World Bank Document Document of The World Bank Report No: 20500 MLI Public Disclosure Authorized PROJECT APPRAISAL DOCUMENT ONA PROPOSED CREDIT IN THE AMOUNT OF SDR 86.7 MILLION Public Disclosure Authorized (US$ 115.1 MILLION EQUIVALENT) TO THE REPUBLIC OF MALI FOR THE NATIONAL RURAL INFRASTRUCTUREPROJECT IN SUPPORT OF THE FIRST PHASE OF THE NATIONAL RURAL INFRASTRUCTUREPROGRAM Public Disclosure Authorized June 2, 2000 Rural Development III Country Department 15 Africa Region Public Disclosure Authorized CURRENCY EQUIVALENTS (Exchange Rate Effective February 07, 2000) Currency Unit CFA Franc (CFAF) 673 CFAF = US$1 US$0.0015 = I CFAF FISCAL YEAR January 1 - December 31 ABBREVIATIONS AND ACRONYMS AGETIER Agency for Rural Works and Equipment (Agence d'Execution de Travaux d'Infrastructures et d 'Equipements Ruraux) AGETIPE Agency for Public Works and Employment (Agence d'Execution des Travaux d'Inter2t Public et pour I 'Emploi) APL Adaptable Program Loan CAS Country Assistance Strategy CFAF Westem Africa Franc (Franc de la Communaute Financiere Africaine) CNRA National Committee for Agronomic Research (Comite National de la Recherche Agronomique) CTD Decentralized communes (Collectivites territoriales decentralisees) DNACPN National Directorate for Sanitation, and Pollution and Nuisance Control (Direction Nationale de I 'Assainissement et du Controle de la Polution et des Nuisances) DNAER National Directorate for Rural Works and Equipment (Direction Nationale de I 'Amenagementet de I 'Equipement Rural) DNH National Directorate for Water (DirectionNationale de I 'Hydraulique) DNSI National Directorate for Statistic and Computing (Direction Nationale de la Statistique et de l'Informatique) DNTP National Directorate for Public Works (Direction Nationale des Travaux Publics) DRACPN Regional Directorate for Sanitation, and Pollution and Nuisance Control (Direction Regionale de ! 'Assainissement et du Contr6le de la Polution et des Nuisances) DRAER Regional Directorate for Rural Works and Equipment (Direction Regionale de l'Amenagement et de I 'Equipement Rural) DIRH Regional Directorate for Water (Direction Regionale de I 'Hydraulique) FAO Food and Agriculture Organization of the United Nations GOM Government of Mali IDA International Development Association KfW German Cooperation Bank (Kredietanstaltfur Wiederaujbau) M&E Monitoring and evaluation MDR Ministry of Rural Development (Ministere du Developpement Rural) NGO Non-Governmental Organization NRIP National Rural Infrastructure Project O&M Operation and maintenance ON Office du Niger PCC Project Coordination Committee PCU Project Coordination Unit PNIR Programme national d'infrastructures rurales (PNIR) RA Road Authority RWSS Rural Water Supply and Sanitation SECO-ONG Secretariat for Coordinating Non-Governmental Organizations (Secrdtariat pour la Coordination des Organisations Non-Gouvernementales) SOE Statement of Expenses TOR Terms of Reference Vice President: Callisto Madavo Country Director: Hasan Tuluy Sector Manager: Jean-Paul Chausse Team Leader: Eustacius Betubiza MALI National Rural Infrastructure Project CONTENTS A: PROGRAM PURPOSE AND PROJECT DEVELOPMENT OBJECTIVE .................. ................................1 Al. PROGRAMPURPOSE AND PROGRAM PHASING ...................... ...................................................... I A2. PROJECTDEVELOPMENT OBJECTIVE (SEE ANNEX 1) ................................................... ......................... 2 A3. KEY PERFORMANCEINDICATORS (SEE ANNEX1) ................................ ............................................ 2 B: STRATEGIC CONTEXT ............................................................................ 3 B 1. SECTOR-RELATEDCOUNTRY ASSISTANCE STRATEGY (CAS) GOALSUPPORTED BY THEPROJECT ......... ...........3 B2. MAIN SECTORISSUES AND GOVERNMENT STRATEGY ............................................................................ 4 B3. SECTORISSUES TO BE ADDRESSEDBY THEPROJECT AND STRATEGIC CHOICES ................................................ 11 B4. PROGRAMDESCRIPTION AND PERFORMANCE TRIGGERS FOR SUBSEQUENT LOANS .......................................... 13 C: PROGRAM AND PROJECT DESCRIPTION SUMMARY .........................................................................15 C 1. PROJECTCOMPONENTS .......................................................... 15 C2. KEY POLICYAND INSTITUTIONAL REFORMS SUPPORTED BY THE PROJECT....................................................... 21 C3. BENEFITSAND TARGET POPULATION .......................................................... 21 C4. INSTITUTIONALAND IMPLEMENTATION ARRANGEMENTS .......................................................... 22 D: PROJECT RATIONALE .......................................................... 27 DI. PROJECTALTERNATIVES CONSIDERED AND REASONS FOR REJECTION .......................................................... 27 D2. MAJORRELATED PROJECTS FINANCED BY THEBANK AND/OROTHER DEVELOPMENT AGENCIES .................... 28 D3. LESSONSLEARNED AND REFLECTED IN THEPROJECT DESIGN .......................................................................... 28 D4. INDICATIONS OF BORROWER COMMITMENT AND OWNERSHIP.......................................................................... 29 D5. VALUEADDED OF BANK SUPPORTIN THIS PROJECT.......................................................................... 29 E: SUMMARY PROJECT ANALYSIS .......................................................................... 30 El. ECONOMICANALYSIS .......................................................................... 30 E2. FINANCIAL(SEE ANNEX 5) .......................................................................... 31 E3. TECHNICAL.......................................................................... 33 E4. INSTITUTIONAL........ .................................................................. 33 ES. SOCIAL....... ................................................................... 35 E6. ENVIRONMENTAL ASSESSMENT (ENVIRONMENTCATEGORY B) ........................................................................36 E7. PARTICIPATORYAPPROACH .......................................................................... 37 F: SUSTAINABILITY AND RISKS .......................................................................... 38 F 1. SUSTAINABILITY ........ .................................................................. 38 F2. CRITICALRISKS ........ .................................................................. 40 F3. POSSIBLECONTROVERSIAL ASPECTS .......................................................................... 42 G: MAIN LOAN CONDITIONS .......................................................................... 42 GI. BOARDCONDITIONS: NONE .......................................................................... 42 G2 CREDITEFFECTIVENESS CONDITIONS .......................................................................... 42 G3. DISBURSEMENTCONDITIONS .......................................................................... 42 H: READINESS FOR IMPLEMENTATION .......................................................................... 43 1. COMPLIANCE WITH BANK POLICIES ................................................... 43 ANNEXES .................................................... 44 ANNEX 1: PROJECTDESIGN SUMMARY ................................................... 44 ANNEx 2: DETAILEDPROJECT DESCRIPTION ................................................... 51 ANNEx 3: ESTIMATEDPROJECT COSTS ................................................... 67 ANNEx 4: COST-BENEFIT/COST-EFFECTIVENESSANALYSIS ................................................... 68 ANNEX5: FiNANCIALSUMMARY ................................................... 77 ANNEX 6: PROCUREMENTAND DISBURSEMENT ARRANGEMENTS ................ ................................... 80 Table 6A. Procurement Methods................................................... 83 Table 6B: Thresholdsfor Procurement Methods and Prior Review ................................................... 84 Table 6C: Allocation of IDA Credit Proceeds ................................................... 89 ANNEx 7: PROJECTPROCESSING BUDGET AND SCHEDULE ................................................... 94 ANNEx 8: DOCUMENTSIN PROJECTFILE* ................................................... 95 ANNEX9: STATEMENTOF LOANS AND CREDITS ................................................... 97 ANNEx 10: COUNTRYAT A GLANCE................................................... 99 ANNEx 1:1: LETTEROF DEVELOPMENTPOLICY ................................................... 101 ANNEX 12: ENVIRONMENTALAND SOCIAL MANAGEMENT PLAN ................................................... 110 Maps IBRD 30882 & 30883 v MALI National Rural Infrastructure Project Project Appraisal Document Africa Region Country Departnent 15 Date: June 2, 2000 Team Leader: Eustacius N. Betubiza (AFTR3) Country Director: Hasan A. Tuluy (AFC15) Sector Manager: Jean-Paul Chausse (AFTR3) Project ID: P041723 Sector(s): AI - Irrigation & Drainage, TR-Rural Roads, VY-Environment, WR-Rural Water Supply & Sanitation. Lending Instrument: Adaptable Program Loan Theme(s): Rural Development, Transport, Water Poverty Targeted Intervention: Yes Program Fitin.cing Data Estimatedv Implementation Period Indicative Financing Plan vBakFY) Borrower IDA Others Total Commitment Closing US$ m % US$m US$ m Date Date APL 1 115.1 82.6 24.2 139.3 FY01 FY06 17.4 APL 2 150.0 83.3 30.0 180.0 FY06 FY11 18.0 Total 265.1 90.8 54.2 319.3 35.4 Type of Financing Credit Total Bank Financing (US$m) 115.1 Proposed Terms:
Recommended publications
  • World Bank Document
    Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY Report No: 39308 - ML PROJECT APPRAISAL DOCUMENT ON A Public Disclosure Authorized PROPOSED CREDIT IN THE AMOUNT OF SDR59.5 MILLION (US$90.0 MILLIONEQUIVALENT) TO THE REPUBLIC OF MALI FOR A Public Disclosure Authorized SECOND TRANSPORT SECTOR PROJECT April 30,2007 This document has a restricted distribution and may be used by recipients only in the Public Disclosure Authorized performance oftheir official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective March 3 1,2007) Currency Unit = Franc CFA CFAF 495 = US$1 US$1.51326 = SDR 1 US$1= SDR 0.660825 FISCAL YEAR January 1-December 3 1 *. 11 - ABBREVIATIONS AND ACRONYMS ACDP Agricultural Competitiveness and Diversification Project AFD Agence Franqaise de Dheloppement (French Agency for Development) AfDB African Development Bank AGEROUTE Agence d’extcution d’Entretien des Travaux Routiers (Road Works Execution Agency) AGETIER Agence d’extcution des Travaux d’hfiastructure et d’Equipements Ruraux (Infrastructure and Rural Equipment Works Execution Agency) ASPEN Africa Safeguards Policy Enhancement BOAD Banque Ouest Afhcaine de DCveloppement CAS Country Assistance Strategy CDD Community Driven Development CETAC Technical Committee of Support to Towns CFAA Country Financial Accountability Assessment CFAF Franc ofthe French Community ofAfhca CMDT Compagnie Malienne pour le Ddveloppement des Textiles (Malian Textile Development Company)
    [Show full text]
  • HDRO, Landlocked Report 2003
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Research Papers in Economics United Nations Development Programme Human Development Report Office OCCASIONAL PAPER Background paper for HDR 2003 Country case studies on the challenges facing landlocked developing countries Thomas Snow, Michael Faye, John McArthur and Jeffrey Sachs 2003 COUNTRY CASE STUDIES ON THE CHALLENGES FACING LANDLOCKED DEVELOPING COUNTRIES BY THOMAS SNOW, MICHAEL FAYE, JOHN MCARTHUR AND JEFFREY SACHS JANUARY 2003 Provisional Draft: Please do not cite without author's permission. ACKNOWLEDGMENTS: We would like to acknowledge the valuable input of Guido Schmidt-Traub, Michael Salter and David Wright for their research assistance, of Malanding Jaiteh for his GIS data analysis and map construction, and of Nuño Limao and Anthony Venables for the use of their freight quote data. TABLE OF CONTENTS PART 1: INTRODUCTION AND BACKGROUND................................................................. 1 INTRODUCTION ............................................................................................................ 2 INDICATORS OF DEVELOPMENT................................................................................... 3 Landlocked Countries and Their Maritime Neighbours ......................................... 3 Measures of Relative Human Development Amongst Landlocked States ............. 5 Measures of Relative Landlockedness.................................................................... 6 PART 2: OBSERVATIONS FROM
    [Show full text]
  • Small Farm Commercialisation in Africa: Reviewing the Issues Steve Wiggins, Gem Argwings-Kodhek, Jennifer Leavy & Colin Poulton
    Research Paper Research Small farm commercialisation in Africa: Reviewing the issues Steve Wiggins, Gem Argwings-Kodhek, Jennifer Leavy & Colin Poulton September 2011 Tomato growers, Brong-Ahafo, Ghana Brong-Ahafo, growers, Tomato Cover photo: photo: Cover Research Paper 023 | April 2011 www.future-agricultures.org Acknowledgments Many thanks to the Thom Jayne of Michigan State University for detailed comments on previous drafts of this review. Nevertheless, the opinions and judgments in this paper, as well as any errors and omissions, are solely the responsibility of the authors. Abbreviations Eurep Euro-Retailer Produce Working Group GAP Good Agricultural practice protocol, Eurep HACCP Hazard Analysis and Critical Control Points KTDA Kenya Tea Development Authority kt Thousand tonnes LF Large farmer m Million SF Small farmer SPS Sanitary and Phytosanitary Standards Research Paper 023 | April 2011 ii Table of Contents Summary ..............................................................................................................................................................................................................................vi Introduction and framework ................................................................................................................................................... vi Process of commercialisation ................................................................................................................................................ vii Outcomes from commercialisation of small
    [Show full text]
  • Review of Food and Agricultural Policies in Mali 2005-2011
    MONITORING AFRICAN FOOD AND AGRICULTURAL POLICIES (MAFAP) REVIEW OF FOOD AND AGRICULTURAL POLICIES IN MALI 2005-2011 COUNTRY REPORT FEBRUARY 2013 MONITORING AFRICAN FOOD AND AGRICULTURAL POLICIES (MAFAP) REVIEW OF FOOD AND AGRICULTURAL POLICIES IN MALI 2005-2011 COUNTRY REPORT FEBRUARY 2013 Food and Agriculture Organization of the Unided Nations Review of Food and Agricultural Policies in Mali 2005-2011 - Country report Suggested citation: MAFAP (2013). Review of food and agricultural policies in Mali. MAFAP Country Report Series, FAO, Rome, Italy. © FAO 2013 FAO encourages the use, reproduction and dissemination of material in this information product. Except where otherwise indicated, material may be copied, downloaded and printed for private study, research and teaching purposes, or for use in non-commercial products or services, provided that appropriate acknowledgement of FAO as the source and copyright holder is given and that FAO’s endorsement of users’ views, products or services is not implied in any way. All requests for translation and adaptation rights, and for resale and other commercial use rights should be made via www.fao.org/contact-us/licence-request or addressed to [email protected] information products are available on the FAO website (www.fao.org/publications) and can be purchased through publications- [email protected]. 2 Monitoring African Food and Agricultural Policies (MAFAP) Review of Food and Agricultural Policies in Mali 2005-2011 - Country report Table of contents Table of contents ....................................................................................................................................
    [Show full text]
  • The Appropriation of ICT in a Network of Rural Collectivities
    The appropriation of ICT in a network of rural collectivities ‘Empowerment or Exclusion?’ Hanneke Post Master student International Development Studies at the Wageningen University. Specialization: Communication, Technology and Policy. LAW-80436 Main supervisor: Prof. Mirjam de Bruijn (African Studies Centre, Leiden) Co- supervision: Prof. Han van Dijk and Dr. Otto Hospes (Law and Governance group) Dr. Todd Crane (Technology and Agricultural Development group) Index Index .................................................................................................................................................... 2 Abbreviations........................................................................................................................................ 4 Abstract ................................................................................................................................................ 6 Acknowledgements............................................................................................................................... 7 1. Introduction ...................................................................................................................................... 8 Research setting............................................................................................................................................ 8 The use of ICT in the agricultural context of Sikasso, Mali............................................................. 8 The use of ICT within a network of rural collectivities.
    [Show full text]
  • “Improving Transport Project Appraisals in the Islamic Countries”
    Ff Standing Committee for Economic and Commercial Cooperation of the Organization of Islamic Cooperation (COMCEC) Proceedings of the 13th Meeting of the COMCEC Transport and Communications Working Group “Improving Transport Project Appraisals in the Islamic Countries” COMCEC COORDINATION OFFICE March 2019 Standing Committee for Economic and Commercial Cooperation of the Organization of Islamic Cooperation (COMCEC) PROCEEDINGS OF THE 13TH MEETING OF THE COMCEC TRANSPORT AND COMMUNICATIONS WORKING GROUP ON “Improving Transport Project Appraisals in the Islamic Countries” (21st March 2019, Ankara, Turkey) COMCEC COORDINATION OFFICE March 2019 For further information please contact: Mr. Nihat AKBALIK Expert COMCEC Coordination Office Necatibey Caddesi No: 110/A 06100 Yücetepe Ankara/TURKEY Phone : 90 312 294 57 10 Fax : 90 312 294 57 77 Web: www.comcec.org E-mail: [email protected] [email protected] TABLE OF CONTENTS Introduction .......................................................................................................................................................... 1 1. Opening Remarks .......................................................................................................................................... 2 2. Transport and Communications Outlook 2018 ................................................................................. 2 3. Conceptual Framework for Transport Project Appraisals ............................................................ 4 4. Status of Transport Project Appraisals in the
    [Show full text]
  • Improving Rural Mobility: Options for Developing Motorized and Nonmotorized Transport in Rural Areas
    W ORLD B ANK T ECHNICAL P APER N O . Improving Rural Mobility: Options for Developing Motorized and Nonmotorized Transport in Rural Areas Paul Starkey Simon Ellis John Hine Anna Ternell CONTENTS Foreword iv Abstract v Acknowledgments vi Overview 1 Rural Transport Is Crucial to Poverty Reduction 1 Efforts to Improve Rural Transport Services Must Consider Many Issues 1 What Should Be Done to Promote Rural Transport? 5 1. The Nature and Importance of Rural Transport 8 Rural Transport and Poverty Reduction 8 Patterns of Rural Transport 10 2. Issues Affecting Rural Mobility 12 Wide Range of Stakeholders 12 Critical Mass of Users, Operators, and Suppliers 19 Population Densities and Income Levels 20 Patterns of Adoption and Use of Transport Services 22 Complementary and Competitive Services 23 Issues Related to Cost 25 3. Promoting Rural Mobility 28 Importance of Inclusive, Participatory Methods 28 Financial Considerations 31 Regulatory Considerations 35 Complementary Options 40 Annex 1. Terms of Reference for a Country Study of Rural Transport Services 44 Annex 2. Three Contrasting Rural Transport Situations 49 Annex 3. Rural Transport Problems, Remedies, and Implementation Options 52 Annex 4. Options for Rural Transport Services 55 References 60 iii FOREWORD Rural poverty is pervasive and difficult to address. Improving mobility can reduce rural poverty by facilitating women, men, and children to more readily access services (education, health, finance, markets), obtain goods and income, and participate in social, political and community activities. Mobility requires a combination of appropriate transport infrastructure, improved transport services, and affordable means of transport, both motorized and nonmotorized. This publication concentrates on the many and varied types of transport that provide that mobility such as bus services, freight trucks, bush taxis, transport animals, bicycles, or handcarts.
    [Show full text]
  • Mali - Land, Climate, Energy, Agriculture and Development a Study in the Sudano-Sahel Initiative for Regional Development, Jobs, and Food Security
    Working Paper 199 Ousmane Coulibaly Mali - Land, climate, energy, agriculture and development A study in the Sudano-Sahel Initiative for Regional Development, Jobs, and Food Security ISSN 1864-6638 Bonn, January 2021 ZEF Working Paper Series, ISSN 1864 - 6638 Center for Development Research, University of Bonn Editors: Christian Borgemeister, Joachim von Braun, Manfred Denich, Till Stellmacher and Eva Youkhana Author’s address Dr. Ousmane Nafolo Coulibaly Consultant Bamako, Mali [email protected] Mali – Land, climate, energy, agriculture and development A study in the Sudano - Sahel Initiative for Regional Development, Jobs, and Food Security Ousmane Coulibaly Abstract Mali is a S u b - Saharan African country with 19.1 million people. Almost half of this population lives in poverty, due to the dysfunction of activity sectors (agriculture, energy, education, employment, services, etc.). N atural resource management especially land and wa ter toget her with corollaries re main one of the greatest challenges for this dryland region to sustainably face climate change, meet food demand and improve its economy. The social crisis (especially in the northern region) is significantly affecting devel opment an d human security as well. This study had been carried out to review the current state of affairs, key trends, problems, solutions and their implications for sustainable development of Mali under changing climate and the impacts of land degradation . Likewis e , investment opportunities in the priority areas are highlighted in this report. Keywords: Mali, p overty, agriculture, economy, climate change, land degradation, sustainable development. JEL codes: O1, O2, O3, Q1, Q2, Q4, Q5, J43 Acknowledgmen ts The study was funded by the “Program of Accompanying Research for Agricultural Innovation” (PARI), which is funded by the German Federal Ministry of Economic Cooperation and Development (BMZ).
    [Show full text]
  • Concept Project Information Document
    The World Bank Dakar-Bamako Intermodal Corridor Project (P171122) Note to Task Teams: The following sections are system generated and can only be edited online in the Portal. Please delete this note when finalizing the document. Public Disclosure Authorized Public Disclosure Authorized Project Information Document (PID) Concept Stage | Date Prepared/Updated: 10-Sep-2019 | Report No: PIDC27489 Public Disclosure Authorized Public Disclosure Authorized Sep 10, 2019 Page 1 of 14 The World Bank Dakar-Bamako Intermodal Corridor Project (P171122) BASIC INFORMATION A. Basic Project Data OPS TABLE Country Project ID Parent Project ID (if any) Project Name Western Africa P171122 Dakar-Bamako Intermodal Corridor Project (P171122) Region Estimated Appraisal Date Estimated Board Date Practice Area (Lead) AFRICA Oct 05, 2020 May 25, 2021 Transport Financing Instrument Borrower(s) Implementing Agency Investment Project Financing Republic of Senegal,Republic Agence Nationale du Chemin of Mali de Fer (ANCF), National Coordination Unit Proposed Development Objective(s) To reduce the transport and trade time and cost of carrying goods along the Dakar-Bamako inter-modal corridor while increasing the freight transport by rail. PROJECT FINANCING DATA (US$, Millions) SUMMARY-NewFin1 Total Project Cost 830.00 Total Financing 830.00 of which IBRD/IDA 600.00 Financing Gap 0.00 DETAILS-NewFinEnh1 World Bank Group Financing International Development Association (IDA) 600.00 IDA Credit 600.00 Non-World Bank Group Financing Commercial Financing 230.00 Unguaranteed Commercial Financing 230.00 Sep 10, 2019 Page 2 of 14 The World Bank Dakar-Bamako Intermodal Corridor Project (P171122) Environmental and Social Risk Classification Concept Review Decision High Track II-The review did authorize the preparation to continue Note to Task Teams: End of system generated content, document is editable from here.
    [Show full text]
  • Ouagadougou–Bamako Transport Corridor Logistics Analysis Using Fastpath
    Ouagadougou–Bamako Transport Corridor Logistics Analysis Using FastPath July 2012 This publication was produced by Nathan Associates Inc. for review by the United States Agency for International Development. Ouagadougou–Bamako Transport Corridor Logistics Analysis Using FastPath SUBMITTED TO United States Agency for International Development (USAID) Cory O’Hara, COTR USAID EGAT/EG Office Brinton Bohling, Chief, Office of Trade and Investment, USAID/West Africa SUBMITTED BY Nathan Associates Inc. for DAI/Nathan Group 2101 Wilson Boulevard, Suite 1200 Arlington, Virginia 22201 Tel.: 703.516.7798 Fax: 703.351.6162 E-mail: [email protected] April 2012 UNDER CONTRACT NO. EEM-I-00-07-00009-00, Order No. 2 DISCLAIMER This document is made possible by the support of the American people through the United States Agency for International Development (USAID). Its contents are the sole responsibility of the author or authors and do not necessarily reflect the views of USAID or the United States government. Contents Acronyms and Codes vii Abstract ix Executive Summary xi 1. Introduction 1 Background 1 Objective 2 FastPath 2 2. Corridor Description 5 Landocked Transit Country: Burkina Faso 5 Landlocked Destination Country: Mali 6 General Description of the Corridor 9 Road Infrastructure 9 Custom Procedures/Border Posts 12 Road Inventory of the Corridor 15 Import and Export Procedures in the Corridor 19 Scenarios for FastPath Analysis 19 Summary Statistics for Corridor Performance 19 3. Corridor Analysis 25 Scenario 1: Inbound Containerized Transit Traffic (Burkina Faso to Mali) 25 Port Performance 28 Road Performance 28 Border Post and Customs Performance 30 Scenario 2: Outbound Containerized Transit Traffic (Mali to Burkina Faso) 34 Summary of FastPath Results 37 Scenario 1: Inbound Transit Traffic (Burkina Faso to Mali) 38 IV C ONTENTS Scenario 2: Outbound Containerized Transit Traffic (Mali to Burkina Faso) 38 4.
    [Show full text]
  • 111. Economic Prospects and Challenges
    Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No. 41746 - ML INTERNATIONAL DEVELOPMENT ASSOCIATION AND Public Disclosure Authorized INTERNATIONAL FINANCE CORPORATION COUNTRY ASSISTANCE STRATEGY FOR THE REPUBLIC OF MALI Public Disclosure Authorized FOR THE PERIOD FYOS-FY11 December 12,2007 Country Department for Mali AFCF2 Africa Region Public Disclosure Authorized ~ has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. ~~ ~ ~~ ~ ~~~ ~ ~ - The last Country Assistance Strategy for Mali was approved on July 3 1,2003. CURRENCY EQUIVALENTS Currency Unit = CFA Franc (CFAF) $1 = 45 1 CFAF (December 10,2007) WEIGHTS AND MEASURES Metric System GOVERNMENT FISCAL YEAR January 1 - December 3 1 ACRONYMS AND ABBREVIATIONS AAA Analytical and Advisory Activities CDD Community-Driven Development CDI CBte d’Ivoire (Republic of Ivory ACP African, Caribbean and Pacific Coast) countries CDMAP Capacity Development in Africa: ADP Accelerated Data Program Management Action Plan ACDP Agriculture Competitiveness and CEA Country Environmental Assessment Diversification Project CENA Capacity Enhancement Needs ADP Accelerated Data Program Assessments AFD Agence Frangaise de Dkveloppement CEM Country Economic Memorandum (French Agency for Development) CERCAP Centre d’e‘tudes et de renforcement ADD African Development Bank des capacitks AFR Africa Region (World Bank) CFAF CFA Franc AFTRL Africa
    [Show full text]
  • Global Assessment of Sand and Dust Storms
    Global Assessment of Sand and Dust Storms UNEA Supplementary Information Global Assessment of Sand and Dust Storms Draft Report Not for circulation UNEP Logo WMO logo UNCCD logo ii Contents Table of Contents Contents ..................................................................................................................................... iii 1 Introduction ........................................................................................................................ 1 1.1 Sand and dust storm significance .................................................................................. 1 1.2 Policy context .............................................................................................................. 3 1.3 Aims and scope of the assessment ............................................................................... 4 2 Sand and Dust Storms Processes .......................................................................................... 6 2.1 Sand and dust storm definitions ................................................................................... 6 2.2 Sand and dust storm mechanisms ................................................................................ 7 2.3 Causes of sand and dust storms .................................................................................... 9 2.3.1 Direct drivers in natural ecosystems ................................................................................. 9 2.3.2 Indirect drivers in natural ecosystems ...........................................................................
    [Show full text]