SOLTRANS ACRONYMS LIST OF TRANSPORTATION TERMS Last Updated: April 11, 2019 Solano County Transit

A MPO Metropolitan Planning Organization ABAG Association of Bay Area Governments MTC Metropolitan Transportation Commission ADA Americans with Disabilities Act N, O, & P APC Automatic Passenger Counter NEXT National Express Transit APTA American Public Transit Association NTD National Transit Database AVL Automated Vehicle Location System O&M Operations and Maintenance B PAC Public Advisory Committee BAFO Best and Final Offer PARS Public Agency Retirement Services BART PCC Paratransit Coordinating Council C PNR Park & Ride CalACT California Association for Coordinated PPP (3P) Public Private Partnership Transportation PY Prior Year CalOES California Office of Emergency Services R & S CalSTA California State Transportation Agency RFP Request for Proposals Caltrans California Department of Transportation RM2 Regional Measure 2 Funds CAM Cost Allocation Model RM3 Regional Measure 3 Funds CARB California Air Resources Board RVH Revenue Vehicle Hours CNG Compressed Natural Gas RVM Revenue Vehicle Miles COA Comprehensive Operational Analysis SRTP Short Range Transit Plan COV City of Vallejo STA Solano Transportation Authority CTA California Transit Association STAF State Transit Assistance Fund CTC California Transportation Commission T CTSA Consolidated Transportation Services TAC Technical Advisory Committee Agency TCP Transit Capital Priorities D TDA Transportation Development Act DAR Dial-a-Ride TIP Transportation Improvement Program DBE Disadvantaged Business Enterprise TNC Transportation Network Company DOT Department of Transportation U, V, W, Y E & F UA or UZA Urbanized Area FAST Fairfield and Suisun Transit VMT Vehicle Miles Traveled FAST Act Fixing America's Surface Transportation Act VTC Vallejo Transit Center FHWA Federal Highway Administration WETA Bay Area Water Emergency FTA Federal Transit Administration Transportation Authority FY Fiscal Year YTD Year to Date G, H, I, & J GFI Gen-fare Industries Farebox GPS Global Positioning System HOV High Occupancy Vehicle IFB Invitation for Bid JPA Joint Powers Authority L & M LCTOP Low Carbon Transit Operations Program LoNo Low or No Carbon emissions MCI Motor Coach Industries MOD Mobility on Demand MOU Memorandum of Understanding

SR 37/Fairgrounds Drive SolanoExpress Stops

PRESENTED TO THE SOLTRANS BOARD ON NOVEMBER 21, 2019 Old SolanoExpress Service • Route 85 – Connected Vallejo Transit Center with Fairfield Transit Center and served Six Flags Discovery Kingdom •Route 80 – Connected Vallejo Transit Center with El Cerrito Del Norte BART Station in Richmond New Service Red Line–Combines old Routes 80 & 85

•Exits SR 37 then picks up passengers at On-Ramps to provide Express Service for Six Flags/North Vallejo •Eliminates travel on Local Roads (Express travel on SR 37 and SR 29 to Vallejo Transit Center) New Service

Current and Projected Average Weekday Ridership 8000 7300 6600 7000 6100 6200 6000 5000 4200 4000 3000 2000 1000 0 2018 2020 2025 2030 2035 Average Weekday Ridership

Projected 20% Increase 2020-2035 SIX FLAGS/NORTH VALLEJO (SR 37/Fairgrounds Drive On-Ramp Stops)

CURRENT DAILY RIDERSHIP

Mon Tue Wed Thu Fri Sat Total

WB 94 56 75 54 60 82 421

EB 101 159 139 104 114 104 721

Total 195 215 214 158 174 186 1,142 Solano Countywide Parking Demand Study and Mode Transition Plan The Solano Parking Demand Study will analyze the current supply and future needs for parking at or near Transit Facilities of Regional Significance in Solano County. As a component of this Study, STA has hired a consultant who will: • Analyze Transit Parking Demand near the new SolanoExpress stops and potential new Park-and-Ride Lot on Fairgrounds Drive • Survey potential sites for a potential park-and-ride lot near the new SolanoExpress stops on Fairgrounds Drive/SR 37, with consideration to Solano County’s Solano 360 proposed development and Six Flags expansion plans. • Estimate the annual cost for the Operation and Maintenance (O&M) of the new or improved parking facilities annually, and over a 10-year period. Westbound Stop Eastbound Stop SIX FLAGS/NORTH VALLEJO (SR 37/Fairgrounds Drive On-Ramp Stops) IMPROVEMENTS: •Reconfigure WB On-Ramp; New signal and Bus Stop •Provide New Pedestrian Crossing across Fairgrounds Dr at EB Ramps •Construct EB On-Ramp Bus Stop SCHEDULE AND COST: •Began Construction March 2019 •Opened for Service July 1, 2019 •Final Construction Cost Approx $900,000 (still closing final CCOs) Legend: = Bus Stops SR37 @ Fairgrounds Dr. Bike/Ped and = Bike/Ped = Landscape Landscape Improvements

Project Schedule Update: - Bus Stops Complete - Bike/Ped/Landscape Construction Summer 2020 SIX FLAGS/NORTH VALLEJO (SR 37/Fairgrounds Drive Interchange Improvement Project)

Project Design SCHEDULE AND COST: •Caltrans Approval of Conceptual Design Geometrics – Spring 2020 •Submittal of 65% PS&E – Fall 2020 •R/W Dedication Activities w Solano County/City of Vallejo – 2021 •Ready for Construction (Pending RM3 $ and STIP $)- end 2021