LIST OF JOB-WORKERS ENGAGED BY O.C.C. LTD. IN DIFFERENT WORKS DURING THE MONTH OF OCTOBER'2016 to NOVEMBER'2016

Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

1 Name of work Construction of balance work of spillway 1 Execution of Balance work of Spillway M/s. SSNR Project Pvt. 01/13-14 Provisional Dt- of Lower Suktel Spillway Project (Civil work, Phase I, RD 231m to RD 255m Ltd., D.NO-51-8-40, Plot 15.04.2013 work), Bolangir No, 05, Behind BOC Ltd., Seethamdhara, Vishakhapattanam AP

Agreement No. 02F2/2011-12 Executive Engineer, Lower 2 Supply of labour, material & hire M/s. SSNR Project Pvt. 06/2013-14 Suktel Dam Division charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spilway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 231m Ltd., Seethamdhara, to 255m (Right Abutment) (Phase I, Vishakhapattanam AP Reach I).

Agreement 14073.72 3 Supply of labour, material & hire M/s. SSNR Project Pvt. 8/2013-14 value charges of machineries for execution of Ltd., D.NO-51-8-40, Plot (Rs. in lakhs) balance work of Spilway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 231m Ltd., Seethamdhara, to 255m (Right Abutment) (Phase I, Vishakhapattanam AP Reach II).

4 Supply of labour, material & hire M/s. SSNR Project Pvt. 13/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 231m Ltd., Seethamdhara, to 255m (Right Abutment) (Phase I Vishakhapattanam AP Reach III).

5 Supply of labour, material & hire M/s. SSNR Project Pvt. 27/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 195m Ltd., Seethamdhara, to 231m ( 2 nos piers and 2 nos spasns) Vishakhapattanam AP (Phase II Reach I).

6 Supply of labour, material & hire M/s. SSNR Project Pvt. 28/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 195m Ltd., Seethamdhara, to 231m ( 2 nos piers and 2 nos spasns) Vishakhapattanam AP (Phase II Reach II).

7 Supply of labour, material & hire M/s. SSNR Project Pvt. 29/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 195m Ltd., Seethamdhara, to 231m ( 2 nos piers and 2 nos spasns) Vishakhapattanam AP (Phase II Reach III.

8 Supply of labour, material & hire M/s. SSNR Project Pvt. 30/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 195m Ltd., Seethamdhara, to 231m ( 2 nos piers and 2 nos spasns) Vishakhapattanam AP (Phase II Reach IV).

9 Supply of labour, material & hire M/s. SSNR Project Pvt. 12/2014-15 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 31m Ltd., Seethamdhara, to 195m to 180m (Phase III Reach I). Vishakhapattanam AP

10 Supply of labour, material & hire M/s. SSNR Project Pvt. 13/2014-15 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 31m Ltd., Seethamdhara, to 195m from RL 169M TO 180M Vishakhapattanam AP (Phase III Reach II).

11 Supply of labour, material & hire M/s. SSNR Project Pvt. 14/2014-15 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 31m Ltd., Seethamdhara, to 195m from RL 169M to 180M Vishakhapattanam AP (Phase III Reach III).

12 Supply of labour, material & hire M/s. SSNR Project Pvt. 15/2014-15 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 31m Ltd., Seethamdhara, to 195m from RL 169M to 180M Vishakhapattanam AP (Phase III Reach IV).

13 Supply of labour, material & hire M/s. SSNR Project Pvt. 20/2014-15 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 31m Ltd., Seethamdhara, to 195m from RL 169M to 180M Vishakhapattanam AP (Phase III Reach IV).

14 Supply of labour, material & hire M/s. SSNR Project Pvt. 21/2014-15 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balancePage 1 of work 72 of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 31m Ltd., Seethamdhara, to 195m from RL 169M to 180M Vishakhapattanam AP (Phase III Reach IV). Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

15 Supply of labour, material & hire M/s. SSNR Project Pvt. 01/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 31m Ltd., Seethamdhara, to 195m from RL 169M to 180M Vishakhapattanam AP (Phase III, Reach VIII).

Page 2 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

16 Supply of labour, material & hire M/s. SSNR Project Pvt. 04/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 31m Ltd., Seethamdhara, to 195m from RL 169M to 180M Vishakhapattanam AP (Phase III, Reach VII).

17 Supply of labour, material & hire M/s. SSNR Project Pvt. 05/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 31m Ltd., Seethamdhara, to 195m from RL 169M to 180M Vishakhapattanam AP (Phase III, Reach XI).

18 Supply of labour, material & hire M/s. SSNR Project Pvt. 08/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 31m Ltd., Seethamdhara, to 195m from RL 169M to 180M Vishakhapattanam AP (Phase III, Reach XII).

19 Supply of labour, material & hire M/s. SSNR Project Pvt. 09/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 31m Ltd., Seethamdhara, to 195m from RL 169M to 180M Vishakhapattanam AP (Phase III, Reach XIV).

20 Supply of labour, material & hire M/s. SSNR Project Pvt. 10/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 31m Ltd., Seethamdhara, to 195m from RL 169M to 180M Vishakhapattanam AP (Phase III, Reach XIII).

21 Supply of labour, material & hire M/s. SSNR Project Pvt. 31/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project from RD 31m Ltd., Seethamdhara, to 195m from RL 169M to 180M Vishakhapattanam AP (Phase III, Reach XVI).

22 Supply of labour, material & hire M/s. SSNR Project Pvt. 02/2016-17 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project, Bolangir from Ltd., Seethamdhara, RD 35m to 255m (Phase IV) Vishakhapattanam AP

23 Supply of labour, material & hire M/s. SSNR Project Pvt. 03/2016-17 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot balance work of Spillway of Lower No, 05, Behind BOC Suktel Irrigation Project, Bolangir from Ltd., Seethamdhara, RD 35m to 255m (Phase V) Vishakhapattanam AP

2 Name of work Water Front Development of Dam 1 Water Front Development of Hirakud Sri Susanta Kumar 16/2014-15 Reservoir Near Jhankarani Temple, Dam Reservoir Near Jhankarani Badhei, At.-Bhikam Pur, Phase-I Temple, Phase-I P.O.-Pamampur, Dist.- Agreement No. Main Dam Division ,Burla, Sambalpur 2 Water Front Development of Hirakud Sri Susanta Kumar 17/2014-15 Dam Reservoir Near Jhankarani Badhei, At.-Bhikam Pur, Temple, Phase-II P.O.-Pamampur, Dist.- Sambalpur Agreement 69.36 3 Water Front Development of Hirakud Sri Susanta Kumar 18/2014-15 value Dam Reservoir Near Jhankarani Badhei, At.-Bhikam Pur, (Rs. in lakhs) Temple, Phase-III(Reach I) P.O.-Pamampur, Dist.- Sambalpur 4 Water Front Development of Hirakud Sri Susanta Kumar 17/2015-16 Dam Rrservoir near Jhankarani temple, Badhei,AT- Phase-III,Reach II) Bhikampur,PO- Parmanpur,Dist- Sambalpur

3 Name of work Construction of Earth Dam from RD 490m 1 Supply of labour, material & hire M/s. SSNR Project Pvt. 31/2013-14 to 1410m of Lower Suktel Irrigation charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Project, Bolangir Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution from 490m to Ltd., Seethamdhara, 800m (W.R.D. 400m to 800,) (Phase I, Vishakhapattanam AP Reach VI)

Agreement No. 01F2/2013-14 of Executive Engineer 2 Supply of labour, material & hire M/s. SSNR Project Pvt. 32/2013-14 Lower Suktel Dam Division charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution from 490m to Ltd., Seethamdhara, 800m (W.R.D. 400m to 800,) (Phase I, Vishakhapattanam AP Reach VII)

Agreement 5990.2 3 Supply of labour, material & hire M/s. SSNR Project Pvt. 33/2013-14 value charges of machineries for execution of Ltd., D.NO-51-8-40, Plot (Rs. in lakhs) Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution from 490m to Ltd., Seethamdhara, 800m (W.R.D. 400m to 800,) (Phase I, Vishakhapattanam AP Reach VII)

4 Supply of labour, material & hire M/s. SSNR Project Pvt. 34/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution from 490m to Ltd., Seethamdhara, 800m (W.R.D. 400m to 800,) (Phase I, Vishakhapattanam AP Reach IX) Page 3 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

5 Supply of labour, material & hire M/s. SSNR Project Pvt. 36/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m and 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950 and 1100 to 1410m,) (Phase II, Reach I )

Page 4 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

6 Supply of labour, material & hire M/s. SSNR Project Pvt. 37/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m and 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950 and 1100 to 1410m,) (Phase II, Reach II )

7 Supply of labour, material & hire M/s. SSNR Project Pvt. 39/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) (Phase II, Reach III)

8 Supply of labour, material & hire M/s. SSNR Project Pvt. 40/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) (Phase II, Reach III)

9 Supply of labour, material & hire M/s. SSNR Project Pvt. 09/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution from 490m to Ltd., Seethamdhara, 800m (W.R.D. 400m to 800,) (Phase I, Vishakhapattanam AP Reach I)

10 Supply of labour, material & hire M/s. SSNR Project Pvt. 10/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution from 490m to Ltd., Seethamdhara, 800m (W.R.D. 400m to 800,) (Phase I, Vishakhapattanam AP Reach II)

11 Supply of labour, material & hire M/s. SSNR Project Pvt. 11/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution from 490m to Ltd., Seethamdhara, 800m (W.R.D. 400m to 800,) (Phase I, Vishakhapattanam AP Reach III)

12 Supply of labour, material & hire M/s. SSNR Project Pvt. 12/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution from 490m to Ltd., Seethamdhara, 800m (W.R.D. 400m to 800,) (Phase I, Vishakhapattanam AP Reach IV)

13 Supply of labour, material & hire M/s. SSNR Project Pvt. 14/2013-14 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution from 490m to Ltd., Seethamdhara, 800m (W.R.D. 400m to 800,) (Phase I, Vishakhapattanam AP Reach V)

14 Supply of labour, material & hire M/s. SSNR Project Pvt. 19/2014-15 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Project Working RD Ltd., Seethamdhara, 950m to 1100m Phase III,( Reach I) Vishakhapattanam AP

15 Supply of labour, material & hire M/s. SSNR Project Pvt. 22/2014-15 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach IV)

16 Supply of labour, material & hire M/s. SSNR Project Pvt. 23/2014-15 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach VI)

17 Supply of labour, material & hire M/s. SSNR Project Pvt. 24/2014-15 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach VII)

18 Supply of labour, material & hire M/s. SSNR Project Pvt. 25/2014-15 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach VIII)

19 Supply of labour, material & hire M/s. SSNR Project Pvt. 02/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, Page 5 of 72 work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XI) Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

20 Supply of labour, material & hire M/s. SSNR Project Pvt. 03/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XII)

Page 6 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

21 Supply of labour, material & hire M/s. SSNR Project Pvt. 06/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach IX)

22 Supply of labour, material & hire M/s. SSNR Project Pvt. 07/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XIII)

23 Supply of labour, material & hire M/s. SSNR Project Pvt. 11/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XV)

24 Supply of labour, material & hire M/s. SSNR Project Pvt. 12/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach X)

25 Supply of labour, material & hire M/s. SSNR Project Pvt. 13/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XVII)

26 Supply of labour, material & hire M/s. SSNR Project Pvt. 14/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XIV)

27 Supply of labour, material & hire M/s. SSNR Project Pvt. 15/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XVI)

28 Supply of labour, material & hire M/s. SSNR Project Pvt. 16/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XVIII)

29 Supply of labour, material & hire M/s. SSNR Project Pvt. 20/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XIX)

30 Supply of labour, material & hire M/s. SSNR Project Pvt. 21/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XX)

31 Supply of labour, material & hire M/s. SSNR Project Pvt. 32/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XXI)

32 Supply of labour, material & hire M/s. SSNR Project Pvt. 33/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XXXIII)

33 Supply of labour, material & hire M/s. SSNR Project Pvt. 34/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, Page 7 of 72 work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XXX) Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

34 Supply of labour, material & hire M/s. SSNR Project Pvt. 35/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XXXIV)

Page 8 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

35 Supply of labour, material & hire M/s. SSNR Project Pvt. 36/2015-16 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project, Execution of balance Ltd., Seethamdhara, work from 490m to 950m & 1100 to Vishakhapattanam AP 1410m (W.R.D. 400m to 950, & 1100m to 1410m) Phase II, Reach XXXI)

36 Supply of labour, material & hire M/s. SSNR Project Pvt. 01/2016-17 charges of machineries for execution of Ltd., D.NO-51-8-40, Plot Earth Dam from RD 490m to 1410m of No, 05, Behind BOC L.S.I. Project,Bolangir(Phase IV) Ltd., Seethamdhara, Vishakhapattanam AP

4 Name of work Construction of 30 Men barrack with 1 Construction of 30 Men barrack with Sri Sai Deva Infra. 41/2013-14 armory for fortification at Spillway site of armory for fortification at Spillway site Projects Pvt. Ltd., D. Lower Suktel Project of Lower Suktel Project No. 51-8-40, Plot No, Ground Floor, Behind BOC Ltd.,Seethammdhara, Vishakhapattanam Agreement No. E.E. RRC & B Divn. LSIP, Bolangir 2 Water supply & sanitary installation to Sri Sai Deva Infra. 25/2015-16 the building 30 men barrack with Projects Pvt. Ltd., D. armory for fortification at Spillway site No. 51-8-40, Plot No, of Lower Suktel Project Ground Floor, Behind BOC Ltd.,Seethammdhara, Vishakhapattanam Agreement 20.4 value (Rs. in lakhs) 3 Electrification to the building 30 men Sri Girish Chandra 33/2014-15 barrack with armory for fortification at Patra, Spillway site of Lower Suktel Project Sikabehenga,Bolangir

5 Name of work FDR to FPE cum ring road at Tarabha 1 Supply of labour material & hire Sri S.N Kanungo 29/2011-12 charges of machinery for FDR Trabha Infrastructure, Bauxi RD.00M to 1100M bazar, Agreement No. 110F2/2011-12 E.E, Bolangir Irrigation 2 Supply of labour material & hire Sri S.N Kanungo 35/2013-14 Division, Bolangir charges of machinery for FDR Trabha Infrastructure, Bauxi RD 00 to1100 m (Extra item) bazar, Cuttack

Agreement 115.45 3 Supply of labour material & hire Sri S.N Kanungo 09/2012-13 value charges of machinery for FDR Trabha Infrastructure, Bauxi (Rs. in lakhs) RD 00 to1100 m (Phase-1) bazar, Cuttack

6 Name of work FDR to FPE cum ring road at Sonepur 1 Supply of labour material & hire S.N Kanungo 30/2011-12 charges of machinery for FDR Sonepur Infrastructure, Bauxi RD.00M to 450M U/S Phase-I bazar, Cuttack

Agreement No. 111F2/2011-12 E.E, Bolangir Irrigation 2 Supply of labour material & hire S.N Kanungo 31/2011-12 Division, Bolangir charges of machinery for FDR Sonepur Infrastructure, Bauxi RD.00M to 900M D/S Phase-II bazar, Cuttack

Agreement 593.83 3 Supply of labour material & hire S.N Kanungo 32/2011-12 value charges of machinery for FDR Sonepur Infrastructure, Bauxi (Rs. in lakhs) RD.450M to 1000M U/S Phase-IV bazar, Cuttack

4 Supply of labour, material & hire S.N Kanungo 01/2012-13 charges of machineries for FDR Infrastructure, Bauxi Sonepur RD 4500m to 5118m D/S bazar, Cuttack Phase-III 5 Supply of labour, material & hire S.N Kanungo 06/2012-13 charges of machineries for FDR Infrastructure, Bauxi Sonepur RD 00m to 900m D/S Phase bazar, Cuttack II(A) 6 Execution of flood protection S.N Kanungo 12/2012-13 embankment cum ring road RD 3350m Infrastructure, Bauxi to 4500m (Tel bridge ) at Sonepur bazar, Cuttack Phase-V 7 Execution of F.D.R to flood protection S.N Kanungo 20/2013-14 embankment cum ring road RD 00m to Infrastructure, Bauxi 900m (Tel bridge ) & RD 3350m to bazar, Cuttack 5118m at Sonepur (Extra item)

8 Execution of F.D.R to flood protection S.N Kanungo 25/2013-14 embankment cum ring road RD 3350m Infrastructure, Bauxi to 4000m ( Working RD 3488m to bazar, Cuttack 4000m) from Tel bridge at Sonepur (Phase V-A)

7 Name of work Design, Supply, fabrication, 1 Dismantaling of old concrete in Sri Kanhu Ch Padhy,AT- 03/2013-14 transportation, erection, commissioning & existing bay of all 12 nos.bays of Bagh OCC Telengiri Office, testing of stoplog gates with embeded Project Bariniput, , parts etc of Bagh Barrage Project .

Agreement No. 263F2/2011-12 2 Fabrication of 1st stage, 2nd stage Sri Suresh Swain At- 04/2013-14 embeded parts & stoplog gate leaves Raju Street, Bypass Road, Jeypore. Agreement 607.32 3 Shop floor painting of jobs 12 sets of Sri Sudhir Ku. Jena 09/2014-15 value second stage embedded parts & 8 Nos ,Jagat Janani (Rs. in lakhs) of stoplog gates leaves for bagh Street,VIP Lane Barrage Project ,Jeypore 4 Concrete cutting work of sill beam Sri Kanhu Ch Padhy,AT- 10/2015-16 grooves of 12 Nos. of bays of Bagh OCC Telengiri Office, Barrage Project Bariniput, Jeypore, Koraput

8 Name of work Construction of F.P.E on Suktel left from 1 SupplyPage 9 of 72 labour, material & hire M/s SBM Nirman 11/2012-13 Dhamanasar to Semilia charges of machineries for construction Construction Pvt. Ltd, of Flood Protection Enbankment on Dhanupalli, Bolangir Suktel left from Dhamanasar to Semlia from RD2880m to 4680m (Reach-II) Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

Agreement No. 112F2/12-13 Executive Engineer, 2 Supply of labour, material & hire Sri Bhakta Ram Purohit, 13/2012-13 Bolangir Irrigation Division charges of machineries for Rajendrapara, Dist.- construction of flood protrection enbamkment on suktel from Dhamanasar to Semelia from RD 5640m to 6360m (Reach-IV)

Page 10 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

Agreement 576.59 3 Supply of labour, material & hire S.N Kanungo 14/2012-13, value charges of machineries for Infrastructure, Bauxi Supplmt. Agt. No.01/2014- (Rs. in lakhs) construction of flood protrection bazar, Cuttack 15 enbamkment on suktel from Dhamanasar to Semelia from RD 4680m to 5640m (Reach-III) 4 Supply of labour, material & hire M/s Ram Kumar 15/2012-13 charges of machineries for Agrawal Enginners Pvt construction of flood protrection Ltd, Shreeram Kutir, enbamkment on suktel from Railway Station Road, Dhamanasar to Semelia from RD 00m Bolangir to 2880m (Reach-I) 5 Supply of labour, material & hire Sri Bhakta Ram Purohit, 15/2013-14 charges of machineries for Rajendrapara, Dist.- construction of flood protrection Balangir enbamkment on suktel from Dhamanasar to Semelia from RD 6360m to 72000m (Reach-V)

9 Name of work Reconstruction of Ogee type of Spillway 1 Supply of labour,material & hire Debadatta Dash, 05/2013-14 of Ghurlijore M.I.P. charges of machineries for the work re- Pattanaik Para, construction of ogee type Spillway of Sambalpur Ghurlijore M.I.Project in sadar block of Sundragarh Dist. Under R.R and R SCHME (Phase-I) .

Agreement No. P1 138/2012-13 E.E. Sundragarh 2 Supply of labour,material & hire Debadatta Dash, 19/2013-14 M.I.Division, Sundragarh charges of machineries for the work re- Pattanaik Para, construction of ogee type Spillway of Sambalpur Ghurlijore M.I.Project in sadar block of Sundragarh Dist. Under R.R and R Scheme (Phase-II) .

Agreement 238.45 3 Supply of labour,material & hire Suklal Munda,AT- 34/2014-15 value charges of machineries for the balance Birjaberana, (Rs. in lakhs) work" re-construction of ogee type G.P.Kinjirma,P.S. Spillway of Ghurlijore M.I.Project in Dharuadihi, sadar block of Sundragarh Dist. Under Dist-Sundargarh R.R and R Scheme (Phase-I)"

4 Supply of labour,material & hire Suklal Munda,AT- 35/2014-15 charges of machineries for the balance Birjaberana, work" re-construction of ogee type G.P.Kinjirma,P.S. Spillway of Ghurlijore M.I.Project in Dharuadihi, sadar block of Sundragarh Dist. Under Dist-Sundargarh R.R and R Scheme (Phase-II)"

10 Name of work Design,drawing,fabrication, 1 Erection of Radial Gates Sri B.K. Nayak, Hirakud 01/2010-11 erection,installation with permanent wiring system, hoisting, testing, commissioning, & painting etc. for 5 Nosof Radial Gates of Titilagarh Gate Erection Project(Stage-II).

Agreement No. 31F2/2002-03 of Executive Engineer 2 Erection of Radial Gates Sri K.C. Padhy, Jaipur 01/2011-12 Irrigation Division, Titlagarh (Koraput)

Agreement 322.04 3 Erection of Stop Logs Sri K.C. Padhy, Jaipur 03/2011-12 value (Koraput) (Rs. in lakhs) 4 Erection of Gantry Crane Sri M.C. Swain, Aingol, 06/2012-13 Saraba, 5 Painting of Radial Gates etc Sri K.C. Padhy, Jaipur 02/2013-14 (Koraput)

11 Name of work Resectioning & Cement Concrete Liniing 1 RD 10500 M to 14912M,Reach-III The Managing Director 04/2013-14 of Hariharjore main canal. Elite Infra Projects Pvt. Ltd.,Jubilee hills,Hyderabad

Agreement No. Executive Engineer vide letter No.CE&BM-W/M/467/14-15/1327(WE) dt.04.03.2014 under 9133 circular dt.06.09.2012 Agreement 827.53 value (Rs. in lakhs)

12 Name of work Restoration and construction to 1 (Phase-I) (RD2537M to 3750M) Reach- Sri Manoranjan 01/2013-14 FPE near (Phase-I) in Sonepur II Dash,AT-Telenpali,PO- District" (RD2537M to 3750M) Reach-II Brajarajnagar,Dist- Agreement No. Executive Engineer WF-EST-BOL-1/2013- 1141(WE) dt.27.01.2014 under 9133 circular dt.06.09.2012 Agreement 225.92 value (Rs. in lakhs)

13 Name of work FDR to Flood Protection Embankment- 1 RD 00 M to RD 1920 M (Phase-II) SN Kanungo 02/2013-14 cum-Ring road at Sonepur REACH-I Infrastructure,colony, buxi bazar,cuttack Agreement No. Executive Engineer WF-EST-Blr-2/2013- 1145(WE) dt.28.01.2014 under 9133 circular Agreement 455.37 value (Rs. in lakhs)

14 Name of work FDR to Flood Protection Embankment- 1 RD 1920 M to RD 5118 M (Phase-II) Sri Bhaktaram 03/2013-14 cum-Ring road at Sonepur REACH-II Purohit,AT/PO- Rajendrapara,Dist- Page 11 of 72 Bolangir Agreement No. Executive Engineer WF-EST-Blr-2/2013- 1145(WE) dt.28.01.2014 under 9133 circular Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

Agreement 275.73 value (Rs. in lakhs)

15 Name of work Restoration and Construction to 1 Phase-I (RD 00 M to 889M) Reach-I SN Kanungo 03/2014-15 Mahanadi Flood Protection Embankment Infrastructure,colony, near Binika buxi bazar,cuttack

Page 12 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

Agreement No. Executive Engineer WF-EST-BOL-1/2013- 1141(WE) dt.27.01.2014 under 9133 circular dt.06.09.2012 Agreement 121.89 value (Rs. in lakhs)

16 Name of work Resectioning & Cement Concrete Liniing 1 RD 00 to 4.950km., Reach-I M/s SN Kanungo 02/2014-15 of Hariharjore main canal. Infrastructure,colony, buxi bazar,cuttack

Agreement No. Executive Engineer vide letter No.CE&BM-W/M/467/14-15/1327(WE) dt.04.03.2014 under 9133 circular dt.06.09.2012

Agreement 965.95 value (Rs. in lakhs)

17 Name of work Kanupur Spill Channel Work 1 Excavation of Spill Channel Sri Durga Condev P ltd 1/2011-12

Agreement No. 62F2/2010-11

Agreement 1,407.11 value (Rs. in lakhs)

18 Name of work Construction of "High level spur of Devi 1 Spur-3 M/s Haraparvati 01/2010-11 Right Embankment near Bauriakania" Constn., Akhuapada, Agt. No. 01F2/2010-11 2 Spur-4 M/s Haraparvati 05/2010-11 Constn., Akhuapada, Bhadrak

Agt. value 1499.25 3 Spur-14 Sri Bikram Rout, 01/2010-11 (Rs. in lakhs) Gatirout Patna, 07/2013-14 Chauliaganj, Cuttack 4 Slip-1 Sri Mohan Kumar 03/2010-11 Senapati, Niali Cuttack 5 Slip-2 Sri Mohan Kumar 04/2010-11 Senapati, Niali Cuttack

6 Spur-1 M/s Classic Super 06/2010-11 Constn.2135/5065, Budha Lane, Bhubaneswar 7 Spur-2 M/s Classic Super 07/2010-11&13/2013-14 Constn.2135/5065, Bsudha Lane, Bhubaneswar 8 Balance Spur-3 M/s Haraparvati 15/2011-12 Constn., Akhuapada, Bhadrak 9 Balance qty Spur-4 M/s Haraparvati 16/2011-12 Constn., Akhuapada, Bhadrak 03/2013-14 10 Balance Spur-2 M/s Classic Super 32/2011-12 Constn.2135/5065, Bsudha Lane, Bhubaneswar 11 Spur-13 M/s Classic Super 23/2011-12 Constn.2135/5065, Bsudha Lane, Bhubaneswar 12 Slip-1 Balance Sri Mohan Kumar 63/2013-14 Senapati, Niali Cuttack

13 Slip-2 Balance Sri Mohan Kumar 62/2013-14 Senapati, Niali Cuttack

14 Balance qty of Spur-2 S.N. Kanunogo, 09/2013-14 Baxibazar, Cuttack

19 Name of work Improvement to Kakatpur branch canal by 1 RD 70.360 km to 71.080km Sri K. Kariappa Swamy, 33/2011-12 providing RCC trough from RD 70.360 Balianta, Khurdha Km to 71.800 Km near Bauriakana under NABARD assistance(RIDF-XIV)

Agt. No. 972F2/2011-12 2 RD 71.080km to 71.800 km Sri Dillip Kumar Swain, 35/2011-12 Alasahi, , Puri

Agt. value 362.50 3 RD 70.360 km to 71.080km Sri K. Kariappa Swamy, 37/2011-12 (Rs. in lakhs) Balianta, Khurdha

4 RD 70.360 km to 71.080km Sri Rohit Kumar Barik, 43/2011-12 Niali, Cuttack 5 … K.Kariappa 06/2012-13 Swamy,Naharkanta, Via- Balianta 6 RD 71.645 km to 71.800km Part-I 02/2012-13 7 RD 71.645 km to 71.800km 14/2012-13 8 RD 71.645 km to 71.800km Sri Prahallad Sahoo 15/2012-13 9 RD 71.645 km to 71.800km At/Po-Naraj, Baranga 16/2012-13 10 … 02/2013-14

20 Name of work Permanent Restoration to the breaches of 1 Reach - I Sri B.C.Patra , 22/2011-12 Gop branch canal from RD 42.500 KM to Laxmisagar , Sup..01/2012-13 RD 47.800 KM. Bhubaneswar

Agt. No. 987F2/2011-12 2 ReachPage 13- II of 72 Sri Mohan Ku 30/2011-12 Senapati, Niali, Cuttack

Agt. value 263.90 (Rs. in lakhs) Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

21 Name of work Improvement to Astaranga Minor from RD 1 07 to 11/2012-13 8.800 KM to 12.385 KM in Kakatapur block of . Agt. No. 1500F2/2011-12 2 27 to 30/2012-13

K.Kariappa Swamy,AT-

Page 14 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

K.Kariappa Swamy,AT- 736.90 3 31 to 42/2012-13 Agt. value RD8.800 km to 9.400 km and hanspal jagannath (Rs. in lakhs) RD9.400km to 9.700km sadak,naharkanta,balia 4 08/2013-14 nta,khurda

5 10/2013-14

6 11/2013-14

7 RD 9.700KM to 10.000KM Sri Rohit Kumar Barik, 49 to 56/2012-13 At/P.O.-Niali, Cuttack

8 64 &65/2013-14

9 RD 10.000KM to 10.300KM Sri Avisek Jena, 17 to 26 / 2012-13 Bhubaneswar

22 Name of work Construction of spillway of Kanupur Concreting work M/s SEW Infra Ltd 31/2010-11 Irrigation Project Agreement No. 19F2/2007-08 of Executive Engineer, Kanupur Rehabilitation Camps & Building Division, Basudevpur, Keonjhar

Agreement 13566.56 value (Rs. in lakhs)

23 Name of work Design,Supply,Fabrication,Transportation 1 Erection of 1st stage embedded parts Sri Dillip Kumar Das, 01/2011-12 ,Erection,Commissioning & Testing of of Barrage Gate Erection At/P.O-B.t.Pur, Dist.- Gates and stoplog gates with hoisting Project. Bhadrak arrangements for Spillways,Under-sluices and Head regulators of Anandapur Barrage

Agreement No 68F2/2009-10 of Executive Engineer , 2 Erection of 2st stage embedded parts Sri Dillip Kumar Das, 01/2012-13 Anandapur Barrage Division , Salapada of stoplogs and spillway gates At/P.O-B.t.Pur, Dist.- Anandapur Barrage Gate Erection Bhadrak Project.5 nos days

Agreement 9,447.15 3 Surface preparation and painting of M/s Kamakshi Engg. 10/2014-15 Value gates, hoist, hoist supporting structures, Works, AT/p.o.- (Rs. In Lakhs) stoplogs of ABP Bariniput, Dist.-Koraput

4 Erection 1st stage embedded parts of Sri Dillip Kumar Das, 15/2014-15 A.B.G.E.P. at Anandapur with supply At/P.O-B.t.Pur, Dist.- of all required labours, consumables, Bhadrak tools and, tackles etc.

5 Erection of second stage embedded Sri Dillip Kumar Das, 21/2015-16 parts of stoplogs & spillway gates of At/P.O-B.t.Pur, Dist.- Anandapur Barrage Gate Erection Bhadrak Project .(1 No Bay)

6 Erection of second stage embedded M/s Kamakshi Engg. 22/2015-16 parts of stoplogs & spillway gates of Works, AT/p.o.- Anandapur Barrage Gate Erection Bariniput, Dist.-Koraput Project .(1 No Bay)

7 Erection of second stage embedded Sri Dillip Kumar Das, 23/2015-16 parts of stoplogs & spillway gates of At/P.O-B.t.Pur, Dist.- Anandapur Barrage Gate Erection Bhadrak Project .(1 No Bay)

8 " Labour chages for assembly & Sri Dillip Kumar Das, 20/2014-15 erection,testing and commissioning of At/P.O-B.t.Pur, Dist.- spillway gates including fitting of seals Bhadrak wheel assembly,guide shoes etc. and erection of trestle and hoist assembly & trial operation by rope drum hoist as per drawings and instructions of Engineer-in-Charge at Anandapur Barrage Project"

9 Erection of 2nd stage embedded parts M/s Kamakshi Engg. 25/2015-16 of stoplogs and spillway gates of Works, AT/p.o.- Anandapur Barrage Gate Erection Bariniput, Dist.-Koraput Project.1 No. Bay

10 Labour charges for welding of Sri Dillip Kumar Das, 09/2014-15 upstream side of skin plates (12mm At/P.O-B.t.Pur, Dist.- thick) of gate leafs of spillway gate of Bhadrak Anandapur Barrage Gate Erection Project,Salapada for but welding with 60 degree singe "V" with one rout run and twp rout runs of final welding at Anandapur Barrage Gate Site,Anandapur

11 Labour charges for fitting the pin jont Sri Dillip Kumar Das, 19/2014-15 brackets by aligning and welding the At/P.O-B.t.Pur, Dist.- base plates and brackets of spillway Bhadrak gates on the left side river bank inside the working yard of Anandapur Barrage Gate Erection Project as per drawings and instructions of Engineer-In-Charge at Anandapur Barrage Project

Page 15 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

12 Labour charges for fitting the pin jont Sri Dillip Kumar Das, 30/2015-16 brackets by aligning and welding the At/P.O-B.t.Pur, Dist.- base plates and brackets of spillway Bhadrak gates on the left side river bank inside the working yard of Anandapur Barrage Gate Erection Project as per drawings and instructions of Engineer-In-Charge at Anandapur Barrage Project

Page 16 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

13 Labour charges for welding of side seal Sri Dillip Kumar Das, 31/2015-16 base flat on both side by 6 mm fillet At/P.O-B.t.Pur, Dist.- welding for top,second and third Bhadrak segment of gate leafs ( except bottom leaf ) of spillway and under-sluice gate of Anandapur Barrage Gate Erection Project upstream side of skin plates (12mm thick) of gate leafs of spillway gate of Anandapur Barrage Gate Erection Project.

14 Surface preparation and painting of M/s Kamakshi Engg. 32/2015-16 spillway gates, hoist, hoist supporting Works, AT/p.o.- structures, stoplogs of ABP Bariniput, Dist.-Koraput

15 Labour charges for surface preparation M/s Kamakshi Engg. 35/2015-16 & painting of rail girder of ABP Works, AT/p.o.- Bariniput, Dist.-Koraput 16 Labour charges for assembly & M/s HTMPL-PBG- 37/2015-16 erection,testing and commissioning of JV,Bapuji spillway gates alongwith both the Nagar,Bhubaneswar upstream & downstream rail gorders only on the interrelated bays with latch bracket of stoplog including fitting of seals wheel assembly,guide shoes etc and erection of trestle and hoist assembly & trial operation by rope drum hoist as per drawings and instructions of Engineer-In-Charge at Anandapur Barrage Project 17 Labour charges for six mm fillet Sri Dillip Kumar Das, 39/2015-16 welding of bracing angles with flange At/P.O-B.t.Pur, Dist.- of horizontal girder of spillway gates for Bhadrak a lenth of 10(Ten) mtrs ( with 10% extra if arises) by electric arc welding,removal of lifting hooks made of MS plate/MS angle in either side of horizontal girders of spillway gate for quantity of 10 Nos.( with plus or minus 20% extra if arises) by gas cutting and by cleaning by grinding and removal of welding burs,angle clits,stay roads & foreign materials by grouising & grinding,rectification of undercut weld & deep scores on the body of gate structures by welding & grinding & welding the left-out welds if any etc. including the cost of scaffolding required for above work of spillway gates as is where basis inside the working yard of Anandapur Barrage Gate Erection Project,Salapada as per drawings and instructions of Engineer- In-Charge

18 Erection of second stage embedded M/s Kamakshi Engg. 43/2015-16 parts of stoplogs and spillway gates of Works, AT/p.o.- Anandapur Barrage Gate Erection Bariniput, Dist.-Koraput Project 19 Erection of second stage embedded M/s Kamakshi Engg. 44/2015-16 parts of stoplogs and spillway gates of Works, AT/p.o.- Anandapur Barrage Gate Erection Bariniput, Dist.-Koraput Project

20 Erection of second stage embedded Sri Dillip Kumar Das, 01/2016-17 parts of stoplogs and spillway gates of At/P.O-B.t.Pur, Dist.- Anandapur Barrage Gate Erection Bhadrak Project

21 Erection of second stage embedded Sri Dillip Kumar Das, 03/2016-17 parts of stoplogs and spillway gates of At/P.O-B.t.Pur, Dist.- Anandapur Barrage Gate Erection Bhadrak Project. 01 No bay

24 Name of Work Construction of PMGSY road work from 1 ….. M/s Makes Engineers & 11/2015-16 Kulia to San Routpati under Package No Builders,Plot No.-MIG- OR-07-ADB-39/T-III in the 80,Sector-07,CDA- 75,Markat Nagar,Cuttack Agreement No 09/PMGSY/ADB/T-III of 2014-15 Agreement 412.47 2 Consruction L.T.line M/s Jay Maa Tarini 29/2015-16 value Electrical & (Rs.in lakhs) Construction,Gotara,Nis chintakoili,Cuttack

25 Name of Work (1)Restoration of flood embankment cum 1 Restoration of flood embankment cum M/s Manoranjan 05/2014-15 ring road of sambalpur Town from RD ring road of sambalpur Town from RD Dash,At-Telenpali,Po- 3000M to 7050M 3000M to 4440M(Reach-I) Brajarajnagar,Jharsugu da Agreement No (2)Restoration of flood embankment cum 2 Restoration of flood embankment cum 03/2014-15 ring road of sambalpur Town from RD ring road of sambalpur Town from RD M/s S.N. Kanungo 3000M to 7050M 4440M to 6000M(Reach-II) Infrastructure,Rouspatna ,New Colony,Buxibazar, Cuttack Agreement (3)Restoration of flood embankment cum 3 Restoration of flood embankment cum M/s Susant Kumar 04/2014-15 value ring road of sambalpur Town from RD ring road of sambalpur Town from RD Badhei,At- (Rs.in lakhs) 3000M to 7050M 6000M to 7050M(Reach-III) Bhikampur,Po- Parmanpur,Sambalpur (4)Disposal of accumulated storm water 4 Disposal of accumulated storm water M/s Susant Kumar 12/2014-15 on upstream of sluice regulator at onPage upstream 17 of 72 of sluice regulator at Badhei,At- Binakhandi,Balibandha & Tanganallah Binakhandi,Balibandha & Bhikampur,Po- ( CH 4 Km of ring road) of Sambalpur city Tanganallah ( CH 4 Km of ring road) Parmanpur,Sambalpur ( Civil works part-I for construction of of Sambalpur city ( Civil works part-I for Pump house at Binakhandi sluice) construction of Pump house at Binakhandi sluice) Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

(5)Disposal of accumulated storm water 5 Disposal of accumulated storm water M/s Susant Kumar 10/2015-16 on upstream of sluice regulator at on upstream of sluice regulator at Badhei,At- Binakhandi,Balibandha & Tanganallah Binakhandi,Balibandha & Bhikampur,Po- ( CH 4 Km of ring road) of Sambalpur city Tanganallah ( CH 4 Km of ring road) of Parmanpur,Sambalpur ( Civil works part-1 for construction of Sambalpur city ( Civil works part-1 for Pump house at Binakhandi sluice)(Phase- construction of Pump house at II) Binakhandi sluice)(Phase-II)

(6)Disposal of accumulated storm water 6 Disposal of accumulated storm water M/s Manoranjan 03/2015-16 on upstream of sluice regulator at on upstream of sluice regulator at Dash,At-Telenpali,Po- Binakhandi,Balibandha & Tanganallah Binakhandi,Balibandha & Brajarajnagar,Jharsugu ( CH 4 Km of ring road) of Sambalpur city Tanganallah ( CH 4 Km da ( Civil works part-II for construction of of ring road) of Sambalpur city ( Civil Pump house at Balibandha) works part-II for construction of Pump house at Balibandha) (7)Flood protection of Dhobijore Nallah 7 Flood protection of Dhobijore Nallah M/s Susant Kumar 04/2015-16 such as construction of protection wall such as construction of protection wall Badhei,At- from RD 3671 mtr to 3710mtr (L), from RD 3671 mtr to 3710mtr (L), Bhikampur,Po- 3821mtr to 3829mtr (L), 3675mtr to 3821mtr to 3829mtr (L), 3675mtr to Parmanpur,Sambalpur 3767mtr ® and both side 5617mtr to 3767mtr ® and both side 5617mtr to 6198mtr in Sambalpur town for 2015-16 6198mtr in Sambalpur town for 2015- 16 (8)Drainage imorovement plan of 8 Sri Ranjan Kumar Das, 07/2016-17 Sambalpur Town under the scheme Reconstruction of VRB at RD 2100Mtr At/Po- Kulita Drainage improvement programme of Dhobijore Nallah inside Sambalpur Tukura,Larambha, Dist- City for 2016-17 ( Old RD 2323Mtr) Baragarh

26 Name of Work Renovation of Hingima Distributary RD 0.000Km to RD 4.020Km(Reach-I) M/s Y.B. Construction 12/2015-16 Pvt. Ltd.,Nayapalli,Bhubane swar Agreement No CE & BM Tel Basin Vide Letter No.3697/18.12.2016 under 9133 Circular Agreement 483.1 value (Rs.in lakhs)

27 Name of Work Renovation of Hingima Distributary RD 4.020Km to RD 9.858Km(Reach-II) M/s Unicorn 18/2015-16 Instruction,At/Po- Salipur,Cuttack Agreement No CE & BM Tel Basin Bhawanipatna Vide Letter No.3697/18.12.2016 under 9133 Circular Agreement 537.14 value (Rs.in lakhs)

28 Name of Work Execution of Nine Nos. of work pertaining Restoration & flood protection to right M/s Sri Jagannath 19/2015-16 to Irrigation Division bank of river Mahanadi near village Construction,IRC Subarnapur,Kaudiatola,Jagati & Village,Bhubaneswar Chandigarh of Boudh Block Agreement No Letter No.40778/23.11.2015 of CE & BM,LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 339.41 value (Rs.in lakhs)

29 Name of Work Execution of Nine Nos. of work pertaining Restoration & flood protection to right M/s Sri Jagannath 20/2015-16 to Boudh Irrigation Division bank of river Mahanadi near village Construction,IRC Baunsuni & Taterkela of Boudh Block Village,Bhubaneswar under NABARD assistance RIDF-XX

Agreement No Letter No.40778/23.11.2015 of CE & BM,LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 212.29 value (Rs.in lakhs)

30 Name of Work Execution of Nine Nos. of work pertaining Flood protection work to left bank of M/s Sri Pratap Chandra 01/2016-17 to Boudh Irrigation Division river Mahanadi near village Marjakud ( Paridah, Chandaka Island under Boudh NAC under Industrial NABARD Assistance) Estate,KIIT,Chandrasek harpur,Bhubaneswar

Agreement No Letter No.40778/23.11.2015 of CE & BM,LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 134.78 value (Rs.in lakhs)

31 Name of Work Re-sectioning & Cement concrete lining RD 9.000Km to RD 10.500Km(Reach- M/s Shiva jyoti 02/2016-17 of Hariharjore Main Canal II)(Balance Work) Construction,At- Patrapur,Patamundai,K endrapara Agreement No Executive Engineer Vide Letter No. CE & BM-W/M/467/14-1327(WE) Dt.04.03.2014 under 9133 circular Dt.06.09.2012 Agreement 257.28 value (Rs.in lakhs)

32 Name of Work Re-sectioning & Cement concrete lining RD 10.500Km to 14.912Km(Reach- M/s Shiva jyoti 03/2016-17 of Hariharjore Main Canal III)(Balance Work) Construction,At- Patrapur,Patamundai,K endrapara Agreement No Executive Engineer Vide Letter No. CE & Page 18 of 72 BM-W/M/467/14-1327(WE) Dt.04.03.2014 under 9133 circular Dt.06.09.2012 Agreement 197.57 value (Rs.in lakhs) Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

33 Name of Work Preparation of Design & Drawing of Preparation of Design & Drawing of Namita Kumari 04/2016-17 proposed RCC portal structure with slab proposed RCC portal structure with slab Gauda,Propietor of M/s for the balance work of construction of for the balance work of construction of Architectural flood protection Embankment cum Right flood protection Embankment cum Construction & Engg. Road at Sonepur Right Road at Sonepur Consultancy,Nayapalli, Bhubaneswar

Page 19 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

Agreement No Letter No.27919/03.08.2015 of CE & BM- LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 15.8 value (Rs.in lakhs)

34 Name of Work Execution of Nine Nos. of work pertaining Restoration & protection to right bank Sri Smruti ranjan 05/2016-17 to Boudh Irrigation Division of river Mahanadi near village Sahoo,At-BOSE Pillaspat & Harbhanga under NABARD Campus,SCB assistance RIDF-XX Medical,Cuttack Agreement No Letter No.40778/23.11.2015 of CE & BM- LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 134.46 value (Rs.in lakhs)

35 Name of Work Execution of Nine Nos. of work pertaining Restoration & protection to right bank Sri Smruti ranjan 06/2016-17 to Boudh Irrigation Division of river Mahanadi near village Sahoo,At-BOSE Kellakata& right bank of river Campus,SCB Khajuripadanallh near village B.N.Pur Medical,Cuttack under NABARD assistance RIDF-XX

Agreement No Letter No.40778/23.11.2015 of CE & BM- LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 170.43 value (Rs.in lakhs)

36 Name of Work Execution of Nine Nos. of work pertaining Restoration & protection to right bank Sri Smruti ranjan 07/2016-17 to Boudh Irrigation Division of river Salki near village Girasingha Sahoo,At-BOSE under NABARD assistance RIDF-XX Campus,SCB Medical,Cuttack Agreement No Letter No.40778/23.11.2015 of CE & BM- LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 341.75 value (Rs.in lakhs)

37 Name of Work Execution of Nine Nos. of work pertaining Restoration & protection to right bank Sri Smruti ranjan 08/2016-17 to Boudh Irrigation Division of river Tel at Mallikund,Ghantapada & Sahoo,At-BOSE Kantamal under NABARD assistance Campus,SCB RIDF-XX Medical,Cuttack Agreement No Letter No.40778/23.11.2015 of CE & BM- LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 306.57 value (Rs.in lakhs)

38 Name of Work Erection of gate works of Rukura Irrigation 1 Erection of second stage embedded M/s Ananta 01/2016-17 Project parts of radial & stoplog gates,hubs, Constructions,Patrapad end arms,horizontal girders,skin a, Bhubaneswar plates,hoists & hoist supporting structures,trunnion walkways, latch arrangements for both radial & stop log gates etc. of Rukura Gate Erection Project Agreement No 2 Second stage concreting in gate Sri K.Kariappa 11/2016-17 grooves of Rukura Irrigation Project Swamy,At-Hanspal,Po- Naharkanta,Via- balianta,Dist-Khurda 09F2/2010-11 Agreement value (Rs.in lakhs)

39 Name of Work Supply, Labour charges for fixing of 16mm dia M/s Allied 05/2016-17 fabrication,transportation,erection,commi anchor bolts by drilling holes and Engineering,Bhubanes ssioning & testing of vertical lift chemical grouting at drainage sluice war gates/drainage sluice gates along with bays over old Brahmani Nallah at screw hoist arrangements & second stage Gamu & Keluanallah at concreting of Brahmani Nallah at Gamu Mahakalapada under Brahmani-Kelua- & Kelua Nallah at Mahakalapada Birupa Doab Project

Agreement No 101F2/2015-16 & 100F2/2015-16 Agreement 2.19 value (Rs.in lakhs)

40 Name of Work Erection ,commissioning & testing of Erection ,commissioning & testing of M/s Kamakshi Engg. 12/2015-16 three Nos of vertical lift gates,fabricated three Nos of vertical lift Works,Barinipur,Jeypore in segments including alignment gates,fabricated in segments including alignment Agreement No 143F2/2015-16 Agreement 339.27 value (Rs.in lakhs)

41 Name of Work Review of survey,design & drawings of Review of survey,design & drawings of M/s Hydropenum alignments of Branch canal alignments of Bhuban Branch canal Sustems,Raghuvansh,C. system within the existing available land system within the existing available T.S. No-755/80, Plot of the Damsala canal system of Minor land of the Damsala canal system of NO-78,Flat NO-3 & 4, 01/2016-17 Irrigation Project and redesign wherever Minor Irrigation Project and redesign Mayur required of Rengali Irrigation Project ( wherever required of Rengali Irrigation Colony,Kothrud,Pune Phase-II) under JICA Assistance Project ( Phase-II) under JICA Assistance Agreement No MOU No.01/2016-17 Agreement 61.31 Page 20 of 72 value (Rs.in lakhs) Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

42 Name of work Resectioning & Cement Concrete Liniing RD 00 to 4.950km., Reach-I SN Kanungo 02/2014-15 of Hariharjore main canal. Infrastructure,colony, buxi bazar,cuttack Agreement No. Executive Engineer vide letter No.CE&BM-W/M/467/14-15/1327(WE) dt.04.03.2014 under 9133 circular dt.06.09.2012 Agreement 965.95 value (Rs. in lakhs)

Page 21 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

43 Name of work Resectioning & Cement Concrete Liniing RD9.00 Km to 10.5000km., Reach-II The Managing Director 01/2014-15 of Hariharjore main canal. Elite Infra Projects Pvt. Ltd.,Jubilee hills,Hyderabad

Agreement No. Executive Engineer vide letter No.CE&BM-W/M/467/14-15/1327(WE) dt.04.03.2014 under 9133 circular dt.06.09.2012 Agreement 279.54 value (Rs. in lakhs)

44 Name of work Resectioning & Cement Concrete Liniing RD 10.5000km to RD 14.912Km, The Managing Director 04/2013-14 of Hariharjore main canal. Reach-III Elite Infra Projects Pvt. Ltd.,Jubilee hills,Hyderabad

Agreement No. Executive Engineer vide letter No.CE&BM-W/M/467/14-15/1327(WE) dt.04.03.2014 under 9133 circular dt.06.09.2012 Agreement 827.53 value (Rs. in lakhs)

45 Name of work Resectioning & Cement Concrete Liniing RD 4.950km to RD 9.000Km, Reach- M/s Shivajyoti 02/2015-16 of Hariharjore main canal. II(Balance Work) Construction Pvt. Ltd.,Patrapur, Agreement No. Executive Engineer vide letter No.CE&BM-W/M/467/14-15/1327(WE) dt.04.03.2014 under 9133 circular dt.06.09.2012 Agreement 754.66 value (Rs. in lakhs)

46 Name of work SH-17 to Podamari to …… Sri Pabitra Mohan 12/2015-16 Road,Dist.PU under package Lenak,AT/PO- No.OR-11-ADB-72/T-III Jagamara,PO- Khandagiri,Bhubanesw ar,Dist-Khurda Agreement No. NCT-04/2014-15

Agreement 790.81 value (Rs. in lakhs)

47 Name of work Providing cement concrete lining from 1 Providing cement concrete lining from M/s 01/2015-16 RD 13.636 Km to RD 36.000Km & RD 16.700Km to RD 19.810Km & B.M.S.Projects,Malkang renovation of structure of Gompakonda renovation of structure of iri main canal (G.M.C.) under CLSRP Gompakonda main canal (G.M.C.) under CLSRP Agreement No. 173F2/2015-16 2 Providing cement concrete lining from M/s I.S.R. Infra, 02/2015-16 RD 27.100Km to RD 30.310Km & Vishakhapatnam,Andhr renovation of structure of apradesh Gompakonda main canal (G.M.C.) under CLSRP Agreement 6700.43 value (Rs. in lakhs)

48 Name of work Improvement to Tamasa Main Canal 1 Improvement to Tamasa Main Canal Sri Raghunath 03/2015-16 from RD 60.000Km to 79.815Km & from RD 72.770Km to 79.815Km Sahu,Jagatpur,Cuttack Udayagiri Distributary from RD 0.000Km including Udayagiri Distributary from to 5.000Km of Poterru Irrigation project RD 0.000Km to 5.000Km with repair of CD at RD 78.485Km and 2 Nos. of VRBS Agreement No. 116F2/2015-16 2 Improvement to Tamasa Main Canal M/s Unicorn 04/2015-16 from RD 60.000Km to 64.000Km Construction,Jagatpur,C including 2 Nos. of VRBS and one uttack Aqueduct at RD 60.128Km Agreement 4282.6 value (Rs. in lakhs)

49 Name of work Renovation of Champamal Distributary RD 2.590Km to RD 5.180Km(Reach-II) M/s Shivajyoti 14/2015-16 Construction Pvt. Ltd.,Patrapur, Kendrapara Agreement No. CE & BM Tel Basin Bhawanipatna Vide Letter No.3697/18.12.2016 under 9133 Circular Agreement 422.35 value (Rs. in lakhs)

50 Name of Work Renovation of Champamal Distributary RD 5.180Km to RD 8.400Km(Reach-III) M/s S.N. Kanungo 15/2015-16 Infrastructure,Rauspatna ,Buxibazar,Cuttack Agreement No CE & BM Tel Basin Bhawanipatna Vide Letter No.3697/18.12.2016 under 9133 Circular Agreement 426.6 value (Rs.in lakhs)

51 Name of Work Renovation of Champamal Distributary RD 8.400Km to RD 12.000Km(Reach- M/s BKD Infrastructure 17/2015-16 IV) Pvt.Ltd.,Dhankouda,Sa mbalpur Page 22 of 72

Agreement No CE & BM Tel Basin Bhawanipatna Vide Letter No.3697/18.12.2016 under 9133 Circular Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

Agreement 410.82 value (Rs.in lakhs)

52 Name of Work Renovation of Hingima Distributary RD 0.000Km to RD 4.020Km(Reach-I) M/s Y.B. Construction 12/2015-16 Pvt. Ltd.,Nayapalli,Bhubane swar

Page 23 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

Agreement No CE & BM Tel Basin Bhawanipatna Vide Letter No.3697/18.12.2016 under 9133 Circular Agreement 483.1 value (Rs.in lakhs)

53 Name of Work Renovation of Hingima Distributary RD 4.020Km to RD 9.858Km(Reach-II) M/s Unicorn 18/2015-16 Instruction,At/Po- Salipur,Cuttack Agreement No CE & BM Tel Basin Bhawanipatna Vide Letter No.3697/18.12.2016 under 9133 Circular Agreement 537.14 value (Rs.in lakhs)

54 Name of Work Execution of Nine Nos. of work pertaining Restoration & flood protection to right M/s Sri Jagannath 19/2015-16 to Boudh Irrigation Division bank of river Mahanadi near village Construction,IRC Subarnapur,Kaudiatola,Jagati & Village,Bhubaneswar Chandigarh of Boudh Block Agreement No Letter No.40778/23.11.2015 of CE & BM,LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 339.41 value (Rs.in lakhs)

55 Name of Work Execution of Nine Nos. of work pertaining Restoration & flood protection to right M/s Sri Jagannath 20/2015-16 to Boudh Irrigation Division bank of river Mahanadi near village Construction,IRC Baunsuni & Taterkela of Boudh Block Village,Bhubaneswar under NABARD assistance RIDF-XX

Agreement No Letter No.40778/23.11.2015 of CE & BM,LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 212.29 value (Rs.in lakhs)

56 Name of Work Execution of Nine Nos. of work pertaining Flood protection work at the left bank Sri Pratap Chandra 01/2016-17 to Boudh Irrigation Division of river Mahanadi near village Paridah,Chandaka Marjakud (Island) under Boudh NAC Industrial Estate,KIIT, under NABARD Assistance Chandrasekharpur, Bhubaneswar Agreement No Letter No.40778/23.11.2015 of CE & BM,LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 134.78 value (Rs.in lakhs)

57 Name of Work Re-sectioning & Cement concrete lining RD 9.000Km to RD 10.500Km(Reach- M/s Shiva jyoti 02/2016-17 of Hariharjore Main Canal II)(Balance Work) Construction,At- Patrapur,Patamundai,K endrapara Agreement No Executive Engineer Vide Letter No. CE & BM-W/M/467/14-1327(WE) Dt.04.03.2014 under 9133 circular Dt.06.09.2012 Agreement 257.28 value (Rs.in lakhs)

58 Name of Work Re-sectioning & Cement concrete lining RD 10.500Km to 14.912Km(Reach- M/s Shiva jyoti 03/2016-17 of Hariharjore Main Canal III)(Balance Work) Construction,At- Patrapur,Patamundai,K endrapara Agreement No Executive Engineer Vide Letter No. CE & BM-W/M/467/14-1327(WE) Dt.04.03.2014 under 9133 circular Dt.06.09.2012 Agreement 197.57 value (Rs.in lakhs)

59 Name of Work Preparation of Design & Drawing of Preparation of Design & Drawing of Namita Kumari 04/2016-17 proposed RCC portal structure with slab proposed RCC portal structure with slab Gauda,Propietor of M/s for the balance work of construction of for the balance work of construction of Architectural flood protection Embankment cum Right flood protection Embankment cum Construction & Engg. Road at Sonepur Right Road at Sonepur Consultancy,Nayapalli, Bhubaneswar Agreement No Letter No.27919/03.08.2015 of CE & BM- LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 15.8 value (Rs.in lakhs)

60 Name of Work Execution of Nine Nos. of work pertaining Restoration &flood protection to right Sri Narayan 11/2016-17 to Boudh Irrigation Division bank of river Mahanadi near village Pradhan,College Tentulipalli& Kankala of Boudh block Road,,Dist- Kandhamal Agreement No Letter No.40778/23.11.2015 of CE & BM- LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 280.31 value (Rs.in lakhs)

61 Name of Work Execution of Nine Nos. of work pertaining Restoration & protection to right bank Sri Narayan 12/2016-17 to Boudh Irrigation Division of river Mahanadi near village Pradhan,College Page 24 of 72 Kodasingha& right bank of Road,Phulbani,Dist- Laxminallah near village Purunakatak Kandhamal under NABARD Assistance RIDF-XX Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

Agreement No Letter No.40778/23.11.2015 of CE & BM- LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 110.11 value (Rs.in lakhs)

Page 25 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

62 Name of Work Execution of Nine Nos. of work pertaining Restoration & protection to right bank M/s Smruti Ranjan 05/2016-17 to Boudh Irrigation Division of river Mahanadi near village Pilaspat Sahoo At- BOSE & Harbhanga under NABARD Campus, SKB-4,Po- Assistance RIDF-XX SCB Medical,Cuttack Agreement No Letter No.40778/23.11.2015 of CE & BM- LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 134.46 value (Rs.in lakhs)

63 Name of Work Execution of Nine Nos. of work pertaining Restoration & protection to right bank M/s Smruti Ranjan 06/2016-17 to Boudh Irrigation Division of river Mahanadi near village Sahoo At- BOSE Kellakata & right bank of river Campus, SKB-4,Po- Khajuripadanallah near village B.N. SCB Medical,Cuttack Pur under NABARD Assistance RIDF- XX Agreement No Letter No.40778/23.11.2015 of CE & BM- LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 170.43 value (Rs.in lakhs)

64 Name of Work Execution of Nine Nos. of work pertaining Restoration & protection to right bank M/s Smruti Ranjan 07/2016-17 to Boudh Irrigation Division of river Salki near village Girasingha Sahoo At- BOSE under NABARD Assistance RIDF-XX Campus, SKB-4,Po- SCB Medical,Cuttack Agreement No Letter No.40778/23.11.2015 of CE & BM- LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 341.75 value (Rs.in lakhs)

65 Name of Work Execution of Nine Nos. of work pertaining Restoration & protection to right bank M/s Smruti Ranjan 08/2016-17 to Boudh Irrigation Division of river Tel at Mallikund,Ghantapada & Sahoo At- BOSE Kanatamal under NABARD Assistance Campus, SKB-4,Po- RIDF-XX SCB Medical,Cuttack

Agreement No Letter No.40778/23.11.2015 of CE & BM- LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 306.57 value (Rs.in lakhs)

66 Name of Work Execution of Nine Nos. of work pertaining Renovation of Damaged structures of M/s Trinath 15/2016-17 to Boudh Irrigation Division Main Canal of Hariharjore Irrigation Engineers,Plot No- 373, Project,Biramaharajpur Pradhansahi,Baramund a,Bhubaneswar

Agreement No Letter No.40778/23.11.2015 of CE & BM- LMB,Odisha under 9133 circular Dt.06.09.2012 Agreement 581.46 value (Rs.in lakhs)

67 Name of work Design,Supply,Fabrication,Transportation 1 Erection of 1st stage embedded parts Sri Dillip Kumar Das, 01/2011-12 ,Erection,Commissioning & Testing of of Anandapur Barrage Gate Erection At/P.O-B.t.Pur, Dist.- Gates and stoplog gates with hoisting Project. Bhadrak arrangements for Spillways,Under-sluices and Head regulators of Anandapur Barrage Agreement No 68F2/2009-10 of Executive Engineer , 2 Erection of 2st stage embedded parts Sri Dillip Kumar Das, 01/2012-13 Anandapur Barrage Division , Salapada of stoplogs and spillway gates At/P.O-B.t.Pur, Dist.- Anandapur Barrage Gate Erection Bhadrak Project.5 nos days Agreement 9,447.15 3 Surface preparation and painting of M/s Kamakshi Engg. 10/2014-15 Value gates, hoist, hoist supporting structures, Works, AT/p.o.- (Rs. In Lakhs) stoplogs of ABP Bariniput, Dist.-Koraput

4 Erection 1st stage embedded parts of Sri Dillip Kumar Das, 15/2014-15 A.B.G.E.P. at Anandapur with supply At/P.O-B.t.Pur, Dist.- of all required labours, consumables, Bhadrak tools and, tackles etc.

5 Erection of second stage embedded Sri Dillip Kumar Das, 21/2015-16 parts of stoplogs & spillway gates of At/P.O-B.t.Pur, Dist.- Anandapur Barrage Gate Erection Bhadrak Project .(1 No Bay)

6 Erection of second stage embedded M/s Kamakshi Engg. 22/2015-16 parts of stoplogs & spillway gates of Works, AT/p.o.- Anandapur Barrage Gate Erection Bariniput, Dist.-Koraput Project .(1 No Bay)

7 Erection of second stage embedded Sri Dillip Kumar Das, 23/2015-16 parts of stoplogs & spillway gates of At/P.O-B.t.Pur, Dist.- Anandapur Barrage Gate Erection Bhadrak Project .(1 No Bay)

8 " Labour chages for assembly & Sri Dillip Kumar Das, 20/2014-15 erection,testing and commissioning of At/P.O-B.t.Pur, Dist.- spillway gates including fitting of seals Bhadrak wheel assembly,guide shoes etc. and erection of trestle and hoist assembly & trial operation by rope drum hoist as per drawings and instructions of Engineer-in-Charge at Anandapur Barrage Project" Page 26 of 72 9 Erection of 2nd stage embedded parts M/s Kamakshi Engg. 25/2015-16 of stoplogs and spillway gates of Works, AT/p.o.- Anandapur Barrage Gate Erection Bariniput, Dist.-Koraput Project.1 No. Bay Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

10 Labour charges for welding of Sri Dillip Kumar Das, 09/2014-15 upstream side of skin plates (12mm At/P.O-B.t.Pur, Dist.- thick) of gate leafs of spillway gate of Bhadrak Anandapur Barrage Gate Erection Project,Salapada for but welding with 60 degree singe "V" with one rout run and twp rout runs of final welding at Anandapur Barrage Gate Site,Anandapur

Page 27 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

11 Labour charges for fitting the pin jont Sri Dillip Kumar Das, 19/2014-15 brackets by aligning and welding the At/P.O-B.t.Pur, Dist.- base plates and brackets of spillway Bhadrak gates on the left side river bank inside the working yard of Anandapur Barrage Gate Erection Project as per drawings and instructions of Engineer-In-Charge at Anandapur Barrage Project

12 Labour charges for fitting the pin jont Sri Dillip Kumar Das, 30/2015-16 brackets by aligning and welding the At/P.O-B.t.Pur, Dist.- base plates and brackets of spillway Bhadrak gates on the left side river bank inside the working yard of Anandapur Barrage Gate Erection Project as per drawings and instructions of Engineer-In-Charge at Anandapur Barrage Project

13 Labour charges for welding of side seal Sri Dillip Kumar Das, 31/2015-16 base flat on both side by 6 mm fillet At/P.O-B.t.Pur, Dist.- welding for top,second and third Bhadrak segment of gate leafs ( except bottom leaf ) of spillway and under-sluice gate of Anandapur Barrage Gate Erection Project upstream side of skin plates (12mm thick) of gate leafs of spillway gate of Anandapur Barrage Gate Erection Project.

14 Surface preparation and painting of M/s Kamakshi Engg. 32/2015-16 spillway gates, hoist, hoist supporting Works, AT/p.o.- structures, stoplogs of ABP Bariniput, Dist.-Koraput

15 Labour charges for surface preparation M/s Kamakshi Engg. 35/2015-16 & painting of rail girder of ABP Works, AT/p.o.- Bariniput, Dist.-Koraput

16 Labour charges for assembly & M/s HTMPL-PBG- 37/2015-16 erection,testing and commissioning of JV,Bapuji spillway gates alongwith both the Nagar,Bhubaneswar upstream & downstream rail gorders only on the interrelated bays with latch bracket of stoplog including fitting of seals wheel assembly,guide shoes etc and erection of trestle and hoist assembly & trial operation by rope drum hoist as per drawings and instructions of Engineer-In-Charge at Anandapur Barrage Project

17 Labour charges for six mm fillet Sri Dillip Kumar Das, 39/2015-16 welding of bracing angles with flange At/P.O-B.t.Pur, Dist.- of horizontal girder of spillway gates for Bhadrak a lenth of 10(Ten) mtrs ( with 10% extra if arises) by electric arc welding,removal of lifting hooks made of MS plate/MS angle in either side of horizontal girders of spillway gate for quantity of 10 Nos.( with plus or minus 20% extra if arises) by gas cutting and by cleaning by grinding and removal of welding burs,angle clits,stay roads & foreign materials by grouising & grinding,rectification of undercut weld & deep scores on the body of gate structures by welding & grinding & welding the left-out welds if any etc. including the cost of scaffolding required for above work of spillway gates as is where basis inside the working yard of Anandapur Barrage Gate Erection Project,Salapada as per drawings and instructions of Engineer- In-Charge

18 Erection of second stage embedded M/s Kamakshi Engg. 43/2015-16 parts of stoplogs and spillway gates of Works, AT/p.o.- Anandapur Barrage Gate Erection Bariniput, Dist.-Koraput Project 19 Erection of second stage embedded M/s Kamakshi Engg. 44/2015-16 parts of stoplogs and spillway gates of Works, AT/p.o.- Anandapur Barrage Gate Erection Bariniput, Dist.-Koraput Project 20 Erection of second stage embedded Sri Dillip Kumar Das, 01/2016-17 parts of stoplogs and spillway gates of At/P.O-B.t.Pur, Dist.- Anandapur Barrage Gate Erection Bhadrak Project 21 Erection of rail girders ( Upstream & Sri Dillip Kumar Das, 03/2016-17 down stream ) for 4( Four ) Nos. of At/P.O-B.t.Pur, Dist.- Spillway bays of Anandapur Barrage Bhadrak Gate Erection Project

68 Name of work Design & drawings of three Nos. of Design & drawings of three Nos. of M/s Techno Resource ….. drainage structures in Balasore District drainage structures in Balasore District Application Centre in Engineering (TRACE) Agreement No 02/2016-17

Agreement 3.95 Value Page 28 of 72 (Rs. In Lakhs) Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

69 Name of work Providing detailed Design & drawings of Providing detailed Design & drawings M/s Techno Resource ….. drainage sluice at RD 7650Mtr. Of of drainage sluice at RD 7650Mtr. Of Application Centre in Hanskura Nallah in Balasore district Hanskura Nallah in Balasore district Engineering (TRACE)

Agreement No 01/2016-17

Agreement 1.5 Value (Rs. In Lakhs)

Page 29 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

70 Name of work M/s Regal Engineering 08/2016-17 Repair/renovation by Removal of old wire ropes ,rope & Construction, Brit supply,delivery.installation & attachments,turn buckles etc. of Colony,Nayapalli, commissioning of electrical materials for spillway radial gates and fittings of new Bhubaneswar 45T capacity gantry crane & replacement ones by means of labour,machinery, by removal of old wire ropes of radial equipments,tools,tackles,consumables, gates and supply,delivery and fitting of scafolldings etc at Rengali new ones of Rengali Dam,Rengali Dam,Rengali Agreement No 12F2/2014-15

Agreement 33.49 Value (Rs. In Lakhs)

71 Name of work Design,supply,fabrication,transportation,e Labour charges for Sri Nirmal Ch. 07/2016-17 rection,commissioning and testing along transportation,erection,painting,commi Dash,Kainchi with second stage concreting of cross ssioning and testing along with second Sasan,Madhuban regulator gates,trash racks and escape stage concreting of cross regulator Hat, gates at RD 79630Mtr of Right Bank gates and escape gates with hoist Canal under Brahmani Right Basin arrangement & trasf racks at RD 79630Mtr of Right Bank Canal under Brahmani Right Basin

Agreement No 01F2/2016-17

Agreement 60.74 Value (Rs. In Lakhs)

72 Name of work Slope Protection Work of LMC from RD 1 Stone Packing work of Slope Sri Nityananda Bhoi, 12/2014-15 47.75m to 750m of LLIP Protection Work from RD 310m to At/P.O.-Badmaheswar, 340m of L.L.I.P Dist.-

Agreement No 30F2/2009-10 2 Construction of concrete drain from RD Sri Rajib Lochan 04/2015-16 65m to 172.8m (left side) & 185.8m to Sharma AT/PO- Khariar 290m (right side) of LMC of LIIP Dist- Nuapada

Agreement 528.94 3 Stone Packing work of Slope Sri Rajib Lochan 05/2015-16 Value Protection Work from RD 252m to Sharma AT/PO- Khariar (Rs. In Lakhs) 310m of L.L.I.P Dist- Nuapada 4 Slope protection work of LMC from RD Sri Rajib Lochan 07/2015-16 47.75M to 750M of LIIP(CC lining over Sharma AT/PO- Khariar CNC layer from RD 765M to 900M of Dist- Nuapada LMC) 5 Slope protection work of LMC from RD Sri Rajib Lochan 08/2015-16 47.75M to 750M of LIIP(CC lining over Sharma AT/PO- Khariar CNC layer from RD 900M to 1000M of Dist- Nuapada LMC) 6 Stone packing work of slope protection Sri Nityananda Bhoi, 09/2015-16 work from RD 720m to 750m of L.L.I.P At/P.O.-Badmaheswar, Dist.-Nuapada

7 Slope protection work of LMC from RD Sri Dasmu Behera,At- 10/2015-16 458M to 530M of LIIP Tikhali,Nuapada 8 Slope protection work of LMC from RD Sri Dasmu Behera,At- 11/2015-16 530M to 610M of LIIP Tikhali,Nuapada 9 Excavation of LMC from RD 458M to Sri Dasmu Behera,At- 12/2015-16 610M(Balance Work) Tikhali,Nuapada 10 Excavation of LMC from RD 765M to Sri Rajib Lochan 13/2015-16 900M(Balance Work) Sharma AT/PO- Khariar Dist- Nuapada 11 Stone packing work of slope protection Sri Dasmu Behera,At- 01/2016-17 work from RD 440M to 500 M of LIIP Tikhali,Nuapada

12 Stone packing work of slope protection Sri Dasmu Behera,At- 02/2016-17 work from RD 500M to 550 M of LIIP Tikhali,Nuapada

13 Stone packing of slope protection work Sri Dhubaleswar 04/2016-17 of LMC from RD 580M to 610 M of LIIP Goud,Badmaheswar,Nu apada

73 Name of work Cement concrete lining & service road Cement concrete lining & service road M/s Thakur Builders 03/2016-17 from RD 1625m to 10260m of Khariar from RD 1625m to 10260m of Khariar private Distributary of LMC of LIIP Distributary of LMC of LIIP Limited,Bhawanipatna, kalahandi Agreement No M.O.U.No.01/2016-17

Agreement 766.25 Value (Rs. In Lakhs)

74 Name of work Construction of the PMGSY road work 1 Sri Purna Chandra 03/2014-15 from RD Road to Kodiakahania under Nayak,At/Po-Notar,P.S- Package No. OR-23-81-XII in the Sarankul,Dist- Nayagarha District Agreement No 10/PMGSY of 2014-15 04/2014-15 2 Agreement 415.62 05/14-15 Value (Rs. In Lakhs) 3 4 06 & 07/2014-15 5 07/2014-15 6 08/14-15 7 08 & 13/2014-15 8 13/15-16 & 14/15-16 9 17/15-16 10 18/15-16 & 19/15-16 11 20/15-16 & 21/15-16

75 Name of work Des DRW fab supply trans erection testing 1 Erection of 1st stage emb parts of Ms. Sysmo Industries L- 04/2013-14 commissioning of 9 sets of radial gates stoplog & S/W gates in 3 days. 1571,Dumduma Phase- 15mx9m including emb parts for rad II, Bhbuneswar-19 Page 30 of 72 gates , stops log gates hoists bridge hoist arrangement one set of stop log gate (6 seg) L.B Gantry crane 40T for OP. stop log gets of S/W LIIP. Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

Agreement No. 01F2/2005-06 2 Erection of radial gates in 3 bays Ms. Sysmo Industries L- 5/2013-14 (Trunion boxes etc). 157L,DumDAMA Phase- II, Bhbuneswar-L9

Page 31 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

Agreement 1792.30 3(a) Labour charges for erection of trunion M/s Kamakshi Engg. 16/2014-15 value hub , end arm ,horizontal girder , gate Works,C/o Kanhu (Rs. in lakhs) leaf,seal guide & roller,tie beam & Charan Padhy,OCC trunion walk way of radial gates in 3 Colony near OCC Nos of bays. Telengiri Office,Bariniput,Via- Jeypore,Dist- Koraput. (b) Labour charges for erection & M/s Kamakshi Engg. dismantaling of working platform of Works,C/o Kanhu radial gates in 3 Nos of bays. Charan Padhy,OCC Colony near OCC Telengiri Office,Bariniput,Via- Jeypore,Dist- Koraput. 4(a) Labour charges for fixing of first stage Manguli Charan embeded parts of radial gates in 6 Nos Swain,AT-Aingol,Po- of bays. Sorava,Via- Nayahat,Dist-Puri (b) Labour charges for fixing of first stage Manguli Charan embeded parts of stoplog gates in 6 Swain,AT-Aingol,Po- Nos of bays. Sorava,Via- Nayahat,Dist-Puri 19/2014-15 ( c ) Labour charges for fixing of 2nd stage Manguli Charan embeded parts of radial gates in 6 Nos Swain,AT-Aingol,Po- of bays.A)Trunnion anchor bar Sorava,Via- B)Bottom sill beam Nayahat,Dist-Puri (d) Labour charges for erection of trunnion Manguli Charan girder of radial gates in 6 Nos of bays. Swain,AT-Aingol,Po- Sorava,Via- Nayahat,Dist-Puri 5(a) Labour charges for erection and dismantling of bridge girder trusses of M/s Kamakshi Engg. Lower Indra Gate Erection Project Works,C/o Kanhu Charan Padhy,OCC (b) Labour charges for recovery of Colony near OCC 26/2015-16 embedded steel from supporting Telengiri bracket in all Nos. of bay by cutting Office,Bariniput,Via- and dismantling of Lower Indra Gate Jeypore,Dist- Koraput. Erection Project 6(a) Labour charges for erection,alignment M/s Regal Engineering of second stage embedded parts like & Construction, Plot No.- bottom seal beam,guide,track side seal LIG/24,Brit seat for 9 Nos. of stop log bays with Colony,Nayapalli, trial testing by gate Bhubaneswar-751012 27/15-16 (b) Labour charges for erection & commissioning of latch arrangement and final testing of gate leaf by placing in each bay by Gantry crane

7(a) Labour charges for unloading from trailor/truck and assembly of hoist bridge components on a suitable site fabricated bed close to right abutment pier of spillway at RL-268 as per direction of Engineer-In-Charge M/s Kamakshi Engg. Works,C/o Kanhu (b) Labour charges for erection of hoist Charan Padhy,OCC bridge of hoisting equipments at RL- Colony near OCC ……. 271.250 of Lower Indra Spillway radial Telengiri gate components including loading in Office,Bariniput,Via- truck, unloading at spillway Jeypore,Dist- Koraput. bridge,drilling of holes in the hoist bridge for end reducer by magnent machine,fitting of chequered plate & hand railing with trial, testing & commissioning as per direction of Engineer-In-Charge 8(a) Labour charges for erection of trunnion hub,end arm,horizontal girder,gate leaf,seal guide & roller.Tie beam & M/s Kamakshi Engg. trunnion walk way of radial gates in Works,C/o Kanhu 6(six) Noa of bays. Charan Padhy,OCC (b) Labour charges for erection & Colony near OCC 32/2015-16 dismantling of working platform of Telengiri radial gates in 6(six) Nos of bays. Office,Bariniput,Via- © Labour charges for erection of wall Jeypore,Dist- Koraput. plate of radial gates in 9(Nine) Nos of bays. 9 Painting of gate components like M/s Kamakshi Engg. radial gates,end arms,horizontal Works,C/o Kanhu girders etc. with single coat of epilux 4 Charan Padhy,OCC zinc rich primer with surface Colony near OCC preparation by chipping,cleaning and Telengiri stacking them including all Office,Bariniput,Via- 30/2015-16 labour,tools,tackles and painting Jeypore,Dist- Koraput. accessories etc. as per direction of Engineer-In-Charge.Painting work shall be done as per IS:14177:1994

10 M/s Kamakshi Engg. Fabrication,erection and dismantling Works,C/o Kanhu of rigid framed structure in stoplog Charan Padhy,OCC openings on Spillway bridge level at Colony near OCC 04/2016-17 EL-268.00M in bay 1 to 9 by placing I- Telengiri Beams, Channels, Plates to carry out Office,Bariniput,Via- erection work of Hoist Bridge Assembly Jeypore,Dist- Koraput.

76 Name of work Renovation of Champamalributary RD 0.000Km to RD 2.590KM (Reach-I) M/s BKD Infrastructure 16/2015-16 Pvt.Ltd.,Dhankouda,Sa mbalpur Page 32 of 72 Agreement No. CE & BM Tel Basin Bhawanipatna Vide Letter No.3697/18.12.2016 under 9133 Circular Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

Agreement 478.02 value (Rs. in lakhs)

77 Name of work Construction of Earth dam Construction of Earth dam from RD 04/2016-17 Sri Harekrushna Panda 420M to RD 520M Agreement No. 06F2/2003-04

Page 33 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

Agreement 12.33 value (Rs. in lakhs)

78 Name of work Construction of Earth dam 1 Construction of Spillway bridge work of 05/2016-17 Sri Laxman Rana bay No. 6 of LIIP Agreement No. 13F2/2001-02 2 Construction of Spillway bridge work of 06/2016-17 Sri Laxman Rana bay No. 1 of LIIP Agreement 56.01 value (Rs. in lakhs)

79 Name of work Improvement to Tamasa Main Canal 1 Improvement to Tamasa Main Canal Sri Raghunath 03/2016-17 from RD 60.000Km to RD 79.815Km and from RD 72.77Km to RD 79.815Km Sahu,Jagatpur,Cuttack Udayagiri Distributary from 0.000Km to and Udayagiri Distributary from RD 5.000KM of Potteru Irrigation Project 0.000Km to RD 5.000KM with repair of under CLSRP CD at RD 78.485Km & 2 Nos. of VRBs.

Agreement No. 116F2/2015-16 2 Improvement to Tamasa Main Canal M/s Unicorn 04/2016-17 from RD 60.00Km to RD 64.000Km Construction,Salipur,Cu including repair of 2 Nos. VRBs & 1 ttack Aqueduct at RD 0.128Km. Agreement 4282.6 value (Rs. in lakhs)

80 Name of work Execution of balance work of LMC from Execution of balance work of LMC from M/s D. D. Builders 05/2016-17 RD 20.000Km to RD 29.000KM of LIIP RD 20.000Km to RD 29.000KM of LIIP Ltd,33F, BJB Nagar,Bhubaneswar Agreement No. MOU NO.02/2016-17

Agreement 855.01 value (Rs. in lakhs)

81 Name of work M/s D. D. Builders 06/2016-17 Execution of balance work i.e. Ltd,33F, BJB Execution of balance work i.e. Excavation Excavation of Construction of Nagar,Bhubaneswar of Construction of Bangomunda Branch Bangomunda Branch Canal from RD Canal from RD 0.000M to RD 13800M 0.000M to RD 13800M including all including all structures of taking at RD structures of taking at RD 37.59Km of 37.59Km of LMC of LIIP & Excavation & LMC of LIIP & Excavation & Construction of Goimundi Distributary (RD Construction of Goimundi Distributary 00M to Rd 7200M) including all structures (RD 00M to Rd 7200M) including all of taking at RD 7860M of Bangonunda structures of taking at RD 7860M of Branch Canal) Bangonunda Branch Canal) Agreement No. MOU NO.01/2016-17

Agreement 3992.28 value (Rs. in lakhs)

82 Name of work 1 C.C. lining over C.N.C. layer from RD M/s Rajib Lochan 07/2016-17 Excavation & Construction of LMC from 1000M to RD 1130M of LMC of LIIP Sharma,At/Po- RD 1KM to RD 20.04KM with structures Khariar,Nuapada Agreement No. 13F2/2005-06 2 C.C. lining over C.N.C. layer from RD M/s Rajib Lochan 08/2016-17 1130M to RD 1260M of LMC of LIIP Sharma,At/Po- Khariar,Nuapada Agreement 3312.74 value (Rs. in lakhs)

83 Name of work Erection of gate works of Erection of second stage embedded M/s Tybas Projects Pvt. 04/2016-17 Mahendratanaya Barrage Gate Erection parts, Barrage bay & Under sluice Ltd,Cuttack Project gates, Gate components of Barrage Road,Bhubaneswar bay & under sluice bays,trestles,hoists & hoist supporting structures, latch arrangements etc. of Mahendratanaya Barrage Project

Agreement No. 335P1/2013-14

Agreement value (Rs. in lakhs)

84 Name of work Erection of gate works of Rukura Irrigation Erection of first stage & second stage M/s Ananta 06/2016-17 Project embedded parts, ailgnment and fixing Constructions,Kalinga of rails of gantry crane including all Vihar,Patrapada,Bhuba labour,machinery,equipments,tools,tac neswar kles & consumables etc. required for the work but excluding welding electrodes of Rukura Gate Erection Project as per direction of Engineer-In - ChargeBarrage bay & Under sluice gates, Gate components of Barrage bay & under sluice bays,trestles,hoists & hoist supporting structures, latch arrangements etc. of Mahendratanaya Barrage Project

Agreement No. 09F2/2010-11

Agreement value (Rs. in lakhs)

85 Name of work Cement concrete lining with paver finish 1 Supply of labour & machinery for Sri Ram Krushna Sahoo 01/2016-17 from RD 20.810KM to RD 29.177KM( cutting of grooves in C.C. lining from Excluding 300Mtr of lining work in HR RD 20810Mtr to RD 24533Mtr position), 500Mtr of trough wall,One Page 34 of 72 number of elephant friendly ramp 7 two numbers of inlets of LBC of Rengali Irrigation Project under RIDF(XVIII) Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

Agreement No. 44F2/2012-13 2 Supply of labour & materials and hire Sri Muna Pani 04/2016-17 charges of machinery for C.C. lining from RD 24510Mtr to RD 24900Mtr of LBC-Reach-III(Part-II)(Trough wall position)

Page 35 of 72 Sl. Details of contracts of OCCL Name of sub-work Name of job-workers Agreement No.of OCCL No. with full address with date/ year

Agreement 4253.47 3 Supply of labour & materials and hire Sri Muna Pani 05/2016-17 value charges of machinery for C.C. lining (Rs. in lakhs) from RD 24510Mtr to RD 24900Mtr of LBC-Reach-III(Part-I)(Trough wall position) 4 Supply of labour & materials and hire Sri Muna Pani Suppl. Agmnt. To charges of machinery for C.C. lining Agmnt.No 04/2016- from RD 24510Mtr to RD 24900Mtr of 17&05/2016-17 LBC-Reach-III(Part-I)(Trough wall position)

MANAGING DIRECTOR

Page 36 of 72 LIST OF JOB-WORKERS ENGAGED BY O.C.C. LTD. IN DIFFERENT WORKS DURING THE

Agreement value Original / Revised (in Rs.)

9,536,000.00

9,753,820.00

9,670,500.00

9,670,500.00

8,016,107.00

8,803,250.00

8,518,396.00

8,527,786.00

8,554,330.00

9,846,062.00

9,887,500.00

9,887,500.00

9,947,000.00

9,987,200.00

Page 37 of 72 Agreement value Original / Revised (in Rs.)

9,755,232.00

Page 38 of 72 Agreement value Original / Revised (in Rs.)

9,755,232.00

9,763,726.00

6,648,950.00

9,980,600.00

9,980,600.00

9,975,842.00

94,579,961.00

26,102,794.00

802,667.00

911,396.00

971,647.00

3,563,645.00

4,407,000.00

4,407,000.00

4,407,000.00

3,865,730.00

Page 39 of 72 Agreement value Original / Revised (in Rs.)

9,958,672.00

Page 40 of 72 Agreement value Original / Revised (in Rs.)

9,122,240.00

9,847,500.00

9,847,500.00

4,944,760.00

4,991,500.00

4,991,000.00

4,999,870.00

4,407,000.00

9,830,866.00

9,847,500.00

9,847,500.00

7,910,619.00

8,326,935.00

9,847,500.00

Page 41 of 72 Agreement value Original / Revised (in Rs.)

9,803,700.00

Page 42 of 72 Agreement value Original / Revised (in Rs.)

9,233,611.00

8,287,074.00

9,817,500.00

4,849,703.00

9,817,500.00

6,947,188.00

9,817,500.00

9,817,500.00

9,817,500.00

9,967,225.00

9,919,338.00

9,450,000.00

9,962,300.00

Page 43 of 72 Agreement value Original / Revised (in Rs.)

9,450,000.00

Page 44 of 72 Agreement value Original / Revised (in Rs.)

9,990,000.00

34,303,851.00

2,192,993.00

334,134.00

221,861.00

4,705,046.00

154,256.00

4,853,481.00

8,917,740.00

5,972,119.00

9,838,349.00

8,923,729.00

2,292,499.00

7,942,855.00

434,342.00

276,668.00

405,000.00

441,930.00

21,940.00

668,736.00

9,733,304.00 Page 45 of 72 Agreement value Original / Revised (in Rs.)

9783181/-/91995/-

Page 46 of 72 Agreement value Original / Revised (in Rs.)

9406692,

316890 9,202,450.00

9210830/-/1271686/-

4,683,665.00

4,931,927.00

1,993,923.00

1,986,604.00

534,565.00

668,865.00

172,000.00

185,400.00

251,316.00

82,753,000.00

22,592,000.00

45,537,000.00

27,573,000.00

Page 47 of 72 Agreement value Original / Revised (in Rs.)

12,189,000.00

Page 48 of 72 Agreement value Original / Revised (in Rs.)

96,595,000.00

78,314,502.00

10,440,000.00

10,804,000.00

11544000/- 1,649,000.00

11,656,000.00

11,670,000.00

11,267,000.00

11280000/-& 3465000/-

6,641,000.00

6,552,000.00

925,000.00 6,002,000.00

9,728,000.00

5,305,000.00

2,274,000.00

7,398,228.00

1,872,000.00

5,326,000.00

1,276,000.00

2,206,000.00

1,280,000.00

497,000.00 439,000.00 439,000.00 439,000.00 66,000.00

10,031,000.00

10,074,000.00 Page 49 of 72 Agreement value Original / Revised (in Rs.)

7,823,000.00

1,690,000.00

Page 50 of 72 Agreement value Original / Revised (in Rs.)

5,399,000.00

1,753,000.00

298,000.00

242,000.00

3,707,000.00

825,000.00

4,533,000.00

1,069,469,564.00

537,000.00

493,000.00

1,742,600.00

322,000.00

106,819.20

106,819.20

427,276.80

2,520,000.00

213,638.40

200,000.00

385,000.00

Page 51 of 72 Agreement value Original / Revised (in Rs.)

990,000.00

Page 52 of 72 Agreement value Original / Revised (in Rs.)

97,470.00

3,968,520.00

660,000.00

14,400,000.00

180,000.00

1,200,000.00

104,064.00

1,200,000.00

1,060,000.00

37,563,000.00

208,000.00

82,203,430.00

84,016,499.00

81,242,207.00

16,167,710.00 Page 53 of 72 Agreement value Original / Revised (in Rs.)

11,414,875.00

31,946,043.00

74,357,831.00

4,472,564.00

48,310,000.00

53,714,000.00

33,941,000.00

21,229,000.00

13,478,000.00

25,728,000.00

19,757,000.00

Page 54 of 72 Agreement value Original / Revised (in Rs.)

1,580,000.00

Page 55 of 72 Agreement value Original / Revised (in Rs.)

13,446,000.00

17,043,000.00

34,175,000.00

30,657,000.00

439,671.00

1,433,880.00

73,440.00

2,050,000.00

4,925,000.00

Page 56 of 72 Agreement value Original / Revised (in Rs.)

96,595,000.00

Page 57 of 72 Agreement value Original / Revised (in Rs.)

103,422,000.00

82,753,000.00

75,466,000.00

72,019,000.00

98,754,000.00

98,790,000.00

99,376,000.00

95,453,000.00

42,235,000.00

42,660,000.00

41,082,000.00

Page 58 of 72 Agreement value Original / Revised (in Rs.)

48,310,000.00

Page 59 of 72 Agreement value Original / Revised (in Rs.)

53,714,000.00

33,941,000.00

21,229,000.00

13,478,000.00

25,728,000.00

19,757,000.00

1,580,000.00

28,031,000.00

11,011,000.00 Page 60 of 72 Agreement value Original / Revised (in Rs.)

Page 61 of 72 Agreement value Original / Revised (in Rs.)

13,446,000.00

17,043,000.00

34,175,000.00

30,657,000.00

58,146,000.00

537,000.00

493,000.00

1,742,600.00

322,000.00

106,819.20

106,819.20

427,276.80

2,520,000.00

Page 62 of 72 213,638.40 Agreement value Original / Revised (in Rs.)

200,000.00

Page 63 of 72 Agreement value Original / Revised (in Rs.)

385,000.00

990,000.00

97,470.00

3,968,520.00

660,000.00

14,400,000.00

180,000.00

1,200,000.00

104,064.00

1,200,000.00

1,060,000.00

395,000.00

Page 64 of 72 Agreement value Original / Revised (in Rs.)

150,000.00

Page 65 of 72 Agreement value Original / Revised (in Rs.)

756,000.00

1,381,866.00

255,310.00

492,390.00

497,445.00

1,691,108.00

1,565,527.40

399,190.00

1,932,240.00

1,821,002.00

247,500.00

57,750.00

495,685.00

492,584.00

423,080.00

76,625,661.00

1,700,000.00

1,997,000.00

1,997,000.00

2,500,000.00 1,984,000.00 1,950,000.00 1,972,000.00 1936000/- &1970000/- 1,998,000.00 1994000/- &1992000/- 1910000/- &1984000/-

23,632.00

Page 66 of 72 Agreement value Original / Revised (in Rs.)

585,952.00

Page 67 of 72 Agreement value Original / Revised (in Rs.)

10,73,940.00

879,336.00

2,203,252.00

318,673.00

950,000.00

2,317,982.00

300,000.00

211,680.00

47,802,000.00

Page 68 of 72 Agreement value Original / Revised (in Rs.)

7,555,400.00

Page 69 of 72 Agreement value Original / Revised (in Rs.)

409,050.00

406,050.00

99,376,000.00

95,453,000.00

85,501,627.00

399,228,823.00

1,866,765.00

1,866,765.00

1,957,447.00

65,497.00

469,030.00

Page 70 of 72 Agreement value Original / Revised (in Rs.)

11,417,202.00

Page 71 of 72 Agreement value Original / Revised (in Rs.)

11,417,202.00

3,332,080.00

Page 72 of 72