Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 10/4/2012 82759 LAK SR 002 12.62 Mentor; Heisley Rd over SR‐2 Replace the deck of the Heisley Road bridge over SR‐2 in the $4,000 City of Mentor. 10/4/2012 93980 CUY SR 002 14.41 Bridge Repair Memorial Shoreway over the , Main Avenue Bridge gusset plate retrofit. An expedited sale $650,000 Flats, and GCRTA Railroad will be requested. 10/5/2012 90219 CUY ROCKSIDE ROAD Turney Road to Broadway Avenue in the cities of Garfield Resurface Rockside Road from Turney Road to Broadway $5,066,919 Hts, Maple Hts, and Bedford Avenue.o NOACA STP Project 11/8/2012 92225 D12 MOW FY2013 District Wide FY 2013 District Wide Mowing Contract $400,000 11/29/2012 8418 CUY MADISON AVE/WEST 61ST ST Cleveland: 0.04 mile east of West 65th Street * Remove existing highway superstructure and piers on $2,940,000 Madison Avenue over NS and GCRTA railroad tracks and replace with a pedestrian bridge.* Rehabilitate the West 61st Street pedestrian bridge over NS railroad tracks. Will be sold with PID 10135.[NOACA 11/29/2012 10135 CUY West 74th STREET Cleveland: between Pear Avenue and Wakefield Avenue. o Replace superstructure of the West 74th Street Bridge (160‐ $2,416,756 ft) over NS/CSX Railroad and GCRTA located between Pear Avenue and Wakefield Avenue in the City of Cleveland.o NOACA STP Project 11/29/2012 83488 CUY US 042 15.39 Cleveland; US‐42 over I‐71 Replace the deck of the West 25th street bridge over I‐71 in the $3,005,000 City of Cleveland. Includes widened sidewalks and bike lanes.

11/30/2012 93034 CUY GENERATOR PURCHASE Various Purchase new generators for the District Office (Facility Project $327,000 # F12231) and Riveredge Yard (F12232). 12/7/2012 85412 CUY/SUM/STA/TUS Canalway Signage N/A Phase 2: Installation of informational signs and kiosks along the $646,289 110‐mile & Erie Canal Way Scenic Byway in Cuyahoga, Summit, Stark, and Tuscarawas counties.Earmark ID: SB0606 (SB‐2006‐OH‐6) 12/13/2012 84488 CUY IR 071 11.74E Cleveland; West 150th Exit ramp Replace the superstructure of the West 150th St. NB exit ramp $905,000 over West 154th St. in the City of Cleveland. 1/1/2013 90888 CUY SNOW ROAD Cities of Parma and Parma Heights from West 130th Street NOACA STP Project: Resurface Snow Road (CR‐87) from West $6,355,800 to Ridge Road 130th Street to Ridge Road in the cities of Parma and Parma Heights. 1/10/2013 92226 LAK US 020 26.60 Madison Twp: Along US‐20 @ the intersection of Green FY2013 Maintenance Project: Replace sections of 24" $90,000 Road corrugated plastic pipe on the south side of US‐20 at the Green Road intersection. 1/17/2013 21810 CUY IR 071 14.96/VAR Cleveland; Brooklyn ECL to the Innerbelt Bridge Preventive Maintenance (pavement overlay) of I‐71 from just $3,700,000 west of Ridge Road (Brooklyn East Corp. Limit) to the Innerbelt Bridge in the City of Cleveland. 1/17/2013 85297 CUY CLEMENS ROAD Clemens Road and Crocker Rd./Bassett Road intersection in Construct a Clemens Road by‐pass and an exclusive $3,734,063 the City of Westlake southbound right turn lane for the IR‐90 westbound ramp at the Crocker Road interchange in the City of Westlake. See also PID 91655 for work that is within the limited access.

1/17/2013 85524 CUY IR 090 07.74 Lakewood, Cleveland; Rocky River to W. 44th PM resurfacing from the Rocky River in Lakewood to West 44th $8,000,000 St in Cleveland.

1 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 1/17/2013 91655 CUY IR 090 00.95 City of Westlake: IR‐90 and Crocker Rd/Bassett Rd Construct an exclusive right‐turn lane on Crocker Road $1,315,640 interchange to Clemens Road southbound to the IR‐90WB entrance ramp and an additional right turn lane on the I‐90WB exit ramp at the IR‐90 Crocker Road/Bassett interchange in the City of Westlake. Work within the limited access 1/17/2013 94301 CUY US 006A 00.42 Rocky River, Lakewood; Detroit over the Rocky River Install a debris containment system below the Detroit Rd (US‐ $450,000 6A) bridge over the Rocky River in Lakewood and Rocky River.

1/31/2013 13603 CUY HARVARD AVENUE Cleveland; At East 103rd Street over the W&LE Railroad Rehabilitate the Harvard Avenue Bridge over the W&LE $2,875,000 Railroad located at East 103rd Street in the City of Cleveland. CITY'S‐BR 1/31/2013 83622 GEA US 322 14.47 Claridon & Huntsburg Twps; SR‐608 to County Line Resurfacing from SR‐608 to the County Line in Claridon and $2,000,000 Huntsburg Twps. Includes 3 culverts: GEA‐322‐19.84, GEA‐322‐ 20.01, GEA‐322‐20.44 1/31/2013 85149 CUY SR 254 04.49 Westlake; Over Sperry Creek Replace the superstructure of the Detroit Road (SR‐254) $951,000 concrete box beam bridge overSperry Creek located just west of Clague Road in Westlake. 2/14/2013 87755 LAK SR 283 04.72 Paint Eastlake; SR‐283 over the Chagrin River Paint the structural steel of the Lakeshore Blvd (SR‐283) bridge $800,000 over the Chagrin River in Eastlake. 3/1/2013 87681 CUY SOLON SIGNALS Solon: city wide Replace/upgrade traffic signal equipment. Complete rebuild of $7,200,000 16 signals. Upgrade of additional 30 signals including cabinet, controller, interconnect, pre‐emption, video detection, UPS and pole painting. Improve traffic flow through the city using a cent

3/7/2013 83644 LAK SR 084 23.91 Perry Twp, Madison Twp; Shepard Rd to Madison WCL Resurfacing South Ridge Rd (SR‐84) from Shepard Rd to the $1,360,000 Madison WCL in Perry and Madison Twps. 3/7/2013 84021 CUY US 422 13.91 Warrensville Hts, Orange, Solon; SR‐175 to Solon Rd Resurface US‐422 from Richmond Rd (SR‐175) to Solon Rd in $5,700,000 Warrensville Hts, Orange, and Solon. 3/7/2013 91743 CUY IR 090 00.06 Barrier Rail Westlake: Just east of the county line to west of Cahoon Install continuous median barrier (guardrail type 5 MR) to $500,000 Road prevent median crossover collisions along IR‐90 from just east of the Lorain County Line to west of Cahoon Road in the City of Westlake. 3/12/2013 82566 CUY RIDGE ROAD Delora Avenue to Memphis Avenue in the City of Brooklyn The reconstruction of Ridge Road from Delora Avenue (just $13,860,000 north of I‐480) to Memphis Avenue in the City of Brooklyn.

3/14/2013 10787 CUY SR 087 04.24 Cleveland; Over GCRTA at Shaker Blvd Replace the Buckeye Road (SR‐87) bridge over GCRTA located $9,884,954 at the Woodhill Rd & Shaker Blvd intersection in the City of Cleveland. Combined with PID 24361. Work will include building a new structure on a new profile over the existing structure while mai 3/14/2013 84285 CUY SR 017 14.97 Valley View, Garfield Hts; Canal Rd to ECL Resurfacing Granger Road (SR‐17) from Canal Road to the ECL $1,520,000 in Valley View and Garfield Hts. 3/14/2013 92220 D12 LG FY2013 District Wide FY2013 District Lighting Maintenance Contract $1,000,000

2 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 3/14/2013 92571 GEA SR 087 15.89 Burton Twp, Middlefield, Middlefield Twp; WCL to County Resurface from approximately the Middlefield WCL to the $1,595,000 Line County Line in Burton Twp, Middlefield and Middlefield Twp. Combined with PID 83642. 3/17/2013 92492 LAK IR 090 23.42R Slope IR‐90 over the Grand River Slope repair follow up work to PID 23456. $250,000 3/28/2013 88276 D12 TSG FY2013 N/A FY2013 District Signal Upgrade ContractSafety Funding Project $650,000 to upgrade signals a the following locations in the City of Cleveland:1) CUY‐422‐0.27 (Ontario‐Huron), 2) CUY‐42‐16.35 (West 25th and Clark), and 3) CUY‐43‐11.13 (Miles and Lee)

4/11/2013 77419 CUY IR 077 09.50 Deck Independence, Cuyahoga Hts; Over the Cuyahoga River, Replace the deck of the I‐77 bridge over the Cuyahoga River in $28,010,000 Canal Rd, SR‐17, and the Ohio Canal. Independence and Cuyahoga Hts. Structural steel painting moved to new project: PID 87855. 2013 Major Bridge

4/11/2013 89721 CUY GREENWAY TRAIL Mayfiled Village: 700‐ft trail west of SR‐91 between Wilson Mayfield Village Greenway Trail: Construct an all purpose trail $1,083,201 Mills and White Road that will complete a 2.1 mile trail linking civic functions, employment centers, restaurants, libraries, a series of village parks and North Chagrin Reservation. o NOACA 4/11/2013 92142 D12 BH FY2013 Misc Various Bridge maintenance project $2,000,000 4/25/2013 92229 CUY CB FY2013 Various routes and sections FY2013 Maintenance Project: Drainage and Catch Basin $350,000 Cleanouto IR‐77 NB @ Fleet Ave median wall, IR‐77 NB @ Harvard Ave right sideo IR‐90 EB @ Riverside Rd, IR‐90 EB @ South Marginal,o IR‐480 EB @ West 220th right side, IR‐480 WB @ Lee Rd, IR‐480 WB @ Wes 5/1/2013 85392 CUY SR 087 02.42 Cleveland; East 55th St to Woodhill Resurface Woodland Avenue from East 55th St to Buckeye $1,996,500 Road; and Buckeye Road from Woodland Avenue to Ambler Road all in Cleveland.Combined with PID 89198.

5/1/2013 89197 CUY SR 283 01.09/VAR Cleveland; St. Clair to IR‐90 SR‐283; Resurface East 72nd St from St. Clair to IR‐90 Ramp B2 $808,500 in Cleveland. SR‐283DA; Resurface East 72nd St from IR‐90 Ramp B3 to SR‐283 in Cleveland. 5/3/2013 85361 CUY SR 291 02.05 Brook Park; SCL to NCL Resurfacing of Engle Rd. (SR‐291) from Sheldon Rd. to $1,970,000 Brookpark Rd. (SR‐17) in the City of Brook Park. 5/3/2013 88667 CUY US 042 00.00 Strongsville: Boston Road to Drake Road Widening and Reconstruction of US‐42 (Pearl Road) from $8,550,000 Boston Road to the 5 lane pavement section at Drake Road. Upgrading the signal timing, pavement markings, and adding a TWLTL.o ODOT TRAC Project, NOACA STP Project, ODOT City Pavement Project 5/3/2013 89722 CUY West 6th STREET STREETSCAPE Cleveland: Area bounded by West Third St, Superior Ave, Historic Warehouse District Public Realm Implementation: $760,000 West Tenth St, and the Port Authority West 6th Streetscape ‐ St Clair to Lakeside: Streetscape to widen walks to proivide amenities such as bike racks, wayfinding, public art, historic interpretation, and benches.o NOACA Enhancement P

3 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 5/3/2013 90218 CUY PROFESSOR ST INTERSECTIONS Cleveland: Professor Ave from Fairfield Ave/West 10th St to Professor Street Intersection Improvement: Improve pedestrian $725,000 Jefferson Avenue safety at intersections by decreasing the length of the crosswalks through curb bump‐outs and curb radius reductions and redesigning the angle of intersection to create a simple four‐way stop i 5/3/2013 90422 CUY COLUMBIA ROAD North Olmsted: Butternut Ridge Road to Lorain Road NOACA STP Project: Resurface Columbia Road from Butternut $1,806,200 Ridge Road to Lorain Road in the City of North Olmsted.

5/9/2013 86849 GEA SR 044 06.61 HSIP Newbury Township: SR‐44 and Music Street intersection Remove a portion of the embankment on the east side of SR‐44 $165,000 near the intersection of Music Street to improve sight distance.

5/9/2013 91530 CUY IR 090 14.08 Safety Cleveland: IR‐090 EB from West 25th (US‐42) to the IR‐ 2013 Safety Project: Provide an auxiliary lane in advance of and $2,700,000 490/IR‐71/SR‐176 interchange through the IR‐90/IR‐490/IR‐71 interchange diverge to allow two full lanes to proceed to IR‐90 EB, one full lane to IR‐71 SB/SR‐176 SB, and two full lanes to IR‐490 EB.

5/9/2013 92223 GEA SR 087 00.92 Russell Twp: approximately along mile marker 00.92 FY 2013 Maintenance Project: Slope repair along westbound $350,000 SR‐87 (Kinsman Rd) approximately at mile marker 0.92 in Russell Township. 5/10/2013 86903 CUY SR 175 00.00 Solon, Bedford Hts; SR‐43 to 0.43 mi N of RR tracks Resurface Richmond Rd (SR‐175) from Aurora Rd (SR‐43) to the $501,818 4‐lane concrete pavement in Solon and Bedford Heights. 2013 Urban Paving Program. 5/23/2013 81911 CUY SR 017/021 12.16/09.50 Brooklyn Hts, Independence, Valley View, Cuyahoga Hts; Resurface Granger Rd from the Brooklyn Hts WCL to Canal Rd in $2,380,000 WCL to Canal Rd/CSX to I‐77 Brooklyn Hts, Independence and Valley View; and Brecksville Rd from the CSX RR bridge to I‐77 in Valley View, Independence, and Cuyahoga Hts. 5/23/2013 86481 CUY LAKEFRONT WEST W.73rd Cleveland: Various locations along the West Shoreway (US‐ o Extend and relocate West 73rd Street and construct new $34,800,000 6) bridge under the NS Railroad to access the West Shoreway (US‐ 6) and Edgewater Park, including relocation of the NEORSD trunk sewer.o Also refer to the Lakefront West Project (PID 77330) 5/23/2013 86852 CUY SUPERIOR RD/NOBLE RD East Cleveland: Superior Rd & Forrest Hills Ave and Noble Provide dedicated left‐turn lanes along Superior Road at Forrest $338,400 Rd & Terrace Rd Hills Ave. and replace the entire traffic signal installation.Upgrade traffic signals, signs and pavement markings at the intersection of Noble Road and Terrace Road, in the City of East Cle 5/23/2013 93067 CUY IR 271 04.80 Slope Bedford Heights; N of NS RR Repair the slope on the east side of I‐271 just north of the NS $350,000 railroad structure in Bedford Hts. 2013 GSM project

6/1/2013 93516 D12 GR FY2013(B) Various routes and sections Federal HSIP Project: Upgrade non‐compliant end terminals on $500,000 NHS routes 6/6/2013 87037 CUY SR 014 03.74 HSIP Cleveland: Ackley Road/Union Street Intersection Upgrade signals, sign and pavement markings on Broadway $568,743 Avenue (SR‐14) at the Ackley Road/Union Street intersection in the City of Cleveland.

4 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 6/6/2013 92222 D12 SIGN FY2013 Structure District Wide FY2013 District Sign Structure Repair Contract $250,000 7/1/2013 24855 CUY IR 490 01.65 Cleveland; Bridge to East 55th St PM resurfacing from the bridge over the Cuyahoga River Valley $600,000 to East 55th St in Cleveland. 7/1/2013 88318 CUY IR 090 15.24 Demo Cleveland; Over the Cuyahoga River Standalone project to demo the existing Innerbelt Bridge, SFN $28,100,000 1809393. 7/1/2013 89037 CUY WESTLAKE SIGNAL UPGRADE Westlake: various signal location within the city 2014 NOACA CMAQ Project: Upgrade the existing citywide $3,274,656 signal system in the City of Westlake. 7/12/2013 80955 LAK PAINESVILLE TWP STREETSCAPE N/A Streetscape and related safety improvements to Mentor Ave. $248,380 (US‐20) at various locations between Wellesley Rd. to Fern Dr. in Painesville Township.SAFETEA‐LU Earmark

7/12/2013 80969 CUY CLEVELAND BULKHEAD Cleveland Construct bulkhead and riverwalk connecting Front Street and $5,849,241 Main Avenue.Part of a bigger project called Eastbank ProjectEarmarks: SAFETEA‐LU OH204 and FY 08 AA TC 0803See also PID 88443; CUY CLEVELAND RIVERWALK; OH317

7/12/2013 84402 LAK SR 306 04.60 Kirtland, Willoughby, Mentor; South of Kirtland Rd to SR‐84 Resurface SR‐306 (Chillicothe Rd) from south of Kirtland Rd to $660,000 SR‐84 (Johnnycake Ridge Rd) in Kirtland, Willoughby, and Mentor. SR‐615 work split to PID 92355 7/12/2013 85073 CUY SR 043 09.12 Warrensville Hts; SCL to NCL Resurfacing Miles Rd (SR‐43) from the SCL to the NCL in $1,029,000 Warrensville Hts. Work includes 2 small sections with a split corp with North Randall. 7/12/2013 88290 CUY SRTS FY2011 Chagrin Falls Chagrin Falls; Various locations 2011 SRTS Project: Safe, off road pedestrian facility, signage, $486,050 bike racks, pavement markings for 2 schools in the Village of Chagrin Falls.o Village portion ‐ see PID 89334 for the village school portion. 7/12/2013 88443 CUY CLEVELAND RIVERWALK N/A Construct a riverwalk connecting Front Street and Maine $1,458,148 Avenue in the Flats Eastbank.This project is part of a bigger project called the Flats Eastbank Project.SAFETEA‐LU Earmark OH317See also PID 80969; CUY CLEVELAND BULKHEAD

7/12/2013 89030 CUY US 006 07.64 From Lake Road to the West Shoreway & Lake Ave in the Clifton Boulevard Enhancement Projecto landscaping, partial $8,687,250 cities of Lakewood and Cleveland median, parking, bicycle and pedestrian amenitieso resurfacing/pavement repair in Cleveland, project length restripingo new bus stops with bus pads and transit signal prioritizationo Funding: MPO 7/12/2013 89718 LAK MAIN STREET STREETSCAPE City of Painesville: Main Street from State Street to Park Main Street Transportation and Streetscape Enhancement $893,445 Place/Veteran's Park Project: Provide continuity along Main Street between State Street and Veteran's Park by providing wider pedestrian sidewalks, narrow the lane widths to better balance the space allocated to vehicles 7/12/2013 92121 CUY BELVOIR BLVD Fairmount Blvd to Mayfield Road in the Cities of University NOACA STP Project: Repair and resurface Belvoir Blvd. from $3,148,647 Heights and South Euclid Fairmount Blvd. to Mayfield Rd.

5 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 7/12/2013 92355 LAK SR 615 05.68 Mentor; Center St to SR‐283 Urban Paving Project along Munson Rd (SR‐615) from Center St $385,000 to Lakeshore Blvd (SR‐283) in Mentor. Split from PID 84402The Mentor‐on‐the‐Lake portion is not included.

7/19/2013 93375 LAK ST. CLAIR STREET BRIDGE DEMO City of Willoughby: St. Clair Street over the Chagrin River 2013 CEAO LBR Project: Remove the St. Clair Street two‐span $290,000 steel Warren truss bridge including substructure over the Chagrin River in the City of Willoughby. Work will include embankment work, pavement removal and road termination signage. 9/1/2013 94046 D12 GR FY2014 N/A District guardrail job order contract for SFY 2014 $150,000 9/1/2013 94047 D12 PM FY2014 Distrctwide District maintenance contract for pavement markings, striping $1,317,294 and raised pavement markers beginning SFY 2014

10/1/2013 23455 LAK SR 535 00.39 Painesville, Fairport Harbor; Over the Grand River Replace the superstructure of the SR‐535 bridge over the Grand $3,210,000 River in Fairport Harbor and Painesville. Work will include raising the structure 2 feet and modifying the existing abutments and piers. 10/1/2013 83500 CUY IR 090 22.60/VAR Cleveland; Eddy Rd interchange bridges @ IR‐90 Replace the Eddy Road bridge over IR‐90. Project includes $9,000,000 removing the approach ramp bridges and replacing with MSE walls. 2014 Bridge 10/1/2013 89064 CUY CANAL ROAD BRIDGE Cleveland: Commercial Road over CSX and under Norfolk Municipal Bridge Project: Remove and replace the existing $2,812,500 and Southern Railroad Canal Road (formerly Commercial Road) bridge over CSX railroad and under Norfolk and Southern railroad. The bridge build in 1901 and rehabilititated in 1965 has reached its useful design life.o Pr 10/1/2013 90567 GEA BELL STREET South Russell Village: WCL to SR‐306 NOACA STP Project: GEA Bell Street West Rehabilititation will $2,912,425 resurface Bell Street, widen the paved shoulder from 1.5 feet to 4 feet on each side, enclose existing roadside drainage ditches, modify and/or extend existing culverts, add catch basins and re

10/1/2013 91565 CUY NORTH CHURCH DRIVE Parma Heights: North Church Drive over Big Creek River Municipal Bridge Project: Repair the North Church Drive bridge $843,750 over Big Creek River in the City of Parma Heights. Extent of repair to be determined. 10/1/2013 92528 CUY IR 077/SR 082 02.82/11.76 Broadview Hts: SR‐82 intersection w/ IR‐77 Federal HSIP Project: Improve IR‐77 interchange at SR‐82 in $2,200,000 Broadview Heights by reconfiguring and signalizing IR‐77 exit ramps to eliminate unsafe weaves on SR‐82.

10/24/2013 91820 CUY IR 077 01.75 Brecksville; Over IR‐77 Replace the superstructure of the Valley Parkway bridge over IR‐ $2,600,000 77 in Broadview Hts. This project has been split from PID 87632. 12/1/2013 91115 CUY SR 002 14.41 Steel Cleveland; Main Avenue Bridge Structural steel repairs to the truss portion of the Main Avenue $9,340,000 Bridge. Plans to be completed under PID 90993. 12/1/2013 94043 D12 MOW FY2014 N/A District Mowing Contract for SFY 2014 $460,000

6 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 1/1/2014 22220 GEA US 422 03.19 Bainbridge Twp, Auburn Twp; Approx. SR‐306 to SR‐44 Rehab from E of SR‐306 to E of SR‐44 in Bainbridge and Auburn $24,500,000 Twps. Treatment will likely be break & seat with asphalt overlay. Includes replacing the EB exit and WB entrance ramps at SR‐44. 1/1/2014 25619 CUY US 042 14.57 Cleveland; Over Big Creek & NS RR Spot painting of the Brooklyn‐Brighton bridge over Big Creek $2,000,000 and NS RR in Cleveland. Beam ends at all expansion joints are to be repainted on this weathering steel structure. Major Bridge Candidate 1/1/2014 77040 CUY US 006 14.56 Cleveland; Detroit‐Superior Bridge Spot painting areas of the Veterans Memorial (Detroit‐ $3,350,000 Superior) bridge in the City of Cleveland. Work includes other miscellaneous repairs. Scope to be determined based on 2010 in‐depth inspection.2014 MAJOR BRIDGE PROGRAM

1/1/2014 80982 LAK MAGIC MILE BIKEWAY Willoughby: Johnnycake Ridge Road (SR‐84) to Lost Nation Bicycle paths for the Magic Mile in the City of $1,091,715 Road Willoughby.SAFETEA‐LU Earmark OH2662012‐07‐18; City of Willoughby has requested to cancel this project. 1/1/2014 83624 CUY SR 087 14.74 Moreland Hills, Hunting Valley; WCL to County Line Resurfacing of South Woodland Rd. (SR‐87) from approximately $900,000 SOM Center Rd. (SR‐91) to Geauga County in the Villages of Moreland Hills and Hunting Valley.

1/1/2014 83630 GEA SR 044 00.00 Auburn Twp; County Line to US‐422 Resurfacing of Ravenna Rd. (SR‐44) from the Portage County $1,000,000 line to US‐422 in Auburn Twp. 1/1/2014 83634 GEA SR 087 02.73 Russell Twp, Newbury Twp; SR‐306 to Auburn Rd Resurface Kinsman Rd (SR‐87) from Chillicothe Rd (SR‐306) to $1,600,000 Auburn Rd in Russell and Newbury Twps. 1/1/2014 83643 LAK SR 084 19.14 Painesville Twp, Perry Twp; WCL to Shepard Rd Resurfacing of Walnut Ave/Riverside Dr. (SR‐84) from the WCL $1,500,000 to Shepard Rd. in Painesville and Perry Twps. Includes culverts.

1/1/2014 84296 CUY SR 174 00.00 Gates Mills; Old Mill Rd to the Cnty Line Resurfacing River Rd (SR‐174) from Old Mill Rd to the Lake $1,200,000 County Line in Gates Mills. 1/1/2014 84988 CUY SR 008 02.26 Bedford; Over Tinkers Creek Slope and erosion permanent restoration at the south end of $1,090,769 the Northfield Road (SR‐8) bridge over Tinkers Creek, SR‐14, Metroparks, and W&LE RR in Bedford. See PID 91459 for short‐ term drainage relocation. 1/1/2014 85216 GEA SR 528 09.79 Huntsburg Twp, Montville Twp; Burton‐Windsor Rd to US‐6 Resurface Madison Rd (SR‐528) from Burton‐Windsor Rd to the $1,700,000 GAR Highway (US‐6) in Huntsburg and Montville Twps. Work will include replacing culvert GEA‐528‐1526.

1/1/2014 87799 LAK SR 044 00.83 Concord Twp; Girdled Rd to N of SR‐84 Resurface SR‐44 from Girdled Rd to north of SR‐84 in Concord $4,100,000 Twp. 1/1/2014 89063 CUY ROYALVIEW DRIVE BRIDGE Parma: Royalview Drive over Countryman's Creek Municipal Bridge Project: Replacement of the Royalview Drive $299,970 bridge over Countryman's Creek located approximately 2200 feet west of Ridge Road in the City of Parma.

7 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 1/1/2014 89693 GEA MAPLE HIGHLANDS TRAIL City of Chardon: Fifth Avenue to Water Street (US‐6) Maple Highlands Trail Connection: The construction of $466,500 approximately 2,500 linear feet (0.47 miles) of the trail connection and will extend from Fifth Avenue south to Water Street (US‐6). This portion of the trail will consist of a 10‐ft wide bicycle & ped 1/1/2014 89695 CUY LARCHMERE BLVD City of Cleveland: East 121st Street to East 130th Street o NOACA STP Project ‐ Rehabilitate Larchmere Boulevard from $2,708,443 Martin Luther King Jr. Drive to North Moreland Boulevard.o NOACA Enhancement Project ‐ Make Larchmere Boulevard more pedestrian and bicycle friendly from East 121st Street to East 130th Street.

1/1/2014 89708 CUY LYNDHURST AUDIBLE SIGNALS US‐322 along City of Lyndhurst at intersections: Brainard Rd, City of Lyndhurst Audible Signal Project: Purchase and install $72,704 Richmond Rd, Winchester/Irene Rd signal devices to assist blind or visually‐impaired as well as pedestrians needing additional time to safely cross three busy intersections in the City of Lyndhurst.o NOACA Enhancement Projec 1/1/2014 89714 LAK MORTON‐HEADLANDS TRAIL II Jordan Drive in the City of Mentor connecting Morton Morton ‐ Mentor Headlands Trail Connection ‐ Phase II: Widen $893,600 Community Park and Headlands Beach State Park and resurface 3000 linear feet of Jordan Drive from its current width of 22‐ft to a proposed 32‐ft. Approximately 1500 linear feet of the route will be a multi‐purpose pathway. Two asphalt 5‐fo 1/1/2014 89723 CUY MILL CREEK CONNECTOR TRAIL 2 Garfield Hts: north end of Bacci Park to a trailhead at the Mill Creek Connector ‐ Phase II: Continue the trail from the end $1,649,622 Garfield Blvd/Warner Rd intersection of Phase I (currently at the north end of Bacci Park in the Village of Cuyahoga Heights) to its intermediate destination at a trailhead to be located at the Garfield Boulevard/Warner Road i

1/1/2014 91034 CUY TRISKETT RD/WARREN RD Cleveland: Triskett: Lorain Avenue to West 117h Street; NOACA STP Project: Mill and fill Triskett Road from Lorain $6,355,800 Warren: Lorain Avenue to Munn Road Avenue to West 117th Street. Warren Road from Lorain Avenue to Munn Road. The proposed work also includes drainage repairs, signal upgrades, ADA curb ramps, pole relocation, curb and driveway repl 1/1/2014 91128 GEA SR 306 13.45/VAR Various locations in Geauga & Lake Counties Culvert replacement project that may include the following: $950,000 GEA‐306‐13.45 (south of Wilson Mills in Chester Township)GEA‐ 528‐07.49 (over tributary of Tare Creek in Middlefield Township)GEA‐528‐08.57 (2.2 miles north of SR‐87 in Middlefield Township)LAK‐6 2/28/2014 85362 CUY US 322 05.82 Cleveland Hts; Kenilworth to ECL Resurface Mayfield Rd (US‐322) from Kenilworth Ave to the ECL $2,626,500 in Cleveland Hts. Urban Paving Program 3/1/2014 93518 D12 GR FY2014(B) Various routes and sections Federal HSIP Project: Upgrade non‐compliant end terminals on $250,000 top 100‐150 locations on remaining high volume routes state routes under ODOT jurisdiction. 3/3/2014 93295 LAK HUBBARD ROAD Madison Twp: US‐20 to Lake Road Resurface Hubbard Road (CR‐7) from US‐20 to Lake Road a $2,100,000 distance of 2.38 miles more or less in Madison Township.

8 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 3/3/2014 93296 LAK JACKSON STREET Painesville Twp: WCL to ECL Resurface Jackson Street from the Nye Street to the west $900,000 corporation line w/the City of Painesville a distance of 0.91 mile more or less in Painesville Township.

3/3/2014 93707 GEA AUBURN ROAD (Q&R) Chardon Twp: Thwing Road to Mentor Road MPO STP Project: Resurface Auburn Road from Thwing Road $350,000 (CH 27) to Mentor Road (CH 5n) in Chardon Township.

3/11/2014 85207 CUY US 422 08.88/VAR Inter Chagrin Boulevard (US‐422) and Northfield Road (SR‐8) Reconfigure the six‐legged intersection of Chagrin Boulevard $9,048,248 intersection in the City of Shaker Heights (US‐422), Warrensville Center Road, Northfield Road (SR‐8) and Van Aken Bouelvard in the City of Shaker Heights.o Federal Safety Upgrading Projecto FFY 2010 Appropriation Earmark Project (STP) O 3/21/2014 24106 CUY BELLAIRE ROAD Cleveland; Over Big Creek Replacement of the Bellaire Road Bridge over Big Creek located $4,027,100 between Kensington Avenue and Cress Road in the City of Cleveland. 3/26/2014 18741 CUY SR 237 12.36 Lakewood; SR‐237 over IR‐90 Replace the deck of the Riverside Dr (SR‐237) bridge over IR‐90 $2,100,000 in the City of Lakewood. Work will include raising the south end of the bridge to gain vertical clearance on the interstate. CUY‐90‐0775 3/31/2014 89698 LAK SR 306 Multi‐Purpose Trail City of Kirtland: west of Markell Road to east of Eisenhower SR 306 Multi‐Purpose Path & Pedestrian Bridge: Construct a $750,000 Drive 1200‐ft multi‐purpose path with a new 150‐ft pedestrian bridge over the South Branch of the Chagrin River, from west of Markell Road to east of Eisenhower Drive in the City of Kirtland.o NOACA Enh 4/1/2014 82796 CUY LAKEWOOD SIGNALS Ph 4 Lakewood 2013 NOACA CMAQ Project: Lakewood City Wide Signal Project $2,747,399 ‐ Phase 4* Madison Ave ‐ McKinley Ave/Larchmont Ave to Lark St/Ridgewood Ave 4/1/2014 85358 CUY SR 003 05.30 Parma; SCL to US‐42 Repair & resurface Ridge Rd (SR‐3) from the SCL to Pearl Rd (US‐ $2,750,000 42) in Parma. Work will include resurfacing the asphalt sections and slab & joint repairs to concrete sections.

4/1/2014 87945 CUY IR 271 09.16 NOISE Shaker Boulevard to Mayfield Road Noise Barrier Replacement Project: Replace severely $3,000,000 deteriorated concrete panels and reuse the existing steel posts along IR‐271 between Shaker Boulevard and Mayfield Road.

4/1/2014 92027 CUY US 042 16.95 Cleveland; Over Flats Industrial RR and Train Avenue Work to include: bearing rehabilitation, bearing seat repair, $305,000 drainage repair. 4/1/2014 94044 D12 TSG FY2014 N/A District traffic signal repair contract for SFY 2014 $250,000 4/1/2014 94074 D12 LG FY2014 Various routes & sections Upgrade the lighting on various sections of I‐71 and I‐480. $1,500,000

4/1/2014 94490 D12 BH FY2014 Misc Various Bridge repair on various structures $2,000,000 4/15/2014 10900 CUY BAGLEY/PLEASANT VALLEY Middleburg Hts, Parma; US‐42 to York Rd Widen & reconstruct Bagley Rd/Pleasant Valley Rd from Pearl $20,790,000 Rd (US‐42) to York Road in Middleburg Hts and Parma. TRC ON LBR. CEAO LBR.

9 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 5/1/2014 88032 CUY SR 010 06.00 Streetscape Fairview Park: WCL to West 223rd Street Streetscape improvements along Lorain Road (SR‐10) from $1,200,000 Fairview Park west corporation line to West 223rd Street in the city of Fairview Park.o extend tree plantings started further east on Lorain Roado include brick panel associated with the tree and tre 5/2/2014 5669 LAK VROOMAN ROAD LeRoy, Perry Twps; IR‐90 to SR‐84 Upgrade and relocate Vrooman Rd from IR‐90 to SR‐84 in LeRoy $24,695,771 and Perry Townships. MPO‐STP. $150,000 for Arch Study set up in 1997 as federal. Plans by Lake County. Also refer to PID 85131 for resurfacing portion of project.

5/2/2014 85131 LAK VROOMAN ROAD Leroy Twp: IR‐090 interchange to Vrooman Rd Bridge over o Rehab Vrooman Road from I‐90 to the Vrooman Rd. Bridge $3,447,675 the Grand River over the Grand River in Leroy Townshipo Also refer to PID 5669 for location of the relocated Vrooman Road Bridge over the Grand River.o 2013 CSTP Project 5/2/2014 94456 CUY SNOWVILLE ROAD Culvert Brecksville: Snowville Road over a stream approximately 0.3 Project B: Replace an existing twin 5‐foot round corrugated $298,000 mile west of Riverview Road metal pipe culvert which has failed with a 12' x 5' concrete box culvert and connect to the existing 12' x5' concrete box culvert that runs underneath Snowville Road.o Earmark ID: FL1201o FHWA 2 5/5/2014 91038 CUY HIGHLAND ROAD Euclid/Richmond Hts: Euclid Avenue to Richmond Road NOACA STP PROJECT: Repair and resurface Highland Road in $5,000,000 the cities of Euclid and Richmond Heights. 6/1/2014 80961 CUY SR 082 04.83 Widening North Royalton; WCL to York Road Reconstruct and widen Royalton Road (SR‐82) from the WCL $13,526,000 (W.130th) to YorkRoad in the City of North Royalton.SAFETEA‐ LU Earmarks OH169 + OH323 6/1/2014 94045 D12 SIGN FY2014 N/A District sign structure repair contract for SFY 2014 $250,000 7/1/2014 89039 CUY HIGHLAND ROAD BRIDGES Euclid; Over Euclid Creek Rehabilitate 4 bridges along Highland Road in the City of Euclid: $9,785,600 (3) over Euclid Creek and (1) over the East Branch of Euclid Creek. 7/1/2014 89047 LAK HEISLEY RD PHASE III Mentor: Mentor Avenue to Jackson Street NOACA STP Project: Widen and Reconstruct Heisley Road from $7,051,758 2 to 4 lanes from US 20 (Mentor Ave) to Jackson St. in the City of Mentor.o SAFETEA‐LU Earmark ID OH251o See also PID 80976 8/7/2014 80418 CUY IR 271 00.00 Addlane Oakwood, Bedford; County Line to Emery Road Add one (1) lane in each direction along I‐271 from IR‐480 at $91,700,000 the Summit County Line to IR‐480 at Columbus Rd. Work will include replacing the existing pavement from the Summit County Line to approx. Emery Rd under the Pavement Major Rehab program. ‐ TR 10/1/2014 87687 LAK IR 090 19.21 LeRoy Twp; Vrooman Rd over IR‐90 Replace the superstructure of the Vrooman Road bridge over IR‐ $2,500,000 90 in LeRoy Township. Work willinclude minor widening to add 8' shoulders. 11/1/2014 84489 CUY IR 071 12.45 Cleveland; W.140th over I‐71 Replace the deck and paint the superstructure of the West $2,310,000 140th Street bridge over IR‐71 in the City of Cleveland. Work will include raising the structure to gain vertical clearance on the interstate.

10 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 1/1/2015 23961 CUY/GEA US 422 18.53/0.00 Solon; Solon Rd to the County Line / Bainbridge Twp; Resurface US‐422 from Solon Rd to east of SR‐306 in Solon and $5,800,000 County Line to east of SR‐306 Bainbridge Twp. 1/1/2015 80964 LAK METROPARK BIKE TRAIL City of Mentor between SR‐84/Garfield Rd to Norton o Construct a two‐way multi‐use asphalt path from the $4,218,621 Parkway southeast corner of SR‐84 (Johnnycake Ridge Rd) and Garfield Rd to Norton Parkway in the Newell Creek Development in the City of Mentor.o Plan and construct extension of bicycle trails adjacent to the 1/1/2015 80966 CUY NORTH COAST HARBOR PED BR N/A Construct a movable pedestrian bridge from east of Dock 32 to $4,941,900 Voinovich Park southwest corner in the City Cleveland.SAFETEA‐ LU Earmark + OH313FFY 05 Appropriation OH140 ‐ Preliminary Development 1/1/2015 80988 CUY SR 087 11.99 Woodmere; IR‐271 to Pepper Pike Corp Widen Chagrin Boulevard in the Village of Woodmere. $16,500,000 1/1/2015 84289 CUY SR 010 10.17 Cleveland; W. 150th to W. 117th Urban Paving of Lorain Road in the City of Cleveland from West $1,980,000 150th St to W. 117th St 1/1/2015 84299 GEA SR 168 01.64 Parkman, Troy, Burton Twps; Nash Rd to Burton SCL Resurface SR‐168 from Nash Rd to the Burton SCL in Parkman, $2,200,000 Troy, and Burton Twps. 1/1/2015 84454 GEA SR 044 01.35 Auburn Twp; Over LaDue Reservoir Replace the existing slab superstructure on the SR‐44 bridge $955,000 over LaDue Reservoir in Auburn Township. 1/1/2015 85147 LAK SR 091 04.56 Eastlake; SR‐91 over SR‐2 Replace the deck of the S.O.M. Center Road bridge (SR‐91) over $3,606,000 the Lakeland Freeway (SR‐2) in the City of Eastlake. LAK‐002‐ 03.22 1/1/2015 85188 CUY IR 077 13.31 Cleveland; I‐77 over the industrial access drive Replace the superstructure of the I‐77 bridge over the industrial $3,500,000 access drive, just south of Pershing, in the City of Cleveland.

1/1/2015 85371 CUY SR 087 06.00 Shaker Hts; WCL to ECL Resurface Shaker Blvd from the WCL to the ECL in Shaker Hts. $2,942,500 Urban Paving Program 1/1/2015 85631 CUY SR 237 06.65 Brook Park; Eastland Rd to SR‐17 Concrete pavement repair along the Berea Freeway (SR‐237) $1,800,000 from Eastland Rd to Brookpark Rd (SR‐17) in Brook Park.

1/1/2015 87605 CUY IR 090 29.22 L&R Euclid; IR‐90 over Lakeland Blvd connector Remove the superstructure of the twin mainline slab bridges $4,800,000 over the Lakeland Boulevard Connector in Euclid. Structures will be replaced by fill. 1/1/2015 87613 CUY CHAGRIN FALLS SIDEWALKS Village of Chagrin Falls: North Street, Mill Street and o North Street between Chagrin Falls NCL and Mill Street: 1) $2,575,000 Cleveland Street repair and resurface the existing asphalt pavement, 2) repair and/or replace the existing brick roadway pavers, which is an extension of an existing rehabilitated brick road, 3) provide an appro 1/1/2015 88352 LAK SR 002 14.28 Painesville Twp; Newell St Over SR‐2 Replace the deck of the Newell Street bridge over SR‐2 in $2,000,000 Painesville Township. 1/1/2015 89032 CUY WATERLOO ROAD Cleveland: East 152nd Street to East 162nd Street 2013 NOACA STP Project: Waterloo Road reconstruction2013 $4,195,422 NOACA Enhancement Project: Waterloo Road streetscape

11 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 1/1/2015 89034 CUY LAKE LINK TRAIL N/A Construct the Greenway Corridor Trail (a.k.a Cleveland $8,338,098 Mahoning Trail) along the abandoned railroad right‐of‐way in the Flats from the Towpath Trail along Irishtown Bend underneath the Main Avenue bridge crossing the Willow Street bridge to a proposed ped 1/1/2015 89035 CUY SOUTH GREEN RD SIGNALS South Euclid: Cedar Rd to Monticello Blvd 2013 NOACA CMAQ Project: Upgrade and replace obsolete $2,015,475 traffic signal equipement at tne existing signalized intersections along South Green Road between Cedar Road and Moniticello Boulevard in the City of South Euclid.

1/1/2015 89046 LAK AUBURN‐CRILE CONNECTOR RD Concord Twp: Auburn Rd to Crile Rd 2015 NOACA STP Project: Construct a connector road from $3,699,000 Auburn Road to Crile Road, including modifications to Auburn Road, Crile Road and the intersection of Auburn Road and SR‐ 44. 1/1/2015 90222 GEA SR 088/608 04.96/10.53 Parkman Township; 1.60 miles E of SR‐528 / Hambden Twp; Replace the twin CMP bridge over a stream located 1.60 miles $500,000 Over Sisson Creek S of Sisson Rd east of SR‐528 (just east of Owen Road) on SR‐88 (Nash Road) in Parkman Township. AND replace the bridge over Sisson Creek located 0.15 miles south of Sisson Rd on SR‐608 (Old State Road) in Ha 1/1/2015 90557 LAK CASHEN ROAD Madison Twp: Cashen Road over Arcola Creek CEAO Bridge Replacement Project $1,206,000 1/1/2015 92023 CUY SR 091 08.55 Hunting Valley, Pepper Pike; 0.76 mi N of SR‐87 Replace the prestressed concrete beam bridge over a stream $1,204,000 located north of SR‐87 in Pepper Pike and Hunting Valley.

1/1/2015 92608 GEA SR 608 00.00 Middlefield Twp; SR‐528 to SCL Resurface Old State Road (SR‐608) from SR‐528 to the $450,000 Middlefield SCL in Middlefield Twp and Middlefield. 1/1/2015 94005 CUY IR 271 06.04 Emery to Fairmount PM resurfacing of mainline IR‐271 from Emery Rd to Fairmount $4,000,000 Rd in Warrensville Hts, Orange, Beachwood, and Pepper Pike.

3/1/2015 87470 CUY CLVRT FY2015 Various locations in Cuyahoga County Culvert reconstruction contract. Many locations repaired under $400,000 DSR contracts. 3/2/2015 91042 CUY LAKESHORE BLVD BRIDGE Bratenahl: Lakeshore Boulevard over Nine Mile Creek CEAO LBR Project: Replace the existing 40‐foot span, earth ‐ $1,500,000 filled concrete arch with a new single‐span structure.

3/2/2015 91563 CUY OLD ROCKSIDE ROAD BRIDGE Independence: Old Rockside Road over the Cuyahoga River Municpal Bridge Project: Replace the Old Rockside Road bridge $4,368,100 over the Cuyahoga River in the City of Indpendence. The new structure will provide a 10‐feet of width for pedestrian and bicycle traffic. 3/2/2015 91829 LAK STANTON PARK SHORE Madison Township: Stanton Park along the Protect the Lake Erie shoreline from erosion in Stanton $291,000 shoreline Park.OH062 also used on PIDs 18895 & 23409. 3/2/2015 93297 LAK McMACKIN ROAD Madison Twp: US‐20 (North Ridge Rd) to Chapel Rd Resurface McMackin Road (CR‐117) from US‐20 to Chapel Road $1,600,000 (CR‐26) for a distance of 1.74 miles more or less in Madison Township.

12 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 3/2/2015 93609 CUY SRTS FY2015 East Cleveland N/A 2015 SRTS Infrastructure Project: Improve lighting, signage, $384,000 crosswalks, ped signals, and sidewalks to service the East Cleveland City Schools 3/2/2015 93610 CUY SRTS FY2015 Brooklyn N/A 2015 SRTS Infrastructure Project: Improve crosswalks, $154,000 sidewalk, bike paths, and drop‐off areas to service the Brooklyn City Schools. 3/2/2015 93611 LAK SRTS FY2015 Painesville Twp N/A 2015 SRTS Infrastructure Project: Install sidewalks, signage, $432,000 school flashers, pavement markings and bike racks to service Hadden & Buckeye Schools. 3/2/2015 93697 GEA PETTIBONE ROAD Bainbridge Twp: Cuy Co/Gea Co line to Chillicothe Rd (SR‐ MPO STP Project: Resurface Pettibone Road $480,000 306) 3/2/2015 93701 GEA RAVENNA ROAD (A‐D) Chardon Twp: Chardon Village Corp to Colburn Road MPO STP Project: Resurface Ravenna Road (CR‐601) from the $520,000 Chardon Village/Township Corporation line to Colburn Road (Geauga/Lake county line). 3/2/2015 93704 GEA CHAGRIN ROAD (C‐E) Bainbridge Twp: Catsden Road to SR‐306 (Chillicothe Road) MPO STP Project: Resurface Chagrin Road from Catsden Road $350,000 (TR189) to Chillicothe Road (SR‐306) in Bainbridge Township.

3/2/2015 93706 GEA BAINBRIDGE ROAD Bainbridge Twp: Cuy/Gea Co line to SR‐306 and SR‐306 to MPO STP Project: Resurface Bainbridge Road from the $800,000 Washington Street Cuyahoga County line to Chillicothe Road (SR‐306) and from Chillicothe Road (SR‐306) to Washington Street in Bainbridge Township. (Sections A‐G) 3/6/2015 86480 CUY LAKEFRONT WEST Ramps Cleveland: Various locations along West Shoreway (US‐6) o Closure of the Main Avenue Bridge EB entrance ramp from $6,629,693 West 28th Street and the realignment of the Main Avenue Bridge WB exit ramp to the south.o Reconstruction of the West Shoreway West 45th Street ramps to accomodate the West 28th Street traffic.o Re 3/31/2015 87469 LAK CB FY2015 Along US‐20 in Lake County Catch basin upgrade contract $250,000 3/31/2015 94535 CUY SR 174 03.75 Slide Gates Mills; SR‐174 south of Rodgers Rd GSM Project: Slope stabilization with sheet pile or segmental $432,813 retaining wall (based on geotechnical investigation and recommendation). Removal of current roadway surface and unsuitable subgrade. Rebuilding of 2 lane asphalt roadway at desired plan grades

4/1/2015 23733 GEA SR 087 19.75 Safety Middlefield Twp; Hayes Rd to County Line Reconstruct the hill along SR‐87 to improve vertical sight $2,500,000 distance from Hayes Rd to the east as necessary. Work will include shoulder widening for Amish buggy use along a portion of the project. Resurfacing completed under PID 92571. Work should incl 4/1/2015 84403 LAK SR 283 03.95 Eastlake; WCL to ECL Resurfacing from east of SR‐91 to the ECL in Eastlake $1,166,000 4/1/2015 84405 LAK SR 283 16.30 Painesville; WCL to US‐20 Resurface Richmond St (SR‐283) from the WCL to Erie St (US‐ $737,000 20) in Painesville and Painesville Twp. 4/1/2015 84406 CUY US 042 12.72 Cleveland; I‐480 to I‐71 Resurface Pearl Rd (US‐42) from IR‐480 to IR‐71 in Cleveland. $2,695,000

13 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 4/1/2015 85398 LAK US 020 15.78 Painesville; Watson to the ECL Resurface Mentor Ave (US‐20) from Watson to the ECL in $528,000 Painesville. Urban Paving Program 4/1/2015 92335 CUY IR 480 17.35 Various locations in the IR‐77 and IR‐480 interchange in the GSM Project: Slope and erosion repairs at several locationso $1,068,819 City of Independence backslope failure on the south side of IR‐77 SB ramp from IR‐ 480 EBo erosion along the west slope of the IR‐77 mainline overpass bridgeo slope failure on the north slope of the IR‐480 WB near S 4/1/2015 93460 CUY East 79th STREET BRIDGE Cleveland: East 79th Street over Norfolk Southern Railroad Remove and replace the East 79th Street bridge over Norfolk $7,100,000 and GCRTA tracks. Southern Railroad and GCRTA Rapids tracks along with approach pavements ending at the limits of the wingwall ends.o Local Bridge Projecto MPO STP Project

4/1/2015 94078 D12 LG FY2015 Various routes & sections Lighting upgrade throught the district $1,500,000 5/15/2015 80729 CUY STEARNS ROAD Olmsted Twp; At NS RR Construct a grade separation at Stearns Road and Norfolk $11,000,000 Southern Railroad in Olmsted Township.SAFETEA‐LU Earmark

6/1/2015 84286 CUY SR 017 18.47 Maple Hts; Lee Rd to ECL Resurface from Lee Road to the ECL in Maple Hts. Urban $1,017,500 Paving Program 6/1/2015 87616 LAK METROPARKS PEDESTRIAN BRIDGE Lake Metroparks bike/hike trail over NS RR just west of o Construct an overhead crossing (bridge and approaches) over $1,087,500 Liberty St in Painesville the Norfolk & Southern Railroad tracks that would connect two sections of Lake Metroparks 4.5 mile Greenway Corridor.o 2009 Appropriation Act Earmark OH392

7/1/2015 82119 CUY INNERBELT CCG2 EB Bridge Cleveland; New EB Innerbelt structure over the Cuyahoga Design‐Build‐Finance ContractNew structure to replace existng $288,000,000 River Valley Innerbelt Bridge (1809393). CCG2. Work includes demo of the existing structure,but that work be done under PID 88318 if necessary. Should be sold at the same time as PID 86824. CUY‐ 090‐15.2 7/1/2015 85395 CUY TRANSPORTATION BLVD Garfield Heights: Granger Road (SR‐17), Transportation Blvd o Extension of Transportation Blvd. to Rockside Road allowing $11,500,000 and Antenucci Blvd direct access from I‐480 to the Cuyahoga Valley National Park.o Work included in this project is the installation of multipurpose paths connecting Turney Road to Transportation Boulevard along 7/1/2015 86824 CUY IR 071 18.87 Cleveland; IR‐71 over IR‐490 Replace the deck of the IR‐71 bridge over IR‐490/IR‐90. NEW $5,000,000 DECK TO MAINTAIN EXISTING WIDTH. Should be sold with PID 82119. 10/1/2015 12343 CUY IR 271 14.49 L&R Highland Hts, Mayfield; Over Wilson Mills Rd Replace the mainline IR‐271 slab bridges over Wilson Mills Rd in $4,100,000 the Cities of Highland Hts and Mayfield. 10/1/2015 22891 CUY IR 077 13.75 Cleveland; Pershing Ave over IR‐77 Replace the Pershing Ave bridge over IR‐77 in Cleveland. New $5,600,000 structure will have no median pier. INNERBELT ENVIRO DOCUMENT APPROVED WITH 4 LANES ON PERSHING

1/1/2016 82698 LAK SR 283 00.00 Willowick; WCL to SR‐640 Urban paving $1,078,000

14 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 1/1/2016 82797 CUY LAKEWOOD SIGNALS Ph 5 Lakewood 2015 NOACA CMAQ Project: Lakewood City Wide Signal Project $2,649,686 ‐ Phase 5* Hilliard Rd/Franklin Blvd ‐ SR 237 (Riverside Dr) to Ridgewood Ave 1/1/2016 84112 CUY CLEVELAND TOWPATH TRAIL Ph 3 N/A Construct Stage 3 of the Cleveland Towpath Trail construction $10,000,000 from Steelyard Commons to Tremont/Literary Trailhead.SAFETEA‐LU Earmarks OH214+ OH322

1/1/2016 84297 CUY SR 091 05.26 Moreland Hills; SCL to NCL Resurface SOM Center Rd from the SCL to the NCL in the Village $900,000 of Moreland Hills. 1/1/2016 84298 GEA SR 044 18.45 Chardon Twp; Chardon NCL to Lake Cnty Ln Resurface Ravenna Road (SR‐44) from the Chardon NCL to the $1,100,000 Lake County Line in Chardon Twp. 1/1/2016 84301 GEA US 322 00.00 Chester Twp; Cnty Line to Heath Rd Resurface Mayfield Rd (US‐322) from the Cuyahoga County Line $1,800,000 to Heath Rd in Chester Twp. 1/1/2016 85530 CUY IR 480 19.21 Garfield Hts, Maple Hts; Bridge to IR‐480N PM resurfacing of IR‐480 from the Valleyview Bridge to IR‐480N $8,000,000 in Garfield Hts and Maple Hts. 1/1/2016 85598 GEA US 322 04.89 Munson Twp; Heath Rd to SR‐44 Resurface Mayfield Rd (US‐322) from Heath Rd to Ravenna Rd $2,000,000 (SR‐44) in Munson Twp. 1/1/2016 88400 CUY IR 090 11.51/VAR Paint Cleveland; IR‐90 bridge painting Paint the structural steel of 5 mainline bridges on I‐90 in $4,000,000 Cleveland 1/1/2016 89246 CUY SR 176 12.83 Cleveland; Denison to IR‐90 PM resurfacing on SR‐176 from Denison Ave to merge with IR‐ $675,000 71 near IR‐90 in Cleveland 1/1/2016 90201 CUY IR 090 07.04/VAR Paint Rocky River, Lakewood; Wooster, Hilliard, Woodward over I‐Paint the structural steel of 3 bridges over IR‐90 in Rocky River $3,100,000 90 and Lakewood: Wooster Rd, Hilliard Rd, and Woodward Ave.

1/1/2016 90759 CUY IR 090 20.71 Noise Panel Bratenahl; East 86th to SR‐283 Noise wall panel replacement along IR‐90 from East 86th St to $2,530,000 SR‐283 in Bratenahl. Split from PID 87875. 1/1/2016 90913 GEA SR 608 12.84 Hambden Twp; US‐6 to County Line Resurface Old State Rd (SR‐608) from the GAR Highway (US‐6) $1,100,000 to the Lake County Line in Hambden Twp. 1/1/2016 92601 GEA SR 044 08.88 Newbury, Munson Twps; SR‐87 to US‐322 Resurfacing from Kinsman Rd (SR‐87) to Mayfield Rd (US‐322) $1,500,000 in Newbury and Munson Twps. 1/1/2016 92602 GEA SR 087 13.58 Burton, Middlefield Twps; ECL to WCL Resurfacing from the Burton ECL to the Middlefield WCL in $900,000 Burton and Middlefield Townships. 1/1/2016 93467 LAK SR 002 03.03L Eastlake; Over a stream west of SR‐91 Replace the superstructure of the SR‐2 bridge $450,000 3/1/2016 80960 CUY INDEPENDENCE ALL‐PURPOSE TRL N/A Construct an all‐purpose trail from Brecksville Road to Canal $1,522,684 Road in the City of Independence.SAFETEA‐LU Earmark

3/1/2016 89057 LAK SR 091 00.00 Shared Use Path Willoughby Hills SCL (White Rd) to US‐20 (Euclid Ave) in the 2013 NOACA CMAQ Project: Construct a shared use path along $1,100,000 Cities of Willoughby Hills and Willoughby the east side of SOM Center Road (SR‐91) in the Cities of Willoughby Hills and Willoughby. 3/1/2016 91039 CUY CEDAR AVE BRIDGE Cleveland: Cedar Avenue over Doan Brook CEAO LBR Project: Bridge replacement project. $2,898,000

15 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 3/1/2016 91043 CUY AVERY ROAD BRIDGE Broadview Heights: Avery Road over Chippewa Creek CEAO LBR Project: Rehabilitate a continuous three‐span 152‐ $2,000,000 foot long steel beam bridge along Avery Road in the City of Broadview Heights. The proposed work will include the replacing and widening the superstructure, repairs to the substructure, approach 3/1/2016 93827 CUY WEST CENTER STREET BRIDGE Berea: West Center Street over east branch of the Rocky Municipal Bridge Project: Replace the West Center Street $3,125,000 River Bridge (SFN 1862650) over the east branch of the Rocky River in the City of Berea. 3/3/2016 91049 GEA OLD STATE RD (B‐H) Parkman Twp/Middlefield Twp: SR‐088 to SR‐528 CEAO CSTP Project: Resurface Old State Road from SR‐088 to $811,000 SR‐528 in Parkman and Middlefield townships. 3/3/2016 91050 GEA GR FY2016 LOCAL N/A CEAO HSIP Project: Install new guardrail and updgrade existing $350,000 guardail and guardail end treatments on various county roads.

3/3/2016 93298 LAK VROOMAN ROAD Leroy Twp: SR‐86 (Painesville‐Warren Rd) to IR‐90 Resurface Vrooman Road from SR‐86 (Painesville Warren Road) $1,390,500 to IR‐90 a distance of 1.2 miles more or less in Leroy Township.

3/3/2016 93702 GEA KIRTLAND ROAD Chardon Twp: Lake County/Geauga County Line to US‐6 MPO STP Project: Resurface Kirtland Road (CR‐17) from the $300,000 (Chardon Road) county line (Wisner Road) to US‐6 (Chardon Road) in Chardon Township. 3/31/2016 86256 CUY MEMPHIS AVENUE Brooklyn: WCL to Ridge Road Repair, reconstruct and intersection improvements on $2,936,900 Memphis Avenue. 3/31/2016 94536 CUY SR 017 15.29 Slope Granger Road east of Canal Road in Garfield Hts. GSM Project: The design approach will be focused on 3 major $1,000,000 areas: 1) To improve the collection and transport of groundwater and surface water before it has an opportunity to reach the pavement area. 2) To construct a catchment wall behind the curb line 4/1/2016 85394 CUY SR 091 07.73 Pepper Pike, Hunting Valley; SCL to NCL Resurface SOM Center Rd (SR‐91) from the SCL to the NCL in $1,089,000 Hunting Valley and Pepper Pike. 4/1/2016 85396 LAK SR 084 08.11 Mentor; West of SR‐306 to Garfield Rd Resurfacing of Johnnycake Ridge Road (SR‐84) from west of SR‐ $616,000 306 to Garfield Road in the City of Mentor 4/1/2016 85401 CUY US 322 03.82/04.90 Cleveland; East 93rd to US‐20/Cleveland, Cleveland Hts; US‐ Resurfacing Chester Ave from E. 93rd St to Euclid Ave (US‐20) in $1,485,000 20 to Kenilworth Cleveland/Mayfield Rd from Euclid Ave (US‐20) to Kenilworth Ave in Cleveland and Cleveland Hts 4/1/2016 85403 CUY US 322 00.50 Cleveland; US‐6 to East 93rd St Resurface Chester Ave (US‐322) from Superior Ave (US‐6) East $5,087,500 93rd St in Cleveland. Urban Paving Program 4/1/2016 89235 LAK SR 283 14.39 Mentor ECL to Painesville WCL Resurface Lakeshore Blvd (SR‐283)/Singer Ave/River $775,000 St/Richmond St from the Mentor ECL to the Painesville WCL in Painesville Twp and Grand River Village. 4/1/2016 89257 CUY SR 021 08.22 Independence; Rockside Rd to NCL Resurface from Rockside Rd to the Cuyahoga Valley railroad in $1,045,000 Independence. 4/1/2016 89261 CUY SR 043DA 00.07 Bedford Hts; SR‐8 to SR‐17 Resurfacing from Northfield Rd (SR‐8) to Libby Rd (SR‐17) in $385,000 Bedford Hts 4/1/2016 89262 CUY SR 252 06.64 Westlake; SCL to US‐20 Resurfacing from the North Olmsted corp line to Center Ridge $605,000 Road (US‐20) in Westlake.

16 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 4/1/2016 94082 D12 LG FY2016 Various routes & sections Districtwide lighting upgrade $1,500,000 6/1/2016 12500 CUY HILLSIDE ROAD Independence; SR‐21 to B&O RR Widen and reconstruct from Brecksville Rd (SR‐21) to the B&O $8,236,305 RR tracks in Independence. Work includes alignment and profile changes, drainge upgrading, and widening to standard 2 lanes. 7/1/2016 85146 CUY SR 021 10.04L Cuyahoga Hts; SR‐21 ramp over I‐77 Replace the deck and possibly the superstructure of the I‐77SB $5,750,000 exit ramp bridge to SR‐21 SB in Cuyahoga Heights. Work may include removing the center pier. CUY‐77‐10.12

10/1/2016 90591 CUY IR 480 18.42 L&R Deck Valley View, Garfield Hts; Over the Cuyahoga River Valley Replace the decks of the twin IR‐480 bridges over the Cuyahoga $80,000,000 River Valley in Valley View and Independence. Major Bridge Program 12/1/2016 23414 CUY US 042 16.62 Cleveland; West 25th over IR‐90 Replace the deck of the West 25th St (US‐42) bridge over IR‐90 $2,700,000 in the City of Cleveland. Work will include painting the structural steel. CUY‐090‐1435 1/1/2017 22198 CUY IR 090 00.00 Westlake; County Line to Clague Rd Preventative Maintenance project on I‐90 in the City of $4,200,000 Westlake from the Lorain County Line to Clague Rd. 1/1/2017 77526 CUY IR 480 00.00 North Olmsted, Fairview Park; County Line to the Rocky PM resurfacing from the Lorain County Line to the Rocky River $7,000,000 River bridge in North Olmsted and Fairview Park. 1/1/2017 78343 GEA US 422 17.35 Intersection Intersection of US‐422 and SR‐88/SR‐528 in Parkman Improve geometrics and capacity at the intersection of US‐422 $821,000 Township and SR‐88/SR‐528 in Parkman Twp. 1/1/2017 85217 GEA SR 528 16.48 Montville Twp, Thompson Twp; US‐6 to County Line Resurface Madison Rd (SR‐528) from the GAR Highway (US‐6) $2,600,000 to the Lake County Line in Montville and Thompson Twps.

1/1/2017 85369 CUY SR 082 06.58 North Royalton; York Rd to ECL Resurface Royalton Rd (SR‐82) from York Road to the ECL in $1,157,000 North Royalton. 1/1/2017 87628 CUY IR 090 26.16/VAR Cleveland; Over E.185th, Neff, and E. 200th Replace the decks of 3 mainline bridges on IR‐90 over East $14,100,000 185th St, Neff Rd, and East 200th St in Cleveland. 1/1/2017 87855 CUY IR 077 09.50 Paint Independence, Cuyahoga Heights; Over Cuyahoga River Paint the structural steel of the IR‐77 bridge over the Cuyahoga $20,000,000 Valley River Valley in Independence and Cuyahoga Hts. Split from PID 77419. 1/1/2017 89408 CUY IR 090 20.01 Cleveland, Bratenahl; East 55th to the Bratenahl ECL Resurfacing from East 55th St to the Bratenahl ECL in Cleveland $5,200,000 and Bratenahl. 1/1/2017 92024 CUY SR 175 12.35 Richmond Hts; Over the East Branch of Euclid Creek Repair the filled arch structure on Richmond Road (SR‐175) $1,000,000 over the East Branch of Euclid Creek, located south of Chardon Road (US‐6) and north of White Road in the City of Richmond Heights. 1/1/2017 93229 LAK SR 608 03.37 Concord Twp; Over Metroparks Bikeway Replace the box beams on the SR 608 (Old State Road) bridge $1,300,000 over the Lake Metroparks Greenway Corridor multi‐use path in Concord Township. Project is just east of Ravenna Road.

4/1/2017 84401 LAK SR 306 00.00 Kirtland; SCL to south of Kirtland Rd Resurfacing to existing concrete section. $1,880,000 4/1/2017 85387 CUY SR 176 07.87 Parma; Ridgewood to SR‐17 Resurface Broadview Rd (SR‐176) from Ridgewood Dr to $1,562,000 Brookpark Rd (SR‐17) in Parma. Urban Paving Program

17 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 4/1/2017 85393 CUY US 020 08.01/VAR Rocky River; Center Ridge to Detroit / WCL to Wright Resurface Wooster Rd from Center Ridge to Detroit; and $1,485,000 Detroit Rd from the WCL to Wright Ave all in Rocky River.

4/1/2017 85400 CUY SR 175 09.83 Richmond Hts; SCL to NCL Resurface Richmond Rd (SR‐175) from the SCL to the NCL in $1,738,000 Richmond Hts. 4/1/2017 89277 CUY US 042 15.30 Cleveland; IR‐71 to US‐6 Resurfacing from IR‐71 to Detroit Rd (US‐6) in Cleveland $3,602,500 6/1/2017 23035 CUY SR 252 09.13 Bay Village; NS to US‐6 Reconstruct Columbia Rd (SR‐252) from the NS RR to Lake Rd $2,777,534 (US‐6) in Bay Village. Work will include culvert replacement. LOCAL, NON‐TRADITIONAL, NOACA STP 6/1/2017 80997 CUY CLEVELAND TOWPATH TRAIL Ph 1 Cleveland; Harvard Ave to Steelyard Commons. Construct the Cleveland Towpath Trail in the City of Cleveland $10,881,335 from Harvard Avenue to Steelyard Commons. 1/1/2018 8743 CUY US 006 02.57 Bay Village; 1.29 mi W of SR‐252 Replace the 85' Lake Rd (US‐6) bridge over Cahoon Creek $1,400,000 located west of SR‐252 in Bay Village. Repairs were done in 2002. 1/1/2018 14198 CUY IR 071 10.07/VAR Paint Cleveland, Brook Park; Various structures in the IR‐ Paint the structural steel of 7 bridges in the IR‐71/IR‐480/SR‐ $4,300,000 480/71/237 interchange 237 interchange in Cleveland and Brook Park. 1/1/2018 22213 CUY IR 077 12.12 Newburgh Hts; Harvard over IR‐77 Replace the Harvard Rd bridge over I‐77 in Newburgh Heights. $6,700,000 Work includes removing the center pier. 1/1/2018 24857 LAK IR 090 00.00 Wickliffe, Willoughby Hills; Cnty Ln to Rockefeller PM resurfacing of the Euclid Spur from the Cuyahoga County $1,800,000 Line to Rockefeller Rd in Wickliffe and Willoughby Hills.

1/1/2018 77527 CUY IR 480 12.78 Cleveland; Idlewood to SR‐17 PM resurfacing from Idlewood Rd to Brookpark Rd (R‐17) in $4,300,000 Cleveland. 1/1/2018 83147 CUY IR 090 04.90 NOISE WALL 600 feet west of the Westlake/Rocky River corporation line Construct Type II Noise Barrier at spot locations in the Cities of $1,500,000 to the Rocky River Westlake and Rocky River.Includes sections not built under PID 75314. o Moved to SFY 2018 fro 2015 1/1/2018 84490 GEA SR 044 13.05 Munson Twp; S of US‐322 over Butternut Creek Replace the slab bridge on Ravenna Road (SR44) over Butternut $1,000,000 Creek located 0.10 miles south of Mayfield Rd (US‐322) in Munson Twp. 1/1/2018 85525 CUY IR 077 00.00 Brecksville; Cnty Ln to Oakes Rd PM resurfacing from the County Line to appox. Oakes Rd in $1,550,000 Brecksville. 1/1/2018 85526 CUY IR 480 06.78 Cleveland; Bridge to W. 139th PM resurfacing from the Rocky River Bridge to West 139th St in $4,500,000 Cleveland. 1/1/2018 88353 LAK SR 002 15.97 Painesville; Elm St over SR‐2 Replace the deck of the Elm Street bridge over SR‐2 in the City $1,400,000 of Painesville. 1/1/2018 88398 CUY IR 077 09.09/VAR Independence; I‐77/I‐480 interchange bridges Paint the structural steel of 3 bridges in the I‐77/I‐480 $8,400,000 interchange in Independence. 1/1/2018 90903 GEA SR 044 02.81 Auburn, Newbury Twps; US‐422 to SR‐87 Resurfacing Auburn Rd (SR‐44) from US‐422 in Auburn Twp to $2,300,000 Kinsman Rd (SR‐87) in Newbury Twp. 1/1/2018 90909 GEA US 006 00.00 Chardon Twp; County Line to Chardon WCL Resurface Chardon Rd (US‐6) from the Lake County Line to the $1,400,000 Chardon WCL in Chardon Twp. 1/1/2018 90911 GEA SR 086 00.92 Thompson, Montville Twps; SR‐166 to SR‐528 Resurface Plank Rd (SR‐86) from Rock Creek Rd (SR‐166) in $1,700,000 Thompson Twp to Madison Rd (SR‐528) in Montville Twp.

18 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 1/1/2018 92071 GEA US 422 16.38 Parkman Twp; Over the Grand River Replace the top of the concrete frame bridge over the Grand $1,000,000 River located west of SR‐88 in Parkman Twp. 1/1/2018 92603 GEA SR 088 00.00 Parkman Twp; County Line to Hosmer Road Resurface Nash Rd (SR‐88) from the Portage County Line to $1,600,000 Hosmer Rd in Parkman Twp. 4/1/2018 85360 CUY SR 043 10.61 Cleveland; SCL to Broadway Resurfacing Miles Road from the Warrensville Hts corp line to $3,200,000 Broadway Avenue in Cleveland. 4/1/2018 89258 LAK SR 615 04.93 Mentor; SR‐2 to Munson Resurfacing from north of SR‐2 to Munson Rd in Mentor. $1,120,000 4/1/2018 89267 CUY SR 017 07.09 Cleveland, Parma, Brooklyn; West 130th to ECL Resurface Brookpark Rd (SR‐17) from West 130th St to the $5,965,000 Brooklyn Hts WCL inCleveland, Parma, Brooklyn and a small section of Brooklyn Hts. 4/1/2018 89270 LAK SR 535 00.00 Painesville; SR‐283 to ECL Resurface Richmond St (SR‐535) from SR‐283 to the ECL in $250,000 Painesville. 4/1/2018 89275 LAK SR 633 00.00 Wickliffe; US‐20 to Lakeland Blvd Resurface Lloyd Rd from Euclid Ave (US‐20) to Lakeland Blvd in $374,000 Wickliffe. Urban Paving Program 10/1/2018 81552 CUY IR 071 17.95L Cleveland; SR‐176SB over IR‐71SB Replace the SR‐176SB bridge over IR‐71SB. Work may include $8,000,000 lengthening the structure. This project was recommended by the Innerbelt Study. 1/1/2019 13182 CUY SR 014 06.20 Garfield Hts; Over Mill Creek Rehabilitate the Broadway Ave (SR‐14) bridge over Mill Creek $1,350,000 located east of the WCL in Garfield Hts. 1/1/2019 13183 CUY SR 014 06.70 Garfield Hts; Over Mill Creek Rehabilitate the Broadway Ave (SR‐14) bridge over Mill Creek $1,050,000 located east of Garfield Blvd in Garfield Hts. 1/1/2019 83635 GEA SR 087 07.70 Newbury, Burton Twps; Auburn Rd to Burton WCL Resurface Kinsman Rd (SR‐87) from Auburn Rd to the Burton $1,800,000 WCL in Newbury and Burton Twps. 1/1/2019 83645 LAK SR 084 28.30 Madison, Madison Twp; WCL to County Line Resurface South Ridge Road (SR‐84) from the Madison WCL to $1,300,000 the Ashtabula County Line in Madison and Madison Twp.

1/1/2019 85508 CUY IR 071 00.00 Strongsville, Middleburg Hts; County Line to US‐42 PM resurfacing from the Medina County Line to Pearl Rd (US‐ $5,500,000 42) in Strongsville and Middleburg Hts. 1/1/2019 85532 LAK SR 044 04.14/VAR North of SR‐84 to Headlands Resurfacing SR‐44 from north of SR‐84 to Headlands Park; and $6,000,000 SR‐2 from SR‐44 to the Painesville WCL. 1/1/2019 85601 GEA SR 087 00.00 Russell Twp; County Line to SR‐306 Resurface Kinsman Rd (SR‐87) from the Cuyahoga County Line $1,000,000 to Chillicothe Rd (SR‐306) in Russell Twp. 1/1/2019 85605 GEA SR 700 00.00 Troy Twp; County Line to US‐422 Resurface Claridon‐Troy Rd (SR‐700) from the Portage County $1,000,000 Line to US‐422 in Troy Twp. 1/1/2019 88348 CUY IR 090 24.10/24.63 Cleveland; Over E.140th and E.152nd Replace the decks of the mainline IR‐90 bridges over East 140th $11,400,000 St and East 152nd St in Cleveland. 1/1/2019 90202 CUY SR 014 02.19/02.55 Paint Cleveland; Over IR‐490 and IR‐77 Paint the 2 Broadway Ave (SR‐14) bridges over IR‐490 and IR‐77 $4,500,000 in Cleveland 1/1/2019 90908 GEA SR 528 01.29 Parkman, Middlefield Twps, Middlefield; SR‐88 to SR‐87 Resurface Madison Rd (SR‐528) from Nash Rd (SR‐88) to $1,900,000 Kinsman Rd (SR‐87) in Parkman and Middlefield Twps and the Village of Middlefield. 4/1/2019 85397 LAK SR 174 03.83 Willoughby; SCL to US‐20 Resurface River Rd (SR‐174) from the SCL to Euclid Ave (US‐20) $571,000 in Willoughby. Urban Paving Program

19 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 4/1/2019 89248 CUY SR 010 11.95 Cleveland; W.117th to West 65th St Resurface from West 117th St. to West 65th St. in Cleveland. $2,447,500

4/1/2019 89255 CUY SR 010 14.13 Cleveland; W.65th to US‐422 Resurfacing from West 65th St to Ontario Avenue in Cleveland $3,377,000

4/1/2019 89259 CUY SR 014 06.09 Garfield Hts; WCL to ECL Resurface from the WCL to the ECL in Garfield Hts $2,266,000 4/1/2019 89276 CUY SR 252 04.54/05.51 North Olmsted; I‐480 to SR‐10/SR‐10 to NCL Resurfacing from I‐480 to Lorain Rd (SR‐10) and from Lorain Rd $1,380,500 to the NCL in North Olmsted 6/1/2019 85377 CUY SR 002 14.41 Paint Pt 2 Cleveland; Main Avenue Bridge Paint the non‐truss spans of the Main Avenue Bridge. Includes $20,000,000 all spans not done under previous PID 22130. 746,000 SF of steel to be painted. 10/1/2019 76816 CUY SR 237 06.34 Cuyahoga County SR 237 from 6.34 to 8.03 Candidate Major Rehabilitation Project $21,420,000 1/1/2020 11230 CUY SR 175 00.56 Solon; S of Cannon Rd under NS RR spur Replace the NS RR (Cleveland Commercial Railway) spur track $5,300,000 bridge over Richmond Rd (SR‐175) with a new overhead structure. This structure is located just south of Cannon Rd in Solon. The new structure span will provide clearance for a standard 2‐lane r 1/1/2020 22221 GEA US 422 09.38 Auburn, Troy, Parkman Twps; SR‐44 to E of SR‐88 Resurface Main‐Market St (US‐422) from east of Ravenna Rd $4,300,000 (SR‐44) to east of Main St (SR‐88) in Auburn, Troy, and Parkman Twps. 1/1/2020 23449 CUY SR 021 06.98 Independence; Over Hemlock Creek Replace the 20' concrete culvert along Brecksville Rd (SR‐21) $900,000 over Hemlock Creek located just north of Selig Dr in Independence. 1/1/2020 24853 CUY IR 090 04.52 Westlake, Rocky River; Clague to the Rocky River PM resurfacing from Clague Rd to the Rocky River in Westlake $4,000,000 and Rocky River. 1/1/2020 79671 CUY/SUM IR 077 00.00/33.00 TRAC Richfield, Brecksville; Turnpike to S of Oakes Rd. Add lane and major rehab from the Ohio Turnpike to south of $31,900,000 Oakes Roadin Richfield and Brecksville. 1/1/2020 80541 LAK SR 002 13.28 Painesville, Painesville Twp; SR‐44 to SR‐283 Major rehab, addlane. Total CO cost at $41,800,000.Split from $41,800,000 PID 13486Unfunded at this time. 1/1/2020 80970 CUY IR 480 11.60 Tiedeman Brooklyn; Tiedeman at IR‐480 Upgrade the IR‐480 and Tiedeman Road Interchange in the City $14,006,889 of Brooklyn.o SAFETEA‐LU Earmarko Federal SafetyProject no longer being pursued by the sponser 1/1/2020 84019 CUY IR 480 10.38 Cleveland, Brooklyn; West of W. 130th to Idlewood PM Resurfacing of IR‐480 from approx. West 130th St to $3,400,000 Idlewood Dr in Cleveland and Brooklyn. 1/1/2020 84020 CUY IR 480 23.97 Maple Hts, Bedford Hts; IR‐480N to IR‐271 Resurfacing IR‐480 from IR‐480N to IR‐271 in Maple Hts and $3,300,000 Bedford Hts. 1/1/2020 85600 GEA US 006 05.90 Hambden Twp; Chardon ECL to SR‐166 Resurface the GAR Highway (US‐6) from the Chardon ECL to SR‐ $1,100,000 166 in Hambden Twp. 1/1/2020 86044 CUY IR 071 18.29 Cleveland; West 14th over I‐71 Replace the deck of the West 14th St bridge over IR‐71 in $8,000,000 Cleveland. 1/1/2020 86479 CUY US 006 13.73/VAR Bikeway Cleveland: Various locations along West Shoreway (US‐6) o Installation of the Lakefront Bikeway multipurpose trail along $9,585,000 the West Shoreway (US‐6) from West 65th Street to West 28th Street.o Reconstruction of the West 49th Street ramps and reconfiguration of the Herman Avenue bridge over US‐6.o Reconstruct the

20 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 1/1/2020 86482 CUY US 006 12.20 Pavement Cleveland: Clifton Boulevard to Main Avenue Bridge o Replacement of existing West Shoreway mainline pavement $27,450,000 from Clifton Boulevard to Main Avenue Bridge, including ramps to and from .o Shoulders will be eliminated to reflect non‐freeway speed limit.o New multipurpose trail will be construct 1/1/2020 90900 CUY IR 271 09.73 Fairmount to S of Wilson Mills PM resurfacing of mainline IR‐271 from Fairmount Blvd. to $4,500,000 south of Wilson Mills Rd. 1/1/2020 91605 LAK IR 090 01.88 Rockefeller to W of SR‐306 Resurface IR‐90 from approximately Rockefeller Rd to the $7,000,000 concrete section west of SR‐306 in Willoughby Hills, Waite Hill, and Willoughby. 4/1/2020 87904 CUY IR 071 06.10/VAR Barrier Various section along IR‐71 and IR‐480 in Cuyahoga County Barrier‐Concrete: Replacement of the concrete median barriers $5,990,000 on IR‐71 from SLM 6.10 to 10.20 and on I‐480 from SLM 21.26 to 24.11 4/1/2020 88901 CUY IR 090 13.34/23.71 Barrier Cleveland; Various sections on IR‐90 Median barrier: Repair/replace concrete median barrier on I‐90 $7,000,000 from SLM 13.34 to 14.40, and from SLM 23.71 to 29.17. Split from PID 87903. 4/1/2020 89260 CUY SR 091 02.45 Solon; Bainbridge Rd to NCL Resurface SOM Center Rd (SR‐91) from Bainbridge Rd to the $2,200,000 NCL in Solon. Urban Paving Program 4/1/2020 89265 CUY SR 003 02.61 North Royalton; SR‐82 to the NCL Resurfacing from south of SR‐82 to the NCL in North Royalton. $1,540,000

4/1/2020 89268 CUY US 422 00.00 Cleveland; Public Square to Woodland Ave Resurfacing from Public Square to Woodland Avenue in $2,860,000 Cleveland. 4/1/2020 89274 LAK SR 640 00.00 Wiilowick; SR‐283 to ECL Resurface Vine St (SR‐640) from Lakeshore Blvd (SR‐283) to the $2,035,000 ECL in Willowick. Urban paving Program 4/1/2020 89278 CUY SR 082 12.56 Brecksville; WCL to ECL Resurfacing from the WCL to the County Line in Brecksville $2,310,000

6/1/2020 10788 CUY SR 176 09.31 Parma; 0.57 mi S of SR‐17 Replace the deck of the Broadview Rd (SR‐176) bridge over $2,200,000 West Creek located south of Brookpark Rd (SR‐17) in Parma. Overlay done in 2004 under PID 75203. This project moved to 2020. ‐ MJH 6/15/2020 13184 CUY SR 014 12.12E Bedford; Over Tinkers Creek Rehabilitate the Union St (SR‐14) bridge over Tinkers Creek $650,000 located south of Broadway Ave in Bedford. 10/1/2020 77613 CUY East 55th STREET TRAC Cleveland; CSX Railroad Bridge over East 55th Street Replace the non‐inventoried CSX Railroad Bridge over East 55th $14,195,000 Street located just south of IR‐90 in order to accomodate the widening of East 55th Street, including bike lanes. Project is part of the larger Innerbelt Project. TRAC Project

1/1/2021 21788 CUY IR 077 11.11 Cuyahoga Hts; CSX over IR‐77 Replace the CSX RR bridge over IR‐77 located south of Grant $34,000,000 Avenue in Cuyahoga Hts. New structure will be longer with no center pier. Construction funded with PPGS SAC for now.

1/1/2021 85608 LAK SR 084 13.17 Painesville Twp; Mentor ECL to Painesville WCL Resurface Johnny Cake Ridge Rd (SR‐84) from the Mentor ECL $1,700,000 to the Painesville WCL in Painesville Twp.

21 of 22 PIO_10year.xls Proposed ODOT Construction Projects 10/18/2012 10/1/12 thru 6/18/22 Construction Sale Date PID Project Name Project Termini Project Description Estimate 1/1/2021 85627 CUY IR 480 15.83 Brooklyn Hts, Independence; Tuxedo to the Valleyview PM resurfacing of IR‐480 from Tuxedo Ave to the Valleyview $3,625,000 Bridge Bridge in Brooklyn Hts and Independence. 1/1/2021 85629 CUY IR 090/490 13.41/0.00 Cleveland; W.44th to IR‐71/IR‐90 to bridge PM resurfacing of IR‐90 from West 44th St to IR‐71; and IR‐490 $3,300,000 from IR‐90 to the Cuyahoga River Valley all in Cleveland.

1/1/2021 87800 CUY SR 002 15.75 Cleveland; Bridge to IR‐90 Resurface the Shoreway from the Main Avenue Bridge to IR‐90 $3,500,000 in Cleveland. 1/1/2021 92611 CUY SR 008 00.00 Walton Hills; Cnty Ln to NCL Resurface Northfield Rd (SR‐8) from the County Line to the NCL $1,300,000 in Walton Hills. 1/1/2021 92614 LAK SR 086 01.68 Painesville Twp, LeRoy Twp; SCL to Vrooman Rd Resurface Painesville‐Warren Rd (SR‐86) from the Painesville $1,600,000 SCL to Vrooman Rd in Painesville and LeRoy Townships.

10/1/2021 21781 CUY SR 002 05.97 Rocky River; Over IR‐90 Replace the deck of the Detroit Rd (SR‐2/SR‐254) bridge over IR‐ $4,200,000 90 in Rocky River. 1/1/2022 13484 LAK SR 002 00.31/VAR Wickliffe; Over Lloyd Rd, Lloyd Ramp, Worden Rd Replace the mainline SR‐2 slab bridges over Lloyd Rd and $10,000,000 Worden Rd and widen the mianline structures over the Lloyd Rd connector ramps in the City of Wickliffe. 1/1/2022 22215 CUY SR 252 08.79 Westlake; Columbia over IR‐90 Replace the deck of the Columbia Rd bridge over IR‐90 in $3,500,000 Westlake. CUY‐090‐0356 1/1/2022 75483 CUY IR 090 18.72 Cleveland; SR‐2 to East 55th Street Resurface the East Shoreway (IR‐90) from the Innerbelt Curve $3,100,000 to East 55th Street in Cleveland. 1/1/2022 85529 CUY IR 071 10.48 Cleveland; I‐480 to the Brooklyn Corp Line PM resurfacing from IR‐480 to the Brooklyn Corp Line $6,850,000 1/1/2022 85611 LAK SR 608 00.00 Concord Twp; County Line to Painesville‐Ravenna Rd Resurface Concord‐Hambden Rd (SR‐608) from the Geauga $1,400,000 County Line to Painesville‐Ravenna Rd in Concord Twp.

1/1/2022 85634 LAK SR 002 00.00 Wickliffe, Willowick, Eastlake; County Line to E of SR‐91 PM resurfacing of the Lakeland Freeway (SR‐2) from the $3,900,000 Cuyahoga County Line to approx. SR‐91 in Wickliffe, Willowick, and Eastlake. 1/1/2022 88350 CUY IR 071 13.72 Cleveland; Bellaire over IR‐71 Replace the deck of the Bellaire Road bridge over IR‐71 in the $4,900,000 City of Cleveland. 1/1/2022 90901 CUY/LAK IR 271 14.09/00.00 Highland Hts, Mayfield, Willoughby Hils; S of Wilson Mills to PM resurfacing of mainline IR‐271 from south of Wilson Mills $5,370,000 IR‐90 Rd. to IR‐90 in the Cities of Highland Hts. and Willoughby Hills and the Village of Mayfield.

22 of 22 PIO_10year.xls