Atlas Secondary and Dual Payload Accommodations

Total Page:16

File Type:pdf, Size:1020Kb

Load more

2006 AIAA/USU Small Satellite Conference AtlasAtlas SecondarySecondary andand DualDual PayloadPayload AccommodationsAccommodations August 17, 2006 Gerard Szatkowski 17 August 2006 1 Atlas V Family Evolution 2006 AIAA/USU Small Satellite Conference • Improving performance & reliability • Improving primary & secondary accommodations 17 August 2006 2 EELV Secondary Payload Adapter (ESPA) 2006 AIAA/USU Small Satellite Conference • Produced by CSA Engineering Inc. Mountain View Ca www.csaengineering.com • 1st Flight is STP-1 scheduled for Nov 2nd 2006 • a Primary and 5 SPs – Orbital Express (primary) with MidStar-1 at 492km circular, 46 deg incl – NPSAT1, STPSat-1, CFE, FalconSat-3 at 560km circular, 35.4 deg incl 17 August 2006 3 Integrated Payload Carrier (IPC) 2006 AIAA/USU Small Satellite Conference • Comprised of a C-22 Adapter, ESPA Ring, and a C-29 Adapter • Can use a D1666 Separation System • Selected for the LRO Mission 17 August 2006 4 Secondary Payload Carrier (SPC) 2006 AIAA/USU Small Satellite Conference • SPC Platforms on an ESPA Ring provides vertical loads to SPs Separate, ∅591-mm (∅23 ¼-in.) Separation System Interface Removable Platforms Enable ∅381-mm (∅15-in.) ESPA Equivalent Separation System Interface Easier SP Fit Checks ESPA Ring 1 to 4 Removable & Interchangeable Platforms Can Be Located at Either of 2 Elevations Aluminum Construction Platform Upper Panel Easily Modified for Nonstandard Interface 1 to 4 Volumes Measuring 76x76x76 cm (30x30x30 in.) or More Half- Pegasus Equivalent Volume Rectangular Volume Exceeds STS SHELS Volume 1 to 4 Secondary Payloads at Up to 200-kg Each Interchangeable Bolt Patterns Enable Dual Platform Positions Common Atlas Payload Adapter Interface Top & Bottom 17 August 2006 5 SPC Configurations 2006 AIAA/USU Small Satellite Conference 4-m Fairing Primary Payload Separation Ring 4-m Diameter Large Payload C-29 Adapter Fairing (LPF) Upper Deck 2 PL (Located To Avoid 4-m Primary Payload Fairing Jettison Sweep Zones) C-13 Adapter Centaur Forward Adapter Jettison Sweep Zone (2 Pl) 5-m Fairing 5.4-m Short Payload Fairing Lower Deck Primary 4 PL Payload C-22 Adapter SPC with 4 SPs 17 August 2006 6 IPC with Internal Payload 2006 AIAA/USU Small Satellite Conference • The IPC can accommodate an Internal Payload and separation system allowing for various combinations of SP sizes, & masses 76 cm (30 in.) D1666 VS Payload Separation Ring (PSR) 76 cm 76 cm ESPA SP SP (30 in.) (30 in.) C-13 Adapter 1,524 mm (60.0 in.) I.D. Centaur Forward Adapter Allowable SP Diameter When Mounted on the IPC B1194VS Payload Primary Payload D1666VS B1194VS Separation Ring NASA 76-cm Separation System (30-in.) Cube C-29 Adapter 3PL Separating SP Ø1219 mm (Ø48 in.) Ø762 mm (Ø30 in.) Nonseparating SP Ø1372 mm (Ø54 in.) Ø1372 mm (Ø54 in.) Two SPC Platforms IPC 17 August 2006 7 Secondary Payload Accommodations 2006 AIAA/USU Small Satellite Conference . Secondary Payload Carrier (SPC) Internal Payload Carrier (IPC) Mass Dimensions No. of SPs Command Telemetry Mass Dimensions SP Qty Command Telemetry SPC 200 kg 76x76x115 cm Up to 4 SPs 1 Primary & 1 1 Separation Baseline per SP or on SPC Redundant Verification Capability (440 lb) 61x162x115 cm Separation Signal per SP or Signal per SP Ø97x115 cm IPC 200 kg Minimum 1 SP per IPC 1 Primary & 1 1 Separation Baseline per SP Ø76x76 cm Redundant Verification Capability (440 lb) Separation Signal per SP Signal per SP Baseline Capabilities Presented Can Be Incrementally Enhanced 17 August 2006 8 Type-C Carrier (TCC) 2006 AIAA/USU Small Satellite Conference C-22 Adapter flies on every Atlas launch Can carry up to 6 Carrier Plates Each Carrier Plate can hold 150 lbs Can use pPods Dispensers or other systems Cube Sat (from CalPoly) pPod Dispenser (from CalPoly) [email protected] 303-977-5066 17 August 2006 9 Dual Spacecraft Carrier (DSC) 2006 AIAA/USU Small Satellite Conference • Uses 4M fairing to accommodate smaller payloads • Support structure uses existing hardware 17 August 2006 10 m3 : ATLAS MS7M3 - Go Atlas / Go Centaur : kwcope : /pa Dual Payload Carrier (DPC) 2006 AIAA/USU Small Satellite Conference • 5.4 m Medium Payload Fairing • Forward Primary Spacecraft and Adapter • Atlas V Dual Payload Carrier (DPC) • Dispenser Forward Load Reactor DPC Truss • Aft Primary or Secondary Structure Payload and Adapter • Mini/microsat Secondary Payloads • Secondary Payload Carrier (SPC) DPC Provides Additional Flexibility for Dual/Secondary Payload Manifesting 17 August 2006 11 DPC and IPC Provide Range of Options 2006 AIAA/USU Small Satellite Conference TLAS MS7M3 - Go Atlas / Go Centaur : kwcope : /pa Multiple SPs in the 4-m LargerMS7M3 - Go SP Atlas in / Go the Centaur DPC : kwcope w :i /path Primary or secondary ATLAS MS7M3Dual - Go Manif Atlas / Goe stCentaur Spacecraft : kwcope : /pa payload fairing under the the 5.4-m payload fairing payload and multiple SPs using the DPC with the ATLAS MS7M3 prima- Go Atlas / rGoy Centaur pay : lkwcopeoad : /pa using both the DPC and SPC 5.4-m payload fairing with the 5.4-m PLF 17 August 2006 12 Aft-Bulkhead Carrier (ABC) 2006 AIAA/USU Small Satellite Conference • Used for pPod type dispenser systems • Uses existing space in Centaur Aft-Bulkhead • Uses existing attachment fittings • Does not interfere with primary mission separation sequence 17 August 2006 13 X-ternal Payload Carrier (XPC) 2006 AIAA/USU Small Satellite Conference • Used for sub-orbital, hypersonic, or orbital (w/ kick motor) experiments • Uses existing attachments to the booster w/ strong-back • 750 cubic feet volume to 350,000 ft altitude, speed of Mach 14, 0-G separation 17 August 2006 14 SP Integration Flow 2006 AIAA/USU Small Satellite Conference Integrate Secondary L-27 mo NLT L-10 mo NLT L-9.5 mo Secondary Payloads to IPC Primary SP Mission Combined Payloads Mission Mission Service Receipt at ATP Award Integration Kick Off Launch Site NLT L-60 Days NLT L-16 mo NLT L-13 mo Secondary Payload Mission Compatibility Feasibility Study Study Primary Integrate Payload Primary & Integration Secondary Primary Payloads Payload Receipt at Launch Site Encapsulate Payloads Encapsulated P/L Hoist & Mating Ops PLF Roll Vehicle to Receipt Launch Pad Integrated Launch Vehicle Testing Transport Encapsulated Payloads To VIF Launch Encapsulated P/L 17 August 2006 Hoist & Mating Ops 15 Pre-Engineering & Integration in Denver 2006 AIAA/USU Small Satellite Conference • Centaur Avionics & Gnd umbilicals simulator for electrical C/O • Payload Adapters (C-adapters, ESPA, XPC) for match-mate • 4 and 5M Fairing Access Doors w/ CFLR decks for fit checks • Centaur Tank & Aft Boat-tail for access checks • Gnd Control & Telemetry data processing for data compatibility [email protected] 303-977-5066 17 August 2006 16.
Recommended publications
  • ESPA Ring Datasheet

    ESPA Ring Datasheet

    PAYLOAD ADAPTERS | ESPA ESPA THE EVOLVED SECONDARY PAYLOAD ADAPTER ESPA mounts to the standard NSSL (formerly EELV) interface bolt pattern (Atlas V, Falcon 9, Delta IV, OmegA, Vulcan, Courtesy of Lockheed Martin New Glenn) and is a drop-in component in the launch stack. Small payloads mount to ESPA ports featuring either a Ø15-inch bolt circle with 24 fasteners or a 4-point mount with pads at each corner of a 15-inch square; both of these interfaces have become small satellite standards. ESPA is qualified to carry 567 lbs (257 kg), and a Heavy interface Courtesy of NASA (with Ø5/16” fastener hardware) has been introduced with a capacity of 991 lbs (450 kg). All small satellite mass capabilities require the center of gravity (CG) to be within 20 inches (50.8 cm) of the ESPA port surface. Alternative configurations can be accommodated. ESPA GRANDE ESPA Grande is a more capable version of ESPA with Ø24-inch ports; the ring height is typically 42 inches. The Ø24-inch port has been qualified by test to Courtesy of ORBCOMM & Sierra Nevada Corp. carry small satellites up to 1543 lb (700 kg). ESPA ESPA IS ADAPTABLE TO UNIQUE MISSION REQUIREMENTS • The Air Force’s STP-1 mission delivered multiple small satellites on an Atlas V. • NASA’s Lunar Crater Observation and Sensing Satellite (LCROSS): ESPA was the spacecraft hub for the LCROSS shepherding satellite in 2009. • ORBCOMM Generation 2 (OG2) launched stacks of two and three ESPA Grandes on two different Falcon 9 missions and in total deployed 17 satellites.
  • Spaceflight, Inc. General Payload Users Guide

    Spaceflight, Inc. General Payload Users Guide

    Spaceflight, Inc. SF‐2100‐PUG‐00001 Rev F 2015‐22‐15 Payload Users Guide Spaceflight, Inc. General Payload Users Guide 3415 S. 116th St, Suite 123 Tukwila, WA 98168 866.204.1707 spaceflightindustries.com i Spaceflight, Inc. SF‐2100‐PUG‐00001 Rev F 2015‐22‐15 Payload Users Guide Document Revision History Rev Approval Changes ECN No. Sections / Approved Pages CM Date A 2011‐09‐16 Initial Release Updated electrical interfaces and launch B 2012‐03‐30 environments C 2012‐07‐18 Official release Updated electrical interfaces and launch D 2013‐03‐05 environments, reformatted, and added to sections Updated organization and formatting, E 2014‐04‐15 added content on SHERPA, Mini‐SHERPA and ISS launches, updated RPA CG F 2015‐05‐22 Overall update ii Spaceflight, Inc. SF‐2100‐PUG‐00001 Rev F 2015‐22‐15 Payload Users Guide Table of Contents 1 Introduction ........................................................................................................................... 7 1.1 Document Overview ........................................................................................................................ 7 1.2 Spaceflight Overview ....................................................................................................................... 7 1.3 Hardware Overview ......................................................................................................................... 9 1.4 Mission Management Overview .................................................................................................... 10 2 Secondary
  • Commercial Orbital Transportation Services

    Commercial Orbital Transportation Services

    National Aeronautics and Space Administration Commercial Orbital Transportation Services A New Era in Spaceflight NASA/SP-2014-617 Commercial Orbital Transportation Services A New Era in Spaceflight On the cover: Background photo: The terminator—the line separating the sunlit side of Earth from the side in darkness—marks the changeover between day and night on the ground. By establishing government-industry partnerships, the Commercial Orbital Transportation Services (COTS) program marked a change from the traditional way NASA had worked. Inset photos, right: The COTS program supported two U.S. companies in their efforts to design and build transportation systems to carry cargo to low-Earth orbit. (Top photo—Credit: SpaceX) SpaceX launched its Falcon 9 rocket on May 22, 2012, from Cape Canaveral, Florida. (Second photo) Three days later, the company successfully completed the mission that sent its Dragon spacecraft to the Station. (Third photo—Credit: NASA/Bill Ingalls) Orbital Sciences Corp. sent its Antares rocket on its test flight on April 21, 2013, from a new launchpad on Virginia’s eastern shore. Later that year, the second Antares lifted off with Orbital’s cargo capsule, (Fourth photo) the Cygnus, that berthed with the ISS on September 29, 2013. Both companies successfully proved the capability to deliver cargo to the International Space Station by U.S. commercial companies and began a new era of spaceflight. ISS photo, center left: Benefiting from the success of the partnerships is the International Space Station, pictured as seen by the last Space Shuttle crew that visited the orbiting laboratory (July 19, 2011). More photos of the ISS are featured on the first pages of each chapter.
  • ULA Rideshare Capabilities for Providing Low-Cost Access to Space

    ULA Rideshare Capabilities for Providing Low-Cost Access to Space

    United Launch Alliance Rideshare Capabilities for Providing Low-Cost Access to Space Keith Karuntzos United Launch Alliance PO Box 3788, MIS C4102 Centennial, CO 80155-3788 303-269-5499 [email protected] Abstract-United Launch Alliance (ULA) has a long history of REFERENCES ••••••••••••••••••••••••••••••••••••••••••••••••••••••••• 9 providing launch services to high-value payloads for a variety BIOGRAPHY •••••••••••••••••••••••••••••••••••••••••••••••••••••••••• 9 of customers, including the US Department of Defense, the National Reconnaissance Office, NASA, and commercial customers. These missions have deployed a wide variety of capabilities into Earth orbit and beyond, such as navigation, 1. VVHAT IS RIDESHARE? communication, R&D, observation, and science, all which have Since the dawn of the space age, spacecraft have often provided us with a tremendous amount of knowledge about Earth and our solar system. The majority of these spacecraft shared launch services with one another while being has been launched as primary payloads, and used the full delivered into space. This approach has normally been done capability of the launch vehicle; yet there is a lower-cost to support spacecraftmuch smaller than the primary payload alternative for achieving similar mission objectives: rideshare. it is launching with. By designing launch services in this manner, spacecraft operators were able to deliver more Rideshare is the approach of sharing available launch vehicle payloads to orbit for a fraction of the cost of a full-up launch performance and volume margins with two or more spacecraft service. that would otherwise go underutilized by the spacecraft community. This allows spacecraft customers the opportunity This method of launching multiple payloads into orbit on a to get their spacecraft to orbit and beyond in an inexpensive single launch vehicle is called rideshare.
  • Small Satellite Access to ESPA Standard Service

    Small Satellite Access to ESPA Standard Service

    SSC10-IX-1 Small Satellite Access to ESPA Standard Service Mr. Ted Marrujo DoD Space Test Program (STP), Mission Design 3548 Aberdeen Ave. SE, Kirtland AFB NM 87117; (505) 853-3338 Ted. [email protected] Lt Jake Mathis Space and Missile Systems Center, Launch and Range Systems Wing, Engineering 483 N. Aviation Blvd, Los Angeles AFB, CA; (310) 653-3392 [email protected] Mr. Caleb C. Weiss United Launch Alliance, Mission Integration 12257 S. Wadsworth Blvd, TSB-B7140, Littleton, CO 80125; (303) 977-0843 [email protected] ABSTRACT The DoD Space Test Program (STP), the Air Force Launch and Range Systems Wing (LRSW), and United Launch Alliance (ULA) are teaming up to provide a rideshare service to small satellites (<400lb) using an Evolved Expendable Launch Vehicle (EELV) Secondary Payload Adapter (ESPA). This rideshare service is an opportunity on EELV missions with margin to carry auxiliary payloads (APLs). This paper will define the ESPA, the standard rideshare service provided to APLs, and how APLs can access this service. We will discuss the roles and responsibilities the different government organizations, ULA, and the small satellite provider have in accessing and implementing ESPA Standard Service. In brief, ULA builds the EELV and performs the launch service, LRSW is responsible for developing and acquiring EELVs from ULA, and STP is responsible for identifying and manifesting APLs that meet ESPA Standard Service requirements. We will further define the processes and procedures required to implement ESPA Standard Service to include: how a particular EELV mission is selected to host ESPA Standard Service, the selection process for auxiliary satellites to utilize the capability, the requirements and timelines small satellites must meet to qualify, and the scope of services provided by ULA as part of Standard Service.
  • Paper Session I-A - Risks and Trade-Offs for Unproven Launch Vehicles

    Paper Session I-A - Risks and Trade-Offs for Unproven Launch Vehicles

    1997 (34th) Our Space Future - Uniting For The Space Congress® Proceedings Success Apr 29th, 2:00 PM Paper Session I-A - Risks and Trade-Offs for Unproven Launch Vehicles Philip Chien Earth News Follow this and additional works at: https://commons.erau.edu/space-congress-proceedings Scholarly Commons Citation Chien, Philip, "Paper Session I-A - Risks and Trade-Offs for Unproven Launch Vehicles" (1997). The Space Congress® Proceedings. 7. https://commons.erau.edu/space-congress-proceedings/proceedings-1997-34th/april-29-1997/7 This Event is brought to you for free and open access by the Conferences at Scholarly Commons. It has been accepted for inclusion in The Space Congress® Proceedings by an authorized administrator of Scholarly Commons. For more information, please contact [email protected]. Risks and Tradeoffs for Unproven Launch Vehicles © Copyright 1997 Philip Chien, Earth News Philip Chien Earth News 252 Barton Blvd #1201 Rockledge, Fl 32955 (407)-639-7138 E-Mail: [email protected] Abstract: AMSAT, The Radio Amateur Satellite Corporation, has launched over 30 amateur radio satellites. Most have flown as piggyback payloads where excess payload capacity was not required. Many have flown as test payloads for new launch vehicles on their test flights. The Phase 3-D satellite is scheduled for launch in the second half of 1997 as the primary payload for the Ariane 502 launch vehicle. This paper will discuss the risks and tradeoffs associated with flying on an unproven launch vehicle, insurance issues, and past successes and failures for those 30 satellites. AMSAT has always relied on the kindness of the aerospace industry.
  • 2013 Commercial Space Transportation Forecasts

    2013 Commercial Space Transportation Forecasts

    Federal Aviation Administration 2013 Commercial Space Transportation Forecasts May 2013 FAA Commercial Space Transportation (AST) and the Commercial Space Transportation Advisory Committee (COMSTAC) • i • 2013 Commercial Space Transportation Forecasts About the FAA Office of Commercial Space Transportation The Federal Aviation Administration’s Office of Commercial Space Transportation (FAA AST) licenses and regulates U.S. commercial space launch and reentry activity, as well as the operation of non-federal launch and reentry sites, as authorized by Executive Order 12465 and Title 51 United States Code, Subtitle V, Chapter 509 (formerly the Commercial Space Launch Act). FAA AST’s mission is to ensure public health and safety and the safety of property while protecting the national security and foreign policy interests of the United States during commercial launch and reentry operations. In addition, FAA AST is directed to encourage, facilitate, and promote commercial space launches and reentries. Additional information concerning commercial space transportation can be found on FAA AST’s website: http://www.faa.gov/go/ast Cover: The Orbital Sciences Corporation’s Antares rocket is seen as it launches from Pad-0A of the Mid-Atlantic Regional Spaceport at the NASA Wallops Flight Facility in Virginia, Sunday, April 21, 2013. Image Credit: NASA/Bill Ingalls NOTICE Use of trade names or names of manufacturers in this document does not constitute an official endorsement of such products or manufacturers, either expressed or implied, by the Federal Aviation Administration. • i • Federal Aviation Administration’s Office of Commercial Space Transportation Table of Contents EXECUTIVE SUMMARY . 1 COMSTAC 2013 COMMERCIAL GEOSYNCHRONOUS ORBIT LAUNCH DEMAND FORECAST .
  • Space Test Program

    Space Test Program

    The Space Congress® Proceedings 1973 (10th) Technology Today and Tomorrow Apr 1st, 8:00 AM Space Test Program Neal T. Anderson Project Officer, HQ SAMSO/Spaee Test Program, Los Angeles, CA 90009 Follow this and additional works at: https://commons.erau.edu/space-congress-proceedings Scholarly Commons Citation Anderson, Neal T., "Space Test Program" (1973). The Space Congress® Proceedings. 4. https://commons.erau.edu/space-congress-proceedings/proceedings-1973-10th/session-6/4 This Event is brought to you for free and open access by the Conferences at Scholarly Commons. It has been accepted for inclusion in The Space Congress® Proceedings by an authorized administrator of Scholarly Commons. For more information, please contact [email protected]. SPACE TEST PROGRAM Neal T. Anderson, Capt, USAF Project Officer HQ SAMSO/Spaee Test Program Los Angeles, CA 90009 ABSTRACT The Department of Defense Space Test Program is a certain operational payloads. The only limitation unique organization dedicated to stimulating space- on this charter is that the payloads must not be related technology by providing launch and orbital authorized their own means of spaceflight. The support for research and development payloads. Program was never intended to be a launch agency This paper delineates program management techniques, for the large space programs. past accomplishments, and current activities. The benefit to the DOD is discussed. To achieve this objective a governing philosophy was established which required the Program to: INTRODUCTION • be comprehensive in scope In large measure the military power of the United • select and support the most States depends upon the possession of space systems beneficial payloads which are products of superior technology.
  • Microspacecraft Secondary Payload Launch

    Microspacecraft Secondary Payload Launch

    • SSC97-IX-3 • Microspacecraft Secondary Payload Launch Capabilities • & Mission Possibilities Joel Rademacher • Jet Propulsion Laboratory California Institute of Technology 4800 Oak Grove Drive, MIS 301-485 • Pasadena, CA 91109-8099 818-354-6740 • [email protected] • Kim Leschly Jet Propulsion Laboratory California Institute of Technology • 4800 Oak Grove Drive, MIS 301-485 Pasadena, CA 91109-8099 • 818-354-3201 • [email protected] • Abstract. Worldwide secondary payload launch capabilities and future opportunities have been studied at the Jet Propulsion Laboratory (JPL) as a part of planning future microspacecraft missions. Launch vehicles which have been identified as having near-term secondary payload opportunities for launching microspacecraft include; Delta II, • Ariane 5, Atlas II - Centaur, Space Shuttle, Pegasus, Taurus, HIIA, Molniya, Proton, and Cosmos. Interface requirements and contact information have been identified for these. The secondary payload launch capabilities are summarized and missions which have been proposed or are currently under study are described for some of these • opportunities. Several types of microspacecraft missions can be accomplished with secondary payloads. We have studied several mission concepts at JPL including advanced technology demonstration platforms, a constellation of • climate monitoring microspacecraft, low-cost university technology demonstration platforms, a Medium Earth Orbit (MEO) technology validation platform, and the use of Geosynchronous Transfer Orbit (GTO) for deep space • trajectory missions. Backeround • If a specific launch vehicle is not included in this Data presented in this paper have been taken from paper, it is not to say that a secondary payload • contractor sources, National Aeronautics and Space capability does not exist on that vehicle.
  • Suborbital Reusable Vehicles: a 10-Year Forecast of Market Demand

    Suborbital Reusable Vehicles: a 10-Year Forecast of Market Demand

    Suborbital Reusable Vehicles: A 10-Year Forecast of Market Demand This study was jointly funded by the Federal Aviation Administration Office of Commercial Space Transportation and Space Florida. Suborbital Reusable Vehicles: A 10-Year Forecast of Market Demand Table of Contents Executive Summary .................................................................... 1 Suborbital Reusable Vehicles: A 10-Year Forecast of Market Demand . 9 Purpose of the Forecast . 10 Methodology . 10 Suborbital Reusable Vehicles . 13 Market Analysis . 17 Suborbital Reusable Vehicle Markets . 18 Commercial Human Spaceflight . 21 Basic and Applied Research . 37 Aerospace Technology Test and Demonstration . .49 Media and Public Relations . 55 Education . 61 Satellite Deployment . 69 Remote Sensing . 75 Point-to-Point Transportation . 79 Forecast . 83 Demand by Market . 84 Demand by Type of User . 86 Type of SRV Payload . 88 Revenue . 88 Summary of Major Uncertainties . 89 Limited Awareness of SRVs . 90 Conclusion . 91 i The Tauri Group List of Figures Figure 1: SRV market definitions . .2 Figure 2: Total SRV forecast by market and scenario . 4 Figure 3: Possible trends over time -- Individual demand for Commercial Human Spaceflight . .4 Figure 4: Price elasticity of suborbital tickets for individuals with $5M in investable assets . .5 Figure 5: Enterprise demand and individual demand in baseline case . 6 Figure 6: Enterprise demand by type of payload . 6 Figure 7: Enterprise demand by type of user . 6 Figure 8: Possible reservations trend to meet forecasted demand . .7 Figure 9: 10-year SRV demand forecast . 9 Figure 10: SRV Markets . 11 Figure 11: Forecast process . 13 Figure 12: Status of SRVs . 16 Figure 13: SRV market definitions . 20 Figure 14: Affluent travelers identified a suborbital flight as a trip of a lifetime .
  • Commercial Space Industry Launches a New Phase

    Commercial Space Industry Launches a New Phase

    Commercial Space Industry Launches a New Phase Bill Canis Specialist in Industrial Organization and Business December 12, 2016 Congressional Research Service 7-5700 www.crs.gov R44708 Commercial Space Industry Launches a New Phase Summary Rockets, satellites, and the services they provide, once the domain of governments, are increasingly launched and managed by privately owned companies. Although private aerospace firms have contracted with federal agencies since the onset of the Space Age six decades ago, U.S. government policy has sought to spur innovation and drive down costs by expanding the roles of satellite manufacturers and commercial launch providers. Global spending on space activity reached an estimated $323 billion in 2015. Of this amount, nearly 40% was generated by commercial space products and services and 37% by commercial infrastructure and support industries. The U.S. government—including national security agencies and the National Aeronautics and Space Administration (NASA)—accounted for about 14% of global spending; government spending by other countries was responsible for the remaining 10%. The satellite and launch vehicle supply chains are global, with a small number of manufacturers. In 2015, global satellite manufacturing revenues were $6 billion; launches booked $2.6 billion in revenue. Ground stations—the largest part of the commercial space infrastructure—generated more than $100 billion in revenue, largely from geolocation and navigation equipment. The face of the U.S. space industry is changing with a government shift toward use of fixed price contracts for commercial services, new entrants with new launch products, and an increase in the use of smaller satellites: NASA’s commercial cargo program and other federal contracts are supporting the growth of the commercial launch industry, with less expensive rockets, some of which are planned to be reusable.
  • July 28, 2011 ULA Rideshare Capabilities

    July 28, 2011 ULA Rideshare Capabilities

    July 28, 2011 ULA Rideshare Capabilities Jake Szatkowski Business Development & Advanced Programs Copyright © 2011 United Launch Alliance, LLC. All Rights Reserved. Rideshare Missions ULA's family of expendable launch vehicles has a long history of providing high-value payload accommodations for a variety of customer spacecraft & missions throughout the solar system ULA PLANETARY MISSIONS LAUNCH VEHICLE DESTINATION (Since 2001) DATE Mars Odyssey Delta II 7925 4/7/2001 Mars CONTOUR Delta II 7425 7/3/2002 Comet Mars Rover A (Spirit) Delta II 7925 6/10/2003 Mars Mars Rover B (Opportunity) Delta II 7925H 7/7/2003 Mars MESSENGER Delta II 7925H 8/3/2004 Mercury Deep Impact Delta II 7925 1/12/2005 Comet Mars Reconnaissance Orbiter Atlas V 401 8/12/2005 Mars New Horizons Atlas V 551 1/19/2006 Pluto STEREO Delta II 7925 10/25/2006 Sun (Earth orbit) Phoenix Delta II 7925 8/4/2007 Mars Dawn Delta II 7925H 9/27/2007 Asteroid Belt Lunar Reconnaissance Orbiter Atlas V 401 6/18/2009 Moon Most of these missions were launched as primary payloads and used the full capability of the launch vehicle, but there are lower-cost alternatives for achieving these science objectives July 2011 | 1 Rideshare Concept What is Rideshare? –Sharing available performance and volume margin that would otherwise go unused by the primary payload Advantages to Rideshare –Provides an inexpensive and reliable solution • Cost-savings allows more funding to be applied to the science mission • Rideshare payload receives the benefits of full-up launch service Successfully demonstrated