STATE LEVEL EXPERT APPRAISAL COMMITTEE, ODISHA (Constituted Vide Order No

Total Page:16

File Type:pdf, Size:1020Kb

STATE LEVEL EXPERT APPRAISAL COMMITTEE, ODISHA (Constituted Vide Order No STATE LEVEL EXPERT APPRAISAL COMMITTEE, ODISHA (Constituted vide order No. S.O. 3387 (E) dated 15th December 2015 of MoEF&CC, Govt. of India) Paribesh Bhawan, A/118, Nilakanthanagar, Unit –VIII, Bhubaneswar – 751 012, ODISHA DATE & TIME : 17.05.2017 AT 03:30 PM VENUE : Conference Hall of State Pollution Control Board, A/118, Nilakantha Nagar, Unit –VIII, Bhubaneswar – 12 MEETING OF THE STATE LEVEL EXPERT APPRAISAL COMMITTEE, ODISHA REVISED AGENDA A. DECISION ON FOLLOWING MINOR MINERAL PROPOSALS: Sl. File. No Name of the Project Type of Tahasil District No. Mineral 1. 18101/ 1769- Kokalunda River Sand Bed Sand Bellaguntha Ganjam NCM/12-2016 (13.375 Acres / 5.412 Ha) At Village-Kokalunda, Tahasil- Bellaguntha, District-Ganjam 2. 18370/ 1794- Ambapua Sand Quarry Sand Belaguntha Ganjam NCM/01-2017 (15.758 Acres) Village- Ambapua, Tehsil- Belaguntha, Dist- Ganjam, Odisha 3. 18866/ 1811- Santhapada-B Sand Quarry Sand Talcher Angul NCM/03-2017 (18 Acres or 7.284 Ha) At Village-Santhapada, Tahasil- Talcher, Dist-Angul 4. 62282/ 1818- Maheswarpur And Sand Kudumulugu Malkangiri NCM/03-2017 Kondelguda Sand Quarry mma over An Area Of 5.796 Ha. At Village-Maheswarpur and Kondelguda,Tahasil- Kudumulugumma, Dist- Malkangiri 5. 61780/ 1829- Boragam Sand Quarry(12.40 Sand Kodinga Nabarangpur NCM/04-2017 Acres Or 5.018 Ha)At Village-Boragam,Tahasil- Kodinga,Dist-Nabarangpur 6. 63875/ 1832- Panchpada Sand Bed (E) Sand Jharsuguda Jharsuguda NCM/04-2017 (15.00 Acres Or 6.07 Ha) At Village-Panchpada, Tahasil- Jharsuguda, Dist-Jharsuguda 7. 52045/1561- Ramachandrapur Luna River Sand Garadpur Kendrapada NCM/03-2016 Sand Bed over an area of 5.060ha under Garadpur Tahasil, Dist – Kendrapada, Odisha. Page 1 of 2 Sl. File. No Name of the Project Type of Tahasil District No. Mineral 8. 53339/ 1641- Gargadbahal Sand Quarry Sand Jujomura Sambalpur NCM/04-2016 (13.33 acre/ 5.394 Ha) At Village-Gargadbahal,Tahasil- Jujomura, Dist-Sambalpur 9. 61120/ 1759- Proposal for Kumunibahali-A Sand Padampur Bargarh NCM/12-2016 Sand Quarry (Ong River Sand Bed) over an area 20.00 acres or 8.09 ha. at village Kumunibahali Tahasil Padampur in the district of Bargarh. 10. 63503/ 1820- Proposal for Kumunibahali-B Sand Padampur Bargarh NCM/03-2017 Sand Quarry (Ong River Sand Bed) over an area 20.02 acres or 8.10 ha. at village Kumunibahali, Tahasil Padampur in the district of Bargarh. B. CONSIDERATION OF FOLLOWING OLD PROPOSALS (COMPLIANCE RECEIVED): Sl. No. File. No Proposals 1. 10959/08- Proposal for EC of M/s. Emami Cement Ltd for IND/04-2016 establishment of a cement grinding unit of capacity 2.0 MTPA at Manatira village, Kalinganagar Industrial Complex, Tahasil-Danagadi of Jajpur district (EC) 2. SEAC-40 Proposal for Environmental Clearance for 1.1 MTPA (Portland Slag Cement & Ground Granulated Slag) Cement Grinding Unit At Village Mukundapur & Bhubanpur, Tahasil Chendipada, Dist – Angul By M/S Jindal Steel & Power Ltd (ToR) 3. 5162/1789- Environmental clearance for Kurlubhata decorative Stone NCM/01-2017 Mines over an area of 8.089 ha. at village Kurlubhata, Tahasil-Titilagarh, Dist-Bolangir of M/s. Kamadgiri Polyspin Pvt. Ltd. 4. SEAC-58 Appeal for exemption of public hearing for expansion of production capacity for caustic soda from 72,000 tons/annum to 105,000 TPA and consequently its bi- products and value added derivatives by M/s Grasim Industries Ltd., Jayashree, Dist-Ganjam 5. 18240/1788- Proposal for EC for Rajsitapur Decorative Stone Mines over NCM/01-2017 an area of 8.089 ha at - village Rajsitapur, Tahasil- Paralakhemundi, Dist-Gajapati of Sri Rashmi Jain. 6. 50051/1499- Proposal for EC for Mahulput Decorative Stone Mine over NCM/02-2016 an area of 11.128 Ha located At- Village Mahulput; Tahasil- Boipariguda, Dist-Koraput Page 2 of 2 .
Recommended publications
  • Gover Rnme Nt of Odish Ha
    Government of Odisha OUTCOME BUDGET 2013-14 Rural Development Department Hon’ble Chief Minister Odisha taking review of departmental activities of DoRD on 1st March 2013 ………………………….Outcome budget of 2012-13 Sl. Page No. No. CONTENTS 1. EXECUTIVE SUMMARY I-VII 2. 1-16 CHAPTER-I Introduction Outcome Budget, 2013-14 3. 17-109 CHAPTER-II Statement (Plan & Non-Plan) 4. Reform Measures & 110 -112 CHAPTER-III Policy Initiatives 5. Past performance of 113-119 CHAPTER-IV programmes and schemes 6. 120-126 CHAPTER- V Financial Review 7. Gender and SC/ST 127 CHAPTER-VI Budgeting EXECUTIVE SUMMARY The Outcome Budget of Department of Rural Development (DoRD) broadly indicates physical dimensions of the financial outlays reflecting the expected intermediate output. The Outcome budget will be a tool to monitor not just the immediate physical "outputs" that are more readily measurable but also the "outcomes" which are the end objectives. 2. The Outcome Budget 2013-14 broadly consists of the following chapters: • Chapter-I:Brief introduction of the functions, organizational set up, list of major programmes/schemes implemented by the Department, its mandate, goals and policy frame work. • Chapter-II:Tabular format(s)/statements indicating the details of financial outlays, projected physical outputs and projected outcomes for 2013-14 under Plan and Non-Plan. • Chapter-III:The details of reform measures and policy initiatives taken by the Department during the course of the year. • Chapter-IV:Write-up on the past performance for the year 2011-12 and 2012-13 (up to December, 2012). • Chapter-V:Actual of the year preceding the previous year, Budget Estimates and Revised Estimates of the previous year, Budget Estimates of the Current Financial year.
    [Show full text]
  • Fortran Program for Regional-Residual Separation by Finite Element Method
    Appendix I 259 Appendix I Fortran Program for Regional-Residual Separation by Finite Element Method C AG-BOUGUER,GN-REGIONAL,D-RESIDUAL C PROGRAM FOR SEPARATION OF REGIONAL & RESIDUAL USING FEM METHOD C PROGRAM NEEDS THE GRAVITY VALUES ALSO IN ADDITION TO THE A(I)& B(I)VALUES DIMENSION G(12),X(12),Y(12) DIMENSION A(200000),B(200000),GN(200000),AG(200000),D(200000) OPEN(UNIT=3,FILE=‘F1-8.DAT’, STATUS=‘OLD’) OPEN(UNIT=4,FILE=‘A1.DAT’, STATUS=‘NEW’) OPEN(UNIT=11,FILE=‘A2.DAT’, STATUS=‘NEW’) OPEN(UNIT=12,FILE=‘A3.DAT’, STATUS=‘NEW’) OPEN(UNIT=13,FILE=‘A4.DAT’, STATUS=‘NEW’) READ (3,*) N,NN WRITE (*,*)‘GIVE OUTPUT DATA FILE NAME AS UNIT 4’ WRITE (4,*)‘NUMBER OF NODES{A(I)& B(I)} AND DATA(8 or 12) POINTS’ WRITE (4,*)N,NN WRITE (4,*)‘INPUT VALUES X,Y,AND GRAVITY DATA’ DO 10 I=1,NN READ (3,*) X(I),Y(I),G(I) 10 WRITE (4,*) X(I),Y(I),G(I) WRITE (4,*)‘INPUT VALUES OF A(I) & B(I)’ DO 20 I=1,N READ (3,*) A(I),B(I),AG(I) 20 WRITE (4,*)A(I),B(I),AG(I) WRITE (4,*)‘OUTPUT X , Y , REGIONAL GRAVITY & RESIDUAL VALUES’ DO 100 I=1,N A1=1+A(I) A2=1-A(I) AA=1-A(I)*A(I) K. Mallick et al., Bouguer Gravity Regional and Residual Separation: Application to Geology 259 and Environment, DOI 10.1007/978-94-007-0406-0, © Capital Publishing Company 2012 260 Bouguer Gravity Regional and Residual Separation B1=1+B(I) B2=1-B(I) BB=1-B(I)*B(I) C1=(9*AA)/32 C2=(9*BB)/32 C3=(-10+9*(2-AA-BB))/32 AN1=0.25*A2*B2*(A2+B2-3) AN3=0.25*A1*B2*(B2-A2-1) AN5=0.25*A1*B1*(1-A2-B2) AN7=0.25*A2*B1*(A2-B2-1) AN2=0.5*AA*B2 AN6=0.5*AA*B1 AN4=0.5*BB*A1 AN8=0.5*BB*A2 T1=AN1*G(1)+AN2*G(2)+AN3*G(3)+AN4*G(4)
    [Show full text]
  • Annual Report 2018-2019
    ANNUAL REPORT 2018-2019 STATE POLLUTION CONTROL BOARD, ODISHA A/118, Nilakantha Nagar, Unit-Viii Bhubaneswar SPCB, Odisha (350 Copies) Published By: State Pollution Control Board, Odisha Bhubaneswar – 751012 Printed By: Semaphore Technologies Private Limited 3, Gokul Baral Street, 1st Floor Kolkata-700012, Ph. No.- +91 9836873211 Highlights of Activities Chapter-I 01 Introduction Chapter-II 05 Constitution of the State Board Chapter-III 07 Constitution of Committees Chapter-IV 12 Board Meeting Chapter-V 13 Activities Chapter-VI 136 Legal Matters Chapter-VII 137 Finance and Accounts Chapter-VIII 139 Other Important Activities Annexures - 170 (I) Organisational Chart (II) Rate Chart for Sampling & Analysis of 171 Env. Samples 181 (III) Staff Strength CONTENTS Annual Report 2018-19 Highlights of Activities of the State Pollution Control Board, Odisha he State Pollution Control Board (SPCB), Odisha was constituted in July, 1983 and was entrusted with the responsibility of implementing the Environmental Acts, particularly the TWater (Prevention and Control of Pollution) Act, 1974, the Water (Prevention and Control of Pollution) Cess Act, 1977, the Air (Prevention and Control of Pollution) Act, 1981 and the Environment (Protection) Act, 1986. Several Rules addressing specific environmental problems like Hazardous Waste Management, Bio-Medical Waste Management, Solid Waste Management, E-Waste Management, Plastic Waste Management, Construction & Demolition Waste Management, Environmental Impact Assessment etc. have been brought out under the Environment (Protection) Act. The SPCB also executes and ensures proper implementation of the environmental policies of the Union and the State Government. The activities of the SPCB broadly cover the following: Planning comprehensive programs towards prevention, control or abatement of pollution and enforcing the environmental laws.
    [Show full text]
  • Pledge for Disaster Preparedness
    THE VOLUNTEER PLEDGE I shall serve as a volunteer, to the best of my ability, the depressed, the underprivileged, and the needy, with true voluntary spirit, equality and democratic fervour. I shall develop such judgement, affection and patience, that my voluntary service will heal ill feelings and distress. I hereby pledge myself to compassion, kindness and empathy, that will enter into the joys and sorrows of all whom are needy, afflicted or erring. I shall never lose faith in the value of every human being, and the capacity of human beings to change their ways of life and thinking. I pledge myself to work for loyalty with other fellow volunteers. I also pledge to work to extend such loyalty to all the men and women, who have the responsibility of serving humanity. I shall look not back but forward, till this goal is achieved in true voluntary spirit. Let the spirit of volunteering extend to all the people, to end suffering, inequity and sadness. This is all I ask. This manual has been compiled by: Yashwant P. Raj Paul IYV Volunteer With contributions from Rita Missal & Saroj Kumar Jha CONTENTS Foreword 2 Introduction 3 Role of Orissa Emergency Volunteer Corps 4 What is Expected of a Volunteer 4 Procedures 4 How Volunteers Can Help after a Disaster 4 Non-discrimination in Disaster Management 5 Do’s and Don’ts 5 Coping Emotionally and Helping Others Cope 6 Additional Tips for Volunteers 6 Overview of a Natural Disaster Experience 6 Developing an Emergency Plan with the Community 7 Volunteer Emergency Survival Kit 8 Response During Different
    [Show full text]
  • Inter State Agreements
    ORISSA STATE WATER PLAN 2 0 0 4 INTER STATE AGGREMENTS Orissa State Water Plan 9 INTER STATE AGREEMENTS Orissa State has inter state agreements with neighboring states of West Bengal, Jharkhand ( formerly Bihar),Chattisgarh (Formerly Madhya Pradesh) and Andhra Pradesh on Planning & Execution of Irrigation Projects. The Basin wise details of such Projects are briefly discussed below:- (i) Mahanadi Basin: Hirakud Dam Project: Hirakud Dam was completed in the year 1957 by Government of India and there was no bipartite agreement between Government of Orissa and Government of M.P. at that point of time. However the issues concerning the interest of both the states are discussed in various meetings:- Minutes of the meeting of Madhya Pradesh and ORISSA officers of Irrigation & Electricity Departments held at Pachmarhi on 15.6.73. IBB DIVERSION SCHEME: 3. Secretary, Irrigation & Power, Orissa pointed out that Madhya Pradesh is constructing a diversion weir on Ib river. This river is a source of water supply to the Orient Paper Mill at Brajrajnagar as well as to Sundergarh, a District town in Orissa State. Government of Orissa apprehends that the summer flows in Ib river will get reduced at the above two places due to diversion in Madhya Pradesh. Madhya Pradesh Officers explained that this work was taken up as a scarcity work in 1966- 77 and it is tapping a catchment of 174 Sq. miles only in Madhya Pradesh. There is no live storage and Orissa should have no apprehensions as regards the availability of flows at the aforesaid two places. It was decided that the flow data as maintained by Madhya Pradesh at the Ib weir site and by Orissa at Brajrajnagar and Sundergarh should be exchanged and studied.
    [Show full text]
  • IEE: India: Sambalpur-Titlagarh Doubling Subproject, Railway
    Initial Environmental Examination March 2011 India: Railway Sector Investment Program Sambalpur-Titlagarh Doubling Subproject Prepared by Ministry of Railway for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 15 March 2011) Currency unit – Indian rupee (Rs) Rs1.00 = $0.22222 Rs 45.00 $1.00 = ABBREVIATIONS ACF Assistant Conservator of Forest ADB Asian Development Bank EIA environmental impact assessment EMoP environment monitoring plan EMP environment management plan ESDU Environment and Social Development Unit GIS geographic information system GOI Government of India GHG greenhouse gases HFL highest flood level IBS Intermittent Block Station ICAR Indian Council of Agricultural Research IEE initial environmental examination IS Indian Standard IUCN International Union for Conservation of Nature Jn. junction (The term used by Indian Railways for the Stations where two or more lines meet) LHS Left Hand Side MoEF Ministry of Environment and Forests MOR Ministry of Railways NAAQS National Ambient Air Quality Standard NE northeast NGO non-governmental organization NH national highway NSDP National Strategic Development Program NOx oxides of nitrogen PF protected forest PHC public health centre PIU project implementation unit PPEs personal protective equipments PMC Project Management Consultant PWD Public Works Department RDSO Research Design and Standards Organization R&R resettlement and rehabilitation RF reserved forest RHS right hand side RoB road over bridge RoW right of way RSPM respirable suspended particulate matter RuB road
    [Show full text]
  • Hydrological Modeling in the Ong River Basin, India Using SWAT Model
    Journal of Spatial Hydrology Volume 14 Number 2 Article 3 2018 Hydrological Modeling in the Ong River Basin, India using SWAT Model Follow this and additional works at: https://scholarsarchive.byu.edu/josh BYU ScholarsArchive Citation (2018) "Hydrological Modeling in the Ong River Basin, India using SWAT Model," Journal of Spatial Hydrology: Vol. 14 : No. 2 , Article 3. Available at: https://scholarsarchive.byu.edu/josh/vol14/iss2/3 This Article is brought to you for free and open access by the Journals at BYU ScholarsArchive. It has been accepted for inclusion in Journal of Spatial Hydrology by an authorized editor of BYU ScholarsArchive. For more information, please contact [email protected], [email protected]. Journal of Spatial Hydrology Vol.14, No.2 Fall 2018 Hydrological Modeling in the Ong River Basin, India using SWAT Model S. C. Ghadei1, P.K. Singh2, S.K. Mishra1 1Dept. of Water Resources Development & Management, IIT Roorkee, Uttarakhand 2National Institute of Hydrology, Roorkee, Uttarakhand Abstract The Ong river basin, a tributary of the Mahanadi River (a major river basin in eastern India) needs an effective management of water resources due to flood severity for sustainable agricultural production and flood protection. The Soil and Water Assessment Tool (SWAT) was used in this study for setting up a watershed model for discharge simulation in the basin. SWAT-CUP (SWAT-Calibration and Uncertainty Program) that enables calibration, sensitivity and uncertainty analysis with the Sequential Uncertainty Fitting (SUFI-2) technique was used in the study. The SWAT model was calibrated from 1981–1990 (warm up period: 1979–1981); and validated from1991-2000.
    [Show full text]
  • Dist Gazetter.Jpg
    PREFACE Bargarh, previously a Sub-Division of undivided Sambalpur District was conferred the status of a district on 1st April 1993 to usher in better and faster service delivery, to bridge the gap between the Government and the governed and to ensure governance at the doorstep. The district owes its name to “Vagharkotta” as revealed by the Rastrakuta inscription of 12th Century AD. This province acquired its present name "Bargarh “during the reign of Balaram Dev, the King of Chauhan dynasty of Sambalpur. Historically, this district as contributed its mite in India’s freedom struggle. Ghess Zamindar Madho Singh, his four sons Hatte Singh, Kunjel Singh, Bairi Singh, Airi Singh and his son-in-law Narayana Singh have become legends of the district due to their extraordinary valour shown during the first war of independence. Similarly, village Panimora has received a special recognition in the history of freedom struggle due to the participation of 42 young men in the Satyagraha Movement of Gandhiji out of which 32 persons were incarcerated by the Britishers. An enthusiastic young girl Parbati Giri of village Samaleipadar showed her bravery inthe freedom struggle, who in the post- independence time is credited with the opening of “Kasturaba Gandhi Matruniketan”, the first ever orphanage of the district at Paikmal. Further, Debrigarh, a peak in the Barapahad hills of Ambabhona block, was used as a rebel stronghold by Lakhanpur Jamidar Balabhadra Deo and the noted freedom fighter Veer Surendra Sai stands as a mute spectator to the first revolt against the Britishin this area. In the post-independence period, Bargarh became the laboratory for different experimentations under the Cooperative Movement in Odisha.
    [Show full text]
  • Draft Initial Environmental Examination Report India: Odisha
    Odisha Skill Development Project (RRP IND 46462-003) Draft Initial Environmental Examination Report January 2017 India: Odisha Skill Development Project (OSDP) Prepared by the Skill Development and Technical Education Department (SDTED), Government of Odisha for the Asian Development Bank This initial environmental review report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CURRENCY EQUIVALENTS (as of 16 January 2017) Currency unit – Indian rupee/s (Re/Rs) Re1.00 = $0.014672 $1.00 = Rs68.1565 ABBREVIATIONS ASTI - Advance Skill Training Institute CGWA - Central Ground Water Authority CO - Carbon Monoxide DG - Diesel Generator DPR - Detailed Project Report DTET - Directorate of Technical Education & Training EHS - Environment, Health & Safety EMP - Environmental Management Plan ESMC - Environment and Social management Cell GoI - Government of India GoO - Government of Odisha GRC - Grievance Redressal Committee IT - Information Technology ITC - Industrial Training Centre ITES - Information Technology Enabled Service ITI - Industrial Training Institute LPG - Liquid Petroleum Gas MoEFCC - Ministry of Environment, Forest
    [Show full text]
  • District Survey R*Port (D.S.R.)
    \rz ZT _M ).. :Z ,'/W**1 )lz 4\ ,./rrr-,-C,iit- e\, 4\ )< TTffiBT\ )i< )rz \r\ frW * l.l ).. :Z\ffi$-=Yl:t;-/r\\\--1 /7tY ).. f$ft;#;/ ).. )i< ,: District Survey ).' R*port (D.s.R.) i5 rn respect of Minor Mineral (Sand) of Subarnapur f ;i: odisha p..p;;;Jas District, ).. per Notification No. I41(E) x January Dated r5th ii) ' ,2016 and S.o. sori 6) DateJ is.ol.zors ir Ministry J*"1.o_r*.rrt,hr...t oi,re ;i: ( & afiLut. )< ( MoEFMoRF &,&o CC),r'nr r1'^-- change- ).. I,i.. H -u,rr Cor..rr*;;ffi.bovernment of fndia. ).. )'.., l6dFrFq x\r/ :Z 'I *,t.ts,*t*j'rj'rt)"1u''t' r i ..i- :--' -::::::::::::::- sZ z'i(-z'ii I ,, lsutl-+._Aruou,ro,, sugg.-t<lt-qPunj I _-...)__i ,/,-r,.r1"..-..r'*-'-,-. 1i i)1) ;!<]---,-,,:..,^),;;;":1:;';":./l\ I _ -.- )i.|rf:;.r.-,:*"=;;4,';;,.j. ]'r ;t 1-ti..-[ii}'tliiitilli ,, -,.---,.,*,.,,u, I )i - ,"':,:! X.i, I t I f ZS.X I ,r.'i;*;,;',,,,ft r*_*".:,]7,;.','ii rlua.t;.'nu,..t;. i )(,!i)i( 'x L,'',;1;',;iI ;'_ I/ 5L_rlz t:i.- ,__1 ,1. )....).a I . ,r,!r'i' ,tl", ,,,1"'t",""i/ ,, i"'--J I ' ;i: )< I lt'---'t 't't" 't''= ''1' I "';ii' -'i t''-.- -'' '.**..'--- )i( !:i:t ;; ;;,,::'' ,-- - - .,4'* -*.-/" X I - .''. 'r I ,"*__ ;-t -,.-.' --:-:,t-: ,l .X '--=-=-- .---rc*--jl-.Hf;*rr'*' 2 j:G;"t;: r_es";ij X )< I,I t. p t,, * t"zztr'"zzt" . i**;;t, I )< ' v 4 a :,- :. *ii$fi)i) = t:-.',.;'-' *"ar"rl*"aa':'1,, i.
    [Show full text]
  • Are You Suprised ?
    Executive Summary of Mahanadi (Barmul) – Godavari (Dowlaiswaram) This Feasibility Report deals with the Mahanadi (Barmul) – Godavari (Dowlaiswaram) link project (M - G link project), which is an integral part of the Mahanadi - Godavari - Krishna - Pennar – Cauvery - Vaigai - Gundar peninsular rivers link system formulated for inter-basin transfer of water from surplus river basins to deficit basins. The Peninsular Rivers Development component of the National Perspective Plan for Water Resources Development, formulated in the year 1980 by the erstwhile Union Ministry of Irrigation (now Ministry of Jal Shakti) and Central Water Commission, envisaged diversion of surplus flows of the Mahanadi basin and the Godavari basin to the water short Krishna, Pennar, Cauvery and Vaigai basins in the South. The National Water Development Agency (NWDA) has assessed the water balance position in various peninsular river basins keeping in view the ultimate development scenario in these basins. The National Institute of Hydrology, Roorkee has carried out “Hydrological Studies and Multi- Reservoir Simulation for the proposed Mahanadi-Godavari link” using latest techniques and submitted the report to NWDA during April-2018. In this study, the water availability analysis at various projects has been carried out using the observed flow series as well as the water utilization by upstream projects, regenerations from these utilizations and minor utilizations in the project catchments. The proposed Barmul project is to be constructed downstream of the Tikarpara gauging site of CWC on Mahanadi River. The total flow at Tikarpara site is to be divided into the following components: 1. Contribution from the Mahanadi Sub-basin up to Hirakud dam. 2.
    [Show full text]
  • A Preliminary Report on Prehistoric Investigation in the Middle Ong River Basin with Particular Reference to the Uttali and the Ghensali Stream, Southern Bargarh
    A Preliminary Report on Prehistoric Investigation in the Middle Ong River Basin with Particular Reference to the Uttali and the Ghensali Stream, Southern Bargarh Upland, Odisha RESEARCH PAPER KSHIRASINDHU BARIK P. D. SABALE *Author affiliations can be found in the back matter of this article ABSTRACT CORRESPONDING AUTHOR: Kshirasindhu Barik The paper presents a preliminary report on the systematic surface exploration Department of AIHC & conducted in the Middle Ong basin with particular focus on the northern tributaries, viz. Archaeology, Deccan College the Uttali, Ghensali and Mongragod stream in the southern Bargarh Upland of Western Post-Graduate and Research Odisha. The investigations have resulted in the discovery of 43 new prehistoric sites Institute, Pune, Maharashtra, in the area with predominance of microlithic components. These sites are observed India; P.G. Department of History, Sambalpur University, in different geomorphological contexts, such as, in the cliff surface of riverbanks, Odisha-768019, India hillslope, foothills and rocky outcrops. Abundant availability of raw materials, mainly [email protected] chert of different colors and vein quartz in the area seem to have attracted the prehistoric communities for intensive settlements in the area. while sporadic acheulian artifacts have been found scattered here and there, most of the documented sites are dominated by microlithic components, some of which have also been associated with TO CITE THIS ARTICLE: Barik, K and Sabale, PD. used/unused red ochre minerals, suggesting advanced cognitive abilities and symbolic 2021. A Preliminary Report behavior of the microlith using communities in the area of investigation. on Prehistoric Investigation in the Middle Ong River Basin with Particular Reference to the Uttali and the Ghensali Stream, Southern Bargarh Upland, Odisha.
    [Show full text]