Downstream of O'neill Forebay

Downstream of O'neill Forebay

DSM2DSM2 CaliforniaCalifornia AqueductAqueduct ExtensionExtension Presented to California Water and Environmental Modeling Forum March 1, 2005 Introduction and Project Goals • CH2M HILL is constructing a DSM2 model of the California Aqueduct on behalf of DWR’s Municipal Water Quality Investigation (MWQI) program and the State Water Project Contractors • Goals: – Detailed evaluation of Aqueduct Hydrodynamics, Water Quality, and Operations – Forecasting short-term and long-term water quality – Potential for Real-time analysis of Water Quality throughout system Model Coverage and Geometry • The model includes – California Aqueduct, South Bay Aqueduct – East Branch to Silverwood Lake, West Branch to Pyramid Lake, – San Luis Reservoir and O’Neill Forebay, and – DMC from Tracy Pumping Plant to the Mendota Pool – 580 miles in total • EXCEL tool built to generate ASCII cross section files • Pipes and Tunnels treated as channels Model Area Model Schematic Boundary Conditions • Flow at Tracy and Banks • San Luis Reservoir Operations • DMC and O’Neill Forebay Operations • Diversions to South Bay Aqueduct and West Branch (pumping plant data) • Contractor Diversions Database • Mass Balance Closure Terms Application-specific issues • Treatment of Check Structures – gates and weirs to control elevation • Use of Object to Object programming – DSM2 tool that allows for instantaneous transfer of water from location to another • Flow into South Bay Aqueduct • O’Neill Pumping and Generating Flows • Gianelli Pumping and Generating Flows • Flow into South Bay Aqueduct • Flow south out of O’Neill Forebay into California Aqueduct • DMC Wasteways can be handled with object to object flows Initial Calibration (1/1/2001 to 12/31/2003) • Flow – Closure terms • Stage – culverts and weirs to control stage • EC – Measured Data along California Aqueduct at Checks 12, 13, 18, 21,29, 41, and 66 – Measured Data in the DMC at the O’Neill Intake and Checks 20 and 21(upstream of DMP) (Downstream ofO’Neill Forebay) EC atCheck13 EC (mS/cm) -200 -100 100 200 300 400 500 600 700 800 0 01/01/2001 03/01/2001 Error (Modeled - Observed) - (Modeled Error Test2A EC FullAq09 Output - Model Measured 05/01/2001 07/01/2001 09/01/2001 11/01/2001 01/01/2002 03/01/2002 EC Calibration - Check 13 05/01/2002 07/01/2002 09/01/2002 11/01/2002 01/01/2003 03/01/2003 05/01/2003 07/01/2003 09/01/2003 11/01/2003 (Downstream ofEdmonston Pumping Plant) EC atCheck41 EC (mS/cm) -200 -100 100 200 300 400 500 600 700 800 0 01/01/2001 03/01/2001 05/01/2001 07/01/2001 09/01/2001 Error (Modeled - Observed) - (Modeled Error Test2A ECFullAq09 Output - Model Measured 11/01/2001 01/01/2002 03/01/2002 EC Calibration - Check 41 - EC Calibration 05/01/2002 07/01/2002 09/01/2002 11/01/2002 01/01/2003 03/01/2003 05/01/2003 07/01/2003 09/01/2003 11/01/2003 EC inSanLuis Reservoir EC (mS/cm) -200 -100 100 200 300 400 500 600 700 800 0 01/01/2001 03/01/2001 05/01/2001 07/01/2001 09/01/2001 11/01/2001 01/01/2002 EC Calibration -San Luis Reservoir Error (Modeled - Observed) - (Modeled Error Test2A EC FullAq09 Output - Model Measured 03/01/2002 05/01/2002 07/01/2002 09/01/2002 11/01/2002 01/01/2003 03/01/2003 05/01/2003 07/01/2003 09/01/2003 11/01/2003 EC Calibration Downstream of O’Neill with Major Flows EC Calibration - Check 13 with Controlling Flows 1000 10000 Measured EC Model Output EC - FullAq09 Test2A 900 San Luis Releases to O'Neill Forebay 9000 DMC pumped to O'Neill Forebay Banks Flow 800 8000 700 7000 600 6000 Q [cfs] 500 5000 EC (mS/cm) 400 4000 300 3000 200 2000 100 1000 0 0 01/01/2001 03/01/2001 05/01/2001 07/01/2001 09/01/2001 11/01/2001 01/01/2002 03/01/2002 05/01/2002 07/01/2002 09/01/2002 11/01/2002 01/01/2003 03/01/2003 05/01/2003 07/01/2003 09/01/2003 11/01/2003 Areas for Continued Development and Improvement • San Luis Reservoir (Currently well mixed) • Stormwater inflows and associated EC • Treatment of mass balance error terms • Stage calibration • DSM2 Database Version and Gate Operations flexibility Potential Future Applications • Join California Aqueduct grid with Delta grid and San Joaquin River grid • Recirculation Studies • Forecasting capability • CALSIM link Acknowledgements • Thanks to DWR Delta Modeling Staff for assistance in troubleshooting modeling issues (Tara, Parviz, Bijaya, Tawnley, Michael, Eli) • Questions?.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us