04Chapter of Migration
Total Page:16
File Type:pdf, Size:1020Kb
1 Chapter of Operation: Bringing into Play 16 01 the Project’s Comprehensive Benefits Flood Prevention 18 Drought Relief 19 Navigation Condition Improvement 20 Clean Electricity Supply 21 About This Report Chapter of Construction: Dedication to 22 02 Quality Projects Time Frame First-rate Engineering Design 24 The time frame of the Report is from January 1st, 2012 to December 31st, 2012. Part of the Refined Project Construction 27 29 content is beyond this duration. Accountability in Purchasing on an Overall Scale Publication Cycle Chapter of Environment: Maintaining 30 03 the Ecological Balance of Nature This is an annual report and the third Corporate Social Responsibility Report published by Conservation of Biological Diversity 32 CTG. Contents Sustainable Utilization of Water Resources 37 Promotion of Energy Conservation and Emission 38 References Address 02 Reduction The Report is compiled in accordance with the requirements of the Guidelines of State- Response to Climate Change 39 06 owned Enterprises Directly under the Central Government on Fulfilling Corporate Social About CTG Responsibilities by the State-owned Assets Supervision and Administration Commission of A Brief Introduction to CTG 06 Chapter of Migration: Promotion of 40 the State Council (SASAC), PRC, in reference to the Sustainability Reporting Guidelines Social Responsibility 12 04 Sustainable Development for Migrants (G3.1) of the Global Reporting Initiative (CRI), Writing and Compiling Guidelines of the Management Coordination with the Government and Doing Well in 42 the Resettlement Work Chinese Corporate Social Responsibility Reporting (CASS-CSR2.0) and International Putting Migrants in Heart and Launching Community 43 Guidance on Social Responsibility (ISO 26000:2010). Assistance Supporting Migrants and Helping Them Build Self- 46 Title Description 72 Key Performance reliance and Self-improvement In the Report, “China Three Gorges Corporation” is also referred to as “CTG” and “we”. Table of 2012 Chapter of Employees: Establishment 48 Range of the Report Prospects of 2013 73 05 of a Harmonious Labor Relation 50 “China Three Gorges Corporation” is the principle part of the Report, including its Work with Dignity 74 Realization of life Value 52 subsidiaries, branches and affiliated institutes. Index of Report 53 Indicators Working Together to Create a Happy CTG Respect for Migrant and Skilled Labors 54 Statistics Source The 3rd-party 76 The data herein comes from the China Three Gorges Corporation annual report 2010/11 and Chapter of Public Welfare: Dedication 56 additional formal documents and statistical reports from CTG. Review 06 to Repaying the Society Helping Improve People's Livelihood 58 Further Reading & Report Request Readers' Feedback 78 Support of Culture and Education 60 If you wish to know more about social responsibility of CTG or download electronic version Disaster Relief and Rescue Actions 61 of this report, please visit the official website at: www.ctg.com.cn or scanning the QR code directly from the display in the back cover of the report. You could contact us at 86-10- Chapter of Global Presence: Be a 62 57081851 or send email to [email protected] for printed version. English and Chinese 07 Qualified Global Corporate Citizenship 64 versions are both available. The Latest Development of Our "Go Global" Strategy Overall Promotion of Localized Operation 65 Coordinated Development with Local Communities and 67 Environment Promotion of the Sustainable Development of Global 70 Hydropower Industry 02 Address Address 03 Address The Three Gorges Dream, the Chinese Dream Cao Guangjing Board Chairman, China Three Gorges Corporation The relationship between climate change and energy supply has never been so direct and production patterns. In addition, we focus more on supplying low-carbon energy producing close and all countries are looking for an effective solution that could ensure sufficient energy green clean energy, providing green power in an environmental-friendly way to the world supply and tackle climate change. The Chinese government has set up an ambitious goal of that’s changing, tackling climate change with our product. building a comprehensive well-off society and doubling its 2010 GDP and per capita income The dream of CTG takes social harmony and people’s happiness as the basic principles for for both urban and rural residents by 2020, promoting the transformation of its energy CTG dream to come true. We integrate dedication, responsibility, innovation and harmony production and consumption, developing energy conservation and low-carbon economy into the blood of each and every member of CTG and fully tap our own strengths to improve and new energy and renewable energy to ensure China’s energy security. Consequently, to the wellbeing of disadvantaged groups through our knowledge, skills and resources. build CTG into an international first class clean energy group supplying clean energy for the Migration issue undoubtedly remains an arduous task in hydropower development in realization of building a comprehensive well-off society is a requirement for adapting to the China, however, we believe that as long as we draw on the experience of the successful sustainable development trend in the world and serving the national strategy. resettlement of over one million migrants for the Three Gorges Project and adhere to the The third industrial revolution with new energy as an important driving force hope for green principle of “long term cooperation, local integration, equal consideration of all sides, and development in the future, as well as opportunities and challenges for enterprises and mutual benefits and double-win”, we can better coordinate with the government in reservoir countries from all over the world. In the face of new situation, CTG will further strengthen its areas to do the migration work well and help migrants to achieve sustainable development. core business, accelerate the innovation of new energy, enhance its ability in value creation, We have been committed to becoming an international first-class clean energy group. adhere to its internationalized business operations to strengthen its competitiveness The challenge we encounter today will be driving force to realize our dream tomorrow. We worldwide, stick to innovation in terms of technology, manage and institution to enhance are dedicated to exploring a development path that is greener, more inclusive and more its economic growth potential and promote its healthy development in a production and sustainable with our global vision, open mind and passion for the career and along with other operation mode that is more intensive, sustainable and considerable of the nature and hydropower industry counterparts. We are dedicated to becoming leading force in China to society. drive the world energy revolution to the bright prospects of all the human beings. “The benevolent values the interactive relationship of everything in the universe”, keeping in mind our commitment to nature, we uphold the belief that the realization of our dream should be based on ecological balance. We integrate the concept of ecological civilization into every move in our strategic decision-making, operation and management to protect the nature. We endeavor to reduce greenhouse gas emissions by changing the way of our life and 04 Address Address 05 The Health and Vitality of the Yangtze River-CTG’s Commitment Chen Fei President, China Three Gorges Corporation China Three Gorges Corporation (CTG) was established with responsibility and “Build the tourism, and power generation. In addition, as a state-owned enterprise, we should shoulder Three Gorges Project and develop the Yangtze River” is a lofty mission bestowed on us the political, social and economic responsibilities well. At the same time, we will accelerate by our time. The Three Gorges Project is a national project that epitomizes the intelligence the pace to develop hydropower resources on the lower reaches of Jinsha River, and build and strength of the Chinese people and serves a large population and brings benefits for the 4 mega-size hydropower stations - Xiluodu, Xiangjiaba, Baihetan and Wudongde with generations to come. The Three Gorges Project is also a landmark for the great historical high standard and quality. During the process of developing Jinsha River hydropower revival of the Chinese Nation. During the construction and operation of the Three Gorges resources, we must adhere to the guidance of Scientific Outlook on Development, Project, we have been upholding strong sense of responsibility, carrying out our mission with handle the relationships between hydropower development and immigrant resettlement, great prudence, striving for first-class scientific design, first-class quality, high efficiency and environmental protection and local economic growth well, so as to promote the hydropower environment friendliness with strong willing to build a monumental project in hydropower industry development. At the new historical moment, CTG bear in mind the lofty mission of project history, to fulfill the long-cherished dream of the Chinese Nation to tame the “to maintain the health and vitality of the Yangtze River” enhance the scientific and efficient Yangtze River. In 2012, Three Gorges Project successfully withstood flood peak of 71,200 regulation and management of the cascade hydropower station system on the mainstream cubic meters per second which was the largest since the construction of the reservoir and of the Yangtze River,