 107 Izat Wala, Mansoor Wala, Ahmad Wala U/C 1000000 50000 500 90-Days Paighan # 57 Construction of Drain, Soling at Tibbi Eisran. 108 1000000 50000 500 90-Days Constuction of Soling Basti Sonary Wala, 109 500000 25000 500 90-Days Ahmad wala, u/c Paighan # 57 Construction of Soling Chah Kheray Wala.U/C 110 1000000 50000 500 90-Days Paighan # 58 Providing & Laying PVC pipe line Mohallah 111 Saleem abad street Masjid wali Ward No.01 300000 15000 500 60-Days

Construction of Soling Chah Chandia Wala 112 ,Basti Mural, Basti Lund.U/C Mamori. 1000000 50000 500 90-Days

Construction of jeepable track from Dahar to 113 875000 43750 500 60-Days Jaroo U/C Barthi Providing and laying of Sewer System and construction of drain soling at basti musa 114 700000 35000 500 60-Days khan khosa, Chah Sahib Ram Wala, Mouza Churhatta Kot Haibat. Construction of Drain , Soling, Tuff Tile Qasba 115 1000000 50000 500 90-Days Alli wala U/C Alli Wala. Construction of Drain, Soling,Basti Gull Wala, 116 Mouza Rikera,Chaha Punjay Wala,Basti 1000000 50000 500 90-Days Rikera, Chah Lal Wala,U/C Haider Qureshi. Construction of Soling at Chara Basti shah wala, Basti Khowi Arrain, Basti Lashari, Basti 117 Mamar, Basti Zulfiqar Malik, Street Rana 1000000 50000 500 90-Days Younis , Street Munshi Shamla U/C Ghusa Abad. Construction of Soling & Drain street Bashir 118 Leghari Basti Dawoo Wali U/C Bubbi 145000 7250 500 60-Days

Construction of Mattel Road in Basti Bishrat 119 1000000 50000 500 90-Days pur U/C Hazara. Construction of Soling ,Drain , Culverts Chaha 120 Jiweni wala,chah Hunair Wala, Qasba Jhoke 1000000 50000 500 90-Days ConstructionUtra.U/C Jhoke of DrainUtra , Soling ,Basti Cheena,Basti Naseer Sharqi , Gharbi, Basti 121 1000000 50000 500 90-Days Lurky Wala U/C Kotla Ahmad Khan.

Construction of Drain Soling, Basti Faqeer 122 Bakhsh Mastoi Mouza Chorahta Pachdh. 400000 20000 500 60-Days

Construction of Culvert on Qabool Minor at 123 Gaman Wala, Mauza Shero Dasti patli Tali 325000 16250 500 60-Days

Construction of Soling from Chah Manjhi wala to Graveyard Mohab Laskani, From Road Dadi wala to Graveyard Mohab Laskni, 124 Const.of Drain, Soling Mouza Mohab Laskani 1000000 50000 500 90-Days U/C Haji Kamand.

Construction of Soling Basti Kanho, Basti 125 Sandhila, Basti Mohna, Bait Cheen Wala, 1000000 50000 500 90-Days Basti Sial Bate Bait wla , Basti Haji Khadim Bate Cheen Wala.U/C Bate Bait Wala Construction of Drain, Soling , Earth Filling 126 Basti Peer Wala, Mouza Yaro. 167000 8350 500 60-Days Construction of Drains, Soling, Culverts Basti Kanho, Basti Nach Arrain,Basti Chundrh,Basti Hafiz Naseer, Basti Abdul Kareem, Basti Mureed Ahmad Nach, Basti 127 Ch.Kala, Basti Murid Hussain Budoi, Basti 500000 25000 500 60-Days Ajmal Kanho,Basti Malik Allah Ditta, Basti Ameer Bakhsh, Basti Manzoor Hussain U/C Bate Bait Wala Construction of Drain , Soling, Tuff Tile Basti 128 Mural, Basti Shero, Mouza Noor Wahi Mural, 1000000 50000 500 90-Days Basti Bubray Wala.U/C Jakhar Imam Shah. Construction of Drain , Soling Basti Malana, 129 Basti Wajay Wala, Basti Diyat Lashari U/C 1000000 50000 500 90-Days Basti Malana. Construction of Soling From Shoria Canall To Chah Mando Wala, From Mando Wala to chah 130 1000000 50000 500 90-Days Mouchi Wala U/C Basti Jaam.

Construction of Culverts Quatob Wala, Peer Muhammad Ghoori , Laay wala,Iqbal Khakh, 131 Drain , Soling Mouchi Wala, Bhatti Wala, 1000000 50000 500 90-Days Quatob Wala, U/C Jalbani

Construction of Drain , Soling Basti Shalee, 132 Khano Wala, Chah Tahrry wala, u/c Notak 1000000 50000 500 90-Days Mehmeed. Construction of Soling Street Rehmat ullah Basti Yary Wali,street Gull Bahar, Street Bakhat Ali wahocha mouza Hala,chahra Wahid Bakhsh Malukh wala, Makra Ahmadni,Chahra Riaz Khan Makra, Mouza 133 Tuba Dari, Chahra Shabeer Khan Ahmadi, 1000000 50000 500 90-Days Chah Bahndo wala, chahra Majeed khan Baghola,M.Sadiq Lalwani,Ghulam Shabeer khan(Late) U/C Arra Jafar.

Construction of Drain Soling, Tuff Tile from 134 Metalled road (Bahdur Garh to Manka Canal) 800000 40000 500 60-Days to Basti Bahadur Garh. Construction of Culverts Bhundh Wala, Drain , Soling Bohar Wala,Ward # 2 Drain , Soling Street Dahdee Birtheri, & Lashari Brotheri, Ward #3 Drain , Soling street Buglani 135 Brotheri, ward #4 Drain , Soling Ahmadni 1000000 50000 500 90-Days Brotheri, ward #5 Drain , Soling Wahid Bakhah Ahmadni, ward #6 Tuff Tile, Drain Soling Mohalla Arrain U/C Mana Ahmadani.

Construction of Drain Soling Bashir colony, New Saadat colony, Street Rehan Lodhi Street 136 500000 25000 500 60-Days Zulfiqar Rajpoot U/C Mana Ahmadani

Construction of Drain , Soling Basti Kot Jano, Basti Rock Nagar, Chaha Chaty wala, Basti 137 1000000 50000 500 90-Days near Zila Tax. U/C Basti Fouja

Construction of Drain, soling Basti Rehmat ullah khosa Farooq abad, Basti Razi 138 1000000 50000 500 90-Days jogyani,Abbas Wala, U/c Khan Pur Junabi.

Construction of Drain, Soling Tuff Tile from 139 khan pur to Basti Hafiz Manzoor Hussain. 500000 25000 500 60-Days

Repair & R/H of Metled Road From Choti , 140 Kot Chutta Road To Nawan Shahar Road U/C 5492000 274600 500 120-Days Mutafraq Chahan. Construction of Drain, Soling, Culverts at Ali Wala, Ruk Wala, Noor Wala, Batil wala, 141 500000 25000 500 60-Days Shahal Wala, Basti Durvesh, Mouza Kot Mubarak Shumali. Construction of Drain, Soling Basti Mahar Asif Ward # 6 Adda Notak, Basti Nazar Arwal 142 500000 25000 500 60-Days Basti Malana, Basti Qasai Wala U/C Basti Malana 11-12-2017 Construction of Drain, Concerte Flooring, 143 1100000 55000 500 90-Days 08-12-2017 Receipt Basti Kharar Buzdar. Upto 12:00 pm Construction of Soling Chahra Basti Peer 12:00 PM Opening Bakhsh , Mubarak Wala, Rangahy wala, Basti 01:00 PM Jindani wala, Basti Dhora, Basti Lalani,Basti 144 Birmani Gharbi, Basti Ghulam Rasool 1000000 50000 500 90-Days Ramdani, U/C Thutha Gabolan

Construction of Tuff Tile Street Abdullah 145 Shah, Street Iqbal Darzi, Const, Soling Tufil 1000000 50000 500 90-Days Abad Mian Street, Mohallah Islam Abad . U/C Choti Zareen Construction of Drain , Soling Basti Sami 146 1000000 50000 500 90-Days wala, U/C Nawan Januabi Construction of Tuff Tile Basti Talpur, Street 147 Zulfiqar Talpur, u/c Nawan Janubi 500000 25000 500 60-Days

Construction of V.R. Bridge On Dhora ( Same 148 800000 40000 500 60-Days Nala) at Pakky Wala, Construction of Soling Basti Haji Hazoor Bakhsh Ahmadni, Soling Remaining Work Shahik Baghyani,Basti Karam Jindani,Basti Talib Hussian Hamzani, Basti Sola, Basti Bitta Ghulam Ali Ahmadni,Basti Allah Wasaya 149 Sirjani,Basti Gafoor kaloi, Basti Raham Khan 1000000 50000 500 90-Days Machi, Basti Peer Bakhsh Bohar, Basti Meer Muhammad Ahmadni,U/C D J Khan Junabi

Construction of RCC Slaib at Badro manka Oppst, Shop Yousif Bohar, V.R Bridge Basti 150 M.Ramzan, Soling Basti Allah Ditta Kachla, 1000000 50000 500 90-Days Soling Abdul Gafoor Chandia U/C D.J Khan Darmayni Construction of Soling Basti Meer Muhammad Khosa, Basti Wahid Bakhsh Shahani,Soling Wahid Bakhsh Kaloi, Basti Shah Bakhsh Buzdar. Basti Haji Jetha Tondwani,Const.of Culverts Basti Shafi Kaleri, Basti Mitto Khan Kaleri, Khaala Basti Maqsood Khosa. Khaala 151 Basti Meer Hazar Khalyani,Basti Nazar 1000000 50000 500 90-Days Muhammad Kechala, Basti Punjabi, Basti Langrana,Basti Peer Bakhsh Chandia, Basti Mitta Khan Hasnani,Basti Nazar Muhammad Hasnani U/c D.J Khan Gharabi

Construction of Culverts Basti Mohsin Kaleri, Basti Nasrullah Kaleri, Chahra New Jamal Abad to Mian Phero,chara Ranjha Khalilani,chahra farooq chanida,chara Ibrahim dewani,Const, of Water Tank & 152 Laying of pipe line Basti Joghyani, Chak 1000000 50000 500 90-Days Joghyani,Laying of water supply pipe line Gull Muhammad Joghyani, Laying of Tuff Tile Matel Road to High School Bakhar Wah U/C Bakhar Wah

Construction of Foot Bridge Nalla Noor Wah Near Ghee Mill,const. soling Basti Gull Muhammad S/o Haider Buglani near Dandi 153 Sardar Farooq Khan Leghari wli,u/c Chack 1000000 50000 500 90-Days Dodara, Concert & Drains chowk Near Well Aab Noshi Choti Bala U/C Choti Bala

Construction of Soling Talpur Road to Basti Nika Talpur,Soilng Talpur road to Basti Nazar Hussain Kachala, Talpur Road to Basti Khuda 154 Bakhsh, Soling Link #4 To Basti Mirza 1000000 50000 500 90-Days Sinjarani U/c Chak Dodara

Construction of Soling Basti Allah Wasyia Kachala, Allah Dewiya Lashari, Allah Dewyia Buzdar Tahirani, Sadiq Khan Member ,Allah 155 Bakhsh, Jafar Buzdar, Maher Bakhsh Buzdar 1000000 50000 500 90-Days Gamoani,Sawan Khan Jhur,Allah Bakhsh Jhur. U/c Nawan Shomali

Construction of concerte Flooring & Drain from Chowk Fayyaz Medical Store to Arra Ghulam Akbar , const. of Drain street Peer 156 Bakhsh Tiba Dulyani,& Street Peer Bakhsh 1000000 50000 500 90-Days Barhimani, U/c Sakhi Sarwar Sharqi

Construction of Drain, Soling Butta Kot Near 157 Darbar Shareef, Bindo Wala, Basti Manzoor, 1000000 50000 500 90-Days Basti Allah Wasaya, Basti Ghulam Muhammad U/c Sakhi Sarwar Gharbi. Construction of V.R. Bridge On Dhora ( Same 158 Nala) at Jhalar Wala, 800000 40000 500 60-Days

Construction of jeepable track Bathi to Lerri. 159 1000000 50000 500 90-Days U/C Mithwan Construction of jeepable track Basti Mehal to 160 1000000 50000 500 90-Days Phugla U/C Barot Mundwani. Providing & laying of water supply pipe Suka Chur to Opra, Nala to Mar Sar and installation 161 1000000 50000 500 90-Days sub mercible pump at Gulnokh, Basti Korh U/C Fazla Kuch Construction of Bridge on Kiryia Minor near House Mahar Ramzan Chah Baig Wala, 162 1000000 50000 500 90-Days Const.of Culverts , Soling Chah Loty Wala . Repair of water Supply Scheme Zain U/C 163 245000 12250 500 60-Days Barthi. Installation of hand pumps at Basti Mat & 164 Phuglo U/C Barthi 500000 25000 500 60-Days Construction of Soling, Tuff Tile Basti Kaper 165 Shah. 800000 40000 500 60-Days Construction of jeepable track Kandha 166 500000 25000 500 60-Days Graveyard to Basti Gari tak U/C Tehkar Laying of Tuff Tile Street Yateem Khana, U/C 167 500000 25000 500 60-Days Choti Zareen Construction of jeepable track Gawalagh Gur 168 to Marsar, Durmat to Karisar and Karisar to 1000000 50000 500 90-Days Dub Ghoray Vail U/C Tehkar Construction of soling Basti Peer Muhammad 169 325000 16250 500 60-Days U/C Mutfariq Chahan Construction of jeepable tracks Choki Tak via Rojha to Mubaraki Sandh, Mat Chandia To 170 Baghul Chur Via Graveyard, Repair of Jeep 1000000 50000 500 90-Days able Track Dar Sar To Shatrat To Lophanidaf U/C Mubarki. Laying of pipe line , water supply scheme kashoba, Const. of Kacha Jeep Able Track at 171 1000000 50000 500 90-Days Jogiani Tak, Shaheed Tak U/C Tuman Khosa.

Construction of Soling chahra Basti Faiz Kareem Ahmadni, Dr. Iqbal Ahmadni,Fida 172 Hussain Bughlani, Chahra Basti 1000000 50000 500 90-Days Buzdar,Chahra Basti Shokarani, Basti Kijayani,Basti Bubber,Basti Khosa,U/C D.J InstallationKhan Darmani of Hand Pumps at Sari Road, Basti Jameel, Basti Ghulam Hussain , Constt: 173 of Jeepable Track from Sari Nala To Basti 1000000 50000 500 90-Days Ramdani U/C Tuman Leghari Zareen.

Construction of Water Tank and laying of 174 1000000 50000 500 90-Days Pipe Line U/C Tuman Leghari Bala. 175 Renovation of offices Chairman Block 1300000 65000 500 60-Days 176 Renovation of Offices Chief Officer Block 1400000 70000 500 60-Days Repair of Vehical Complete in all respect DGE 177 1000000 50000 500 90-Days 4848 District Council D.G.Khan. Repair of Vehical Complete in all respect DGE 178 1000000 50000 500 60-Days 4948 District Council D.G.Khan. Repair Road Rolar Complete in all respect 179 District Council Dera Ghazi Khan 1 No. 500000 25000 500 60-Days

Repair Road Rolar Complete in all respect 180 District Council Dera Ghazi Khan 1 No. 500000 25000 500 60-Days

Construction of jeepable track Marunj Daff to 181 1000000 50000 500 90-Days Kachi Wanga U/C Fazla Kuch. 182 Repair of RWSS Thul Allo U/C Thul Allo 500000 25000 500 60-Days Construction of Drain Soling Basti Hamal Wali 183 300000 15000 500 60-Days U/C Bubbi Laying of sewerage pipe line office District 184 400000 20000 500 60-Days Council, D.G. Khan. Construction of jeep able Track Basti Aziz 185 100000 5000 500 60-Days Buzdar. Repair of Vehical ( Hud, tyers ) Complete in all 186 200000 10000 500 30-Days respect DGE 4949 Upgradation of Sound System District Council 187 1000000 50000 500 60 Days Hall, District Council D.G.Khan

179292000

Furmaish Ali Ch. Sardar Abdul Qadir Khan Khosa Chief Officer Chairman District Council D.G.Khan District Council D.G.Khan

Endst. No. ______Dated.______/2017

A copy is forwarded for information to the:-

1. Residant Deputy Director Audit & Accounts District Council D.G.Khan

2. District Officer (Finance) District Council D.G.Khan

3. Head Clerk, O/o the District Officer (I&S) District Council D.G.Khan. He is directed to upload Tender Notice on PPRA website. Furmaish Ali Ch. Sardar Abdul Qadir Khan Khosa Chief Officer Chairman District Council D.G.Khan District Council D.G.Khan DISTRICT COUNCIL DERA GHAZI KHAN

TENDER NOTICE District Council Dera Ghazi Khan Intends to call sealed tenders for its development project pertaining to ADP 2017-18 from contractors who are enlisted in Dera Ghazi Khan for the financial year 2017- 18 .

1. The bid documents will be issued on charges of Rs.500/- per bid document by the Head Clerk (I&S Branch) on written request of contractors from the date of publication of tender notice till to 08-12- 2017 accompanying the following documents.

i) Enlistment letter along with Govt Fee deposit slip for financial year 2017-2018 from zila council Dera ii) Ghazi Partnership Khan. deed in case of limited company

iii) No Litigation certificate on letter head pad.

2. 5% earnest money in the shape of call deposit from any scheduled bank in Punjab in favour of Chairman District Council D.G.Khan shoud be attached with the sealed bid document at the time of received from contractors. 3. The Tender form will be issued @ of 500 (Rupees ) per form Sr.No 1 To 100 will be issued in office time upto 23-12-2017 & Sr.No 101 To 107 will be issued in office time upto 29-12-2017 & Sr.No 108 To 198 will be issued upto 05-01-2018. 4. All the received / Sealed bids Sr .No 1 To 100 will be received on dated 26-12-2017 at 12:00 pm & opened on the same date on 01:00 pm & Sr.No 101 To 107 will be received on dated 01-01-2018 on 12:00 pm & Opened on the same date 01:00 pm & Sr.No 108 To 198 will be received on dated08-01-2018 on 12:00 pm & opened on the same date 01:00 Pm in the office of District Council D.G.Khan by the Tender opening committee in the presence of available contractores or their authorized representatives.

5. It is compulsory on all participated contractors to quote their rates in Nos as will as in words on above or below the estimate on percentage basis.

6. Additional performance guarantee 10% of tender cost ( balance amount adjusting 5% of earnest money) should be deposited by the bidder whose rates are approved by the competent authourity within 7 days. If he does not deposit the required amount, his 5% CDR deposited will be forefeited by the District Council and his tender rate will be rejected and process of re-tendering will be initiated. This action cannot be challenged in any Court of Law. 7. Conditional, unsigned, incomplete, cutting, over written and doubtful bids will be dealt as rejected.

8. When work order issued to approved contractor, he has to make the agreement with department on stamp paper of value specified by Government.

9. The period for completion of each project will be mentioned in work order after approval of rates of the lowest bidder.

10. The bids poured by contractores within 5% CDR without getting receipt from Head Clerk will be dealt cancelled. 11. The sealed bids should be with orignal CDR. The bid documents not issued from the office of Head Clerk will be considered as rejected. The bidder has no right to challenge it.

12. The contractores to Whom work order are issued, are bound to conduct the required quality control tests on their own expences. The detail of work to be tendered is as below.

Last date for Tenders Sr. Estimated Earnest Tender Completio Name of Development Schemes issue of /receipt No. Cost Money Fee n Time tenders opening date Construction of Soling, Drain & Culverts Basti Kotani U/C 26-12-2017 1 Kotani . 1000000 50000 500 90-Days Receipt 12:00 23-12-2017 up pm Construction of Drain, Soling & Tuff Tile Basti Ladha Mouza to 03:00 pm Opening 2 Rakh Marri Gharbi & Marri Darmini U/C Panjgraien 1000000 50000 500 90-Days 01:00 PM

Desalting of Nala Masoo Wah Qasba Nari U/C Nari junabi 3 1000000 50000 500 90-Days Installation of Handpumps Basti Jaday Wali, Basti Wajan & 4 Soling Basti Jarwar U/C Lakhani 1000000 50000 500 90-Days

Construction of Drain Soling Basti Jullo Wali U/C Jullo Wali 5 1000000 50000 500 90-Days

Construction of Drain, soling, Culverts, sub Murcible Pump, Basti Bechra, Basti Makwal, Basti Nizam Abad, Basti Chowki 6 1000000 50000 500 60-Days Wala, U/c Makwal Kalan

Construction of Boundary Wall Janaza Gah Basti Maral, Basti 7 1000000 50000 500 90-Days Lashari U/C Kalo Wala Construction of culvert, Laying of Sub base, Soling & Slaib 8 from Khoja Masjid to Farm Haji Abid Buzdar Mouza Tub U/C 1000000 50000 500 90-Days Bindi. Repair of Road Basti Fateh Khan from Basti Nutkani To Basti 9 118000 500 120-Days Fateh Khan U/C Nutkani 2360000 Construction of Drain Soling Basti Sadoo from Link Road to 10 25000 500 60-Days Dera Haji Bahar Khosa U/C Cholani 500000 Construction of Soling & Earth filling Basti Azeem U/C 11 50000 500 90-Days Panjgraien 1000000 Construction of Culvert Basti Manjotha U/C Bubbi 12 268000 13400 500 60-Days

Construction of Soling street Girls School Basti Sobha U/C 13 25000 500 60-Days Babbi. 500000 Construction of Drain Soling Street Haji Akhtar Khan Tibbi 14 23450 500 60-Days Qaisrani U/C Bubbi 469000 Construction of Nala Main street Basti Dawoo Wali U/C Bubbi 15 546000 27300 500 60-Days

Construction of Soling & Drain street Bashir Leghari Basti 16 7250 500 60-Days Dawoo Wali U/C Bubbi 145000 Construction of B/Wall Janaza Gha Basti Gazar U/C Bubbi 17 350000 17500 500 60-Days

18 Construction of Drain Soling Basti Hamal Wali U/C Bubbi 300000 15000 500 60-Days 26-12-2017 Construction of Drain, Soling Basti Bolani U/C More Jhangi 19 1000000 50000 500 90-Days 23-12-2017 Receipt 12:00 Upto pm Construction of soling Basti Merwani, Basti Ahmadni, Basti 20 25000 500 60-Days 03:00 PM Opening Jindani, Basti Kanla. U/C Pardan Sharqi. 500000 01:00 PM Construction of culvert Basti Tibba Malkani & Drain / Soling 21 50000 500 90-Days Basti Malkani U/C Tibbi Qaisrani 1000000 Construction of Drain , Soling Qasba Kot Mohi U/C Pardan 22 50000 500 90-Days Sharqi. 1000000 Construction of Bridge at Gang Basti Borani U/C Vehoa Chak 23 17500 500 60-Days Shomali 350000 Construction of Nala & Drain / Soling Basti Nari U/C Nari 24 50000 500 90-Days Janubi 1000000 Construction of Drain Soling from residence Azmat Khan / 25 25000 500 60-Days Adbul Razaq Khan to land Zafar Khan Khosa.U/C Paki 500000 Construction of Boundary wall Janaza Gha Dona & Drain / 26 50000 500 90-Days Soling Basti Dona U/C Dona 1000000 Construction of Drain Soling, Basti Khalil-ur-Rehman, Wahid Bakhsh, Muhammad Faiz, Qadir Bakhsh, Muhammad Nawaz, 27 Abdul Hameed, Basti Dhoray Wali, Mouza Pir Adil, U/C Pir 500000 25000 500 60-Days Adil Construction of Nala Basti Tub Mohallah Sharqi U/C Bindi 28 1000000 50000 500 90-Days

Laying of G.I. Pipe line Basti Abdul Aziz Jiani Mouza Chak 29 Kaura Khan RWSS Chak Kaura Khan U/C Kot Mubarak / u.c 360000 18000 500 60-Days Bahdur Garh.. Construction of Tuff Tile from Jul Pai Minor to Chaha Yousif 30 wala mouza khakhi gharbi u/c khakhi 1006000 50300 500 60 Days Construction of Drain Soling, Tuff Tile from Metalled road 31 (Bahdur Garh to Manka Canal) to Basti Bahadur Garh U/C 800000 40000 500 60-Days Bhadur Gharh Construction of V.R. Bridge On Dhora ( Same Nala) at Jhalar 32 40000 500 60-Days Wala, U/C Yaroo 800000 Construction of Drain, Soling Basti Mithay Wali Mohallah 33 25000 500 60-Days Gazar and Mohallah Buzdar U/C Kotani. 500000 Construction of Drain, soling, Culverts, sub Murcible Pump, 34 Basti Bechra, Basti Makwal, Basti Nazim Abad, Basti Chowki 500000 25000 500 90-Days Wala, U/c Makwal Kalan Construction of Soling Basti Ladhayani, Band Rahi Wala, 35 20000 500 60-Days Mouza Chabri Bala U/C Chabri Bala 400000 Construction of Bridge on Kiryia Minor near House Mahar 36 Ramzan Chah Baig Wala, Const.of Culverts , Soling Chah 1000000 50000 500 90-Days Loty Wala u/c Khakhi. Construction of soling Basti Chatani, Basti Mehrowani, Chah 37 Gidder wala, Basti Bhanday wala U/C Pardan Sharqi 500000 25000 500 60-Days

Installation of Hand Pumps , Sub Murcible Pump, PVC Pipe 38 62500 500 90-Days Line Mouza Chit Pani, Mouza Ghoona, U/C Bohar 1250000 39 Installation of Hand Pumps Mouza Jatt Gaadi,U/C Sokar 750000 37500 500 60-Days Construction of Nala & drain Soling , sub Murcible pump Basti 40 65000 500 90-Days Koro & Basti Buzdar U/C Basti Buzdar 1300000 41 Construction of soling Basti Merwani U/C Pardan Sharqi 500000 25000 500 60-Days Construction of culverts, Laying of PVC Pipe, installation of Sub Murcible pump, Mangrotha Sharqi, Mangrotha Gharabi, 42 Jhoke Bakhwani, Jhoke Manglay Wali,U/C Mangrotha 1000000 50000 500 90-Days

Installation of Hand pumps Basti Chapri & Basti Bahar Wali & 43 Construction of soling Drain Kot Qaisrani. U/C Kot Qaisrani. 1000000 50000 500 90-Days

Construction of Drain . Soling , Qasba Bodo U/C Jhoke Bodo 44 1000000 50000 500 90-Days

Construction of soling from link road Chatri to Basti Tibbay wali 45 50000 500 90-Days and main street Basti Ladhacha U/C Litra 1000000 Construction of of Drain Soling Mohallah Itlani Vehova. U/C 46 50000 500 90-Days Vehoa Janobi. 1000000 Construction of Drain Soling & culvert Basti Bilwani U/C 47 50000 500 90-Days Vehova Chak Shumali U/C Vehoa Chak Shomali. 1000000 Construction of Drain, soling, Culverts Basti Kandi Wala, Basti 48 50000 500 90-Days Tibbi Sahani U/C Ahmadani 1000000 Construction of Drain. Soling Basti Noor Pur U/C Shahdan 49 50000 500 90-Days Lund 1000000 i.Construction of soling, from Indus High Way to Basti 50 Baggar,Ghulam Abbas Baggar. Ii.Const,of Drain, Soling,Basti 1000000 50000 500 90-Days Notak Sekhani U/C Basti Ranjha Construction of Drain, soling, Culverts, Tuff Tile Qasba Kala 51 50000 500 90-Days U/C Kala 1000000 Construction of Drain, soling, Culverts & Earth Filling Basti 26-12-2017 Marhay wala, Basti Hutwani, Basti Rind, Basti Thaddi, Basti 23-12-2017 Receipt 12:00 52 Jatt, Basti Ghulam Siddique U/C Chack Raman 1000000 50000 500 90-Days Upto pm 12:00 PM Opening 01:00 PM Construction of Drain, soling, Culverts Basti Baig, Basti Gujjani, Basti Umedya Wala, Basti Bhandy Wala, Basti 53 Bisharat Wala, Basti Turbani, Basti Bhatti, Basti Bhojani U/C 1000000 50000 500 90-Days Shero Dasti Construction of Drain, Soling, Tuff Tile and construction of 54 drain at Siddqui Market Qasba Shah Sadar Din U/C Shah 500000 25000 500 60-Days Sadar Din. Construction of Drain, Soling, Street Ahmad Shah, Qasba 55 Shah Sadar Din and Basti Rindi, Dhandlay Wala, U/C Shah 785000 39250 500 90-Days Sadar Din. Construction of Bridge on Peer Adil Minor at Jogyani wala,U/C 56 20000 500 60-Days Marhata 400000 Construction of V.R Bridge at peer Adil Minor Basti Haji 57 17500 500 60-Days Sohanra U/C Marhata 350000 Construction of metalled road from Indus Highway to Usman 58 66350 500 90-Days Bara Road, Length 900 feet. U/C Paki. 1327000 Construction of Drain, soling, Village Peer Adil U/C Peer Adil 59 1000000 50000 500 90-Days

Construction of Drain Soling, Darkhan Wala, Basti Shehwani, 60 52500 500 90-Days Jiwan Wala, U/C Bahadur garh. 1050000 Construction of Soling Ch. Muhammad Jamil, Dari Dholay Wali, installation of Water Supply System Basti Jarwar and 61 Water Supply System Ghuzi Stai, Construction of 2 No. 1050000 52500 500 90-Days Culverts U/C Stai Construction of Drain Soling, Village Kot Mubarak, U/C Kot 62 50000 500 90-Days Mubarak 1000000 Construction of Drain , Soling Street School Wali, Village Kot 63 25000 500 60-Days Mubarak.U/C Kot Mubarak. 500000 64 Construction of Drain Soling, U/C Dahoo, 1000000 50000 500 90-Days 65 Construction of Drain Soling, Village Yaroo U/C Yaroo 1000000 50000 500 90-Days Construction of Drain , Soling ,Culverts Basti Dhoor Pur , Basti 66 Fardani, Basti Gishkorri mouza Rakh Chabri Zareen U/C 1500000 75000 500 90-Days Chabri Zareen Construction of Drain, Soling, Tuff Tile, sewer, culverts basti 67 yasir abad mouza nooria koria, Basti Ghurwangh mouza ladan 1000000 50000 500 90-Days U/c Ladan. Construction of Drain Soling, Langay wala, Karmo Wala, Basti 68 Bijrani, Chah Bijar Wala, Mauza Umrani, U/C Chak Nau Abad. 1000000 50000 500 90-Days

Providing and laying of Tuff tile and construction of drain from baithak Imran Khan to residence of Sami Ullah Khan via 69 Residence Aown Muhammad, Qasba Chabri Bala U/C Chabri 1000000 50000 500 90-Days Bala . Installation of Hand Pumps, Basti Alyani, Basti Bara,Basti 70 50000 500 90-Days Chahtari Ganda, U/C Wador 1000000 Construction of soling at Chahra Basti Inam Ullah Buber,Basti 71 Atta Muhammad Chandia, Basti Razaq Buzdar, Basti Kashif 1000000 50000 500 90-Days Khosa, U/C Dagar Chit. Construction of Drain , Soling Basti Chandia , Basti Machi, U/C 72 50000 500 90-Days Bela 1000000 Construction of Drain , Soling at Lurkay wala, Basti Rafiq Abad, Const, of V.R. Bridge at Chandia Minor U/C Gadai 73 Gharbi. 1000000 50000 500 90-Days

Construction of Drain, Soling,Sludge carrier Basti Gud Pur U/C 74 50000 500 90-Days Basti Khosa. 1000000 Construction of Drain , Soling at Basti Kotla Sikhani, Basti 75 50000 500 90-Days Dorhatta, U/C Tibbi Kharak, 1000000 Construction of Drain Soling, Basti Hafiz Abdul Rahman 76 Baghani, Basti Sultan Baghani, Mouchi Wala,Talhi Wala, Basti 800000 40000 500 60-Days Abdul Malik U/C Churhatta Kot Habiat, Construction of Drain, Soling,Basti Sarwar wali , Halail wala, 77 50000 500 90-Days Banghy Wala U/C Darhma. 1000000 Construction of Drain , Soling Basti ranjha Wali, Basti Wada Hasam wala, Basti Peer Bakhsh , Basti Sadiq Hussain, Basti 78 Ajmal,Basti Hameed, Basti Raheed, Basti Akbar U/C Haji 1000000 50000 500 90-Days ghazi gharbi. Construction of Soling Kot Chuuta Bypass to Chah phol Nai 79 wala, From Masjid Tobe Wli to Chah Ghulam Fareed 1000000 50000 500 90-Days Chandia,U/C Samina. Construction of Bridge on Nala Samdari near Hafiz Ghulam 80 Rasool, Const.Bridge Basti Arrain, Const. Culverts Mouza 1000000 50000 500 90-Days Bhai.U/C Sabra Nachan 26-12-2017 Construction of Tuff Tile , Drain,Basti Shadi wala, Basti Bur Receipt 12:00 81 1000000 50000 500 90-Days 23-12-2017 Bochi Wala.U/C Khakhi. pm Upto 12:00 Pm Construction of Drains,Soling, Tuff Tile, Sewer chah Pongher Opening wala, Basti Meer Wala, Basti Nawan Gull, Chah Darkhan 01:00 PM 82 Wala, Jinah Colony,Chah Gaddi Wala.U/C Gaddai Sharqi. 1000000 50000 500 90-Days

Construction of Tuff Tile , Soling, Drain Basti Izat Wala, 83 50000 500 90-Days Mansoor Wala, Ahmad Wala U/C Paighan # 57 1000000 Construction of Soling Chah Kheray Wala.U/C Paighan # 58 84 1000000 50000 500 90-Days

Construction of Soling Chah Chandia Wala ,Basti Mural, Basti 85 50000 500 90-Days Lund.U/C Mamori. 1000000 Construction of Drain , Soling, Tuff Tile Qasba Alli wala U/C 86 50000 500 90-Days Alli Wala. 1000000 Construction of Drain, Soling,Basti Gull Wala, Mouza 87 Rikera,Chaha Punjay Wala,Basti Rikera, Chah Lal Wala,U/C 1000000 50000 500 90-Days Haider Qureshi. Construction of Soling at Chara Basti shah wala, Basti Khowi Arrain, Basti Lashari, Basti Mamar, Basti Zulfiqar Malik, Street 88 Rana Younis , Street Munshi Shamla U/C Ghous Abad. 1000000 50000 500 90-Days

Construction of Mattel Road in Basti Bishrat pur U/C Hazara. 89 1000000 50000 500 90-Days

Construction of Soling ,Drain , Culverts Chaha Jiweni 90 wala,chah Hunair Wala, Qasba Jhoke Utra.U/C Jhoke Utra 1000000 50000 500 90-Days

Construction of Drain , Soling ,Basti Cheena,Basti Naseer 91 Sharqi , Gharbi, Basti Lurky Wala U/C Kotla Ahmad Khan. 1000000 50000 500 90-Days

Construction of Drain Soling Street Sajjad Khitran U/C Kotani . 92 300000 15000 500 60-Days

Construction of Drain & Soling Basti Jerh Leghari U/C Dona. 93 500000 25000 500 60-Days

Construction of Drain Soling at Basti Tauheed Abad, Basti 94 Hafiz Qasim, Mauza Bhatti Metla, U/C Shah Sadar Din 580000 29000 500 60-Days

Construction of Drain, Soling & Boundary wall Janazagah Basti 95 50000 500 90-Days Kaloo wala. U/C Kalo Wala. 1000000 Construction of Culverts on minor Kotla Sikhani at Chah Dadli 96 Wala, Chah Dahat Wala, Mauza Rakh Chabri, U/C Chabri 500000 25000 500 60-Days Zarin Construction of Drain, Soling,Qasba Retra Basti Malkani U/C 97 1500000 75000 500 60-Days Tibbi Qasrani 26-12-2017 98 Construction of Drain Soling Basti Tub U/C Bindi 500000 25000 500 60-Days Receipt 12:00 23-12-2017 Providing & Laying PVC pipe line Mohallah Saleem abad pm 99 15000 500 60-Days Upto 12:00 Pm street Masjid wali Ward No.01 U/C Kot Qaisrani 300000 Opening Construction of Culvert on Qabool Minor at Gaman Wala, 01:00 PM 100 16250 500 60-Days Mauza Shero Dasti patli Tali U/C Stai. 325000 Repair & R/H of Road from Samina Adda to Darbar Peer Abdullah Shah Sahib U/C Samina 101 4000000 200000 500 120 Days

Repair & R/H of Mettled road fromJhoke Saddique abad wali 102 to Exchange Makwal Kalan U/C Makwal Kalan. 5074000 253700 500 120-Days Repair & R/H of Mettled road from Indus road adda Hairo to 103 Bindi U/C Bindi 6836000 341800 500 120-Days 01-01-2018 Repair & R/H of Mettled road from Indus High Way adda choki 29-12-2017 Up Receipt 12:00 to 12:00 Pm pm Opening 104 wala to Jhoke Saddique abad wali U/C Makwal Kalan. 4956000 247800 500 120-Days 01:00 pm

Repair & R/H of Mettled road from Indus High Way adda 105 228900 500 120-Days Phehar To High School Phehar U/C Tibbi Qaisrani. 4578000 Repair & R/H of Metled Road From Choti , Kot Chutta Road 106 To Nawan Shahar Road U/C Mutafraq Chahan. 5492000 274600 500 120-Days

Repair & R/H of Metled Road from Chack Masoo Hajan Murad 107 to Shoria canal U/C Mutfariq Chahan 2820000 141000 500 120-Days

Construction of Drain, soling Basti Chooni Mouza Chooni U/C 108 Jullo wali. 1000000 50000 500 90-Days

Construction of Soling, Tuff Tile Basti Kaper Shah U/C Mamori 109 800000 40000 500 60-Days

Construction of Drain Soling Mouza Maqsood Chujhra, Mouza 110 Sakhani Kot Meer U/C Dahoo. 450000 22500 500 60-Days

Construction of Soling & V.R. Bridge at Burjee # 2300 at 111 Raqba Aman Ullah Khosa on Peer Adil Minor U/C Paki. 800000 40000 500 90-Days

Construction of Drain, Soling, Culverts at Ali Wala, Ruk Wala, 112 Noor Wala, Batil wala, Shahal Wala, Basti Durvesh, Mouza 500000 25000 500 60-Days Kot Mubarak Shumali.U/C Bhadur Garh

Repair & R/H of Metalled road Basti Bate Alyani U/C Cholani 113 1770000 88500 500 90-Days

Construction of V.R. Bridge On Dhora ( Same Nala) at Pakky 114 Wala, U/C Yaroo 800000 40000 500 60-Days

Constuction of Soling Basti Sonary Wala, Ahmad wala, u/c 115 Paighan # 57 500000 25000 500 90-Days

Construction of Soling at Darkhan Wala, Sewerage at Basti 116 Sahib Wala. U/C Paki 750000 37500 500 60-Days 08-01-2018 Construction of Drain soling & culvers Zumbo wali Bhuttay wali 05-01-2017 Up Receipt 12:00 117 Beroon Taunsa U/C Basti Buzdar 500000 25000 500 60-Days to 12:00 Pm pm Opening Construction of Boundary Wall Grave Yard Dinay wala, 01:00 pm 118 Ibrahim wala.Mouza Sabra Nacha U/C Sabra Nacha 150000 7500 500 60-Days

Construction of Culvert , Earth filling Basti Bilwani U/C Vehova 119 Chak Shumali 500000 25000 500 60-Days

Construction of Drain, Soling , Earth Filling Basti Peer Wala, 120 Mouza Yaro U/C Yaroo 167000 8350 500 60-Days

Construction of Drain Soling, Basti Faqeer Bakhsh Mastoi 121 Mouza Chorahta Pachdh U/C Churhatta Kot Habiat, 400000 20000 500 60-Days

Construction of Drain Soling at Mohallah Eisani Village 122 Yaroo.U/C Yaroo 500000 25000 500 60-Days

Excavation of Gang though Nala Excavator U/C Vehova Chak 123 Shumali 500000 25000 500 60-Days

Construction of Drain Soling Ramoon Wala, Khaji Wala, Sair Wala, Darkhan Wala, Kikar Wala. Basti Khan Muhammad 124 700000 35000 500 90-Days Dhorhatta U/C Shah Sadar Din.

Construction of Drain, Soling at Tibbi Eisran U/C Chabari 125 Zareen 1000000 50000 500 90-Days

Construction of Drain, Soling Qasba Rehman Abad ( Lashari 126 Birdari ) U/C More Jhangi 1000000 50000 500 90-Days

Construction of Soling from Chah Manjhi wala to Graveyard Mohab Laskani, From Road Dadi wala to Graveyard Mohab 127 Laskni, Const.of Drain, Soling Mouza Mohab Laskani U/C Haji 1000000 50000 500 90-Days Kamand. Construction of Soling Basti Kanho, Basti Sandhila, Basti 128 Mohna, Bait Cheen Wala, Basti Sial Bate Bait wla , Basti Haji 1000000 50000 500 90-Days Khadim Bate Cheen Wala.U/C Bate Bait Wala Construction of Drains, Soling, Culverts Basti Kanho, Basti Nach Arrain,Basti Chundrh,Basti Hafiz Naseer, Basti Abdul Kareem, Basti Mureed Ahmad Nach, Basti Ch.Kala, Basti 129 Murid Hussain Budoi, Basti Ajmal Kanho,Basti Malik Allah 500000 25000 500 60-Days Ditta, Basti Ameer Bakhsh, Basti Manzoor Hussain U/C Bate Bait Wala

Construction of Drain , Soling, Tuff Tile Basti Mural, Basti Shero, Mouza Noor Wahi Mural, Basti Bubray Wala.U/C 130 1000000 50000 500 90-Days Jakhar Imam Shah.

Construction of Drain , Soling Basti Malana, Basti Wajay 131 50000 500 90-Days Wala, Basti Diyat Lashari U/C Basti Malana. 1000000 Construction of Drain, Soling Basti Mahar Asif Ward # 6 Adda 132 Notak, Basti Nazar Arwal Basti Malana, Basti Qasai Wala U/C 500000 25000 500 60-Days Basti Malana Construction of Soling From Shoria Canall To Chah Mando 133 Wala, From Mando Wala to chah Mouchi Wala U/C Basti 1000000 50000 500 90-Days Jaam. Construction of Culverts Quatob Wala, Peer Muhammad 134 Ghoori , Laay wala,Iqbal Khakh, Drain , Soling Mouchi Wala, 1000000 50000 500 90-Days Bhatti Wala, Quatob Wala, U/C Jalbani Construction of Drain , Soling Basti Shalee, Khano Wala, Chah 135 50000 500 90-Days Tahrry wala, u/c Notak Mehmeed. 1000000 Construction of Soling Street Rehmat ullah Basti Yary Wali,street Gull Bahar, Street Bakhat Ali wahocha mouza Hala,chahra Wahid Bakhsh Malukh wala, Makra Ahmadni,Chahra Riaz Khan Makra, Mouza Tuba Dari, Chahra 136 1000000 50000 500 90-Days Shabeer Khan Ahmadi, Chah Bahndo wala, chahra Majeed khan Baghola,M.Sadiq Lalwani,Ghulam Shabeer khan(Late) 08-01-2018 U/C Arra Jafar. 05-01-2017 Up Receipt 12:00 to 12:00 Pm pm Opening Construction of Culverts Bhundh Wala, Drain , Soling Bohar 01:00 pm Wala,Ward # 2 Drain , Soling Street Dahdee Birtheri, & Lashari Brotheri, Ward #3 Drain , Soling street Buglani Brotheri, ward #4 Drain , Soling Ahmadni Brotheri, ward #5 Drain , Soling 137 1000000 50000 500 90-Days Wahid Bakhah Ahmadni, ward #6 Tuff Tile, Drain Soling Mohalla Arrain U/C Mana Ahmadani.

Construction of Drain Soling Bashir colony, New Saadat 138 colony, Street Rehan Lodhi Street Zulfiqar Rajpoot U/C Mana 500000 25000 500 60-Days Ahmadani Construction of Drain , Soling Basti Kot Jano, Basti Rock 139 Nagar, Chaha Chaty wala, Basti near Zila Tax. U/C Basti 1000000 50000 500 90-Days Fouja Construction of Drain, soling Basti Rehmat ullah khosa Farooq 140 abad, Basti Razi jogyani,Abbas Wala, U/c Khan Pur Junabi. 1000000 50000 500 90-Days

Construction of Drain, Soling Tuff Tile from farooq abad to 141 Basti Hafiz Manzoor Hussain khosa.U/C Khanpur Janubi 500000 25000 500 60-Days

Construction of soling Basti Peer Muhammad U/C Mutfariq 142 16250 500 60-Days Chahan 325000 Construction of soling Basti Ahmad Khan Khundrani U/C 143 27000 500 60-Days Mutfariq Chahan 540000 Construction of Soling Chahra Basti Peer Bakhsh , Mubarak Wala, Rangahy wala, Basti Jindani wala, Basti Dhora, Basti 144 Lalani,Basti Birmani Gharbi, Basti Ghulam Rasool Ramdani, 1000000 50000 500 90-Days U/C Thutha Gabolan Construction of Tuff Tile Street Abdullah Shah, Street Iqbal 145 Darzi, Const, Soling Tufil Abad Mian Street, Mohallah Islam 1000000 50000 500 90-Days Abad . U/C Choti Zareen Laying of Tuff Tile Street Yateem Khana, U/C Choti Zareen 146 500000 25000 500 60-Days

Construction of Drain , Soling Basti Sami wala, U/C Nawan 147 50000 500 90-Days Januabi 1000000 Construction of Tuff Tile Basti Talpur, Street Zulfiqar Talpur, 148 25000 500 60-Days u/c Nawan Janubi 500000 Construction of Soling Basti Haji Hazoor Bakhsh Ahmadni, Soling Remaining Work Shahik Baghyani,Basti Karam Jindani,Basti Talib Hussian Hamzani, Basti Sola, Basti Bitta Ghulam Ali Ahmadni,Basti Allah Wasaya Sirjani,Basti Gafoor 149 1000000 50000 500 90-Days kaloi, Basti Raham Khan Machi, Basti Peer Bakhsh Bohar, Basti Meer Muhammad Ahmadni,U/C D J Khan Junabi

Construction of RCC Slaib at Badro manka Oppst, Shop Yousif Bohar, V.R Bridge Basti M.Ramzan, Soling Basti Allah 150 Ditta Kachla, Soling Abdul Gafoor Chandia U/C D.J Khan 1000000 50000 500 90-Days Gharbi. Construction of Soling chahra Basti Faiz Kareem Ahmadni, Dr. Iqbal Ahmadni,Fida Hussain Bughlani, Chahra Basti 151 Buzdar,Chahra Basti Shokarani, Basti Kijayani,Basti 1000000 50000 500 90-Days Bubber,Basti Khosa,U/C D.J Khan Darmani Construction of Soling Basti Meer Muhammad Khosa, Basti Wahid Bakhsh Shahani,Soling Wahid Bakhsh Kaloi, Basti Shah Bakhsh Buzdar. Basti Haji Jetha Tondwani,Const.of Culverts Basti Shafi Kaleri, Basti Mitto Khan Kaleri, Khaala Basti Maqsood Khosa. Khaala Basti Meer Hazar 152 1000000 50000 500 90-Days Khalyani,Basti Nazar Muhammad Kechala, Basti Punjabi, Basti Langrana,Basti Peer Bakhsh Chandia, Basti Mitta Khan Hasnani,Basti Nazar Muhammad Hasnani U/c D.J Khan Gharabi Construction of Culverts Basti Mohsin Kaleri, Basti Nasrullah Kaleri, Chahra New Jamal Abad to Mian Phero,chara Ranjha Khalilani,chahra farooq chanida,chara Ibrahim dewani,Const, of Water Tank & Laying of pipe line Basti Joghyani, Chak 153 Joghyani,Laying of water supply pipe line Gull Muhammad 1000000 50000 500 90-Days Joghyani, Laying of Tuff Tile Matel Road to High School Bakhar Wah U/C Bakhar Wah

Construction of Foot Bridge Nalla Noor Wah Near Ghee Mill,const. soling Basti Gull Muhammad S/o Haider Buglani 154 near Dandi Sardar Farooq Khan Leghari wli,u/c Chack Dodara, 1000000 50000 500 90-Days Concert & Drains chowk Near Well Aab Noshi Choti Bala U/C 08-01-2018 Choti Bala 05-01-2017 Up Receipt 12:00 Construction of Soling Talpur Road to Basti Nika to 12:00 Pm pm Opening Talpur,Soilng Talpur road to Basti Nazar Hussain Kachala, 01:00 pm 155 Talpur Road to Basti Khuda Bakhsh, Soling Link #4 To Basti 1000000 50000 500 90-Days Mirza Sinjarani U/c Chak Dodara Construction of Soling Basti Allah Wasyia Kachala, Allah Dewiya Lashari, Allah Dewyia Buzdar Tahirani, Sadiq Khan 156 Member ,Allah Bakhsh, Jafar Buzdar, Maher Bakhsh Buzdar 1000000 50000 500 90-Days Gamoani,Sawan Khan Jhur,Allah Bakhsh Jhur. U/c Nawan Shomali

Construction of concerte Flooring & Drain from Chowk Fayyaz Medical Store to Arra Ghulam Akbar , const. of Drain street 157 Peer Bakhsh Tiba Dulyani,& Street Peer Bakhsh Barhimani, 1000000 50000 500 90-Days U/c Sakhi Sarwar Sharqi Construction of Drain, Soling Butta Kot Near Darbar Shareef, 158 Bindo Wala, Basti Manzoor, Basti Allah Wasaya, Basti Ghulam 1000000 50000 500 90-Days Muhammad U/c Sakhi Sarwar Gharbi. Construction of jeepable track Bathi to Lerri. U/C Mithwan 159 1000000 50000 500 90-Days

Construction of jeepable track Basti Mehal to Phugla U/C 160 50000 500 90-Days Barot Mundwani. 1000000 Providing & laying of water supply pipe Suka Chur to Opra, 161 Nala to Mar Sar and installation sub mercible pump at 1000000 50000 500 90-Days Gulnokh, Basti Korh U/C Fazla Kuch Construction of jeepable track Marunj Duff to Kachi Wanga 162 50000 500 90-Days U/C Fazla Kuch. 1000000 Construction of jeepable track Sallari to Marave Basti Malghani, Khinay wit to Admani Thokh, Johlo Tak to Sharqi 163 Khalo Mouza Dumbar, from Pheer Tak Ali to Kandha 1000000 50000 500 90-Days graveyard, Soling Basti Hamzani.U/C Barthi 164 Repair of water Supply Scheme Zain U/C Barthi. 245000 12250 500 60-Days Construction of jeep able Track Basti Aziz Buzdar U/C Barthi 165 100000 5000 500 60-Days

Installation of hand pumps at Basti Mat & Phuglo U/C Barthi 166 500000 25000 500 60-Days

167 Installation of Hand pumps in U/C Barthi 864000 43200 500 60-Days Construction of jeepable track from Dahar to Jaroo U/C Barthi 168 875000 43750 500 60-Days

Construction of jeepable track Gawalagh Gur to Marsar, 169 Durmat to Karisar and Karisar to Dub Ghoray Vail U/C Tehkar 1000000 50000 500 90-Days

Construction of jeepable track Kandha Graveyard to Basti Gari 170 25000 500 60-Days tak U/C Tehkar 500000 Construction of jeepable tracks Choki Tak via Rojha to Mubaraki Sandh, Mat Chandia To Baghul Chur Via Graveyard, 171 Repair of Jeep able Track Dar Sar To Shatrat To Lophanidaf 1000000 50000 500 90-Days U/C Mubarki. Construction of Drain, Concerte Flooring, Basti Kharar Buzdar 172 55000 500 90-Days U/C Mubarki. 1100000 Laying of pipe line , water supply scheme kashoba, Const. of 173 Kacha Jeep Able Track at Jogiani Tak, Shaheed Tak U/C 1000000 50000 500 90-Days Tuman Khosa. Installation of Hand Pumps at Sari Road, Basti Jameel, Basti Ghulam Hussain , Constt: of Jeepable Track from Sari Nala 174 To Basti Ramdani U/C Tuman Leghari Zareen. 1000000 50000 500 90-Days

Construction of Water Tank and laying of Pipe Line U/C 175 50000 500 90-Days Tuman Leghari Bala. 1000000 Renovation of offices Chairman Block 176 1300000 65000 500 60-Days

177 Renovation of Offices Chief Officer Block 1400000 70000 500 60-Days Providing and laying of Sewer System and construction of drain soling at basti musa khan khosa, Chah Sahib Ram Wala, 178 Mouza Churhatta Kot Haibat, U/C Churhatta Kot Haibat. 700000 35000 500 60-Days Providing Laying R.C.C Slaib On culvert (i) at Belay Wala,(ii) at 179 baghay wala, const. culvert Rohail wala, U/C Chabari Bala. 285000 14250 500 60-Days

180 Repair of RWSS Thul Allo U/C Thul Allo 500000 25000 500 60-Days Laying of sewerage pipe line office District Council, D.G. Khan. 181 400000 20000 500 60-Days

Upgradation of Sound System District Council Hall, District 182 Council D.G.Khan 1000000 50000 500 60 Days Construction of Drain , Soling Basti Mungla U/C Jhoke Bodo 183 500000 25000 500 60 Days 08-01-2018 05-01-2017 Up Receipt 12:00 Construction of Soling from Manka Canal to Basti Master 184 to 12:00 Pm pm Opening Muhammad Ibrahim Talpur U/c Nawan Junabi 500000 25000 01:00 pm Construction of Bridge at Dhora Saim Nala , Chah Baghay 185 Wala Mouza Chabri Bala Sharqi Basti Malik Umer Bubar U/C 800000 40000 500 60 Days Chabri Bala Construction of soling , culverts, basti allah dad lashari, chara kaper shah, basti lashari to lohar wala,memori paighan road to 186 basti Ghulam Hussain khosa mouza bandoni u/c Mamori 500000 25000 500 60 Days

Construction of ponds , Soling Basti Muhammad Ali Jarani 187 U/C Tuman Leghari zareen Basti Hassan Khan Jarani U/c 500000 25000 500 60 Days Tuman Leghari Bala Bore for water supply scheme Basti Ibrahim Bakhar wah gharbi 188 U/c Bakhar wah 500000 25000 500 60 Days Construction of V.R Bridge at lower Manka oppst.Al- Eman 189 Public School U/C D.J. Khan Gharabi 437300 21865 500 60 Days

Construction of Drain , Soling Basti Tibbi Qasrani,U/c Tibbi 190 Qasrani 1000000 50000 500 60 Days

Construction of Soling,Culverts , Janza gah Basti Moga U/C 191 Kalo Wala 500000 25000 500 60 Days

Construction of soling chara Basti Nokhaf BlouchU/c Mutfariq 192 chahan 200000 10000 500 60 Days Construction of soling chara Basti Pahandi khan Blouch U/c 193 Mutfariq chahan 300000 15000 500 60 Days Laying of Tuff Tile Paver at nawan shar from Dera Sardar Riaz 194 Khan to Jama Masjid Nawan Shar U/c Mutfariq Chahan 500000 25000 500 60 Days

Construction of soling at Basti Rahim Bakhsh Buzdar Chak Bkhar, Raheem Buzdar, Eissa Khan, Ghulam Fareed Changwani,Tagia Khan ramdani, abid khan ramdani, Basti Noor Muhammad Hajbani,Rafiq Ahmad Gabool, Abdul Rahman Gabool, Tahir Hajbani,Construction of culverts Basti Bagho Buzdar,Haji Meva khan , Mukhtar Hussain, Aman Ullah 195 Hajbani, Abdul Kareem Gabool, Wahid Bakhsh, Rahim 1000000 50000 500 60 Days Bakhsh, Laying of Tuff Tile streets Abdullah khan ALyani , Irfan Hussain Bhutta Mouza Chak Jloher u/c Mutfarq chahan / Chahan.

Construction of Drains , Soling from Masoo wah to Majeed 196 Abad U/c Panghrain 2000000 100000 500 60 Days 08-01-2018 05-01-2017 Up Receipt 12:00 Construction of Drains , Soling Basti Hadwar U/c Maghrotha 197 1000000 50000 500 60 Days to 12:00 Pm pm Opening 01:00 pm 198 Laying of Tuff Tile at anari U/c Tuman Leghari Bala 500000 25000 500 60 Days Note: Tender Forms for Schemes Mentioned from S/No 1 To 100 will be issued up to 23-12-2017 and Received & Opened on 26-12-2017 . Where as schemes from S/No 101 to 107 be issued up to 29-12-2017 and Received & Opened on 01-01-2018.where as schemes from S/No 108 To 198 be issued up to 05-01-2018 , and Received & Opened on 08-01-2018.

Endst. No. ______Dated.______/2017

A copy is forwarded for information to the:-

1. Residant Deputy Director Audit & Accounts District Council D.G.Khan. 2. District Officer (Finance) District Council D.G.Khan. 3.The Deputy Director LG&CD D.G.Khan. 4. ADLG(HQ) LG&CD D.G.Khan . 5. Head Clerk, O/o the District Officer (I&S) District Council D.G.Khan. He is directed to upload Tender Notice on PPRA website.

Furmaish Ali Ch. Sardar Abdul Qadir Khan Khosa Chief Officer Chairman District Council D.G.Khan District Council D.G.Khan