1104 Nw Overton Retail / Office Space in the Heart of the Pearl

Total Page:16

File Type:pdf, Size:1020Kb

1104 Nw Overton Retail / Office Space in the Heart of the Pearl RETAIL / OFFICE SPACE | 1,625 SF Photo 1: Best Photo of Building RETAIL CREATIVE 1104 NW OVERTON RETAIL / OFFICE SPACE IN THE HEART OF THE PEARL BRIAN GREELEY | TYLER BRUSS | 503.228.3080 WWW.URBANWORKSREALESTATE.COM 1104 NW OVERTON ADDRESS | 1104 NW OVERTON SPACE 1 | 1,625 SF AVAILABLE | NOW AREA | PEARL DISTRICT USES | RETAIL / OFFICE SITKA APARTMENTS The Sitka Apartments is a 6 story, 209 unit affordable housing apartment building complete with ground floor retail. Located in the heart of Portland’s Pearl District, the Sitka was designed, engineered, and constructed with careful attention to its environmental impact. The major focus of the environmental design was to reduce the use of energy and natural resources in the ongoing operation of the building. The Sitka is 100% leased. FLOOR PLAN NW OVERTON ST 1,625 SF NW 11 NW th AVE 1104 NW OVERTON | 2 AREA DEVELOPMENT NW Front Ave NW Savier St 1 NW Raleigh St 3 5 2 4 NW Quimby St 7 9 NW Pettygrove St 6 8 SITE 11 NW Overton St 10 NW Northrup St 12 NW Station Way NW Marshall St NW Lovejoy St 13 16 NW Kearney St 14 15 NW Johnson St 17 NW Irving St NW 15th Ave NW 14th Ave NW 13th Ave NW 9th Ave 9th NW NW 10th Ave 10th NW NW 12th Ave NW 11th Ave 1. Abigail Apartments - 155 apt. units 10. The Cosmopolitan on the Park - 150 condos 2. Broadstone Pearl - 146 apt. units 11. Station Place Lot 5 - 9 Story office building 3. Block 26 - 93 apt. units 12. Wolff Development - 840 apt. units 4. Block 20 - 143 condos 13. 930 NW. 14th - mixed use development 5. Centennial Mills Redevelopment 14. Stagecraft Building - Design Within Reach 6. 1440 NW Overton St. - 69 apt. units 15. Block 136 - 208 apt. units + offices 7. Modera Pearl - 290 apt. units 16. Post Office Redevelopment 8. The N.V - 284 apt. units 17. Pearl West - Class A office building 9. Block 17 - 281 apt. units The Pearl District is located just north of the central business district of Portland, Oregon. For years this area was a warehouse district that later evolved to house many artists’ lofts. In the last 10 years, this area has blossomed into a retail and residential mecca, all paved by the artists and creative influence in the area. The district is bordered by NW Broadway to the east, NW 16th/I-405 to the west, W. Burnside to the south and the Willamette River to the north. There are approximately 6,179 existing and planned residential units in the Pearl District. Naturally, retail has followed the residential boom, including grocery (Whole Foods, a 47,000 square foot Safeway and Pearl Market), service (dry cleaning, salons, banks, interior design services, etc.), boutique retail (clothing, shoes, eyewear, gifts, flowers, garden stores and art galleries), big box retail (REI and Office Max), 24 Hour Fitness and food (more than 35 restaurants and bars and numerous coffee establishments). 1104 NW OVERTON | 3 AREA RETAIL & DEMOS .25 MILES .5 MILES 1 MILE 2018 POPULATION 5,295 9,942 33,920 TOTAL EMPLOYEES 3,166 16,407 85,570 TOTAL BUSINESSES 301 1,548 7,469 MEDIAN HH INCOME $97,889 $88,157 $63,850 MEDIAN AGE 37.6 36.9 36.1 TANNER SPRINGS PARK BRIDGEPORT BREWPUB REI LOVEJOY BAKERS THE FIELDS PARK SISTERS COFFEE LA FITNESS 1104 NW OVERTON | 4 PEARL DISTRICT Food and Drink Retail Other The Fields Park Ovation Pizzicato SITE Dublin Bay Knitting ecru modern stationer Tea Bar NW Can Font The Fields Bar & Grill Lot Four Urban Eatery Tanner Springs Park Residence Inn BridgePort Brewpub Via Delizia Cerulean Winery Sisters Coffee Co. Parallel On Running Olive Shoes Starbucks Chase Bank Umpqua Bank DeJardin Safeway Subway KeyBank Chipotle Seres Urban Pantry Lovejoy Bakers Pearl Thai Vacasa Starbucks U.S. Bank Yama Sushi Daily Cafe Olive Or Twist Posh Baby Urban Grind Title Nine The Hairy Lobster On Deck Wells Fargo Bank Debra Wilde Design REI Design Within Reach Silkwood Greenleaf Jamison Square Nossa Familia Coffee Cool Moon Ice Cream Union Station Piazza Italia Sinju Sushi Wilfs Restaurant & Bar Laughing Planet Cafe red d cafe Irving St. Kitchen TartBerry Blackrock Coffee Recycled Chic Consignment Paragon Giorgio’s Burrito Bar Low Brow Brix Tavern Barista Oba Restaurant Thelonious Wines Touche Keen Garage Express Cafe Blick Art Caffe Allora Columbia Bank Pizza Schmizza Canopy by Hilton Byways Cafe Andina Pho Van Fresh Park Kitchen Cha Cha Cha! Starbucks GP Kitchen 10 Barrel Nuvrei Bank of the West Rogue Public House Lan Su Chinese Minnesota Hotel Garden Hanna Andersson North Park Blocks Caffe Umbria Teardrop Lounge Golden West Bluehour Oven and Shaker World Foods Republic Cafe and Ming Lounge Eden Yoga Pearl Deschutes Brewery The North Face Portland Center Stage at The Armory Old Town Grocery Chase Bank Peet’s Coffee Sur La Table Portland Wellness Whole Foods Market Henry’s 12th Street Tavern Buffalo Exchange McMenamins Crystal Hotel Courier Coffee The Roxy Portland City Grill Georgia’s Grocery Store Tugboat Brewing Jr’s On Broadway Joyce Hotel The Georgia Hotel U.S. Outdoor Mark Spencer Hotel Blue Star Donuts Stumptown Coffee Roasters Your Store Ace Hotel The Palm Court Beneficial State Bank MA & PA Market The Benson 1104 NW OVERTON | 5 El Gaucho First Citizens Bank.
Recommended publications
  • The Fields Neighborhood Park Community Questionnaire Results March-April 2007
    The Fields Neighborhood Park Community Questionnaire Results March-April 2007 A Community Questionnaire was included in the initial project newsletter, which was mailed to over 4,000 addresses in the vicinity of the park site (virtually the entire neighborhood) as well as other interested parties. The newsletter was made available for pick-up at Chapman School and Friendly House and made available electronically as well. A total of 148 questionnaires were submitted, either by mail or on the web, by the April 20 deadline. The following summarizes the results. 1. The original framework plan for the River District Parks suggested three common elements that would link the parks together. Which do you feel should be included in The Fields neighborhood park? 100 90 80 70 60 50 40 30 20 10 0 Boardwalk Pedestrian Gallery Aquifer 2. This park is envisioned as a “neighborhood park no answ er – over two square blocks providing more traditional spaces for neighborhood residents. Do you agree ? with this overall concept? no yes Comments Regarding Question #2 “Traditional Neighborhood Park” #1 - None (of the original “framework concepts” are important What to you mean by "traditional" As long as this park does not become filthy (ie. bad terrain, homeless) like the waterfront, I'm for it. Excellent idea. A traditional park will be a nice complement to the other two parks. I don't know if my selections were recorded above. A continuation of the boardwalk is essential to making the connection between and among the parks. The design of the buildings around the park has narrowed the feeling of openness so it is beginning to look like a private park for the residential buildings surrounding it.
    [Show full text]
  • Waterfront Pearl
    FOR LEASE OR SALE WATERFRONT PEARL FOR LEASE OR SALE | COMMERCIAL CONDO FIELD OFFICE 300,000 SF office COMMERCIAL CONDO WATERFRONT PEARL DEMOGRAPHICS Miles 0.5 1 2 PROPERTY HIGHLIGHTS Employees 16,917 88,374 179,331 Population 8,173 25,968 93,829 • Approximately 1,011 SF (Unit 106) Avg HH Income $88,644 $65,405 $74,564 Lease Rate: $22/SF NNN Asking Price: $550,000 • 1 parking space included inside garage The Abigail • Beautiful Tenant Improvements completed BLOCK 26 155 units residential opened 2016 proposed in 2016 (including grease trap) • 192 units of high-end residential Broadstone The Reveal Ramona Centennial Mills condominiums with 300 residents 147 units redevelopment proposed • HOA monthly fees include gas, water, Modera Pearl The Parker 1264 NW Naito garbage, other common area expenses 280 units 177 units opened 2014 opened 2014 ($508/month) The Fields Park Waterfront • Real Estate Taxes: $3,400 Pearl Freedom NV BLOCK 17 Center 284 units 281 units opened 2016 opened 2014 1264 NW Naito Parkway, Portland, Oregon 97209 The Tanner Cosmopolitan Point 153 units 8-story office opened 2016 opened 2018 Tanner Springs Alber’s Mill Kearney Enso Asa Flats Loft Plaza Park Place Post Office Redevelopment proposed Pearl BLOCK 136 Jamison Court 208 units Square opened 2014 CONTACT CONTACT Anne Hecht Anne Hecht Director Director 503 279 1728 503 279 1728 [email protected] [email protected] Cushman & Wakefield of Oregon, Inc. Cushman & Wakefield of Oregon, Inc. 200 SW Market Street, Suite 200 Cushman & Wakefield Copyright 2015. No warranty or representation, express or implied, is made to the accuracy or completeness of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental 200 SW Market Street, Suite 200 Cushman & Wakefield Copyright 2015.
    [Show full text]
  • PP Annual Report Exec Summary V4.Indd
    2015–16 Dear Portlanders: Thank you for your recent commitment to repairing and improving Portland’s parks. In November 2014, you and an impressive 74 percent of Portlanders voted “Yes” for the Parks Replacement Bond Projects26 underway — the highest percentage ever for a Parks ballot measure. You became part of a long tradition of Portlanders who’ve built and maintained our city’s enviable collection of park facilities. In this fi rst full year of the Bond, from July 2015 to July 2016, we’ve laid the foundation for the work to be done. In this upcoming year, you’ll start to see tangible results in the parks. Replacement of the 70 to 90 year old mechanical systems at Grant Pool was the fi rst completed project, and next year, results will be visible across the city. Project1 completed About every nine years over the last century, Portlanders have invested in increasing, preserving and maintaining our park system by voting “yes” on parks bonds or levies. Before the 2014 bond, the last major bond was in 1994, meaning 20 years passed without signifi cant park improvements or address- ing dire repair needs. Portland Parks & Recreation anticipates a $248 million funding gap for major maintenance needs over the next 10 years. The $68 million in funds from the 2014 Parks Replacement Bond will not address all of these maintenance issues, but it is vital to fi xing, upgrading and replacing the most crucial of these needs. Projects18 ahead of As your Parks Commissioner and Parks Director, we are making sure the funds will be used wisely and schedule maximize benefi ts to the greatest number of park users.
    [Show full text]
  • Ri-Ze D______----::D-A-Te- -=S~~E~J/Ddny Qeh:Nh ~~~·!-\ Printed Name of Authorlz Lty Offrclal Title 3 70 8 5
    Notice of City Measure Election SEL 802 ,.., 1111. o!lls 160-on. m o.u. 1~ H&. 2StUt5.15ot Ot5. 1S4 465 City and Notice Information Notlee Is hereby given on August 7th , 20 ~. that a measure election will be held In City of Portland oregon on November 4th · , 20~. - - - - - Name of City or Cities Date of Election The following shall be the ballot title of the measure io be submitted to the city's voters: Caption 10 words I 1 Please see attached. ! ! I Question 20 words Please see attached. Summary 175 words :ti I rn ("") I Please see attached. rn rn< -•• 0 I I I The following authorizad city official haraby certifies the above ballot title Is true and complete, which Includes publication of notice and the completion of the ballot title challenge process. Signature redacted 0 Signature of Au tho~ ~fflcial no-t-re.... ~- u-i re-d-to--:-b-e_n_o_ta-:ri-ze_d__ _ ___----::D-a-te- -=s~~e~J/ddNy Qeh:nh ~~~·!-\ Printed Name of Authorlz lty Offrclal Title 3 70 8 5 EXHIIUTC CAPTION Bonds to fix playgrounds, trails; improve park facilities, safety, accessibility. QUESTION Shall Portland fix, improve park facilities by issuing bonds estimated to maintain cmrent tax rate; require audits and public oversight? If the bonds are approved, they will be payable from taxes on property or properly ownership that are not subject to the limits of sections II and II b, Article XI of the Oregon Constitution. SUMMARY Measure would authorize $68,000,000 in general obligation bonds for Portland Parks & Recreation facilities.
    [Show full text]
  • Median Income, City Officials Said
    The Oregonian Portland parks will spend $8 million to extend North Park Blocks as part of Broadway Corridor redevelopment By Everton Bailey Jr. February 1, 2020 Portland’s parks department says it plans to use up to $8 million in fees paid by developers to turn a city-owned downtown parking lot into new public green space. The move to redevelop the lot near the Pacific Northwest College of Art along Northwest Glisan Street would extend the North Park Blocks one square block toward the city’s vacant central post office site, which is also slated for redevelopment. The money would come from system development charges and it would cover planning, design and construction costs, said Mark Ross, a parks and recreation spokesperson. “We are optimistic that some funds may remain after the North Park Blocks project,” Ross said. Any remaining money, he said, would likely be put toward a new park planned to be built on the post office site. The developments are part of the city’s Broadway Corridor redevelopment project, a plan to create a new neighborhood encompassing 34 acres in Northwest Portland between the Chinatown-Japantown historic district and the Pearl District featuring the 14-acre post office site as its anchor. The area also covers Union Station and the former Greyhound bus terminal. The project is expected to include at least 720 affordable housing units, small business opportunities, new parks, public art and a new cycle track for biking. Affordable housing units are planned to be made available for families earning less than 60% of area median income, city officials said.
    [Show full text]
  • South Park Blocks Urban Renewal Plan, As Amended September 11, 1991 (Second Amendment)
    Portland State University PDXScholar Portland City Archives Oregon Sustainable Community Digital Library 9-11-1991 South Park Blocks Urban Renewal Plan, as Amended September 11, 1991 (Second Amendment) Portland (Or.). Development Commission Follow this and additional works at: https://pdxscholar.library.pdx.edu/oscdl_cityarchives Part of the Urban Studies Commons, and the Urban Studies and Planning Commons Let us know how access to this document benefits ou.y Recommended Citation Portland (Or.). Development Commission, "South Park Blocks Urban Renewal Plan, as Amended September 11, 1991 (Second Amendment)" (1991). Portland City Archives. 36. https://pdxscholar.library.pdx.edu/oscdl_cityarchives/36 This Report is brought to you for free and open access. It has been accepted for inclusion in Portland City Archives by an authorized administrator of PDXScholar. Please contact us if we can make this document more accessible: [email protected]. CITY OF PORTLAND, OREGON SOUTH PARK BLOCKS URBAN RENEWAL PLAN AS AMENDED SEPTEMBER 11, 1991 (SECOND AMENDMENT) CITY OF PORTLAND DEVELOPMENT COMMISSION 1120 SW FIFTH AVENUE, SUITE 1100 PORTLAND, OREGON 97204-1968 URBAN RENEWAL PLAN FOR THE SOUTH PARK BLOCKS URBAN RENEWAL PROJECT ADOPTED July 24, 1985 BY CITY COUNCIL ORDINANCE NO. 157635 FIRST AMENDMENT ADOPTED May 22, 1991 BY CITY COUNCIL ORDINANCE NO. 164216 SECOND AMENDMENT ADOPTED September 11, 1991 BY PORTLAND DEVELOPMENT COMMISSION RESOLUTION NO 4141 TABLE OF CONTENTS Page No. SECTION 100 - Introduction 1 SECTION 200 - Definitions 2 SECTION 300 -
    [Show full text]
  • Report Number 11-42 Intergovern
    DATE: May 25, 2011 TO: Board of Commissioners FROM: Patrick Quinton, Executive Director SUBJECT: Report Number 11-42 Intergovernmental Agreement with Portland Parks & Recreation for Construction of The Fields Neighborhood Park (NW Overton Street between NW 10th and NW 11th Avenues) in the River District Urban Renewal Area; providing funding in an amount not to exceed $5,140,000. EXECUTIVE SUMMARY BOARD ACTION REQUESTED Adopt Resolution No. 6880 ACTION SUMMARY This action will authorize the Executive Director to execute an Intergovernmental Agreement (IGA) between the Portland Development Commission (PDC) and Portland Parks & Recreation (PP&R) for the construction of The Fields Neighborhood Park (the Park). The planned 3.3 acre park is located in the Pearl District, north of NW Overton Street between NW 10th and NW 11th Avenues. This IGA will provide up to $5,140,000 to PP&R to construct the Park. The IGA budget for fiscal years 2011-12 and 2012-13 is as follows: FY 11-12 FY 12-13 Total Park Improvements - Base $1,300,000 $2,035,000 $3,335,000 Park Improvements – Package 1 $0 $1,000,000 $1,000,000 Environmental Remediation $99,000 $231,000 $330,000 Right of Way Improvements $0 $504,000 $504,000 Park Construction Subtotal $1,399,000 $3,770,000 $5,169,000 Construction Management $83,000 $288,000 $371,000 Total $1,482,000 $4,058,000 $5,540,000 This action will bring the total expected PDC investment in the Park to $14.2 million, and the total cost of the Park to $19.5 million including the value of the 1.2 acres donated by Hoyt Street Properties (HSP) and $400,000 in PP&R funding towards the total $5.54 million construction cost.
    [Show full text]
  • South Park Blocks Master Plan
    0 South Park Blocks Master Plan Draft Preferred Design Community Comment Report November 2020 South Park Blocks Draft Preferred Design Community Comment Report 1 Contents Introduction Page 2 Survey Respondent Demographics Page 3 Major Themes from Focus Groups Page 5 Survey Results Page 6 Focus Group Summaries Page 40 Comments Submitted by Email Page 42 South Park Blocks Master Plan Project www.portlandoregon.gov/parks/spb Contact: Barbara Hart 503-823-5596 [email protected] South Park Blocks Draft Preferred Design Community Comment Report 2 Introduction Portland Parks & Recreation is working with the community to develop a plan for a South Park Blocks that is safe, accessible and welcoming for all Portlanders. The plan will address key challenges and opportunities, including maintaining a healthy tree canopy, making the park more accessible for all users, retaining park character while enhancing connections, and providing space for community events. Portland Parks & Recreation began the South Parks Block planning process by convening a community advisory committee to guide the project and launching a community visioning process in Summer 2019 to inform the development of three draft design concepts. The draft concepts were shared with the community in Fall 2019. The feedback on the design concepts guided the development of a draft preferred design. The community engagement approach for this stage of the project was designed to: • Enlist community participation in the design review process with a special focus on PSU students, the Native American Community Advisory Council and Parks Accessibility Advisory Committee; • Explain how community feedback and ideas heard during the draft concept phase influenced the development of Draft Preferred Design; • Gather and understand community feedback on the Draft Preferred Design to develop a preferred park design; and, • Strengthen community relationships and build support for the South Park Blocks and PP&R.
    [Show full text]
  • Street Tree Inventory Report the Pearl District June 2016 Street Tree Inventory Report: the Pearl District June 2016
    Street Tree Inventory Report The Pearl District June 2016 Street Tree Inventory Report: The Pearl District June 2016 Written by: Carrie Black, Kat Davidson, Angie DiSalvo, Julie Fukuda, Jeremy Grotbo and Jeff Ramsey Portland Parks & Recreation Urban Forestry 503-823-4484 [email protected] http://portlandoregon.gov/parks/treeinventory Staff Neighborhood Coordinator: Carrie Black GIS Technical Support: Josh Darling, Portland Parks & Recreation Financial Support: Portland Parks & Recreation Cover Photos (from top left to bottom right): 1) The interesting, textured bark of a sycamore maple (Acer pseudoplatanus). 2) A flowering ash Fraxinus( ornus) fruiting profusely. 3) A Portland Streetcar on a tree-lined street in the Pearl District. 4) Sunlight on the flower of a sweetbay magnolia Magnolia( virginiana). 5) The distinctive fan-shaped foliage of a ginkgo (Ginkgo biloba). 6) A view of the Fremont Bridge through The Fields park. 7) Fragrant flowers clustered on a lilac tree Syringa( reticulata). 8) The leaf of a London planetree (Platanus x acerifolia), an uncommon sight in the Pearl. ver. 10/18/2016 Portland Parks & Recreation 1120 SW Fifth Avenue, Suite 1302 Portland, Oregon 97204 (503) 823-PLAY Commissioner Amanda Fritz www.PortlandParks.org Director Mike Abbaté Contents Key Findings .......................................... 1 About Portland’s Street Tree Inventory . 3 Pearl Street Tree Inventory .............................. 5 Neighborhood Characteristics ......................... 5 Urban Forest Composition...........................
    [Show full text]
  • Media Clips Template
    The Oregonian Portland City Council votes to fight transparency: Editorial Agenda 2016 By The Oregonian Editorial Board January 14, 2016 The Portland City Council articulated an interesting position on transparency Wednesday: There is, in fact, no public document too old to release to the public without a fight. Thank your lucky stars that these people don't write Oregon's public records laws. Council voted 4-1 to support a resolution requested by the city attorney's office and plopped on the agenda at the eleventh hour. The single dissenter was Commissioner Steve Novick, who said, in effect, City Council might not like the transparency with which it must function, but the law's the law. The Council's transparency crisis began with a September 2015 request for three legal opinions and a memorandum written by the city attorney to Portland's mayor and colleagues. The three opinions were penned in the 1980s, and the memorandum was written in 1990. In other words, a looooong time ago. Mark Bartlett, who requested the legal advice and the memo, read about the documents in a 2002 email in which a city Water Bureau employee discussed mixed public ownership on Mt. Tabor. Both the Water Bureau, supported by ratepayer funds, and the Parks Bureau, supported by property tax revenue, own property there, Brad Schmidt of The Oregonian/OregonLive reported. The 2002 email, citing the legal advice Bartlett has requested, cautioned that "Parks cannot use a Water Fund property for any purpose, and neither can Water Funds be used in support of a Park purpose, without 'market value' compensation to the Water Fund in some form." The use – and potential misuse - of utility funds is a sore spot for city leaders, who surely don't relish the prospect of being poked there yet again.
    [Show full text]
  • Download PDF File 2019-20
    2019–20 YEAR 5 PARKS BOND EXECUTIVE SUMMARY YEAR 5 Dear Portlanders, We are happy to report that 46 of the 52 Bond projects have been completed, with the remaining six projects underway. Your investment has been used wisely. Year 5 of the Bond started out as planned: • In July 2019, Commissioner Fish cut the ribbon on the completely overhauled Peninsula Pool. • In October 2019, the community gathered to celebrate a more accessible playground at Glenhaven Park. • Construction wrapped up on the installation of new play pieces and drainage repairs at over 30 parks. Sadly, 2020 started off with the loss of our colleague and beloved Parks Commissioner, Nick Fish. And then COVID-19 hit. With some adaptations, Bond projects stayed on track. Construction began on a new playground for Creston Park, and we completed a new playground at Verdell Burdine Rutherford Park, the first Portland park to be named solely after a Black woman. The public health crisis was followed by a groundswell of action for racial justice. Now, our parks and open spaces are even more precious than ever, serving as shared public spaces to exercise our bodies, our minds, and our voices. While this Bond could only tackle the most critical maintenance needs, it has given us all a glimpse of what we can achieve together. Let’s continue to create a more sustainable and more equitable future for our city and our parks. Stay safe, stay healthy, and stay hopeful. Sincerely, Commissioner Amanda Fritz Portland Parks & Recreation Director Adena Long 1 PARKS BOND EXECUTIVE SUMMARY YEAR 5 46Projects completed Glenhaven Park playground opening celebration Projects6 underway Peninsula Pool opening celebration Current3 projects ahead of or on schedule Marshall Park bridge construction 2 PARKS BOND EXECUTIVE SUMMARY YEAR 5 NORTH Acquisitions at Cathedral, Open Meadow.
    [Show full text]
  • 1131 Nw Hoyt Turn-Key Restaurant Space in the Pearl –Please Do Not Disturb Tenant–
    SALE RETAIL RESTAURANT CREATIVE 1131 NW HOYT TURN-KEY RESTAURANT SPACE IN THE PEARL –PLEASE DO NOT DISTURB TENANT– CHARLOTTE LARSON | 503.228.3080 WWW.URBANWORKSREALESTATE.COM 1131 NW HOYT –PLEASE DO NOT DISTURB TENANT– ADDRESS | 1131 NW HOYT USES | RESTAURANT / RETAIL SPACE | 1,780 SF AREA | PEARL DISTRICT PARKING | ONE COVERED OFF-STREET PARKING SPACE TURN-KEY RESTAURANT SPACE This is a rare opportunity to acquire an exquisite Pearl District restaurant space. Located in the heart of the Pearl at the corner of NW Hoyt and 12th Ave, the space features a bar area, full kitchen with grease trap and type-1 hood, and general restaurant seating area - all meticulously maintained. FF&E can be negotiated with sale. With hundreds of apartment units being added to the Pearl each year, this corner is a desirable, charming setting to serve this hot trade area. 1131 NW HOYT | 2 NEIGHBORHOOD & DEMOS .25 MILES .5 MILES 1 MILE 2019 POPULATION 4,704 17,116 43,864 TOTAL EMPLOYEES 11,977 34,232 107,631 TOTAL BUSINESSES 1,085 3,194 9,166 MEDIAN HH INCOME $79,4469 $62,814 $59,734 MEDIAN AGE 37.4 36.7 36.8 EDU - SOME COLLEGE 91.1% 86.4% 87.2% POWELL’S DESCHUTES BREWERY REI DESIGN WITHIN REACH WEST END SHOPS LITTLE BIG BURGER GARDEN BAR 1131 NW HOYT | 3 THE OLD PORTLAND LAND ROVER PLANET GRANITE THE FIELDS PARK Food and Drink Retail OVATION PURE SPACE Hotel PIZZICATO SCHUBACK Service / OtherVIOLIN SHOP TEA BAR CROSSFIT AREA RETAIL PEARL THE FIELDS LA FITNESS TANNER PORTLAND CLOSET CO.
    [Show full text]