Infrastructure Delivery Plan
Total Page:16
File Type:pdf, Size:1020Kb
East Staffordshire Borough Council Infrastructure Audit and Delivery Plan Infrastructure Delivery Plan Issue Final | 17 October 2013 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 231577-00 Ove Arup & Partners Ltd The Arup Campus Blythe Gate Blythe Valley Park Solihull B90 8AE United Kingdom www.arup.com Document Verification Job title Infrastructure Audit and Delivery Plan Job number 231577-00 Document title Infrastructure Delivery Plan File reference Document ref Issue Revision Date Filename East Staffordshire Infrastructure Delivery Plan.docx Draft 1 16 Sep Description First draft 2013 Prepared by Checked by Approved by Rebecca Ford, Anna Shafee, Andy Name Rebecca Ford Mark Smith Hardy, Hannah Smith Signature Final draft 10 Oct Filename East Staffordshire Infrastructure Delivery Plan.docx 2013 Description Final draft Prepared by Checked by Approved by Rebecca Ford, Anna Shafee, Andy Name Rebecca Ford Mark Smith Hardy, Hannah Smith Signature Final issue 1 7 Oct Filename East Staffordshire Infrastructure Delivery Plan Final Issue.docx 2013 Description Final Issue Prepared by Checked by Approved by Rebecca Ford, Anna Shafee, Andy Name Anna Shafee Rebecca Ford Hardy, Hannah Smith Signature Issue Document Verification with Document Issue | Final | 17 October 2013 East Staffordshire Borough Council Infrastructure Audit and Delivery Plan Infrastructure Delivery Plan Contents Page 1 Introduction 1 1.1 Infrastructure audit and infrastructure delivery plan (IDP) 1 1.2 Background 1 1.3 Infrastructure planning principles 2 1.4 Report structure 2 2 Method Statement 4 2.1 Overview 4 2.2 Key assumptions 4 2.3 Demographic forecasting 5 2.4 Calculating infrastructure needs 6 3 East Staffordshire Local Plan and Spatial Strategy 7 3.1 Introduction 7 3.2 Local planning context 7 3.3 The Local Plan spatial strategy 9 3.4 Neighbouring growth plans 17 4 Gas 22 4.1 Scope 22 4.2 Infrastructure providers 22 4.3 Forward planning 23 4.4 Implications of future growth 23 4.5 Delivery and funding 24 5 Electricity 25 5.1 Scope 25 5.2 Infrastructure providers 25 5.3 Forward planning 25 5.4 Assessment of future requirements 25 5.5 Delivery and funding 27 6 Water 28 6.1 Scope 28 6.2 Infrastructure providers 28 6.3 Assessment of existing provision 28 6.4 Forward planning 28 6.5 Assessment of future requirements 29 6.6 Delivery and funding 30 Issue | Final | 17 October 2013 East Staffordshire Borough Council Infrastructure Audit and Delivery Plan Infrastructure Delivery Plan 7 Foul and Surface Water Sewerage 31 7.1 Scope 31 7.2 Infrastructure Providers 31 7.3 Assessment of existing provision 31 7.4 Assessment of future requirements 33 7.5 Flooding Considerations 33 8 Transport 36 8.1 Scope 36 8.2 Infrastructure providers 36 8.3 Assessment of existing provision 37 8.4 Forward planning 37 8.5 Assessment of future requirements 39 8.6 Conclusion 42 9 Waste management 43 9.1 Scope 43 9.2 Infrastructure providers 43 9.3 Assessment of existing provision 43 9.4 Forward planning 44 9.5 Assessment of future requirements 46 9.6 Conclusion 47 10 Education 49 10.1 Scope 49 10.2 Infrastructure providers 49 10.3 Assessment of existing provision 49 10.4 Assessment of future requirements 52 10.5 Forward planning 56 10.6 Conclusion 58 11 Healthcare 59 11.1 Scope 59 11.2 Infrastructure providers 59 11.3 Forward planning 59 11.4 Assessment of existing and future provision 60 11.5 Conclusion 67 12 Emergency services 69 12.1 Scope 69 12.2 Infrastructure providers 69 12.3 Assessment of existing provision 69 12.4 Forward planning 70 12.5 Delivery and funding 72 Issue | Final | 17 October 2013 East Staffordshire Borough Council Infrastructure Audit and Delivery Plan Infrastructure Delivery Plan 13 Community facilities 73 13.1 Scope 73 13.2 Infrastructure providers 73 13.3 Assessment of existing provision 74 13.4 Forward planning and committed investment 76 13.5 Assessment of future requirements 77 13.6 Conclusion 80 14 Leisure and culture 81 14.1 Scope 81 14.2 Infrastructure providers 81 14.3 Assessment of existing provision 82 14.4 Forward planning 86 14.5 Planned and committed investment 86 14.6 Assessment of future requirements 87 14.7 Conclusion 89 15 Open space and recreation 91 15.1 Scope 91 15.2 Infrastructure providers 91 15.3 Assessment of existing provision 92 15.4 Forward planning 97 15.5 Assessment of future requirements 99 15.6 Conclusion 103 16 Green Infrastructure 104 16.1 Scope 104 16.2 Infrastructure providers 104 16.3 Forward planning 104 16.4 Assessment of existing and future provision 106 16.5 Conclusion 114 17 Infrastructure Delivery Plan 115 17.1 National planning context 1 17.2 Best Practice Guidance 2 Tables Table 1: Population and housing forecast 2011-2031 Table 2: Burton upon Trent spatial strategy Table 3: Uttoxeter spatial strategy Table 4: Strategic villages spatial strategy Issue | Final | 17 October 2013 East Staffordshire Borough Council Infrastructure Audit and Delivery Plan Infrastructure Delivery Plan Table 5: Windfall allocations and neighbourhood plan Table 6: Electrical power demand at allocated sites Table 7: Water supply infrastructure capacity Table 8: Assessment of water treatment infrastructure Table 9: Flood risk at allocated sites Table 10: Economic Prosperity and Community Priorities Table 11: Burton upon Trent Local Transport Package - Strategic Road Network requirements Table 12: Recycling and composting rates 2010/11 Table 13: Future waste infrastructure requirements Table 14: Existing provision and capacity - first schools in Uttoxeter Table 15: Existing provision and capacity - middle and high schools in Uttoxeter Table 16: Existing provision and capacity - schools in Burton Table 17: Projected provision and capacity - first schools in Uttoxeter Table 18: Projected provision and capacity - middle and high schools in Uttoxeter Table 19: Projected provision and capacity - schools in Burton Table 20: Existing primary care provision within East Staffordshire Table 21: Existing primary care provision outside of East Staffordshire with catchment areas extending into the borough Table 22: Existing healthcare standards of provision Table 23: Forecast GP requirement Table 24: Floorspace of existing libraries Table 25: Mobile library service Table 26: Libraries future requirements Table 27: Floorspace of existing museums Table 28: Outdoor sports standards Table 29: 2031 outdoor sports provision Table 30: 2031 outdoor sports surplus and deficiency Table 31: Distribution of spaces for children and teenagers Table 32: Cemetery and churchyard provision Table 33: Quality of cemetery space Table 34: East Staffordshire Open Space SPD, standards of provision Table 35: Parks and gardens assessment of future requirements Table 36: Amenity greenspace assessment of future requirements Table 37: Provision for children and teenagers assessment of future requirements Table 38: Allotments assessment of future requirements Table 39: Semi/natural greenspace provision standards Table 40: Future requirements for natural and semi-natural green space Table 41: Infrastructure Delivery Schedule Table 42: PAS steps approach Table 43: Forecast pupil numbers - first schools in Uttoxeter Table 44: Forecast pupil numbers - middle and high schools in Uttoxeter Issue | Final | 17 October 2013 East Staffordshire Borough Council Infrastructure Audit and Delivery Plan Infrastructure Delivery Plan Figures Figure 1: Burton upon Trent spatial strategy Figure 2: Uttoxeter spatial strategy Figure 3: Tutbury spatial strategy Figure 4: Rolleston on Dove spatial strategy Figure 5: Barton under Needwood spatial strategy Figure 6: Rocester spatial strategy Figure 7: East Staffordshire and neighbouring authorities Figure 8: Existing GPS with spatial strategy – Burton and surrounds Figure 9: Existing GPS with spatial strategy – Uttoxeter and surrounds Figure 10: Existing GPS and spatial strategy Figure 11: Existing libraries and spatial strategy - Uttoxeter and surrounds Figure 12: Existing libraries and spatial strategy - Burton and surrounds Figure 13: Small areas of natural and semi natural greenspace within 300m Figure 14: Natural and semi-natural greenspace within 2km, 5km and 10km Appendices Appendix A National policy and best practice guidance Appendix B Forecast pupil calculations – Uttoxeter Appendix C Consultation log Appendix D Resource list Issue | Final | 17 October 2013 East Staffordshire Borough Council Infrastructure Audit and Delivery Plan Infrastructure Delivery Plan 1 Introduction To deliver the necessary infrastructure in the right place at the right time, infrastructure delivery needs to keep pace and be coordinated with the growth aspirations of the borough. Infrastructure planning is an essential element in the plan making process, helping to ensure that the Local Plan is robust, deliverable and sound. 1.1 Infrastructure audit and infrastructure delivery plan (IDP) This report provides the findings of an infrastructure audit and sets out the IDP for the borough of East Staffordshire. The audit provides a review of social, physical and green infrastructure, including an assessment of current provision and an assessment of future requirements. This is based on an assessment of predicted demand generated by the planned growth of the borough as proposed in the Pre- Submission Local Plan and the demographic forecast set out in the Strategic Housing Market Assessment (SHMA)1. The IDP