Appendix T Socio-Economic Treasury Metals Revised EIS Report Goliath Gold Project April 2018 APPENDIX T SOCIO-ECONOMIC TC160516 Treasury Metals Revised EIS Report Goliath Gold Project April 2018 NOTE TO READER APPENDIX T In April 2015, Treasury Metals submitted an Environmental Impact Statement (EIS) for the proposed Goliath Gold Project (the Project) to the Canadian Environmental Assessment Agency (the Agency) for consideration under the Canadian Environmental Assessment Act (CEAA), 2012. The Agency reviewed the submission and informed Treasury Metals that the requirements of the EIS Guidelines for the Project were met and that the Agency would begin its technical review of the submission. In June 2015, the Agency issued a series of information requests to Treasury Metals regarding the EIS and supporting appendices (referred to herein as the Round 1 information requests). The Round 1 information requests included questions from the Agency, other federal and provincial reviewers, and members of Indigenous communities, as well as interested stakeholders. As part of the Round 1 information request process, the Agency requested that Treasury Metals consolidate the responses to the information requests into a revised EIS for the Project. Appendix T to the revised EIS (Socio-Economic) presents the results of the study on current social and economic profiles of municipalities and First Nations in the study area, describing the baseline socio-economic conditions. The information presented in this appendix was used for describing the existing conditions for land use (Section 5.12.1 of the revised EIS), social factors (Section 5.12.2 of the revised EIS), economic factors (Section 5.12.3 of the revised EIS), and to a certain extent for Indigenous communities (Aboriginal peoples) (Section 5.13 of the revised EIS). No changes have been made to this appendix from the original EIS issued in April 2015. As part of the process to revise the EIS, Treasury Metals has undertaken a review of the status for the various appendices. The status of each appendix to the revised EIS has been classified as one of the following: • Unchanged: The appendix remains unchanged from the original EIS, and has been re-issued as part revised EIS. • Minor Changes: The appendix remains relatively unchanged from the original EIS, and has been re-issued with relevant clarification. • Major Revisions: The appendix has been substantially changed from the original EIS. A re- written appendix has been issued as part of the revised EIS. • Superseded: The appendix is no longer required to support the EIS. The information in the original appendix has been replaced by information provided in a new appendix prepared to support the revised EIS. • New: This is a new appendix prepared to support the revised EIS. The following table provides a listing of the appendices to the revised EIS, along with a listing of the status of each appendix and their description. TC160516 Treasury Metals Revised EIS Report Goliath Gold Project April 2018 List of Appendices to the Revised EIS Appendix Status Description Appendix A Major Revisions Table of Concordance Appendix B Unchanged Optimization Study Appendix C Unchanged Mining Study Appendix D Major Revisions Tailings Storage Facility Appendix E Minor Changes Traffic Study Appendix F Major Revisions Water Management Plan Appendix G Superseded Environmental Baseline Appendix H Minor Changes Acoustic Environment Study Appendix I Unchanged Light Environment Study Appendix J Minor Changes Air Quality Study Appendix K Minor Changes Geochemistry Appendix L Superseded Geochemical Modelling Appendix M Minor Changes Hydrogeology Appendix N Unchanged Surface Hydrology Appendix O Superseded Hydrologic Modeling Appendix P Unchanged Aquatics DST Appendix Q Major Revisions Fisheries and Habitat Appendix R Major Revisions Terrestrial Appendix S Major Revisions Wetlands Appendix T Unchanged Socio-Economic Appendix U Minor Changes Heritage Resources Appendix V Major Revisions Public Engagement Appendix W Unchanged Screening Level Risk Assessment Appendix X Major Revisions Alternatives Assessment Matrix Appendix Y Unchanged EIS Guidelines Appendix Z Unchanged TML Corporate Policies Appendix AA Major Revisions List of Mineral Claims Appendix BB Unchanged Preliminary Economic Assessment Appendix CC Unchanged Mining, Dynamic And Dependable For Ontario’s Future Appendix DD Major Revisions Indigenous Engagement Report Appendix EE Unchanged Country Foods Assessment Appendix FF Unchanged Photo Record Of The Goliath Gold Project Appendix GG Minor Changes TSF Failure Modelling Appendix HH Unchanged Failure Modes And Effects Analysis Appendix II Major Revisions Draft Fisheries Compensation Strategy and Plans Appendix JJ New Water Report TC160516 Treasury Metals Revised EIS Report Goliath Gold Project April 2018 List of Appendices to the Revised EIS Appendix Status Description Appendix KK New Conceptual Closure Plan Appendix LL New Impact Footprints and Effects TC160516 Introduction gck Consulting Ltd. was retained by Treasury Metals Incorporated to conduct a socioeconomic study associated with the Goliath Gold Project (the Project). The Project is located in the Village of Wabigoon, Kenora District, in Northwestern Ontario, approximately 20 kilometres east of the City of Dryden and approximately 330 kilometres west of Thunder Bay. Methodology Local Study Area A local study area for the socioeconomic baseline was established to define the region that could be influenced by the Project (Figure 1). The study area includes several towns and communities within the Kenora and Thunder Bay Districts. The portion of these Districts under consideration extends from the Municipality of Machin (Vermillion Bay) in the west to the Town of Ignace in the east. Source: gck Consulting custom graphic Figure 1 - Socioeconomic Baseline Report Area Map Goliath Gold Project 2 Socioeconomic Baseline Report - Introduction The study area is comprised of a number of communities that are likely to experience direct and indirect employment and economic benefits and associated socioeconomic effects. The study area allows cumulative or regional effects resulting from other known or future planned projects to be characterized. The study area communities include: • City of Dryden • Town of Ignace • Municipality of Sioux Lookout • Municipality of Machin • Wabigoon Lake Ojibway Nation • Eagle Lake First Nation • Lac Seul First Nation • Village of Wabigoon All of the local study area communities are located in the Kenora District. Provincial and Regional Study Areas The Provincial Study area is the province of Ontario, Canada. An overview of recent statistics and relevant data regarding Ontario has been included in this report to provide additional context for the regional and local areas of study. The regional study area has been defined as the larger city centres surrounding the Project and includes the Cities of Kenora and Thunder Bay. The regional study area is not analyzed with the same level of detail as the local study area, as it is meant to be regarded as an overview. Data Gathering Where available, 2011 Statistics Canada data are presented. For First Nations, census data was drawn from their major reserves. Since census data is based on place of residence, First Nation census data does not include off-reserve membership. Additional information was collected through accessing the community profiles available for each community and key stakeholder interviews. A list of references utilized in the report is listed in Appendix C. Project Overview Treasury Metals Incorporated is proposing to develop the Goliath Gold Project into an operating mine. The Project is located approximately 8 kilometers west of the village of Wabigoon, Ontario or 20 kilometers east of the City of Dryden. The project area is located partially within both the Hartman and Zealand townships and includes a total area of approximately 4,976 hectares, comprising 4,064 hectares of 137 unpatented mining claims and 20 patented mining claims for the remainder. Treasury holds the entire project area, subject to specific royalties on 13 of the patented land parcels. Goliath Gold Project 3 Socioeconomic Baseline Report - Introduction The scope of the project commences with an open pit mine with an expected mine life of 5 years. During years 3 to 5, underground development and mining will commence and continue to the end of the total 10 to 12 year mine life. The underground and open pit mines will be running simultaneously during years 3 to 5. The project will employ approximately 200 people over the 2-year construction and development period. Treasury Metals will employ approximately 150 full time people over the 10 to 12 years of mine life. The most recent Preliminary Economic Assessment completed by ACA Howe indicates that the initial capital expenditure for construction will be in the order of $90 million, with another $100 million for sustaining capital over the life of the mine. The proposed open pit will be 1.5 km east to west on strike length with a final depth of approximately 180 metres and will contain a total of 46 million tonnes of both ore and waste rock with a large portion of the waste rock to be backfilled into the completed pit. Underground operations will be accessed by a portal and ramp to an estimated depth of 600 metres. Underground mining development in the main zone ore body will generally use the transverse long-hole open stopping method with cemented backfill. Other methods may be used in specific areas of the mine. Ore will be processed
Recommended publications
  • G410020002/A N/A Client Ref
    Solicitation No. - N° de l'invitation Amd. No. - N° de la modif. Buyer ID - Id de l'acheteur G410020002/A N/A Client Ref. No. - N° de réf. du client File No. - N° du dossier CCC No./N° CCC - FMS No./N° VME G410020002 G410020002 RETURN BIDS TO: Title – Sujet: RETOURNER LES SOUMISSIONS À: PURCHASE OF AIR CARRIER FLIGHT MOVEMENT DATA AND AIR COMPANY PROFILE DATA Bids are to be submitted electronically Solicitation No. – N° de l’invitation Date by e-mail to the following addresses: G410020002 July 8, 2019 Client Reference No. – N° référence du client Attn : [email protected] GETS Reference No. – N° de reference de SEAG Bids will not be accepted by any File No. – N° de dossier CCC No. / N° CCC - FMS No. / N° VME other methods of delivery. G410020002 N/A Time Zone REQUEST FOR PROPOSAL Sollicitation Closes – L’invitation prend fin Fuseau horaire DEMANDE DE PROPOSITION at – à 02 :00 PM Eastern Standard on – le August 19, 2019 Time EST F.O.B. - F.A.B. Proposal To: Plant-Usine: Destination: Other-Autre: Canadian Transportation Agency Address Inquiries to : - Adresser toutes questions à: Email: We hereby offer to sell to Her Majesty the Queen in right [email protected] of Canada, in accordance with the terms and conditions set out herein, referred to herein or attached hereto, the Telephone No. –de téléphone : FAX No. – N° de FAX goods, services, and construction listed herein and on any Destination – of Goods, Services, and Construction: attached sheets at the price(s) set out thereof.
    [Show full text]
  • Bimose Tribal Council Shared Education Services Initiative Survey
    Bimose Tribal Council Shared Education Services Initiative Survey PURPOSE The purpose of this Shared Education Service Initiative survey is to determine, through community collaboration and discussion, how we can improve student educational outcomes in all of our First Nations while supporting the Anishinaabe language, culture and traditions. The overalls goals of the Shared Education Services Initiative are: 1) The Development of Anishinaabe Language and Culture Programs and Curriculum 2) To Ensure Better Education Results for our Students 3) To Increase Funding for Our Schools to Match or Exceed Current Provincial Levels 4) To Increase Community Control of Education 5) To Increase Parent and Community Engagement 1. Are you a community member? nmlkj Yes nmlkj No 2. If you are a community member, which community are you from? nmlkj Asubpeescheewagong Netum Anishinabek (Grassy Narrows) nmlkj Wabaseemoong Independent Nations nmlkj Shoal Lake 40 First Nation nmlkj Eagle Lake First Nation nmlkj Wabigoon Lake Ojibway Nation nmlkj Lac Des Mille Lacs First Nation nmlkj Iskatewizaagegan # 39 Independent Nation nmlkj Obashkaandagaang First Nation nmlkj Ochiichagwe’Babigo’Ining Ojibway Nation nmlkj Wabauskang First Nation nmlkj Naotkamegwanning First Nation Bimose Tribal Council Shared Education Services Initiative Survey 3. If you are not a community member, in which community do you live in or work with? nmlkj Asubpeescheewagong Netum Anishinabek (Grassy Narrows) nmlkj Wabaseemoong Independent Nations nmlkj Shoal Lake 40 First Nation nmlkj Eagle Lake First Nation nmlkj Wabigoon Lake Ojibway Nation nmlkj Lac Des Mille Lacs First Nation nmlkj Iskatewizaagegan # 39 Independent Nation nmlkj Obashkaandagaang First Nation nmlkj Ochiichagwe’Babigo’Ining Ojibway Nation nmlkj Wabauskang First Nation nmlkj Naotkamegwanning First Nation 4.
    [Show full text]
  • Core 1..44 Committee (PRISM::Advent3b2 17.25)
    Standing Committee on Indigenous and Northern Affairs INAN Ï NUMBER 155 Ï 1st SESSION Ï 42nd PARLIAMENT EVIDENCE Thursday, June 6, 2019 Chair The Honourable MaryAnn Mihychuk 1 Standing Committee on Indigenous and Northern Affairs Thursday, June 6, 2019 Grassy Narrows. In 1970, it was discovered that there was a high level of mercury in the English-Wabigoon river system. The Ï (0845) contamination was traced to an area pulp and paper mill, found to [English] have been dumping effluent containing high levels of mercury into The Chair (Hon. MaryAnn Mihychuk (Kildonan—St. Paul, the water system for a number of years. Lib.)): Good morning, everyone. Thank you for tuning in and for arriving. We're at the indigenous and northern affairs standing The communities of Grassy Narrows and Wabaseemoong First committee of Parliament. We are so pleased to have you here on the Nation, known as Whitedog, were deeply impacted, with much of unceded territory of the Algonquin people. the population of both communities having varying degrees of mercury exposure. All Canadians are in a process of truth and reconciliation. Canada has a long history of colonization and policies that have oppressed a In 1986, two pulp and paper mill companies, together with the particular group of people who, historically, were extremely Government of Canada and the Province of Ontario, paid a total of generous and helpful to settlers, and still are. We say this not only $16.67 million, in a one-time compensation payment to the two as a formality but also as an opportunity to reflect on our history, communities.
    [Show full text]
  • Rank of Pops
    Table 1.3 Basic Pop Trends County by County Census 2001 - place names pop_1996 pop_2001 % diff rank order absolute 1996-01 Sorted by absolute pop growth on growth pop growth - Canada 28,846,761 30,007,094 1,160,333 4.0 - Ontario 10,753,573 11,410,046 656,473 6.1 - York Regional Municipality 1 592,445 729,254 136,809 23.1 - Peel Regional Municipality 2 852,526 988,948 136,422 16.0 - Toronto Division 3 2,385,421 2,481,494 96,073 4.0 - Ottawa Division 4 721,136 774,072 52,936 7.3 - Durham Regional Municipality 5 458,616 506,901 48,285 10.5 - Simcoe County 6 329,865 377,050 47,185 14.3 - Halton Regional Municipality 7 339,875 375,229 35,354 10.4 - Waterloo Regional Municipality 8 405,435 438,515 33,080 8.2 - Essex County 9 350,329 374,975 24,646 7.0 - Hamilton Division 10 467,799 490,268 22,469 4.8 - Wellington County 11 171,406 187,313 15,907 9.3 - Middlesex County 12 389,616 403,185 13,569 3.5 - Niagara Regional Municipality 13 403,504 410,574 7,070 1.8 - Dufferin County 14 45,657 51,013 5,356 11.7 - Brant County 15 114,564 118,485 3,921 3.4 - Northumberland County 16 74,437 77,497 3,060 4.1 - Lanark County 17 59,845 62,495 2,650 4.4 - Muskoka District Municipality 18 50,463 53,106 2,643 5.2 - Prescott and Russell United Counties 19 74,013 76,446 2,433 3.3 - Peterborough County 20 123,448 125,856 2,408 2.0 - Elgin County 21 79,159 81,553 2,394 3.0 - Frontenac County 22 136,365 138,606 2,241 1.6 - Oxford County 23 97,142 99,270 2,128 2.2 - Haldimand-Norfolk Regional Municipality 24 102,575 104,670 2,095 2.0 - Perth County 25 72,106 73,675
    [Show full text]
  • Draft Environmental Study Report for the Phase 2 Connecting 17 Remote
    WATAYNIKANEYAP POWER L.P. Final Environmental Study Report for the Phase 2 Connecting 17 Remote First Nation Communities Project Comparative Analysis of Revised 115 kV Transmission Line Corridors within the Whitefeather Forest and near Sachigo Lake First Nation Report Number: 20138626 April 2021 PHASE 2: CONNECTING 17 REMOTE FIRST NATION COMMUNITIES COMPARATIVE ANALYSIS OF REVISIONS TO 115kV SECTIONS Table of Contents 1.0 INTRODUCTION .............................................................................................................................................. 1 1.1 Description of Project Design Refinements .................................................................................................... 3 2.0 METHOD FOR THE ANALYSIS OF PROJECT REFINEMENTS ................................................................... 3 3.0 PROJECT REFINEMENT COMPARATIVE ANALYSIS RESULTS ................................................................ 4 3.1 Red Lake Subsystem ..................................................................................................................................... 4 3.1.1 Alignment near Critchell Lake and Alignment near McInnes Lake .............................................................. 4 3.2 Pickle Lake Subsystem ................................................................................................................................ 14 3.2.1 Alignment along the connection to Sachigo Lake First Nation .................................................................. 14 4.0
    [Show full text]
  • Table of Contents/Table De Matières
    Comptes publics de l’ Public Accounts of Ministry Ministère of des Finance Finances PUBLIC COMPTES ONTARIOONTARIO ACCOUNTS PUBLICS of de ONTARIO L’ONTARIO This publication is available in English and French. CD-ROM copies in either language may be obtained from: ServiceOntario Publications Telephone: (416) 326-5300 Toll-free: 1-800-668-9938 2011–2012 TTY Toll-free: 1-800-268-7095 Website: www.serviceontario.ca/publications For electronic access, visit the Ministry of Finance website at www.fin.gov.on.ca Le présent document est publié en français et en anglais. 2011-2012 On peut en obtenir une version sur CD-ROM dans l’une ou l’autre langue auprès de : D E TA I L E D S C H E D U L E S Publications ServiceOntario Téléphone : 416 326-5300 Sans frais : 1 800 668-9938 O F P AY M E N T S Téléimprimeur (ATS) sans frais : 1 800 268-7095 Site Web : www.serviceontario.ca/publications Pour en obtenir une version électronique, il suffit de consulter le site Web du ministère des Finances à www.fin.gov.on.ca D ÉTAILS DES PAIEMENTS © Queen’s Printer for Ontario, 2012 © Imprimeur de la Reine pour l’Ontario, 2012 ISSN 0381-2375 (Print) / ISSN 0833-1189 (Imprimé) ISSN 1913-5556 (Online) / ISSN 1913-5564 (En ligne) Volume 3 3 TABLE OF CONTENTS/TABLE DE MATIÈRES Page General/Généralités Guide to Public Accounts.................................................................................................................................. 3 Guide d’interprétation des comptes publics ...................................................................................................... 5 MINISTRY STATEMENTS/ÉTATS DES MINISTÈRES Aboriginal Affairs/Affaires autochtones ........................................................................................................... 7 Agriculture, Food and Rural Affairs/Agriculture, Alimentation et Affaires rurales.........................................
    [Show full text]
  • Appendix K Indigenous Communities Contact Lists
    Appendix K Indigenous Communities Contact Lists Waasigan Transmission Line • Terms of Reference• Record of Consultation October 2020 WAASIGAN TRANSMISSION LINE TERMS OF REFERENCE • RECORD OF CONSULT!TION Appendix K: - Indigenous Community Contact Lists Appendix K: Indigenous Communities Contact List First name Last name Main position Main address Main email Main phone COUCHICHING FIRST NATION RMB 2027 R.R. #2 Allan Yerxa Lands & Resources Coordinator [email protected] 807-274-3228 ext. 202 Fort Frances ON P9A 3M3 RMB 2027 R.R. #2 Brian Perrault Chief [email protected] 807-274-3228 Fort Frances ON P9A 3M3 RMB 2027 R.R. #2 Dale Morrisseau Band Manager [email protected] - Fort Frances ON P9A 3M3 FORT WILLIAM FIRST NATION 90 Anemki Place Suite 200 Anthony Collins Councillor [email protected] - Fort William First Nation ON P7J 1L3 90 Anemki Place Suite 200 Cheryl St James Economic Development Officer [email protected] - Fort William First Nation ON P7J 1L3 90 Anemki Place Suite 200 Deanna Therriault Consultation/Liaison Officer [email protected] - Fort William First Nation ON P7J 1L3 90 Anemki Place Suite 200 Desiree Morriseau Band Councillor [email protected] - Fort William First Nation ON P7J 1L3 90 Anemki Place Suite 200 Jennelle Charlie Band Councillor [email protected] - Fort William First Nation ON P7J 1L3 90 Anemki Place Suite 200 Kristy Boucher Communications Officer & Executive Assistant [email protected] 807-623-9543 ext. 217 Fort William First Nation ON P7J 1L3 90 Anemki Place Suite 200 Kyle Maclaurin - [email protected] - Fort William First Nation ON P7J 1L3 90 Anemki Place Suite 200 Leo Bannon Jr Band Councillor [email protected] - Fort William First Nation ON P7J 1L3 90 Anemki Place Suite 200 Lori Payne Controller [email protected] 807-623-9543 ext.
    [Show full text]
  • Dumping Liquids May Be a Thing of the Past!
    Airport Management Council of Ontario FEBRUARY 2012 V o l u m e 1, I s s u e 2 The Airport Environment and You Weather Warning Representing Systems Ontario’s Airports PRESERVING AIRPORT’S HISTORY AVIATION 2012 Security CATSA Regulations New Chief Executive GTAA Names New CEO Regional Market Potential Dumping Liquids May be a thing of the past! Register today at www.amco.ca Airport Management Council of Ontario NOVEMBER 2011 V o l u m e 1, I s s u e 1 The Airport Environment and You From The President’s Desk Preserving Airport’s History 3 HAPPY NEW YEAR TO YOU & YOURS! Airlines With the celebrations of the holidays over, it’s back to the grindstone for many of us. Air Carrier Services in Ontario 4 Over the past few months, the Airport Management Council of Ontario (AMCO) has been Canada’s Regional reviewing many of the ways that we help our members, and the services we use to do Market Potential 4 so. With 2012 moving forward, we are pleased to mention a few of our new plans to our members, and to industry stakeholders. Ontario Airports CYYZ’s Evolution 5 As some of you may have seen, we sent a survey to members asking for input on an Airfield Environment Canada to Workshop AMCO plans to organize for May 2012, at the Region of Waterloo International Improve Weather Warnings 5 Airport. We appreciate the feedback we received, and have made some changes to the topics and timelines to the meeting as per your requests.
    [Show full text]
  • Formal Customary Care a Practice Guide to Principles, Processes and Best Practices
    Formal Customary Care A Practice Guide to Principles, Processes and Best Practices In accordance with the Ontario Permanency Funding Policy Guidelines (2006) and the Child and Family Services Act Formal Customary Care* A Practice Guide to Principles, Processes and Best Practices *In accordance with the Ontario Permanency Funding Policy Guidelines (2006) and the Child and Family Services Act 2 Table of Contents Formal Customary Care Practice Guide Project Team ................................................................ 6 Disclaimers ................................................................................................................................... 6 Artwork ........................................................................................................................................ 6 Acknowledgments .............................................................................................................. 7 Preamble ............................................................................................................................. 9 Success Indicator .......................................................................................................................... 9 Scope of the Guide ....................................................................................................................... 9 Clarification of Terms Used in this Practice Guide ................................................................... 10 Acronyms Used in this Practice Guide .....................................................................................
    [Show full text]
  • BEECH D18S/ D18C & RCAF EXPEDITER Mk.3 (Built at Wichita, Kansas Between 1945 and 1957)
    Last updated 10 March 2021 BEECH 18 PRODUCTION LIST Compiled by Geoff Goodall PART 2: BEECH D18S/ D18C & RCAF EXPEDITER Mk.3 (Built at Wichita, Kansas between 1945 and 1957) Beech D18S VH-FIE (A-808) flown by owner Rod Lovell at Mangalore, Victoria in April 1984. Photo by Geoff Goodall The D18S was the first new commercial Beechcraft model at the end of World War II. It began a production run of 1,800 Beech 18 variants for the post-war market (D18S, D18C, E18S, G18S, H18), all built by Beech Aircraft Company at their Wichita Kansas plant. The “S” suffix indicated it was powered by the reliable 450hp P&W Wasp Junior series. The first D18S c/n A-1 was first flown in October 1945 at Beech field, Wichita. On 5 December 1945 the D18S received CAA Approved Type Certificate No.757, the first to be issued to any post-war aircraft. The first delivery of a new model D18S to a customer departed Wichita the following day. From 1947 the D18C model was available as an executive version with more powerful 525hp Continental R-9A radials, also offered as the D18C-T passenger transport approved by CAA for feeder airlines. Beech assigned c/n prefix "A-" to D18S production, and "AA-" to the small number of D18Cs. Total production of the D18S, D18C and Canadian Expediter Mk.3 models was 1,035 aircraft. A-1 D18S NX44592 Beech Aircraft Co, Wichita KS: prototype, ff Wichita 10.45/48 (FAA type certification flight test program until 11.45) NC44592 Beech Aircraft Co, Wichita KS 46/48 (prototype D18S, retained by Beech as demonstrator) N44592 Tobe Foster Productions, Lubbock TX 6.2.48 retired by 3.52 further details see Beech 18 by Parmerter p.184 A-2 D18S NX44593 Beech Aircraft Co, Wichita KS: ff Wichita 11.45 NC44593 reg.
    [Show full text]
  • Community Profiles for the Oneca Education And
    FIRST NATION COMMUNITY PROFILES 2010 Political/Territorial Facts About This Community Phone Number First Nation and Address Nation and Region Organization or and Fax Number Affiliation (if any) • Census data from 2006 states Aamjiwnaang First that there are 706 residents. Nation • This is a Chippewa (Ojibwe) community located on the (Sarnia) (519) 336‐8410 Anishinabek Nation shores of the St. Clair River near SFNS Sarnia, Ontario. 978 Tashmoo Avenue (Fax) 336‐0382 • There are 253 private dwellings in this community. SARNIA, Ontario (Southwest Region) • The land base is 12.57 square kilometres. N7T 7H5 • Census data from 2006 states that there are 506 residents. Alderville First Nation • This community is located in South‐Central Ontario. It is 11696 Second Line (905) 352‐2011 Anishinabek Nation intersected by County Road 45, and is located on the south side P.O. Box 46 (Fax) 352‐3242 Ogemawahj of Rice Lake and is 30km north of Cobourg. ROSENEATH, Ontario (Southeast Region) • There are 237 private dwellings in this community. K0K 2X0 • The land base is 12.52 square kilometres. COPYRIGHT OF THE ONECA EDUCATION PARTNERSHIPS PROGRAM 1 FIRST NATION COMMUNITY PROFILES 2010 • Census data from 2006 states that there are 406 residents. • This Algonquin community Algonquins of called Pikwàkanagàn is situated Pikwakanagan First on the beautiful shores of the Nation (613) 625‐2800 Bonnechere River and Golden Anishinabek Nation Lake. It is located off of Highway P.O. Box 100 (Fax) 625‐1149 N/A 60 and is 1 1/2 hours west of Ottawa and 1 1/2 hours south of GOLDEN LAKE, Ontario Algonquin Park.
    [Show full text]
  • City of Kenora Committee of the Whole Agenda Tuesday, September 6, 2016 9:00 A.M
    City of Kenora Committee of the Whole Agenda Tuesday, September 6, 2016 9:00 a.m. City Hall Council Chambers A. Public Information Notices As required under Notice By-law #144-2007, the public is advised of Council’s intention to adopt the following at its September 13, 2016 meeting:- N/A B. Declaration of Pecuniary Interest & the General Nature Thereof 1) On Today’s Agenda 2) From a Meeting at which a Member was not in Attendance. C. Confirmation of Previous Committee Minutes Motion: That the Minutes from the last regular Committee of the Whole Meeting held August 9, 2016 and be confirmed as written and filed. D. Deputations/Presentations Rick Strain – Kenora Pickleball Club Debra LeMaistre – Kenora Rotary Club E. Reports: 1. Corporate Services & Strategic Initiatives Item Subject Pages 3-20 1.1 Flag Protocol Policy 1.2 Healthy Meeting and Events Policy 1.3 July 2016 Financial Statements 1.4 Truth and Reconciliation Report and Calls to Action 2. Fire & Emergency Services Item Subject 2.1 No Reports 3. Operations & Infrastructure Item Subject 3.1 No Reports 4. Community & Development Services Item Subject Pages 21-28 4.1 Anicinabe Park Stage NOHFC Application 4.2 Community Capital Program Project Application 4.3 Free Venue Rental Policy 4.4 Rotary Splash Park – Memorandum of Understanding Other: Proclamations Childhood Cancer Awareness Month – September World Mental Health Day – October 10th Next Meeting Tuesday, October 4, 2016 Motion - Adjourn to Closed Meeting: That this meeting be now declared closed at _____________ a.m.; and