What Options Were Considered

Total Page:16

File Type:pdf, Size:1020Kb

What Options Were Considered What options were considered As part of the initial planning for the new runway, several options were identified and assessed before determining that the new runway is the most appropriate development to meet the future demand for air services for Perth. Planning Location for the new runway identified in the 1970s by a joint Commonwealth and State Government Committee Support growth Providing essential transport infrastructure capacity and supporting WA’s economic development Connecting people and places Furthering Western Australia’s social and cultural development and connecting WA to the world The new runway represents the best option to support the international competitiveness of the State’s critical export industries, including resources, tourism, international study and agriculture. When do we need a How is the new new runway? runway funded? The need for an additional runway at Perth Airport was Perth Airport is located on approximately 2,105 hectares of land owned by the first recommended more than 40 years ago by a joint Commonwealth of Australia. Commonwealth and State Government Committee In 1997, the airport was privatised investigating Perth’s planning requirements. under a long term lease with oversight remaining with the Commonwealth of Recent modelling shows that an additional runway is needed to meet Australia. Perth Airport is operated by the demand of intrastate, interstate and international services to and Perth Airport Pty Ltd, which is a wholly from Perth. The need for the new runway is driven by the demand for owned subsidiary of Perth Airport arrivals and departures in a given hour. Development Group Pty Ltd (PADG). Perth Airport experiences significant peak periods at particular times More than 50 per cent of PADG is during the day. owned by superannuation funds, including AustralianSuper and Sunsuper. During the morning peak period, approximately 80 per cent of aircraft are departing and only 20 per cent are arriving. In the early morning, there Perth Airport funds infrastructure is a departure peak that sees up to 40 aircraft departing each hour for a development through a mix of equity and two to three hour period. In the afternoon, there is an arrivals peak which debt from banks and capital markets. sees up to 26 aircraft arriving each hour for a two to three hour period. Current demand exceeds the capacity in these peak periods. No Commonwealth or State Simulation modelling shows that an additional runway is needed when the funding is required for the number of flights exceeds 145,000 per year. In 2013, flight numbers peaked construction of the new runway at 151,000 resulting in significant delays to airlines and passengers. The number of annual flights is forecast to grow, reaching 172,000 by 2025 and 241,000 by 2045. 1985 $1.72b 41.8 MILLION Location of the new runway Lost tourism expenditure Passengers that would not travel released as part of the over 20 years if the new to or from Perth Airport over 20 Perth Airport Master Plan 1985 runway is not built years if the new runway is not built What alternative options were considered? As part of the initial planning for the new runway, several options were identified and assessed before determining that the new runway is the most appropriate development to meet the future demand for air services for Perth. Maximising existing A second metropolitan airport October 2015 with the final approval infrastructure by changing A second metropolitan airport has granted in December 2016. Construction operations been considered since the late 1970s. is scheduled to commence early 2018 with operations starting in 2026. It is Perth Airport, in collaboration with In 2015, the State Government released expected to cost in excess of $2.4 billion. Airservices Australia, continually the State Aviation Strategy noting looks at opportunities to improve the that preliminary work was being Combined with the cost of building the efficiency and capacity of the existing undertaken by the relevant government second airport and given a lead time for runways by improving or changing departments to identify a suitable site. approvals and construction, it is unlikely operational processes and procedures. However, the State Government has that an airport would be constructed Any changes must be considered not identified a location or provided in time to meet the immediate growth and balanced against any impacts any commitment or funding toward needs or forecast demand for air to the environment, surrounding the project. services and therefore is not considered communities and safety. a viable alternative to the new runway. When considering a secondary Between 2008 and 2013, Perth Increase use of other airports Airport undertook significant airfield metropolitan airport, the Alternative airports were considered, infrastructure projects. $250 million significant cost, impact to including Jandakot Airport, Cunderdin was invested in new taxiways, taxiway newly affected areas and the Airport, Busselton - Margaret River widening, enhanced lighting and approach timeframe to plan, approve and Regional Airport and other regional equipment, as well as runway overlays. construct a new airport must airfields. These airports were not viable In 2012, Airservices and Perth Airport be examined. options for various reasons including engaged NATS, the UK’s largest air- not having the runway or terminal navigation service provider, to study In the case of Western Sydney Airport, infrastructure to support the large Perth Airport operations. Through policy makers first considered the passenger aircraft types that use Perth implementing recommendations from need for a second airport in Sydney in Airport and, in some cases, the airports the study, capacity has improved. the 1940’s. It wasn’t until 1986, some are not conveniently located near large However, Perth Airport has largely 40 years later, that land began to be population centres. exhausted efficiencies associated with purchased at the Bagerys Creek site. the existing infrastructure and there is An environmental impact statement a need for additional runway capacity. was released for public comment in $2.5b INVESTMENT The new runway forms part of a privately funded investment program over the next decade New runway timeline 1970s planning PLAN commenced Use of RAAF Base Pearce Expand existing runway LOCATE 1984 location for RAAF Base Pearce is approximately infrastructure parallel runway 30 kilometres north of Perth Airport at Perth Airport The proposed extension of the and has been considered previously as identified cross runway (06/24) from an alternative civilian airport, however 2,163 metres to 3,000 metres 2008 – 2012 GROWTH it was deemed as unacceptable due dramatic and would enable the runway to to operational constraints imposed by unforecast growth accommodate all aircraft types, the topography of the nearby Darling including the Airbus A380. It would INVEST 2010 – 2014 Scarp. allow for an increase in arrivals $250m airfield The Commonwealth Department and departures from the north/ investment of Defence has also publicly stated east, however, there would be very program to that RAAF Pearce is not a suitable little increase in capacity when improve capacity at Perth Airport alternative civilian airport because arriving or departing from the it is one of their busiest and most south/west. The overall increase in 2014 Master MASTER PLAN complex airfields and it operates capacity would only be sufficient Plan approved 2014 using very specialised air traffic to accommodate around 193,000 including how the procedures to allow for the large annual aircraft movements, after new runway would quantity and type of air traffic. which, a new runway would again likely operate be needed. and timing Relocation of Perth Airport DESIGN 2013 – 2017 Increasing the length of the main Given the billions of dollars in technical studies runway (03L/21R) from 3,444 investment of both public and and design work metres to 3,800 metres would private funds that have gone into not provide an increase in arrival 2018 public COMMENT the development of Perth Airport, comment and departure capacity but simply closing Perth Airport would not be a caters for larger aircraft. APPROVAL Anticipated viable solution and an alternative site 2019 approval and has not been identified. Any current Therefore, extending the existing decision to build issues with noise from aircraft would runway infrastructure would not cater 4 years to CONSTRUCT not lessen but simply shift the areas for additional aircraft in peak periods. construct where people are affected. OPEN 2023 – 2028 opening subject to actual demand and airline commercial agreement Why do we need a new runway? No new infrastructure This would have a significant economic Tourism Not constructing the new runway will flow on effect to the State’s economy, Air services are vital to WA’s tourism result in flight delays and constrain including $1.72 billion lost tourism industry and the jobs it supports. growth. expenditure over 20 years if the More than 90 per cent of visitors to runway is not built. WA come by air, with most arriving Simulation modelling has shown that at Perth Airport. Spending by delays would increase from an average The new runway will allow more efficient international and domestic tourists of a five minutes in 2016 to 34 minutes scheduling of regional, domestic and helps to drive the WA economy. by 2045. This would be unacceptable international flights, while improving to airlines and passengers. connectivity between business, tourism and employment, all of which support Supporting the resource sector To reduce the likelihood of delay, airlines WA’s economic growth. Most fly-in fly-out workers are from the would need to either change the time of Perth and Peel regions and rely on flights flights to or from Perth and move flights Social and Cultural Benefits with narrow departure windows, which into the shoulder or non-peak periods, Western Australians rely on air transport are generally in the morning.
Recommended publications
  • Protected Airspace Assessment Tool (Paat)
    PROTECTED AIRSPACE ASSESSMENT TOOL (PAAT) USER MANUAL March 2016 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 STATUTORY APPROVALS PROCESS 2 2.1 PRESCRIBED AIRSPACE 2 2.2 PERTH AIRPORT ASSESSMENT PROCESS 3 2.2.1 PAAT 3 3.0 USING PAAT 4 3.1 REGISTERING AS A NEW USER 4 3.2 USER ACCOUNT 7 3.3 CHANGING YOUR PASSWORD 7 3.4 LODGING A NEW APPLICATION 7 3.4.1 SITE NAME 8 3.4.2 ON-SITE MOBILE 8 3.4.3 TYPE 8 3.4.4 MAKE 8 3.4.5 MODEL 8 3.4.6 REGO 8 3.4.7 MAX OPERATING HEIGHT 8 3.4.8 MAX OPERATING RADIUS 8 3.4.9 REQUESTED OPERATING HEIGHT 8 3.4.10 REQUESTED START DATE 9 3.4.11 REQUESTED END DATE 9 3.4.12 OPERATING TIME 9 3.4.13 PURPOSE OF ACTIVITY 9 3.4.14 SUPPORTING DOCUMENTS 9 3.4.15 MAP FUNCTIONS 9 3.4.16 MARKING A LOCATION 10 3.4.17 DELETING A LOCATION 11 3.4.18 SUBMITTING AN APPLICATION 11 3.5 REVISING AN APPLICATION 11 3.6 VIEWING OPEN AND CLOSED APPLICATIONS 11 3.7 CHECKING THE STATUS OF AN APPLICATION 12 3.7.1 APPLICATION STATUS LEVELS 12 4.0 HOW TO CONTACT PERTH AIRPORT 13 5.0 FAQ 14 1.0 INTRODUCTION The protection of airspace for Perth Airport’s current and future needs is essential to provide a safe, predictable environment for the arrivals and departures of aircraft in all weather conditions.
    [Show full text]
  • Western Australia Manual of Air Traffic Services Supplementary Procedures
    Western Australia Manual of Air Traffic Services Supplementary Procedures Procedure ATS-PROC-0002 Version 39 Effective 21 May 2021 Authorised: High Density Services (Southern FIR) ,Terminal Services (Southern FIR) ,Primary Aerodrome Svcs - Twr (Sth FIR) ATC STAND1 – Headquarters 44 Wing ATTENTION Temporary amendments may apply Ensure document is current before use © Airservices Australia 2012 1 of 42 Western Australia Manual of Air Traffic Services Supplementary Procedures Change summary Western Australia Manual of Air Traffic Services Supplementary Procedures Version 39: Effective 21 May 2021 Location of change Change description CRC All New Template 8344 Cover Page Amended Authorisers Various Formatting Corrections 2.5.1.1 Note Changed to Body text 3.3.1.2 Level for aircraft transiting into class E removed IAW Class E PIR. Paragraph reformatted. 3.3.2 Jet/Non- Jet descriptors added Additional tracking point added for jet aircraft tracking via AVNEX Additional tracking point added for jet aircraft tracking via OTLED Additional route clearance added for aircraft planned via CANRI for destination YNOV 3.4.3 Inclusion of requirement for agency responsible for initiating non-standard tracking to notify PHF 5 RAAF contact numbers updated. This document was created using Air Traffic Services (ATS) Operational Document Template (C-TEMP0256) Version 5. View change summaries for the previous six months Table of contents 1 Definitions ................................................................................................................................
    [Show full text]
  • Aviation Short Investigations Bulletin
    InsertAviation document Short Investigations title Bulletin LocationIssue 30 | Date ATSB Transport Safety Report Investigation [InsertAviation Mode] Short OccurrenceInvestigations Investigation XX-YYYY-####AB-2014-064 Final – 26 May 2014 Released in accordance with section 25 of the Transport Safety Investigation Act 2003 Publishing information Published by: Australian Transport Safety Bureau Postal address: PO Box 967, Civic Square ACT 2608 Office: 62 Northbourne Avenue Canberra, Australian Capital Territory 2601 Telephone: 1800 020 616, from overseas +61 2 6257 4150 (24 hours) Accident and incident notification: 1800 011 034 (24 hours) Facsimile: 02 6247 3117, from overseas +61 2 6247 3117 Email: [email protected] Internet: www.atsb.gov.au © Commonwealth of Australia 2014 Ownership of intellectual property rights in this publication Unless otherwise noted, copyright (and any other intellectual property rights, if any) in this publication is owned by the Commonwealth of Australia. Creative Commons licence With the exception of the Coat of Arms, ATSB logo, and photos and graphics in which a third party holds copyright, this publication is licensed under a Creative Commons Attribution 3.0 Australia licence. Creative Commons Attribution 3.0 Australia Licence is a standard form license agreement that allows you to copy, distribute, transmit and adapt this publication provided that you attribute the work. The ATSB’s preference is that you attribute this publication (and any material sourced from it) using the following wording: Source: Australian Transport Safety Bureau Copyright in material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations. Where you want to use their material you will need to contact them directly.
    [Show full text]
  • State Planning Policy 5.3 Land Use Planning in the Vicinity of Jandakot Airport
    State Planning Policy 5.3 Land Use Planning in the Vicinity of Jandakot Airport January 2017 Prepared under Part Three of the Planning and Development Act 2005 by the Western Australian Planning Commission click to follow 1. CITATION 1 APPENDIX 1 - BUILDING SITE ACCEPTABILITY 9 2. INTRODUCTION AND BACKGOUND 1 APPENDIX 2 2.1 Importance of - INDOOR DESIGN SOUND Disclaimer Jandakot Airport 1 This document has been produced by the LEVELS 10 Department of Planning on behalf of the 2.2 Aircraft noise Western Australian Planning Commission. Any measurement 1 APPENDIX 3: representation, statement, opinion or advice 2.3 Australian Noise NOTIFICATION ABOUT expressed or implied in this publication is Exposure Forecast 1 made in good faith and on the basis that the AIRCRAFT NOISE TO BE Government, its employees and agents are 2.4 Policy measures 1 PLACED ON PROPERTY TITLE 11 not liable for any damage or loss whatsoever which may occur as a result of action taken 3. APPLICATION or not taken, as the case may be, in respect FIGURE 1: FRAME AREA 12 of any representation, statement, opinion or OF THE POLICY 1 advice referred to herein. Professional advice 3.1 Other policies that should be obtained before applying the relate to this policy 1 GLOSSARY OF TERMS 13 information contained in this document to particular circumstances. 4. POLICY OBJECTIVES 2 REFERENCES 13 © Western Australian Planning Commission 5. POLICY MEASURES 2 Published by the Western Australian Planning Commission 5.1 Interpretation 2 Gordon Stephenson House 140 William Street 5.2 Areas below 20 ANEF 2 Perth WA 6000 5.3 Areas between 20 Locked Bag 2506 ANEF and 25 ANEF 3 Perth WA 6001 5.4 Areas above 25 ANEF 4 Published January 2017 6.
    [Show full text]
  • Matthew R Daniel CEO Global Urban Forest Pty Ltd Discipline Arboriculture / Urban Forestry / Soil Health Expertise Quantified P
    Matthew R Daniel CEO Global Urban Forest Pty Ltd Discipline Arboriculture / Urban Forestry / Soil Health Expertise Quantified Plant and Soil Health Investigation & Remediation, App – Based Environmental Sensing Technology and Application - Tools for the Internet of Nature (IoN , Photosynthetic Plant Science , Micro – climate Data and Quality Assessments, Pest and Disease / Biosecurity. Arboriculture Matthew has over 25 years’ international experience in Urban Forest/ Arboriculture Industries and Regenerative Agriculture. Technology Developer Plant and Soil Health Applied Science for the Urban Forest Industry. Quantifying Plant and Soil Health and function via Laboratory Analysis and App – Based Environmental sensors. • OurSci PhotosynQ Regenerative Agriculture Consultant / Trainer in Advanced Compost Production and Actively Aerated Compost Tea (AACT) and Waste Stream Analysis (Circular Economy) • Weilong Grape Wine Company, Shandong Province, Eastern China. • Queensland Government, Great Barrier Reef Recuse Soil Health Grant 2008, Monduran Citrus, Gin Gin, QLD. Project Experience • Scholarship Arborist with Launceston City Council led to overseas placement with Boston Tree Preservation on a H1 Residency Visa for 3 yrs. • Dangerous Tree Management (Lead Climber) – Queensland Arboriculture Industry (QAA) - Boston Tree Preservation Massachusetts USA. • Plant and Soil Health Science- Boston Tree Preservation Mass, USA. • Powerline management (HV, LV – Feeder / Distribution Shutdown (Lead Climber). QLD • Cyclone Storm Event Repair / Plant Health Care, Soil Health Rehabilitation – Laucala Island, Fiji • Soil Health Industry Development • Biohazard Identification and Management – Victorian, Giant Pine Scale Outbreak. • Mornington Peninsula Shire - Phytophthora Cinnamomi and Tree Decline Investigation. • Glen Eira City Council Phytophthora Remediation – Allnutt Park. • Hume City Council – Quantified Plant and Soil Health study in collaboration with Massachusetts Institute of Technology. • Swinburne University of Technology – Environmental Sensing Masterclass.
    [Show full text]
  • Aviation Safety Investigation Report 200303579
    AVIATION SAFETY INVESTIGATION 200303579 Cessna 404, VH-ANV Jandakot Airport, WA 11 August 2003 Released under the provisions of the Transport Safety Investigation Act 2003. Front cover photo by George Canciani © ISBN 1 877071 92 7 March 2005 This report was produced by the Australian Transport Safety Bureau (ATSB), PO Box 967, Civic Square ACT 2608. Readers are advised that the ATSB investigates for the sole purpose of enhancing safety. Consequently, reports are confined to matters of safety significance and may be misleading if used for any other purpose. As ATSB believes that safety information is of greatest value if it is passed on for the use of others, copyright restrictions do not apply to material printed in this report. Readers are encouraged to copy or reprint for further distribution, but should acknowledge ATSB as the source. ii CONTENTS INTRODUCTION vii EXECUTIVE SUMMARY viii 1 FACTUAL INFORMATION 1 1.1 History of the flight 1 1.2 Injuries to persons 2 1.3 Damage to aircraft 3 1.4 Other damage 3 1.5 Personnel information 3 1.6 Aircraft information 3 1.6.1 Aircraft certification 4 1.6.2 Recent maintenance history 4 1.6.3 Engine and propeller information 4 1.6.4 Fuel system information 4 1.6.5 Quality of the fuel 5 1.6.6 Aircraft flight controls & associated systems information 6 1.6.7 Aircraft operating weight 6 1.6.8 Aircraft equipment configuration 7 1.7 Meteorological information 7 1.8 Aids to navigation 7 1.9 Communications 7 1.10 Aerodrome information 8 1.10.1 General 8 1.10.2 Runway 24R information 8 1.10.3 Published
    [Show full text]
  • Agenda of Airport Advisory Committee
    Airport Advisory Committee Agenda 3 February 2021 ALL INFORMATION AVAILABLE IN VARIOUS FORMATS ON REQUEST [email protected] CITY OF BUSSELTON MEETING NOTICE AND AGENDA – 3 FEBRUARY 2021 TO: THE MAYOR AND COUNCILLORS NOTICE is given that a meeting of the Airport Advisory Committee will be held in the Committee Room, Administration Building, Southern Drive, Busselton on Wednesday, 3 February 2021, commencing at 10.30am. The attendance of Committee Members is respectfully requested. DISCLAIMER Statements or decisions made at Committee meetings should not be relied on (or acted upon) by an applicant or any other person or entity until subsequent written notification has been given by or received from the City of Busselton. Without derogating from the generality of the above, approval of planning applications and building permits and acceptance of tenders and quotations will only become effective once written notice to that effect has been given to relevant parties. The City of Busselton expressly disclaims any liability for any loss arising from any person or body relying on any statement or decision made during a Committee meeting. MIKE ARCHER CHIEF EXECUTIVE OFFICER 25 January 2021 CITY OF BUSSELTON AGENDA FOR THE AIRPORT ADVISORY COMMITTEE MEETING TO BE HELD ON 3 FEBRUARY 2021 TABLE OF CONTENTS ITEM NO. SUBJECT PAGE NO. 1. DECLARATION OF OPENING AND ANNOUNCEMENT OF VISITORS................................................... 4 2. ATTENDANCE ..............................................................................................................................
    [Show full text]
  • Airport Categorisation List
    UNCLASSIFIED List of Security Controlled Airport Categorisation September 2018 *Please note that this table will continue to be updated upon new category approvals and gazettal Category Airport Legal Trading Name State Category Operations Other Information Commencement CATEGORY 1 ADELAIDE Adelaide Airport Ltd SA 1 22/12/2011 BRISBANE Brisbane Airport Corporation Limited QLD 1 22/12/2011 CAIRNS Cairns Airport Pty Ltd QLD 1 22/12/2011 CANBERRA Capital Airport Group Pty Ltd ACT 1 22/12/2011 GOLD COAST Gold Coast Airport Pty Ltd QLD 1 22/12/2011 DARWIN Darwin International Airport Pty Limited NT 1 22/12/2011 Australia Pacific Airports (Melbourne) MELBOURNE VIC 1 22/12/2011 Pty. Limited PERTH Perth Airport Pty Ltd WA 1 22/12/2011 SYDNEY Sydney Airport Corporation Limited NSW 1 22/12/2011 CATEGORY 2 BROOME Broome International Airport Pty Ltd WA 2 22/12/2011 CHRISTMAS ISLAND Toll Remote Logistics Pty Ltd WA 2 22/12/2011 HOBART Hobart International Airport Pty Limited TAS 2 29/02/2012 NORFOLK ISLAND Norfolk Island Regional Council NSW 2 22/12/2011 September 2018 UNCLASSIFIED UNCLASSIFIED PORT HEDLAND PHIA Operating Company Pty Ltd WA 2 22/12/2011 SUNSHINE COAST Sunshine Coast Airport Pty Ltd QLD 2 29/06/2012 TOWNSVILLE AIRPORT Townsville Airport Pty Ltd QLD 2 19/12/2014 CATEGORY 3 ALBURY Albury City Council NSW 3 22/12/2011 ALICE SPRINGS Alice Springs Airport Pty Limited NT 3 11/01/2012 AVALON Avalon Airport Australia Pty Ltd VIC 3 22/12/2011 Voyages Indigenous Tourism Australia NT 3 22/12/2011 AYERS ROCK Pty Ltd BALLINA Ballina Shire Council NSW 3 22/12/2011 BRISBANE WEST Brisbane West Wellcamp Airport Pty QLD 3 17/11/2014 WELLCAMP Ltd BUNDABERG Bundaberg Regional Council QLD 3 18/01/2012 CLONCURRY Cloncurry Shire Council QLD 3 29/02/2012 COCOS ISLAND Toll Remote Logistics Pty Ltd WA 3 22/12/2011 COFFS HARBOUR Coffs Harbour City Council NSW 3 22/12/2011 DEVONPORT Tasmanian Ports Corporation Pty.
    [Show full text]
  • Runway-0117-Web.Pdf
    ISSUE 1, 2017 WHERE YOUR JOURNEY TAKES OFF GERALDTON EXPLORE WA’S STUNNING CORAL COAST NORTHBRIDGE HEART OF THE INNER-CITY ACTION PERTH AIRPORT CROWNED CAPITAL CITY AIRPORT OF THE YEAR Mauritius PAGE 22 CHARMING ISLAND NATION SPARKLES WITH STUNNING BOTANICAL GARDENS, CRYSTAL CLEAR CORAL REEFS AND SPRAWLING VISTAS THAT STRETCH FOREVER WHAT'S ON IN WA + FIVE OF THE BEST + PERTH AIRPORT NEWS + CONVERSATION QUILPIE OPALS CONTENTS PERTH 04 WELCOME 06 CALENDAR WHAT'S HAPPENING IN WA TAKE HOME A PRECIOUS PIECE OF AUSTRALIA FROM ONE OF PERTH’S LONGEST SERVING OPAL DEALERS (EST. 1979). 08 PERTH PRECINCT Image: Grahame Kelaher. 18 INTERNATIONAL REPUTATION FOR QUALITY, VALUE, AND SERVICE. NORTHBRIDGE 10 CONVERSATION PRESENT THIS AD FOR A DISCOUNT OF 30% 10 CLARE WATSON 12 DESTINATION DISCOVERED MAURITIUS 14 OUR GREAT STATE GERALDTON 6 16 IN THE WINDOW DUTY FREE SHOPPING 18 FIVE OF THE BEST WEEKEND GETAWAYS ISSUE 1, 2017 WHERE YOUR JOURNEY TAKES OFF GERALDTON 14 EXPLORE WA’S STUNNING PERTH TOP SPOTS CORAL COAST 20 NORTHBRIDGE HEART OF THE ACTION ROOFTOP BARS 22 AIRPORT NEWS ON THE COVER PERTH AIRPORT MAURITIUS CROWNED CAPITAL CITY PUZZLE/REVIEW AIRPORT 24 OF THE YEAR 12 Mauritius PAGE 20 CHARMING ISLAND NATION SPARKLES WITH STUNNING BOTANICAL GARDENS, TERMINAL DIRECTORY CRYSTAL CLEAR CORAL REEFS AND SPRAWLING VISTAS THAT STRETCH FOREVER 26 • 50 YEARS PLUS EXPERIENCE IN THE OPAL INDUSTRY • WHAT'S ON IN WA + FIVE OF THE BEST + PERTH AIRPORT NEWS + CONVERSATION • DESIGN EXCELLENCE FOR ALL BUDGETS • • PIONEER OPAL MINER OF QUEENSLAND BOULDER OPAL • Spanish churros, hot chocolate, desserts, coffee and cakes.
    [Show full text]
  • East Pilbara Shire Council Minutes Ordinary
    Unconfirmed copy of Minutes of Meeting held on 25 August 2017 subject to confirmation at meeting to be held on 22 September 2017 EAST PILBARA SHIRE COUNCIL MINUTES ORDINARY COUNCIL MEETING NOTICE IS HEREBY GIVEN that an ORDINARY Meeting of the Council was held, in Council Chambers, Newman, 10.00 AM, FRIDAY, 25 AUGUST, 2017. Allen Cooper CHIEF EXECUTIVE OFFICER DISCLAIMER No responsibility whatsoever is implied or accepted by the Shire of East Pilbara for any act, omission or statement or intimation occurring during Council or Committee Meetings. The Shire of East Pilbara disclaims any liability for any loss whatsoever and howsoever caused arising out of reliance by any person or legal entity on any such act, omission or statement or intimation occurring during Council or Committee Meetings. Any person or legal entity who acts or fails to act in reliance upon any statement, act or omission made in a Council or Committee Meeting does so at that person’s or legal entity’s own risk. In particular and without derogating any planning application or application of a licence, any statement or intimation of approval made by any member or Officer of the Shire of East Pilbara during the course of any meeting is not intended to be and is not taken as notice of approval from the Shire of East Pilbara. The Shire of East Pilbara warns that anyone who has any application lodged with the Shire of East Pilbara must obtain and should only rely on WRITTEN CONFIRMATION of the outcome of the application and any conditions attaching to the decision made by the Shire of East Pilbara in respect of the application.
    [Show full text]
  • Joint Parliamentary Committee
    COMMONWEALTH OF AUSTRALIA JOINT PARLIAMENTARY COMMITTEE on PUBLIC WORKS Reference: Development of operational facilities at RAAF Base, Learmonth EXMOUTH Monday, 30 June 1997 OFFICIAL HANSARD REPORT CANBERRA WITNESSES BATHGATE, Mr Douglas George, Former Councillor/President, Shire of Exmouth, PO Box 21, Exmouth, Western Australia 6707 49 BATHGATE, Mr Douglas George, Senior Regional Officer, Gascoyne Development Commission, PO Box 266, Exmouth, Western Australia 6707 83 BYRNE, Group Captain, Philip Darcy, Director of Aerospace Systems Development, Department of Defence, Russell Offices, Canberra, Australian Capital Territory 2600 3 103 FORTE, Mr Andrew Jeffrey, Airport Consultant, Shire of Exmouth, PO Box 21, Exmouth, Western Australia 6707 49 GRAHAM, Mr Kerry James, Chief Executive Officer, Shire of Exmouth, PO Box 21, Exmouth, Western Australia 6707 49 KAVANAGH, Group Captain, Brian Lawrence, Officer Commanding No 321 Air Base Wing, Department of Defence, RAAF Base, Darwin, Northern Territory 0800 3 103 KENNEDY, Air Commodore James Frederick George, Director General Facilities—Air Force, Department of Defence, Campbell Park Offices, Australian Capital Territory 26003 103 MORGAN, Wing Commander Stephen James, Project Director, Department of Defence, Campbell Park Offices, Canberra, Australian Capital Territory 26003 103 JOINT COMMITTEE ON PUBLIC WORKS Development of operational facilities at RAAF Base, Learmonth EXMOUTH Monday, 30 June 1997 Present Mr Andrew (Chairman) Senator MurphyMr Hatton Mr Hollis The committee met at 1.29 p.m. Mr Andrew took the chair. 1 PW 2 JOINT Monday, 30 June 1997 CHAIRMAN—On behalf of the Parliamentary Standing Committee on Public Works I declare open this public hearing into the proposed development of the operational facilities at RAAF Base, Learmonth, Western Australia.
    [Show full text]
  • Kangaroo Management in Wa
    WESTERN AUSTRALIA tate ildlife Vol. 4 No. 2 Autumn, 1973 Some-C:hins S~.GA~.S to think abou-C: •••• Vol. 4 No. 2 AUTUMN, 1973 Most persons think that a state in order to be happy Issued by direction of the Hon. A. W. Bicker­ ought to be large; but even if they are right, they have no ton, M.L.A., Minister for Fisheries and Fauna. idea of what is a large and what a small state ... To the Director of Fisheries and Fauna: B.K. Bowen, size of states there is a limit, as there is to other things, B.Sc. plants, animals, implements; for none of these retain their Chief Warden of Fauna: H.B. Shugg, A.A.P.A., A.F.A.I.M. natural power when they are too large or too small, but they either wholly lose their nature, or are spoiled. The support of the public is an essential component in any conservation or reserve management programme-but an informed, ARISTOTLE, 322 B.C. educated public is needed to ensure its con- tinuing success. This publication is designed as a medium by which the various organisations, indivi­ duals, and wildlife management personnel may be kept informed of the work being carried out by this department; of depart­ mental policies and directions; and for pro­ moting a better understanding and apprecia­ tion of Western Australian wildlife and the role it plays in maintaining a suitable environment in which man can live. S.W.A.N.S. is published quarterly at the conclusion of each season by: Extension and Publicity Service, Department of Fisheries and Fauna, 108 Adelaide Terrace, IN THIS ISSUE ...
    [Show full text]