Welcome to the Arthur Sheridan Enhancement Project Public Information Meeting

Wednesday, October 18 5 p.m. – 7:30 p.m.

• Three new pedestrian signalized crossings • New pedestrian bridge to • Dedicated bike path • New landscaping For more information go to: www.dot.ny.gov/SouthBronx or contact:

The Arthur Sheridan Enhancement Project Team New York State Department of Transportation 47-40 21st Street Long Island City, New York, 11101 [email protected] Project Limits

Arthur Sheridan Enhancement Project PIN X731.49 1 Project Purpose and Objectives

The purpose of the Sheridan Project is to provide improved pedestrian accommodations throughout the corridor, while enhancing the compatibility of the corridor with current and future adjacent land uses.

The objectives of the project are to:  Provide improved pedestrian access and connections between the communities to the west and River Greenway from Starlight Park to Concrete Plant Park to the east;  Provide streetscape improvements, such as planted medians and buffers, street trees, lighting, and improved signage;  Introduce geometric changes in the roadway in a manner that promotes traffic calming and enhances safety for users;  Reduce the vehicular operating speed along the Sheridan corridor while maintaining vehicular access to the community;  Reduce or alleviate existing traffic congestion on the Westchester Avenue exit ramp.

Arthur Sheridan Enhancement Project PIN X731.49 2 Existing Conditions

Arthur Sheridan Enhancement Project PIN X731.49 3 Scope of Work

Construct a pedestrian bridge over the within Starlight Park Introduce three (3) signalized at-grade intersections for pedestrian and bicycle crossings Provide two lane exit ramp at Westchester Ave from Southbound Sheridan Convert Edgewater Rd. to a one-way street, add a two-way protected bicycle Improve landscaping, drainage, traffic signals, pavement and lighting on the lane, and provide access to Southbound Sheridan Sheridan Convert West Farms Road to one-way southbound between 173rd St. and Create a public space at the entrance to Starlight Park Jennings St. Provide parking along northbound Sheridan

Arthur Sheridan Enhancement Project PIN X731.49 4 Jennings Street - Proposed

Arthur Sheridan Enhancement Project PIN X731.49 5 172nd Street - Proposed

Arthur Sheridan Enhancement Project PIN X731.49 6 173rd Street - Proposed

Arthur Sheridan Enhancement Project PIN X731.49 7 173rd Street Access to Starlight Park – Under Study

Arthur Sheridan Enhancement Project PIN X731.49 8 Pedestrian Bridge in Starlight Park-Proposed

Arthur Sheridan Enhancement Project PIN X731.49 9 Proposed Public Space at Starlight Park - Overview

KEY MAP BRONX RIVER

Arthur Sheridan Enhancement Project PIN X731.49 10 Schedule & Cost

 Design Completion: Spring 2018

 Contract Bid and Award: Summer 2018

 Construction Start: Fall 2018

 Substantial Construction Completion: Fall 2019

 Construction Cost: $97 Million

Arthur Sheridan Enhancement Project PIN X731.49 11