August 25, 2021
Total Page:16
File Type:pdf, Size:1020Kb
September 22, 2021 The Nebraska Interstate & State Highway Construction & Detour Report does not include Waze reports, construction and maintenance projects that will take less than 30 days to complete, rough roads reports, rest area information, and traffic accidents. Call 511 or visit www.511.nebraska.gov for the most current information. SUBSCRIBE to be notified when this document is updated. Nebraska Interstate & State Highway Construction & Detour Report Both directions between Colorado State Line and I-80. 10-foot width limit in effect. The roadway is reduced to one I-76 lane due to road construction work. The roadway is shared with opposing traffic. Anticipated completion is November 1, 2021. Between Exit 85: L-25A; Chappell (25 miles east of Sidney) and Exit 101: US 138; Big Springs; Julesburg (31 miles I-80 west of the Ogallala exit). There is a 12-foot width limit in effect. Road construction work is in progress. The roadway is reduced to two lanes. Between Exit 101: US-138; Big Springs; Julesburg and Exit 107: L-25B; Big Springs (Ogallala). Road construction I-80 work is in progress. The roadway is reduced to two lanes. Traffic restrictions are in force. The roadway is shared with opposing traffic, 10-foot width limit. Anticipated completion is November 1, 2021. Eastbound between Exit 102: I-76; North 14th Street; Sidney and Exit 107: L-25B; Big Springs (Ogallala). The left I-80 lane is closed due to road construction work. Both directions between Exit 107: L-25B; Big Springs and Exit 133: L-51B; Roscoe (Ogallala). There is a 11-foot I-80 width limit in effect. The roadway is reduced to one lane due to road construction work. Anticipated completion is November 10, 2021. Westbound between Exit 126: N-61; US 26; Ogallala; Grant and Exit 107: L-25B; Big Springs (Ogallala). The right I-80 lane is closed due to road construction work. Both directions between Exit 291: L-10D; Shelton and Exit 305: L-40C; Alda (Kearney). 12-foot width limit in effect. I-80 A lane is closed intermittently due to road construction work. The entrance ramp is closed. Anticipated completion is November 1, 2021. Both directions between Exit 324: S-41B; Giltner and Exit 342: S-93A; Henderson; Bradshaw (Aurora). There is a I-80 12-foot width limit in effect. A lane is closed intermittently due to road construction work. Night time construction work is in progress. Approximate completion is October 8, 2021. Both directions between Exit 332: N-14; Aurora (5 miles east of Aurora) and Exit 348: L-93E; Bradshaw; County I-80 Road H (7 miles west of York). There is a 12-foot width limit in effect. A lane is closed intermittently because of night time construction work, From 7:00PM CDT to 10:00AM CDT on weekdays. 1 September 22, 2021 Nebraska Interstate & State Highway Construction & Detour Report Both directions between Exit 369: L-80E Beaver Crossing (19 miles east of York) and Exit 388: N-103; Crete I-80 (13 miles west of Lincoln). There is a 12-foot width limit in effect. A lane is closed intermittently due to long term road construction work. Anticipated completion is September 30, 2021. Both directions between Exit 426: N-66; Mahoney State Park; Ashland; South Bend and Exit 442: Giles Road; Harrison Street (Omaha). Nighttime construction work is in progress. Various nighttime lane closures on I-80 I-80 between N-66 and N-50. Lane closures are necessary for pavement repairs, joint and crack sealing, and permanent pavement markings. Anticipated completion is late fall 2021. Eastbound between Exit 448: 84th Street and Exit 450: 60th Street (Omaha). The roadway is reduced to three I-80 lanes for bridge repairs over 84th Street and Big Papio Creek. A detour is in operation. There is a 12-foot width limit in effect. Anticipated completion is late spring 2022. Both directions between Exit 2: Dakota Avenue and Iowa State Line (South Sioux City). Road construction work is I-129 in progress and the roadway is reduced to one lane. Traffic maintained, one lane road EB and WB, Bridge Repair Anticipated completion is November 2021. Both directions between the start of I-129 and Iowa State Line (South Sioux City). Traffic restrictions are in force. I-129 12-foot width limit. Traffic maintained EB and WB Pavement Patching and Bridge Repair, EB loop at Dakota Ave Interchange CLOSED, use marked detour. Anticipated completion is September 2021. Westbound between Iowa State Line and Capitol Avenue (Omaha). Road construction work is in progress. A lane is closed intermittently. The entrance ramp is closed. The exit ramp is closed. There is a 12-foot width limit. There I-480 will be various lane and ramp closures along I-480 between the Missouri River and 20th street. Lane and ramp closures are necessary for bridge deck repairs. Anticipated completion is spring 2023. Both directions between I-80 and Exit 6: N-133; Blair High Road (Omaha). Nighttime construction work is in progress. A lane is closed intermittently. The entrance ramp is closed. The exit ramp is closed. Weather permitting, I-680 there will be various nighttime lane and ramp closures along I-680 between I-80 and Fort Street. Anticipated completion is fall 2021. Both directions between Road J (13 miles east of Hastings) and East Hickory Street (Sutton). There is a 12-foot US-6 width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. Look out for temporary traffic lights. Anticipated completion is May 31, 2022. Both directions between Road 12 and 3rd Avenue (Fairmont) There is a 11-foot width limit in effect. The roadway is US-6 reduced to one lane due to road construction work. Look out for flaggers. Anticipated completion is November 19, 2021. 2 September 22, 2021 Nebraska Interstate & State Highway Construction & Detour Report Both directions between Summit Avenue and 73; East J Street (Hastings). There is a 12-foot width limit in effect. US-6 The roadway is reduced to two lanes due to road construction work. Look out for flaggers. Anticipated completion is November 12, 2021. Both directions between N-31: Nebraska Crossing Dr (1 mile west of Gretna) and N 192nd St (Omaha) A lane is closed intermittently due to road construction work. There will be various lane and shoulder closures on US-6 US-6 between I-80 and West Dodge Road. Closures are necessary to interconnect existing traffic signals with fiber optic cable. Anticipated completion is spring 2022. Both directions between N-116; 577 Avenue (7 miles east of Laurel) and 588 Avenue (11 miles west of Jackson). US-20 Traffic restrictions are in force because the roadway is reduced to one lane. Look out for flaggers. A pilot car is in operation. 12-foot width limit. Culvert - Bridge - and Asphalt work. Anticipated completion is September 2021. Both directions between Navaho Road (near Gibbon) and South Platte Valley Academy Drive (near Shelton). The US-30 roadway is reduced to one lane due to road construction work. Look out for flaggers. Anticipated completion is November 19, 2021. Between Pennington Drive and Road 117 (Sidney). 12-foot width limit in effect. The roadway is reduced to one US-30 lane. Road construction work is in progress. Look out for flaggers. Both directions between South Gun Club Road (2 miles east of Maxwell) and South Overpass Road (1 mile east of US-30 Brady). There is a 12-foot width limit in effect. The roadway is reduced to one lane due to road construction work. Look out for flaggers. Anticipated completion is September 30, 2021. Both directions between US-6 and West A Street (Hastings). 12-foot width limit in effect. The roadway is reduced to US-34 two lanes due to road construction work. Look out for flaggers. Anticipated completion is November 12, 2021. ROAD CLOSED: Both directions between Road B (5 miles east of Hampton) and US-81 (York). The road is closed US-34 due to road construction work. Anticipated completion is November 11, 2021. See detour map. Both directions N-1; Murray Road and Oak Hill Road (Plattsmouth). A lane is closed intermittently due to road US-34 construction work. Anticipated completion is November 1, 2023. Both directions between 6th Street (1 mile north of Auburn) and N-128 (4 miles south of Nebraska City). There is a US-75 width limit in effect. The roadway is reduced to one lane because of road maintenance activities. Anticipated completion is November 30, 2021. Both directions between 6th Street (1 mile north of Auburn) and N-128 (4 miles south of Nebraska City). The US-75 roadway is reduced to one lane due to road construction work. Look out for flaggers. Anticipated completion is October 29, 2021. 3 September 22, 2021 Nebraska Interstate & State Highway Construction & Detour Report Both directions between N 23rd Avenue (Blair) and County Road A (near Herman). A lane is closed intermittently US-75 due to road construction work, asphalt overlay, bridge repairs and bridge replacement. Traffic will be maintained with temporary traffic signals. There is a 11-foot width limit in effect. Anticipated completion is November 30, 2022. Both directions between Walnut Ave (near Herman) and B Road (Tekamah). Traffic restrictions are in force US-75 because the roadway is reduced to one lane and because of temporary traffic lights. 12-foot width limit. Asphalt work. Anticipated completion is September 2021. Both directions between S St and County Rd P (Tekamah) Road construction in progress, traffic maintained, US-75 Seeding and Sho-fly removal.