&

This fact sheet is an overview of some of the legal compliance and soundness of our Local key information regarding this ward which is Plan. Comments relating to legal compliance contained in the Draft Local Plan. predominantly relate to procedural requirements. It is intended to act as a guide to help better In the case of comments relating to soundness, direct you to the relevant information in the Draft these should include whether the plan has been Local Plan which contains more detail. positively prepared and whether it is justified, effective and consistent with national policy. We have created a map for each of the 20 wards in the district, as well as listing some important Once Regulation 19 is complete, an updated information for each including: Draft Local Plan is submitted for examination by an independent Planning Inspector who will

Allocated housing sites – This is a site that has undertake a ‘public examination’. been allocated for residential development. Infrastructure – Requirements for roads, Key documents schools and health centres etc. To view the Draft Local Plan and the Town Centres, Local Centres and Spatial Strategy document, please visit Neighbourhood Centres – These are protected www..gov.uk/localplan. shopping areas. Tourism Asset – These are protected places Key information for Tatsfield & Titsey to visit. Allocated Housing Sites Strategic Employment Sites and Important Employment Sites – Provide a mix of There are no allocated housing sites. employment uses which will be protected and intensified. . Tourism Asset & Gardens. Garden Community in South The Garden Community will be located in South Strategic Employment Site Godstone. Please note, the black boundary on Road Industrial Estate, Tatsfield. the Godstone map (see separate fact sheet) is SES04 only an area of search, it does not mean all the land within the black line will be developed or Infrastructure* removed from the Green Belt. Improved access to Industrial Estate.

Draft Local Plan Consultation (Regulation 19) Subject to Committee approval, this will take place from 16 July to 28 August.

What is a Regulation 19 Consultation? * Not all infrastructure provision relates to a policy. Some infrastructure will be funded through developer The main purpose of the Regulation 19 commissions and some will be funded by the Community consultation is to ask for comment on the Infrastructure Levy.