Investment Opportunities in Public Works and Highways
Total Page:16
File Type:pdf, Size:1020Kb
Investment Opportunities in Public Works and Highways Secretary MARK A. VILLAR Imperial Hotel, Tokyo, Japan February 28, 2017 Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved PHILIPPINES INFRASTRUCTURE BUDGET (Billions and % of GDP) TARGET INFRASTRUCTURE SPENDING 7% of GDP $16.9B P 847.2 B (5.3%) $3.5B FY 2017 P 175.4 B (1.8%) FY 2011 1 US $ - P 49.987 (as of Feb. 20, 2017) Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved SOURCE: www.build.org.ph Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved Traffic Decongestion Program (Construct / widen national roads and bridges; Construct by-passes/diversion roads; Construct flyovers; interchanges and underpasses) Integrated and Seamless Transport System (Construct/improve logistics infrastructure network in Northern Mindanao, Davao, SOCSARGEN and CARAGA (MLIN); Construct/improve roads leading to growth corridors in Western Mindanao; Study and implement Inter-island linkage projects through long-span bridges; Connect gaps along national roads; Construct/replace bridges; Initiate studies on tunneling technology) Public-Private Partnership Program (Augment and complement Locally-Funded and Foreign-Assisted projects; Construct High- Standard Highway Network based on Masterplan and Technical Studies.) Convergence and Rural Road Development Program (Construct/upgrade local access roads to designated tourism destinations, RORO ports / seaports and airports; Construct Farm to Market Roads (FMRs); Construct/improve roads leading to industrial trade corridors.) Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved Livable, Sustainable and Resilient Communities Integrated Water Resources Management Program (Construct/rehabilitate flood mitigation structures along major river basins and principal rivers; Construct water impounding projects to optimize water resources; Construct water supply/septage & sewerage/rain collectors; Upgrade/improve drainage capacity) Disaster Risk Reduction and Climate Change Adaptation Program (Rehabilitate, retrofit and strengthen existing bridges; Provide safe access to highly vulnerable areas; Improve national roads vulnerable to flooding, landslide and slope failure; Build evacuation centers; Upgrade quality standards based on Design Guidelines, Criteria & Standards (DGCS) 2015) Infrastructure Support for Marginalized Sectors (Construct support facilities for marginalized sectors (senior citizens, physically challenged persons, women sector, etc.) Create Environment-Friendly Communities (Build more bike lanes and pedestrian infrastructure.) Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved DPWH FY 2017 INFRASTRUCTURE PROGRAM (Amount in Billion) P107.8 B ($2.2B) Traffic Decongestion Program $8.6B P18.8 B ($0.4B) Convergence and Rural Road Development P428.4B Program (TRIP, ROLL-IT) P95.9 B ($1.9B) Integrated and Seamless Transport System (Includes P31.1 B for Mindanao Logistics FY 2017 Infrastructure Network, MLIN) $1.8B P90.7B P104.4 B ($2.1B) Livable, Sustainable and Resilient Communities FY 2011 1 US $ - P 49.987 (as of Feb. 20, 2017) Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved Traffic Decongestion Program Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved 6.90 km – 4 lane elevated expressway from the end point of NAIA Expressway Phase I to PAGCOR Entertainment City. It will provide access to NAIA Terminals 1, 2 and 3 as well as an interface with the Skyway and Cavitex. Will reduce travel time between Skyway and Terminal 1 from 24 minutes to 8 minutes. Will benefit 80,000 travelers per day. Project Cost: P20.45 B ($409.11 M) Schedule: 2014-2017 Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved Widening/Concreting of 3.24 kilometers section of Radial Road 10 (R-10) into 6 lanes road including lateral and cross drainage. 2,107 Informal Settler Families (ISFs) were relocated and 427 ISFs availed financial assistance. Will reduce travel time between Manila and Navotas City from 1hour to 30 minutes. Project Cost: P378.18 M ($7.56 M) Schedule: 2006-2017 Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved 5.65 km -6 lanes elevated expressway connecting McArthur Highway and C-3. It will utilize the existing PNR railroad tracks that cut across Valenzuela City & Malabon City. Will decongest Metro Manila by providing access to NLEX without passing through EDSA or the Balintawak Toll Plaza and improve movement of cargo between NLEX and Radial Road 10. Project Cost: P9.00 B ($ 180.05 M) Schedule: 2014-2017 Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved 8 km- four lane expressway from C3 Road in Caloocan City to PUP, Sta. Mesa, Manila and will connect to common alignment of Skyway Stage 3. Will reduce travel time between SLEX and NLEX from 1.5 - 2 hours to 15 - 20 minutes. Will reduce travel time between Clark and Calamba from 3 hours to 1 hour and 40 minutes. Will benefit 35,000 travelers per day. Project Cost: P23.30 B ($466.12 M) Schedule: 2018-2020 Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved 14.8km - 6lane expressway that will connect Balintawak, Quezon City to Buendia, Makati Will decongest EDSA and other major roads in Metro Manila (e.g., Quezon Ave., Araneta Ave., Nagtahan, Quirino Ave) by as much as 55,000 vehicles daily. Will reduce travel time from Buendia to Balintawak from 2 hours to 15 to 20 minutes Project Cost: P37.43 B ($748.79M) Schedule: 2015-2018 Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved Construction/widening of two (2) bridges, rehabilitation/concreting of existing 7.46 kms road with provision of additional two lanes, including construction of 2-meter wide planting strips and 3 meter bike lane. Will reduce travel time from Taytay via C-5 to Bicutan from 1 hour to 30 minutes via Laguna Lake Highway. Project Cost: P1.068 B ($21.36 M) Schedule: 2013-2018 Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved 34 kms - 6-lanes expressway from Skyway FTI, Paranaque City to Batasan, Quezon City. Its alignment will connect to Skyway Stage 1 at FTI, towards C5/Diego Silang, going towards Laguna de Bay, intersecting Ortigas extension at Tikling intersection in Antipolo City midway, crossing Marcos Highway and terminating in Batasan Complex. Project Cost: P31.32 B ($626.56 M) Schedule: 2016-2020 Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved 50 expressway that will connect Bataan with Metro Manila and providing direct access to the provinces of Bulacan and Pampanga. City Flood Control in the coastal waters of Navotas City. Coastal Sea Barrier through the northern part of Manila Bay covering the coastal areas of Bulacan, Pampanga and Bataan. Project Cost: P399.66 B ($7,995.28 M) Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved 88.85-km expressway from Tarlac City to Rosario, La Union. Will reduce travel time between Tarlac City and Rosario, La Union from 3.5 hours to 1 hour. Will benefit 20,000 travelers per day. Project Cost: P24.42 B ($488.53 M) Schedule: 2010-2018 Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved 30 km –four lane expressway from Tarlac City to Cabanatuan City, Nueva Ecija. Will reduce travel time between Tarlac City and Cabanatuan City from 70 minutes to 20 minutes. Will benefit 11,200 motorists per day. Decongest traffic by about 48% passing thru Daang Maharlika Project Cost: P14.94 B ($298.88 M) Schedule: 2016-2020 Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved 44.2 km – four lane expressway with 8 interchanges and 12,207 lm bridges (inclusive of 4,618 lm viaduct) Will connect CAVITEX in Kawit, Cavite and SLEX-Mamplasan interchange in Biñan, Laguna. Will reduce travel time between CAVITEX and SLEX from 1.5 hours to 45 minutes Project Cost: P35.68 B ($713.79 M) Schedule: 2017-2020 Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved 56.87 km – 4 lane expressway extension from Sto. Tomas, Batangas to Tayabas / Lucena, Quezon Will facilitate faster and safer travel to Laguna, Batangas, Quezon and Bicol Region. Will reduce travel time from Sto. Tomas, Batangas to Lucena, Quezon from 4 hrs to 1 hour. Will benefit 17,000 travelers per day Project Cost: P13.10 B ($262.07 M) Schedule: 2017-2021 Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved 180 kilometer expressway that will start about two (2) kilometers from the end of the proposed TR-4 project and will end before the start of the proposed Camarines Sur Expressway. To provide a direct and fast route between both provinces, the trade of goods will also prosper not only between Quezon and Bicol but also in the Northern part of Luzon because travel time for trucks will be reduced. Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved Four (4) lane divided underpass along Senator Gil Puyat Avenue passing through the Makati Avenue and Paseo de Roxas intersections. Underpass/Covered tunnel-570m; approaches and At-grade Transition-310m (Length = 880 m) It will relieve traffic congestion along EDSA, Kalayaan Ave and Osmena Highway in Makati City and nearby C-5 Road, Pres Quirino Ave and Roxas Boulevard. Project Cost: P1.01 B ($20.21 M) Schedule: 2015-2018 Copyright 2017 © Department of of Public Works and Highways of the Philippines All Rights Reserved Four (4) lane 2nd level flyover along Gov.