National Electric Power Regulatory Authority Islamic Republic of Pakistan
Total Page:16
File Type:pdf, Size:1020Kb
National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: [email protected] No. NEPRA/ADG(L)/LAN-2187/ / 6 Y 2 1- (3 September 17 2019 Mr. Zafar Aitmad Siddique, R-3, Block-1, Gulistan-e-Johar, Karachi, Phone No. 0301-8258533 Subject: Generation Licence No. DGL/2187/2019 Licence Application No. LAN-2187 Mr. Zafar Aitmad Siddique, K — Electric Limited Ref KEL's letter No. KE/BPR/NEPRA/2019/624 dated 23.07.2019 (received on 29.07.2019) Enclosed please find herewith Generation Licence No. DGL/2187/2019 granted by the National Electric Power Regulatory Authority to Mr. Zafar Aitmad Siddique for 05.20 kW photo voltaic solar based distributed generation facility located at R-3, Block-1, Gulistan-e-Johar, Karachi, under NEPRA (Alternative & Renewable Energy) Distributed Generation and Net Metering Regulations, 2015. 2. Please quote above mentioned Generation ence No. for future correspondence. Enclosure: Generation Licence (DGL/2187/2019) CA (Syed Safeer Hussain) Copy to: 1. Chief Executive Office, Alternative Energy Development Board, 2nd Floor, OPF Building, G-5/2, Islamabad. 2. Chief Executive Officer, K-Electric Limited, KE House, 39 B, Main Sunset Boulevard, DHA Phase-II, Karachi. 3. Director General, Environment Protection Department, Government of Sindh, Complex Plot No. ST-2/1, Korangi Industrial Area, Karachi. National Electric Power f equlatory Authority NEP Is! mabad— kistan The Authority hereby grants Generation Licence to Mr. Zafar Aitvpad Siddique, for 5.20 KW photovoltaic solar based distributed generation facility, having consumer reference number LA912022, located at R-3, Block-I, Gulistan-e- Jouhar, Karachi under the National Electric Power Regulatory Authority (Alternative & Renewable Energy) Distributed Generation and Net Metering Regulations, 2015 (the "A&RE Regulations") for a period of seven (07) years. This Licence is valid up to 10 day of August 2026. Sertembel- 2. The Licensee shall abide by the proyisions under the A&RE Regulations during the currency of the GenerationLien* 3. The technl pgrantetart , arrangements are sh‘vn hereunder:- (i). Primary EnergySource: Solar (ii). Size of Distributed GeneralOnfacility: 5.20 KW (iii). Generator/Inverter Information: Manufacture: Voltronic Power 'Model No. Infini 3PI0KW (iv). GeneratiOti Type: Inver* 4. This Licence may be renewed subject to the AtRE tions. Sefiembet This Licence is given under mys. hiind on 11 gay of Aktetiet Two Thousand & Nineteen Registrar 1.1 fl 11 .