Jigawastate Government Ministry of Health Block B New Secretariat Complex, 3 Arm Zone Dutse

Total Page:16

File Type:pdf, Size:1020Kb

Jigawastate Government Ministry of Health Block B New Secretariat Complex, 3 Arm Zone Dutse JIGAWASTATE GOVERNMENT MINISTRY OF HEALTH BLOCK B NEW SECRETARIAT COMPLEX, 3 ARM ZONE DUTSE. ADVERTISEMENT. INVITATION FOR PREQUALIFICATION AND TENDER IN RESPECT OF PHASE II CONTRUCTION WORKS AT SPECIALIST HOSPITAL HADEJIA, SPECIALIST HOSPITAL KAZAURE, SCHOOL OF NURSING AND MIDWIFERY BABURA AND NEW GENERAL HOSPITAL GURI AND CONSTRUCTION OF 3 NEW GENERAL HOSPITALS AT GAGARAWA, GWIWA AND KIRIKASAMMA PROCUREMNET NO MOH/STB/01-09/2021 In Compliance with Jigawa State Procurement Process, Jigawa State Ministry of Health wishes to notify the interested bidders of its intention to carry out Phase II Construction Works at School of Nursing and Midwifery Babura, Specialist Hospital Kazaure, Specialist Hospital Hadejia, and New General Hospital Guri, and Construction of 3 New General Hospitals at Gagarawa, Gwiwa and Kirikasamma. 2 PROJECT SCOPE: The Projects to be carried out include: Lot 1: Construction of Additional Student’s Hostel (1 Block) and External Mechanical and Electrical Installation at School of Nursing and Midwifery Babura Lot 2: Construction of External Road Network and Drainages at School of Nursing and Midwifery Babura Lot 3: Phase II Construction works at Specialist Hospital Kazaure (Extension of Road Network, Drainages, Construction of Staff Quarters and Mechanical Installation for all the blocks) LOT 4: Construction of External Road Network and Drainages at Specialist Hospital Hadejia LOT 5: Construction of Staff Quarters and Mechanical Installation for all the blocks at Specialist Hospital Hadejia LOT 6: Construction of New General Hospital at Gagarawa LOT 7: Construction of New General Hospital at Gwiwa LOT 8: Construction of New General Hospital at Kirikasamma Lot 9: Construction External Road Network, Drainages and additional structures at New General Hospital Guri. 3 ELIGBILITY REQUIREMENTS Bidding document should be submitted along with following documents: I. Certificate of Incorporation with Corporate Affairs Commission II. Certified True Copy of Memorandum and Article of Association III. Evidence of registration with Jigawa State Works Registration Board IV. Tax clearance certificate for the last three (3) years V. Audited Account for the Last One (1) Year VI. VAT Registration and Evidence of Past Remittance VII. Evidence of financial capability and banking support VIII. Company Average Annual Turn Over of not less than N500Million IX. That the Company have fulfilled all obligations to pay taxes, pensions, ITF Contribution and social security contributions X. Evidence of execution and completion of similar jobs at least 3 in the last 5 years (Letter of Award and Certificate of Practical Completion to be included). XI. Verifiable evidence of Company profile and technical qualification of key personnel registered with relevant professional bodies (COREN, CORBON, QSRBN, ARCON etc. XII. A sworn affidavit certifying as Follows: a) That the document submitted for the pre-qualification exercise bare not only genuine but correct b) That none of the directors of the Company has been convicted by any court of law c) That the Company is not bankrupt. d) That none of the officers of Jigawa State/Local Government is a present or former director of the Company. XIII Any other relevant information that will help in determining the Company’s suitability for the work. Any prospective Bidder that does not possess any of the above documents need not to apply. 4 COLLECTION OF TENDER DOCUMENT: Bidding Document Could be obtained from the office of the Director Planning, Research and Statistics, Ministry of Health Dutse at a non-refundable fee of Three Hundred and Fifty Thousand Naira (N350,000.00) only by 9.00am to 5.00pm from Thursday 28th January ,2021. Bid submission will close on Thursday, 11th February ,2021 by 12.00 noon. Bids will be opened on the same day by 12.00 noon. Prompt. Signed Dr Salisu B. Muazu, Permanent Secretary, Ministry of Health. .
Recommended publications
  • Nigeria's Constitution of 1999
    PDF generated: 26 Aug 2021, 16:42 constituteproject.org Nigeria's Constitution of 1999 This complete constitution has been generated from excerpts of texts from the repository of the Comparative Constitutions Project, and distributed on constituteproject.org. constituteproject.org PDF generated: 26 Aug 2021, 16:42 Table of contents Preamble . 5 Chapter I: General Provisions . 5 Part I: Federal Republic of Nigeria . 5 Part II: Powers of the Federal Republic of Nigeria . 6 Chapter II: Fundamental Objectives and Directive Principles of State Policy . 13 Chapter III: Citizenship . 17 Chapter IV: Fundamental Rights . 20 Chapter V: The Legislature . 28 Part I: National Assembly . 28 A. Composition and Staff of National Assembly . 28 B. Procedure for Summoning and Dissolution of National Assembly . 29 C. Qualifications for Membership of National Assembly and Right of Attendance . 32 D. Elections to National Assembly . 35 E. Powers and Control over Public Funds . 36 Part II: House of Assembly of a State . 40 A. Composition and Staff of House of Assembly . 40 B. Procedure for Summoning and Dissolution of House of Assembly . 41 C. Qualification for Membership of House of Assembly and Right of Attendance . 43 D. Elections to a House of Assembly . 45 E. Powers and Control over Public Funds . 47 Chapter VI: The Executive . 50 Part I: Federal Executive . 50 A. The President of the Federation . 50 B. Establishment of Certain Federal Executive Bodies . 58 C. Public Revenue . 61 D. The Public Service of the Federation . 63 Part II: State Executive . 65 A. Governor of a State . 65 B. Establishment of Certain State Executive Bodies .
    [Show full text]
  • OUTCOME ANALYSIS Nigeria
    OUTCOME ANALYSIS Nigeria November 2017 The HEA analytical framework HEA is based on a range of information (qualitative and quantitative) collected on the ground or secondary information … is a comparative analysis in time … structured around 2 pillars: BASELINE + HAZARD + COPING = OUTCOME Outcome Analysis The objective of an outcome analysis is to investigate the effects of hazards (or other changes) on future access to food and income at household level Expected results (1/2) The projected Outcome Analysis results allow: ①. Comparison of the projected situation of the households against 2 thresholds: - Survival threshold: level of total income (in food or in cash) needed to satisfy the 2100 Kcal per person per day as well as the essentials expenditures linked to preparation and consumption of food. - Livelihoods protection threshold: level of total income needed to ensure the basic survival and maintain local livelihoods Harvest Milk Labour Livestock sales Petty Trade Charcoal sales 200 150 Livelihoods protection Threshold GAP 100 Survival Threshold 50 0 Reference yearEffect of the shock without copying strategyProjected results Expected results (2/2) ②. To identify the socio-economic group(s) affected by survival or livelihoods protection deficits ③. To identify, for an area, the seasonality of the deficit for an affected group on a consumption year Period of Deficit Komondjari, Burkina Faso, Very Poor category 120% 100% 80% 60% 40% 20% 0% O N D J F M A M J J A S O N % min. % food energy needs deficit total expenditure Updated Livelihood
    [Show full text]
  • Jigawa State Due Process Project Monitoring Bureau Contracts Awarded January to December, 2020 End of Year Report
    JIGAWA STATE DUE PROCESS PROJECT MONITORING BUREAU CONTRACTS AWARDED JANUARY TO DECEMBER, 2020 END OF YEAR REPORT COMP. S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT (N) EXECUTING MINISTRIES PERIOD WORKS Constr. Of 31No. Hand Pump Borehole water supply schemes (2019 First Quarter Constituency Project) LOT-16 at G/Tela Kabo Fulanin Dandabino, G/Musa Shanu Fulanin Tsanfau, Mekekiya Gari, Gidan Haruna Babe, Dungundun Gari, Fulanin Danmodi, Dangoho Gari, Muku Gari, Maigatari Albasu, G.A gaiya Fulanin Dantsakuwa, Karangi Gari, Tsangayar Kirgi, G/Shu'aibu Ajiya Fulanin Kakudi, Dankulli Gari, Lululu, Zangunan Jeke, Gidan Hardo Yahaya,Gidan Dashi, G/ Hardo Amadu Fulanin Kukule, Gidan Alh. Dare, Gidan Hardo Katore Fulanin Dan Marke, Haro Kandir, Fulanin Barawa, Gidan Mati, Gidan Jikan Banki, Fulanin Jarimawa, Tashar Hajja, Fulanin Dukuku, Hardo Murnai, Gidan Bulama Suna and 1 21/01/2020 Fulanin Mailefe in Sule Tankarkar constituency JEC/478/2019/VOL.I/7 H.M Dangara Ltd 22,872,730.00 Min of Water Res 12 weeks 2 30/01/2020 Upgarde of Malam Madori Primary Health Care to General Hospital (Additional work) FGPC/149/2018/VOL.I/12 Sassauchi Multi Trade Invest Ltd 23,257,704.02 Min of Health 6 Month Constr. Of 1 Block of 2 classroom Islamiyya School Each Lot-8 (2019 Second Quarter Constituency Projects) at andaza 3 21/01/2020 Gabas, Zakwaro and Karangi in Kiyawa Constituency JEC/486/2019/VOL.I/14 Alkayawa Multi services 9,438,765.00 Cabinet Office 8 weeks Constr. Of 3No Daily Prayer Mosques ( 2019 Second Quarter Constituency Projects) Lot-35 at Hariyal, madawa Bello 4 14/01/2020 and Sharbi in Kafin Hausa Constituency JEC/380/2019/VOL.I/29 K-Manu Gen Constr Ltd 5,870,869.00 Cabinet Office 8 weeks Constr.
    [Show full text]
  • Survey Report for Out-Of-School Children in Jigawa
    SURVEY REPORT FOR OUT-OF-SCHOOL CHILDREN IN JIGAWA STATE, NIGERIA CO-ORDINATED BY JIGAWA STATE GOVERNMENT IN COLLABORATION WITH ESSPIN August, 2014 Page | 1 Table of Contents Cover page i Acknowledgements iii Preface iv List of Tables v List of Figures vi Acronyms vii Executive Summary viii Section One: Introduction 1 1.1 Background 1 1.2 Objectives 2 1.3 Framework for Out-of-School Children 2 1.4 Profile of Jigawa State 4 Section Two: Methodology 6 2.1 Survey Planning for Out-of-School Children 6 2.2 Sampling Design 7 2.3 Data Quality and Supervision 7 2.4 Pilot Survey 8 2.5 Process of Data Collection and Analysis 9 Section Three: Results for Out-of-School Children 10 3.1 Number of Households and Population Size 10 3.2 Number of Out-of-School Children 12 3.3 Number of Children Attending Schools 20 3.4 Percentages of Out-of-School Children 24 Section Four: Possible Risk Factors for Out-of-School Children 27 4.1 Reasons for Out-of-School Children 27 4.2 Socio-Economic Relationships with Out-of-School Status 28 Section Five: Conclusion and Recommendations 42 5.1 Conclusion 42 5.2 Suggestions and the way forward 45 5.3 Limitations 46 References 47 Appendix A: Questionnaire 48 Page | 2 Appendix B: Interview Guide 52 Appendix C: Number of Children in the Sampled Household 53 Appendix D: Percentages of Children that Dropout from School 54 Appendix E: Percentages of Children that Never Attended School 55 Appendix F: Percentages of Children Attending Only Islamiyya/Quranic 56 Schools Appendix G: Percentages of Children Attending any Form of School 57 Appendix H: Population Projection (3-18) by Age, Sex and LGA, 2014 58 Appendix I: Sampling Variability and Ranges for OOS Children 59 Page | 3 Acknowledgements Education planning is incomplete without credible statistics on out-of-school children.
    [Show full text]
  • A Study of Violence-Related Deaths in Nafada Local Government Area Of
    # Makai DANIEL http://www.ifra-nigeria.org/IMG/pdf/violence-related-deaths-gombe-jigawa-state-nigeria.pdf A Study of Violence-Related Deaths in Nafada Local Government Area of Gombe State and Auyo, Gagarawa, Gumel, Gwiwa, Kaugama and Yankwasi Local Government Areas of Jigawa State (2006-2014) IFRA-Nigeria working papers series, n°46 20/01/2015 The ‘Invisible Violence’ Project Based in the premises of the French Institute for Research in Africa on the campus of the University of Ibadan, Nigeria Watch is a database project that has monitored fatal incidents and human security in Nigeria since 1 June 2006. The database compiles violent deaths on a daily basis, including fatalities resulting from accidents. It relies on a thorough reading of the Nigerian press (15 dailies & weeklies) and reports from human rights organisations. The two main objectives are to identify dangerous areas and assess the evolution of violence in the country. However, violence is not always reported by the media, especially in remote rural areas that are difficult to access. Hence, in the last 8 years, Nigeria Watch has not recorded any report of fatal incidents in some of the 774 Local Government Areas (LGAs) of the Nigerian Federation. There are two possibilities: either these places were very peaceful, or they were not covered by the media. This series of surveys thus investigates ‘invisible’ violence. By 1 November 2014, there were still 23 LGAs with no report of fatal incidents in the Nigeria Watch database: Udung Uko and Urue-Offong/Oruko (Akwa Ibom), Kwaya Kusar (Borno), Nafada (Gombe), Auyo, Gagarawa, Kaugama and Yankwashi (Jigawa), Ingawa and Matazu (Katsina), Sakaba (Kebbi), Bassa, Igalamela- Odolu and Mopa-Muro (Kogi), Toto (Nassarawa), Ifedayo (Osun), Gudu and Gwadabaw (Sokoto), Ussa (Taraba), and Karasuwa, Machina, Nguru and Yunusari (Yobe).
    [Show full text]
  • Jigawa Code: 17 Lga : Auyo Code: 01 Name of Registration Name of Reg
    INDEPENDENT NATIONAL ELECTORAL COMMISSION (INEC) STATE: JIGAWA CODE: 17 LGA : AUYO CODE: 01 NAME OF REGISTRATION NAME OF REG. AREA COLLATION S/N CODE NAME OF REG. AREA CENTRE (RAC) AREA (RA) CENTRE (RACC) 1 AUYO 01 AUYO SPECIAL PRI. SCH AUYO SPECIAL PRI. SCH 2 AUYAKAYI 02 AUYAKAYI PRI. SCH AUYAKAYI PRI. SCH 3 AYAMA 03 AYAMA PRI SCH AYAMA PRI SCH 4 AYAN 04 AYAN PRI SCH AYAN PRI SCH 5 GAMAFOI 05 GAMAFOI PRI. SCH GAMAFOI PRI. SCH 6 GATAFA 06 GATAFA PRI SCH GATAFA PRI SCH 7 GAMSARKA 07 GAMSARKA PRI SCH GAMSARKA PRI SCH 8 KAFUR 08 KAFUR PRI SCH KAFUR PRI SCH 9 TSIDIR 09 TSIDIR PRI SCH TSIDIR PRI SCH 10 UNIK 10 UNIK PRI SCH UNIK PRI SCH TOTAL LGA : BABURA CODE: 02 NAME OF REGISTRATION NAME OF REG. AREA COLLATION S/N CODE NAME OF REG. AREA CENTRE (RAC) AREA (RA) CENTRE (RACC) 1 BABURA 01 AREWA PRI.SCH AREWA PRI.SCH 2 BATALI 02 BATALI PRI SCH BATALI PRI SCH 3 DORAWA 03 DORAWA PRI. SCH DORAWA PRI. SCH 4 GARU 04 GARU PRI SCH GARU PRI SCH 5 GASAKOLI 05 GASAKOLI PRI. SCH GASAKOLI PRI. SCH 6 INSHARUWA 06 INSHARUWA PRI SC INSHARUWA PRI SC 7 JIGAWA 07 JIGAWA PRI SCH JIGAWA PRI SCH 8 KANYA 08 KANYA PRI. SCH KANYA PRI. SCH 9 KAZUNZUMI 09 KAZUNZUMI PRI SCH KAZUNZUMI PRI SCH 10 KYAMBO 10 KYAMBO PRI SCH KYAMBO PRI SCH 11 TAKWASA 11 TAKWASA PRI SCH TAKWASA PRI SCH TOTAL LGA : BIRRIN-KUDU CODE: 03 NAME OF REGISTRATION NAME OF REG.
    [Show full text]
  • States and Lcdas Codes.Cdr
    PFA CODES 28 UKANEFUN KPK AK 6 CHIBOK CBK BO 8 ETSAKO-EAST AGD ED 20 ONUIMO KWE IM 32 RIMIN-GADO RMG KN KWARA 9 IJEBU-NORTH JGB OG 30 OYO-EAST YYY OY YOBE 1 Stanbic IBTC Pension Managers Limited 0021 29 URU OFFONG ORUKO UFG AK 7 DAMBOA DAM BO 9 ETSAKO-WEST AUC ED 21 ORLU RLU IM 33 ROGO RGG KN S/N LGA NAME LGA STATE 10 IJEBU-NORTH-EAST JNE OG 31 SAKI-EAST GMD OY S/N LGA NAME LGA STATE 2 Premium Pension Limited 0022 30 URUAN DUU AK 8 DIKWA DKW BO 10 IGUEBEN GUE ED 22 ORSU AWT IM 34 SHANONO SNN KN CODE CODE 11 IJEBU-ODE JBD OG 32 SAKI-WEST SHK OY CODE CODE 3 Leadway Pensure PFA Limited 0023 31 UYO UYY AK 9 GUBIO GUB BO 11 IKPOBA-OKHA DGE ED 23 ORU-EAST MMA IM 35 SUMAILA SML KN 1 ASA AFN KW 12 IKENNE KNN OG 33 SURULERE RSD OY 1 BADE GSH YB 4 Sigma Pensions Limited 0024 10 GUZAMALA GZM BO 12 OREDO BEN ED 24 ORU-WEST NGB IM 36 TAKAI TAK KN 2 BARUTEN KSB KW 13 IMEKO-AFON MEK OG 2 BOSARI DPH YB 5 Pensions Alliance Limited 0025 ANAMBRA 11 GWOZA GZA BO 13 ORHIONMWON ABD ED 25 OWERRI-MUNICIPAL WER IM 37 TARAUNI TRN KN 3 EDU LAF KW 14 IPOKIA PKA OG PLATEAU 3 DAMATURU DTR YB 6 ARM Pension Managers Limited 0026 S/N LGA NAME LGA STATE 12 HAWUL HWL BO 14 OVIA-NORTH-EAST AKA ED 26 26 OWERRI-NORTH RRT IM 38 TOFA TEA KN 4 EKITI ARP KW 15 OBAFEMI OWODE WDE OG S/N LGA NAME LGA STATE 4 FIKA FKA YB 7 Trustfund Pensions Plc 0028 CODE CODE 13 JERE JRE BO 15 OVIA-SOUTH-WEST GBZ ED 27 27 OWERRI-WEST UMG IM 39 TSANYAWA TYW KN 5 IFELODUN SHA KW 16 ODEDAH DED OG CODE CODE 5 FUNE FUN YB 8 First Guarantee Pension Limited 0029 1 AGUATA AGU AN 14 KAGA KGG BO 16 OWAN-EAST
    [Show full text]
  • Katsina State 2021 SECURITY PLANNING MAP As of February 2021
    For Humanitarian Purposes Only LOGISTICS ACCESS Production date : 17 Feb AND NIGERIA - Katsina State 2021 SECURITY PLANNING MAP As of February 2021 Niger SABON BIRNI Dutsin Bamli Forest* Dan Kunama Dan Kabba SOKOTO Forest Re Dagura Dadin Sarki ISA Matsai Maiaduwa KAITA Washemi Jibiya MAI'ADUA Jasai Kaita MASHI Mazanya Jerdedi Forest Zango Rese* Daura JIBIA Karawa Gulbin Baure KATSINA Forest* Zandam, Gulbi ZANGO Katsina Mashi Sandamu DAURA Forest Dan Tambara Fiwuni Kututure SHINKAFI Katsina Damakola Rese* Gurjiya Kigo, River Sandamu DUTSI Sukanawa MANI Unguwar GajeUnguwar Gaje Batagarawa Kaurin Saidu Pakarawa Forest* Maikiliya Dan Aunai SANDAMU Yantuba Dutsawa Lemo Tamdamwa Dutsawa Sabon Gari Fulani Giginya Nat* Forest Gidan Adamu Burudu Gargarawa Rese* Saboa Dandogo Rimi Mani Forest* Maibara Rimi Baure DancaleDancale Dutsi Kufani Adalawa Salei BATSARI Kawari Bardaya Zakata Dutsi BAURE Zurmi Gwiwa Kyaras ZURMI Yan Molo Batsari Alumu RIMI BINDAWA YANKWASHI Inga Dole GWIWA Musari Ungua Tsamia Tuwaru Sabuwa Dan KuliyaDan Gagi Daura Kuraye Yankwashi Kwahi Bagadi Safana Kabura Gawaji Kuma Faru Tachiawa Kurfi Yanuku Charanchi Roni Kazaure Ajiwa Bindawa Ingawa KURFI CHARANCHI Dandi Lake Gaiwa KAURA Dan Jakko Dambuna KAZAURE INGAWA Ruruma Birci NAMODA Kirkini Yakassa Jobe BABURA Gamda RONI Birni Mogaji Kankiya Gaci Kunchi MAKODA SAFANA Daddare Eaguwa Forest Rese JIGAWA Kusada BIRNIN MAGAJI Dutsin Ma KUSADA Dambatta Kafarda KUNCHI Safana KANKIA Makoda DAMBATTA GARKI Magwai, River Ungwan Adar Duru Ganuwa Dan-Tudu Makanwashi Karaduwa Jigawar Sawai
    [Show full text]
  • Senate Inspects On-Going TCN Trx Line Projects Governor, Minister Inspect
    Issue No. 47 July 2020 Senate inspects on-going TCN trx line projects Governor, Minister inspect Gagarawa Substation NSE President commends FG’s Appointment . ng tcn_nigeria org.ng TTCNCN NNewsletterewsletter SENATE INSPECTS ON-GOING TCN TRANSMISSION LINE PROJECT AND 330/132/33KV SUBSTATION SITES By Bili Akau doing, and to ensure a steady but seamless power delivery not only in Abuja but in the whole country”. He expressed satisfaction that the completion timeline of the project would be actualized, particularly because it is a donor funded project. Commenting on the projects, the project supervisor, Engr. Jane Okemini, explained that when completed, the project, would put the Federal Capital Territory on a ring at 132kV voltage level, thereby providing flexibility for L-R ED TSP Engr. Victor Adewumi speaking with the bulk electricity service delivery in Chairman House Committee on Power Sen. Gabriel Suswan Abuja and environs. The ring would make it possible for TCN to he Senate Committee on Power has commended TCN move from one line to another, if a for various ongoing projects meant to enhance bulk problem occurs on any of the lines. At the end of the project, Tpower delivery to electricity consumers. she said, Abuja would be on supply 24/7 hours. The Committee members led by its Chairman, Sen. Gabriel The on-going Katampe-National Stadium 132kV DC line Suswam gave the commendation in Abuja, while on oversight which originates from the 330/132/33kV Katampe inspection of TCN's ongoing 12.4KM Katampe-National Transmission Substation comprises 8.4KM of underground Stadium 132kV double circuit transmission line and the New armored cabling that would terminate in Wuye District.
    [Show full text]
  • Nigeria Security Situation
    Nigeria Security situation Country of Origin Information Report June 2021 More information on the European Union is available on the Internet (http://europa.eu) PDF ISBN978-92-9465-082-5 doi: 10.2847/433197 BZ-08-21-089-EN-N © European Asylum Support Office, 2021 Reproduction is authorised provided the source is acknowledged. For any use or reproduction of photos or other material that is not under the EASO copyright, permission must be sought directly from the copyright holders. Cover photo@ EU Civil Protection and Humanitarian Aid - Left with nothing: Boko Haram's displaced @ EU/ECHO/Isabel Coello (CC BY-NC-ND 2.0), 16 June 2015 ‘Families staying in the back of this church in Yola are from Michika, Madagali and Gwosa, some of the areas worst hit by Boko Haram attacks in Adamawa and Borno states. Living conditions for them are extremely harsh. They have received the most basic emergency assistance, provided by our partner International Rescue Committee (IRC) with EU funds. “We got mattresses, blankets, kitchen pots, tarpaulins…” they said.’ Country of origin information report | Nigeria: Security situation Acknowledgements EASO would like to acknowledge Stephanie Huber, Founder and Director of the Asylum Research Centre (ARC) as the co-drafter of this report. The following departments and organisations have reviewed the report together with EASO: The Netherlands, Ministry of Justice and Security, Office for Country Information and Language Analysis Austria, Federal Office for Immigration and Asylum, Country of Origin Information Department (B/III), Africa Desk Austrian Centre for Country of Origin and Asylum Research and Documentation (ACCORD) It must be noted that the drafting and review carried out by the mentioned departments, experts or organisations contributes to the overall quality of the report, but does not necessarily imply their formal endorsement of the final report, which is the full responsibility of EASO.
    [Show full text]
  • JIGAWA STATE CONTRIBUTORY HEALTHCARE MANAGEMENT AGENCY (JICHMA) LIST of ACCREDITED FACILITIES S/N Accred
    JIGAWA STATE CONTRIBUTORY HEALTHCARE MANAGEMENT AGENCY (JICHMA) LIST OF ACCREDITED FACILITIES S/N Accred. Code Facility Facility Type Local Government 1 TMP001 Auyo PHC Primary Auyo 2 TMP003 Ayama PHC Primary Auyo 3 TMP005 Ayan PHC Primary Auyo 4 TMP004 Kalgwai PHC Primary Auyo 5 TMP002 Shinge PHC Primary Auyo 6 TMP012 Alpha Clinic Both Babura 7 TMP006 BABURA GEN.HOSP Both Babura 8 TMP011 Batali PHC Primary Babura 9 TMP007 Jigawa Babura PHC Primary Babura 10 TMP008 Kanya PHC Primary Babura 11 TMP010 Kuzunzumi PHC Primary Babura 12 TMP009 Kyambo PHC Primary Babura 13 TMP027 Babaldu Clinic Primary Birnin Kudu 14 TMP023 Badunga PHC Primary Birnin Kudu 15 TMP020 Bamaina Health Clinic Primary Birnin Kudu 16 TMP019 BIRNIN KUDU GEN.HOSP Both Birnin Kudu 17 TMP187 Federal Medical Center Birnin Kudu Both Birnin Kudu 18 TMP026 Kangire PHC Primary Birnin Kudu 19 TMP024 Kantoga PHC Primary Birnin Kudu 20 TMP022 Sundimina PHC Primary Birnin Kudu 21 TMP025 Wurno PHC Primary Birnin Kudu 22 TMP021 Yalwan Damai Dispensary Primary Birnin Kudu 23 TMP013 BIRNIWA GEN.HOSP Both Birniwa 24 TMP015 Diginsa PHC Primary Birniwa 25 TMP018 Dole PHC Primary Birniwa 26 TMP014 Kazura PHC Primary Birniwa 27 TMP016 Kubuna PHC Primary Birniwa 28 TMP017 Kupsa PHC Primary Birniwa 29 TMP030 Buji Phc Primary Buji 30 TMP028 Gantsa Prientre Primary Buji 31 TMP032 Kukuma Phc Primary Buji 32 TMP029 Sagu Primary Health Centre Primary Buji 33 TMP031 Yayarin Tukur Phc Primary Buji 34 TMP040 Alkhairi Hospital Both Dutse 35 TMP034 Chamo Phc Primary Dutse 36 TMP039 Dundubus Phc Primary
    [Show full text]
  • Paper Title (Use Style: Paper Title)
    International Journal of Innovative Research and Advanced Studies (IJIRAS) ISSN: 2394-4404 Volume 5 Issue 8, August 2018 Assessing The Effectiveness Of The Drought Coping Strategies Practiced Among Farming Communities In Northern Part Of Jigawa State, Nigeria Idris, S. Abdullahi, B. U. Jigawa Research Institute, Kazaure, Jigawa State Abstract: The study was conducted purposely to assess the effectiveness of the drought coping strategies adopted on crops and livestock in northern part of Jigawa state. Multi stage and purposive sampling techniques were used in the selection of the study area and the 3 purposively selected LGAs namely; Babura, Sule-Tankarkar and Maigatari. Data for the study was collected using semi-structured questionnaire. A sample size of 384 respondents obtained from all the 32 farming communities in the 3 selected LGAs was used. Raw data gathered from the survey was summarize in Microsoft Excel and analyzed using descriptive statistics that is mainly the use of tables, frequencies and percentages. Likert scale was also used to rate farmer’s knowledge on drought incidence. Findings of the study revealed extent of farmer’s knowledge and experience on drought. However, major coping strategies practiced on crops include; mixed cropping, differing of sowing date, using special farming implements, crops diversification through adoption of improved seeds and prayers and supplications. The study also revealed using supplementary feeds as a major coping strategy adopted on livestock during drought. Therefore, the methodology employed and the results obtained from this study could be usefully applied to other areas suffering from similar negative effects of drought on agricultural production. Keywords: Drought, Coping Strategies, Farming Communities, Northern part of Jigawa State I.
    [Show full text]