Airport ProjectsYEARS Joannou & Paraskevaides Group International Building and Engineering Contractors

Contents

Introduction 7 Company History 8 Group’s Office Addresses 10

Major Airport Projects Emirates Airline New Engineering Center, Dubai 14 Queen Alia International Airport, , 16 King Fahd International Airport, , 18 Allama Igbal International Airport, Lahore, Pakistan 22 Eleftherios Venizelos International Airport, Athens, 24 International Airport, U.A.E. 26 Seeb International Airport, , Sultanate of 28 Royal Flight Complex, Muscat, Sultanate of Oman 29 Thumrait Airbase, Sultanate of Oman 30 Salalah Airport Complex, Sultanate of Oman 31 Denver International Airport, Denver, Colorado, USA 32 L.A. International Airport, Los Angeles, California, USA 33 Sky Harbor International Airport, Phoenix, Arizona, USA 34

Complete List of Airport Contracts Sultanate of Oman 36 Saudi Arabia 39 Pakistan 40 41 United Arab Emirates 42 Greece 43 Jordan 44 United States of America 45

Introduction

J&P have been building airports for nearly 50 years. engineering to the limits, and the sheer scale and quality From the successful completion of the RAF station and of the work commissioned was a huge technical and Airport in El Adem, Libya, in 1967, and the contract to logistical challenge that brought out the best in J&P. resurface and extend the Dhahran Airport in Saudi Arabia, Today, the magnificent Airport complex – delivered in 1969, the company has been building a solid base in perfectly and on time in 1990 - stands proudly for the this highly specialized field. world to see.

From the outset, J&P’s ability to create the infrastructure The 1990’s was a period of solid and rapid expansion necessary to facilitate huge and complex construction for J&P’s worldwide operations and during this time they contracts in the most challenging and difficult of terrains branched out through a subsidiary company, Ball, Ball and to deliver on time – has been the company’s major and Brosamer (3B’s), and began bidding for multi-million strength. It led to their breakthrough contract, one that airport construction contracts in the USA. The result was would demand not only speed of execution and expert a series of important airport projects that spanned the workmanship, but also revolutionary measures to country, in the Los Angeles International Airport, the Sky overcome the obstacles and difficulties of working in a Harbor International Airport in Phoenix, Arizona, and the country still in its early stages of development: Denver International Airport in Colorado and other major airports in USA. The Seeb International Airport in Muscat, Oman, was J&P’s greatest challenge at the time, and the successful As a new century dawned, J&P’s outstanding and completion of the immense facility, comprising terminals, proven abilities led the industrial giant, SIEMENS, to cargo buildings, runways and aprons all within two partner with them in a powerful joint venture that won years of breaking ground, delighted the client and his the construction and financing bid to build the Allama consultants. Other contracts quickly followed, among Igbal International Airport in Lahore, Pakistan. The them the Royal Flight Complex in Oman, the Sultanate of project was a massive undertaking and an enormous Force (SOAF) Airport, and the Salalah Airport logistical challenge. It included not only a completely new Complex in the South Province of Oman. passenger terminal with new aprons and the upgrading of all runways, but also taxiways, related services, car The successful execution of these projects meant parks and airfield lighting. It was a challenge that J&P that by 1976, J&P were building a global reputation for relished and when the project was completed to exact the quality of their work, and the contract to build an specifications and delivered on time in 2002, J&P had airport with the longest runway in the was proved beyond any doubt they could tackle projects of awarded to them. This contract, for the New Abu Dhabi any size, anywhere in the world. International Airport, with extensive taxiways, aprons and general infrastructure was completed by J&P in 1979 and The company grew rapidly into the new century and was followed by a further contract to construct the cargo the next five airport contracts came from Greece for terminal and ancillary buildings of the Airport. the Elefterios Venizelos International Airport in Athens. Completing these projects, J&P were next awarded Technical precision and working against the odds had their most challenging project to date; the much-coveted become the bedrock of J&P’s airport operations and contract to build the Queen Alia International Airport in their ability to deliver on time was once more illustrated Amman. Incorporating cutting edge technology and all the when they built the Al-Kharj Airbase near Riyadh, Saudi latest facets in airport design, J&P built this immaculate, Arabia. This exacting contract, awarded to them in 1987 ultra-modern complex and unveiled it to the world, on was successfully completed in just thirty months; an schedule, at the beginning of 2013. extraordinary achievement, combining the finest quality workmanship with unmatched speed of execution. The Queen Alia International Airport was a triumph from the opening ceremony. It was attended by many heads of In the same year J&P won the contract for the state and international consulting firms who expressed largest airport project they’d ever had: Comprising a their admiration for the peerless quality of J&P’s work and huge passenger terminal, a concourse building and the the seamless combination of design and functionality on administrative infrastructure of a vast airport complex, such a vast scale. It was clear to all that once again J&P the King Fahd International Airport (KFIA) in the Eastern had completed a project to the perfect satisfaction of their Province of Saudi Arabia, was the biggest challenge client, and once again they had done what they do best; J&P had faced. It took their specialist’s knowledge of exceed all expectations.

7 Company History

The Joannou & Paraskevaides Group, better first major overseas project to build the British known as J&P, is one of the largest and most Airbase in El Adem, Libya. Libya, at the time, experienced Building and Civil Engineering was just beginning to exploit its oil reserves with Companies in the world. From historic beginnings the collaboration of American and British Oil in 1941 as a partnership in that began Companies, and except for the major difficulties by building British Military Bases vital to the of the native terrain, the country was a promising Allied war effort, J&P has grown into a leading venue. J&P enthusiastically took up the challenge, International Construction Company that in 2011 completing the Airbase on plan, on budget and celebrated 70 successful years in the global on time, followed by large projects for the Libyan construction industry. Government for houses, offices, schools, as well J&P’s ability to meet challenge with innovation as civil engineering projects for the international and obstacle with solution that was forged during oil companies operating there. the difficult war years, blossomed in peace- By 1969, as the oil boom began to seize the time Cyprus and the post war years of 1945 to Arabian Gulf, J&P’s success began to bring 1960 saw their rapid rise to become the leading ever-more ambitious projects. Led by visionary domestic contender for both Government and management, the company chose the perfect civil contracts. At the same time, J&P were at moment and expanded once more, this time into the forefront of property development in Cyprus Saudi Arabia. Here, J&P’s first major contract and their enigmatic vision opened new horizons was for the Dhahran Airport, building the aprons for the local construction industry. They were and extensions and resurfacing the runways and pioneers in real-estate and property development taxiways. It was a perfect job and J&P were then and it was J&P who set the standards of modern awarded by the Sultanate of Oman the contract town-planning and the development of all related to build the entire International Airports of Seeb services. The island began to prosper, and as and Salalah. As investment poured into the prosperity grew it was J&P who built the holiday region, J&P became a major participant in the complexes and tourist developments which construction and development of the Country. would be the bedrock of the emerging domestic They blasted mountain rock in the harsh desert, industry. built highways, tunnels, bridges and flyovers, By 1960, when Cyprus gained independence, dams and irrigation schemes, ports. From the the J&P workforce was a multi-faceted, fast ground up, J&P built huge housing complexes and growing group that was primed for expansion. whole towns with comprehensive infrastructure, For the Directors, the small group of visionaries sports stadiums, shopping malls and commercial who had started the company 20 years before, centres, hospitals and medical centres and luxury the writing was on the wall: The foundations for hotel complexes. And naturally, among the many an international company had been built. It was prestigious projects entrusted to them across the time to market J&P’s capabilities and export their region, in the U.A.E., Oman and Saudi Arabia, expertise to the world. J&P also built Palaces and high profile residences Joannou and Paraskevaides (Overseas) Ltd for Royalty and prominent statesmen. was formed in 1961, and shortly afterwards the The services of the J&P Group were in high vision of the Directors was rewarded with J&P’s demand. From across the region, big contracts

8 Company History

came in for prestigious projects in Iraq, Algeria, and managerial support for J&P projects Pakistan, , Egypt and Ethiopia. At the same worldwide, as well as maintaining the timely time J&P were active in , partnering in supply of specialized materials and equipment the big consortiums that built the three largest needed to complete the work. The centres projects in Greece’s history: the Rion-Antirion are staffed by experienced professionals; Road Bridge over the Gulf of Corinth, the ‘Attiki engineers, supervisors and artisans who are Odos’ (Elefsina-stavros-Spata Highway) and a skilled in all aspects and disciplines of the major part of the biggest and most demanding construction industry and who can operate of the projects, the ‘Egnatia Odos’. quickly and expertly, rising to any new challenge When the 2004 Olympics were awarded to or assignment to any kind of building project Athens in J&P were a leading player in the that J&P undertakes. construction of the majority of new sports From its humble beginning in the 1940's as a facilities. And with their diverse fields of partnership between the two founders, the J&P expertise, they were also awarded a number of Group now employs over 18000 people, directly railway projects for the Athens Metro network or indirectly, for its international operations, that required a highly specialized knowledge of and is consistently ranked among the top construction. Because of the company’s rich construction companies in the world by the background of experience in so many areas prestigious trade publication, the Engineering of the industry, J&P were soon in demand in News Record (ENR). the rest of Europe. New opportunities quickly On a global scale, J&P now offers new and followed and J&P secured building and innovative solutions to challenging construction infrastructure contracts in Poland, Romania projects of any size, almost anywhere in the and Kosovo, exploring at the same time other world. This includes procurement of finance for European markets. projects of special interest, establishment of J&P’s reputation and sphere of operations grew B.O.T consortia and the undertaking of Turnkey strongly and rapidly and the 1980’s saw the projects. And their unwavering commitment to company diversifying and expanding activities the highest quality workmanship, supported by the in the Oil and Gas sectors as well as in the field latest equipment and managerial techniques, ensure progressive and timely change in every aspect of power generation.The result is that today, of J&P’s global operations…with one exception; J&P has a long and impressive international 70 years on from a runway in 1941, having portfolio of successfully completed projects, in embraced the most advanced technology in the both the upstream and downstream sectors of construction industry and tackled some of its the Oil Industry. most difficult projects, there is still something True to the original global vision for the company, about the company of J&P that has never J&P has expanded considerably over the years, changed: establishing a well-organized infrastructure of IT Every day, just like their first day of business, and logistics centres in its zones of operations J&P goes out to do what they have always in the Middle East, North and East , Asia done; Build the future success of their clients. and Europe. These centres are the vital links in a chain that ensure top level technical, financial

9 Group's offices addresses

CHANNEL ISLANDS, U.K. SAUDI ARABIA Joannou & Paraskevaides Joannou & Paraskevaides (Overseas) Ltd ( Saudi Arabia) Ltd. Registered Office : Joannou & Paraskevaides Canada Court, Upland Road (Overseas) Ltd. St. Peter Port P. O. Box 5881, RIYADH 11432 GUERNSEY GY1 3BQ Tel: +966 11 4040002-4 Channel Islands Fax: +966 11 4010123, 4039575 Tel: +44 1481 744000 [email protected] Fax: +44 1481 744520 P. O. Box 720, AL KHOBAR 31952 UNITED KINGDOM Tel: +966 13 8571966, 8579096 Joannou & Paraskevaides Fax: +966 13 8572308 (UK) Ltd 16 Hanover Street , P. O. Box 5028, JEDDAH LONDON , W1S 1YL Tel: +966 12 6674551 Tel: +44 20 74625000 Fax: +966 12 6604515 Fax: +44 20 74930059 [email protected]

CYPRUS UNITED ARAB EMIRATES Joannou & Paraskevaides National Wheel J&P L.L.C Group Baniyas Street 1 Byron Avenue Al Marsaf Tower, 7th floor, Suite705, P. O. Box 21178 P. O. Box 4624, Deira DUBAI CY-1503 NICOSIA Tel: +971 4 2212248 Tel: +357 22 868600 Fax: +971 4 2284365 Fax: +357 22 818868 [email protected] [email protected] Abu Dhabi J&P L.L.C GREECE P. O. Box 2536, ABU DHABI J&P AVAX S.A Tel: +971 2 6221533 16, Amarousiou-Halandriou Street Fax: +971 2 6221536 GR-15 125 Marousi, [email protected] ATHENS Tel: +30 210 6375500 Fax: +30 210 6104380 QATAR [email protected] Joannou & Paraskevaides Qatar W.L.L Building No. 163 J&P Energy & Industrial Nuaija, 41 Hilal West Projects S.A. Rawdat Al Khail Str. 330 27 Fragoklisias Street , P.O.Box 18637 & 12924 GR 15 125 Marousi, ATHENS Tel: +974 44675409, 44675429 Tel: +30 210 6389100 Fax: +974 44675433 Fax: +30 210 6104595 [email protected] [email protected]

10 Group's offices addresses

LIBYA JORDAN Joannou & Paraskevaides J.V. J&P (Overseas) Ltd (Overseas)Ltd. J&P AVAX S.A P. O. Box 6072 P.O Box 5145, AMMAN 11953 TRIPOLI / SWANI Mecca Street-Abraj Al-Hijaz Bldg Tel: +218 21 5670101 - 02 6th floor - Office no. 607 +218 21 5670106 - 08 Tel: +962 6 5524403 Fax: +218 21 5621580 Fax: +962 6 5522586 [email protected] [email protected] P. O. Box 2055, BENGHAZI ROMANIA Tel: +218 61 2225448 – 49 J&P AVAX S.A., +218 61 2230395 Bidescu Voda Str., Fax: +218 61 2225447, 9080184 Nr 1,Bl. P4, Ap.41, sector 4 [email protected] 040151 BUCHAREST [email protected] Tel: +40 21 335 1498 Fax: +40 21 335 8067 [email protected]

SULTANATE OF OMAN J&P Oman L.L.C. Villa 1846, Al Rusayl, Area Code 315 MUSCAT Tel: +968 245 11398, 245 11301 Fax: +968 245 11287 [email protected]

WEBSITES: EGYPT www.jandp-group.com Joannou & Paraskevaides (Overseas) Ltd. www.janpcy.com 9, Shehab street, Mohandeseen Giza, CAIRO Tel: +20 2 33384960, 37485403 Fax: +20 2 37499161 [email protected] websites: www.jandp-group.com www.jandpcy.com

11

Major Airport Projects Emirates Airline New Engineering Centre Dubai

Construction of 8 maintenance hangars, workshops and stores, central plant & utilities building, office & administration building, gate house, mosque, car park building, and all external works and services providing a fully self-contained aircraft maintenance facility for Emirates Airline at Dubai International Airport.

14 15 Queen Alia International Airport, Amman Jordan

Design, engineering, construction, financing and operation of the Airport. The design and construction contract undertaken by the J&P Group covers the construction of a new modern Terminal Building of 130,000 sq.m, the resurfacing of the taxiways and renovations of the existing terminal and related external works.

16 17 King Fahd International Airport, Dammam Saudi Arabia

The King Fahd International Airport (KFIA) control of International Airports Projects (IAP), has been constructed to meet the increasing a directorate of the Ministry of Defence and needs of the Eastern region for air transport Aviation. services and to accommodate increased traffic Saudi Arabia Bechtel Co. was the construction of passengers and cargo. KFIA is located 50 management contractor for this project. kilometres northwest of Dammam on a sprawling Joannou & Paraskevaides (Overseas) Ltd site of 528 square kilometres.The airport will participated in the King Fahd International meet the needs of the Eastern Province well Airport with the construction of the following into the next century. It was built under the three projects.

18 1.The Passenger Terminal Building

The Passenger Terminal Building, encompassing Moving sidewalks, escalators and elevators commercial passenger facilities for Saudia Airline minimize the walking distances within the and foreign carriers, is a six level building that will Passenger Terminal Complex rightfully form a world notable landmark for years The departures level is 56,000 sq. mtrs, the to come. boarding levels 54,000 sq. mtrs. and the arrivals Standing inside the Passenger Terminal, one level which contains the baggage claim area with is overwhelmed by its extremely high quality six 60-metres carousels is 64,000 sq. mtrs in standards and by its immensity of 327,390 area. The lower two levels, the service level and square metres of gross floor area. mezzanine, encompass 68,000 sq. mtrs.

19 King Fahd International Airport 2. The Passenger Concourse Building 3. The Administration Building Complex

The Passenger Concourse consists of three airside of the main passenger building and is of levels comprising the arrivals, boarding and similar construction to the Passenger Terminal departures lounges on the ground, middle and Building. It includes the VIP sections, and the top levels respectively. arrivals, boarding and departures lounges. The Concourse Building currently has five This section of the Concourse features superb boarding bridges which, together with the six quality finishes including marble floors and walls, fixed gates in the Passenger Terminal, can custom metal ceilings, custom carpets and rugs, serve 20 aircraft simultaneously. The Concourse silk fabric wall panelling, bronze screens and Building is an extension of the north and south bronze cladding.

20 3. The Administration Building Complex

The Administration Building is a two-storey building of 7000 square metres consisting of general office and administration areas and a medical section. The project includes associ- ated car parks, site development and utilities.

21 Allama lqbal International Airport, Lahore Pakistan

A modern airport development project having aprons, taxiways, roads, car parks, water handling capacity of 6.5 million passengers tower, underground water reservoir and other per year comprising a five-level terminal related facilities and services. building with separate departure and arrival levels, telescopic passenger boarding bridges, a departure level approach bridge,

22 23 Eleftherios Venizelos International Airport, Athens Greece

Eleftherios Venizelos Airport project at hydrant refuelling system and pedestrian Spata Athens involved the execution of bridge including all electrical & mechanical five contracts by J&P. These included the installations, ancillary works and services construction of the Control Tower and ATC Building, two Cargo Buildings, the Catering Building, extension of taxiways,

24 25 Abu Dhabi International Airport United Arab Emirates Phase 1: Infrastructure

Abu Dhabi’s International Airport, which The first phase consisted of the construction of a was constructed between the years 4100m long runway with two parallel and many 1977 to 1980, is one of the largest in the interconnecting taxiways, all surfaced with flexible Middle East and was based on the most bitumen pavement totalling 1,592,000 cubic metres. modern design concepts of passenger There were three pavement concrete aprons of a handling and safety. total area of 79,800 square meters andapproximately The contract was awarded in three 20 kilometres of access roads. The first phase also separate phases to J&P. included the electrical and specialist works to landing and lighting systems and included the provision and laying of 210.5 kilometres of electrical cable.

26 Phase 2: General Buildings Phase 3: Access Road to the Airport

The second phase consisted of the The third phase consisted of the construction of construction of all the general buildings of a 14.5 kilometres long dual carriageway surfaced the airport. The largest and most important with flexible bitumen pavement. The Access Road of these 13 buildings are the Cargo Terminal was constructed across salt marshes to connect the Building, various warehouses and the airport to the existing Dubai - Abu Dhabi highway. Aircraft Catering Building. All the buildings The contract also included the construction of pre- were constructed with a concrete frame to stressed concrete bridges over the dual carriageway the most modern design. This phase also with all necessary slip roads as well as all culverts, included all related mechanical and electrical guard rails, traffic signs and road markings services and associated external works.

27 Seeb International Airport, Muscat Sultanate of Oman

1971 was the year when the Sultanate of Oman started The works were completed in the record time of 22 its major economic development. One of the priorities months. Due to the excellent performance and timely was to construct a modern airport which in addition to completion of this project, J&P was awarded additional being capable of handling the future air traffic needs of contracts in the Seeb Airport complex. These included the Country would be used as a connecting point for the technical facilities building, aircraft catering building, traffic between Europe and Asia. the Seeb Airport runway extension, the holding lounge, The construction of runways, taxiways and infrastructure cargo aprons, radar system, the Royal Oman Police started in July 1971 and soon after J&P was awarded the hangar complex, the VIP lounge and many other smaller contract of the terminal building, the cargo building and contracts the fire and rescue building.

28 Royal Flight Complex Sultanate of Oman

Shortly after the successful and timely completion of large aircraft hangar in parabolic form constructed the Seeb International Airport, J&P was selected by with laminated timber. His Majesty the Sultan of Oman to build the airport All finishes in the royal pavilion and terminal building facilities for the Royal Flight Complex. were of superb standard and materials of excellent The works commenced in September 1974 and quality were used in the project. were completed in April 1977. Additional concrete aprons and taxiways were added The project included the royal pavilion, terminal to the contract later, together with airfield lighting building incorporating royal accommodation and a and all the related external works.

29 Thumrait Airbase Sultanate of Oman

J&P was the selected contractor to build an Air Base buildings, control tower, office and storage facilities, in the southern region, in the record time of one messes and all associated external works and year. To meet this big challenge, J&P worked round electromechanical services. the clock, mobilizing all resources including long- The above establishments were subsequently term chartered aircraft for air lifting materials and expanded and J&P was awarded again all personnel to this remote site. comprehensive construction works. The works consisted of all the temporary and These included the Integrated Air Defence System permanent accommodation, support facilities, with sophisticated buildings and facilities under the helicopter and aircraft hangars, communication supervision of British Aerospace Corporation

30 Salalah Airport Complex Sultanate of Oman

In Dhofar Province, the southern region of the Country, contract included the construction of the cargo building, J&P has constructed this Airport under various phases. fire & rescue and maintenance buildings together with The first contract was the construction of a 3km runway the accommodation compound. The Company has also with connecting taxiways, concrete aprons, control tower, constructed the Sultan of Oman Air Force Development power station, airfield lighting and extensive anti-flood which included aircraft hangars with all associated works including a guard dam and drainage channels. facilities, air movement terminal, communications, The works continued with the construction of the Control maintenance and technical facilities buildings, Tower and Communications Building, erection of the accommodation buildings, barracks, cookhouses, radar installations with all associated mechanical and messes, administration buildings, married quarters and all electrical works, roads and parking areas. Another major associated external works, facilities and infrastructure.

31 Denver International Airport Colorado, USA

A project by 3Bs (Ball, Ball & Brosamer), a J&P project, 3Bs poured 1.2 million cubic yards of Group Subsidiary. concrete. In addition to concrete and asphalt The City and County of Denver awarded 3Bs the paving of the shoulders, the contract included project of constructing two runways, concourse earthwork excavation, lime and cement soil B and C, aprons and the east taxiways. 3Bs stabilization, airfield lighting, utility vaults, and completed this project in March, 1994. other installations. Over the course of this 140 million dollar

32 Los Angeles International Airport California, USA

A project by 3Bs, a J&P Group Subsidiary. cross-taxiways involved removing the existing The City of Los Angeles awarded 3Bs (Ball, Ball runway and replacing it with a new section & Brosamer) this contract to reconstruct a major consisting of compacted fill, two layers of base runway at Los Angeles International Airport. 3Bs course and a 15-inch thick layer of concrete. completed the job in June 1988. Construction also included electrical lighting. Reconstruction of the runway and adjoining

33 Sky Harbor International Airport, Phoenix Arizona, USA

A project by 3Bs, a J&P Group Subsidiary. completed the work in 1990. The City of Phoenix Arizona, awarded 3Bs The sheer volume of concrete placed, the project of constructing this Airport’s combined with the difficulties of having to 4 aprons, taxiways and hydrant fuelling work on a fully operating airport, made this system, which involved high quality work project especially challenging. on one of America’s busiest airports. 3Bs

34 Complete List of Airport Contracts

35 Sultanate of Oman

Sultanate of Oman Description of works Consultant/ Engineer Client Description of works Consultant // Engineer Client

SEEB INTERNATIONAL AIRPORT Construction of a completely new International Netherlands Airport Government of the Airport Complex including all buildings, Consultants Sultanate of Oman infrastructureinfrastructureSultanate of and Oman services therein. In more detail, construction of the runways, taxiways, aprons, passengerDescription terminal of works building, cargo terminal building, Consultant / Engineer Client control tower and all ancillary buildings with all mechanicalSEEB INTERNATIONAL and electrical works.AIRPORT The contract included distributionConstruction of ofwater a completely and power, new airport International lighting system, Netherlands Airport Government of the sewageAirport Complex treatment including plant, water all buildings, reservoir, pumping main Consultants Sultanate of Oman andinfrastructure all other services. and services therein. In more detail, construction of the runways, taxiways, aprons, THUMRAITpassenger terminal AIRBASE building, - PROJECT cargo terminal33 building, Permanentcontrol tower and and temporary all ancillary accommodation buildings with all Sir William Halcrow Ministry of Defence formechanical a complete and new electrical military works. base, Thesupport contract included & Partners facildistributionitiesities (mechanical of water and and power, electrical,electrical, airport etc. lighting) system, hangars,sewage treatment communication plant, waterbuildings, reservoir, control pumping main tower,and all office other andservices. storage facilities, officers' messes, sports facilities and all associated works.THUMRAIT AIRBASE - PROJECT 33 Permanent and temporary accommodation Sir William Halcrow Ministry of Defence for a complete new military base, support & Partners IADS, THUMRAIT ANDAND SALALAH Majorfacilities upgrading (mechanical and expansionand electrical, of the etc. existing) British Aerospace Ministry of Defence Majorhangars, upgrading communication and expansion buildings, of the control existing British Aerospace Ministry of Defence military airbase (built by J&P) with all modern Corporation tower, office and storage facilities, officers' and sophisticated buildings and facilities under the messes, sports facilities and all associated Integrated Air Defence System (IADS) project. works.

ROYAL FLIGHT COMPLEX, SEEB AirportIADS, THUMRAITfacilities of Royal AND SALALAHstandard for His Netherlands Airport Directorate Majesty'sMajor upgrading Royal Flight and expansion 3km long runway,of the existing ConsultantsBritish Aerospace MinistryGeneral of of Defence includingincludingmilitary airbase the royal (built pavilion, by J&P) terminalterminal with all building modern Corporation His Majesty's incorporatingincorporatingand sophisticated royal buildings accommodation and facilities and large under the Properties hangarIntegrated to house Air Defence His Maj Systemesty's airplanes. (IADS) project. Also constructionion ofof taxiways,taxiways, aprons, pavements, airfieldROYAL lighting FLIGHT and COMPLEX, all related SEEBexternal works includingincludingAirport facilities mechanical of Royal and standard electrical for His Netherlands Airport Directorate installations.Majesty's Royal Flight 3km long runway, Consultants General of installations. including the royal pavilion, terminal building His Majesty's incorporating royal accommodation and large Properties SALALAHhangar to house AIRPORT His Maj esty's airplanes. Also SALALAHconstruction AIRPORT of taxiways, aprons, pavements, Construction of 3 km longlong runway, connecting Netherlands Airport Ministry of airfield lighting and all related external works taxiways, concrete aprons, control tower, wadi Consultants Communications interceptorincluding mechanical and guard anddam, electrical drainage channels, interceptorinstallations. and guard dam, drainage channels, power station, airfield lighting.

COMMUNICATIONS BUILDING, SALALAH AIRPORT ConstructionConstruction of a3 verykm long high runway standard, connecting sophisticated Netherlands Airport CommunicationsMinistry of ConstructionCommunicationstaxiways, concrete of the Building aprons,radar head for control the building Salalah tower, with wadiAirport all , Consultants Communications associatedcinterceptoronstruction trenchingand of theguard radar and dam, head cabling. drainage building Includ channels, withed inall the contractassociatedpower station, are trenching all airfieldassoc iatedand lighting. cabling. mechanical Includ anded in the electricalcontract are installations, all associated external mechanical works including and roads,electricalCOMMUNICATIONS parking installations, areas etc. BUILDING, external works including roads,SALALAH parking AIRPORT areas etc. Construction of a very high standard sophisticated Communications Construction of the radar head building with all 36 associated trenching and cabling. Included in the 36contract are all associated mechanical and electrical installations, external works including 36roads, parking areas etc.

36 DescriptionDescriptionDescription ofof of worksworks works Consultant CConsultantonsultant/ / Engineer / EEngineerngineer Client CClientlient

TECHNICALTECHNICAL FACILITIES FACILITIES BUILDING, BUILDING, SEEB SEEB AIRPORTAIRPORT ConstructionConstruction of of the the Communications Communications Building Building PANPAN-AM-AM MinistryMinistry of of forfor the the Airport. Airport. CommunicationsCommunications

FIREFIRE RESCUE, RESCUE, CAD CAD MAINTENANCE MAINTENANCE & & CARGOCARGO BUILDING BUILDING FOR FOR DGCA DGCA AT AT SALALAH SALALAH ConstructionConstruction of of fire fire rescue rescue building, building, cargo cargo building building NetherlandsNetherlands Airport Airport MinistryMinistry of of andand maintenance maintenance building building at at Salalah Salalah Airport Airport and and ConsultantsConsultants CommunicationsCommunications alsoalso construction construction of of a a3 -3storey-storey building building of of ten ten flats flats inin the the D.G.C.A. D.G.C.A. camp camp at at Salalah. Salalah.

AIRCRAFTAIRCRAFT CATERING CATERING BUILDING, BUILDING, SEEB SEEB AIRPORTAIRPORT CateringCatering building building for for Seeb Seeb International International Airport Airport AusconAuscon Consultants, Consultants, MinistryMinistry of of approx.approx. 4000 4000 sq sq. m.,. m., steel steel structure structure CommunicationsCommunications withwith concrete concrete block block walls walls and and suspended suspended ceiling ceiling system.system. The The building building includes includes cold cold stores, stores, dining dining rooms,rooms, offices, offices, access access roads, roads, parking parking areas, areas, fencing.fencing. etc.. etc..

SEEBSEEB AIRPORT AIRPORT RUNWAY RUNWAY EXTENSION EXTENSION ExtensionExtension of of runway runway and and main main taxiway taxiway by by 533m 533m to to NetherlandsNetherlands Airport Airport MinistryMinistry of of a atotal total length length of of 3500m 3500m at at Seeb Seeb International International Airport. Airport. ConsultantsConsultants CommunicationsCommunications WorksWorks also also included included the the construction construction of of connecting connecting taxiways,taxiways, wadi wadi intercepto interceptor, r,service service and and crush crush roads, roads, safetysafety fencing, fencing, drainage drainage channels, channels, relocation relocation of of existingexisting services, services, airfield airfield lighting lighting and and installations installations of of ILS ILS equipment equipment and and antennas. antennas.

ROYALROYAL FLIGHT FLIGHT HELIPAD HELIPAD & &HELICOPTER HELICOPTER HANGARHANGAR AT AT SALALAH SALALAH ConstructionConstruction of of a ahelicopter helicopter hangar hangar for for GeneralGeneral design, design, DiwanDiwan of of H .M.H.M. threethree helicopters helicopters with with a aconcrete concrete helipad helipad H.M.'sH.M.'s Properties Properties ProtocolProtocol andand an an asphalted asphalted area area of of 20,000 20,000 sq sq. m,. m,. .

HOLDINGHOLDING LOUNGE LOUNGE - SEEB- SEEB AIRPORT AIRPORT ConstructionConstruction of of a alounge lounge to to hold hold the the full full Jumbo Jumbo load load NetherlandsNetherlands Airport Airport MinistryMinistry of of ofof passengers passengers in in transit transit and and also also to to serve serve as as a a ConsultantsConsultants CommunicationsCommunications departuredeparture lounge. lounge. Steel Steel frame frame structure structure with with cavity cavity wallwall cladding cladding and and aluminium aluminium frames frames fascia. fascia.

CARGOCARGO APRONS, APRONS, SEEB SEEB AIRPORT AIRPORT ConstructionConstruction of of a aconcrete concrete cargo cargo apron apron at at Seeb Seeb Netherlands,Netherlands, Airport Airport MinistryMinistry of of AirportAirport 195 195 x x70 70 x x0.33 0.33 metres, metres, and and also also ConsultantsConsultants CommunicationsCommunications constructionconstruction of of connecting connecting taxiways, taxiways, access access roads, roads, airfieldairfield lighting, lighting, street street lighting, lighting, drainage, drainage, culverts, culverts, etc. etc.

RADARRADAR SYSTEM SYSTEM - SEEB- SEEB AIRPORT AIRPORT ConstructionConstruction o fo instrumentf instrument rooms rooms and and generator generator NetherlandsNetherlands Airport Airport MinistryMinistry of of househouse and and also also 9 9km km of of trenching trenching with with ducting ducting and and ConsultantsConsultants CommunicationsCommunications cablescables (signal (signal and and power). power).

3737 37 Sultanate of Oman

Description of works Consultant/ Engineer Client Description of works Consultant / Engineer Client R.O.P. HANGAR COMPLEX AT SEEB AIRPORT

Construction of an aircraft hangar for the Royal Oman Police, fire sub-station, explosives stores, Netherlands Airport Royal Oman utilities building, accommodation block, social club Consultants Police building and cinema, including all associated external works. Work also included the construction of aircraft concrete apron.

SOAF SALALAH REDEVELOPMENT Various facilities in upgrading and modernising John Harris Associates Ministry of Defence the existing SOAF camp and SOAF terminal in Salalah (South Oman). Additional accommodation, messes, training centres, maintenance, storage, technical and welfare, additional aircraft parking aprons, sports facilities, shops, cinema, HQ buildings, officers housing, communications buildings and air movements terminal. Ancillary roads, infrastructure, services and power generation.

VIP LOUNGE AT SEEB INTERNATIONAL AIRPORT Construction of a two-storey reception building Consulting Engineering Ministry of for VIP passengers at Seeb Airport with high Services, India Communications quality finishes, concrete walls, marble flooring, including all associated external works.

38 38 Saudi Arabia Saudi SaudiArabia Arabia Saudi Arabia SaudiSaudiSaudiSaudi Arabia ArabiaArabia Arabia Description of works DescriptionDescription of works of works CConsultantonsultant/Consultant / EngineerEngineer / Engineer CClientlient Client DescriptionDescriptionDescription ofof of worksworks works DescriptionDescription of of works works ConsultantConsultantConsultantConsultant // /EngineerEngineer/ EngineerEngineer ClientClientClientClient DHAHRANDHAHRAN AIRPORT AIRPORT Consultant / Engineer Client DHAHRANDHAHRANConstruction AIRPORT AIRPORT of aprons and extension and DHAHRANDHAHRANDHAHRANConstruction AIRPORT AIRPORT AIRPORT of aprons and extension and NetherlandsNetherlands Airport Airport GovernmentGovernment of of ConstructionConstructionresurfacing ofof of apronsrunways aprons and and extension extensiontaxiways and and ConstructionConstructionConstructionresurfacing of of aprons ofaprons aprons of and runwaysand and extension extension extension and taxiways and and and NetherlandsNetherlandsNetherlandsNetherlandsConsultantsConsultants AirportAirport Airport Airport GovernmentGovernmentGovernmentGovernmentSaudi ArabiaSaudi ofof ofof Arabia resurfacingresurfacingresurfacing ofof of runwaysrunways runways andand and taxiwaystaxiways taxiways Netherlands Airport Government of resurfacingresurfacing of ofrunways runways and and taxiways taxiways ConsultantsConsultantsConsultantsConsultants SaudiSaudiSaudiSaudi ArabiaArabia ArabiaArabia AIRCRAFT SUPPORT FACILITIES, Consultants Saudi Arabia AIRCRAFT SUPPORT FACILITIES, AIRCRAFTAIRCRAFTDHAHRAN, SUPPORT SUPPORT RIYADH FACILITIES,& FACILITIES, KHAMIS MUSHAYT AIRCRAFTAIRCRAFTAIRCRAFTDHAHRAN, SUPPORT SUPPORT SUPPORT RIYADH FACILITIES, FACILITIES, FACILITIES, & KHAMIS MUSHAYT DHAHRAN,DHAHRAN,Design and RIYADH constructionRIYADH & &KHAMIS KHAMIS of several MUSHAYT MUSHAYT technical British Aerospace plc Royal Saudi Air-force / DHAHRAN,DHAHRAN,DHAHRAN,Design RIYADH RIYADH RIYADH and construction& & KHAMIS &KHAMIS KHAMIS MUSHAYT ofMUSHAYT MUSHAYTseveral technical British Aerospace plc Royal Saudi Air-force / DesignDesignand non and and-technical construction construction facilities of of several forseveral aircraft technical technical BritishBritish Aerospace Aerospace plc plc RoyalRoyalBritish Saudi Saudi Aerospace Air Air-force-force plc / / DesignDesignDesign and andand and construction construction non construction-technical of of several offacilitiesseveral several technical technicalfor technical aircraft BritishBritishBritish Aerospace Aerospace Aerospace plc plc plc RoyalRoyalRoyal Saudi Saudi SaudiBritish Air Air Air- Aerospaceforce-force-force / / / plc andandmaintenance non non-technical-technical and facilities personnelfacilities for for support,aircraft aircraft required BritishBritishBritish AerospaceAerospace Aerospace plcplc plc andandand non non non-technical-maintenancetechnical-technical facilities facilities facilities and forpersonnel for foraircraft aircraft aircraft support, required BritishBritish Aerospace Aerospace plc plc maintenancemaintenancefor the operation and and personnel of personnel military support, airport, support, includingrequired required maintenancemaintenancemaintenancefor the and and andoperation personnel personnel personnel of support, militarysupport, support, airport,required required required including forforflying the the operation wing, operation squadron of of military military headquarters airport, airport, including including and forfor forthe the the operation operation flyingoperation wing, of of military ofmilitary squadron military airport, airport, airport, headquarters including including including and flyingflyingconcrete wing, wing, apronssquadron squadron headquarters headquarters and and flyingflyingflying wing, wing, wing,concrete squadron squadron squadron aprons headquarters headquarters headquarters and and and concreteconcrete aprons aprons concreteconcreteconcrete aprons aprons aprons CENTRALCENTRAL AIRBASE AIRBASE AL KHARJ AL KHARJ CENTRALCENTRALConstruction AIRBASE AIRBASE of runway, AL AL KHARJtaxiways, KHARJ aprons, Frank E. Basil Inc. General CENTRALCENTRALCENTRALConstruction AIRBASE AIRBASE AIRBASE AL ofAL ALrunway, KHARJ KHARJ KHARJ taxiways, aprons, Frank E. Basil Inc. General ConstructionConstructionConstructionConstructionmain roads,main ofof water,of of roads, runway,runway, runway,runway, sewage water, taxiways,taxiways, taxiways,taxiways, sewageand electrical aprons,aprons, aprons,aprons, and electrical FrankFrank E. E. Basil Basil Inc. Inc. GeneralGeneralDirectorate of Construction of runway, taxiways, aprons, FFrankrankFrank E. E. Basil E.Basil Basil Inc. Inc. Inc. GeneralGeneralGeneral Directorate of mainmainmainmaininstallations roads,roads, roads,roads,installations water,water, water, water,for a sewagenewsewage sewagesewage for airbase. a new andand andand electricalairbase. electrical electricalelectrical DirectorateDirectorateMilitary works of of main roads, water, sewage and electrical DirectorateDirectorateDirectorateMilitary of of of works installationsinstallationsinstallationsinstallations forfor forfor aa a anewnew newnew airbase.airbase. airbase.airbase. MilitaryMilitaryMinistry works works of Defence installations for a new airbase. MilitaryMilitaryMilitary works worksMinistry works of Defence Ministryand Aviation of Defence MinistryMinistryMinistry of ofofand Defence DefenceDefence Aviation andMinistry Aviation of Defence andandand Aviation AviationAviation AIRBASE FACILITIES, AL KHARJ and Aviation AIRBASE FACILITIES, AL KHARJ AIRBASEAIRBASEAIRBASEAIRBASEDesign andDesign FACILITIES,FACILITIES, FACILITIES,FACILITIES, construction and construction ALAL ALAL of KHARJKHARJ KHARJfamilyKHARJ of family AIRBASE FACILITIES, AL KHARJ British AerospaceBritish Aerospace plc plc Royal SaudiRoyal Air Saudi-force Air -force DesignDesignDesignDesignhouses, andand andandhouses, bachelor constructionconstruction constructionconstruction bachelor accommodation, ofof ofof familyaccommodation,family familyfamily Design and construction of family BritishBritishBritish AerospaceAerospace Aerospace plcplc plc RoyalRoyal Saudi Saudi Air Air-force- force houses,houses,houses,squadron bachelorbachelor squadronbachelor headquarters accommodation,accommodation, accommodation,headquarters and runway and runway BritishBritish Aerospace Aerospace plc plc RoyalRoyalRoyal Saudi Saudi Saudi Air Air Air-force-force-force houses,houses, bachelor bachelor accommodation, accommodation, squadronsquadronextension, headquarters headquarters including support and and runway runwayfacilities squadronsquadronsquadronextension, headquarters headquarters headquarters including and and and runway runwaysupport runway facilities extension,extension,and all related including including infrastructure. support support facilities facilities extension,extension,extension,and including including includingall related support support support infrastructure. facilities facilities facilities andand all all related related infrastructure. infrastructure. andandand all all allrelated related related infrastructure. infrastructure. infrastructure. KING FAHD INTERNATIONAL AIRPORT, KING FAHD INTERNATIONAL AIRPORT, KINGKINGKINGKINGDammam FAHFAH FAHFAHDammamDD D D INTERNATIONALINTERNATIONAL INTERNATIONALINTERNATIONAL AIRPORT,AIRPORT, AIRPORT,AIRPORT, DammamKING FAH D INTERNATIONAL AIRPORT, DammamDammamDammam(A) PASSENGER TERMINAL BUILDING Dammam(A) PASSENGER TERMINAL BUILDING Saudi ArabianSaudi Arabian Ministry ofMinistry Defence of Defence (A)(A)(A)(A)Construction PASSENGER PASSENGER PASSENGERPASSENGERConstruction of the TERMINALTERMINAL TERMINALTERMINAL passenger of the passenger BUILDINGBUILDING BUILDINGBUILDINGterminal ter building minal buildingfor Saudi forSaudiBechtel Arabian Arabian Co. Ltd. MinistryMinistryand Aviation of of Defence Defence (A) PASSENGER TERMINAL BUILDING SaudiSaudiSaudi Arabian Arabian ArabianBechtel Co. Ltd. MinistryMinistryMinistry of ofand Defence ofDefence Defence Aviation ConstructionConstructionConstructionthe Kingthe Fah ofKingof dof the theInternational the Fah passengerpassenger passengerd International Airport. terter terminalminalminal Airport. buildingbuilding building forfor for BechtelBechtel Co. Co. Ltd. Ltd. andand Aviation Aviation ConstructionConstruction of ofthe the passenger passenger ter terminalminal building building for for BechtelBechtelBechtel Co. Co. Co. Ltd. Ltd. Ltd. andandand Aviation Aviation Aviation thethe King King Fah Fahd dInternational International Airport. Airport. thethethe King King King Fah Fah Fahdd International Internationald International Airport. Airport. Airport. (B) CONCOURSE(B) CONCOURSE BUILDING BUILDING Saudi ArabianSaudi Arabian Ministry ofMinistry Defence of Defence (B)(B)(B)Construction CONCOURSECONCOURSE CONCOURSEConstruction of the BUILDINGBUILDING BUILDINGconcourse of the concourse building, building, passenger passenger SaudiSaudiBechtel Arabian Arabian Co. Ltd. MinistryMinistryand Aviation of of Defence Defence (B)(B) CONCOURSE CONCOURSE BUILDING BUILDING SaudiSaudiSaudi Arabian Arabian ArabianBechtel Co. Ltd. MinistryMinistryMinistry of ofand Defence ofDefence Defence Aviation ConstructionConstructionConstructionterminalterminal aprons, ofof of thethe the aprons,operations concourseconcourse concourse operations tower, building,building, building, guard tower, passengerpassenger passenger shelters, guard shelters, BechtelBechtel Co. Co. Ltd. Ltd. andand Aviation Aviation ConstructionConstruction of ofthe the concourse concourse building, building, passenger passenger BechtelBechtelBechtel Co. Co. Co. Ltd. Ltd. Ltd. andandand Aviation Aviation Aviation terminalterminalparking aprons, structureaprons, operations operations and roads tower, tower,and otherguard guard special shelters, shelters, terminalterminalterminal aprons, parkingaprons, aprons, operations structureoperations operations and tower, tower, tower,roads guard guard andguard shelters, othershelters, shelters, special parkingparkingairport structure systems. structure and and roads roads and and other other special special parkingparkingparking structure structureairport structure systems. and and and roads roads roads and and and other other other special special special airportairport systems. systems. airportairportairport systems. systems. systems. (C) ADMINISTRATION(C) ADMINISTRATION BUILDING BUILDING Saudi ArabianSaudi Arabian Ministry ofMinistry Defence of Defence (C)(C)(C)(C)Completion ADMINISTRATION ADMINISTRATION ADMINISTRATIONCompletion of administration of BUILDINGadministrationBUILDING BUILDING building buildinginclusive inclusive of ofSaudi SaudiBechtel Arabian Arabian Co. Ltd. MinistryMinistryand Aviation of of Defence Defence (C)ADMINISTRATION ADMINISTRATION BUILDING BUILDING SaudiSaudiSaudi Arabian Arabian ArabianBechtel Co. Ltd. MinistryMinistryMinistry of ofand Defence ofDefence Defence Aviation CompletionCompletionCompletionstructuralstructural steelwork, ofof of administrationadministration administration steelwork, precast buildingbuilding precawalling,buildingst inclusive inclusive walling, internalinclusive internal andofof of andBechtel Bechtel Co. Co. Ltd. Ltd. andand Aviation Aviation CompletionCompletion of ofadministration administration building building inclusive inclusive of of BechtelBechtelBechtel Co. Co. Co. Ltd. Ltd. Ltd. andandand Aviation Aviation Aviation structuralstructuralexternal steelwork, finishes steelwork, including preca precast st asphaltwalling, walling, paving,internal internal and and structuralstructuralstructural externalsteelwork, steelwork, steelwork, finishes preca preca preca includingstst walling, stwalling, walling, asphalt internal internal internal paving, and and and externalexternallandscaping finishes finishes and including includinginternal/external asphalt asphalt paving, mechanicalpaving, and externalexternalexternal finishes landscapingfinishes finishes including including including and internal/externalasphalt asphalt asphalt paving, paving, paving, mechanical and landscapinglandscapingelectrical installations. and and internal/external internal/external mechanical mechanical and and landscapinglandscapinglandscapingelectrical and and and internal/external internal/external installations. internal/external mechanical mechanical mechanical and and and electrical electricalelectrical installations.installations. installations. electricalPagePageelectrical 39 39 installations. installations.

TSP TSP – –DHAHRAN DHAHRAN DesignDesign and and construction construction of of the the facilities facilities BritishBritish Aerospace Aerospace plc plc RoyalRoyal Saudi Saudi Airforce Airforce / / withwith the the necessary necessary infrastructure infrastructure for for military military BritishBritish Aerospace Aerospace plc plc aircraftaircraft located located on on King King Abdul Abdul Aziz Aziz Airbase Airbase in in Dhahran.Dhahran. The The main main facility facility is is a ahangar hangar of of 20,00020,000 sq. sq. mtrs mtrs with with a anumber number of of support support buildingsbuildings and and workshops. workshops. 39 39 39 39393939

39 Pakistan

Pakistan Description of works Consultant/ Engineer Client Description of works Consultant / Engineer Client

ALLAMA IQBAL INTERNATIONAL AIRPORT Lahore (Participation in Joint Venture 65%). NESPAK Pakistan Civil Aviation Ultramodern airport development project, having Authority, a handling capacity of 6.5 million passengers Government per year and comprising the terminal building of Pakistan (covered area 71,000 sq. m), taxiways and interconnections (3,200 m x 23 m), aprons (150,000 sq. m), water tower, car park and road- works, including all electromechanical installations and external works and services.

40

40 Libya Libya Libya Libya Description of works Libya Libya Consultant/ Engineer Client LibyaLibyaLibya LibyaLibya Description of works Consultant / Engineer Client DescriptionDescriptionDescriptionDescription of of works worksof works of works ConsultantConsultantConsultantConsultant / /Engineer Engineer / Engineer / Engineer ClientClientClient Client DescriptionDescriptionDescriptionDescription Descriptionof works of of works works of of worksworks ConsultantConsultantConsultant Consultant/Consultant Engineer / Engineer/ Engineer // EngineerEngineer ClientAIRSTRIPClient Client ClientClient UPGRADE AT RAS LANUF AIRSTRIPAIRSTRIPAIRSTRIP UPGRADE AIRSTRIPUPGRADE UPGRADE UPGRADEAT AT ATRAS RAS RAS LANUF LANUF AT LANUF RAS LANUFUpgrading of existing airstrip. Removal of Mobil Oil Mobil Oil Upgrading ofUpgrading existing airstrip.of existing Removal airstrip. of Removal existing of surfacesMobil and Oil reconstructionMobil Oil with Mobil Oil Mobil Oil AIRSTRIPAIRSTRIPAIRSTRIP UPGRADEAIRSTRIPAIRSTRIP UPGRADE UPGRADE AT UPGRADEUPGRADE ATRAS AT RAS RASLANUF ATLANUFAT LANUF RASRAS LANUF LANUFUpgradingUpgrading of existingof existing airstrip. airstrip. Removal Removal of of MobilMobil Oil Oil MobilMobil Oil Oil UpgradingUpgradingUpgrading ofUpgradingUpgrading existing of of existing existing airstrip. ofof airstrip. existing existingairstrip. Removal Removal airstrip. airstrip.Removal of RemovalRemovalof of existing existingexisting ofof surfaces surfacesMobil existingsurfacesMobilMobil Oiland and surfaces Oiland reconstruction Oilreconstruction MobilMobil reconstruction and OilOil reconstruction with with with Mobil increasedMobilMobil withOil Oil Oil MobilMobillength OilOil and width, supply and existingexistingexisting surfaces surfacesexisting existingsurfaces and surfacesandsurfaces reconstructionand reconstruction reconstruction andand reconstructionreconstruction with with with increasedincreased withwithincreased length lengthincreased length and and and width, lengthwidth, width, supply andsupply supply width, and and and supply installation and of airstrip lighting, all ancillary installation of airstrip lighting, all ancillary increasedincreasedincreased lengthincreasedincreased length length and and width, and lengthlength width, width, supply andand supply supply width,width, and and andsupplysupply installation andandinstallation installation of airstripof airstrip lighting, of lighting,airstrip all lighting, allancillary ancillary all ancillary facilities, reception building, approach installationinstallationinstallation ofinstallationinstallation airstrip of of airstrip airstrip lighting, of oflighting, airstriplighting,airstrip all ancillary all lighting,lighting, all ancillary ancillary allall ancillaryancillary facilities,facilities,facilities, reception receptionfacilities, reception building, building, reception building, approach approach building, approach approach road and relocation of services. facilities,facilities,facilities, reception facilities,receptionfacilities, reception building, reception receptionbuilding, building, approach building,approachbuilding, approach approachapproach roadroadroad and and and relocation relocationroad relocation and of ofrelocation services. services.of services. of services. Total length of airstrip 2,300m, width 42m. roadroad roadand and relocationand roadroadrelocation relocation andand of relocationrelocationservices. of of services. services. ofof services.services. TotalTotalTotal length length lengthTotal of of airstrip airstripof length airstrip 2,300m, 2,300m, of 2,300m,airstrip width width 2,300m, width 42m. 42m. 42m. width 42m. TotalTotalTotal length length length TotalofTotal airstrip of of lengthairstriplength airstrip 2,300m, of of2,300m, airstrip2,300m,airstrip width width2,300m,2,300m, width 42m. 42m. 42m. widthwidth 42m.42m. MARSA BREGA AIRPORT MARSAMARSAMARSA BREGA BREGAMARSA BREGA AIRPORT AIRPORT BREGA AIRPORT AIRPORT Construction of four warehouses and one Sirte Oil Co. Sirte Oil Co. ConstructionConstruction of four warehouses of four warehouses and one andaircraft one hangar. Sirte Total Oil Co.areaS irte of Oilwarehouse Co. Sirte Oil Co.Sirte Oil Co. MARSAMARSAMARSA BREGA BREGAMARSAMARSA BREGA AIRPORT AIRPORTBREGABREGA AIRPORT AIRPORTAIRPORT ConstructionConstruction of fourof four warehouses warehouses and and one one SirteSirte Oil OilCo. Co. SirteSirte Oil OilCo. Co. aircraft hangar. Total area of warehouse ConstructionConstructionConstructionConstruction Constructionof four of of four warehousesfour warehouses warehouses ofof fourfour warehouseswarehousesand and oneand one one andand aircraft aircraft oneone hangar. Shangar.aircraftirteS irte SOilTotalirte hangar. TotalOilCo. Oil area Co. SS Co.irteareairte Totalof OilOil warehouseof Co. Co.warehousearea of warehouse Sirte 6,040Sirte SirteOil OilCo.square Oil Co. SirteSirte Co. metres Oil Oil Co.Co.. Area of aircraft aircraftaircraftaircraft hangar. hangar. aircrafthangar.aircraft Total Total hangar. hangar.Total area area areaof Total Totalwarehouse of of warehouse areawarehousearea ofof warehousewarehouse 6,0406,0406,040 square square square6,040 metres metres metressquare. . Area Area. metres Area of of aircraft aircraftof. Areaaircraft of aircrafthangar 2,400 square metres 6,0406,0406,040 square square square6,0406,040 metres metres squaremetressquare. Area. . Areametres metres Areaof aircraft of of. . aircraft AreaAreaaircraft ofof aircraftaircrafthangarhangarhangar 2,400 2,400 2,400hangar square square square 2,400 metres metres metressquare metres hangarhangarhangar 2,400 2,400 hangar2,400hangar square square square 2,4002,400 metres metres squaremetressquare metresmetres CONSTRUCTION OF AIRSTRIP AT MESLA CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTION OF OF OFAIRSTRIP AIRSTRIP AIRSTRIP OF AT AIRSTRIPAT ATMESLA MESLA MESLA TheAT MESLA work consisted of the construction Arabian Gulf Oil Co. Arabian Gulf Oil Co. The work consistedThe work of consisted the construction of the construction of runway at ArabianMesla 2,200m GulfArabian Oil long, Co. Gulf 30m Oil wide, Co.Arabian GulfArabian Oil(AGOCO) Co. Gulf Oil Co. (AGOCO) CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTION OF OFAIRSTRIP OF AIRSTRIP AIRSTRIP OFOF AT AIRSTRIPAIRSTRIP ATMESLA AT MESLA MESLA ATATThe TheMESLAMESLA work work consisted consisted of theof the construction construction ArabianArabian Gulf Gulf Oil OilCo. Co. ArabianArabian Gulf Gulf Oil OilCo. Co. TheThe workThe work workconsistedThe Theconsisted consisted workwork of consistedtheconsisted of of theconstruction the construction construction ofof thethe constructionconstruction ofof runway runwayof runway at Arabianatof Mesla MeslarunwayatArabian ArabianMesla Gulf2,200m 2,200m at Gulf2,200mArabian ArabianOilMeslaGulf OilCo.long, long, Oil 2,200mCo. long, Gulf GulfCo. 30m 30m Oil30mOil wide, wide,long, Co.Co. wide,Arabian with30mArabianArabian taxiway,wide, Gulf GulfArabian Arabian OilGulf(AGOCO) (AGOCO) parkingOilCo. Oil(AGOCO) Co. Gulf GulfCo. apron, Oil Oil(AGOCO) Co.Co. shoulder (AGOCO)(AGOCO)(AGOCO) (AGOCO) with taxiway, parking apron, shoulder of runwayofof runway runway at ofofMesla at runwayrunwayat Mesla Mesla 2,200m at2,200mat 2,200m MeslaMesla long, long, 2,200m 2,200m long,30m 30m 30mwide, long,long, wide, wide, 30m30mwith with wide, wide,taxiway, taxiway, (AGOCO)with parking(AGOCO) taxiway,(AGOCO) parking apron,(AGOCO)(AGOCO) parkingapron, shoulder shoulder apron, shoulder (AGOCO)protection,(AGOCO)(AGOCO) (AGOCO)(AGOCO) markings and other ancillary

withwith taxiway,with taxiway, taxiway,withwith parking parkingtaxiway,taxiway, parking apron, apron, parking parkingapron, shoulder shoulder shoulder apron,apron, shouldershoulder protection,protection,protection, markings protection,markings markings and and markings and other other other ancillary ancillaryand ancillary other ancillary installations.

protection,protection,protection, markingsprotection,protection, markings markings and markings markingsand otherand other other ancillary andand ancillary ancillary otherother ancillaryancillary installations.installations.installations. installations.

installations.installations.installations.installations. installations. ORA STRIP UPGRADE ORAORAORA STRIP STRIP STRIPORA UPGRADE UPGRADE UPGRADESTRIP UPGRADE Construction of 1500 m of runway. J&P (Overseas) Ltd VEBA OIL ConstructionConstruction of 1500 m of of runway. 1500 m of runway. ORAORAORA STRIP STRIP STRIP ORAORAUPGRADE UPGRADE UPGRADESTRIPSTRIP UPGRADEUPGRADE ConstructionConstruction of 1500of 1500 m ofm runway.of runway. J&PJ&PJ&P (Overseas) (Overseas) (Overseas)J&P Ltd Ltd(Overseas) Ltd Ltd VEBAVEBAVEBA OIL OIL OIL VEBA OIL Operations ConstructionConstructionConstruction Constructionof 1500 of of 1500 1500 m of m ofmrunway. of 1500of runway. runway. m of runway. J&P (Overseas) Ltd NEW WAHAVEBA AIRPORT OIL Operations Operations Construction of 1500 m of runway. J&PJ&P (Overseas)J&P (Overseas) (Overseas)J&P Ltd (Overseas) Ltd Ltd Ltd VEBAVEBAVEBA OIL OIL OILVEBAVEBA OILOIL OperationsOperations NEW WAHANEW AIRPORT WAHA AIRPORT Detailed drawings,Operations design calculations and Waha Oil Co. NEWNEW WAHA WAHA AIRPORT AIRPORT OperationsOperationsOperations OperationsOperations J&P (Overseas) Ltd Detailed drawings,Detailed design drawings, calculations design calculations and construction and of airstrip, 2100 m long with all Waha Oil Co.Waha Oil Co. NEWNEWNEW WAHA WAHA WAHANEWNEW AIRPORT AIRPORT WAHAAIRPORTWAHA AIRPORTAIRPORT DetailedDetailed drawings, drawings, design design calculations calculations and and J&PJ&PJ&P (Overseas) (Overseas) (Overseas)J&P Ltd Ltd(Overseas) Ltd Ltd WahaWaha Oil OilCo. Co. Waha Oil Co. DetailedDetailedDetailed drawings, drawings,DetailedDetailed drawings, design drawings,drawings, design design calculations calculations calculationsdesigndesign calculationsandcalculations and andconstruction construction construction andand construction J&Pof of airstrip, J&P airstrip,of(Overseas)J&P airstrip, (Overseas) (Overseas) 2100 2100ofJ&P airstrip,2100Ltd m (Overseas)m Ltd longLtd longm 2100 long with with Ltd withm all all longWaha necessaryallWaha withWaha Oil Co.allOil Oil Wahaelectrical Co. Co. Oil Co.works and markings. J&P (Overseas) Ltd constructionconstructionconstruction constructionof airstrip, of of airstrip, airstrip, 2100 of 2100 airstrip,2100 m long m m long 2100withlong with all withm longall necessaryallnecessary withnecessary all electrical necessaryelectrical electrical works works electrical works and and and markings. worksmarkings. markings. and markings. construction of airstrip, 2100 m long with all necessarynecessarynecessary electricalnecessary electrical electrical works electricalworks works and and markings.and works markings. markings. and markings. NEW ES-SIDER AIRPORT necessary electrical works and markings. NEWNEW ES -ESSIDERNEW-SIDER AIRPORTES -AIRPORTSIDER AIRPORT Detailed drawings, design calculations and J&P (Overseas) Ltd NEW ES-SIDER AIRPORT Waha Oil Co. NEW ES-SIDER AIRPORT Detailed drawings,Detailed design drawings, calculations design calculations and construction and of airstrip, 2100 m long. Also NEWNEWNEW ES -ESSIDER ES-NEWNEWSIDER-SIDER AIRPORT ESES AIRPORT- -SIDERAIRPORTSIDER AIRPORTAIRPORT DetailedDetailed drawings, drawings, design design calculations calculations and and J&PJ&PJ&P (Overseas) (Overseas) (Overseas)J&P Ltd Ltd(Overseas) Ltd Ltd Waha Oil Co.Waha Oil Co. WahaWaha Oil OilCo. Co. DetailedDetailedDetailed drawings, drawings,Detailed drawings, design drawings, design design calculations calculations calculationsdesign andcalculations and andconstruction construction construction and construction J&Pof of airstrip, J&P airstrip,of(Overseas)J&P airstrip, (Overseas) (Overseas) 2100 2100ofJ&P airstrip,2100Ltd m (Overseas)m Ltd long.Ltd long.m 2100 long. Also Also Ltd mAlso long.construction Also Waha of waiting Oil Co. ro om complete with Detailed drawings, design calculations and J&P (Overseas) Ltd WahaWahaWaha Oil Co.Oil Oil Waha Co.Waha Co. OilOil Co.Co. constructionconstructionconstruction constructionof airstrip, of of airstrip, airstrip, 2100 of 2100 airstrip,2100 m long. m m long. 2100 long.Also Also mAlso long. construction construction constructionAlso construction of of waiting waitingof waiting ro roofomom rowaiting omcomplete complete complete room with with complete with furniture with and fittings. construction of airstrip, 2100 m long. Also constructionconstructionconstruction constructionof waiting of of waiting waiting ro omof ro rowaiting omcompleteom complete complete room with completewith withfurniture furniture furniture with and andfurniture and fittings. fittings. fittings. and fittings. construction of waiting room complete with furniturefurniture andfurniture and fittings. fittings. and fittings. DAHRA AIRSTRIP furniture andfurniture fittings. and fittings. Reconstruction of existing airstrip (1683m X Waha Oil Co. DAHRADAHRADAHRA AIRSTRIP AIRSTRIPDAHRA AIRSTRIP AIRSTRIP Waha Oil Co. ReconstructionReconstruction of existing airstripof existing (1683m airstrip X 37.5m) (1683m and X extension by a further 817m, WahaWaha Oil Co.OilWaha Co. Oil Co. DAHRADAHRADAHRA AIRSTRIP AIRSTRIPDAHRADAHRA AIRSTRIP AIRSTRIPAIRSTRIP ReconstructionReconstruction of existingof existing airstrip airstrip (1683m (1683m X X WahaWahaWaha Oil Oil Co. OilCo.Waha Co. Oil Co. Waha Oil Co. Waha Oil Co. ReconstructionReconstructionReconstructionReconstruction of existing of of existing existing airstrip of airstrip existingairstrip (1683m (1683m (1683mairstrip X X37.5m) (1683m37.5m) X 37.5m) and andX and37.5m) extension Wahaextension WahaextensionWaha Oil and Co.Oil by byOilextension Co.Waha a byaCo. further further a furtherOil byCo.817m, 817m, a 817m,further Waha construction 817m,WahaWaha Oil Co.Oil Oil Waha Co. Co.of parking Oil Co. area and installation of Reconstruction of existing airstrip (1683m X Waha Oil Co. 37.5m)37.5m)37.5m) and and extensionand37.5m) extension extension and by extension aby furtherby a afurther further 817m, by 817m,a 817m,further construction construction817m,construction construction of of parking parkingof parking area areaof parkingarea and and and installation installation area installation and ofinstallation electricalof of equipment. of 37.5m) and extension by a further 817m, constructionconstructionconstruction constructionof parking of of parking parking area of area parkingareaand and installationand areainstallation installation and of installationelectrical electrical of of electrical equipment. equipment. ofelectrical equipment. equipment. construction of parking area and installation of electricalelectricalelectrical equipment. electricalequipment. equipment. equipment. HAMADA RUNWAY electrical equipment. HAMADA RUNWAYHAMADA RUNWAY Runway at Hamada 2,360m long 25m Arabian Gulf Oil Co. HAMADAHAMADA RUNWAY RUNWAY Arabian Gulf Oil Co. HAMADA RUNWAY Runway at HamadaRunway at2,360m Hamada long 2,360m 25m long wide25m and installation Arabian ofGulf aircraft Oil Co. fuelling HAMADAHAMADAHAMADA RUNWAYHAMADAHAMADA RUNWAY RUNWAY RUNWAYRUNWAY RunwayRunway at Hamadaat Hamada 2,360m 2,360m long long 25m 25m ArabianArabian Gulf GulfArabian Oil OilCo. Co. Gulf Oil Co. ArabianArabianArabian Gulf Gulf ArabianGulf Oil Oil Co. OilCo. Co.Gulf Oil Co. Runway at Hamada 2,360m long wide25m and installationwide and ofinstallation aircraftArabian fuelling ofGulf aircraft Oil Co. fuelling system. RunwayRunwayRunway at Hamada atRunway at Hamada Hamada 2,360m at Hamada2,360m 2,360m long long 2,360m 25mlong 25m 25m long 25mwidewide and and installationArabian installationArabianArabian Gulf of Gulf Oil aircraftArabianofGulfArabian Co.aircraftOil Oil Co. fuellingCo. GulfGulf fuelling OilOil Co.Co. ArabianArabianArabian Gulf Gulf OilArabianGulf Co.Oil Oil Co. Co.Gulf Oil Co. system. Arabian Gulf Oil Co. widewide wideand and installationandwide wideinstallation installation andand of installationinstallation aircraft of of aircraft aircraft fuelling ofof fuelling aircraftfuellingaircraft fuellingfuellingsystem.system. system. system.system.system. system.system.

41 4141 41 41 41 4141 4141 41 United Arab Emirates

UnitedUnited Arab Arab Emirates Emirates Description of works Consultant/ Engineer Client DescriptionDescription of of works works ConsultantConsultant / /Engineer Engineer ClientClient

ABUABU DHABI DHABI INTERNATIONAL INTERNATIONAL AIRPORT AIRPORT (A)(A) INFRASTRUCTURE INFRASTRUCTURE AeroportAeroport de de Paris Paris France France PublicPublic Works Works 4100m4100m long long runway, runway, taxiways, taxiways, three three DepartmentDepartment aprons,aprons, over over 20 20 km km of of roads, roads, water water U.A.E.U.A.E. supplysupply services, services, sewage, sewage, irrigation, irrigation, drainage,drainage, electrical electrical network, network, airfield airfield lighting, lighting, etc. etc.

(B)(B) GENERAL GENERAL BUILDINGS BUILDINGS AeroportAeroport de de Paris Paris France France PublicPublic Works Works LargeLarge building building project project including including freight freight DepartmentDepartment terminal,terminal, warehouses, warehouses, catering catering buildings buildings U.A.E.U.A.E. andand all all mechanical mechanical and and electrical electrical services services and and externalexternal works. works.

(C)(C) ACCESS ACCESS ROAD ROAD TO TO ABU ABU DHABI DHABI DrDr Ing. Ing. Walter Walter KG KG Public Public Works Works INTERNATIONALINTERNATIONAL AIRPORT AIRPORT International,International, Germany Germany DepartmentDepartment 14.514.5 km km dual dual carriageway carriageway with with a a U.A.E. U.A.E. prepre-stressed-stressed concrete concrete bridge. bridge.

EMIRATESEMIRATES AIRLINE AIRLINE ENGINEERING ENGINEERING CENTRE CENTRE ConstructionConstruction of of 7 7 m maintenanceaintenance h hangars,angars, AeroportsAeroports de de Paris Paris EmiratesEmirates Airline Airline workshopsworkshops and and stores, stores, central central plant plant & & u utilitiestilities lnginieurslnginieurs building,building, o officeffice & & a administdministrationration b building,uilding, ggateate h house,ouse, mosque, mosque, car car park park b building,uilding, andand all all external external works works and and services services providing providing aa fully fully self self-contained-contained aircraft aircraft maintenance maintenance facility facility for for EmiratesEmirates Airline Airline at at Dubai Dubai International International Airport. Airport.

DUBAIDUBAI INTERNATIONAL INTERNATIONAL AIRPORT AIRPORT ROADS ROADS IMPROVEMENTSIMPROVEMENTS - -PHASE PHASE II II EXPANSIONS EXPANSIONS TerminalTerminal 3 3 and and cargo cargo village village access access r oads.roads. DeDe Leuw Leuw Cather Cather DubaiDubai RelocationRelocation of of Airport Airport road road for for 1.5 1.5 km km in in OverseasOverseas Ltd. Ltd. Municipality,Municipality, associationassociation with with the the development development and and RoadsRoads Dept Dept constructionconstruction of of series series of of ramps ramps and and an an underpassunderpass to to connect connect the the airport airport to to the the new new terminalterminal 3. 3. All All existing existing servic serviceses were were relocated relocated inin the the new new corridor. corridor.

4 4LIGHT LIGHT MAINTENANCE MAINTENANCE AIRCRAFT AIRCRAFT HANGARS HANGARS 4 LIGHT4 LIGHT MAINTENANCE MAINTENANCE AIRCRAFT AIRCRAFT HANGARS HANGARS Design, procurement, fabrication, supply, Aeroports de Paris Design,Design, procurement, procurement, fabrication, fabrication, supply, supply, AeroportsAeroports de deParis Paris Emirates Airline Design, procurement,installation, testing fabrication, and commissioning supply, and AeroportsInginieurs de Paris EmiratesEmirates Airline Airline Emirates Airline installation,installation, testing testing and and commissioning commissioning and and Inginieurs Emirates Airline Emirates Airline installation,defects testing rectification and commissioning of 4 Light andMaintenance InginieursInginieurs EmiratesEmirates Airline Airline defectsdefects rectification rectification of of4 Light4 Light Maintenance Maintenance defects rectificationAircraft Hangars of 4 Light at the Maintenance existing west apron of AircraftAircraft Hangars Hangars at atthe the existing existing west west apron apron of of Aircraft HangarsDubai International at the existing Airport. west apron of DubaiDubai International International Airport. Airport. Dubai International Airport.

4242 42

Greece

GreeceGreece Description of works Consultant/ Engineer Client DescriptionDescription ofof worksworks ConsultantConsultant // EngineerEngineer ClientClient

ELEFTHERIOSELEFTHERIOS VENIZELOSVENIZELOS INTERNATIONALINTERNATIONAL AIRPORTAIRPORT ATAT SPATA,SPATA, AthensAthensGreece CONTROLCONTROL TOWERTOWER ANDAND AIRAIR TRAFFICTRAFFIC Description of works Consultant / Engineer Client CONTROLCONTROL BUILDINGBUILDING ConstructionConstruction ofof thethe ControlControl TTowerower andand thethe HochtiefHochtief A.GA.G HochtiefHochtief A.GA.G AirELEFTHERIOSAir TrafficTraffic CControlontrol VENIZELOS buildingbuilding atat thethe INTERNATIONAL newnew AthensAthens InternationalAIRPORTInternational AT AirportAirport SPATA, atat Spata. Spata. Athens HYDRANTCONTROLHYDRANT REFUELLINGREFUELLINGTOWER AND SYSTEMAIRSYSTEM TRAFFIC AirportCONTROLAirport hydranthydrant BUILDING refuerefuelllingling systemsystem 8",8", BurnsBurns && McDonnellMcDonnell AthensAthens InternationalInternational 10"Construction10" andand 16"16" diameterdiameter of the Control pipelinepipeline Tower and the InternationalHochtiefInternational A.G AirportHochtiefAirport A.G includingAirincluding Traffic allall C ontrolspecialspecial building fittingsfittings at the new Athens International Airport at Spata. HYDRANTHYDRANT REFUELLINGREFUELLING SYSTEMSYSTEM InstallationHYDRANTInstallation ofofREFUELLING 4,500m4,500m 20"20" diameter diameterSYSTEM pipeline,pipeline, AthensAthens InternationalInternational OlympicOlympic FuelFuel cAirportconstructiononstruction hydrant ofof 2,5002,500refue l lingmm electricalelectrical system 8", dductuct --bankbank Airport/ParsonsBurnsAirport/Parsons & McDonnell Co.Co.Athens S.A.S.A. International and10"and manholes.andmanholes. 16" diameter pipeline International Airport including all special fittings CARGOCARGO BUILDINGBUILDINGSS DesignHYDRANTDesign andand REFUELLINGconstructionconstruction ofof SYSTEM twotwo cargocargo buildingsbuildings AthensAthens InternationalInternational AthensAthens InternationalInternational 2 ofofInstallation steelsteel structure,structure, of 4,500m 16,000m16,000m 20" diameter2 areaarea withwith pipeline, 60m.60m. Airport/ParsonsAthensAirport/Parsons International AirportOlympicAirport Fuel andcandonstruction 70m.70m. spansspans of 2,500 includingincluding m electrical ancillaryancillary d worksuctworks-bank andand Airport/Parsons Co. S.A. M&EandM&E manholes. iinnstallationsstallations ..

CATERINGCARGOCATERING BUILDING INSTALLATIONSINSTALLATIONSS DesignDesign andand constructionconstruction ofof thetwothe Catering Cateringcargo buildings buildings,buildings, AthensAthens InternationalInternational Athens Athens Athens InternationalInternational International

73007300of steel sq.sq. structure, mm.. areaarea including16,000mincluding 2 M&EM&E area installations installationswith 60m. andand Airport/ParsonsAirport/Parsons AirportAirport externalexternaland 70m. works.works. spans including ancillary works and M&E installations.

CATERING INSTALLATIONS Design and construction of the Catering buildings, Athens International Athens International 7300 sq. m. area including M&E installations and Airport/Parsons Airport external works.

4343 43

43 Jordan

Jordan

Description of works Consultant/ Engineer Client Description of works Consultant / Engineer Client

QUEEN ALIA INTERNATIONAL AIRPORT, Amman Design, engineering, construction, financing Foster & Partners Airport International and operation of the Airport. The design and Group construction contract undertaken by the J&P Group Group covers the construction of a new modern terminal building of 130,000 sq. m., the resurfacing of the taxiways and renovations of the existing terminal and related external works.

44

44 United States of America

UnitedDescriptionUnited StatesStates of works ofof AmericaAmerica Consultant/ Engineer Client

TheThe following following Airport Airport projects projects in in USA USA have have been been constructed constructed by by 3Bs, 3Bs, a a J&P J&P Group Group Subsidiary.Subsidiary.

Description of works Consultant/EngineerConsultant/Engineer ClientClient Description of works VANDENBERGVANDENBERG AIR AIR FORCE FORCE BASE BASE Vandernberg, Vandernberg, California California SpaceSpace shuttle shuttle landing landing facility facility and and V17 V17 tow tow route route for for CorpsCorps of of Engineers Engineers CorpsCorps of of Engineers Engineers NASA;NASA; included included 15,000 15,000 x x 200 200 feet feet concrete concrete runway runway

STAPLETONSTAPLETON INTERNATIONAL INTERNATIONAL AIRPORT AIRPORT Denver,Denver, Colorado Colorado RemoveRemove and and replace replace runway runway 8L/26R 8L/26R and and IsbillIsbill Associates Associates CityCity & & County County associatedassociated taxiways, taxiways, including including lighting lighting ofof Denver, Denver, USA USA

LIBBYLIBBY ARMY ARMY AIRFIELD AIRFIELD Ft.Ft. Huachuca, Huachuca, Arizona Arizona ConstructionConstruction of of Runway Runway 8 8--26,26, parallel parallel and and BlantonBlanton & & Company Company AirAir Force Force National National connectingconnecting taxiways, taxiways, parking parking apron; apron; GuardGuard Bureau Bureau reconstructreconstruct portions portions of of runways runways 1111--2929 and and 2 2--2020 and and associated associated taxiways; taxiways; relocaterelocate utilities utilities and and roadways roadways

MARINEMARINE AIRFIELD AIRFIELD APRON APRON Yuma,Yuma, Arizona Arizona MiscellaneousMiscellaneous repairs repairs and and replacements replacements CorpsCorps of of Engineers Engineers DeptDept of of U.S. U.S. Navy Navy

LOSLOS ANGELES ANGELES INTERNATIONAL INTERNATIONAL AIRPORT AIRPORT LosLos Angeles, Angeles, California California RunwayRunway 24L 24L reconstruction reconstruction and and adjoining adjoining cross cross P&DP&D Engineering Engineering CityCity & & County County of of taxiways;taxiways; removed removed existing existing runway runway and and replaced replaced it it LosLos Angeles Angeles withwith a a new new section section consisting consisting of of compacted compacted fill, fill, two two layerslayers of of base base courses courses and and a a 15 15 inch inch thick thick layer layer of of concrete.concrete. Construction Construction included included electrical electrical lighting lighting

JOHNJOHN WAYNE WAYNE AIRPORT AIRPORT SantaSanta Ana, Ana, California California TerminalTerminal apron apron and and taxiways, taxiways, blast blast fen fencece and and CH2MCH2M Hill Hill CountyCounty of of Orange Orange aircraftaircraft hydrant hydrant fuel fuel system. system.

SKYSKY HARBOR HARBOR INTERNATIONAL INTERNATIONAL AIRPORT AIRPORT Phoenix,Phoenix, Arizona Arizona TerminalTerminal Four Four aprons aprons and and taxiways taxiways and and hydrant hydrant CityCity of of Phoenix Phoenix CityCity of of Phoenix Phoenix fuellingfuelling system system

TRAVISTRAVIS AIR AIR FORCE FORCE BASE BASE Travis,Travis, California California RunwayRunway repair repair CorpsCorps of of Engineers Engineers Dept.Dept. of of U.S.U.S. Air Air Force Force

45 4545 United States of America

Description of works Consultant/ Engineer Client DescriptionDescriptionDescriptionDescription of of of works works works of works Consultant/EngineerConsultant/EngineerConsultant/EngineerConsultant/Engineer ClientClientClient Client

MUNICIPALMUNICIPALMUNICIPALMUNICIPAL AIRPORT AIRPORT AIRPORT AIRPORT

ColoradoColoradoColorado ColoradoSprings Springs Springs Springs

ConstructionConstructionConstruction of of of runway runway runway 17L/35R 17L/35R 17L/35R CentennialCentennialCentennial Construction of runway 17L/35R Centennial CityCityCity of of of andandand associated associated associated taxiways. taxiways. taxiways. Site Site Site prep prep prep and and and paving, paving, paving, EngineeringEngineeringEngineering City of and associated taxiways. Site prep and paving, Engineering ColoradoColoradoColorado SpringsColorado Springs Springs Springs grading,grading,grading, drainage drainage grading,drainage erosion drainageerosion erosion protection; protection; protection;erosion protection; fencing,fencing,fencing, access, access, fencing,access, security, security, security,access, waterline security,waterline waterline andwaterline and and and sleeve,sleeve,sleeve, working working workingsleeve, platforms platformsworkingplatforms andplatforms and and lighting lighting lighting and lighting conduitconduitconduit conduit

LOSLOSLOS ANGELES ANGELES ANGELESLOS ANGELES INTERNATIONAL INTERNATIONAL INTERNATIONAL INTERNATIONAL AIRPORT AIRPORT AIRPORT AIRPORT Los Los Los Angeles, Angeles, Angeles, Los CaliforniaAngeles, California California California TaxiwayTaxiwayTaxiway 75 75 Taxiway75 and and and Taxiways Taxiways Taxiways 75 and J&KTaxiways J&K J&K J&K PP&DP&D&D Engineering Engineering EngineeringP&D Engineering CityCityCity of of of Los Los LosCity Angeles Angeles Angeles of Los Angeles WesterlyWesterlyWesterly extension Westerlyextension extension extensionand and and Runway Runway Runway and 25R 25R Runway25R and and and 25R and TaxiwayTaxiwayTaxiway J JTaxiwaypavementJ pavement pavement J pavementreplacement replacement replacement replacement. . . .

DENVERDENVERDENVER INTERNATIONALDENVER INTERNATIONAL INTERNATIONAL INTERNATIONAL AIRPORT AIRPORT AIRPORT AIRPORT Denver,Denver,Denver, Colorado Colorado Denver,Colorado Colorado ConstructionConstructionConstructionConstruction of of of two two two runways, runways, runways, of two Concourserunways, Concourse Concourse Concourse CH2MCH2MCH2M Hill, Hill, Hill,CH2M Hill, CityCityCity & & & City & BB Band and and C C Caprons, aprons, Baprons, and Cand and andaprons, the the the east east eastand taxiways. taxiways. thetaxiways. east taxiways. MartinMartinMartin Airways, Airways, Airways,Martin JV, Airways,JV, JV, JV, CountyCountyCounty of of of County of PouredPouredPoured 1.2 1.2 1.2Poured million million million 1.2cubic cubic cubic million yards yards yards cubic of of of concrete; concrete; yardsconcrete; of concrete; Turner,Turner,Turner, Collie Collie CollieTurner, & & & Collie & DenverDenverDenver Denver airfieldairfieldairfield lighting lighting lightingairfield utility utility utilitylighting vaults vaults vaults utility and and and vaults under under under and-drain--draindrain under -drain BradenBradenBraden Braden installationsinstallationsinstallationsinstallations. . . .

LIBBYLIBBYLIBBY ARMY ARMY ARMYLIBBY AIRFIELD AIRFIELD AIRFIELD ARMY AIRFIELD Ft.Ft.Ft. Huachuca, Huachuca, Huachuca,Ft. Huachuca, Arizona Arizona Arizona Arizona InstallingInstallingInstalling runway Installingrunway runway edge edge edgerunway lights, lights, lights, edge threshold threshold threshold lights, lights,threshold lights, lights, lights, CorpsCorpsCorps of of of Engineers CorpsEngineers Engineers of Engineers Dept.Dept.Dept. of of of U.S. U.S. Dept.U.S. Army Army Army of U.S. Army approachapproachapproach pathapproach path path indicators; indicators; indicators; path indicators; upgrade upgrade upgrade airfield airfield upgradeairfield airfield pavement,pavement,pavement,pavement, remove remove remove existing existing existingremove runway, runway, runway,existing install installrunway,install sub sub sub -install-- sub- drainagedrainagedrainage system, drainagesystem, system, aggregate aggregatesystem,aggregate aggregatebase base base course, course, course, base course, asphalticasphalticasphaltic cement asphalticcement cement surface, surface, surface,cement sodding, sodding, surface,sodding, re sodding,re re-seeding--seedingseeding re - seeding andandand grading grading gradingand. . . grading.

TRAVISTRAVISTRAVIS AIR AIR TRAVISAIR FORCE FORCE FORCE AIR BASE BASEFORCEBASE BASE Travis,Travis,Travis, California California CaliforniaTravis, California RepaveRepaveRepave taxiway taxiway taxiway N N Nand and and spalled spalled spalled CorpsCorpsCorps of of of Engineers Engineers Engineers Repave taxiway N and spalled Corps of Engineers Dept.Dept.Dept. of of of Dept. of areas,areas,areas, clean clean clean and and and seal seal seal joints joints joints and and and areas, clean and seal joints and U.S.U.S.U.S. Air Air Air Force Force U.S.Force Air Force crackscrackscracks. . . cracks.

TRAVISTRAVISTRAVIS AIR AIR TRAVISAIR FORCE FORCE FORCE AIR BASE BASEFORCEBASE BASE Travis,Travis,Travis, California California CaliforniaTravis, California CorpsCorpsCorps of of of Engineers CorpsEngineers Engineers of Engineers Dept.Dept.Dept. of of of Dept. of Clean,Clean,Clean, repair repair repairClean, and and and repairseal seal seal joints andjoints joints sealand and and joints and U.S.U.S.U.S. Air Air Air Force Force U.S.Force Air Force crackscrackscracks and and andcracks damaged damaged damaged and areasdamaged areas areas on on on areas on taxiwaystaxiwaystaxiways. .taxiways . .

46

464646 46

Art Direction & Design: Valentino Thellos Production Co-ordination & Texts: Panicos Orphanides Photographs: Paul Kavanagh, Polys Georgakis Page Composition &Colour Separations: Lithoweb Printing: Lithoweb tel: 22 87 20 81

47 Art Direction & Design: Valentino Thellos Production Co-ordination: Panicos Orphanides Photographs: Paul Kavanagh, Polys Georgakis Page Composition &Colour Separations: Lithoweb Printing: Lithoweb