Figures 19.28 – 19.32

Total Page:16

File Type:pdf, Size:1020Kb

Figures 19.28 – 19.32 VViewiew flflatat a tat a ac ocomfortablemfortable a rarm’sm’s l elengthngth LLittlehamptonittlehampton ttoo BBarnhamarnham RRailwayailway LLineine Climping Company: Photograph Parameters Viewpoint C1 Benjamin Grey Drive, Littlehampton: Indicative locations of the onshore elements of the Proposed Development 100% Enlargement Rampion 2 Offshore Wind Farm WOOD Extent of onshore cable corridor visible during construction Location grid reference: E501 536, N103 601 Distance: 182m Drawn By: GPS location accuracy: +/- 3m Camera: Canon EOS 5D Mk2 Extent of onshore cable corridor screeened by intervening vegetation BRYCC Figure 19.28 90º (cylindrical projection) Lens: 50mm (Canon EF 50mm f/1.8) Onshore Cable Corridor – Viewpoint C1: Horizontal field of view: Chk/Aprvd: Trenchless crossing of onshore cable corridor (not visible during Benjamin Grey Drive, Littlehampton Paper size: 841mm x 297mm (1/2 A1) Camera height: 1.5m AGL construction) SINHR Correct printed image size: 820 x 250mm Date and time: 15/12/2020 10:55 Drawn Date: 15/06/2021 Preliminary Environmental Information 0 km 0.5 km 1 km 1.5 km 2 km Report Status: Scale 1:5,000 Note: Figure produced to accord with the Landscape Institute’s Technical Guidance Note 6/19: Visual Representation of Development Proposals. TYPE 1 VISUALISATION FINAL 42285-WOOD-PE-ON-FG-OL-0028 VViewiew flflatat a tat a ac ocomfortablemfortable a rarm’sm’s l elengthngth Existing Solar FFarmarm Littlehampton Company: Photograph Parameters Viewpoint D Ford Road, near Tortington: Indicative locations of the onshore elements of the Proposed Development 100% Enlargement Rampion 2 Offshore Wind Farm WOOD Extent of onshore cable corridor partially visible / screened during construction Location grid reference: E500 574, N105 380 Distance: 1,422m Drawn By: GPS location accuracy: +/- 3m Camera: Canon EOS 5D Mk2 Trenchless crossing of onshore cable corridor (not visible during construction) BRYCC Figure 19.29 90º (cylindrical projection) Lens: 50mm (Canon EF 50mm f/1.8) Onshore Cable Corridor – Viewpoint D: Horizontal field of view: Chk/Aprvd: Extent of temporary construction compound screened by intervening vegetation and built- Ford Road, near Tortington Paper size: 841mm x 297mm (1/2 A1) Camera height: 1.5m AGL form SINHR Correct printed image size: 820 x 250mm Date and time: 15/10/2020 17:00 Drawn Date: 15/06/2021 Preliminary Environmental Information 0 km 0.5 km 1 km 1.5 km 2 km Report Status: Scale 1:5,000 Note: Figure produced to accord with the Landscape Institute’s Technical Guidance Note 6/19: Visual Representation of Development Proposals. TYPE 1 VISUALISATION FINAL 42285-WOOD-PE-ON-FG-OL-0029 VViewiew flflatat a tat a ac ocomfortablemfortable a rarm’sm’s l elengthngth AArundelrundel WWetlandetland CCentreentre RRiveriver AArunrun VVillagesillages ooff WWephamepham aandnd BBurphamurpham WWarningcamparningcamp AArundelrundel ttoo AAmberleymberley RailwayRailway LineLine Company: Photograph Parameters Viewpoint E Arundel Castle (The Keep): Indicative locations of the onshore elements of the Proposed Development 100% Enlargement Rampion 2 Offshore Wind Farm WOOD Extent of onshore cable corridor visible during construction Location grid reference: E501 838, N107 89370 Distance: 1,278m a Drawn By: GPS location accuracy: +/- 3m Camera: Canon EOS 5D Mk2 Extent of onshore cable corridor partially visible / screened during BRYCC Figure 19.30a Horizontal field of view: 90º (cylindrical projection) Lens: 50mm (Canon EF 50mm f/1.8) construction Onshore cable corridor – Viewpoint E: Chk/Aprvd: Arundel Castle (The Keep) Paper size: 841mm x 297mm (1/2 A1) Camera height: 1.5m AGL b SINHR Correct printed image size: 820 x 250mm Date and time: 15/12/2020 10:15 Drawn Date: 25/06/2021 Preliminary Environmental Information 0 km 0.5 km 1 km 1.5 km 2 km Report Status: Scale 1:5,000 Note: Figure produced to accord with the Landscape Institute’s Technical Guidance Note 6/19: Visual Representation of Development Proposals. TYPE 1 VISUALISATION FINAL 42285-WOOD-PE-ON-FG-OL-0030 VViewiew flflatat a tat a ac ocomfortablemfortable a rarm’sm’s l elengthngth English Channel in the far distance AArundelrundel RRiveriver AArunrun CCathedralathedral ooff oourur LLadyady aandnd PPhilliphillip HowardHoward Company: Photograph Parameters Viewpoint E Arundel Castle (The Keep): Indicative locations of the onshore elements of the Proposed Development 100% Enlargement Rampion 2 Offshore Wind Farm WOOD Extent of onshore cable corridor partially visible / screened during construction a Location grid reference: E501 838, N107 89370 Distance: 1,278m Drawn By: GPS location accuracy: +/- 3m Camera: Canon EOS 5D Mk2 Extent of temporary construction compound screened by intervening vegetation BRYCC Figure 19.30b Horizontal field of view: 90º (cylindrical projection) Lens: 50mm (Canon EF 50mm f/1.8) and built-form Onshore cable corridor – Viewpoint E: Chk/Aprvd: Arundel Castle (The Keep) Paper size: Camera height: b 841mm x 297mm (1/2 A1) 1.5m AGL SINHR Correct printed image size: 820 x 250mm Date and time: 15/12/2020 10:15 Drawn Date: 25/06/2021 Preliminary Environmental Information 0 km 0.5 km 1 km 1.5 km 2 km Report Status: Scale 1:5,000 Note: Figure produced to accord with the Landscape Institute’s Technical Guidance Note 6/19: Visual Representation of Development Proposals. TYPE 1 VISUALISATION FINAL 42285-WOOD-PE-ON-FG-OL-0030 VViewiew flflatat a tat a ac ocomfortablemfortable a rarm’sm’s l elengthngth RRiveriver AArunrun VVillagesillages ooff WWephamepham aandnd BBurphamurpham AArundelrundel ttoo AAmberleymberley RRailwayailway llineine Company: Photograph Parameters Viewpoint E1a Arundel Park: Indicative locations of the onshore elements of the Proposed Development 100% Enlargement Rampion 2 Offshore Wind Farm WOOD Extent of onshore cable corridor visible during construction Location grid reference: E501 954, N109 234 Distance: 2,484m Drawn By: GPS location accuracy: +/- 3m Camera: Canon EOS 5D Mk2 Extent of onshore cable corridor partially visible / screened during BRYCC Figure 19.31 Horizontal field of view: 90º (cylindrical projection) Lens: 50mm (Canon EF 50mm f/1.8) construction Onshore Cable Corridor – Viewpoint E1a: Chk/Aprvd: Arundel Park Paper size: Camera height: 841mm x 297mm (1/2 A1) 1.5m AGL SINHR Correct printed image size: 820 x 250mm Date and time: 15/12/2020 13:15 Drawn Date: 15/06/2021 Preliminary Environmental Information 0 km 0.5 km 1 km 1.5 km 2 km Report Status: Scale 1:5,000 Note: Figure produced to accord with the Landscape Institute’s Technical Guidance Note 6/19: Visual Representation of Development Proposals. TYPE 1 VISUALISATION FINAL 42285-WOOD-PE-ON-FG-OL-0031 VViewiew flflatat a tat a ac ocomfortablemfortable a rarm’sm’s l elengthngth Burpham Norfolk Clump AArundelrundel ttoo AAmberleymberley RRailwayailway LLineine RRiveriver AArunrun Company: Indicative locations of the onshore elements of the Proposed Development 100% Enlargement Photograph Parameters Viewpoint E1b PRoW 2266 near Offham Farm, Arundel: Rampion 2 Offshore Wind Farm WOOD Extent of onshore cable corridor visible during construction Location grid reference: E501 954, N109 234 Distance: 1,216m Drawn By: GPS location accuracy: +/- 3m Camera: Canon EOS 5D Mk2 Extent of onshore cable corridor partially visible / screened during BRYCC Figure 19.32 90º (cylindrical projection) Lens: 50mm (Canon EF 50mm f/1.8) construction Onshore Cable Corridor – Viewpoint E1b: Horizontal field of view: Chk/Aprvd: Paper size: Camera height: PRoW 2266 near Offham Farm, Arundel 841mm x 297mm (1/2 A1) 1.5m AGL SINHR Correct printed image size: 820 x 250mm Date and time: 15/12/2020 13:15 Drawn Date: 16/06/2021 Preliminary Environmental Information 0 km 0.5 km 1 km 1.5 km 2 km Report Status: Scale 1:5,000 Note: Figure produced to accord with the Landscape Institute’s Technical Guidance Note 6/19: Visual Representation of Development Proposals. TYPE 1 VISUALISATION FINAL 42285-WOOD-PE-ON-FG-OL-0032.
Recommended publications
  • Tortington and the Great War
    West Sussex & the Great War Project www.westsussexpast.org.uk Tortington and the Great War Family and faith in a rural Sussex parish Church of St Mary Magdalene, Tortington Photo J Henderson John Henderson © John Henderson and West Sussex County Council West Sussex & the Great War Project www.westsussexpast.org.uk The Church of St Mary Magdalene in Tortington, West Sussex Tortington is a small hamlet on the west bank of the River Arun, just two miles to the south of Arundel. Its parish church, built in the 12th century and dedicated to St Mary Magdalene and to St Thomas, owes its existence to a former Augustinian priory which stood on a site nearby until the Dissolution of the Monasteries in the 16th century.1 The ‘Black Canons’ of the priory received an income as well as sustenance from the land farmed around them and until the 18th century agriculture and prayer were the only preoccupations of the parish. That was when brick-making began to offer alternative employment in Tortington and in the 19th century an iron foundry and engineering works added more economic diversity. At the southernmost end of the parish the coming of the railway in 1846, and by 1863 an inn and goods yards, saw yet more opportunities arise as well as adding several unfamiliar family names to the parish registers. In the early 20th century political and demographic factors were to alter the character of Tortington again, this time reversing the trend towards small industrial enterprises by virtue of a parish boundary change. In 1902 Arundel swallowed up parts of Tortington lying on either side of the Chichester road and these included Park Farm and the White Swan inn on the north side of the road and the area around Ford road on the south side.
    [Show full text]
  • A27 Arundel Bypass Consultation Response
    A27 7.2 Arundel Bypass Report on public consultation Appendix D Appendix Spring 2018 Appendix D7.2 – Stakeholder responses Community groups (part 2) www.arundelbypass.co.uk 6 November 2017 Attached is ABNC Evidence Section D, which completes our A27 Arundel Bypass consultation response. Thank you for agreeing to accept this evidence section by 6 November due to its dependence on work by traffic consultants RGP, who awaited information from yourselves, and by Gerald Eve LLP. The evidence consists of three reports, D1, D2 and D3. All three reports throw into question the Benefit Cost Ratio given by Highways England for Option 5A and show that this should be recalculated with a much higher cost and much less benefit. Section D1: Faulty Benefit Cost Calculations for Option 5A on Mitigation, Compensation and Biodiversity Offsetting As regards biodiversity, only the mitigation costs for the loss of Ancient Woodland appear to have been included in Highways England’s calculation of Benefit Cost Ratios. However, the loss of biodiversity from Option 5A is even greater than for Option 3, as is shown by the comparative table of impacts on habitats and species at ABNC Evidence C1. Irreplaceable habitats which would be lost include wet woodland, a chalk stream, lowland fen communities, and veteran trees. All are Habitats of Principal Importance under the NERC Act 2006. A list of 12 necessary mitigation measures is given in this section. Since these habitats are irreplaceable, as well as mitigation, compensation measures would be needed for Option 5A, such as planting large areas of new native woodland, for instance on farm fields made unusable by Option 5A.
    [Show full text]
  • West Sussex County Council Monument Full Report 20/09/2018 Number of Records: 27 Boundary Markers in West Sussex
    West Sussex County Council Monument Full Report 20/09/2018 Number of records: 27 Boundary Markers in West Sussex SMR Number Site Name Record Type MWS1392 Gunters Stone Boundary Marker Monument Gunters Stone is a triangular boundary stone on the Hampshire/Sussex border. Monument Types and Dates BOUNDARY MARKER (Unknown date) Evidence STRUCTURE Description and Sources Description Gunters Stone is a triangular boundary stone on the Hampshire/Sussex border.{1}{2} Sources (1) Map: OS. 1963. 6inch (2) Bibliographic reference: Aldsworth F G. 1975. SU70NW1. Associated resources - None recorded Location National Grid Reference SU 7429 0950 (point) SU70NW Administrative Areas Civil Parish Stoughton, Chichester, West Sussex District Chichester, West Sussex Address/Historic Names - None recorded Designations, Statuses and Scorings Associated Designations - None recorded Other Statuses and Cross-References SHINE Candidate (Possible) Active Sites & Monuments Record - 37 Active OS Number - SU70NW1 Active Ratings and Scorings - None recorded Land Use Associated Historic Landscape Character Records - None recorded Other Land Classes - None recorded Related Monuments - None Recorded Finds - None recorded Associated Events/Activities - None recorded Associated Individuals/Organisations - None recorded MonFullRpt Report generated by HBSMR from exeGesIS SDM Ltd Page 1 SMR Number MWS1771 Site Name Roman Building and Palisade, Broadbridge SMR Number Site Name Record Type MWS1771 Roman Building and Palisade, Broadbridge Monument Monument Types and Dates BOUNDARY MARKER (Roman - 43 AD to 409 AD) Evidence DOCUMENTARY EVIDENCE FINDSPOT (Domestic-fitting, Roman - 43 AD to 409 AD) Evidence DOCUMENTARY EVIDENCE BUILDING (Building-unclassified, Roman - 200 AD to 299 AD) Evidence DOCUMENTARY EVIDENCE Description and Sources Description Trial excavation in 1967 on the site of a proposed telephone exchange, 65yds.
    [Show full text]
  • A27 Arundel Bypass Preferred Route Announcement
    A27 Arundel Bypass Preferred route announcement Spring 2018 A27 Arundel Bypass Preferred route announcement Introduction Why is the scheme needed? As the only east-west trunk road south of the M25, Road safety is also a concern with an above At Highways England, we believe in a the A27 serves a population of more than 750,000 average number of accidents on this section connected country and our network people, and connects a number of coastal of the A27, while congestion around Arundel makes these connections happen. communities between Portsmouth and Pevensey, results in some drivers seeking alternative routes near Eastbourne. On average, West Sussex which are less suited to accommodating higher We strive to improve our major roads also attracts 17 million visitor days per year, traffic flows. These alternatives include the and motorways – engineering the which, according to VisitBritain, is worth around B2139 through the South Downs National Park, future to keep people moving today £508 million to the local economy1. disrupting the otherwise tranquil nature of the and moving better tomorrow. We want Park. Residents in local towns and villages are The A27 is currently a dual carriageway on also affected by increases in through traffic. to make sure all our major roads are either side of Arundel, but the single carriageway more dependable, durable and, most section and junctions through the town cannot cope with today’s traffic volumes. In recognition of these problems, the Government, importantly, safe. That’s why we’re in its Road Investment Strategy 2015-2020, set delivering £15 billion of investment on Long queues approaching Arundel are out its intention to replace “the existing single our network – the largest investment in commonplace and, with the population predicted carriageway road with a dual carriageway bypass, to rise across the region in future, congestion linking together the 2 existing dual carriageway a generation.
    [Show full text]
  • Report to the Secretary of State for Environment, Food and Rural Affairs
    The Planning Report to the Secretary of State Inspectorate Temple Quay House 2 The Square for Environment, Food and Temple Quay Bristol BS1 6PN Rural Affairs GTN 1371 8000 by Robert Neil Parry BA DIPTP MRTPI An Inspector appointed by the Secretary of State for Environment, Date: Food and Rural Affairs 31 March 2006 THE SOUTH DOWNS NATIONAL PARK INSPECTOR’S REPORT Volume 2 Inquiry held between 10 November 2003 and 18 March 2005 Inquiry held at The Chatsworth Hotel, Steyne, Worthing, BN11 3DU SOUTH DOWNS NATIONAL PARK VOLUME 2 Appendix 1: List of persons appearing at the Inquiry Appendix 2: List of Core Documents/Inquiry Documents Appendix 3: List of Countryside Agency Responses (CARS) Appendix 4: List of Proofs/further statements Appendix 5: List of written representations Appendix 6: List of representations in numeric order. Appendix 1 South Down National Park Public Inquiry INQUIRY APPEARANCES FOR THE COUNTRYSIDE AGENCY (CA) Robert Griffiths QC, assisted by Stephen Whale of Counsel They called: Jane Cecil Head of Finest Countryside, CA David Thompson Senior Countryside Officer, CA Christoph Kratz Martin Leay CPM Limited Clair Brockhurst CPM Limited Fiona McKenzie CPM Limited Ben Rosedale CPM Limited Dr Alan Thompson Capita Symonds FOR THE LOCAL AUTHORITIES West Sussex County Council & Chichester District Council Rhodri Price Lewis QC, assisted by Scott Lyness of Counsel They called: Jeff Bartley Partick Ellis Chris Cousins Moria Hankinson Hankinson Duckett Associates Sam Howes Chichester District Council Mid Sussex District Council Dick
    [Show full text]
  • The Binsted Bugle ARUNDEL BYPASS
    November 2020 parish news Subscription Renewal - Act NOW! See Page 39 60p 1 2 3 WHERE CAN I FIND?.... Funeral Page IN THIS MONTH’S PARISH NEWS Oaklands57 WWW.STMARYSWALBERTON.ORG.UK AccountancyPage Reynolds58 COVER PICTURE: AUTUMN COLOURS ON THE MEADOW PR Personal Tax 57 Page Article Gardening B&B Bygone Gardening 63 6 Services on line at St Mary’s Woodacre 51 PRH Garden Jobs 55 7 Letter from the Vicar SAApps 51 Beauty Therapy 8 The Ed’s Page Reflexions 55 Health Care 9 Flower Rota; Walberton Hort. Soc.; The Art Society Boxgrove ElaineSturgess 54 10 Walberton Baptist Church JillCanavan 51 Builders / Property Maintenance 11 Ken Cox Warren Vaughan 62 Lesley Suter 55 Martin Sewell 62 13 Community Playcentre SDL 63 House and Home 14 British Legion Poppy Appeal A Dog’s Walk Pet Services 31 15 Link to Hope Shoebox Appeal Care Services Aerial Man 62 Angelcare Southern Limited 46 Apparent Time 53 16 Mothers’ Union Euphoria Kitchens 2 19 Walberton Pre-School Catering Georgina Morrieson Ceramics 53 20 Walberton & Binsted PTA Appeal BlackHorse 2 Here to Help 12 Home Minder 51 21 Walberton Village Hall; Another limerick Cleaning 22 Here to Help our Community; Village Minibus; How can we We Clean Ovens 53 Legal Services help?; Wednesday Afternoon Club GWCA 50 23 Noticeboard Community VillageFriends 56 Logs / Tree Surgery 24 Walberton Players Award Walberton Toddler Group 51 Pro-forest 53 26 Interview with Bishop Michael Langrish DMChainsaws 56 28 Is This a Good Idea? Ashwood Tree Surgery 57 Computing / Telecoms 29 International Day of Prayer for the
    [Show full text]
  • Bognor Regis Regeneration Board
    Bognor Regis Regeneration Board 130 Manor Way Aldwick Bay Bognor Regis West Sussex PO21 4HL A27 Arundel Bypass Highways England Bridge House 1 Walnut Tree Close Guildford GU1 4LZ 9th October 2017 Dear Sir Re: Response to A27 Arundel Consultation I am writing to you on behalf of the Bognor Regis Regeneration Board regarding the above Highways England project. The Board was established in 2007 to act as an independent advisory body, bringing together leading representatives from the key public, private and community stakeholders in Bognor Regis. The Board has three key objectives: 1. To collectively promote Bognor Regis as a great place to live, work, visit and invest 2. To consider, give opinion and comment upon how and to what extent planned and proposed developments contribute to: • the town's growth and development • addressing and overcoming the town's socio-economic challenges; and, • maximising benefits and opportunities for the town. 3. To consider and evaluate strategies which impact upon the economic growth of Bognor Regis and offer comment, opinion and where appropriate modifications. Board membership is drawn from the major local private and public organisations including the University of Chichester, West Sussex County Council, Arun District Council, Butlins, Sime Darby London and Landlink Estates. The case for the A27 Arundel Bypass The Board supports the A27 Arundel Scheme as an integral part of the strategically important A27 improvements in Highway England’s Road Investment Scheme. The Arundel scheme is capable of being implemented independently and is critical for the economic prosperity of Bognor Regis and Coastal West Sussex. Future growth will result in demand further exceeding capacity through Arundel, and this section of the A27 will act as a constraint to the planned growth in housing and employment in the area.
    [Show full text]
  • (Public Pack)Agenda Document for Full Council, 13/01/2021 18:00
    Public Document Pack Arun District Council Civic Centre Maltravers Road Littlehampton West Sussex BN17 5LF Tel: (01903 737500) This is a virtual meeting and will Fax: (01903) 730442 be webcast live – please use this DX: 57406 Littlehampton Minicom: 01903 732765 link webcast page e-mail: [email protected] 23 December 2020 COUNCIL MEETING To all Members of the Council You are summoned to attend a virtual meeting of the ARUN DISTRICT COUNCIL to be held on Wednesday 13 January 2021 at 6.00 pm to transact the business set out below: Nigel Lynn Chief Executive PLEASE NOTE: This meeting will be a ‘virtual meeting’ and any member of the press and public may listen-in and view the proceedings via a weblink which will be publicised on the Council website at least 24 hours before the meeting. Different meeting arrangements are in place for the period running from 4 April 2020 to 7 May 2021 from the provisions of the Coronavirus Act 2020 and the meeting regulations 2020, to allow formal ‘virtual meetings’. This Council’s revised Rules of Procedures for ‘virtual meetings’ can be found by clicking on this link: https://www.arun.gov.uk/constitution Any members of the public wishing to address the Full Council meeting during Public Question Time, will need to email [email protected] by 5.15 pm on Thursday, 7 January 2021 on line with current Cabinet Procedure Rules. It will be at the Chief Executive’s/Chairman’s discretion if any questions received after this deadline are considered. For further information on the items to be discussed, please contact: [email protected] AGENDA 1.
    [Show full text]
  • Arun District Council Planning Weekly List
    List date: 09-NOV-18 ARUN DISTRICT COUNCIL PLANNING WEEKLY LIST Advertised date: 15-NOV-18 The application, plans and documents may be inspected by clicking on the application reference link or by searching on line at: www.arun.gov.uk/weekly-lists If you wish to comment on an application where representations are invited, they should be made before 06 December 2018. Comments can be submitted electronically by going to the website and commenting on the application or by writing to: Group Head of Planning The Arun Civic Centre Maltravers Road Littlehampton West Sussex BN17 5LF It may not be possible to take into account any comments received after 06 December 2018. All representations are published on our website so please make sure your views are clear and only include information that you are happy for the public to view. Do not include personal information or information from third parties unless you have their permission to do so. If a complaint is received that permission has not been given for comments included about a third party, the Council reserves the right to redact/remove all relevant information. Do not include information which is defamatory or breaches equality or any other legislation. The Council will aim to redact signatures, telephone numbers and email addresses but please help us by not including this information within the comments section if you are submitting through the website or in the main body of your letter. For details of what we do with your personal information please refer to our privacy statement comments on planning applications which is available on our website at www.arun.gov.uk/planning-privacy-statements Unfortunately it is not possible for the council to respond to each letter individually but your comments will be carefully considered before the application is determined.Unless you comment using the online facility your representation will not be acknowledged, but you will be advised if the application is to be determined by the Development Control Committee and you will be informed of the decision.
    [Show full text]
  • Minutes of the Ordinary Meeting of Slindon Parish Council 23 Augsut 2021
    Slindon Parish Council Minutes of the Ordinary Meeting of Slindon Parish Council Held at Slindon Coronation Hall, Reynolds Lane, Slindon BN18 0QZ. On Monday 23 August 2021 at 7 p.m. Present: Councillors Jan Rees (Chairman), Barbara Brimblecombe, Peter Fenton and Derek Thomas. In attendance: Sarah Linfield BSc (Hons), CiLCA (Parish Clerk/RFO/Proper Officer) Lisa Trownson, Area Ranger, National Trust 2 members of the public 23. Declarations of Interest Councillor Fenton declared his role as a Chairman of a committee of the Slindon Community Land Trust. 24. Public Participation A member of the public spoke regarding the draft flag flying policy to be adopted, advocating the payment of a small honorarium to the two Flag Officers in recognition of the work undertaken and of a monthly check to maintain the flagpoles in good order. Another spoke later regarding ‘Operation Watershed’ and was reassured that the willow would only be felled by the Council if its application was successful. 25. Apologies for Absence Not applicable, all Parish Council members present. 26. Minutes from the Council Meetings Held On 28th April 2021 and 4th May 2021. It was Resolved - to approve the minutes of the meetings as a true record of the decisions of those meetings and the Chairman be authorised to sign them. 27. Chairman’s Report Councillor Rees spoke regarding – • The A27 Elected Representatives’ Forum with Highways England and of the ecological surveys and archaeological work currently being undertaken. Two ‘green bridges’ will be constructed at Binsted and Tortington Lane – landscaped bridges allowing wildlife to keep moving safely despite the road blocking their path.
    [Show full text]
  • A27 Arundel Bypass Interim Scheme Assessment Report
    A27 Arundel Bypass Interim Scheme Assessment Report Chapter 4 – Environmental Status 30 August 2019 Interim Scheme Assessment Report A27 Arundel Bypass – PCF Stage 2 Further Consultation CONTENTS 4 ENVIRONMENTAL STATUS ........................................................................................ 4-1 4.1 Introduction .............................................................................................................. 4-1 4.2 Air Quality ................................................................................................................. 4-1 4.3 Cultural Heritage ...................................................................................................... 4-3 4.4 Landscape and Visual .............................................................................................. 4-4 4.5 Biodiversity ............................................................................................................... 4-6 4.6 Geology and Soils .................................................................................................. 4-11 4.7 Material Assets and Waste .................................................................................... 4-12 4.8 Noise and Vibration ................................................................................................ 4-13 4.9 Population and health ............................................................................................ 4-13 4.10 Road Drainage and the Water Environment ......................................................
    [Show full text]
  • Sussex RARE PLANT REGISTER of Scarce & Threatened Vascular Plants, Charophytes, Bryophytes and Lichens
    The Sussex RARE PLANT REGISTER of Scarce & Threatened Vascular Plants, Charophytes, Bryophytes and Lichens NB - Dummy Front Page The Sussex Rare Plant Register of Scarce & Threatened Vascular Plants, Charophytes, Bryophytes and Lichens Editor: Mary Briggs Record editors: Paul Harmes and Alan Knapp May 2001 Authors of species accounts Vascular plants: Frances Abraham (40), Mary Briggs (70), Beryl Clough (35), Pat Donovan (10), Paul Harmes (40), Arthur Hoare (10), Alan Knapp (65), David Lang (20), Trevor Lording (5), Rachel Nicholson (1), Tony Spiers (10), Nick Sturt (35), Rod Stern (25), Dennis Vinall (5) and Belinda Wheeler (1). Charophytes: (Stoneworts): Frances Abraham. Bryophytes: (Mosses and Liverworts): Rod Stern. Lichens: Simon Davey. Acknowledgements Seldom is it possible to produce a publication such as this without the input of a team of volunteers, backed by organisations sympathetic to the subject-matter, and this report is no exception. The records which form the basis for this work were made by the dedicated fieldwork of the members of the Sussex Botanical Recording Society (SBRS), The Botanical Society of the British Isles (BSBI), the British Bryological Society (BBS), The British Lichen Society (BLS) and other keen enthusiasts. This data is held by the nominated County Recorders. The Sussex Biodiversity Record Centre (SxBRC) compiled the tables of the Sussex rare Bryophytes and Lichens. It is important to note that the many contributors to the text gave their time freely and with generosity to ensure this work was completed within a tight timescale. Many of the contributions were typed by Rita Hemsley. Special thanks must go to Alan Knapp for compiling and formatting all the computerised text.
    [Show full text]