Downstream of O'neill Forebay

Total Page:16

File Type:pdf, Size:1020Kb

Downstream of O'neill Forebay DSM2DSM2 CaliforniaCalifornia AqueductAqueduct ExtensionExtension Presented to California Water and Environmental Modeling Forum March 1, 2005 Introduction and Project Goals • CH2M HILL is constructing a DSM2 model of the California Aqueduct on behalf of DWR’s Municipal Water Quality Investigation (MWQI) program and the State Water Project Contractors • Goals: – Detailed evaluation of Aqueduct Hydrodynamics, Water Quality, and Operations – Forecasting short-term and long-term water quality – Potential for Real-time analysis of Water Quality throughout system Model Coverage and Geometry • The model includes – California Aqueduct, South Bay Aqueduct – East Branch to Silverwood Lake, West Branch to Pyramid Lake, – San Luis Reservoir and O’Neill Forebay, and – DMC from Tracy Pumping Plant to the Mendota Pool – 580 miles in total • EXCEL tool built to generate ASCII cross section files • Pipes and Tunnels treated as channels Model Area Model Schematic Boundary Conditions • Flow at Tracy and Banks • San Luis Reservoir Operations • DMC and O’Neill Forebay Operations • Diversions to South Bay Aqueduct and West Branch (pumping plant data) • Contractor Diversions Database • Mass Balance Closure Terms Application-specific issues • Treatment of Check Structures – gates and weirs to control elevation • Use of Object to Object programming – DSM2 tool that allows for instantaneous transfer of water from location to another • Flow into South Bay Aqueduct • O’Neill Pumping and Generating Flows • Gianelli Pumping and Generating Flows • Flow into South Bay Aqueduct • Flow south out of O’Neill Forebay into California Aqueduct • DMC Wasteways can be handled with object to object flows Initial Calibration (1/1/2001 to 12/31/2003) • Flow – Closure terms • Stage – culverts and weirs to control stage • EC – Measured Data along California Aqueduct at Checks 12, 13, 18, 21,29, 41, and 66 – Measured Data in the DMC at the O’Neill Intake and Checks 20 and 21(upstream of DMP) (Downstream ofO’Neill Forebay) EC atCheck13 EC (mS/cm) -200 -100 100 200 300 400 500 600 700 800 0 01/01/2001 03/01/2001 Error (Modeled - Observed) - (Modeled Error Test2A EC FullAq09 Output - Model Measured 05/01/2001 07/01/2001 09/01/2001 11/01/2001 01/01/2002 03/01/2002 EC Calibration - Check 13 05/01/2002 07/01/2002 09/01/2002 11/01/2002 01/01/2003 03/01/2003 05/01/2003 07/01/2003 09/01/2003 11/01/2003 (Downstream ofEdmonston Pumping Plant) EC atCheck41 EC (mS/cm) -200 -100 100 200 300 400 500 600 700 800 0 01/01/2001 03/01/2001 05/01/2001 07/01/2001 09/01/2001 Error (Modeled - Observed) - (Modeled Error Test2A ECFullAq09 Output - Model Measured 11/01/2001 01/01/2002 03/01/2002 EC Calibration - Check 41 - EC Calibration 05/01/2002 07/01/2002 09/01/2002 11/01/2002 01/01/2003 03/01/2003 05/01/2003 07/01/2003 09/01/2003 11/01/2003 EC inSanLuis Reservoir EC (mS/cm) -200 -100 100 200 300 400 500 600 700 800 0 01/01/2001 03/01/2001 05/01/2001 07/01/2001 09/01/2001 11/01/2001 01/01/2002 EC Calibration -San Luis Reservoir Error (Modeled - Observed) - (Modeled Error Test2A EC FullAq09 Output - Model Measured 03/01/2002 05/01/2002 07/01/2002 09/01/2002 11/01/2002 01/01/2003 03/01/2003 05/01/2003 07/01/2003 09/01/2003 11/01/2003 EC Calibration Downstream of O’Neill with Major Flows EC Calibration - Check 13 with Controlling Flows 1000 10000 Measured EC Model Output EC - FullAq09 Test2A 900 San Luis Releases to O'Neill Forebay 9000 DMC pumped to O'Neill Forebay Banks Flow 800 8000 700 7000 600 6000 Q [cfs] 500 5000 EC (mS/cm) 400 4000 300 3000 200 2000 100 1000 0 0 01/01/2001 03/01/2001 05/01/2001 07/01/2001 09/01/2001 11/01/2001 01/01/2002 03/01/2002 05/01/2002 07/01/2002 09/01/2002 11/01/2002 01/01/2003 03/01/2003 05/01/2003 07/01/2003 09/01/2003 11/01/2003 Areas for Continued Development and Improvement • San Luis Reservoir (Currently well mixed) • Stormwater inflows and associated EC • Treatment of mass balance error terms • Stage calibration • DSM2 Database Version and Gate Operations flexibility Potential Future Applications • Join California Aqueduct grid with Delta grid and San Joaquin River grid • Recirculation Studies • Forecasting capability • CALSIM link Acknowledgements • Thanks to DWR Delta Modeling Staff for assistance in troubleshooting modeling issues (Tara, Parviz, Bijaya, Tawnley, Michael, Eli) • Questions?.
Recommended publications
  • Committee San Diego County Water Authority Board Meeting
    San Diego County Water Authority Board Meeting Documents April 25, 2019 Committee Administrative and Finance Engineering and Operations Imported Water Legislation and Public Outreach Water Planning and Environmental Formal Board On April 9, Congress passed implementing legislation for the Drought Contingency Plan, capping years of collaborative efforts among the seven Colorado River Basin states and the Bureau of Page 1 of 146 Reclamation to minimize the impacts of long-term drought in the river basin. NOTICE TO THE PUBLIC BOARD OF DIRECTORS’ AND STANDING COMMITTEES’ REGULAR MEETING APRIL 25, 2019 BOARD ROOM WATER AUTHORITY HEADQUARTERS BUILDING 4677 OVERLAND AVENUE, SAN DIEGO, CALIFORNIA 1. UNIFIED AGENDA: This unified agenda provides a brief description of each item to be considered by the Board and its Administrative and Finance, Engineering and Operations, Imported Water, Legislation and Public Outreach, and Water Planning Committees. For convenience, the agenda for each of the Committees and for the formal Board meeting are stated separately; however, all agendas shall be considered as a single agenda and any item listed on the agenda of any Committee may be acted upon by the Board. All items on the agenda of any Committee, including information items, may be deliberated and become subject to action by the Board. 2. DOCUMENTS: Staff reports and any other public information provided to the Board or Committee before the meeting relating to items on the agenda are available for public review at the San Diego County Water Authority 4677 Overland Avenue San Diego, CA 92123 during normal business hours. Additional documents may be distributed at the meeting.
    [Show full text]
  • Simulation of Flows and Water Quality in the California Aqueduct Using DSM2
    Simulation of Flows and Water Quality in the California Aqueduct Using DSM2 Siqing Liu, Bob Suits DWR, Bay Delta Office, Modeling Support Branch 2011 CWEMF Annual Meeting, February 28 –March 2 1 Topics • Project objectives • Aqueduct System modeled • Assumptions / issues with modeling • Model results –Flows / Storage, EC, Bromide 2 Objectives Simulate Aqueduct hydraulics and water quality • 1990 – 2010 period • DSM2 Aqueduct version calibrated by CH2Mhill Achieve 1st step in enabling forecasting Physical System Canals simulated • South Bay Aqueduct (42 miles) • California Aqueduct (444 miles) • East Branch to Silverwood Lake • West Branch to Pyramid Lake (40 miles) • Delta‐Mendota Canal (117 miles) 4 Physical System, cont Pumping Plants Banks Pumping Plant Buena Vista (Check 30) Jones Pumping Plant Teerink (Check 35) South Bay Chrisman (Check 36) O’Neill Pumping-Generating Edmonston (Check 40) Gianelli Pumping-Generating Alamo (Check 42) Dos Amigos (Check 13) Oso (West Branch) Las Perillas (Costal branch) Pearblossom (Check 58) 5 Physical System, cont Check structures and gates • Pools separated by check structures throughout the aqueduct system (SWP: 66, DMC: 21 ) • Gates at check structures regulate flow rates and water surface elevation 6 Physical System, cont Turnout and diversion structures • Water delivered to agricultural and municipal contractors through diversion structures • Over 270 diversion structures on SWP • Over 200 turnouts on DMC 7 Physical System, cont Reservoirs / Lakes Represented as complete mixing of water body •
    [Show full text]
  • CA-Waterways-Map.Pdf
    O R E G O N S rk m o it F h e dl R Mid . Goose Lake S o ut k h r o F C K l O O a m a N t h r Sa e c v r er i a Riv R m d e u A A aterways n o l t o o C c R W M E V A D i v e R i r r t v i e Some of the water you use every day has probably traveled T P r S S r i n i Trinity Lake ty M a d T T R iv er great distances and over high mountain ranges before reaching E UREKA R i v e r Shasta Lake Va n your faucet. This is because water is not always where we need R EDDING Du Clear zen Whiskeytown River Creek Lake Tunnel it. In California, most of the rain and snowfall is in the north. But Lake Antelope E Almanor Lake e l most of the people live in the south. The solution is to distribute S a R c i v r e a r m Corning R k Lake Frenchman e r n o Canal F Davis Lake the water to where it is needed through delivery systems such t o h t r o A R N rk Black i Fo v e e Butte r dl id as the State Water Project (SWP). Lake M Lake k N or F Oroville h t u So G Thermalito New Bullards The SWP delivers water from Lake Oroville in the north to the T Forebay and Bar Reservoir e h Lake Oroville Afterbay F e a a Visitors Center Indian m t h r a a e Valley e iv E R R r a San Francisco Bay area, the San Joaquin Valley, and Southern b u u Y Reservoir - s s i Clear Lake R a C i n o v e l u r S R sa i California.
    [Show full text]
  • Power and Energy Technical Report, DEIS
    Draft Power and Energy Technical Report Shasta Lake Water Resources Investigation, California Prepared by: U.S. Department of the Interior Bureau of Reclamation Mid-Pacific Region U.S. Department of the Interior Bureau of Reclamation June 2013 Contents Contents Chapter 1 Affected Environment ....................................................................................... 1-1 Environmental Setting .............................................................................................................. 1-1 Shasta Lake and Vicinity ................................................................................................. 1-7 Upper Sacramento River (Shasta Dam to Red Bluff) ...................................................... 1-9 Lower Sacramento River and Delta ............................................................................... 1-10 CVP/SWP Service Areas ............................................................................................... 1-12 Chapter 2 Modeling Results ................................................................................................ 2-1 Chapter 3 Bibliography ....................................................................................................... 3-1 Tables Table 1-1. Central Valley Project Power Plants, Capacities, and Historical Annual Generation ................................................................................................................. 1-5 Table 1-2. Major State Water Project Facilities, Capacities, and Historical Power Generation
    [Show full text]
  • Energy and Water Co-Benefits from Covering Canals with Solar Panels B
    Nature Sustainability, 2021 https://doi.org/10.1038/s41893-021-00693-8 Author-formatted copy Energy and water co-benefits from covering canals with solar panels B. McKuina,b*, A. Zumkehra, J. Taa, R. Balesa, J. H. Viersa, T. Pathaka, J. E. Campbell b* a Sierra Nevada Research Institute, University of California, Merced b Environmental Studies Department, University of California, Santa Cruz * Corresponding authors: [email protected] and [email protected] Solar-power development over canals is an emerging response to the energy-water-food nexus that can result in multiple benefits for water and energy infrastructure. Case studies of over-canal solar photovoltaic (PV) arrays have demonstrated enhanced PV performance due to the cooler microclimate next to the canal. Further, shade from the PV panels has been shown to mitigate evaporation and could mitigate aquatic weed growth. However, the evaporation savings and financial co-benefits have not been quantified across major canal systems. Here we use regional hydrologic and techno-economic simulations of solar PV panels covering California’s 6350 km canal network, which is the world’s largest conveyance system and covers a wide range of climates, insolation rates, and water costs. We find that over-canal solar could reduce annual evaporation by an average of 39 ± 12 thousand m3 per kilometer of canals. Furthermore, the financial benefits from shading the canals outweigh the added costs of cable-support structures required to span canals. The net present value (NPV) of over-canal solar exceeds conventional over-ground solar by 20% to 50%, challenging the convention of leaving canals uncovered and calling into question our understanding of the most economic locations to locate solar power.
    [Show full text]
  • Initial Study of the Long-Term Operation of the State Water Project
    Initial Study of the Long-Term Operation of the State Water Project State Clearinghouse No. 2019049121 State of California Department of Water Resources November 22, 2019 Initial Study of the Long-Term Operation of the State Water Project State Clearinghouse No. 2019049121 Lead Agency: California Department of Water Resources Contact: Dean Messer, Division of Environmental Services, Regulatory Compliance Branch 916/376-9844 Responsible Agency: California Department of Fish and Wildlife November 22, 2019 TABLE OF CONTENTS 1 INTRODUCTION .................................................................................................................... 1-1 1.1 Background ...................................................................................................................... 1-1 1.2 Project Objectives ............................................................................................................ 1-2 1.2.1 Required Permits and Approvals ......................................................................... 1-2 1.2.2 Document Organization ....................................................................................... 1-2 1.3 Summary of Findings........................................................................................................ 1-3 2 PROJECT DESCRIPTION .......................................................................................................... 2-1 2.1 Introduction ....................................................................................................................
    [Show full text]
  • CALIFORNIA STATE PARKS LIFEGUARD I (SEASONAL) Starting Pay $15.92 Per Hour
    Job Announcement CALIFORNIA STATE PARKS LIFEGUARD I (SEASONAL) Starting Pay $15.92 per hour BEGIN A REWARDING & CHALLENGING CAREER! Work as a lifeguard for the California State Parks PAID TRAINING IN: Public Safety First Aid, CPR, AED Open Water Lifesaving Techniques Aquatic Search and Rescue Procedures REQUIREMENTS: Possess a valid California Driver License with good driving record. Physical strength and endurance. Willingness to work weekends and holidays. Visual and hearing acuity necessary to detect and rescue a struggling victim in the water. TO QUALIFY: All applicants are required to complete the following: 1.) Pass a COMPETITIVE swimming test at a listed location consisting of the following: - 1,000 yard open water swim. Time limit of 20 minutes. - A continuous 200 yard run, 400 yard swim, 200 yard run. Time limit of 10 minutes. 2.) Qualification appraisal interview. 3.) Successful completion of the California State Park Lifeguard Training Program. 4.) Successful completion of Field Training Program. 2020 Reservoir & Lake Testing Dates & Locations: Lake Perris SRA Saturday, March 7, 10:00 AM Folsom Lake SRA Saturday, March 7, 10:00 AM Silverwood Lake SRA Saturday, March 7, 10:00 AM (@ Perris) San Luis Reservoir SRA Sunday, March 8, 10:00 AM Lake Oroville SRA Saturday, March 14, 12:00 PM Millerton Lake SRA Sunday, March 15, 10:00 AM Interviews to immediately follow for successful candidates www.parks.ca.gov/aquaticsafety [email protected] LIFEGUARD I (SEASONAL) Additional Testing Information Picture I.D. is REQUIRED on the day of the swim test. All minors shall have a parent or guardian PRESENT on the day of the swim test for swim test waiver signature.
    [Show full text]
  • Metropolitan's Water Treatment Plants
    Metropolitan’s Water Treatment Plants Safeguard Public Health The Metropolitan Water District of Southern California is the largest wholesale provider of drinking water in the country. Metropolitan provides water for 26 member public agencies to deliver to nearly 19 million people living across six Southland counties. Metropolitan operates five water treatment plants, including some of the largest facilities in the nation. U DINO R LES CO LES E G ERNA AN B N LOS LOS LL SA 21010 SILVERWOOD LAKE JOSEPH (DWR) JENSEN Joseph5 Jensen, Granada Hills WATER MORRIS EAGLE ROCK TREATMENT 17070 RESERVOIR CONTROL CENTER 15 PLANT 210 LIVE OAK F.E. Weymouth,RESERVOIR La Verne 5 10101 605 110 ETIWANDA MWD RESERVOIR 40505 10 F.E. WEYMOUTH UNION STATION SAN BERNARDINO WATER TREATMENT 10 HEADQUARTERS 10 10 PLANT 57 SAN BERNARDINO COUNTY 60 60 GARVEY RIVERSIDE COUNTY SANTA RESERVOIR MONICA 71 7101 405 Henry J. Mills, Riverside 5 ORANGE COUNTY RESERVOIR HENRY J. MILLS 60 ROBERT B. DIEMER 155 WATER TREATMENT WATER TREATMENT PLANT LAKE PERRIS 91 PLANT 91 91 605 LAKE MATHEWS 7100 405 555 21515 PALOS VERDES RESERVOIR LONG BEACH 1110 22 SANTIAGO RESERVOIR 405 DIAMOND 5 VALLEY LAKE 55 Robert B. Diemer, YorbaSAN JOAQUIN Linda EL TORO RESERVOIR RESERVOIR TY Y LAKE SKINNER COUNT ROBERT A. SKINNER WATER TREATMENT ORANGE COUN PACIFIC OCEAN RIVERSIDE PLANT Robert A. Skinner, Winchester RIVERSIDE COUNTY SAN CLEMENTE Metropolitan imports water from the Colorado drawn from the confluence of the Sacramento River and Northern California. Colorado River water and San Joaquin rivers and transported in the is brought via Metropolitan’s 242-mile Colorado State Water Project’s 444-mile California Aqueduct River Aqueduct extending from Lake Havasu on to serve urban and agricultural needs in the the California-Arizona border, to Lake Mathews San Francisco Bay area as well as Central and near Riverside.
    [Show full text]
  • Environmental Assessment
    Environmental Assessment United States Department of Miller Canyon OHV Staging Area Project Agriculture Forest Service September 2013 Mountaintop Ranger District, San Bernardino National Forest San Bernardino County, California For More Information Contact: David Kotlarski, District Recreation Officer [email protected] 909-382-2815 The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual’s income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250- 9410, or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. Environmental Assessment Miller Canyon OHV Staging Area Project Table of Contents Document Structure .................................................................................................................................. ii Chapter 1 – Need for the Proposal ...............................................................................................................
    [Show full text]
  • Examination of Exhumed Faults in the Western San Bernardino Mountains, California: Implications for Fault Growth and Earthquake Rupture
    Utah State University DigitalCommons@USU All Graduate Theses and Dissertations Graduate Studies 5-2005 Examination of Exhumed Faults in the Western San Bernardino Mountains, California: Implications for Fault Growth and Earthquake Rupture Joseph R. Jacobs Follow this and additional works at: https://digitalcommons.usu.edu/etd Part of the Geology Commons Recommended Citation Jacobs, Joseph R., "Examination of Exhumed Faults in the Western San Bernardino Mountains, California: Implications for Fault Growth and Earthquake Rupture" (2005). All Graduate Theses and Dissertations. 5246. https://digitalcommons.usu.edu/etd/5246 This Thesis is brought to you for free and open access by the Graduate Studies at DigitalCommons@USU. It has been accepted for inclusion in All Graduate Theses and Dissertations by an authorized administrator of DigitalCommons@USU. For more information, please contact [email protected]. EXAMINATION OF EXHUMED FAULTS IN THE WESTERN SAN BERNARDINO MOUNTAINS, CALIFORNIA: IMPLICATIONS FOR FAULT GROWTH AND EARTHQUAKE RUPTURE by Joseph R. Jacobs A thesis submitted in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE in Geology Approved: James P. Evans Susanne U. Janecke Major Professor Committee Member Peter T. Kolesar Laurens H. Smith, Jr. Committee Member Interim Dean of Graduate Studies UTAH STATE UNIVERSITY Logan, Utah 2005 ii ABSTRACT Examination of Exhumed Faults in the Western San Bernardino Mountains, California: Implications for Fault Growth and Earthquake Rupture by Joseph R. Jacobs, Master of Science Utah State University, 2005 Major Professor: Dr. James P. Evans Department: Geology The late Miocene Cedar Springs fault system is a high-angle transpressional system in the Silverwood Lake area, western San Bernardino Mountains, southern California.
    [Show full text]
  • Where Does Our Water Come From?
    Have you ever wondered where your water comes from? Here in Huntington Beach, about three-quarters of our water is drawn from local groundwater supplies, while the rest is imported from both Northern California and the Colorado River. Shasta Trinity Lake Water from Northern California travels to us through a complex delivery system Lake known as the California State Water Project. Designed and built in the 1960s, the State Water Project is one of the largest public water and power utilities in the REDDING world, providing drinking water for more than 25 million people statewide. THE Managed by the California Department of Water Resources, the project stretches CALIFORNIA AQUEDUCT over 700 miles, from Lake Oroville in the north to Lake Perris in the south. Water Lake stored in Lake Oroville, Folsom Lake, and other tributaries, and fed by snow melt Oroville from the Sierra Mountains, flows into the Sacramento and San Joaquin rivers, and from there into reservoirs in the Bay-Delta region. Feather River Sacramento From the Bay-Delta, giant pumps lift the water into the 444-mile-long California River Aqueduct, there to flow southward to cities and farms in central and Southern Folsom SACRAMENTO Lake California. Composed mainly of concrete-lined canals, the Aqueduct also includes over 20 miles of tunnels, more than 130 miles of pipelines, New Hogan and 27 miles of siphons. Along the way, the water is pumped Reservoir Managed by the Metropolitan The 2,882 feet over the Tehachapi Mountains. The Edmonston Water District of Southern Bay-Delta Pumping Plant alone lifts millions of gallons a day up California, the Colorado River SAN San 1,926 feet, the highest single water lift in the world.
    [Show full text]
  • Drought Brochure 2021 Update
    Drought In California January 2021 California Department of Water Resources | Natural Resources Agency | State of California Major Water Facilities Tule Lake Clear LLaakke Reservoir Trinity Reservoir Shasta Lake Whiskeytown Redding State Water Project Lake Antelope Federal Water Project Corning Canal Lake Tehama-ColuColussa Local Water Project Canal Frenchmmaan BlackBlack ButteButte LaLakke Lake Lake Lake Oroville Davis Stony GoGorgege Reservvoioir New BullBullaards East PaParrk Reservoivoir Bar Reservoir Lake Mennddoocincino Englebrightight Reservoivoir Indian Vaalleylley Reservoivoir Glenn-Colusa Canal Lake Sonoma Folsom Lake Lake Sacramento Auburn FolFolsom Sooututhh CCananaal Berryessa Putah S. CanaCanal Camanche Reservvoioir North Bay Aqueduct Mokelkeluummnne New Hogan Reservoir AqAquedueducuct New Meloelonnees LaLakke Contra Costa CCananal Stockton Los Vaqueros Reservoir Hetch Hetchyetchy Reservoir Don Pedro Lake San Francisco Lake McClure Lake Crowley Lake Hetch Hetchy Aqueduct Del Vaalllle South Bay Aqueduceduct Delta-Meendotandota Pachechecoo Conduit Canal Madera CaCanal Tinemaha Santa Clara CondConduiuit Millerton Lake Reservoir Hollister Condduuiit Pine Flat Reservoir San Luis Reeservvoioir Fresno San Luis Los Banos Reservoir Canal Lake Friant-Kern Kaweah Coalinga Canal Canal Haiwee Reservoir Lake Calif Success San Antonio Reservvoioir or Nacimientnto ni Isabella Reservoiir a Lake Los Angeles Cross Valley Aqueduct Canal California Aqueduct Twitchelwitchell Coastal Branch Reservoir Quail Lake Aq ued Pyramid LaLakke u ct Colorado
    [Show full text]